What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-31; filed 2024-05-14.

0000950170-24-059574

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-06-30; filed 2024-08-13.

0000950170-24-096321

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 83 previous paragraphs and 91 current paragraphs.

64 unchanged; 8 reworded; 19 added; 11 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (19)

Current report

Exploration and operational risks associated with the mining industry;

Current report

Federal and state legislation and regulation that affects mining development and activities;

Current report

The Company’s Manh Choh Project continued ore mining and stockpiling at the Fort Knox facility during the quarter. On July 8, 2024, Manh Choh achieved a significant milestone and poured its first gold bar, on schedule.

Current report

Ore transportation has ramped up to planned volumes, full commissioning of the modifications at the Fort Knox mill is expected in the third quarter and the project remains on track to deliver its planned production this year.

Current report

On July 30, 2024 the Company announced the start of a surface drilling campaign at the Johnson Tract property. The 2024 surface exploration drilling targets 3,000 meters (~9,850 ft) across 20 drill holes and is designed to in-fill the upper one-third of the near vertical resource. In parallel with the in-fill drilling, selected holes will undergo hydrological testing and monitoring to characterize the overall surficial and deposit hydrology and water quality. In addition to assaying the core, selected drill core will undergo advanced metallurgical, geochemical, and specific gravity tests to assist in building a geometallurgical model for the deposit. Camp opened in mid-July and the drilling program is expected to last approximately three months.

Current report

The Lucky Shot project remains in care and maintenance as the Company plans a surface and underground drilling program for 2025.

Current report

On July 10, 2024, the Company completed the HighGold Acquisition and, as contemplated by the Arrangement Agreement, each HighGold share of common stock was exchanged for 0.019 shares of Contango common stock, par value $0.01 per share (the “common stock”). HighGold options were also exchanged, directly or indirectly, for Contango shares of common stock, based on the fair market value of the HighGold options prior to the closing date. Upon closing of the HighGold Acquisition, the Company issued an aggregate of 1,698,887 shares of Contango common stock, with a value of approximately $33.4 million, to HighGold shareholders in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 3(a)(10) of the Securities Act. Such exemption was based on the final order of the Supreme Court of British Columbia issued on July 2, 2024, approving the Acquisition following a hearing by the court which considered, among other things, the fairness of the Acquisition to the persons affected. Upon completion of the Acquisition, existing Contango shareholders own approximately 85.9% and HighGold shareholders own approximately 14.1% of the combined company.

Current report

On August 6, 2024, the Company completed the Avidian Alaska Acquisition. As contemplated by the stock purchase agreement entered into with Avidian, the initial purchase price of $2,400,000 consisted of (i) $400,000 in cash (the “Cash Consideration”) and (ii) $2,000,000 in shares of Contango common stock, with $250,000 of such shares withheld at closing and to be paid only upon settlement of a withholding contingency (the “Equity Consideration”). The Cash Consideration shall be paid in the following tranches: (i) a deposit of $50,000 (paid), (ii) $150,000 to be paid upon settlement of a withholding contingency and (iii) $200,000 of the Cash Consideration to be paid on or before the six-month anniversary of the closing date. The number of shares of common stock constituting the Equity Consideration, which were issued or will be issued in reliance upon an exemption from the registration requirements of the Securities Act, pursuant to Section 4(a)(2) of the Securities Act, was determined based on Contango’s 10-day VWAP on the NYSE American immediately prior to the closing date.

Current report

On June 10, 2024, the Company entered into an underwriting agreement with Canaccord Genuity LLC and Cormark Securities Inc. (collectively, the “June 2024 Underwriters”), relating to an underwritten public offering (the “June 2024 Offering”) of 731,750 units (the “Units”) of the Company at a price of $20.50 per Unit. Each Unit consisted of (i) one share of the Company's common stock and (ii) one-half of one accompanying warrant. Each whole accompanying warrant is exercisable to purchase one share of the Company's common stock at a price of $26.00 per warrant, exercisable for a period of 36 months. The June 2024 Underwriters agreed to purchase the Units from the Company pursuant to the June 2024 Underwriting Agreement at a price of $19.37 per Unit, which included a 5.5% underwriting discount. The net proceeds from the June 2024 Offering were $13.7 million after deducting underwriting discounts and commissions and offering expenses. The June 2024 Offering was made pursuant to the Company’s effective shelf registration statement on Form S-3. The June 2024 Offering closed on June 12, 2024.

