Key Trends and Uncertainties

During 2026 and beyond, we expect to face the following challenges at certain of our businesses. Management expects that improved operating performance at certain businesses, growth from new businesses, and global cost reduction initiatives may lessen or offset their impact. If these favorable effects do not occur, or if the challenges described below and elsewhere in this section impact us more significantly than we currently anticipate, or if volatile foreign currencies and commodities move more unfavorably, then these adverse factors (or other adverse factors unknown to us) may have a material impact on our operating margin, net income attributable to The AES Corporation and cash flows. We continue to monitor our operations and address challenges as they arise. For the risk factors related to our business, see Item 1.—Business and Item 1A.—Risk Factors of this Form 10-K.

Operational

Trade Restrictions and Supply Chain— In April 2022, the U.S. Department of Commerce (“Commerce”) initiated an investigation into whether imports into the U.S. of solar cells and panels from Cambodia, Malaysia, Thailand, and Vietnam (“Southeast Asia”) were circumventing antidumping and countervailing duty (“AD/CVD”) orders on solar cells and panels from China. In August 2023, Commerce rendered final affirmative findings of circumvention with respect to all four countries, which resulted in the imposition of AD/CVD duties on certain imported cells and panels from Southeast Asia. Commerce’s determination and related matters remain the subject of ongoing litigation before the U.S. Court of International Trade ("CIT") and the U.S. Court of Appeals for the Federal Circuit.

In 2024, Commerce and the U.S. International Trade Commission (“ITC”) initiated new AD/CVD investigations on solar cells and panels imported from Southeast Asia. On April 18, 2025, Commerce rendered final affirmative determinations and AD/CVD rates with respect to all four countries. On June 13, 2025, the ITC issued its determination that imports from Malaysia and Vietnam have injured the U.S. industry and that imports from Cambodia and Thailand threaten injury. Commerce then issued orders on June 24, 2025, implementing the AD/CVD rates, which will be subject to annual review by Commerce. There is ongoing litigation about these and related matters in the CIT. We do not expect these AD/CVD orders will have a negative impact on our business.

Separately, the U.S. maintains a global safeguard tariff (currently 14% ad valorem) on solar cells and modules pursuant to the Section 201 Safeguard Action on crystalline silicon photovoltaic products, which became effective in February 2018. On June 21, 2024, President Biden issued Proclamation 10779, revoking the exclusion of bifacial panels from safeguard relief previously proclaimed in Proclamation 10339, and reinstating the tariff on bifacial panels under the Section 201 Safeguard Action, subject to certain qualifications. These global tariffs expired in February 2026.

The U.S. also maintains Section 301 tariffs on certain Chinese made lithium-ion batteries and related components utilized for energy storage systems, with such tariffs currently set at 25% effective January 1, 2026 (an increase from the previous rate of 7.5%). There are also ongoing AD/CVD investigations with respect to exports by China of natural and synthetic graphite used to make lithium-ion battery anode material. Final ITC and Commerce AD/CVD determinations in these investigations are expected in the first quarter of 2026 and could result in price increases.

Additionally, the Uyghur Forced Labor Prevention Act (“UFLPA”) seeks to block the import of products made with forced labor in certain areas of China, at any point in the supply chain, and may lead to certain suppliers being blocked from importing solar cells and panels into the U.S. While this has impacted the U.S. market, AES has managed this issue without significant impact to our projects. Further forced labor designations of entities under the UFLPA may impact our suppliers’ ability or willingness to meet their contractual agreements or to continue to supply cells or panels into the U.S. market on terms that we deem satisfactory.

The Trump Administration has threatened or imposed tariffs on a wide range of countries and products. On February 10, 2025, President Trump signed Executive Orders modifying existing tariffs under Section 232 of the Trade Expansion Act of 1962 ("Section 232") on steel and aluminum imports to expand their scope and impose 25% tariffs on both products. The President raised these rates to 50% effective June 4, 2025. At this time, we do not expect the modifications to tariffs on steel and aluminum to have a material impact on our business.

