STERLING INFRASTRUCTURE, INC.

For the period ended Dec 31, 2025. Filed Feb 26, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 26, 2026

STRL$252.82+3.5%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-26.

0000874238-25-000025

Item 1A. Risk Factors

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-26.

0000874238-26-000024

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 156 previous paragraphs and 169 current paragraphs.

108 unchanged; 42 reworded; 17 added; 6 removed; 0 previous and 2 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (17)

Current report

The early termination of contracts and uncertainty of new project awards could adversely affect our business.

Current report

Risks Related to Legal and Regulatory Matters

Current report

We are, and may continue to be, involved in routine litigation and government inquiries in the ordinary course of business.

Current report

Due to the nature of our business, we are involved in routine litigation or subject to other disputes or claims related to our business activities, including, among other things, workers’ compensation claims, employment-related disputes and issues related to liability, breach of contract or tortious conduct in connection with our performance of services and provision of materials. The outcomes of these inquiries and legal proceedings are not expected to have a material effect on our financial position or results of operations on an individual basis, although adverse outcomes in a significant number of such ordinary course inquiries and legal proceedings could, in the aggregate, have a material adverse effect on our financial condition and results of operations.

Current report

We are required to obtain, maintain and comply with government permits, licenses and approvals, and failure to obtain, maintain, and comply with such permits, licenses and approvals could adversely affect our or our customers’ operations.

Current report

We, as well as our customers, are required to obtain, maintain, and comply with numerous federal, state and local government permits, licenses and approvals. Any of these permits, licenses or approvals may be subject to denial, revocation or modification under various circumstances. Failure to obtain or maintain such approvals or to comply with the conditions of permits, licenses or approvals may adversely affect our operations by, for instance, temporarily suspending our activities or curtailing our work and may subject us to fines, penalties, injunctive relief and other sanctions. Although existing permits and licenses are routinely renewed by various regulators, renewal could be denied or jeopardized by various factors, including:

Current report

• failure to provide adequate financial assurance for closure;

Current report

• failure to comply with environmental, health and safety laws and regulations or permit conditions; and

Current report

• executive action.

Current report

Furthermore, the regulatory permitting process for various projects requires significant investments of time and money by our customers and sometimes by us. We cannot guarantee that we or our customers will obtain the necessary permits for these projects.

Current report

Our business is subject to complex and evolving laws and regulations regarding data privacy and cybersecurity.

Current report

In the ordinary course of our business, we collect, use, store, and process personal information relating to our employees, vendors, and suppliers, and we may share such information with third‑party service providers for limited purposes under contractual arrangements.

Current report

Although we have implemented commercially reasonable measures to comply with applicable data privacy and cybersecurity laws and regulations, many of these laws are relatively new and subject to interpretation, and there can be no assurance that our compliance efforts will be deemed sufficient.

Current report

We use artificial intelligence (“AI”) technologies in our business, and the deployment, use, and maintenance of these technologies involve significant technological and legal risks.

Current report

We invest in AI, but face challenges: an evolving market, unproven growth, and potential development failures. We currently use third-party tools and are developing our AI strategy with external vendors. Risks include flawed algorithms, biased data, intense competition, and the inability to commercialize AI offerings effectively. The rapidly changing legal landscape, including privacy and consumer protection laws, poses unpredictable compliance costs. Ultimately, AI investments may not always benefit our business.

Current report

•assumption of contractual obligations that contain terms that are not beneficial to us or increase our risk for liability;

Current report

Our failure to address these risks or other problems encountered in connection with any future acquisitions could cause us to fail to realize the anticipated benefits of these acquisitions, cause us to incur unanticipated liabilities and harm our business generally. Future acquisitions could also result in dilutive issuances of the combined company’s equity securities, the incurring of debt, contingent liabilities, amortization expenses or the write-off of goodwill, any of which may adversely affect our business, prospects, liquidity, financial condition, and results of operations.
Removed paragraphs (6)

Previous report

•continued or worsening inflationary pressures;

Previous report

•economic downturn or recession;

Previous report

•labor shortages, especially craft labor, and rising costs of labor; and

Previous report

•changes in the tax laws that reduce the benefits of home ownership.

Previous report

Most of our contracts can be canceled on short notice.

Previous report

Risks Related to Regulatory Matters
Reworded paragraphs (42)

Previous wording

Across our three operating segments, revenue and profit are generated from infrastructure projects and services, but we do not directly control the process by which such infrastructure projects and services are awarded. The construction industry historically has experienced cyclical fluctuations in financial results due to economic recessions, downturns in business cycles of our customers, supply chain disruptions, inflationary pressures, interest rate fluctuations and other economic factors beyond our control. Many factors, including the financial condition of the infrastructure industry, could adversely affect our customers and their willingness to fund capital expenditures in the future. Additionally, consolidation, competition or capital constraints in the industries we serve may result in reduced spending by our customers.

Current wording

Across our three operating segments, revenue and profit are generated from infrastructure projects and services, but we do not directly control the process by which such infrastructure projects and services are awarded. The construction industry historically has experienced cyclical fluctuations in financial results due to economic recessions, downturns in business cycles of our customers, supply chain disruptions and the price or availability of building materials, inflationary pressures, interest rate fluctuations, international trade issues, including tariffs and counter tariffs, and other economic factors beyond our control. Many factors, including the financial condition of the infrastructure industry, could adversely affect our customers and their willingness to fund capital expenditures in the future. Additionally, consolidation, competition or capital constraints in the industries we serve may result in reduced spending by our customers.

Previous wording

The price and availability of the materials required to execute our projects are subject to volatility and disruptions caused by global economic factors that are beyond our control, including, but not limited to, supply chain disruptions, labor shortages, wage pressures, rising inflation and potential economic slowdown or recession, as well as fuel and energy costs, the impact of natural disasters, public health crises, geopolitical conflicts (such as the conflicts in Eastern Europe and the Middle East), and other matters that have impacted or could impact the global economy. If shortages and cost increases in materials and tightness in the labor market persist for a prolonged period of time, and we are unable to offset such cost increases, our profit margins could be adversely impacted.

