ITEM 1A. RISK FACTORS

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-02.

0000874761-26-000063

ITEM 1A. RISK FACTORS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 211 previous paragraphs and 209 current paragraphs.

189 unchanged; 20 reworded; 0 added; 1 removed; 1 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Removed paragraphs (1)

Previous report

As more fully disclosed in Item 9A.—Controls and Procedures, we have identified a material weakness in our internal control over financial reporting that existed at December 31, 2024. The Company did not design effective controls over management's review of the disposition of AES Brasil, a complex non-routine transaction; specifically, the evaluation of the completeness and accuracy of data and information used in the impairment and disposition calculations of the AES Brasil disposal group. This control deficiency was not remediated as of December 31, 2024. Since there is a reasonable possibility that the control deficiency could result in a material misstatement in our financial statements that would not be detected, we determined that this control deficiency constituted a material weakness. While we are taking steps to implement a remediation plan, the material weakness will not be considered remediated until the applicable controls operate and management has concluded, through testing, that the controls are operating effectively. Furthermore, we can give no assurance that the measures we take will remediate the material weakness or that additional material weaknesses will not arise in the future, either of which could result in material misstatements in our financial statements and cause us to fail to meet our reporting and financial obligations, and in turn, could negatively impact investor confidence in our reported financial information.
Reworded paragraphs (20)

Previous wording

Wind, solar, hydrogen, and energy storage projects are subject to substantial risks. Some of these business lines are dependent upon favorable regulatory incentives to support continued investment, and there is significant uncertainty about the extent to which such favorable regulatory incentives, in particular, those associated with the U.S. Inflation Reduction Act of 2022, will be available in the future. In particular, in the U.S., AES’ renewable energy generation growth strategy depends in part on federal, state and local government policies and incentives that support the development, financing, ownership and operation of renewable energy generation projects, including investment tax credits, production tax credits, accelerated depreciation, renewable portfolio standards, feed-in-tariffs and similar programs, REC mechanisms and compliance programs, and tax exemptions. If these policies and incentives are changed or eliminated, or AES is unable to use them, there could be a material adverse impact on AES’ U.S. renewable growth opportunities, including fewer future PPAs or lower prices in future PPAs, decreased revenues, reduced economic returns on certain project company investments, increased financing costs, and/or difficulty obtaining financing.

Current wording

Wind, solar, and energy storage projects are subject to substantial risks. In particular, in the U.S., AES’ renewable energy generation growth strategy has depended in part on federal, state, and local government policies and incentives that support the development, financing, ownership, and operation of renewable energy generation projects, including investment tax credits, production tax credits, accelerated depreciation, renewable portfolio standards, feed-in-tariffs, and similar programs, REC mechanisms and compliance programs, and tax exemptions. More recently, the favorable regulatory regimes associated with the U.S. Inflation Reduction Act of 2022 have been curtailed by the passage of H.R. 1 (the "2025 Act"). See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Macroeconomic and Political—U.S. Tax Law Reform and U.S. Renewable Energy Tax Credits. If these policies and incentives are further changed or eliminated, if pending tax guidance related to these policies is adverse, or AES is otherwise unable to use these policies or incentives, there could be a material adverse impact on AES’ U.S. renewable growth opportunities, including fewer future PPAs, decreased revenues, reduced economic returns on certain project company investments, increased financing costs, and/or difficulty obtaining financing. Further, the adoption of the 2025 Act requires the issuance of tax guidance, some of which has not yet been issued, that may further impact our projects.

Previous wording

Any such developments could impede the realization of our U.S. renewables strategy by resulting in, among other items, lack of a satisfactory market for the development and/or financing of our U.S. renewable energy projects, abandoning the development of certain U.S. renewable energy projects, a loss of our investments in the projects, and/or reduced project returns.

Current wording

In addition, new tariffs, duties, or other assessments have been imposed on the imports of solar cells, modules, batteries, or other equipment utilized in our renewable energy projects. Any such developments could impede the realization of our U.S. renewables strategy by resulting in, among other items, lack of a satisfactory market for the development and/or financing of our U.S. renewable energy projects, abandoning the development of certain U.S. renewable energy projects, a loss of our investments in the projects, and/or reduced project returns.

