Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-14.
0000895728-25-000006
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 364 previous paragraphs and 360 current paragraphs.
134 unchanged; 100 reworded; 115 added; 120 removed; 10 previous and 11 current paragraphs rearranged.
Tables are not compared: 19 previous and 18 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (115)
Current report
The Mainline Tolling Settlement (MTS) is a negotiated settlement with a term of seven and a half years through the end of 2028 that covers both the Canadian and US portions of the Mainline, except for Lines 8 and 9 which are tolled on a separate basis. Enbridge Inc. (Enbridge) filed an application with the Canadian Energy Regulator (CER) for approval of the MTS on December 15, 2023 and the CER issued an order on March 4, 2024 approving Enbridge’s application as filed. Refer to Part I. Item I. Business - Business Segments - Liquids Pipelines - Tolling Framework for detailed terms of the MTS.
Current report
On September 30, 2024, we acquired all of the membership interests of Fall North Carolina Holdco LLC, which owns 100% of PSNC, for cash consideration of $2.7 billion (US$2.0 billion) (the PSNC Acquisition). PSNC is a public utility primarily engaged in the purchase, sale, transportation and distribution of natural gas to residential, commercial and industrial customers in North Carolina. PSNC operates under rates approved by the North Carolina Utilities Commission (North Carolina Commission). Subsequent to its acquisition, PSNC conducts business as Enbridge Gas North Carolina.
Current report
On May 31, 2024, we acquired all of the membership interests of Fall West Holdco LLC which owns 100% of Questar and Wexpro for cash consideration of $4.1 billion (US$3.0 billion) (the Questar Acquisition). Questar is a public natural gas utility providing distribution, storage and transmission services to residential, commercial and industrial customers in Utah, southwestern Wyoming and southeastern Idaho. The Utah Public Service Commission (Utah Commission), the Wyoming Public Service Commission (Wyoming Commission), and the Idaho Public Utilities Commission (Idaho Commission) have granted Questar the necessary regulatory approvals to serve these areas. Wexpro develops and produces cost-of-service gas reserves for Questar and operates under agreements with the states of Utah and Wyoming. Subsequent to its acquisition, Questar conducts business as Enbridge Gas Utah, Enbridge Gas Wyoming, and Enbridge Gas Idaho in those respective states.
Current report
On March 6, 2024, we acquired all of the outstanding shares of capital stock of EOG for cash consideration of $5.8 billion (US$4.3 billion) (the EOG Acquisition). EOG is a public natural gas utility providing distribution, storage and transmission services to residential, commercial and industrial customers in Ohio and is regulated by the Public Utilities Commission of Ohio (Ohio Commission). Subsequent to its acquisition, EOG conducts business as Enbridge Gas Ohio.
Current report
The Acquisitions further diversify, and are complementary to, our existing gas distribution operations.
Current report
Joint Venture with WhiteWater/I Squared and MPLX
Current report
On May 29, 2024, we formed a joint venture (the Whistler Parent JV) with WhiteWater/I Squared Capital (WhiteWater/I Squared) and MPLX LP (MPLX) that will develop, construct, own and operate natural gas pipeline and storage assets connecting Permian Basin natural gas supply to growing liquefied natural gas (LNG) and other US Gulf Coast demand. The Whistler Parent JV is owned by WhiteWater/I Squared (50.6%), MPLX (30.4%) and Enbridge (19.0%) and owns the following assets:
Current report
•a 100% interest in the Whistler Pipeline, a 450-mile intrastate pipeline transporting natural gas from the Waha Header in the Permian Basin to Agua Dulce, Texas;
Current report
•a 100% interest in the Rio Bravo Pipeline project, two new parallel 137-mile pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande LNG project in Brownsville, Texas;
Current report
•a 70% interest in the ADCC Pipeline, a new 40-mile pipeline which was placed into service in July 2024 and is designed to transport 1.7 billion cubic feet per day (bcf/d) of natural gas from the terminus of the Whistler Pipeline in Agua Dulce, Texas to Cheniere's Corpus Christi LNG export facility; and
Current report
•a 50% interest in Waha Gas Storage, a 2.0 bcf gas storage cavern facility connecting to key Permian egress pipelines including the Whistler Pipeline.
Current report
In connection with the formation of the Whistler Parent JV, we contributed our 100% interest in the Rio Bravo Pipeline project and $487 million (US$357 million) of cash to the Whistler Parent JV. In addition to our 19.0% equity interest in the Whistler Parent JV, we received a special equity interest in the Whistler Parent JV which provides for a 25.0% economic interest in the Rio Bravo Pipeline project. This interest is subject to certain redemption rights held by Whitewater/I Squared and MPLX. After the closing on May 29, 2024, we accrued for our share of the post-closing mandatory capital expenditures of approximately US$150 million for the Rio Bravo Pipeline project. Additional capital expenditures to complete the Rio Bravo Pipeline project will be proportionate to our economic interest.
Current report
On April 1, 2024, we closed the sale of our 50.0% interest in the Alliance Pipeline, our interest in Aux Sable (including a 42.7% interest in Aux Sable Midstream LLC and Aux Sable Liquid Products L.P., and a 50.0% interest in Aux Sable Canada LP) and our interest in NRGreen Power Limited Partnership (NRGreen) to Pembina Pipeline Corporation (Pembina) for $3.1 billion, including $327 million of non-recourse debt. A gain on disposal of $1.1 billion before tax, which is net of $1.0 billion of the goodwill from our Gas Transmission segment allocated to the disposal group, is included in Gain on disposition of equity investments in the Consolidated Statements of Earnings for the year ended December 31, 2024.