Current wording

The price and availability of the materials required to execute our projects are subject to volatility and disruptions caused by global economic factors that are beyond our control, including, but not limited to, labor shortages, wage pressures, rising inflation and potential economic slowdown or recession, as well as fuel and energy costs, the impact of natural disasters, geopolitical conflicts (such as the conflicts in Eastern Europe and the Middle East), and other matters that have impacted or could impact the global economy. If shortages and cost increases in materials and tightness in the labor market persist for a prolonged period of time, and we are unable to offset such cost increases, our profit margins could be adversely impacted.

Previous wording

We rely on third party suppliers to provide substantially all of the materials (including aggregates, cement, asphalt, concrete, steel, oil and fuel) for our contracts and third party subcontractors to perform some of the work on many of our projects. Increasing prices of materials and equipment and substantial delays in delivering supplies have and could continue to adversely impact our operations and construction projects. For the past several years, our operating margins have been adversely impacted, and may continue to be impacted, by price increases for certain materials, including fuel, concrete, steel and lumber. To the extent that we are unable to obtain commitments from our suppliers for materials or engage subcontractors, our ability to bid for contracts may be impaired.

Current wording

We rely on third party suppliers to provide substantially all of the materials for our contracts and third party subcontractors to perform some of the work on many of our projects. For the past several years, our operating margins have been adversely impacted, and may continue to be impacted, by price increases for certain construction materials, as well as fuel for our equipment. To the extent that we are unable to obtain commitments from our suppliers for materials or engage subcontractors, our ability to bid for contracts may be impaired.

Previous wording

•changes in availability, proximity and costs of materials, including steel, concrete, aggregates and other construction materials (such as stone, gravel, sand and oil for asphalt paving), as well as fuel and lubricants for our equipment; and

Current wording

•changes in availability and proximity of construction materials, as well as fuel for our equipment; and

Previous wording

Because all of our construction projects are performed outdoors, work on our contracts is subject to seasonal weather conditions that may delay our work and contribute to project inefficiency. Lengthy periods of wet or cold winter weather will generally interrupt construction, and this can lead to under-utilization of crews and equipment, resulting in less efficient rates of overhead recovery. Extreme heat or cold can prevent us from performing certain types of operations. For example, during the late fall to the early spring months of each year, our work on construction projects in the Rocky Mountain States has been curtailed at times due to snow and other work-limiting weather. In addition, our work is subject to extreme and unpredictable weather conditions, which could become more frequent or severe if general climatic changes occur. For example, in 2021 there was a Texas-wide freezing weather event that caused delays for some of our Transportation Solutions and Building Solutions operations. Future extreme weather events may limit the availability of resources, increase our costs, delay our performance of work for extended periods of time, or cause our projects to be canceled. While revenues can be recovered following a period of bad weather, it is generally impossible to recover the cost of inefficiencies, and significant periods of bad weather typically reduce profitability of affected contracts both in the current period and during the future life of affected contracts. Such reductions in contract profitability negatively affect our results of operations in current and future periods until the affected contracts are completed. To the extent climate change results in an increase in such extreme adverse weather conditions, the likelihood of a negative impact on our operations may increase.

Current wording

Because a significant portion of our construction projects are performed outdoors, work on those contracts is subject to seasonal weather conditions that may delay our work and contribute to project inefficiency. Lengthy periods of wet or cold winter weather will generally interrupt construction, and this can lead to under-utilization of crews and equipment, resulting in less efficient rates of overhead recovery. Extreme heat or cold can prevent us from performing certain types of operations. For example, during the late fall to the early spring months of each year, our work on construction projects in the Rocky Mountain States has been curtailed at times due to snow and other work-limiting weather. In addition, our work is subject to extreme and unpredictable weather conditions, which could become more frequent or severe if general climatic changes occur. For example, in 2021 there was a Texas-wide freezing weather event that caused delays for some of our Transportation Solutions and Building Solutions operations. While revenues can be recovered following a period of bad weather, it is generally impossible to recover the cost of inefficiencies, and significant periods of bad weather typically reduce profitability of affected contracts both in the current period and during the future life of affected contracts. Such reductions in contract profitability negatively affect our results of operations in current and future periods until the affected contracts are completed. To the extent climate change results in an increase in such extreme adverse weather conditions, the likelihood of a negative impact on our operations may increase.

Previous wording

We rely on information technology (“IT”) systems in order to achieve our business objectives. We also rely upon industry accepted security measures and technology to securely maintain confidential information on our IT systems. However, our portfolio of hardware and software products, solutions and services and our enterprise IT systems may be vulnerable to damage or disruption caused by circumstances such as catastrophic events, power outages, natural disasters, computer system or network failures, computer viruses, cyber-attacks or other malicious software programs. The failure or disruption of our IT systems to perform as anticipated for any reason could disrupt our business and result in decreased performance, significant remediation costs, transaction errors, loss of data, processing inefficiencies, downtime, litigation and the loss of suppliers or customers. A significant disruption or failure could have a material adverse effect on our business operations, financial performance and financial condition.

Current wording

We rely on information technology (“IT”) systems in order to achieve our business objectives. We also rely upon industry accepted security measures and technology to securely maintain confidential information on our IT systems. However, our portfolio of hardware and software products, solutions and services and our enterprise IT systems may be vulnerable to damage or disruption caused by circumstances such as catastrophic events, power outages, computer system or network failures, computer viruses, cyber-attacks or other malicious software programs. The failure or disruption of our IT systems to perform as anticipated for any reason could disrupt our business and result in decreased performance, significant remediation costs, transaction errors, loss of data, processing inefficiencies, downtime, litigation and the loss of suppliers or customers. A significant disruption or failure could have a material adverse effect on our business operations, financial performance and financial condition.

Previous wording

Major public health crises could disrupt the Company’s operations and adversely affect its business, results of operations and financial condition.

Current wording

Major public health crises could disrupt our operations and adversely affect our business, results of operations and financial condition.