Previous wording

As a result, these types of projects face considerable risk, including that favorable regulatory regimes expire or are adversely modified. At the development or acquisition stage, our ability to predict actual performance results may be hindered and the projects may not perform as predicted. There are also risks associated with the fact that some of these projects exist in markets where long-term fixed-price contracts for the major cost and revenue components may be unavailable, which in turn may result in these projects having relatively high levels of volatility. These projects can be capital-intensive and generally are designed with a view to obtaining third-party financing, which may be difficult to obtain. As a result, these capital constraints may reduce our ability to develop or obtain third-party financing for these projects.

Current wording

As a result, these types of projects face considerable risk, including that favorable regulatory regimes are further adversely modified. At the development or acquisition stage, our ability to predict actual performance results may be hindered and the projects may not perform as predicted. There are also risks associated with the fact that some of these projects exist in markets where long-term fixed-price contracts for the major cost and revenue components may be unavailable, which in turn may result in these projects having relatively high levels of volatility. These projects can be capital-intensive and generally are designed with a view to obtaining third-party financing, which may be difficult to obtain. As a result, these capital constraints may reduce our ability to develop or obtain third-party financing for these projects.

Previous wording

Additionally, in the U.S., there is a significant backlog of interconnection requests for renewables and battery storage projects and the average time for receiving interconnection approvals is over four years, with significant variations across projects and regions. Our existing interconnection requests may also be subject to regulatory changes that could negatively impact the timing or cost associated with obtaining interconnection approval. Some RTOs, such as PJM, have recently implemented or are considering accelerated or supplemental interconnection processes for high-capacity factor resources, which could result in delays or cost increases to existing or future interconnection requests of intermittent renewable energy projects, such as solar and wind. Additional measures could be considered by RTOs, transmission owners, or governmental authorities to foster or accelerate deployment or utilization of certain high-capacity factor technologies in a manner that negative impacts the development or solar or wind projects. There are also severe bottlenecks in the transmission system and the build-out of renewables to meet policy goals for renewable deployment will require substantial upgrades to the transmission network. These upgrades may also be delayed by the accelerated or supplemental interconnection of high-capacity factor resources, as discussed above.

Current wording

Additionally, in the U.S., there is a significant backlog of interconnection requests for renewables and battery storage projects and the average time for receiving interconnection approvals is over four years, with significant variations across projects and regions. Our existing interconnection requests may also be subject to regulatory changes that could negatively impact the timing or cost associated with obtaining interconnection approval. Some RTOs, such as PJM, have recently implemented or are considering accelerated or supplemental interconnection processes for high-capacity factor resources or for resources that service a resource adequacy need or new load, which could result in delays or cost increases to existing or future interconnection requests of intermittent renewable energy projects, such as solar and wind. Additional measures could be considered by RTOs, transmission owners, or governmental authorities to foster or accelerate deployment or utilization of certain high-capacity factor technologies in a manner that negatively impacts the development of solar or wind projects. There are also severe bottlenecks in the transmission system and the build-out of renewables to meet policy goals for renewable deployment will require substantial upgrades to the transmission network. These upgrades may also be delayed by the accelerated or supplemental interconnection of high-capacity factor resources, as discussed above.

Previous wording

The financial performance of our facilities is dependent on the credit quality of, and continued performance by, suppliers and customers. At times, we rely on a single customer or a few customers to purchase all or a significant portion of a facility's output, in some cases under long-term agreements that account for a substantial percentage of the anticipated revenue from a given facility. Counterparties to these agreements may breach or may be unable to perform their obligations, due to bankruptcy, insolvency, financial distress or other factors. Furthermore, in the event of a bankruptcy or similar insolvency-type proceeding, our counterparty can seek to reject our existing PPA under the U.S. Bankruptcy Code or similar bankruptcy laws, including those in Puerto Rico. We may not be able to enter into replacement agreements on terms as favorable as our existing agreements, and may have to sell power at market prices. A counterparty's breach by of a PPA or other agreement could also result in the breach of other agreements, including the affected businesses debt agreements. Any failure of a supplier or customer to fulfill its contractual obligations could have a material adverse effect on our financial results.