Current report
GAS TRANSMISSION RATE PROCEEDINGS
Current report
Texas Eastern
Current report
In May 2024, Texas Eastern Transmission, LP (Texas Eastern) reached a negotiated settlement with customers to increase rates starting October 1, 2024 with additional increases on January 1, 2026. Texas Eastern filed a Stipulation and Agreement with the Federal Energy Regulatory Commission (FERC) on June 3, 2024 and received approval on July 31, 2024 from the FERC of its uncontested settlement with customers.
Current report
Algonquin
Current report
Algonquin Gas Transmission, LLC (Algonquin) filed a rate case on May 30, 2024. On June 28, 2024, the FERC issued an order accepting and suspending tariff records, subject to refund, conditions, and establishing hearing procedures. In December 2024, Algonquin reached a settlement in principle with customers which will be filed for FERC approval in the first quarter 2025. If approved, rates will be effective December 1, 2024.
Current report
Maritimes & Northeast Pipeline (M&N) US filed a rate case on May 30, 2024. On June 27, 2024, the FERC issued an order accepting and suspending tariff records, subject to refund, conditions, and establishing hearing procedures. In December 2024, M&N US reached a settlement in principle with customers which will be filed for FERC approval in the first quarter 2025. If approved, rates will be effective January 1, 2025.
Current report
In August 2023, the OEB approved the Phase 1 Settlement and in December 2023, the OEB issued its Decision and Order on the remaining unsettled items in Phase 1 (Phase 1 Decision). These decisions include the following findings or orders:
Current report
Enbridge Gas Ontario filed a Notice of Appeal with the Ontario Divisional Court in January 2024 regarding various aspects of the Phase 1 Decision and subsequently filed an amended Notice of Appeal in December 2024 (Amended Appeal). The Amended Appeal focused on two aspects of the Phase 1 Decision: asset class average useful lives for depreciation purposes, and equity thickness. In January 2024, Enbridge Gas Ontario filed a Notice of Motion with the OEB requesting the OEB to review and vary the Phase 1 Decision which was subsequently amended in May 2024 (Amended Motion). The Amended Motion focused on two aspects of the Phase 1 Decision: asset class average useful lives for depreciation purposes, and the recoverability of integration capital. In October 2024, the OEB issued a decision on the Amended Motion and determined that only the issue of integration capital met the threshold to warrant a review. We are currently awaiting an OEB decision on the issue of integration capital.
Current report
In May 2024, Bill 165, the Keeping Energy Costs Down Act, received royal assent, giving the Government of Ontario time-limited authority to set the revenue horizon for small volume customers, effectively reversing that aspect of the OEB's Phase 1 Decision. Regulations are now in place setting the revenue horizon for new customer connections to 40 years.
Current report
In November 2024, the OEB issued its Decision approving the Phase 2 Partial Settlement Proposal (Phase 2 Settlement). The Phase 2 Settlement establishes a price cap IR rate setting mechanism to be used for establishing rates for 2025 – 2028. The price cap mechanism will establish new rates each year through an annual base rate adjustment to migrate an incremental $50 million in capitalized overheads to operating and maintenance costs, annual base rate escalation at inflation less a 0.28% productivity factor, annual updates for certain costs to be passed through to customers, and where applicable, it will provide for the recovery of material unexpected events and discrete incremental capital investments beyond those that can be funded through base rates. The price cap mechanism includes the continuation and establishment of certain deferral and variance accounts, as well as an earnings sharing mechanism that requires Enbridge Gas Ontario to share equally with customers any earnings in excess of 100 basis points over the allowed return on equity (ROE), and 90% of any earnings in excess of 300 basis points over the allowed ROE. Issues not addressed as part of the Phase 2 Settlement proceeded to hearing in December 2024 and a decision is expected in the second quarter of 2025.
Current report
Enbridge Gas Ohio
Current report
In October 2023, Enbridge Gas Ohio filed its base rate case and schedules with the Ohio Commission. Enbridge Gas Ohio proposed a non-fuel, base rate annual revenue increase of $212 million, projected to be effective January 2025. The base rate increase was proposed to recover the significant investment in distribution infrastructure for the benefit of Ohio customers. The proposed rates would have provided for an ROE of 10.40% compared to the currently authorized ROE of 10.38%. In addition, Enbridge Gas Ohio requested approval for an alternative rate plan for the continuation and modification of certain programs, including Pipeline Infrastructure Replacement and Capital Expenditure Program. On December 18, 2024, Enbridge Gas Ohio filed a Notice of Intent to Modify Filed Positions. The Notice of Intent indicated a willingness to accept a reduced annual revenue requirement increase (from $212 million to $60 million) and, if the reduced position were adopted, to forgo filing a new base rate case until October 31, 2027. The hearing began on January 13, 2025, and remains underway.
Current report
On the March 8, 2024 call date, we redeemed at par all of the outstanding US$700 million three-year callable, 5.97% senior notes that carried an original maturity date in March 2026.
Current report
On May 15, 2024, we established an at-the-market equity issuance program (ATM Program) which provided us with additional flexibility to fund the Acquisitions. From May 15, 2024 to July 31, 2024, 51,298,629 common shares were issued on Canadian and US exchanges at average prices of CAD$48.72 and US$35.77 per common share for aggregate gross proceeds of $2.50 billion. On August 1, 2024, we terminated the ATM Program.
Current report
Earnings attributable to common shareholders decreased by $1.1 billion due to certain infrequent or other non-operating factors, primarily explained by the following:
Current report
•an asset impairment loss of $137 million ($103 million after-tax) related to the Big Sandy Pipeline;
Current report
•severance costs of $105 million ($79 million after-tax) as a result of a workforce reduction in February 2024;
Current report
•$137 million ($114 million after-tax) of integration and transaction costs incurred related to the Acquisitions in 2024, as compared to $31 million ($24 million after-tax) of transaction costs in 2023;
Current report
•an impairment loss of $55 million ($49 million after-tax) related to certain renewable assets.