Previous wording

In the past, many of the heavy highway contracts on which we bid were awarded through a competitive bid process, with awards generally being made to the lowest bidder, but sometimes recognizing other considerations, such as shorter contract schedules or prior experience with the customer and reputation. Within our geographic markets, we compete with many international, national, regional and local construction firms. Several of these competitors have achieved greater geographic market penetration than we have in the geographic markets in which we compete, and/or have greater resources, including financial resources, than we do. In addition, a number of international and national companies in the heavy highway industry that are larger than we are and that currently do not have a significant presence in our geographic markets, if they so desire, could establish a presence in our geographic markets and compete with us for contracts.

Current wording

In the past, many of the heavy highway contracts on which we bid were awarded through a competitive bid process, with awards generally being made to the lowest bidder, but sometimes recognizing other considerations, such as shorter contract schedules or prior experience with the customer and reputation. Within our geographic markets, we compete with many international, national, regional and local construction firms. Several of these competitors have achieved greater geographic market penetration than we have in the geographic markets in which we compete, and/or have greater resources, including financial resources, than we do. In addition, a number of international and national companies in the heavy highway construction industry that are larger than we are and that currently do not have a significant presence in our geographic markets, if they so desire, could establish a presence in our geographic markets and compete with us for contracts.

Previous wording

Our business is highly dependent on the amount and timing of infrastructure work funded by various governmental entities, which, in turn, depend on the overall condition of the economy, the need for new or replacement infrastructure, the priorities placed on various projects funded by governmental entities and federal, state or local government spending levels. Spending on infrastructure could decline for numerous reasons, including decreased revenues received by state and local governments for spending on such projects. For example, state spending on highway and other projects can be adversely affected by decreases or delays in, or uncertainties regarding, federal highway funding, which could adversely affect us since we are reliant upon contracts with state transportation departments for a significant portion of our revenues.

Current wording

Our Transportation Solutions business is highly dependent on the amount and timing of infrastructure work funded by various governmental entities, which, in turn, depend on the overall condition of the economy, the need for new or replacement infrastructure, the priorities placed on various projects funded by governmental entities and federal, state or local government spending levels. Spending on infrastructure could decline for numerous reasons, including decreased revenues received by state and local governments for spending on such projects. For example, state spending on highway and other projects can be adversely affected by decreases or delays in, or uncertainties regarding, federal highway funding, which could adversely affect us since we are reliant upon contracts with state transportation departments for a significant portion of our revenues.

Previous wording

The homebuilding industry is cyclical and susceptible to downward changes in general economic or other business conditions which could adversely affect our Building Solutions projects, including foundations for single-family and multi-family homes.

Current wording

The homebuilding industry is cyclical and susceptible to downward changes in general economic or other business conditions which could adversely affect our Building Solutions projects, including foundations and plumbing for single-family and multi-family homes.

Previous wording

The Building Solutions industry is sensitive to changes in economic conditions and other factors, such as the level of employment, consumer confidence, consumer income, availability of financing and interest rate levels. Beginning in 2022, rising inflation and increased interest rates made home ownership less affordable, which resulted in decreased demand for single-family homes. Should these conditions, especially in the markets where we operate, continue or worsen, new home demand and prices could suffer and customers might cancel pending contracts. This impact could adversely affect the number of Building Solutions concrete projects we have or reduce the prices we can charge for these projects, either of which could result in a decrease in our revenues and earnings that could materially adversely affect our results of operations.

Current wording

Our Building Solutions business is sensitive to changes in economic conditions and other factors, such as the level of employment, consumer confidence, consumer income, availability of financing and interest rate levels. Beginning in 2022, rising inflation and increased interest rates made home ownership less affordable, which resulted in decreased demand for single-family homes. Should these conditions, especially in the markets where we operate, continue or worsen, new home demand and prices could suffer and customers might cancel pending contracts. This impact could adversely affect the number of Building Solution projects we have or reduce the prices we can charge for these projects, either of which could result in a decrease in our revenues and earnings that could materially adversely affect our results of operations.

Previous wording

•shortage of lots available for development;

Current wording

•shortage of lots available for development; and

Previous wording

At December 31, 2024, there was approximately $150.3 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $73.6 million represented our proportionate share. We are not aware of any situation that would require us to fulfill responsibilities of our construction joint venture partners pursuant to the joint and several liability under our contracts.

Current wording

At December 31, 2025, there was approximately $371.9 million of construction work to be completed on unconsolidated construction joint venture contracts, of which $148.8 million represented our proportionate share. We are not aware of any situation that would require us to fulfill responsibilities of our construction joint venture partners pursuant to the joint and several liability under our contracts.

Previous wording

Our contracts generally have clauses that permit the cancellation of the contract unilaterally and at any time as long as the customer compensates us for the work already completed and for additional contractual costs for cancellation. A cancellation of an unfinished contract could cause our equipment and work crews to be idle for a period of time until other comparable work becomes available, which could have a material adverse effect on our business and results of operations.

Current wording

Our contracts generally have clauses that permit the cancellation of the contract unilaterally and at any time as long as the customer compensates us for the work already completed and for additional contractual costs for cancellation. A cancellation of an unfinished contract could cause our equipment and work crews to be idle for a period of time until other comparable work becomes available. Additionally, we may be prohibited from bidding on certain government contracts if we fail to maintain required qualifications, and the timing of project awards is unpredictable and outside of our control due to complex and lengthy negotiation processes. Any of the foregoing could have a material adverse effect on our results of operations and financial condition.

Previous wording

Our ability to attract and retain reliable, qualified personnel is a significant factor that enables us to successfully bid for and profitably complete our work. This includes management, project managers, estimators, supervisors, foremen, equipment operators and laborers for each of our subsidiaries. The loss of the services of any of our subsidiaries’ management-level personnel could have a material adverse effect on us. Our future success will also depend on our ability to hire and retain, or to attract when needed, highly-skilled personnel. Our business operations may be further impacted by general labor shortages in our industry or markets. If competition for additional employees is intense, we could experience difficulty hiring and retaining the personnel necessary to support our business. If we do not succeed in retaining our current employees and attracting, developing and retaining new highly-skilled employees, our reputation may be harmed and our operations and future earnings may be negatively impacted. Effective succession planning is also important to our long-term success. Failure to ensure effective transfer of knowledge and smooth transitions involving key employees could hinder our strategic planning and execution.