Current wording

The financial performance of our facilities is dependent on the credit quality of, and continued performance by, suppliers and customers. At times, we rely on a single customer or a few customers to purchase all or a significant portion of a facility's output, in some cases under long-term agreements that account for a substantial percentage of the anticipated revenue from a given facility. Counterparties to these agreements may breach or may be unable to perform their obligations, due to bankruptcy, insolvency, financial distress or other factors. Furthermore, in the event of a bankruptcy or similar insolvency-type proceeding, our counterparty can seek to reject our existing PPA under the U.S. Bankruptcy Code or similar bankruptcy laws, including those in Puerto Rico. We may not be able to enter into replacement agreements on terms as favorable as our existing agreements, and may have to sell power at market prices. A counterparty's breach of a PPA or other agreement could also result in the breach of other agreements, including the affected businesses' debt agreements. Any failure of a supplier or customer to fulfill its contractual obligations could have a material adverse effect on our financial results.

Previous wording

Our business relies on electronic systems and network technologies to operate our generation, transmission and distribution infrastructure. We also use various financial, accounting and other infrastructure systems. Additionally, we store and use customer, employee, and other personal information and other confidential and sensitive information. Our infrastructure may be targeted by nation states, hacktivists, criminals, insiders or terrorist groups. In particular, there has been an increased focus on the U.S. energy grid believed to be related to the Russia/Ukraine conflict. Such an attack, by hacking, malware or other means, may interrupt our operations, cause property damage, affect our ability to control our infrastructure assets, cause the release of sensitive customer information or limit communications with third parties. Any loss or corruption of confidential or proprietary data through a breach of our systems or certain of our third party vendor systems may:

Current wording

Our business relies on electronic systems and network technologies to operate our generation, transmission and distribution infrastructure. We also use various financial, accounting and other infrastructure systems. Additionally, we store and use customer, employee, and other personal information and other confidential and sensitive information. Our infrastructure may be targeted by nation states, hacktivists, criminals, insiders or terrorist groups. In particular, there has been an increased focus on the U.S. energy grid believed to be related to various geopolitical conflicts. Such an attack, by hacking, malware or other means, may interrupt our operations, cause property damage, affect our ability to control our infrastructure assets, cause the release of sensitive customer information or limit communications with third parties. Any loss or corruption of confidential or proprietary data through a breach of our systems or certain of our third-party vendor systems may:

Previous wording

•impact our operations, revenue, strategic objectives, customer and vendor relationships;

Current wording

•impact our operations, revenue, strategic objectives, or customer and vendor relationships;

Previous wording

In addition, we are dependent upon hydrological conditions prevailing from time to time in the broad geographic regions in which our hydroelectric generation facilities are located. Changes in temperature, precipitation and snow pack conditions also could affect the amount and timing of hydroelectric generation. To the extent that hydrological conditions result in droughts or other conditions negatively affect our hydroelectric generation business, such as has happened in Panama in 2019, Brazil in 2021 and Colombia in 2024, our results of operations can be materially adversely affected. Additionally, our contracts in certain markets where hydroelectric facilities are prevalent may require us to purchase power in the spot markets when our facilities are unable to operate at anticipated levels and the price of such spot power may increase substantially in times of low hydrology.

Current wording

In addition, we are dependent upon hydrological conditions prevailing from time to time in the broad geographic regions in which our hydroelectric generation facilities are located. Changes in temperature, precipitation and snowpack conditions also could affect the amount and timing of hydroelectric generation. To the extent that hydrological conditions result in droughts or other conditions negatively affect our hydroelectric generation business, such as has happened in Panama in 2019 and Colombia in 2024, our results of operations can be materially adversely affected. Additionally, our contracts in certain markets where hydroelectric facilities are prevalent may require us to purchase power in the spot markets when our facilities are unable to operate at anticipated levels and the price of such spot power may increase substantially in times of low hydrology.

