Skip to main content

FREEPORT-MCMORAN INC

For the period ended Jun 30, 2026. Filed Aug 6, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2026 · Filed Aug 6, 2026

FCX$59.42+2.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2026-03-31; filed 2026-05-08.

0000831259-26-000025

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-06-30; filed 2026-08-06.

0000831259-26-000036

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 301 previous paragraphs and 318 current paragraphs.

127 unchanged; 116 reworded; 61 added; 52 removed; 6 previous and 14 current paragraphs rearranged.

Tables are not compared: 22 previous and 33 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (61)

Current report

We achieved strong results in second-quarter 2026, supported by solid execution of our operating plans and favorable realized prices for copper, gold and molybdenum. The strength and diversity of our portfolio of assets contributed to these results, as operating income from our U.S. copper mines more than doubled in the first six months of 2026, compared to the first six months of 2025, primarily reflecting higher average realized copper and molybdenum prices. This increase helped offset lower operating income from Indonesia during the continued phased ramp-up of the Grasberg Block Cave underground mine.

Current report

PT Freeport Indonesia (PTFI) has made steady progress with the phased ramp-up of the Grasberg Block Cave underground mine following the September 2025 external mud rush incident and we remain focused on a safe and sustainable ramp-up to full operating capacity. Refer to “Operations – Indonesia” for further discussion of the Grasberg Block Cave ramp-up.

Current report

In May 2026, we purchased 2.0 million shares of Cerro Verde common stock in the open market for $107 million, increasing our ownership interest in Cerro Verde from 55.08% to 55.66%.

Current report

Net income attributable to common stockholders totaled $984 million in second-quarter 2026, $772 million in second-quarter 2025, $1.9 billion for the first six months of 2026 and $1.1 billion for the first six months of 2025. Higher net income attributable to common stock in the 2026 periods, compared to the 2025 periods, primarily reflects the impact of lower income taxes and noncontrolling interests in the 2026 periods associated with a higher contribution of operating income from our U.S. copper mines. The first six months of 2026 also include the recognition of a gain for the insurance settlement related to the September 2025 external mud rush incident. Refer to “Consolidated Results” and “Business Divisions and Segments” for further discussion.

Current report

Projected consolidated sales volumes for third-quarter 2026 are expected to approximate 750 million pounds of copper, 160 thousand ounces of gold and 22 million pounds of molybdenum. We expect an increase in second-half 2026 copper sales volumes, compared to first-half 2026, primarily as a result of the continued phased ramp-up of the Grasberg Block Cave underground mine and at our U.S. copper mines associated with incremental production from leaching initiatives.

Current report

Expected capital expenditures for the year 2026 do not include project capital costs associated with the expansion project at Bagdad, which we are preparing for a potential investment decision during the second half of 2026. Refer to “Operations – United States” for further discussion.

Current report

The conflict in the Middle East continues to contribute to copper price volatility. While direct impacts on copper demand have been limited, secondary effects, including higher energy prices and freight costs, are weighing on global manufacturing activity and delaying demand recovery, particularly in energy-importing regions.

Current report

d. Net income attributable to common stock (i.e., net of any taxes and noncontrolling interests) includes net charges totaling $96 million ($0.06 per share) in second-quarter 2026 and $45 million ($0.03 per share) for the first six months of 2026, primarily reflecting idle facility and restoration costs associated with PTFI’s September 2025 external mud rush incident. Net charges for the first six months of 2026 were partially offset by a gain on the insurance settlement associated with the September 2025 external mud rush incident.

Current report

e. Net income attributable to common stock (i.e., net of any taxes and noncontrolling interests) includes net charges totaling $18 million ($0.01 per share) in second-quarter 2025, primarily associated with adjustments to environmental obligations and related litigation reserves and oil and gas impairments, and $24 million ($0.02 per share) for the first six months of 2025, primarily associated with remediation costs related to the October 2024 fire incident at PTFI’s smelter, charges for the reversal of previously capitalized land lease costs associated with PTFI’s downstream processing facilities and oil and gas impairments.