Current wording

Our ability to attract and retain reliable, qualified personnel is a significant factor that enables us to successfully bid for and profitably complete our work. This includes management, project managers, estimators, supervisors, foremen, equipment operators and laborers for each of our subsidiaries. The loss of the services of any of our subsidiaries’ management-level personnel could have a material adverse effect on us. Our future success will also depend on our ability to hire and retain, or to attract when needed, highly-skilled personnel. Effective succession planning is also important to our long-term success. Failure to ensure effective transfer of knowledge and smooth transitions involving key employees could hinder our strategic planning and execution.

Previous wording

In Arizona, California, Hawaii, Maryland, Nevada, New Jersey and New York, we have project personnel that are unionized. Additional groups of our employees may also unionize in the future. If at any time a significant amount of our employees unionized, it could limit the flexibility of the workforce and could result in demands that might increase our operating expenses and adversely affect our profitability. Our inability to negotiate acceptable contracts with unions could result in work stoppages, and any new or extended contracts could result in increased operating costs. Each of our different employee groups could unionize at any time and would require separate collective bargaining agreements. If any group of our employees were to unionize and we were unable to agree on the terms of their collective bargaining agreement or we were to experience widespread employee dissatisfaction, we could be subject to work slowdowns or stoppages. In addition, we may be subject to disruptions by organized labor groups protesting our non-union status. The future or continued occurrence of any of these events would be disruptive to our operations and could have a material adverse effect on our business, operating results and financial condition.

Current wording

In several of the states in which we operate, we have project personnel that are unionized. Additional groups of our employees may also unionize in the future. If at any time a significant amount of our employees unionized, it could limit the flexibility of the workforce and could result in demands that might increase our operating expenses and adversely affect our profitability. Our inability to negotiate acceptable contracts with unions could result in work stoppages, and any new or extended contracts could result in increased operating costs. In addition, we may be subject to disruptions by organized labor groups protesting our non-union status. The future or continued occurrence of any of these events would be disruptive to our operations and could have a material adverse effect on our business, operating results and financial condition.

Previous wording

We rely heavily on immigrant labor. We have taken steps that we believe are sufficient and appropriate to ensure compliance with immigration laws. However, we cannot provide assurance that we have identified, or will identify in the future, all undocumented immigrants who work for us. Our failure to identify undocumented immigrants who work for us may result in fines or other penalties being imposed upon us, which could have a material adverse effect on our results of operations and financial condition.

Current wording

We rely heavily on immigrant labor. We have taken steps that we believe are sufficient and appropriate to ensure compliance with immigration laws. However, we cannot provide assurance that we have identified, or will identify in the future, all undocumented immigrants who work for us. Our failure to identify undocumented immigrants who work for us may result in fines or other penalties being imposed upon us, which could have a material adverse effect on our results of operations and financial condition. Immigration laws have also been an area of considerable political focus in recent years, and, from time-to-time, the U.S. government considers or implements changes to federal immigration laws, regulations or enforcement programs. Changes in immigration or work authorization laws may increase our obligations for compliance and oversight, which could subject us to additional costs and potential liability and make our hiring processes more cumbersome, or reduce the availability of potential employees. Any of the foregoing could have a material adverse effect on our results of operations and financial condition.

Previous wording

Our workers are subject to hazards associated with providing construction and related services on construction sites, plants and quarries. These operating hazards can cause personal injury, loss of life, damage to or destruction of property, plant and equipment or environmental damage. On most sites, we are responsible for safety and are contractually obligated to implement safety procedures. Our safety record is an important consideration for us and for our customers. If we experience a material increase in the frequency or severity of accidents, our safety record could substantially deteriorate, which may preclude us from bidding on certain work, expose us to potential lawsuits or cause customers to cancel existing contracts.

Current wording

Our workers are subject to hazards associated with providing construction and related services. These operating hazards can cause personal injury, loss of life, damage to or destruction of property, plant and equipment or environmental damage. On most sites, we are responsible for safety and are contractually obligated to implement safety procedures. Our safety record is an important consideration for us and for our customers. If we experience a material increase in the frequency or severity of accidents, our safety record could substantially deteriorate, which may preclude us from bidding on certain work, expose us to potential lawsuits or cause customers to cancel existing contracts.

Previous wording

We maintain general liability and excess liability insurance, workers’ compensation insurance, auto insurance and other types of insurance all in amounts consistent with our risk of loss and infrastructure industry practice, but this insurance may not be adequate to cover all losses or liabilities that we may incur in our operations. Insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents not reported and the effectiveness of our safety program. If we were to experience insurance claims or costs above our estimates, we might be required to use working capital to satisfy these claims rather than to maintain or expand our operations. To the extent that we experience a material increase in the frequency or severity of accidents or workers’ compensation and health claims, or unfavorable developments on existing claims, our results of operations and financial condition could be materially and adversely affected.

Current wording

We maintain general liability and excess liability insurance, workers’ compensation insurance, auto insurance and other types of insurance all in amounts consistent with our risk of loss and infrastructure industry practice, but this insurance may not be adequate to cover all losses or liabilities that we may incur in our operations. Insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the number of incidents not reported and the effectiveness of our safety program. If we were to experience insurance claims or costs above our estimates, we might be required to use working capital to satisfy these claims rather than to maintain or expand our operations. To the extent that we experience a material increase in the frequency or severity of accidents or workers’ compensation and health claims, or unfavorable developments on existing claims, our results of operations and financial condition could be materially and adversely affected.