Previous wording

Further, we have a significant equity method investment in Fluence. As a publicly listed company, Fluence is governed by its own Board of Directors, whose members have fiduciary duties to the Fluence shareholders. While we have certain rights to appoint representatives to the Fluence Board of Directors, the interests of the Fluence shareholders, as represented by the Fluence Board of Directors, may not align with our interests or the interests of our securityholders. As of December 31, 2024, Fluence continues to report that a material weakness in its internal control over revenue recognition has not yet been remediated. Such material weakness can impact the reliability of the Fluence financial information that we may include as part of our financial information.

Current wording

Further, we have a significant equity method investment in Fluence. As a publicly listed company, Fluence is governed by its own Board of Directors, whose members have fiduciary duties to the Fluence shareholders. While we have certain rights to appoint representatives to the Fluence Board of Directors, the interests of the Fluence shareholders, as represented by the Fluence Board of Directors, may not align with our interests or the interests of our securityholders. In recent years, Fluence has reported a material weakness in its internal control over revenue recognition that was remediated as of December 31, 2024. If there is a material weakness in the future, that can impact the reliability of the Fluence financial information that we may include as part of our financial information.

Previous wording

We have 27 defined benefit plans, five at U.S. subsidiaries and the remaining plans at foreign subsidiaries, which cover substantially all of the employees at these subsidiaries. Pension costs are based upon a number of actuarial assumptions, including an expected long-term rate of return on pension plan assets, the expected life span of pension plan beneficiaries and the discount rate used to determine the present value of future pension obligations. Any of these assumptions could prove to be incorrect, resulting in a shortfall of pension plan assets compared to pension obligations under the pension plan. We periodically evaluate the value of the pension plan assets to ensure that they will be sufficient to fund the respective pension obligations. Downturns in the debt and/or equity markets, or the inaccuracy of any of our significant assumptions underlying the estimates of our subsidiaries' pension plan obligations, could result in a material increase in pension expense and future funding requirements. Our subsidiaries that participate in these plans are responsible for satisfying the funding requirements required by law in their respective jurisdictions for any shortfall of pension plan assets as compared to pension obligations under the pension plan, which may necessitate additional cash contributions to the pension plans that could adversely affect our and our subsidiaries' liquidity. See Item 7.—Management's Discussion and Analysis—Critical Accounting Policies and Estimates—Pension and Other Postretirement Plans and Note 16—Benefit Plans included in Item 8.—Financial Statements and Supplementary Data.

Current wording

We have 29 defined benefit plans, five at U.S. subsidiaries and the remaining plans at foreign subsidiaries, which cover substantially all of the employees at these subsidiaries. Pension costs are based upon a number of actuarial assumptions, including an expected long-term rate of return on pension plan assets, the expected life span of pension plan beneficiaries and the discount rate used to determine the present value of future pension obligations. Any of these assumptions could prove to be incorrect, resulting in a shortfall of pension plan assets compared to pension obligations under the pension plan. We periodically evaluate the value of the pension plan assets to ensure that they will be sufficient to fund the respective pension obligations. Downturns in the debt and/or equity markets, or the inaccuracy of any of our significant assumptions underlying the estimates of our subsidiaries' pension plan obligations, could result in a material increase in pension expense and future funding requirements. Our subsidiaries that participate in these plans are responsible for satisfying the funding requirements required by law in their respective jurisdictions for any shortfall of pension plan assets as compared to pension obligations under the pension plan, which may necessitate additional cash contributions to the pension plans that could adversely affect our and our subsidiaries' liquidity. See Item 7.—Management's Discussion and Analysis—Critical Accounting Policies and Estimates—Pension and Other Postretirement Plans and Note 16—Benefit Plans included in Item 8.—Financial Statements and Supplementary Data.