Current report

On July 1, 2024, the Village of Dot Lake, a federally recognized Indian Tribe, located approximately 50 miles from the Manh Choh mine on the ore haul route along the Alaska Highway (“Dot Lake”), filed a complaint in the U.S District Court for the District of Alaska against U.S. Army Corps of Engineers (the “Corps”) and Lt. General Scott A. Spellmon, in his official capacity as Chief of Engineers and Commanding General of the Corps. The complaint seeks declaratory and injunctive relief based on the Corps’ alleged failure to consult with Dot Lake and to undertake an adequate environmental review with respect to the Corps’ issuance in September 2022 of a wetlands disturbance permit in connection with the overall permitting of the Manh Choh mine as to approximately 5 acres of wetlands located on Tetlin Village land. Peak Gold is not named as a defendant in the complaint and it is evaluating its options with respect to protecting its interests in continuing to operate the Manh Choh mine.
Removed paragraphs (11)

Previous report

Availability of capital and the ability to repay indebtedness when due;

Previous report

Impact of pandemics, such as the worldwide COVID-19 outbreak, which could impact the Company's or the Peak Gold JV’s exploration schedule and operating activities;

Previous report

The Company’s Manh Choh Project has commenced ore mining and stockpiling at the Fort Knox facility. The project is on track for first production in early Q3 2024.

Previous report

Ore and waste mining are ongoing with the full mining fleet now in operation as planned. Following several months of orientation runs, transportation of ore to Fort Knox, where the ore will be processed, continues to ramp up with all contracted trucks received, the majority of the drivers onboarded, and trailer manufacturing now complete.

Previous report

At Fort Knox, mill modifications and site preparation remain on plan, including the completion of the ore delivery road and tie-ins for the pebble recycle conveyor. Building construction is advancing well, along with interior piping and electrical works.
Reworded paragraphs (8)

Previous wording

Although the Company believes the expectations reflected in such forward-looking statements are reasonable, such expectations may not occur. These forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are outside of our control, that may cause our actual results, performance or achievements to be materially different from future results expressed or implied by the forward-looking statements. In addition to the risk factors described in Part II, Item 1A. Risk Factors, of this report and Part I, Item 1A. Risk Factors, in our Transition Report on Form 10-KT for the six-month period ended December 31, 2023, these factors include among others:

Current wording

Although the Company believes the expectations reflected in such forward-looking statements are reasonable, such expectations may not occur. These forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are outside of our control, that may cause our actual results, performance or achievements to be materially different from future results expressed or implied by the forward-looking statements. In addition to the risk factors described in Part II, Item 1A. Risk Factors, of this Form 10-Q and Part I, Item 1A. Risk Factors, in our Transition Report on Form 10-KT for the six-month period ended December 31, 2023, these factors include among others:

Previous wording

Impact of new and potential legislative and regulatory changes on mining operating and safety standards;

Current wording

Impact of new and potential legislative and mining operating and safety standards;