On February 1, 2025, President Trump issued an Executive Order declaring a national emergency under the International Emergency Economic Powers Act (“IEEPA”) with respect to U.S. importation of fentanyl. The President imposed a 10% additional tariff on imports from China, effective February 4, 2025. Effective March 4, 2025, this tariff was increased to 20%.

On April 2, 2025, President Trump issued an Executive Order pursuant to IEEPA imposing an indefinite, baseline reciprocal 10% tariff on almost all goods imported into the U.S., effective April 5, 2025, and individualized higher IEEPA tariffs (11% to 50%) starting April 9, 2025 on goods originating from 57 countries with trade surpluses with the U.S. On April 9, 2025, the U.S. government issued a further Executive Order increasing the IEEPA reciprocal tariff on China to 125% effective April 10, 2025. Concurrently, the U.S. government announced a temporary suspension of the country-specific reciprocal tariff measures targeting most U.S. trading partners for a 90-day period, or until July 9, 2025, which was later extended until August 1, 2025. Effective May 14, 2025, the IEEPA reciprocal tariff rate applicable to China was lowered to 10%. IEEPA reciprocal tariffs, at various levels, have now gone into effect for most U.S. trading partners.

Several trading partners (including the EU, Japan, South Korea, and the UK) have reached bilateral trade agreements or frameworks with the U.S. The ultimate outcome of any reciprocal or other tariffs with countries that have not yet reached such trade agreements with the U.S. is uncertain. Also, in February 2026, on review of lower court decisions declaring the tariffs unlawful, the Supreme Court issued a decision holding that IEEPA does not authorize tariffs. However, President Trump subsequently stated that new tariffs would be issued under different statutory authority. The impact of these potential new tariffs on the Company is uncertain.

In July 2025, Commerce initiated a Section 232 investigation to determine the effects on national security of imports of polysilicon and its derivatives. In August 2025, Commerce initiated a separate investigation under Section 232 to determine the effects on national security of imports of wind turbines and their parts and components. These investigations are ongoing and their outcomes are uncertain.

In January 2026, the President issued a Proclamation under Section 232 concerning the importation of several critical minerals (including graphite and lithium) from any country. The Proclamation does not impose tariffs on the critical minerals but directs Commerce and the U.S. Trade Representative to negotiate agreements with foreign partners to secure reliable access to the critical minerals. An update on the outcome or status of these negotiations must be provided to the President within 180 days of the Proclamation. If the negotiations fail to result in agreements or to adequately address the identified risks, the President may consider trade-restrictive measures with respect to the critical minerals. The outcome of this process as well as its potential impact on the Company are uncertain.

We expect the tariffs on imports from China will increase overall costs for materials and parts that are imported to build and maintain renewable energy plants for the U.S. industry. However, AES has already shifted its supply chain outside of China for the vast majority of final products used to build and maintain renewable energy plants in the U.S. We expect limited impact to projects scheduled to become operational in 2026 through 2027 due to the announced tariffs on China.

The impact of new tariffs, reciprocal tariffs, or U.S. Government investigations or proclamations, the impact of any additional adverse Commerce determinations or other tariff disputes or litigation, the impact of the UFLPA, the potential future disruptions to the renewable energy supply chain and their effect on AES’ U.S. project development and construction activities remain uncertain. AES will continue to monitor developments and take prudent steps towards maintaining a robust supply chain for our renewable energy projects. To that end, we have accelerated imports into the U.S. and increased our contracting for U.S. domestically manufactured solar panels, batteries, wind turbines, trackers, and other equipment, significantly mitigating the potential impacts from reciprocal tariffs or other tariffs.

For our U.S backlog of solar projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for most of our panel supply needs, with the majority of such panels being manufactured in the U.S. and most of the remaining panels having already been imported into the U.S. These remaining imports are expected to be largely insulated from AD/CVD measures and potential Section 232 outcomes, as they are expected to be manufactured using U.S. polysilicon. Imports will exclude modules from countries currently subject to AD/CVD orders or investigations.