Previous wording

International, federal and various regional and state authorities regulate GHG emissions and have created financial incentives to reduce them. In 2024, the Company's subsidiaries operated businesses that had total direct CO 2 emissions of approximately 28 million metric tonnes, approximately 10 million of which were emitted by our U.S. businesses (both figures are ownership adjusted). The Company uses CO 2 emission estimation methodologies supported by "The Greenhouse Gas Protocol" reporting standard on GHG emissions. For existing power generation plants, CO 2 emissions data are either obtained directly from plant continuous emission monitoring systems or calculated from actual fuel heat inputs and fuel type CO 2 emission factors. This estimate is based on a number of projections and assumptions that may prove to be incorrect, such as the forecasted dispatch, anticipated plant efficiency, fuel type, CO 2 emissions rates and our subsidiaries' achieving completion of such construction and development projects. While actual emissions may vary substantially; certain projects under construction or development when completed will increase emissions of our portfolio and therefore could increase the risks associated with regulation of GHG emissions.

Current wording

International, federal, and various regional and state authorities regulate GHG emissions and have created financial incentives to reduce them. In 2025, the Company's subsidiaries operated businesses that had total direct CO 2 equivalent emissions of approximately 29 million metric tonnes, approximately 11 million of which were emitted by our U.S. businesses (both figures are ownership adjusted). The Company uses CO 2 emission estimation methodologies supported by "The Greenhouse Gas Protocol" reporting standard on GHG emissions. For existing power generation plants, CO 2 emissions data are either obtained directly from plant continuous emission monitoring systems or calculated from actual fuel heat inputs and fuel type CO 2 emission factors. While actual emissions may vary substantially; certain projects under construction or development when completed will increase emissions of our portfolio and therefore could increase the risks associated with regulation of GHG emissions.

Previous wording

There currently is no U.S. federal legislation imposing mandatory GHG emission reductions (including for CO 2) that affects our electric power generation facilities; however, in 2015, the EPA promulgated a rule establishing New Source Performance Standards for CO 2 emissions for newly constructed and modified/reconstructed fossil-fueled electric utility steam generating units larger than 25 MW and in 2018 proposed revisions to the rule. On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements. The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018. In 2019, the EPA promulgated the Affordable Clean Energy (ACE) Rule which would have replaced the EPA's 2015 Clean Power Plan Rule ("CPP"). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion, holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance. On May 9, 2024, the EPA published the final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024. Existing EGUs are those that were constructed prior to January 8, 2014. Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO2 depending on the date that coal operations cease. Specific standards for performance for EGUs will be established through a State Plan (or a Federal Plan if the state of Indiana were to not submit an approvable plan). The May 2024 rule is subject to legal challenges. On October 16, 2024, the U.S. Supreme Court denied emergency stay applications. The impact of the results of further proceedings and potential future greenhouse gas emissions regulations remains uncertain, but it could be material.

Current wording

There currently is no U.S. federal legislation imposing mandatory GHG emission reductions (including for CO 2) that affects our electric power generation facilities; however, in 2015, the EPA promulgated a rule establishing New Source Performance Standards for CO 2 emissions for newly constructed and modified/reconstructed fossil-fueled electric utility steam generating units larger than 25 MW and in 2018 proposed revisions to the rule. On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements. The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018. In 2019, the EPA promulgated the Affordable Clean Energy (ACE) Rule which would have replaced the EPA's 2015 Clean Power Plan Rule ("CPP"). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion, holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance. On May 9, 2024, the EPA published the final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024. Existing EGUs are those that were constructed prior to January 8, 2014. Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO 2 depending on the date that coal operations cease. Specific standards for performance for EGUs will be established through a State Plan (or a Federal Plan if the state of Indiana were to not submit an approvable plan). The May 2024 rule is subject to legal challenges. On February 18, 2026, the EPA published a final rule to rescind the 2009 greenhouse gas endangerment finding (which had concluded that greenhouse gases endanger public health and welfare). The impact of the results of further proceedings and potential future greenhouse gas emissions regulations remains uncertain, but it could be material.