Current report
•a gain on sale of $1.1 billion ($765 million after-tax) related to the disposition of interests in the Alliance Pipeline, Aux Sable and NRGreen;
Current report
•the absence in 2024 of:
Current report
•a deferred tax recovery of $141 million in 2024 due to change in state apportionment as a result of the Acquisitions.
Current report
•higher contributions from our Gas Transmission segment primarily due to favorable contracting and lower operating costs in our US Gas Transmission assets, and acquisitions of Tres Palacios and Aitken Creek in 2023, Tomorrow RNG, and Whistler Parent JV in 2024;
Current report
•higher contributions from our Liquids Pipelines segment due to lower Mainline power costs and discontinuation of rate-regulated accounting of Southern Lights Pipeline as at December 31, 2023; and
Current report
•higher investment income in Eliminations and Other from the pre-funding of the Acquisitions and from our wholly-owned insurance subsidiaries; partially offset by
Current report
•lower contributions from Alliance Pipeline and Aux Sable from our Gas Transmission segment due to the sale of our interest in these investments in April 2024;
Current report
•higher depreciation and amortization expense mainly driven by acquisitions we completed in 2023 and 2024, as mentioned above;
Showing the first 40 of 115 passages. Open the source sections for the rest.
Removed paragraphs (120)
Previous report
Enbridge Inc. (Enbridge) has reached an agreement on a negotiated settlement with shippers for tolls on its Mainline System. The Mainline Tolling Settlement (MTS) covers both the Canadian and US portions of the Mainline and would see the Mainline continuing to operate as a common carrier system available to all shippers on a monthly nomination basis. The MTS is subject to regulatory approval and the term is seven and a half years through the end of 2028, with revised interim tolls effective on July 1, 2023.
Previous report
The MTS includes:
Previous report
•an International Joint Toll (IJT), for heavy crude oil movements from Hardisty to Chicago, comprised of a Canadian Mainline Toll of $1.65 per barrel plus a Lakehead System Toll of US$2.57 per barrel, plus the applicable Line 3 Replacement (L3R) surcharge;
Previous report
•toll escalation for operation, administration, and power costs tied to US consumer price and power indices;
Previous report
•tolls that continue to be distance and commodity adjusted, and utilize a dual currency IJT; and
Previous report
•a financial performance collar providing incentives for Enbridge to optimize throughput and cost, but also providing downside protection in the event of extreme supply or demand disruptions or unforeseen operating cost exposure. This performance collar is intended to ensure the Mainline earns 11% to 14.5% returns, on a deemed 50% equity capitalization, which is similar to the returns earned on average during the previous tolling agreement.
Previous report
Approximately 70% of Mainline deliveries are tolled under this settlement, while approximately 30% of deliveries are tolled on a full path basis to markets downstream of the Mainline. The other continuing feature is that the Mainline toll flexes up or down US$0.035 per barrel for 50,000 barrel per day changes in throughput.
Previous report
The expected financial outcome from this settlement is in line with previously reported financial results after taking into consideration the previously recognized provision, inflationary cost adjustments and increased volumes. Enbridge filed an application with the Canada Energy Regulator (CER) for approval of the MTS on December 15, 2023, with unanimous support from its Representative Stakeholder Group. The CER indicated in its process letter that no dissenting comments were received by January 19, 2024 and that it may decide on the application or it may establish further process steps.
Previous report
On May 24, 2023, Enbridge filed an Offer of Settlement with the Federal Energy Regulatory Commission (FERC) for the Lakehead System (the Lakehead System Settlement). In addition to resolving litigation related to the Index portion of the Lakehead System rate, the Lakehead System Settlement also includes a depreciation truncation date of December 31, 2048 for the rate base applicable to the Index and Facilities Surcharge and agreement on the terms for future recovery through the Facilities Surcharge of costs related to two Line 5 projects: the Wisconsin Relocation Project and the Straits of Mackinac Tunnel. The Lakehead System Settlement was certified by the Settlement Judge on June 23, 2023 and was approved by the FERC Commissioners on November 27, 2023. Lakehead System tolls were revised effective December 1, 2023 to reflect the terms of the Lakehead System Settlement.
Previous report
Fox Squirrel Solar
Previous report
On November 15, 2023, we acquired a 50% interest in a newly formed partnership with EDF Renewables North America to participate in the initial phase of a solar power facility in Ohio. Cash consideration includes an upfront payment of $157 million (US$115 million) and subsequent capital commitments up to $398 million (US$291 million). Investments past the first phase are contingent on certain conditions being met. An additional payment of $164 million (US$123 million) was made at Phase 1 in-service in December 2023.
Previous report
On November 3, 2023, we acquired an additional 24.45% interest in the Hohe See Offshore Wind Facilities and Albatros Offshore Wind Facilities (the Offshore Wind Facilities), through the acquisition of a 49% interest in Enbridge Renewable Infrastructure Investments S. à r.l (ERII), for $391 million (€267 million) of cash and assumed debt of $524 million (€358 million), bringing our interest in the Offshore Wind Facilities to 49.9%. The Hohe See Offshore Wind Facilities and Albatros Offshore Wind Facilities are located approximately 100 kilometers off the northern coast of Germany and came into service in 2019 and 2020, respectively.