Previous wording

On May 1, 2024, the Company entered into a definitive arrangement agreement (the “Arrangement Agreement”), by and among the Company, Contango Mining Canada Inc., a corporation organized under the laws of British Columbia and a wholly owned subsidiary of the Company, and HighGold Mining Inc., a corporation existing under the laws of the Province of British Columbia (“HighGold”), pursuant to which the Company intends to acquire 100% of the outstanding equity interests of HighGold (the “HighGold Acquisition”). Under the terms of the Arrangement Agreement, each HighGold share of common stock will be exchanged for 0.019 shares of Contango common stock (the “Exchange Ratio”) based on the VWAP of Contango shares on the NYSE American for the five-day period ending on May 1, 2024. The Exchange Ratio implies total consideration of approximately $0.40 per HighGold share and total HighGold equity value of approximately $37 million. Upon completion of the HighGold Acquisition, existing Contango shareholders will own approximately 85% and HighGold shareholders will own approximately 15% of the combined company. In connection with the HighGold Acquisition, Contango will grant to HighGold the right to appoint one director to Contango’s board of directors. Closing of the HighGold Acquisition is subject to customary closing conditions and is expected to occur in July 2024. The Arrangement Agreement contains customary representations, warranties and covenants and also includes indemnification provisions under which the parties have agreed to indemnify each other against certain liabilities.

Current wording

On May 1, 2024, the Company entered into a definitive arrangement agreement (the “Arrangement Agreement”) by and among the Company, Contango Mining Canada Inc., a corporation organized under the laws of British Columbia and a wholly owned subsidiary of the Company, and HighGold Mining Inc., a corporation existing under the laws of the Province of British Columbia (“HighGold”), pursuant to which the Company acquired 100% of the outstanding equity interests of HighGold (the “HighGold Acquisition”) by way of a court approved plan of arrangement under the Business Corporations Act (British Columbia). The HighGold Acquisition, which was approved by HighGold shareholders at HighGold’s special meeting held on June 27, 2024, was subsequently approved by the Supreme Court of British Columbia on July 2, 2024.

Previous wording

On May 1, 2024, the Company entered into a stock purchase agreement with Avidian Gold Corp. (“Avidian”) pursuant to which the Company has agreed to purchase Avidian’s 100% owned Alaskan subsidiary, Avidian Gold Alaska Inc., for initial consideration of $2,400,000, with a contingent payment for up to $1,000,000 (the “Avidian Acquisition”). Closing of the Avidian Acquisition is subject to customary closing conditions and is expected to occur in July 2024.

Current wording

On May 1, 2024, the Company entered into a stock purchase agreement with Avidian Gold Corp. (“Avidian”) pursuant to which the Company has agreed to purchase Avidian’s 100% owned Alaskan subsidiary, Avidian Gold Alaska Inc., for initial consideration of $2,400,000, with a contingent payment for up to $1,000,000 (the “Avidian Alaska Acquisition”).

Previous wording

The Company is a 30% owner of the Peak Gold JV, which operates the Manh Choh mine near Tok, Alaska. Ore from the mine is being trucked to the Fort Knox mill for processing via public roadways in state-of-the-art trucks carrying legal loads. Certain owners of vacation homes along the ore haul route and others claiming potential impact have organized a group to oppose the ore haul plan and disrupt the project. These efforts have included administrative appeals of certain state mine permits unrelated to ore haul. To date, those appeals have been unsuccessful. On October 20, 2023, the Committee for Safe Communities (“CSC”), an Alaskan non-profit corporation inclusive of certain owners of vacation homes along the Manh Choh ore haul route and others claiming potential impact and objecting to the ore haul plan and project, filed suit (the “Complaint”) in the Superior Court in Fairbanks, Alaska against the State of Alaska Department of Transportation and Public Facilities (“DOT”). The Complaint seeks injunctive relief against the DOT with respect to its oversight of the Peak Gold JV’s ore haul plan. The Complaint alleges that the DOT has approved a haul route and trucking plan that violates DOT regulations, DOT’s actions have created an unreasonable risk to public safety constituting an attractive public nuisance, and DOT has aided and abetted the offense of negligent driving. On November 2, 2023, CSC filed a motion for a preliminary injunction against the DOT and is seeking expedited consideration of its motion. The Peak Gold JV is also in consultation with DOT on addressing the allegations raised. On November 9, 2023, the Court denied CSC's motion for expedited consideration of the motion for preliminary injunction. The Peak Gold JV filed a motion to intervene and on November 15, 2023, the Court granted such motion to intervene. The plaintiff’s motion for a preliminary injunction is fully briefed and awaiting decision by the Court. On December 15, 2023, the plaintiff filed a motion for a hearing on its motion for preliminary injunction, which has been fully briefed, and is awaiting decision by the Court. On January 15, 2024, Peak Gold and DOT jointly moved for judgment on the pleadings and to stay all discovery, which motions remain pending.