Previous wording

In 2010, the EPA adopted regulations pertaining to GHG emissions that require new and existing sources of GHG emissions to potentially obtain new source review permits from the EPA prior to construction or modification. In 2016, the U.S. Supreme Court ruled that such permitting would only be required if such sources also must obtain a new source review permit for increases in other regulated pollutants. For further discussion of the regulation of GHG emissions, see Item 1.—Business—Environmental and Land-Use Regulations—U.S. Environmental and Land-Use Legislation and Regulations—Greenhouse Gas Emissions above. The Parties to the United Nations Framework Convention on Climate Change's Paris Agreement established a long-term goal of keeping the increase in global average temperature well below 2°C above pre-industrial levels. We anticipate that the Paris Agreement will continue the trend toward efforts to decarbonize the global economy and to further limit GHG emissions. The impact of GHG regulation on our operations will depend on a number of factors, including the degree and timing of GHG emissions reductions required under any such legislation or regulation, the cost of emissions reduction equipment and the price and availability of offsets, the extent to which market based compliance options are available, the extent to which our subsidiaries would be entitled to receive GHG emissions allowances without having to purchase them in an auction or on the open market and the impact of such legislation or regulation on the ability of our subsidiaries to recover costs incurred through rate increases or otherwise. The costs of compliance could be substantial.

Current wording

In 2010, the EPA adopted regulations pertaining to GHG emissions that require new and existing sources of GHG emissions to potentially obtain new source review permits from the EPA prior to construction or modification. In 2016, the U.S. Supreme Court ruled that such permitting would only be required if such sources also must obtain a new source review permit for increases in other regulated pollutants. For further discussion of the regulation of GHG emissions, see Item 1.—Business—Environmental and Land-Use Regulations—U.S. Environmental and Land-Use Legislation and Regulations—Greenhouse Gas Emissions above. The Parties to the United Nations Framework Convention on Climate Change's Paris Agreement established a long-term goal of keeping the increase in global average temperature well below 2°C above pre-industrial levels. The impact of GHG regulation on our operations will depend on a number of factors, including the degree and timing of GHG emissions reductions required under any such legislation or regulation, the cost of emissions reduction equipment and the price and availability of offsets, the extent to which market based compliance options are available, the extent to which our subsidiaries would be entitled to receive GHG emissions allowances without having to purchase them in an auction or on the open market and the impact of such legislation or regulation on the ability of our subsidiaries to recover costs incurred through rate increases or otherwise. The costs of compliance could be substantial.

Previous wording

In addition to government regulators, many groups, including politicians, environmentalists, the investor community and other private parties have expressed increasing concern about GHG emissions. New regulation, such as the initiatives in Chile and the Puerto Rico Energy Public Policy Act, may adversely affect our operations. See Item 7.—Management's Discussion and Analysis—Key Trends and Uncertainties—Decarbonization Initiatives. Responding to these decarbonization initiatives, including developments in our strategy in line with these initiatives may present challenges to our business. We may be unable to develop our renewables platform as quickly as anticipated. Further, we may be unable to dispose of coal-fired generation assets at anticipated prices, the estimated useful lives of these assets may decrease, and the value of such assets may be impaired. These initiatives could also result in the early retirement of coal-fired generation facilities, which could result in stranded costs if regulators disallow full recovery of investments.

Current wording

In addition to government regulators, many groups, including politicians, environmentalists, the investor community, and other private parties have expressed increasing concern about GHG emissions. Regulation, such as the initiatives in Chile and the Puerto Rico Energy Public Policy Act, may adversely affect our operations. Responding to these decarbonization initiatives, including developments in our strategy in line with these initiatives may present challenges to our business. We may be unable to develop our renewables platform as quickly as anticipated. Further, we may be unable to dispose of coal-fired generation assets at anticipated prices, the estimated useful lives of these assets may decrease, and the value of such assets may be impaired. These initiatives could also result in the early retirement of coal-fired generation facilities, which could result in stranded costs if regulators disallow full recovery of investments.

Previous wording

We operate in the U.S. and various non-U.S. jurisdictions and are subject to the tax laws and regulations of the U.S. federal, state and local governments and of many non-U.S. jurisdictions. From time to time, legislative measures may be enacted that could adversely impact our overall tax positions regarding income or other taxes, our effective tax rate or tax payments. For example, the U.S. Inflation Reduction Act of 2022 includes provisions that benefit the U.S. clean energy industry, including increases, extensions and/or new tax credits for onshore and offshore wind, solar, storage and hydrogen projects. We expect that the extension of the current solar investment tax credits ("ITCs"), as well as higher credits available for projects that satisfy wage and apprenticeship requirements, will increase demand for our renewables products. In the U.S., the IRA includes a 15% corporate alternative minimum tax based on adjusted financial statement income.