Previous report
Aitken Creek Gas Storage
Previous report
On November 1, 2023, through a wholly-owned Canadian subsidiary, we acquired a 93.8% interest in Aitken Creek Gas Storage Facility and a 100% interest in Aitken Creek North Gas Storage Facility (collectively, Aitken Creek), located in BC, Canada, for $400 million, subject to other customary closing adjustments (the Aitken Creek Acquisition). Aitken Creek is the only underground natural gas storage facility in BC and connects to all major natural gas pipelines in western Canada. The Aitken Creek Acquisition enables us to continue to meet regional energy needs and to support increasing demand for liquefied natural gas (LNG) exports.
Previous report
On September 8, 2023, we closed a public offering of 102,913,500 common shares at a price of $44.70 per share for gross proceeds of $4.6 billion which is intended to finance a portion of the aggregate cash consideration payable for the Acquisitions. Refer to Financing Update for further details on the debt issuances and credit facility obtained to support the Acquisitions.
Previous report
Tres Palacios Holdings LLC
Previous report
On April 3, 2023, we acquired Tres Palacios Holdings LLC (Tres Palacios) for $451 million (US$335 million) of cash. Tres Palacios is a natural gas storage facility located in the US Gulf Coast and its infrastructure serves Texas gas-fired power generation and LNG exports, as well as Mexico pipeline exports. Tres Palacios is comprised of three natural gas storage salt caverns with a total FERC-certificated working gas capacity of approximately 35 billion bcf and also owns an integrated 62-mile natural gas header pipeline system, with eleven inter- and intrastate natural gas pipeline connections.
Previous report
On December 13, 2023, we announced that Enbridge has entered into a definitive agreement to sell our 50.0% interest in the Alliance Pipeline and our interest in Aux Sable (including 42.7% interest in Aux Sable Midstream LLC and Aux Sable Liquid Products L.P., and 50% interest in Aux Sable Canada LP) to Pembina Pipeline Corporation for $3.1 billion, including approximately $0.3 billion of non-recourse debt, subject to customary closing adjustments. Closing is expected to occur in the first half of 2024, subject to the receipt of regulatory approvals and satisfaction of customary closing conditions. The sales proceeds will fund a portion of the Acquisitions and be used for debt reduction.
Previous report
GAS TRANSMISSION AND MIDSTREAM PROCEEDINGS
Previous report
Texas Eastern Transmission
Previous report
The Stipulation and Agreement for Texas Eastern Transmission, LP’s (Texas Eastern) consolidated 2021 rate cases was approved by the FERC on November 30, 2022, and became effective on January 1, 2023. Texas Eastern received FERC approval on April 3, 2023 to implement the settled rates and other settlement provisions.
Previous report
The toll settlement agreement for the Canadian portion of the Maritimes & Northeast (M&N) Pipeline (M&N Canada) expired in December 2023. M&N Canada reached a toll settlement with shippers for the effective period from January 1, 2024 to December 31, 2025. On November 28, 2023, M&N Canada filed the 2024 - 2025 toll settlement agreement with the CER for review and approval. A CER decision is expected in the first quarter of 2024.
Previous report
On August 17, 2023, the OEB approved the Settlement Proposal to support the determination of just and reasonable rates effective January 1, 2024. Items resolved in whole or in part include:
Previous report
•additions to rate base up to and including 2022;
Previous report
•interest rates on debt and return on equity;
Previous report
•deferral and variance accounts;
Previous report
•Indigenous engagement; and
Previous report
•rate implementation approach for 2024.
Previous report
On December 21, 2023, the OEB issued its Decision and Order on Phase 1 (Phase 1 Decision). The decision addressed three main areas: energy transition, Enbridge Gas Distribution Inc. and Union Gas Limited amalgamation and harmonization issues, and other issues. The Phase 1 Decision included the following key findings or orders:
Previous report
•our 2024 capital plan must be reduced by $250 million with a focus on monitoring, repair and life extension of our assets and a further $50 million of capitalized indirect overhead costs must be expensed, escalating to $250 million per year during the IR term with an offsetting adjustment to revenues in each year;
Previous report
•January 1, 2024 will be the effective date for 2024 rates.
Previous report
The issues addressed in the Settlement Proposal and the Phase 1 Decision resulted in the following items not approved for future recovery, and the subsequent impairments recognized for the year ended December 31, 2023:
Previous report
•a portion of undepreciated capital projects removed from 2024 rate base of $41 million;
Previous report
•pre-2017 Union Gas Limited related pension balances of $156 million.
Previous report
Enbridge Gas filed a Notice of Appeal in the Ontario Divisional Court on January 22, 2024 regarding four aspects of the Phase 1 Decision: small volume customer revenue horizon, the 2024 capital plan reduction, the extension of service life for certain asset classes and equity thickness. On January 29, 2024 Enbridge Gas also filed a Notice of Motion with the OEB requesting the OEB to review and vary five aspects of the Phase 1 Decision: small volume customer revenue horizon, the 2024 capital plan reduction, integration capital, depreciation and equity thickness. The outcome of these proceedings is uncertain.
Previous report
The Phase 1 Decision results in interim rates, pending phases 2 and 3 of the proceeding, resolution of the Notice of Appeal, Notice of Motion and any possible legislative steps that could be undertaken by the Government of Ontario further to the Ontario Minister of Energy's December 22, 2023 news release. Phase 2 will establish and determine the incentive rate mechanism for the remainder of the rebasing term, and gas cost and unregulated storage cost allocation. Phase 3 will address cost allocation and the harmonization of rates and rate classes between legacy rate zones.
Previous report
Purchase Gas Variance
Previous report
The Purchase Gas Variance Account (PGVA) captures the difference between actual and forecasted natural gas prices reflected in rates. Account balances are typically recovered or refunded over a prospective 12-month period through Quarterly Rate Adjustment Mechanism (QRAM) applications.