Current wording

On October 20, 2023, the Committee for Safe Communities (“CSC”), an Alaskan non-profit corporation inclusive of certain vacation homeowners along the Manh Choh ore haul route and others, filed suit in the Superior Court for the State of Alaska in Fairbanks, Alaska (the “Superior Court”) against the State of Alaska, Department of Transportation and Public Facilities (the “DOT”), seeking injunctive relief with respect to CSC’s oversight of the Peak Gold JV’s ore haul plan. Ore from the Manh Choh mine is being trucked to the Fort Knox mill for processing via public roadways in state-of-the-art trucks carrying legal loads. The complaint alleges that the DOT has approved a haul route and trucking plan for the Manh Choh project that violates DOT regulations, DOT’s actions have created an unreasonable risk to public safety constituting an attractive public nuisance, and DOT has aided and abetted the offense of negligent driving. On November 2, 2023, CSC filed a motion for preliminary injunction. On November 9, 2023, the Peak Gold JV filed a motion to intervene in this lawsuit, which was granted on November 15, 2023. On January 15, 2024, Peak Gold and DOT jointly moved for judgment on the pleadings and to stay all discovery. On May 14, 2024, the Court issued an Order denying the plaintiff’s motion for preliminary injunction and staying discovery. On June 24, 2024, the Court issued an Order granting judgment on the pleadings as to three of the four claims for relief alleged in the Complaint and denying relief as to the claim for public nuisance. The Order further lifted the stay of discovery. On July 3, 2024, the DOT filed motion for reconsideration as to the Court’s Order on the motion for judgment on the pleadings, which Peak Gold joined. At a scheduling conference on July 16, 2024, the Court ordered plaintiff to respond to the motion for reconsideration and set a trial for August 11, 2025.

Previous wording

The Company’s Manh Choh Project has commenced ore mining and stockpiling at the Fort Knox facility. All other projects are in the exploration stage.

Current wording

The Company’s Manh Choh Project achieved a significant milestone on July 8, 2024 and poured its first gold bar.The ore mining continues along with stockpiling ore at the Fort Knox facility. The Project is on schedule and full commissioning of the modifications at the Fort Knox mill is expected in the third quarter. The Project remains on track to deliver its planned production this year. All other projects are in the exploration stage.

Previous wording

Kinross released a combined feasibility study for the Fort Knox mill and the Peak Gold JV in July 2022. Also, in July 2022, Kinross announced that its board of directors (the “Kinross Board”) made a decision to proceed with development of the Manh Choh Project. Effective December 31, 2022, CORE Alaska, LLC, a wholly-owned subsidiary of the Company (“CORE Alaska”), KG Mining, and the Peak Gold JV executed the First Amendment to the Amended and Restated Limited Liability Company Agreement of the Peak Gold JV (as amended, the “A&R JV LLCA”). The First Amendment to the A&R JV LLCA provides that, beginning in 2023, the Company may fund its quarterly scheduled cash calls on a monthly basis. The Peak Gold JV management committee (the “JV Management Committee”) has approved budgets for 2023 and 2024, with cash calls totaling approximately $248.1 million, of which the Company’s share is approximately $74.4 million. As of March 31, 2024, the Company has funded $62.7 million of the budgeted cash calls. On May 15, 2023, the Peak Gold JV received approval of its Waste Management Plan, Plan of Operations, and Reclamation and Closure Plan from the State of Alaska Departments of Environmental Conservation and Natural Resources. Construction is essentially complete, on budget and on schedule for production in the second half of 2024. Mining activities are well underway including the commencement of ore mining and stockpiling. Transportation of ore to Fort Knox, where it will be processed, has commenced and will gradually increase throughout the first half of the year. Modifications to the Fort Knox mill continue to progress on schedule and on budget. Construction of the conveyors and associated buildings are planned for the first quarter along with interior piping and mechanical installations. The commissioning and operational readiness team is in place and preparing for pre-commissioning activities following the mechanical completion of each area. Kinross, on behalf of the Peak Gold JV, is also continuing its comprehensive community programs and prioritizing local economic benefits as it develops the project. All permitting activities are completed with all major permits received from both Federal and State permitting agencies. The Peak Gold JV believes that production is expected to commence at Manh Choh in the second half of 2024, with a mine plan that consists of two small, open pits that will be mined concurrently over 4.5 years.