Current wording

We operate in the U.S. and various non-U.S. jurisdictions and are subject to the tax laws and regulations of the U.S. federal, state, and local governments and of many non-U.S. jurisdictions. From time to time, legislative measures may be enacted that could adversely impact our overall tax positions regarding income or other taxes, our effective tax rate or tax payments. In the U.S., the IRA includes a 15% corporate alternative minimum tax based on adjusted financial statement income. In June 2025, the IRS began releasing interim guidance for CAMT and announced its intention to revise regulations that were proposed in September 2024. The impact to the Company in 2025 is not material. We will continue to monitor the issuance of CAMT revised guidance.

Previous wording

In the fourth quarter of 2022, the European Commission adopted an amended Directive on Pillar 2 establishing a global minimum tax at a 15% rate. The adoption requires EU Member States to transpose the Directive into their respective national laws by December 31, 2023 for the rules to come into effect as of January 1, 2024. The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. The impact to the Company during 2024 was not material. We will continue to monitor the issuance of draft legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments. The impact to the Company remains unknown but may be material.

Current wording

In the fourth quarter of 2022, the European Commission adopted an amended Directive on Pillar 2 establishing a global minimum tax at a 15% rate. The adoption required EU Member States to transpose the Directive into their respective national laws by December 31, 2023 for the rules to have come into effect as of January 1, 2024. The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. The impact to the Company during 2025 was not material. On January 5, 2026, the OECD published a side-by-side package to modify the Pillar 2 system in a manner that will fully exclude domestic and foreign profits of US-parented groups from Pillar 2’s Undertaxed Profits Rule and Income Inclusion Rule. The side-by-side package is intended to take effect as of January 1, 2026, but is subject to enactment of legislation in the local jurisdictions. We will continue to monitor the issuance of legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments. The impact to the Company remains unknown but may be material.

Previous wording

As of December 31, 2024, we had approximately $29 billion of outstanding indebtedness on a consolidated basis. All outstanding borrowings under The AES Corporation's revolving credit facilities are unsecured. Most of the debt of The AES Corporation's subsidiaries, however, is secured by substantially all of the assets of those subsidiaries. A substantial portion of cash flow from operations must be used to make payments on our debt. Furthermore, since a significant percentage of our assets are used to secure this debt, this reduces the amount of collateral available for future secured debt or credit support and reduces our flexibility in operating these secured assets. This level of indebtedness and related security could have other consequences, including:

Current wording

As of December 31, 2025, we had approximately $30 billion of outstanding indebtedness on a consolidated basis. All outstanding borrowings under The AES Corporation's revolving credit facilities are unsecured. Most of the debt of The AES Corporation's subsidiaries, however, is secured by substantially all of the assets of those subsidiaries. A substantial portion of cash flow from operations must be used to make payments on our debt. Furthermore, since a significant percentage of our assets are used to secure this debt, this reduces the amount of collateral available for future secured debt or credit support and reduces our flexibility in operating these secured assets. This level of indebtedness and related security could have other consequences, including:

Previous wording

We attempt to finance our domestic and foreign projects through non-recourse debt or "non-recourse financing" that requires the loans to be repaid solely from the project's revenues and provide that the repayment of the loans (and interest thereon) is secured solely by the capital stock, physical assets, contracts and cash flow of that project subsidiary or affiliate. As of December 31, 2024, we had approximately $29 billion of outstanding indebtedness on a consolidated basis, of which approximately $5.7 billion was recourse debt of the Parent Company and approximately $22.7 billion was non-recourse debt. In some non-recourse financings, the Parent Company has explicitly agreed, in the form of guarantees, indemnities, letters of credit, letter of credit reimbursement agreements and agreements to pay, to undertake certain limited obligations and contingent liabilities, most of which will only be effective or will be terminated upon the occurrence of future events. In the case of our U.S. renewables projects involving tax equity investors or purchasers of tax credits, we provide customary Parent Company or subsidiary guarantees to the tax equity investors or tax credit purchasers that require the Parent Company or subsidiary to bear the risk of any IRS recapture or disallowance of certain tax benefits they receive in connection with the transaction.