Previous wording

We contribute to several multiemployer pension plans for employees covered by collective bargaining agreements. These plans are not administered by us and contributions are determined in accordance with provisions of negotiated labor contracts. The Employee Retirement Income Security Act of 1974, as amended by the Multiemployer Pension Plan Amendments Act of 1980, imposes certain liabilities upon employers who are contributors to a multiemployer plan in the event of the employer’s withdrawal from, or upon termination of, such plan. If we terminate, withdraw or partially withdraw from other multiemployer pension plans, we could be required to make significant cash contributions to fund that plans unfunded vested benefit, which could materially and adversely affect our financial condition and results of operations; however, we are not currently able to determine the net assets and actuarial present value of the multiemployer pension plans’ unfunded vested benefits allocable to us, if any, and we are not presently aware of the amounts, if any, for which we may be contingently liable if we were to withdraw from any of these plans. In addition, if the funding level of any of these multiemployer plans becomes classified as “critical status” under the Pension Protection Act of 2006, we could be required to make significant additional contributions to those plans.

Current wording

We contribute to several multiemployer pension plans for employees covered by collective bargaining agreements. These plans are not administered by us and contributions are determined in accordance with provisions of negotiated labor contracts. The Employee Retirement Income Security Act of 1974, as amended by the Multiemployer Pension Plan Amendments Act of 1980, imposes certain liabilities upon employers who are contributors to a multiemployer plan in the event of the employer’s withdrawal from, or upon termination of, such plan. If we terminate, withdraw or partially withdraw from other multiemployer pension plans, we could be required to make significant cash contributions to fund those plans unfunded vested benefit, which could materially and adversely affect our financial condition and results of operations; however, we are not currently able to determine the net assets and actuarial present value of the multiemployer pension plans’ unfunded vested benefits allocable to us, if any, and we are not presently aware of the amounts, if any, for which we may be contingently liable if we were to withdraw from any of these plans. In addition, if the funding level of any of these multiemployer plans becomes classified as “critical status” under the Pension Protection Act of 2006, we could be required to make significant additional contributions to those plans.

Previous wording

Environmental and other regulatory matters, including those relating to climate change, could adversely affect our ability to conduct our business and could require expenditures that could have a material adverse effect on our results of operations and financial condition.

Current wording

Environmental and other regulatory matters, including those relating to climate change, could adversely affect our ability to conduct our business and could require expenditures that could have a material adverse effect on our results of operations and financial condition. In addition, future regulations, or more stringent enforcement of existing regulations, could increase those costs and liabilities, which could adversely affect our financial position and results of operations.

Previous wording

Our operations are subject to various environmental laws and regulations relating to the management, disposal and remediation of hazardous substances and the emission and discharge of pollutants into the air and water. We could be held liable for such contamination created not only from our own activities but also from the historical activities of others on our project sites or on properties that we acquire or lease. Our operations are also subject to laws and regulations relating to workplace safety and worker health, which, among other things, regulate employee exposure to hazardous substances. Violations of such laws and regulations could subject us to substantial fines and penalties, cleanup costs, third party property damage or personal injury claims. In addition, growing concerns about climate change and other environmental issues could result in the imposition of additional environmental regulations. Such legislation or restrictions could increase the costs of projects for us and our clients or, in some cases, prevent a project from going forward, thereby potentially reducing the need for our services which could in turn have a material adverse effect on our operations and financial condition. Generally, environmental laws and regulations have become, and enforcement practices and compliance standards are becoming increasingly stringent. Moreover, we cannot predict the nature, scope or effect of legislation or regulatory requirements that could be imposed, or how existing or future laws or regulations will be administered or interpreted, with respect to products or activities to which they have not been previously applied. Compliance with more stringent laws or regulations, as well as more vigorous enforcement policies of the regulatory agencies, could increase our compliance costs. Compliance with new regulations could require us to make substantial expenditures for, among other things, pollution control systems and other equipment that we do not currently possess, or the acquisition or modification of permits applicable to our activities.

Current wording

Our operations are subject to various environmental laws and regulations relating to the management, disposal and remediation of hazardous substances and the emission and discharge of pollutants into the air and water. We could be held liable for contamination created not only from our own activities but also from the historical activities of others on our project sites or on properties that we acquire or lease. Our operations are also subject to laws and regulations relating to workplace safety and worker health, which, among other things, regulate employee exposure to hazardous substances. Violations of laws and regulations could subject us to substantial fines and penalties, cleanup costs, third party property damage or personal injury claims, natural resource damages claims, the issuance of orders enjoining our operations and administrative, civil and criminal liability.

Previous wording

Our aggregate quarry leases in Utah and Nevada could subject us to costs and liabilities. As lessee and operator of the quarries, we could be held responsible for any contamination or regulatory violations resulting from activities or operations at the quarries. Any such costs and liabilities could be significant and could materially and adversely affect our business, operating results and financial condition.

Current wording

Our aggregate quarry leases could subject us to costs and liabilities. We could be held responsible for any contamination or regulatory violations resulting from activities or operations at the quarries, which could be significant and could materially and adversely affect our business, operating results and financial condition.

Previous wording

Recent and potential changes in U.S. trade policies and retaliatory responses from other countries may significantly increase the costs or limit supplies of materials and products used in our construction projects involving concrete.

Current wording

Recent and potential changes in U.S. trade policies and retaliatory responses from other countries may significantly increase the costs or limit supplies of materials and products used in our projects.

Previous wording

In the recent past, the federal government imposed new or increased tariffs or duties on an array of imported materials and goods used in connection with our construction business, including steel and lumber, which raised our costs for these items (or products made with them). Foreign governments, including China, Canada and Mexico, and trading blocs, such as the European Union, have responded by imposing or increasing tariffs, duties and/or trade restrictions on U.S. goods, and are reportedly considering other measures. Any trading conflicts and related escalating governmental actions that result in additional tariffs, duties and/or trade restrictions could increase our costs further, cause disruptions or shortages in our supply chains and/or negatively impact the U.S., regional or local economies, and, individually or in the aggregate, materially and adversely affect our business and result of operations.