Additionally, for our U.S. backlog of storage projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted all our battery needs, with almost all of such batteries coming from U.S. or Korean suppliers. We have also completed contracting of U.S. domestically manufactured battery modules to support the remainder of our U.S. energy storage growth through 2027.

For our U.S. backlog of wind projects scheduled to be completed in 2026, we have contracted and received delivery of all turbines, and for our 2027 backlog of U.S. wind projects, we are fully contracted with U.S. suppliers and suppliers with primarily U.S. manufactured turbines.

Operational Sensitivity to Dry Hydrological Conditions — Our hydroelectric generation facilities are sensitive to changes in the weather, particularly the level of water inflows into generation facilities. Dry hydrological conditions in Panama, Colombia, and Chile can present challenges for our businesses in these markets. Low inflows can result in low reservoir levels, reduced generation output, and subsequently possible increased prices for electricity. If our hydroelectric generation facilities cannot generate sufficient energy to meet contractual arrangements, we may need to purchase energy to fulfill our obligations, which could have an adverse impact on AES. As mitigation, AES has invested in thermal, wind, and solar generation assets, which have a complementary profile to hydroelectric plants. These plants are expected to have increased generation in low hydrology scenarios, offsetting possible impacts described from hydro assets.

La Niña conditions emerged towards the end of 2025 in the equatorial Pacific, following a period of ENSO-neutral conditions earlier in the year. According to the Climate Prediction Center (“CPC”) and the International Research Institute for Climate and Society (“IRI”), La Niña began to dissipate in January 2026. Forecasts point to a transition back to ENSO-neutral conditions in early 2026 (through March 2026).

In Panama, total 2025 system inflows remained near historical averages, with the Bayano and Fortuna reservoirs however experiencing above-average levels due to abundant rainfall in the northern basins. These favorable conditions have supported strong hydroelectric generation, reduced reliance on thermal generation, and enabled potential surplus energy sales into the spot market. Furthermore, the commissioning of the Gatun combined cycle gas power plant by mid-2025 significantly reduced price and volatility, due to the displacement of other thermal generation. Additionally, the lower dispatch of natural gas-fired units due to favorable hydrology may create strategic opportunities for gas reallocation to international markets.

In Colombia, 2025 was the second wettest year on record. Reservoir levels remained elevated through Q4, with Chivor and other major reservoirs above seasonal norms. The favorable system hydrology throughout the year drove down spot prices compared to the prior year. Although, the fourth quarter saw a slight decline in rainfall and a moderate rise in spot prices, overall system storage remained robust.

In Chile, 2025 ranked as the fifth driest on record; however, it was marked by a structural decoupling of hydrology and the energy matrix. The power system demonstrated unprecedented resilience by offsetting the decline in hydroelectricity with record-breaking solar and wind generation, while leveraging the accelerated integration of BESS to mitigate curtailment, stabilize prices, and compensate for depleted system reservoirs.

The exact behavior pattern and strength of weather transitions (from/to La Niña or El Niño) is unknown and therefore the impacts could vary from those described above, and may include impacts to our businesses beyond hydrology, including with respect to power generation from other renewable sources of energy and demand. Even if rainfall and water inflows remain in line with historical averages, in some cases, market prices and generation above or below the average could present due to a variety of factors related to demand, market dynamics, or regulatory impacts. Impacts may be material to our results of operations.

Macroeconomic and Political

The macroeconomic and political environments in some countries where our subsidiaries conduct business have changed during 2025. This could result in significant impacts to tax laws and environmental and energy policies. Additionally, we operate in multiple countries and as such are subject to volatility in exchange rates at the subsidiary level. See Item 7A.—Quantitative and Qualitative Disclosures About Market Risk for further information.