Previous report
In March 2023, the April 1, 2023 QRAM application was filed and approved by the OEB, which included an adjustment to the prior rate mitigation approved as part of the July 1, 2022 QRAM. The recovery of the outstanding PGVA balance from the extended recovery period approved as part of the July 1, 2022 QRAM will now be completed by March 31, 2024. In June, September and December 2023, the July 1, 2023, October 1, 2023, and January 1, 2024 QRAM applications, respectively, were filed and approved by the OEB with no adjustments to the prior period rate mitigation plans and did not include any additional rate mitigation measures.
Previous report
As at December 31, 2023, Enbridge Gas' PGVA liability balance was $16 million.
Showing the first 40 of 120 passages. Open the source sections for the rest.
Reworded paragraphs (100)
Previous wording
On September 5, 2023, we announced that Enbridge had entered into three separate definitive agreements with Dominion Energy, Inc. to acquire The East Ohio Gas Company, Questar Gas Company and its related Wexpro companies, and Public Service Company of North Carolina for an aggregate purchase price of $19.1 billion (US$14.0 billion), comprised of $12.8 billion (US$9.4 billion) of cash consideration and $6.3 billion (US$4.6 billion) of assumed debt, subject to customary closing adjustments (together, the Acquisitions). If completed, the Acquisitions will create North America's largest natural gas utility platform delivering over 9 billion cubic feet (bcf) per day to approximately 7 million customers across multiple regulatory jurisdictions. The Acquisitions are expected to close in 2024, subject to the satisfaction of customary closing conditions including the receipt of certain regulatory approvals, which are not cross-conditional.
Current wording
On September 5, 2023, Enbridge entered into three separate definitive agreements with Dominion Energy, Inc. to acquire The East Ohio Gas Company (EOG), Questar Gas Company (Questar) and its related Wexpro companies (Wexpro), and Public Service Company of North Carolina, Incorporated (PSNC) (together, the Acquisitions).
Previous wording
On January 2, 2024, through a wholly-owned US subsidiary, we acquired the first six Morrow Renewables operating landfill gas-to-RNG production facilities located in Texas and Arkansas for total consideration of $1.4 billion (US$1.1 billion), of which $0.5 billion (US$0.4 billion) was paid at close and $0.9 billion (US$0.7 billion) is payable within two years. The total consideration for all seven facilities is $1.6 billion (US$1.2 billion). Combined RNG production of the facilities is approximately 4.5 bcf per year. The acquired assets align with and advance our low-carbon strategy.
Current wording
On January 2, 2024, through a wholly-owned US subsidiary, we acquired six Morrow Renewables operating landfill gas-to-RNG production facilities (Tomorrow RNG) located in Texas and Arkansas for total consideration of $1.3 billion (US$1.0 billion), of which $584 million (US$439 million) was paid at close and an additional deferred consideration is payable within two years with a fair value of $757 million (US$568 million). The acquired assets align with and advance our lower-carbon strategy.
Previous wording
Disposition of Alliance Pipeline and Aux Sable
Current wording
Disposition of Alliance Pipeline and Aux Sable Interests
Previous wording
In October 2022, Enbridge Gas Inc. (Enbridge Gas) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap rate setting mechanism (Phase 2) to be used for the remainder of the IR term. A third phase (Phase 3) has been established with the OEB as part of the Phase 1 Partial Settlement Proposal (Settlement Proposal).
Current wording
In October 2022, Enbridge Gas Inc. (Enbridge Gas Ontario) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap rate setting mechanism (Phase 2) to be used for the remainder of the IR term (2025-2028). A third phase (Phase 3) has been established with the OEB as part of the Phase 1 Partial Settlement Proposal (Phase 1 Settlement). Phase 3 will address cost allocation and the harmonization of rates and rate classes between legacy rate zones, and is anticipated to be completed in 2025.
Previous wording
•energy transition risk requires Enbridge Gas to carry out a risk assessment to consider further risk mitigation measures in three areas: system access and expansion capital spending, system renewal capital spending and depreciation policy;
Current wording
•energy transition risk requires us to carry out a risk assessment to consider further risk mitigation measures in three areas: system access and expansion capital spending, system renewal capital spending and depreciation policy;
Previous wording
•all new small volume customers wishing to connect to natural gas pay their full connection costs as an upfront charge rather than through rates over time effective January 1, 2025;
Current wording
•all new small volume customers wishing to connect to natural gas are to pay their full connection costs as an upfront charge (the revenue horizon was set to zero years), rather than through rates over time effective January 2025;
Previous wording
•approval of a harmonized depreciation methodology that reduced the level of depreciation sought and adjusted asset lives including extensions of service life for certain asset classes;
Current wording
•approval of a harmonized depreciation methodology that reduced the amount of depreciation sought and adjusted asset lives including extensions of service life for certain asset classes;
Previous wording
•undepreciated integration capital costs removed from 2024 rate base of $84 million; and
Current wording
•the removal of $84 million of undepreciated integration capital costs from 2024 rate base; and
Previous wording
•an increase in equity thickness from 36% to 38% effective for 2024; and
Current wording
•an increase in equity thickness from 36% to 38% effective 2024.
Previous wording
We completed long-term debt issuances totaling US$8.5 billion and $3.9 billion during the year ended December 31, 2023, including aggregate amounts of US$2.3 billion of 10-year sustainability-linked senior notes in March 2023 and $400 million of 10-year sustainability-linked medium-term notes in May 2023.
Current wording
We completed long-term debt issuances totaling US$5.7 billion and $1.8 billion during the year ended December 31, 2024.
Previous wording
We increased our credit facilities in March 2023 by approximately $500 million. During our annual renewal process, we renewed and extended approximately $15.4 billion of our credit facilities with maturities ranging from 2024-2028.