Current wording

In the recent past, the federal government imposed new or increased tariffs or duties on an array of imported materials and goods used in connection with our projects, which raised our costs for these items (or products made with them). Foreign governments, including China, Canada and Mexico, and trading blocs, such as the European Union, have responded by imposing or increasing tariffs, duties and/or trade restrictions on U.S. goods. Any trading conflicts and related escalating governmental actions that result in additional tariffs, duties and/or trade restrictions could increase our costs further, cause disruptions or shortages in our supply chains and/or negatively impact the U.S., regional or local economies, and, individually or in the aggregate, materially and adversely affect our business and result of operations.

Previous wording

We conduct business across the United States and file income taxes in the federal and various state jurisdictions. Significant judgment is required in our accounting for income taxes. In the ordinary course of our business, there are transactions and calculations in which the ultimate tax determination is uncertain. Changes in tax laws and regulations, in addition to changes and conflicts in related interpretations and other tax guidance, could materially impact our provision for income taxes, deferred tax assets and liabilities, and liabilities for uncertain tax positions. Issues relating to tax audits or examinations and any related interest or penalties and uncertainty in obtaining deductions or credits claimed in various jurisdictions could also impact the accounting for income taxes. Our results of operations are reported based on our determination of the amount of taxes we owe in various tax jurisdictions, and our provision for income taxes and tax liabilities are subject to review or examination by taxing authorities in applicable tax jurisdictions. An adverse outcome of such a review or examination could adversely affect our operating results and financial condition. Further, the results of tax examinations and audits could have a negative impact on our financial results and cash flows where the results differ from the liabilities recorded in our financial statements.

Current wording

We conduct business across the United States and file income taxes in federal and various state jurisdictions. Significant judgment is required in our accounting for income taxes. In the ordinary course of our business, there are transactions and calculations in which the ultimate tax determination is uncertain. Changes in tax laws and regulations, in addition to changes and conflicts in related interpretations and other tax guidance, could materially impact our provision for income taxes, deferred tax assets and liabilities, and liabilities for uncertain tax positions. Issues relating to tax audits or examinations and any related interest or penalties and uncertainty in obtaining deductions or credits claimed in various jurisdictions could also impact the accounting for income taxes. Our results of operations are reported based on our determination of the amount of taxes we owe in various tax jurisdictions, which are subject to review or examination by taxing authorities in applicable tax jurisdictions. An adverse outcome of such a review or examination could adversely affect our operating results and financial condition. Further, the results of tax examinations and audits could have a negative impact on our financial results and cash flows where the results differ from the liabilities recorded in our financial statements.

Previous wording

We may continue to pursue growth through the acquisition of companies or assets that will enable us to broaden the types of projects we execute and also expand into new markets. We have completed several acquisitions and plan to consider strategic acquisitions in the future. We may be unable to implement this growth strategy if we cannot identify suitable companies or assets or reach agreement on potential strategic acquisitions on acceptable terms. Moreover, an acquisition involves certain risks, including:

Current wording

We continue to pursue growth through the acquisition of companies or assets that will enable us to broaden the types of projects we execute and also expand into new markets. We have completed several acquisitions and plan to consider strategic acquisitions in the future. We may be unable to implement this growth strategy if we cannot identify suitable companies or assets or reach agreement on potential strategic acquisitions on acceptable terms. Moreover, an acquisition involves certain risks, including:

Previous wording

Under this method, estimated contract revenue is recognized by applying the cost-to-cost measure of progress for the period (based on the ratio of costs incurred to total estimated costs of a contract) to the total estimated revenue for the contract. Contract estimates are based on various assumptions to project the outcome of future events that often span several years. These assumptions include labor productivity and availability, the complexity of the work to be performed, the cost and availability of materials and the performance of subcontractors. Changes in job performance, job conditions and estimated profitability, including those changes arising from contract penalty provisions and final contract settlements, may result in revisions to costs and income and are recognized in the period in which the revisions are determined. These adjustments could result in both increases and decreases in profit margins or losses. Actual results could differ from estimated amounts and could result in a reduction or elimination of previously recognized earnings. In certain circumstances, it is possible that such adjustments could be significant and could have an adverse effect on our business. To the extent that these adjustments result in an increase, a reduction or an elimination of previously reported contract profit, we recognize a credit or a charge against current earnings, which could be material.

Current wording

Under this method, estimated contract revenue is recognized by applying the cost-to-cost measure of progress for the period (based on the ratio of costs incurred to total estimated costs of a contract) to the total estimated revenue for the contract. Contract estimates are based on various assumptions to project the outcome of future events that often span several years. These assumptions include labor productivity and availability, the complexity of the work to be performed, and the performance of subcontractors. Changes in job performance, job conditions and estimated profitability, including those changes arising from contract penalty provisions and final contract settlements, may result in revisions to costs and income and are recognized in the period in which the revisions are determined. These adjustments could result in both increases and decreases in profit margins or losses. Actual results could differ from estimated amounts and could result in a reduction or elimination of previously recognized earnings. In certain circumstances, it is possible that such adjustments could be significant and could have an adverse effect on our business. To the extent that these adjustments result in an increase, a reduction or an elimination of previously reported contract profit, we recognize a credit or a charge against current earnings, which could be material.

Previous wording

Backlog as of December 31, 2024 totaled $1.69 billion. Backlog develops as a result of new awards, which represent the potential revenue value realizable pursuant to new project commitments received by us during a given period. Backlog is measured and defined differently by companies within our industry. We refer to “Backlog” as the unearned revenue we expect to earn in future periods on our executed contracts. As the construction on our projects progresses, we increase or decrease Backlog to take into account newly signed contracts, revenue earned during the period and our estimates of the effects of changes in estimated quantities, changed conditions, change orders and other variations from previously anticipated contract revenues, including completion penalties and incentives. We cannot guarantee that the revenue projected in our Backlog will be realized, or if realized, will result in earnings.

Current wording

Backlog as of December 31, 2025 totaled $3.01 billion. Backlog develops as a result of new awards, which represent the potential revenue value realizable pursuant to new project commitments received by us during a given period. Backlog is measured and defined differently by companies within our industry. We refer to “Backlog” as the unearned revenue we expect to earn in future periods on our executed contracts. As the construction on our projects progresses, we increase or decrease Backlog to take into account newly signed contracts, revenue earned during the period and our estimates of the effects of changes in estimated quantities, changed conditions, change orders and other variations from previously anticipated contract revenues, including completion penalties and incentives. In the event of a project cancellation, termination, or scope adjustment, we typically have no contractual right to the total revenues reflected in our Backlog. The timing of contract awards, duration of large new contracts and the mix of services can significantly affect Backlog reporting. We cannot guarantee that the revenue projected in our Backlog will be realized, or if realized, will result in earnings.