U.S. Tax Law Reform and U.S. Renewable Energy Tax Credits — On July 4, 2025, the U.S. enacted H.R. 1 (the “2025 Act”). The legislation significantly revised the laws governing U.S. renewable energy tax credits and the U.S. taxation of certain foreign earnings, which may impact our effective tax rate in future periods and could be material. In addition, the 2025 Act included amendments to, and extensions of, various other U.S. corporate income tax provisions including the determination of limitation on interest expense deductions. Any impact may change as U.S. Treasury and Internal Revenue Service (“IRS”) issue additional guidance, which may be material.

The U.S. Inflation Reduction Act of 2022 (the “IRA”) included provisions that benefited the U.S. clean energy industry, including increases, extensions, direct transfers, and/or new tax credits for onshore and offshore wind, solar, storage, and hydrogen projects. We account for U.S. renewables projects according to U.S. GAAP, which, when partnering with tax-equity investors to monetize tax benefits, utilizes the HLBV method. This method recognizes the value of the tax credit that benefits the tax equity investors at the time of its creation, which for projects utilizing the investment tax credit, begins in the quarter the renewables project is placed in service. For projects utilizing the production tax credit, this value is recognized over 10 years as the facility produces energy.

The 2025 Act amends the phase out of wind and solar ITC and PTC tax credits. Wind and solar renewables projects that begin construction within 12 months of the enactment of the 2025 Act remain eligible for 100% of the credit without the 2027 placed-in-service deadline, provided that, under current Treasury guidance, the projects are placed in service no more than four calendar years after the calendar year when construction began. Wind and solar projects that begin construction after 12 months of the enactment must be placed in service no later than 2027. Wind and solar projects that began construction by the end of 2024 are not impacted by the 2025 Act. The 2025 Act does not impose tighter timelines for energy storage projects to qualify for the ITC and PTC, and it allows energy storage projects to receive the full ITC or PTC credit if they begin construction by 2033.

The 2025 Act also imposes a restriction precluding credits for renewables and storage projects claiming the ITC or PTC credit that start construction after December 31, 2025 and receive material assistance from a prohibited foreign entity, effectively limiting the percentage of total project costs that may be derived from products that are mined, produced or manufactured in China, with varying permissible percentages depending on the calendar year and applicable technology for the project. This restriction also precludes credit eligibility for taxpayers owning projects that start construction after December 31, 2024 that are classified as having ownership or certain other interests by a prohibited foreign entity, including projects over which a prohibited foreign entity is deemed to exercise formal or effective control.

Further, President Trump issued an Executive Order on July 7, 2025 that directed the Secretary of the Treasury to take action to enforce the provisions of the 2025 Act related to issuing updated guidance defining the start of construction for claiming the ITC and PTC and implementing the Foreign Entity of Concern (“FEOC”) Restrictions (the “Treasury Action”). The Executive Order also directed the Secretary of the Interior to take action to review its regulations, guidance, policies, and practices for any preferential treatment of wind and solar projects and eliminate those preferences within 45 days (the “Interior Action”).

On August 15, 2025, the Department of Treasury issued updated guidance defining the start of construction for purposes of claiming the ITC and PTC. AES does not expect the modifications to the start of construction guidance to materially impact its projects. The Department of Treasury has not yet issued comprehensive guidance implementing the FEOC restrictions, however. Further guidance, which may be material, is expected to be released within the coming months.

We expect the vast majority of our renewables project backlog to continue to qualify for the ITC and PTC. However, the Treasury Action may impose additional burdens in qualifying for the ITC and PTC.

In response to the Executive Order, the Department of Interior issued a memorandum requiring any “decisions, actions, consultations, and other undertakings” for wind or solar projects under Department of Interior jurisdiction to go through an additional three-phase approval process ending with approval from the Secretary of the Interior.

Our U.S. wind and solar projects are developed primarily on private land and are designed in a manner that minimizes the potential of a federal nexus. However, due to the broad language of the memorandum, there may be some impact to projects developed on private land.

In 2024, we realized $1,313 million of earnings from Tax Attributes, comprised of $1,293 million from the Renewables SBU and $20 million from the Utilities SBU. In 2025, we recognized $1,540 million of earnings from Tax Attributes, comprised of $1,374 million from the Renewables SBU and $166 million from the Utilities SBU.