Current report

f. Cash used for working capital, including tax payments, totaled $596 million in second-quarter 2026, $45 million in second-quarter 2025, $457 million for the first six months of 2026 and $342 million for the first six months of 2025.

Current report

b. Excludes $0.40 per pound in second-quarter 2026 and $0.50 per pound for the first six months of 2026 of idle facility and restoration costs associated with PTFI’s September 2025 external mud rush incident. Refer to “Operations – Indonesia” for further discussion.

Current report

Atlantic Copper Revenues. Revenues at Atlantic Copper, our wholly owned smelter and refinery in Huelva, Spain, totaled $1.0 billion in second-quarter 2026, $0.8 billion in second-quarter 2025, $2.0 billion for the first six months of 2026 and $1.6 billion for the first six months of 2025. Higher revenues in the 2026 periods, compared to the 2025 periods, primarily reflect higher metals prices, partly offset by lower copper and gold sales volumes.

Current report

Consolidated interest expense, net totaled $95 million in second-quarter 2026, $82 million in second-quarter 2025, $209 million for the first six months of 2026 and $152 million for the first six months of 2025. Higher interest expense, net for the 2026 periods, primarily reflects the placement of assets in service at our U.S. copper mines and at PTFI in 2025, which reduced the amount of interest eligible for capitalization in 2026.

Current report

Refer to Note 4 for further discussion of consolidated interest costs (before capitalization) and capitalized interest.

Current report

Other income, net, which totaled $22 million in second-quarter 2026, $41 million in second-quarter 2025, $33 million for the first six months of 2026 and $99 million for the first six months of 2025, was lower in the 2026 periods reflecting mark-to-market impacts associated with equity investments. Lower other income, net, in the first six months of 2026, also reflects net currency exchange losses, compared to net currency exchange gains for the first six months of 2025.

Current report

c. The U.S. income tax provision primarily relates to the U.S. Corporate Alternative Minimum Tax (CAMT) provisions, which do not benefit from regular tax U.S. net operating loss carryforwards.

Current report

In May 2026, we increased our ownership interest in Cerro Verde from 55.08% to 55.66%.

Current report

b. Includes idle facility and restoration costs associated with the September 2025 external mud rush incident totaling $284 million in second-quarter 2026 and $690 million for the first six months of 2026. Refer to Note 7 for further discussion.

Current report

c. Includes idle facility costs associated with the September 2025 external mud rush incident totaling $79 million in second-quarter 2026 and $172 million for the first six months of 2026. Refer to Note 7 for further discussion.

Current report

d. Represents a volume adjustment on concentrate shipped to Atlantic Copper in a prior period.

Current report

Capital cost estimates for the Bagdad expansion are being finalized, taking into account current estimates, including for materials, equipment and labor. Current estimates, which continue to be reviewed, indicate project capital costs of approximately $4.5 billion, approximately 30% above the prior $3.5 billion estimate prepared in 2023. The revisions incorporate the impact of cost escalation, revisions in project scope and revised estimates associated with additional engineering. Taking into account higher capital cost estimates and enhanced operational plans, the project economics continue to be supported at an incentive copper price of approximately $4.00 per pound and would require three to four years to complete, with no expected major permitting hurdles. The decision to proceed with and timing of the potential expansion will take into account overall copper market conditions and other factors.

Current report

Our consolidated copper sales volumes from the U.S. copper mines totaled 312 million pounds in second-quarter 2026, 308 million pounds in second-quarter 2025, 639 million pounds for the first six months of 2026 and 615 million pounds for the first six months of 2025.

Current report

b. Includes charges for feasibility and optimization studies totaling $0.06 per pound of copper in second-quarter 2026, $0.09 per pound of copper in second-quarter 2025, $0.05 per pound of copper for the first six months of 2026 and $0.07 per pound of copper for the first six months of 2025.