Previous wording

Given these factors, our Backlog at any point in time may not accurately represent the revenue that we expect to realize during any period, and our Backlog as of the end of a fiscal year may not be indicative of the revenue we expect to earn in the following fiscal year. Inability to realize revenue from our Backlog could have an adverse effect on our business.

Current wording

Given these factors, our Backlog at any point in time may not accurately represent the revenue that we expect to realize during any period, and our Backlog as of the end of a fiscal year may not be indicative of the revenue we expect to earn in the following fiscal year and should not be viewed or relied upon as a stand-alone indicator. Consequently, we cannot provide assurance that our estimates of Backlog will accurately reflect future revenue. Inability to realize revenue from our Backlog could have an adverse effect on our business.

Previous wording

We have pledged substantially all of our assets as collateral in connection with that certain credit agreement, dated as of October 2, 2019, by and among the Company, as borrower, certain of our subsidiaries, as guarantors, the financial institutions party thereto as lenders and BMO Bank N.A., as administrative agent for the lenders (as amended, the “Credit Agreement”), and we have additionally pledged the proceeds of and other rights under our E-Infrastructure Solutions and Transportation Solutions contracts to our bonding agent. As a result, we may have difficulty in obtaining additional financing in the future if such financing requires us to pledge assets as collateral. In addition, under our Credit Agreement, we must obtain the consent of our lenders to incur additional debt from other sources (subject to certain limited exceptions).

Current wording

We have pledged substantially all of our assets as collateral in connection with that certain amended and restated credit agreement, dated as of June 5, 2025, by and among the Company, as borrower, certain of our subsidiaries, as guarantors, the financial institutions party thereto as lenders and BMO Bank N.A., as administrative agent for the lenders (as amended, the “Credit Agreement”), and we have additionally pledged the proceeds of and other rights under our E-Infrastructure Solutions and Transportation Solutions contracts to our bonding agent. As a result, we may have difficulty in obtaining additional financing in the future if such financing requires us to pledge assets as collateral. In addition, under our Credit Agreement, we must obtain the consent of our lenders to incur additional debt from other sources (subject to certain limited exceptions).

Previous wording

We incurred indebtedness in connection with recent acquisitions, and the agreement governing such indebtedness contains various covenants and other provisions that impose restrictions on our ability to operate and manage our business.

Current wording

Our Credit Agreement contains various covenants and other provisions that impose restrictions on our ability to operate and manage our business.

Previous wording

As of December 31, 2024, our aggregate principal amount outstanding under our credit facility (“Credit Facility”) was $317.2 million. The Credit Facility will mature on April 2, 2026. While we currently believe we will have the financial resources to meet or refinance our obligations when they come due, we cannot fully anticipate our future performance or financial condition, the future condition of the credit markets or the economy generally.

Current wording

As of December 31, 2025, our aggregate principal amount outstanding under the Credit Agreement was $292.5 million. The Credit Agreement will mature on June 5, 2028. While we currently believe we will have the financial resources to meet or refinance our obligations when they come due, we cannot fully anticipate our future performance or financial condition, the future condition of the credit markets or the economy generally.

Previous wording

The Credit Agreement governing the indebtedness incurred by us under our Credit Facility contains certain subsidiary guarantees, which are secured by a first priority security interest in substantially all assets directly owned by such subsidiaries and us, subject to certain exceptions and limitations. The Credit Agreement contains various affirmative and negative covenants that may, subject to certain exceptions, restrict the ability of us and our subsidiaries to, among other things, grant liens, incur additional indebtedness, make loans, advances or other investments, make non-ordinary course asset sales, declare or pay dividends or make other distributions with respect to equity interests, purchase, redeem or otherwise acquire or retire capital stock or other equity interests, or merge or consolidate with any other person, among various other things.

Current wording

The Credit Agreement is secured by a first priority security interest in substantially all of our assets, subject to certain exceptions and limitations. The Credit Agreement contains various affirmative and negative covenants that may, subject to certain exceptions, restrict our ability to, among other things, grant liens, incur additional indebtedness, make loans, advances or other investments or make certain acquisitions, make non-ordinary course asset sales, declare or pay dividends or make other distributions with respect to equity interests, purchase, redeem or otherwise acquire or retire capital stock or other equity interests, or merge or consolidate with any other person, among various other things.

Previous wording

In addition, the Credit Agreement contains financial covenants that require us and certain of our subsidiaries to maintain certain financial ratios and to prepay outstanding loans under the Credit Agreement in certain cases with proceeds from the issuance of additional debt, asset dispositions, events of loss and excess cash flows. These requirements could limit our cash flow or impair our ability to conduct business and pursue business strategies, which could have a material adverse effect on our results of operations, cash flows or financial condition. The ability of us and our subsidiaries to comply with these provisions may be affected by events beyond our and their control. Failure to comply with these covenants could result in an event of default, which, if not cured or waived, could accelerate our debt repayment obligations, which in turn may trigger cross-acceleration or cross-default provisions in other debt or bonding agreements. The Credit Agreement also contains a cross-default provision. This provision could have a wider impact on liquidity than might otherwise arise from a default of a single debt instrument. Our available cash and liquidity would not be sufficient to fully repay borrowings under all of our debt instruments that could be accelerated upon such an event of default.