The enactment of the 2025 Act requires that substantial guidance be published by the U.S. Department of Treasury and other government agencies. While we have taken significant measures to protect against the impact of changes under the 2025 Act to the IRA, including by implementing a program designed to ensure our backlog of U.S. renewables projects satisfy IRS safe harbor requirements for qualifying for the ITCs and PTCs, the impacts of the 2025 Act, the Treasury Action, the Interior Action or future actions that have the effect of modifying or repealing the ITCs and PTCs or adversely impacting renewable energy projects may be material to our results of operations.

Net CFC Tested Income (“NCTI”) — The 2025 Act amended the Global Intangible Low-Taxed Income (“GILTI”) provision by eliminating the reduction to foreign earnings subject to GILTI by an allowable economic return on investment beginning January 1, 2026. The GILTI provision was also renamed to the NCTI provision. Additionally, the 2025 Act modified the U.S. foreign tax credit provisions beginning January 1, 2026. Although the new NCTI rules provide for a reduced 14 percent effective tax rate on captured foreign income, by way of a 40 percent deduction, companies with a U.S. net operating loss or otherwise insufficient taxable income will not benefit from the lower effective tax rate and may not be able to utilize foreign tax credits. The new NCTI rules may subject a portion of our foreign earnings to current U.S. taxation in the future and could be material.

Limitation on Interest Expense Deductions — The 2025 Act retroactively amended the existing limitation on the deductibility of net interest expense beginning January 1, 2025. As amended, the deduction will be limited to interest income, plus 30% of tax basis EBITDA. Previously, the limitation was based on 30% of tax basis Earnings Before Interest and Taxes (“EBIT”). We expect the amendment to increase the current period permitted interest deductions and reduce the amount of disallowed interest expense subject to an indefinite carryforward. The limitation continues to be inapplicable to interest expense attributable to regulated utility property.

Global Tax— The macroeconomic and political environments in the U.S. and in some countries where our subsidiaries conduct business have changed in recent years. This could result in significant impacts to future tax law. In the U.S., the IRA included a 15% corporate alternative minimum tax (“CAMT”) based on adjusted financial statement income. In June 2025, the IRS began releasing interim guidance for CAMT and announced its intention to revise regulations that were proposed in September 2024. The impact to the Company in 2025 is not material. We will continue to monitor the issuance of CAMT revised guidance.

The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. On January 5, 2026, the OECD published a side-by-side package to modify the Pillar 2 system in a manner that will fully exclude domestic and foreign profits of US-parented groups from Pillar 2’s Undertaxed Profits Rule and Income Inclusion Rule. The side-by-side package is intended to take effect as of January 1, 2026, but is subject to enactment of legislation in the local jurisdictions. We will continue to monitor the issuance of legislation incorporating the side-by-side package, as well as other Pillar 2 amendments and new interpretive guidance in non-EU countries where the Company operates.

Inflation— In the markets in which we operate, there have been higher rates of inflation recently. While most of our contracts in our international businesses are indexed to inflation, in general, our U.S.-based generation contracts are not indexed to inflation. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of some of our development projects that could negatively impact their competitiveness. Our utility businesses allow for recovery of O&M costs through the regulatory process, which may have timing impacts on recovery.

Interest Rates— In the U.S. and other markets in which we operate, there has been a rise in interest rates during 2021 through 2023, and interest rates are expected to remain volatile in the near term. As discussed in Item 7A.—Quantitative and Qualitative Disclosures about Market Risk, although most of our existing corporate and subsidiary debt is at fixed rates, an increase in interest rates can have several impacts on our business. For any existing debt under floating rate structures and any future debt refinancings, rising interest rates will increase future financing costs. In most cases in which we have floating rate debt, our revenues serving this debt are indexed to inflation which helps mitigate the impact of rising rates. For future debt refinancings, AES actively manages a hedging program to reduce uncertainty and exposure to future interest rates. For new business, higher interest rates increase the financing costs for new projects under development and which have not yet secured financing.