Current wording
During our annual renewal process, we renewed and extended approximately $17.6 billion of our credit facilities with maturities ranging from 2025-2029. We also increased our letter of credit facilities by approximately $346 million and entered into new term loans with maturities ranging from 2029-2049 totaling approximately $542 million.
Previous wording
In September 2023, we closed a public offering of 102,913,500 common shares at a price of $44.70 per share for gross proceeds of $4.6 billion which is intended to finance a portion of the aggregate cash consideration payable for the Acquisitions.
Current wording
On September 8, 2023, we closed a public offering of 102,913,500 common shares at a price of $44.70 per share for gross proceeds of $4.6 billion which were also used to finance a portion of the aggregate cash consideration payable for the Acquisitions discussed in Note 6 - Acquisitions and Dispositions.
Previous wording
•a non-cash, net unrealized derivative fair value gain of $1,127 million ($856 million after-tax) in 2023, compared with a net unrealized loss of $1,246 million ($950 million after-tax) in 2022, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate, and commodity risks;
Current wording
•a non-cash, net unrealized loss of $2.1 billion ($1.6 billion after-tax) in 2024, compared with a net unrealized gain of $1.2 billion ($911 million after-tax) in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate, and commodity price risk;
Previous wording
•a gain of $151 million ($129 million after-tax) and a deferred tax adjustment of $69 million were recognized as a result of Southern Lights Pipeline's (Southern Lights) discontinuation of regulatory accounting;
Current wording
•the absence in 2024 of a gain of $151 million ($129 million after-tax) net of a deferred tax adjustment of $69 million recognized as a result of the discontinuation of regulatory accounting for Southern Lights Pipeline;
Previous wording
•the receipt of a litigation claim settlement of $68 million ($52 million after-tax) in 2023; and
Current wording
•the absence of the receipt of a litigation claim settlement of $68 million ($52 million after-tax); and
Previous wording
•a realized loss of $638 million ($479 million after-tax) due to termination of foreign exchange hedges, as foreign exchange risks inherent within the Competitive Toll Settlement (CTS) framework are not present in the negotiated Mainline tolling agreement;
Current wording
◦a realized loss of $638 million ($479 million after-tax) due to termination of foreign exchange hedges, as foreign exchange risks inherent within the Competitive Tolling Settlement (CTS) framework are not present in the negotiated MTS;
Previous wording
•an impairment of $281 million ($232 million after-tax) recognized to certain capital projects, capital costs and pension balances in the fourth quarter of 2023 as a result of the OEB's Phase 1 Decision on Enbridge Gas' application;
Current wording
◦an impairment of $281 million ($232 million after-tax) recognized to certain capital projects, capital costs and pension balances in the fourth quarter of 2023 as a result of the OEB's Phase 1 Decision;
Previous wording
•a provision adjustment and settlement of $124 million ($95 million after-tax) related to a litigation matter;
Current wording
◦a provision adjustment of $124 million ($95 million after-tax) related to a litigation matter;
Previous wording
•an asset retirement loss of $86 million ($65 million after-tax) related to our Alberta Regional Oil Sands System;
Current wording
◦an asset retirement loss of $86 million ($65 million after-tax) related to our Alberta Regional Oil Sands System; and
Previous wording
After taking into consideration the factors above, the remaining $51 million increase in earnings attributable to common shareholders is primarily explained by the following significant business factors:
Current wording
After taking into consideration the factors above, the remaining $294 million increase in earnings attributable to common shareholders is primarily explained by the following significant business factors:
Previous wording
•higher distribution charges at our Gas Distribution and Storage segment resulting from increases in rates and customer base as well as higher demand in the contract market;
Current wording
•contributions from Enbridge Gas Ohio, Enbridge Gas Utah and Wexpro, and Enbridge Gas North Carolina, and higher distribution charges resulting from increases in customer base and higher demand in the contract market from Enbridge Gas Ontario in our Gas Distribution and Storage segment;
Previous wording
Hohe See and Albatros Offshore Wind Facilities
Current wording
•higher contributions from our Renewable Power Generation segment due to the generation of investment tax credits from our investment in Fox Squirrel Solar and the acquisition of an additional 24.45% interest in the Hohe See and Albatros Offshore Wind Facilities in November 2023;
Previous wording
•higher contributions from the Mainline System in our Liquids Pipelines segment driven by increased volumes due to increased crude demand, net of a lower L3R surcharge and lower Mainline System tolls as a result of revised interim tolls effective July 1, 2023;
Current wording
•full year of lower Mainline system tolls in our Liquids Pipelines segment as a result of revised tolls effective July 1, 2023 and lower Line 3 Replacement (L3R) surcharge;
Previous wording
•higher interest expense primarily due to higher interest rates and higher average principal; and
Current wording
•higher interest expense primarily due to higher average principal outstanding resulting from the Acquisitions;
Previous wording
Transportation and other services revenues of $19.8 billion, $18.5 billion and $16.2 billion for the years ended December 31, 2023, 2022 and 2021, respectively, were earned from our crude oil and natural gas pipeline transportation businesses and also include power generation revenues from our portfolio of renewable and power generation assets. For our transportation assets operating under market-based arrangements, revenues are driven by volumes transported and the corresponding tolls for transportation services. For assets operating under take-or-pay contracts, revenues reflect the terms of the underlying contract for services or capacity. For rate-regulated assets, revenues are charged in accordance with tolls established by the regulator and, in most cost-of-service based arrangements, are reflective of our cost to provide the service plus a regulator-approved rate of return.