Current wording

In addition, the Credit Agreement contains financial covenants that require us to maintain certain financial ratios and to prepay outstanding loans under the Credit Agreement in certain cases with proceeds from the issuance of additional debt, asset dispositions, and events of loss. These requirements could limit our cash flow or impair our ability to conduct business and pursue business strategies. Our ability to comply with these provisions may be affected by events beyond our and their control. Failure to comply with these covenants could result in an event of default, which, if not cured or waived, could accelerate our debt repayment obligations, which in turn may trigger cross-acceleration or cross-default provisions in other debt or bonding agreements. The Credit Agreement also contains a cross-default provision. This provision could have a wider impact on liquidity than might otherwise arise from a default of a single debt instrument. Our available cash and liquidity would not be sufficient to fully repay borrowings under all of our debt instruments that could be accelerated upon such an event of default.

Previous wording

We may elect to borrow, continue or convert certain term or revolving loans under our Credit Agreement to bear interest at either a base rate plus a margin, or at a one-, three-, or six-month Secured Overnight Financing Rate (“Term SOFR”) plus a margin, at the Company’s election. Accordingly, increases in interest rates could have a material adverse effect on our business operations, financial performance and financial condition.

Current wording

We may elect to borrow, continue or convert certain term or revolving loans under our Credit Agreement to bear interest at either a base rate plus a margin, or Secured Overnight Financing Rate (“Term SOFR”) plus a margin, at the Company’s election. Accordingly, increases in interest rates could have a material adverse effect on our business operations, financial performance and financial condition.

Previous wording

To service our indebtedness and to fund working capital, we will require a significant amount of cash. Our ability to generate cash depends on many factors that are beyond our control, including the fact that adverse capital and credit market conditions may affect our ability to meet liquidity needs, access to capital and cost of capital.

Current wording

To service our indebtedness and to fund working capital, we will require a significant amount of cash. Our ability to generate cash depends on many factors that are beyond our control, including that adverse capital and credit market conditions may affect our ability to meet liquidity needs, access to capital and cost of capital.

Previous wording

Our ability to generate cash, outside of funds available through our revolving credit facility (“Revolving Credit Facility”), is subject to our operational performance, as well as general economic, financial, competitive, legislative, regulatory and other factors that are beyond our control. We may be unable to expand our credit capacity, which could adversely affect our operations and business. Earnings from our operations and our working capital requirements can vary from period to period, based primarily on the mix of our projects underway and the percentage of project work completed during the period. Capital expenditures may also vary significantly from period to period. We cannot provide assurance that our business will generate sufficient cash flow from operations or asset sales or that we can obtain future borrowing capacity in an amount sufficient to enable us to pay our indebtedness, to fund working capital requirements or to fund our other liquidity needs. Without sufficient liquidity, we will be forced to curtail our operations, and our business will suffer.

Current wording

Our ability to generate cash, outside of funds available through the revolving credit facility under the Credit Agreement, is subject to our operational performance, as well as general factors that are beyond our control. We may be unable to expand our credit capacity, which could adversely affect our operations and business. Earnings from our operations and our working capital requirements can vary from period to period, based primarily on the mix of our projects underway and the percentage of project work completed during the period. Capital expenditures may also vary significantly from period to period. We cannot provide assurance that our business will generate sufficient cash flow from operations or asset sales or that we can obtain future borrowing capacity in an amount sufficient to enable us to pay our indebtedness, to fund working capital requirements or to fund our other liquidity needs. Without sufficient liquidity, we will be forced to curtail our operations.

Previous wording

In the event we cannot generate enough cash to satisfy our liquidity needs, we may have to seek additional financing. The Credit Agreement, subject to certain exceptions, restricts our ability to incur additional financing indebtedness. The availability of additional financing will depend on a variety of factors such as market conditions, the general availability of credit, the volume of trading activities, our credit ratings and credit capacity, as well as the possibility that customers or lenders could develop a negative perception of our long- or short-term financial prospects if the level of our business activity decreased due to a market downturn. The domestic and worldwide capital and credit markets may experience significant volatility, disruptions and dislocations with respect to price and credit availability. Should we need additional funds or to refinance our existing indebtedness, we may not be able to obtain such additional funds. If internal sources of liquidity prove to be insufficient, we may not be able to successfully obtain additional financing on favorable terms, or at all.

Current wording

In the event we cannot generate enough cash to satisfy our liquidity needs, we may have to seek additional financing. The Credit Agreement, subject to certain exceptions, restricts our ability to incur additional financing indebtedness. The availability of additional financing will depend on a variety of factors such as market conditions, the general availability of credit, the volume of trading activities, our credit ratings and credit capacity. The domestic and worldwide capital and credit markets may experience significant volatility, disruptions and dislocations with respect to price and credit availability. Should we need additional funds or to refinance our existing indebtedness, we may not be able to obtain such additional funds. If internal sources of liquidity prove to be insufficient, we may not be able to successfully obtain additional financing on favorable terms, or at all.

Previous wording

We may need to refinance all or a portion of our indebtedness on or before maturity. We cannot provide assurance that we will be able to refinance any of our indebtedness on commercially reasonable terms or at all. Our inability to refinance our debt on commercially reasonable terms also could have a material adverse effect on our business. If we experience operational difficulties, we may need to increase our available borrowing capacity or seek amendments to the terms of our Credit Agreement. There can be no assurance that we will be able to secure any additional capacity or amendment to our Credit Agreement or to do so on terms that are acceptable to us, in which case, our costs of borrowing could rise and our business and results of operations could be materially adversely affected.

Current wording

We may need to refinance all or a portion of our indebtedness on or before maturity. Our inability to refinance our debt on commercially reasonable terms also could have a material adverse effect on our business. If we experience operational difficulties, we may need to increase our available borrowing capacity or seek amendments to the terms of our Credit Agreement.

Showing the first 40 of 42 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

In addition, growing concerns about climate change and other environmental issues could result in the imposition of additional environmental regulations. Legislation or restrictions could increase the costs of projects for us and, in some cases, prevent a project from going forward, thereby potentially reducing the need for our services which could in turn have a material adverse effect on our operations and financial condition.

Current report — wording carried from elsewhere

Generally, environmental laws, regulations, enforcement practices and compliance standards have become increasingly stringent. Compliance with new regulations could require us to make substantial expenditures for, among other things, pollution control systems and other equipment that we do not currently possess, or the acquisition or modification of permits applicable to our activities.