AES typically seeks to incorporate expected financing costs into our new PPA pricing such that we maintain our target investment returns, but higher financing costs may negatively impact our returns or the competitiveness of some of our development projects. Additionally, we typically seek to enter into interest rate hedges shortly after signing PPAs to mitigate the risk of rising interest rates prior to securing long-term financing.

Argentina — In July 2024, the Argentine government enacted Law 27,742, known as Ley Bases, declaring a one-year public emergency in administrative, economic, financial, and energy matters. It grants the President delegated powers and initiates broad state reforms to deregulate the economy, including labor reform, the Incentive Regime for Large Investments, modifications to non-income tax measures, and the privatization of state-owned energy companies. Additionally, the Ministry of Energy issued Resolution 150/2024, repealing certain regulations from previous years that involved excessive state and CAMMESA intervention in the Wholesale Electricity Market (“MEM”).

On January 28, 2025, the Energy Secretariat issued Resolution 21/2025 to reform the MEM and is intended to ensure secure energy supply and stable consumer costs.

On April 11, 2025, the Central Bank of Argentina started a new economic program supported by a $20 billion agreement with the International Monetary Fund. The key points of the program include (a) a removal of exchange restrictions for individuals and (b) foreign shareholders can distribute profits starting from 2025 and deadlines for foreign trade payments are relaxed.

On July 4, 2025, the Argentine government issued Decree 450/25, initiating a 24-month transition period to reform and deregulate the country’s electricity market. The decree encourages free contracting between private entities and fosters competition in electricity generation and commercialization. Subsequently, on October 20, 2025, the Ministry of Economy and the Secretariat of Energy issued Resolution 400/25, which became effective on November 1, 2025, and provides a new framework introducing more competitive price signals, decentralizing fuel management, and reducing subsidies.

These changes may have a profound impact on the sector, influencing our operations and financial results. It is not yet possible to predict the impact of these regulations in our consolidated results of operations, cash flows, and financial condition.

Puerto Rico — Our subsidiaries in Puerto Rico have long-term PPAs with state-owned PREPA, which has been facing economic challenges that could result in a material adverse effect on our business in Puerto Rico.

The Puerto Rico Oversight, Management, and Economic Stability Act (“PROMESA”) was enacted to create a structure for exercising federal oversight over the fiscal affairs of U.S. territories and created procedures for adjusting debt accumulated by the Puerto Rico government and, potentially, other territories (“Title III”). PROMESA also expedites the approval of key energy projects and other critical projects in Puerto Rico. Despite the Title III protection, PREPA has been making substantially all of its payments to the generators in line with historical payment patterns.

PROMESA allowed for the establishment of an Oversight Board with broad powers of budgetary and financial control over Puerto Rico. The Oversight Board filed for bankruptcy on behalf of PREPA under Title III in July 2017. As a result of the bankruptcy filing, AES Ilumina’s non-recourse debt of $20 million continues to be in technical default and is classified as current as of December 31, 2025.

In 2022, a mediation commenced to resolve the PREPA Title III case. On March 19, 2025, the judge presiding over the case entered an order to permit the filing of an amended plan of adjustment and litigation of specific issues, including administrative expense claim by non-settling bondholders. The stay of plan confirmation and bondholder rights-related litigation was extended without a termination date, and the non-settling bondholders' motion to lift the stay was denied. The PROMESA Oversight Board filed an amended plan of adjustment and disclosure statement for PREPA on March 28, 2025. The mediation period was subsequently extended through April 1, 2026, reflecting the continuing efforts to resolve remaining matters under the Title III proceedings.

Considering the information available as of the date hereof, management believes the carrying amount of our long-lived assets in Puerto Rico of $80 million is recoverable as of December 31, 2025.