Current report

Our consolidated copper sales volumes from South America operations totaled 245 million pounds in second-quarter 2026, 265 million pounds in second-quarter 2025, 493 million pounds for the first six months of 2026, and 540 million pounds for the first six months of 2025. Lower copper sales volumes in the 2026 periods, compared to the 2025 periods, primarily reflect lower leach production and the processing of lower grade stockpile ore as a result of mine sequencing.

Current report

a. Includes charges for feasibility and optimization studies totaling $0.04 per pound of copper in the second quarter and for the first six months of 2026, $0.07 per pound of copper in second-quarter 2025 and $0.06 per pound of copper for the first six months of 2025. Also includes charges for inventory write-offs totaling $0.04 per pound of copper in second-quarter 2026 and $0.02 per pound of copper for the first six months of 2026.

Current report

Average unit net cash costs (net of by-product credits) for South America operations totaled $2.48 per pound of copper in second-quarter 2026, $2.46 per pound of copper in second-quarter 2025 and $2.43 per pound of copper for both the first six months of 2026 and 2025. Average unit net cash costs in the 2026 periods, compared to the 2025 periods, reflect lower copper volumes and higher labor and energy costs, partially offset by higher by-product credits.

Current report

PTFI has identified additional exploration targets to leverage its infrastructure in the Grasberg minerals district, including a potential extension below the DMLZ underground mine, which requires further drilling and evaluation.

Current report

PTFI’s consolidated sales volumes totaled 153 million pounds of copper and 118 thousand ounces of gold in second-quarter 2026, 443 million pounds of copper and 518 thousand ounces of gold in second-quarter 2025, 235 million pounds of copper and 234 thousand ounces of gold for the first six months of 2026 and 733 million pounds of copper and 643 thousand ounces of gold for the first six months of 2025. Lower sales volumes in the 2026 periods, compared to the 2025 periods, reflect lower operating rates at PTFI during the phased ramp-up of the Grasberg Block Cave underground mine.

Current report

b. Includes idle facility costs associated with the September 2025 external mud rush incident totaling $0.52 per pound of copper in second-quarter 2026 and $0.73 per pound of copper for the first six months of 2026.

Current report

c. Includes idle facility and restoration costs associated with the September 2025 external mud rush incident totaling $1.86 per pound of copper in second-quarter 2026 and $2.93 per pound of copper for the first six months of 2026.

Current report

d. Includes charges for (i) operational readiness and start-up costs associated with PTFI’s downstream processing facilities totaling $0.13 per pound of copper in second-quarter 2025 and $0.14 per pound of copper for the first six months of 2025 and (ii) remediation costs related to the October 2024 incident at PTFI’s smelter totaling $0.02 per pound of copper in second-quarter 2025 and $0.04 per pound of copper for the first six months of 2025. The first six months of 2025 also includes $0.03 per pound of copper related to the reversal of previously capitalized land lease costs associated with PTFI’s downstream processing facilities.

Current report

A significant portion of PTFI’s costs are fixed and unit costs vary depending on volumes and other factors. Additionally, during the phased ramp-up period of the Grasberg Block Cave underground mine and until PTFI’s operations return to normal capacity, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs totaled $284 million ($1.86 per pound of copper) in second-quarter 2026 and $690 million ($2.93 per pound of copper) for the first six months of 2026, which were excluded from PTFI's unit net cash credits.

Current report

Excluding amounts recognized as idle facility costs, PTFI’s unit net cash credits (including by-product credits) totaled $0.81 per pound of copper in second-quarter 2026, $0.99 per pound of copper in second-quarter 2025, $1.76 per pound of copper for the first six months of 2026 and $0.34 per pound of copper for the first six months of 2025. PTFI’s unit net cash credits (including by-product credits) for the 2026 periods primarily reflect lower copper volumes.

