TECK RESOURCES LTD

For the period ended Dec 31, 2023. Filed Feb 23, 2024.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2023 · Filed Feb 23, 2024

Use the contents to explore the available documents and sections.

TECK$60.46+0.9%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Mining Operations

Mining Operations

Red Dog Mine, United States (Zinc, Lead)

The Red Dog zinc-lead mine, concentrator and shipping facility in the Northwest Arctic Borough, approximately 144 kilometres north of Kotzebue, Alaska, commenced production in 1989 and began shipping concentrates in 1990. The Red Dog mine is 100% owned and operated by Teck Alaska Incorporated (Teck Alaska), a wholly owned subsidiary of Teck, on lands owned by, and leased from, the NANA Regional Corporation (NANA), a Regional Alaska Native corporation.

Since 2007, we have paid NANA a percentage of the net proceeds of production from the mine under a development and operating agreement, starting at 25% and increasing by successive increments of 5% at five-year intervals to a maximum of 50%. The most recent increase occurred in October 2022, bringing the royalty to 40%, with the next adjustment to 45% anticipated to occur in October 2027. The NANA royalty expense in 2023 was US$195 million, compared with US$353 million in 2022. NANA has advised us that it ultimately shares approximately 60% of the royalty, net of allowable costs, with other Regional Alaska Native corporations pursuant to section 7(i) of the Alaska Native Claims Settlement Act. The development and operating agreement also provides for employment and contracting preferences and additional lease rental payments. In addition to the royalties payable to NANA, Red Dog is subject to federal and state income taxes at approximately 26.5% of taxable income and the Alaska Mining License tax at approximately 7% of taxable income. A 5% US withholding tax also applies to dividends paid on any repatriation of earnings to Canada.

Teck Alaska and the Northwest Arctic Borough agreed to a 10-year payment in lieu of taxes agreement (PILT) effective January 1, 2016. Under the agreement, PILT payments to the Northwest Arctic Borough are calculated based on the net book value of the mine lands, buildings and equipment in accordance with U.S. Generally Accepted Accounting Principles, and are generally between US$14 million and US$26 million per year. In addition, Teck Alaska remits annual payments to a separate fund aimed at social investment in villages in the region. These payments, based on mine profitability, are between US$4 million and US$8 million per year.

Red Dog mine is located on a ridge between the middle and south forks of Red Dog Creek, in the DeLong Mountains of the Western Brooks Range. The mine covers approximately 1,000 hectares.The topography is moderately sloping, with elevations ranging from 260 metres to 1,200 metres above sea level. Vegetation is classified as woody tundra. The mine is accessible from a paved airstrip, 5 kilometres from the Red Dog mine, which allows jet access from Anchorage and Kotzebue. Mine personnel are generally drawn from surrounding communities as well as from other locations within the State and in North America. Power for the mine is produced on-site by diesel generators with a maximum capacity of 30 megawatts, sufficient for present and expected future power requirements. Potable water is sourced from Bons Creek.

Red Dog is comprised of a number of sedimentary hosted exhalative lead-zinc sulphide deposits hosted in Mississippian-age to Pennsylvanian-age sedimentary rocks. The orebodies are lens shaped and occur within structurally controlled (thrust faults) plates, are relatively flat-lying and are hosted by marine clastic rocks (shales, siltstones, turbidites) and lesser chert and carbonate rocks. Barite rock is common in and above the sulphide units. Silicification is the dominant alteration type.

The sulphide mineralization consists of semi-massive to massive sphalerite, pyrite, marcasite and galena. Common textures within the sulphide zone include massive, fragmental, veined and, rarely, sedimentary layering.

Teck Resources LimitedPage 36

In 2023, 15 drillholes were completed for mine geotechnical stability and structural information, totaling 1,751 metres in the Aqqaluk pit. No resource drilling was conducted at the mine in 2023; however, district exploration work did occur. Exploration programs focused on the Red Dog District area, specifically the Aktigiruq and Aqqaluk orebodies. Numerous holes were drilled and, together with previous drilling data, will be incorporated into geologic models to support a resource estimation in the future.

Current and planned production is from the Aqqaluk and Qanaiyaq pits. The mining method employed is conventional open pit drill-and-blast and truck-and-shovel technology. The mineral processing facilities employ conventional grinding and sulphide flotation methods to produce zinc and lead concentrates.

Tailings storage and waste disposal areas have adequate design capacity to sustain the current life of mine plan. All contaminated water from the mine area and waste dumps is collected and contained in a tailings impoundment and seasonally discharged through a water treatment plant. Mill process water is reclaimed from the tailings pond. Timely water discharge is a critical activity at Red Dog and is intricately tied to the construction of the tailings dam.

The mine is in material compliance with all of its permits and related regulatory instruments, and has obtained all of the permits that are material to its current operations.

In 2023, the majority of the zinc concentrate produced at Red Dog was shipped to customers in Asia, Australia and Europe, with the balance being shipped to our metallurgical facilities at Trail, British Columbia. The lead concentrate production is also shipped to Trail and to customers in Asia. The majority of concentrate sales are pursuant to long-term contracts at market prices, subject to annually negotiated treatment charges. The balance is sold on the spot market at prices based on prevailing market quotations. The shipping season at Red Dog is restricted to approximately 100 days per year because of sea ice conditions and Red Dog’s sales are seasonal, with the majority of sales in the last five months of each year. Concentrate is stockpiled at the port facility and is typically shipped between July and October.

In 2023, zinc production at Red Dog was 539,800 tonnes, compared to 553,100 tonnes in 2022 due to lower ore grade, as expected in the mine plan, as well as unplanned plant maintenance and weather events. Lead production in 2023 of 93,400 tonnes was higher than 2022 production of 79,500 tonnes primarily as a result of higher grade ore, as expected in the mine plan.

Red Dog’s production of contained metal in 2024 is anticipated to be in the range of 520,000 to 570,000 tonnes of zinc and 90,000 to 105,000 tonnes of lead. After 2024, metal production is expected to decrease as a result of lower grade ore zones being mined. Zinc production in 2025 will decrease to between 460,000 and 510,000 tonnes, between 410,000 and 460,000 tonnes in 2026 and between 365,000 and 400,000 tonnes in 2027. Lead production in 2025 and 2026 is expected to be between 80,000 and 90,000 tonnes and is expected to decrease to between 65,000 and 75,000 tonnes in 2027.

The current mine life, based on existing developed deposits, is expected to extend through to 2031; however, studies to utilize portions of Red Dog infrastructure, for example the concentrator, are underway as part of the Aktigiruq-Annaaraq Exploration Project.

Teck Resources LimitedPage 37

2024 projected capital costs for Red Dog are approximately US$110 - 130 million. The major components of the projected capital costs are:

ComponentApproximate projected cost (US$/million)
Sustaining55 - 65
Growth(1)5 - 10
Capitalized stripping50 - 55
Total110 - 130

(1) Excludes growth capital expenditures related to the Aktigiruq-Annaaraq Exploration Project.

2024 projected cash operating costs for Red Dog are approximately US$415 - 485 million. The major components of the projected cash operating costs are:

ComponentApproximate projected cost (US$/million)
Labour185 - 215
Supplies120 - 140
Energy50 - 55
Other (including general & administrative, inventory changes, corporate allocations)110 - 130
Less amounts associated with projected capitalized stripping(50) - (55)
Total415 - 485