Impairments and Realizability

Long-lived Assets and Current Assets Held-for-Sale — During the year ended December 31, 2025, the Company recognized asset impairment expense of $224 million. See Note 23—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information. As of December 31, 2025, after recognizing these impairment expenses, the carrying value of our investments in long-lived assets and current assets held-for-sale that were assessed for impairment following a triggering event in 2025 was $109 million.

Events or changes in circumstances that may necessitate recoverability tests and potential impairments of long-lived assets may include, but are not limited to, adverse changes in the regulatory environment, unfavorable changes in power prices or fuel costs, increased competition due to additional capacity in the grid, technological advancements, declining trends in demand, evolving industry expectations to transition away from fossil fuel sources for generation, or an expectation it is more likely than not the asset will be disposed of before the end of its estimated useful life.

Tax Asset Realizability —Certain AES Chilean businesses have recorded net deferred tax assets ("DTA") of $243 million relating primarily to net operating loss carryforwards, which are not subject to expiration. Their realization is dependent on generating sufficient taxable income. At this time, management believes it is more likely than not that all of the DTA will be realized; however, it could be reduced by way of valuation allowance in the near term if estimates of future taxable income are reduced.

Regulatory

FERC, RTOs, and Interconnection Prioritization— FERC approved one-time queue jumping proposals in PJM, MISO, and SPP over the course of the year. Limited additions to each RTO’s queue are not expected to materially impact the projects already in our backlog; however, they could create uncertainty around network upgrade costs and the timing of integration of future projects in each RTO’s queue. See Item 1A.—Risk Factors — Our development projects are subject to substantial uncertainties included in this Form 10-K for further details.

AES Ohio Legislation and Three-Year Rate Plan— On April 30, 2025, the Ohio legislature passed new energy legislation (House Bill 15) that was signed by the Governor and became effective August 14, 2025. The legislation allows Ohio’s electric utilities to file three-year forecasted base distribution rate cases, which would replace electric security plans (ESPs) and associated recovery riders. AES Ohio currently anticipates that remaining recovery rider balances would be included in future base rates. Among other provisions, the legislation eliminates as of its effective date, the LGR, which previously allowed for recovery of net OVEC costs and revenues. Changes to the regulatory framework from this legislation, including the recovery of future net OVEC costs and revenues or remaining recovery rider balances, could be material to our results of operations, financial condition, and cash flows. To comply with House Bill 15, AES Ohio filed an application with the PUCO on November 10, 2025 to establish a Three-Year Rate Plan. This plan describes the investments necessary to strengthen and modernize AES Ohio's infrastructure and expand support for its customers. To enable these ongoing investments, the application also proposes rates for future electric distribution service in 2027, 2028, and 2029. The PUCO has set the evidentiary hearing to begin August 4, 2026, and a Commission Order is anticipated by the end of 2026.

AES Ohio ESP Appeal — From November 1, 2017 through December 18, 2019, AES Ohio operated pursuant to an approved ESP plan, which was initially approved on October 20, 2017 (ESP 3). On December 18, 2019, the PUCO approved AES Ohio's Notice of Withdrawal of ESP 3 and reversion to its prior rate plan (ESP 1). Among other items, the PUCO Order approving the ESP 1 rate plan included reinstating the non-bypassable RSC Rider, which provided annual revenue of approximately $79 million. The OCC has appealed to the Ohio Supreme Court the PUCO’s decision approving the reversion to ESP 1 as well as argued for a refund of the RSC revenue dating back to August 2021. Oral arguments regarding this appeal were held on April 22, 2025, and a court decision is pending.