Current report

Average unit net cash costs for our Molybdenum mines totaled $19.20 per pound of molybdenum in second-quarter 2026, $14.20 per pound of molybdenum in second-quarter 2025, $17.31 per pound of molybdenum for the first six months of 2026 and $13.96 per pound of molybdenum for the first six months of 2025. Higher unit net cash costs in the 2026 periods, compared with the 2025 periods, primarily reflect lower volumes and higher costs for supplies, energy and labor.

Current report

In May 2026, we and PTFI entered into a new $3.0 billion, five-year senior unsecured revolving credit facility that matures in May 2031, which replaced the prior revolving credit facility, and Cerro Verde entered into a new $350 million, five-year, senior unsecured revolving credit facility that matures in May 2031, which replaced its prior revolving credit facility. The terms of the new facilities are substantially similar to the respective prior facilities.

Current report

For the first six months of 2026, we generated operating cash flows of $3.5 billion, net of $0.5 billion for working capital and other uses, and including $0.7 billion in pre-tax proceeds collected by PTFI for an insurance settlement associated with the September 2025 external mud rush incident. For the first six months of 2025, we generated operating cash flows of $3.3 billion, net of $0.3 billion for working capital and other uses.

Current report

Acquisition of additional ownership interest in Cerro Verde. In May 2026, we purchased 2.0 million shares of Cerro Verde common stock in the open market for a total cost of $107 million, increasing our ownership interest in Cerro Verde from 55.08% to 55.66%. Refer to Note 1 for further discussion.

Current report

c. Includes charges totaling $18 million ($0.06 per pound of copper) for feasibility and optimization studies.

Current report

c. Includes charges totaling $26 million ($0.09 per pound of copper) for feasibility and optimization studies.

Current report

b. Includes gold sales of 10 thousand ounces ($4,584 per ounce average realized price), silver sales of 0.8 million ounces ($69.40 per ounce average realized price) and related production costs.

Showing the first 40 of 61 passages. Open the source sections for the rest.

Removed paragraphs (52)

Previous report

We are focused on restoring operations in the Grasberg Block Cave underground mine safely and sustainably, driving new technologies and efficiency programs to increase the profitability of our U.S. and South America operations and pursuing our highly attractive portfolio of organic growth options to generate value for common stockholders.

Previous report

Our first-quarter 2026 operations and results were impacted by the September 2025 mud rush incident (Mud Rush Incident) at the Grasberg minerals district in Central Papua, Indonesia. During first-quarter 2026, PT Freeport Indonesia (PTFI) progressed a series of activities to address the Mud Rush Incident and advance preparation for a safe and sustainable restoration of operations in the Grasberg Block Cave underground mine. In March 2026, PTFI commenced a phased ramp-up of the Grasberg Block Cave underground mine, and the projected ramp-up schedule has been adjusted to incorporate modifications to material handling systems. Refer to “Operations – Indonesia” for further discussion.

Previous report

Net income attributable to common stockholders totaled $881 million in first-quarter 2026, compared with $352 million in first-quarter 2025, primarily reflecting higher average realized copper and gold prices and the recognition of a gain for the insurance settlement related to the Mud Rush Incident, partly offset by lower copper sales volumes from PTFI. Refer to “Consolidated Results” for further discussion.

Previous report

Projected consolidated sales volumes for second-quarter 2026 are expected to approximate 690 million pounds of copper, 140 thousand ounces of gold and 22 million pounds of molybdenum. Projected sales volumes for the year 2026 are lower than previous estimates of 3.4 billion pounds of copper and 0.8 million ounces of gold, primarily reflecting a projected delay in achieving full ramp-up of the Grasberg Block Cave underground mine pending modifications to ore loading systems. Refer to “Operations – Indonesia” for further discussion.

Previous report

Following the onset of military conflict in the Middle East in late February 2026, costs for certain petroleum-based energy products, sulfur and sulfuric acid, and other consumables have risen significantly. Prices for diesel fuel and sulfuric acid have been highly volatile with significant regional dislocation. Current unit net cash cost estimates for the year 2026 are higher than previous estimates, reflecting revised sales volumes at PTFI and higher costs for energy and other consumables, partly offset by higher by-product credits related to higher metal price assumptions.