Current wording
Transportation and other services revenues of $19.7 billion, $19.2 billion and $17.9 billion for the years ended December 31, 2024, 2023 and 2022, respectively, were earned from our crude oil and natural gas pipeline transportation businesses and also include power generation revenues from our portfolio of renewable and power generation assets. For our transportation assets operating under market-based arrangements, revenues are driven by volumes transported and the corresponding tolls for transportation services. For assets operating under take-or-pay contracts, revenues reflect the terms of the underlying contract for services or capacity. For rate-regulated assets, revenues are charged in accordance with tolls established by the regulator and, in most cost-of-service based arrangements, are reflective of our cost to provide the service plus a regulator-approved rate of return.
Previous wording
Gas distribution sales revenues of $4.8 billion, $5.7 billion and $4.0 billion for the years ended December 31, 2023, 2022 and 2021, respectively, were recognized in a manner consistent with the underlying rate-setting mechanism mandated by the regulator. Revenues generated by the gas distribution businesses are primarily driven by volumes delivered, which vary with weather and customer composition and utilization, as well as regulator-approved rates. The cost of natural gas is passed through to customers through rates and does not ultimately impact earnings due to its flow-through nature.
Current wording
Gas distribution sales revenues of $6.8 billion, $5.4 billion and $6.2 billion for the years ended December 31, 2024, 2023 and 2022, respectively, were recognized in a manner consistent with the underlying rate-setting mechanism mandated by the regulator. Revenues generated by the gas distribution businesses are primarily driven by volumes delivered, which vary with weather and customer composition and utilization, as well as regulator-approved rates. The cost of natural gas is passed through rates to customers and does not ultimately impact earnings due to its flow-through nature.
Previous wording
Commodity sales revenues of $19.0 billion, $29.2 billion and $26.9 billion for the years ended December 31, 2023, 2022 and 2021, respectively, were generated primarily through our Energy Services operations. Energy Services includes the purchase and sale of crude oil, natural gas, power and NGL to generate a margin, which is typically a small fraction of gross revenue. Sales revenue generated from these operations reflect activity levels which are driven by differences in commodity prices between locations, grades and points in time, rather than on absolute prices. Any residual commodity margin risk is closely monitored and managed. Revenues from these operations depend on activity levels, which vary from year-to-year depending on market conditions and commodity prices.
Current wording
Commodity sales revenues of $27.0 billion, $19.0 billion and $29.2 billion for the years ended December 31, 2024, 2023 and 2022, respectively, were generated primarily through our crude oil marketing, natural gas and power marketing businesses. This includes the purchase and sale of crude oil, natural gas, power and NGL to generate a margin, which is typically a small fraction of gross revenue. Sales revenue generated from these operations reflect activity levels which are driven by differences in commodity prices between locations, grades and points in time, rather than on absolute prices. Commodity sales revenues also include revenue generated from our Tomorrow RNG business. Any residual commodity margin risk is closely monitored and managed. Revenues from these operations depend on activity levels, which vary from year-to-year depending on market conditions and commodity prices.
Previous wording
•a non-cash, net unrealized gain of $607 million in 2023, compared with a net unrealized loss of $183 million in 2022, reflecting net fair value gains and losses arising from changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks;
Current wording
•a non-cash, net unrealized gain of $2 million in 2024, compared with a net unrealized gain of $615 million in 2023, reflecting net fair value gains and losses arising from changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; and
Previous wording
•a gain of $151 million recognized as a result of Southern Lights' discontinuation of regulatory accounting;
Current wording
•the absence in 2024 of both a gain of $151 million recognized as a result of Southern Lights' discontinuation of regulatory accounting and the receipt of a litigation claim settlement of $68 million, partially offset by
Previous wording
•a realized loss of $638 million due to termination of foreign exchange hedges, as foreign exchange risks inherent within the CTS framework are not present in the negotiated Mainline tolling agreement.
Current wording
•the absence in 2024 of both a realized loss of $638 million due to termination of foreign exchange hedges, as foreign exchange risks inherent within the CTS framework are not present in the negotiated MTS and an asset retirement loss of $86 million related to our Alberta Regional Oil Sands System; and
Previous wording
•a provision adjustment and settlement of $124 million related to a litigation matter; and
Current wording
•the absence in 2024 of both a negative provision adjustment of $124 million related to a litigation matter and an impairment loss of $82 million related to certain Offshore equity investments, partially offset by
Previous wording
•a non-cash, net unrealized loss of $72 million in 2023, compared with a net unrealized gain of $8 million in 2022, reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks.
Current wording
•a non-cash, net unrealized loss of $3 million in 2024, compared with a net unrealized gain of $32 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risk;
Previous wording
After taking into consideration the factors above, we saw a$19 million decrease, primarily explained by the following significant business factors:
Current wording
After taking into consideration the factors above, we saw a$384 million increase, primarily explained by the following significant business factors:
Previous wording
•favorable contracting on our US Gas Transmission and Storage assets;
Current wording
•favorable contracting and lower operating costs on our US Gas Transmission assets;
Previous wording
•contributions from the Tres Palacios acquisition in the second quarter of 2023 and Aitken Creek in the fourth quarter of 2023.
Current wording
•contributions from the acquisitions of Tres Palacios in the second quarter of 2023, Aitken Creek in the fourth quarter of 2023, Tomorrow RNG in the first quarter of 2024 and Whistler Parent JV in the second quarter of 2024; and
Previous wording
EBITDA wasnegatively impacted by $252 million due to an impairment of $281 million recognized to certain capital projects, capital costs and pension balances in the fourth quarter of 2023 as a result of the OEB's Phase 1 Decision.
Current wording
EBITDA waspositively impacted by $281 million due to the absence in 2024 of an impairment of $281 million recognized to certain capital projects, capital costs and pension balances in the fourth quarter of 2023 as a result of the OEB's Phase 1 Decision.