Current wording

Kinross released a combined feasibility study for the Fort Knox mill and the Peak Gold JV in July 2022. Also, in July 2022, Kinross announced that its board of directors (the “Kinross Board”) made a decision to proceed with development of the Manh Choh Project. Effective December 31, 2022, CORE Alaska, LLC, a wholly-owned subsidiary of the Company (“CORE Alaska”), KG Mining, and the Peak Gold JV executed the First Amendment to the Amended and Restated Limited Liability Company Agreement of the Peak Gold JV (as amended, the “A&R JV LLCA”). The First Amendment to the A&R JV LLCA provides that, beginning in 2023, the Company may fund its quarterly scheduled cash calls on a monthly basis. The Peak Gold JV management committee (the “JV Management Committee”) has approved budgets for 2023 and 2024, with cash calls totaling approximately $248.1 million, of which the Company’s share is approximately $74.5 million. As of June 30, 2024, the Company has funded $74.5 million of the budgeted cash calls. On May 15, 2023, the Peak Gold JV received approval of its Waste Management Plan, Plan of Operations, and Reclamation and Closure Plan from the State of Alaska Departments of Environmental Conservation and Natural Resources. Construction is essentially complete, on budget and on schedule for production in the second half of 2024. Mining activities are well underway including the commencement of ore mining and stockpiling. Transportation of ore to Fort Knox, where it will be processed, has commenced and will gradually increase throughout the first half of the year. Modifications to the Fort Knox mill continue to progress on schedule and on budget. Construction of the conveyors and associated buildings are complete, along with interior piping and mechanical installations. Full commissioning of the modificaitons at the Fort Knox mill is expected in the third quarter of this year. Kinross, on behalf of the Peak Gold JV, is also continuing its comprehensive community programs and prioritizing local economic benefits as it develops the project. All permitting activities are completed with all major permits received from both Federal and State permitting agencies. Peak Gold JV production commenced at Manh Choh in the second half of 2024, with a mine plan that consists of two small, open pits that will be mined concurrently over 4.5 years.

Previous wording

Structuring Incentives to Drive Behavior. The Company believes that equity ownership aligns the interests of the Company’s executives and directors with those of its stockholders. The Company has implemented an equity compensation program for its executive officers and directors (and other persons) that provides an incentive for such officers to achieve the Company’s long-term business objectives. The Company’s equity compensation program includes two forms of long-term incentives: restricted stock and stock options. As of March 31, 2024, the Company’s directors and executives beneficially own approximately 17.4% of the Company’s common stock.

Current wording

Structuring Incentives to Drive Behavior. The Company believes that equity ownership aligns the interests of the Company’s executives and directors with those of its stockholders. The Company has implemented an equity compensation program for its executive officers and directors (and other persons) that provides an incentive for such officers to achieve the Company’s long-term business objectives. The Company’s equity compensation program includes two forms of long-term incentives: restricted stock and stock options. As of June 30, 2024, the Company’s directors and executives beneficially own approximately 13.9% of the Company’s common stock.