Previous report

In January 2026, both LME and COMEX settlement copper prices closed at all-time highs of $6.28 per pound and $6.18 per pound, respectively. Higher copper prices were influenced by increased speculative buying in several metals, supported by macro factors such as U.S. dollar weakness and expectations for above-trend demand growth. In March 2026, LME and COMEX settlement copper prices declined from these highs in response to conflict in the Middle East, which impacted trade flows and energy infrastructure, resulting in significantly higher oil prices, a stronger U.S. dollar, renewed inflation concerns and revised economic forecasts.

Previous report

d. Net income attributable to common stock includes after-tax net credits totaling $51 million ($0.04 per share), primarily associated with the Mud Rush Incident reflecting a gain from the insurance settlement, partly offset by idle facility and restoration costs (refer to “Operations – Indonesia” for discussion). See below for further discussion of these net credits.

Previous report

e. Cash provided by (used for) working capital totaled $0.1 billion in first-quarter 2026 and $(0.3) billion in first-quarter 2025.

Previous report

b. Excludes $0.62 per pound of idle facility and restoration costs associated with the Mud Rush Incident at PTFI. Refer to “Operations – Indonesia” for further discussion.

Previous report

Atlantic Copper Revenues. Atlantic Copper revenues totaled $969 million in first-quarter 2026, compared to $755 million in first-quarter 2025, primarily reflecting higher copper prices, partly offset by lower copper sales volumes.

Previous report

Consolidated production and delivery costs totaled $4.1 billion in first-quarter 2026 and $3.8 billion in first-quarter 2025.

Previous report

Consolidated interest costs (before capitalization) totaled $174 million in both first-quarter 2026 and 2025.

Previous report

Lower capitalized interest of $60 million in first-quarter 2026, compared to $104 million in first-quarter 2025, primarily reflects the impact of placing PTFI’s downstream processing facilities into service in 2025. Refer to “Capital Resources and Liquidity – Investing Activities” for discussion of capital expenditures associated with our major development projects.

Previous report

Given our U.S. tax position (including potential CAMT), at higher copper prices, we would expect our consolidated effective tax rate to decline because of a higher share of earnings from our U.S. operations.

Previous report

b. Includes $406 million of idle facility and restoration costs associated with the Mud Rush Incident.

Previous report

c. Includes $93 million of idle facility costs associated with the Mud Rush Incident.

Previous report

2025 Annual Report on Sustainability. In April 2026, we published our 2025 Annual Report on Sustainability, marking our 25th year of reporting on our progress. We are committed to building upon our achievements in sustainability and our position as a leading responsible copper producer.

Previous report

Our costs have not been significantly impacted by U.S. tariffs, but we are continuing to monitor the impacts on our business, cost structure and supply chains associated with tariffs on U.S. imports. Efforts continue to identify alternative sourcing options to mitigate potential future impacts of tariffs.

Previous report

Conversion of Bagdad’s haul truck fleet to autonomous haulage was completed in 2025, making Bagdad the first major mine in the U.S. to operate a fully autonomous haulage fleet. We continue to optimize the performance of the new autonomous fleet at Bagdad and are advancing projects to expand tailings storage facilities and local infrastructure to enhance optionality in the future expansion opportunity.

Previous report

Our consolidated copper sales volumes from U.S. copper mines of 327 million pounds in first-quarter 2026 were higher than first-quarter 2025 copper sales volumes of 307 million pounds, primarily reflecting timing of shipments.

Previous report

b. Includes charges totaling $0.05 per pound of copper in both first-quarter 2026 and 2025 for feasibility and optimization studies.

Previous report

a. Includes charges totaling $0.05 per pound of copper in both first-quarter 2026 and 2025 for feasibility and optimization studies.