AES Ohio Smart Grid Comprehensive Settlement — On October 23, 2020, AES Ohio entered into a Stipulation and Recommendation with the staff of the PUCO, various customers and organizations representing customers of AES Ohio and certain other parties with respect to, among other matters, AES Ohio's applications for (i) approval of AES Ohio's plan to modernize its distribution grid (Smart Grid Phase 1), (ii) findings that AES Ohio passed the SEET for 2018 and 2019, and (iii) findings that AES Ohio's ESP 1 satisfies the SEET and the more favorable in the aggregate (MFA) regulatory test. On June 16, 2021, the PUCO issued their opinion and order accepting the stipulation as filed. The OCC appealed the final PUCO order with respect to the 2018 and 2019 SEET to the Ohio Supreme Court on December 6, 2021. Oral arguments regarding this appeal were held on April 2, 2025. The Ohio Supreme Court reversed the PUCO's opinion and order with respect to the methodology used by the PUCO to support its findings related to the 2018 and 2019 SEET, and remanded the case to the PUCO to conduct further analysis of the SEET for those years. In the proceeding on remand, AES Ohio filed testimony proposing a refund of $1.6 million based on methodologies sponsored by its external financial consultant. The PUCO held an evidentiary hearing on this issue on October 28 and 29, 2025, and a PUCO decision is pending.

AES Indiana Rate Case Filing— On June 3, 2025, AES Indiana filed a petition with the IURC for authority to increase its basic rates and charges. On October 15, 2025, AES Indiana entered into a Stipulation and Settlement Agreement (the “Settlement Agreement”) with most parties in AES Indiana’s pending regulatory rate review at the IURC. This Settlement Agreement provides for updated base rates for electric services in AES Indiana’s territory and is subject, and conditioned upon, approval by the IURC. Among other things, the Settlement Agreement proposes an increase in AES Indiana’s revenue of $90.7 million and provides a return on common equity of 9.75% and cost of long-term debt of 5.34%, on a rate base of approximately $5.5 billion for AES Indiana’s 2027 electric service base rates. The partial Settlement Agreement also includes a commitment to not implement additional base rate increases, following the implementation of new base rates under the settlement, until at least January 2030 and to not start a second TDSIC Plan before January 2028. An evidentiary hearing with the IURC was held on January 28 and 29, 2026, and AES Indiana anticipates a final order from the IURC in the second quarter of 2026.

AES Maritza PPA Review — DG Comp is conducting a preliminary review of whether AES Maritza’s PPA with NEK is compliant with the European Union's State Aid rules. No formal investigation has been launched by DG Comp to date. AES Maritza has previously engaged in discussions with the DG Comp case team and the Government of Bulgaria to attempt to reach a negotiated resolution of the DG Comp’s review (“PPA Discussions”). There are no active PPA Discussions at present, but those discussions could resume at any time. The PPA continues to remain in place. However, there can be no assurance that, in the context of DG Comp’s preliminary review or any future PPA Discussions, the other parties will not seek a prompt termination of the PPA.

We do not believe termination of the PPA is justified. Nevertheless, the PPA Discussions involved a range of potential outcomes, including but not limited to the termination of the PPA and payment of some level of compensation to AES Maritza. Any negotiated resolution would be subject to mutually acceptable terms, lender consent, and DG Comp approval. At this time, we cannot predict whether and when the PPA Discussions might resume or the outcome of any such discussions. Nor can we predict how DG Comp might resolve its review if the PPA Discussions do not resume or if any such discussions fail to result in an agreement concerning the agency's review. AES Maritza believes that its PPA is legal and in compliance with all applicable laws, and it will take all actions necessary to protect its interests, whether through negotiated agreement or otherwise. However, there can be no assurance that this matter will be resolved favorably; if it is not, there could be a material adverse effect on the Company’s financial condition, results of operations, and cash flows. As of December 31, 2025, the carrying value of our long-lived assets at Maritza is $64 million.

Foreign Exchange Rates

We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

The overall economic climate in Argentina has deteriorated, resulting in volatility and increased the risk that a further significant devaluation of the Argentine peso against the USD, similar to the devaluations experienced by the country in 2018, 2019, and 2023, may occur. A continued trend of peso devaluation could result in increased inflation, a deterioration of the country’s risk profile, and other adverse macroeconomic effects that could significantly impact our results of operations. For additional information, refer to Item 7A.—Quantitative and Qualitative Disclosures About Market Risk.

ContentsView on SEC.gov