Current wording

We attempt to finance our domestic and foreign projects through non-recourse debt or "non-recourse financing" that requires the loans to be repaid solely from the project's revenues and provide that the repayment of the loans (and interest thereon) is secured solely by the capital stock, physical assets, contracts and cash flow of that project subsidiary or affiliate. As of December 31, 2025, we had approximately $30 billion of outstanding indebtedness on a consolidated basis, of which approximately $6.0 billion was recourse debt of the Parent Company and approximately $23.2 billion was non-recourse debt. In some non-recourse financings, the Parent Company has explicitly agreed, in the form of guarantees, indemnities, letters of credit, letter of credit reimbursement agreements and agreements to pay, to undertake certain limited obligations and contingent liabilities, most of which will only be effective or will be terminated upon the occurrence of future events. In the case of our U.S. renewables projects involving tax equity investors or purchasers of tax credits, we provide customary Parent Company or subsidiary guarantees to the tax equity investors or tax credit purchasers that require the Parent Company or subsidiary to bear the risk of any IRS recapture or disallowance of certain tax benefits they receive in connection with the transaction.

Previous wording

Certain of our subsidiaries are in default with respect to all or a portion of their outstanding indebtedness. The total debt classified as current in our Consolidated Balance Sheets related to such defaults was $540 million as of December 31, 2024. While the lenders under our non-recourse financings generally do not have direct recourse to the Parent Company, such defaults under non-recourse financings can:

Current wording

Certain of our subsidiaries are in default with respect to all or a portion of their outstanding indebtedness. The total debt classified as current in our Consolidated Balance Sheets related to such defaults was $20 million as of December 31, 2025. While the lenders under our non-recourse financings generally do not have direct recourse to the Parent Company, such defaults under non-recourse financings can:

Previous wording

The AES Corporation requires cash primarily to fund: principal repayments of debt, interest, dividends on our common stock, acquisitions, construction and other project commitments, other equity commitments (including business development investments); equity repurchases; taxes and Parent Company overhead costs. Our principal sources of liquidity are dividends and other distributions from our subsidiaries, proceeds from financings at the Parent Company, and proceeds from asset sales. See Item 7.—Management's Discussion and Analysis —Capital Resources and Liquidity. We believe that these sources will be adequate to meet our obligations for the foreseeable future, based on a number of material assumptions about access the capital or commercial lending markets, the operating and financial performance of our subsidiaries, exchange rates, our ability to sell assets, and the ability of our subsidiaries to pay dividends and other distributions; however, there can be no assurance that these sources will be available when needed or that our actual cash requirements will not be greater than expected. In addition, our cash flow may not be sufficient to repay our debt obligations at maturity and we may have to refinance such obligations. There can be no assurance that we will be successful in obtaining such refinancing on acceptable terms.

Current wording

The AES Corporation requires cash primarily to fund: principal repayments of debt, interest, dividends on our common stock, acquisitions, construction and other project commitments, other equity commitments (including business development investments); equity repurchases; taxes and Parent Company overhead costs. Our principal sources of liquidity are dividends and other distributions from our subsidiaries, proceeds from financings at the Parent Company, and proceeds from asset sales. See Item 7.—Management's Discussion and Analysis —Capital Resources and Liquidity. We believe that these sources will be adequate to meet our obligations for the foreseeable future, based on a number of material assumptions about access to capital or commercial lending markets, the operating and financial performance of our subsidiaries, exchange rates, our ability to sell assets, and the ability of our subsidiaries to pay dividends and other distributions; however, there can be no assurance that these sources will be available when needed or that our actual cash requirements will not be greater than expected. In addition, our cash flow may not be sufficient to repay our debt obligations at maturity, and we may have to refinance such obligations. There can be no assurance that we will be successful in obtaining such refinancing on acceptable terms.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

In addition, new tariffs, duties or other assessments could be imposed on the imports of solar cells, modules, batteries or other equipment utilized in our renewable energy projects.