Previous report

Average unit net cash costs (net of by-product credits) for South America operations of $2.38 per pound of copper in first-quarter 2026 were lower than first-quarter 2025 average unit net cash costs of $2.40 per pound of copper, primarily reflecting higher by-product credits and lower treatment charges, mostly offset by lower copper volumes and the impact of currency exchange rates on labor costs.

Previous report

PTFI is also conducting exploration in the Grasberg minerals district targeting the potential extension of significant mineralization below the DMLZ underground mine.

Previous report

During initial ramp-up activities in Production Blocks 2 and 3, PTFI encountered changes in operating conditions at the Grasberg Block Cave underground mine following the period of inactivity between September 2025 and April 2026, resulting in a significant increase in the ratio of wet drawpoints compared to the number of drawpoints containing dry material. While PTFI’s existing automated systems to extract ore at the drawpoints are sufficient to support a ramp-up to previously planned levels, modifications to the chute system used to load ore into the automated trains will be required to operate at full capacity. As a result, near-term production from Production Blocks 2 and 3 is expected to be limited to approximately 60% of capacity until required modifications to ore loading systems are made.

Previous report

Installation of specialized equipment to accommodate the higher percentage of wet ore has commenced and will be sequenced initially to prioritize areas that would benefit the most from the enhancements. PTFI expects the current bottlenecks can be substantially addressed by mid-2027.

Previous report

Given the early stage of the initial ramp‑up, production forecasts are inherently more variable than they were prior to the incident. As the ramp‑up progresses over the coming months, additional clarity is expected on a number of factors that could have a positive or negative impact on PTFI’s near‑term forecast. As such, the revisions to PTFI’s production rates result in the deferral of production to future periods and do not reflect a change in the expected recovery of the Grasberg Block Cave resource. PTFI is confident in the resource, its ability to conduct large‑scale mining safely and efficiently, and its long‑term plans to operate one of the world’s most successful and valuable copper and gold deposits.

Previous report

PTFI’s consolidated sales volumes of 82 million pounds of copper and 116 thousand ounces of gold in first-quarter 2026 were lower than first-quarter 2025 sales volumes of 290 million pounds of copper and 125 thousand ounces of gold, reflecting lower operating rates following the Mud Rush Incident. As a fully integrated producer of refined copper and gold, there may be variability in the timing between production and sales of refined copper and gold.

Previous report

b. Includes $1.13 per pound of copper of idle facility costs associated with the Mud Rush Incident.

Previous report

c. Includes $4.93 per pound of copper of idle facility and restoration costs associated with the Mud Rush Incident.

Previous report

A significant portion of PTFI’s costs are fixed and unit costs vary depending on volumes and other factors. PTFI’s unit net cash credits (including by-product credits) of $3.53 per pound of copper in first-quarter 2026 were favorable compared to unit net cash costs (net of by-product credits) of $0.64 per pound of copper in first-quarter 2025, primarily reflecting higher by-product credits, partly offset by the impact of lower volumes.

Previous report

Average unit net cash costs for our Molybdenum mines of $15.69 per pound of molybdenum in first-quarter 2026 were higher than average unit net cash costs of $13.72 per pound in first-quarter 2025, primarily reflecting higher costs for labor, supplies and energy.

Previous report

We generated operating cash flows of $1.5 billion (including $0.1 billion from working capital and other sources) in first-quarter 2026 and $1.1 billion (net of $0.3 billion for working capital and other uses) in first-quarter 2025. Operating cash flows in first-quarter 2026, compared with first-quarter 2025, reflect the impact of higher metal prices, offset by lower copper and gold sales volumes from PTFI as a result of the Mud Rush Incident.

Previous report

U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs

Previous report

b. Includes gold and silver product revenues and production costs.

Previous report

c. Includes charges totaling $17 million ($0.05 per pound of copper) for feasibility and optimization studies.

Previous report

U.S. Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs

Previous report

b. Includes gold and silver product revenues and production costs.