Previous wording
•higher distribution charges resulting from increases in rates and customer base, as well as higher demand in the contract market; partially offset by
Current wording
•higher distribution charges resulting from increases in customer base and higher demand in the contract market at Enbridge Gas Ontario, partially offset by
Previous wording
•when compared with the normal weather forecast embedded in rates, warmer than normal weather in 2023 negatively impacted 2023 EBITDA by approximately $86 million year over year; and
Current wording
•warmer than normal weather in 2024, when compared with the normal weather forecast embedded in rates, which negatively impacted Enbridge Gas Ontario 2024 EBITDA by approximately $58 million period over period.
Previous wording
EBITDA wasnegatively impactedby $122 million due to certain infrequent or non-operating factors, primarily explained by:
Current wording
EBITDA waspositively impactedby $295 million due to certain infrequent or non-operating factors, primarily explained by:
Previous wording
•an impairment loss of $261 million to Chapman Ranch wind facilities, partially offset by the absence in 2023 of an impairment loss of $227 million to Magic Valley; and
Current wording
•the absence in 2024 of an impairment loss of $261 million to Chapman Ranch wind facilities;
Showing the first 40 of 100 pairs. Open the source sections for the rest.
Rearranged current paragraphs (11)
Current report — wording carried from elsewhere
EBITDA wasnegatively impacted by$71 million due to certain infrequent or other non-operating factors, primarily explained by the following:
Current report — wording carried from elsewhere
•full year of lower Mainline System tolls as a result of revised tolls effective July 1, 2023 and a lower L3R surcharge.
Current report — wording carried from elsewhere
•a non-cash, net unrealized loss of $13 million in 2024, compared with a net unrealized loss of $72 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; and
Current report — wording carried from elsewhere
•higher investment income from the pre-funding of the Acquisitions and from our wholly-owned captive insurance subsidiaries; and
Current report — wording carried from elsewhere
In the near term, we generally expect to utilize cash from operations together with commercial paper issuance and/or credit facility draws and the proceeds of capital market offerings to fund liabilities as they become due, finance capital expenditures and acquisitions, fund debt retirements and pay common and preference share dividends. We target maintaining sufficient liquidity through the use of committed credit facilities with a diversified group of banks and financial institutions to enable us to fund all anticipated requirements for approximately one year without accessing the capital markets.
Current report — wording carried from elsewhere
The increase in cash used in investing activities primarily resulted from the following factors:
Current report — wording carried from elsewhere
•lower net repayments of short-term borrowings in 2024 when compared to the same period in 2023.
Current report — wording carried from elsewhere
•the absence in 2024 of the public offering of common shares, which closed on September 8, 2023 for gross proceeds of $4.6 billion; and
Current report — wording carried from elsewhere
Enbridge filed its Notice of Appeal on June 30, 2023 and the Band filed its Notice of Cross Appeal on July 27, 2023. On December 12, 2023, the 7 th Circuit requested the US to file a brief in this appeal as amicus curiae to address the effect of the Agreement Between the US and Canada Concerning Transit Pipelines, 28 U.S.T. 7449 (1977), and any other issues that the US believes to be material. Subsequently, the US filed its brief on April 8, 2024. As invited by the Court of Appeals, Enbridge and the Band filed their respective responses to the US amicus brief on April 29, 2024. We anticipate the Court of Appeals will issue a decision in early 2025.
Current report — wording carried from elsewhere
The allowed rate of return is determined in accordance with the applicable regulatory model and may impact our profitability. The rates for a number of our projects are based on a cost-of-service recovery model that follows the regulators' authoritative guidance. Under the cost-of-service tolling methodology, we calculate tolls based on forecast volumes and cost. A difference between forecast and actual results causes an over- or under-recovery in any given year.
Current report — wording carried from elsewhere
During the fourth quarter of 2023, Southern Lights Pipeline completed an open season to negotiate new transportation service agreements. We did not renew the agreements under a cost-of-service toll methodology, therefore Southern Lights Pipeline was no longer subject to rate-regulated accounting. As a result, the related regulatory liabilities, regulatory tax assets and associated regulatory deferred tax liabilities were derecognized in 2023.
Rearranged previous paragraphs (10)
Previous report — wording carried elsewhere
•a non-cash, net unrealized gain of $35 million ($33 million after-tax) in 2023, compared with a net unrealized loss of $25 million ($22 million after-tax) in 2022, reflecting changes in the mark-to-market value of equity fund investments held by our wholly-owned captive insurance subsidiaries.
Previous report — wording carried elsewhere
•the receipt of a litigation claim settlement of $68 million in 2023; partially offset by
Previous report — wording carried elsewhere
•an impairment loss of $82 million to certain Offshore equity investments.
Previous report — wording carried elsewhere
The following commercially secured growth projects are expected to be placed into service from 2023 to
Previous report — wording carried elsewhere
The decrease in cash used in investing activities primarily resulted from the following factors:
Previous report — wording carried elsewhere
•lower cash outflows related to acquisitions in 2022 when compared to 2021; and
Previous report — wording carried elsewhere
•proceeds received from the completion of a joint venture merger transaction for DCP Midstream LLC in August 2022.
Previous report — wording carried elsewhere
•the redemption of Preference Shares, Series 17 and Series J in the first and second quarters of 2022, respectively;
Previous report — wording carried elsewhere
•proceeds received from the sale of a non-operating interest in seven pipelines from our Regional Oil Sands System in October 2022; and
Previous report — wording carried elsewhere
The Army Corps earlier indicated that it did not intend to exercise its authority to bar DAPL's continued operation, notwithstanding the absence of an easement.