Previous report

c. Includes charges totaling $14 million ($0.05 per pound of copper) for feasibility and optimization studies.

Previous report

d. Represents the combined total for South America and Indonesia operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

Showing the first 40 of 52 passages. Open the source sections for the rest.

Reworded paragraphs (116)

Previous wording

We continue to progress organic copper growth projects in the U.S. and South America. Across our U.S. and South America operations, we are incorporating new applications, technologies and data analytics into our leaching processes. We are targeting annual production of approximately 300 million pounds of copper from these initiatives in 2026 and believe there is potential for further significant increases in recoverable metal in future years. Additionally, in March 2026, an environmental impact study was submitted to Chile regulatory authorities for a potential major expansion at our El Abra mine in Chile. Refer to “Operations – United States” and “Operations – South America” for further discussion.

Current wording

At our U.S. and South America operations, we are advancing testing of innovative technologies to target significant increases in incremental production from leaching initiatives. We are targeting reaching an annual run rate of 300 million pounds of copper from these initiatives by the end of 2026 and believe there is potential for further significant increases in recoverable metal in future years. We are finalizing cost estimates for an opportunity to more than double the concentrator capacity of the Bagdad operation in northwest Arizona and have advanced technical and economic studies in preparation for a potential investment decision during the second half of 2026. Additionally, we are advancing our evaluation of a potential major expansion at our El Abra mine in Chile. Refer to “Operations – United States” and “Operations – South America” for further discussion.

Previous wording

At March 31, 2026, we had consolidated debt of $9.4 billion and consolidated cash and cash equivalents of $3.7 billion. Net debt totaled $2.4 billion, excluding $3.2 billion of debt for PTFI’s smelter and precious metals refinery (PMR) (collectively, PTFI’s downstream processing facilities). Refer to “Net Debt” for a reconciliation of consolidated debt and consolidated cash and cash equivalents to net debt.

Current wording

At June 30, 2026, we had consolidated debt of $9.4 billion and consolidated cash and cash equivalents of $4.1 billion. Net debt totaled $2.1 billion, excluding $3.2 billion of debt for PTFI’s downstream processing facilities. Refer to “Net Debt” for a reconciliation of consolidated debt and consolidated cash and cash equivalents to net debt.

Previous wording

During first-quarter 2026, we acquired 1.7 million shares of our common stock for a total cost of $93 million ($54.25 average cost per share). At April 30, 2026, we have acquired a total of 53.7 million shares ($39.01 average cost per share) and have $2.9 billion available under our $5.0 billion share repurchase program.

Current wording

During the first six months of 2026, we acquired 3.4 million shares of our common stock for a total cost of $203 million ($59.30 average cost per share). As of July 31, 2026, we have acquired a total of 55.4 million shares ($39.80 average cost per share) and have $2.8 billion available under our $5.0 billion share repurchase program.

Previous wording

Our financial results vary as a result of fluctuations in metals market prices primarily for copper, gold and, to a lesser extent, molybdenum, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Refer to “Markets” below, and “Risk Factors” in Part I, Item 1A. of our 2025 Form 10-K and Part II, Item 1A. herein for further discussion. Because we cannot control the prices of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs, operating cash flows and capital expenditures. References to previous estimates refer to guidance provided in our 2025 Form 10-K.

Current wording

Our financial results vary as a result of fluctuations in metals market prices primarily for copper, gold and, to a lesser extent, molybdenum, as well as other factors. World market prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control. Refer to “Markets” below, and “Risk Factors” in Part I, Item 1A. of our 2025 Form 10-K and Part II, Item 1A. herein for further discussion. Because we cannot control the prices of our products, the key measures that management focuses on in operating our business are sales volumes, unit net cash costs, operating cash flows and capital expenditures.

Previous wording

a. Includes 60 million pounds produced by our U.S. copper mines and Cerro Verde mine, and 30 million pounds produced by our primary molybdenum mines.

Current wording

a. Includes 60 million pounds produced by our U.S. copper mines and Cerro Verde mine, and 33 million pounds produced by our primary molybdenum mines.

Previous wording

Projected sales volumes are dependent on operational performance; the ramp-up of the Grasberg Block Cave underground mine at PTFI; weather-related conditions; timing of shipments and other factors detailed in the “Cautionary Statement” below.

Current wording

Projected sales volumes are dependent on operational performance; the phased ramp-up of the Grasberg Block Cave underground mine at PTFI; weather-related conditions; timing of shipments and other factors detailed in the “Cautionary Statement” below.

Previous wording

Based on achievement of current sales volume and cost estimates and assuming average prices of $4,500 per ounce of gold and $25.00 per pound of molybdenum for the remainder of 2026, consolidated unit net cash costs (net of by-product credits and excluding idle facility and restoration costs associated with the Mud Rush Incident at PTFI) for our copper mines are expected to average $1.95 per pound of copper for the year 2026 (including $2.24 per pound of copper in second-quarter 2026). The impact of price changes on consolidated unit net cash costs for the remainder of 2026 would approximate $0.02 per pound of copper for each $100 per ounce change in the average price of gold and $0.03 per pound of copper for each $2 per pound change in the average price of molybdenum.

Current wording

Based on achievement of current sales volume and cost estimates and assuming average prices of $4,000 per ounce of gold and $30.00 per pound of molybdenum for the second half of 2026, consolidated unit net cash costs (net of by-product credits and excluding idle facility and restoration costs) for our copper mines are expected to average $1.90 per pound of copper for the year 2026 (including $2.00 per pound of copper in third-quarter 2026). The impact of price changes on consolidated unit net cash costs for the second half of 2026 would approximate $0.02 per pound of copper for each $100 per ounce change in the average price of gold and $0.03 per pound of copper for each $2 per pound change in the average price of molybdenum.

Previous wording

Following the Mud Rush Incident and until PTFI’s operations return to normal capacity, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs are expected to total $1.3 billion for the year 2026 (including $0.3 billion in second-quarter 2026). Refer to “Operations – Indonesia” for further discussion.

Current wording

During the phased ramp-up period of the Grasberg Block Cave underground mine and until PTFI’s operations return to normal capacity, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs are expected to approximate $1.2 billion for the year 2026 (including $0.3 billion in third-quarter 2026). Refer to “Operations – Indonesia” for further discussion.

Previous wording

Projected unit net cash costs for the year 2026 are dependent on operational performance; the ramp-up of the Grasberg Block Cave underground mine at PTFI; impacts related to the conflict in the Middle East, including changes in energy costs and other consumables; weather-related conditions; timing of shipments and other factors detailed in the “Cautionary Statement” below.

Current wording

Projected unit net cash costs for the year 2026 are dependent on operational performance; the phased ramp-up of the Grasberg Block Cave underground mine at PTFI; impacts related to the conflict in the Middle East, including changes in energy costs and other consumables; weather-related conditions; timing of shipments and other factors detailed in the “Cautionary Statement” below.

Previous wording

Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors, such as the ramp-up of the Grasberg Block Cave underground mine at PTFI and impacts related to the conflict in the Middle East, including changes in energy costs and other consumables.

Current wording

Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors, such as the phased ramp-up of the Grasberg Block Cave underground mine at PTFI and impacts related to the conflict in the Middle East, including changes in energy costs and other consumables.

Previous wording

Consolidated operating cash flows are expected to approximate $8.7 billion for the year 2026, including $0.2 billion of working capital and other sources, based on current sales volume and cost estimates, and assuming average prices of $6.00 per pound of copper, $4,500 per ounce of gold and $25.00 per pound of molybdenum for the remainder of 2026. Estimated consolidated operating cash flows for the year 2026 also reflect a projected income tax provision of $2.6 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2026). The impact of price changes on consolidated operating cash flows for the remainder of 2026 would approximate $220 million for each $0.10 per pound change in the average price of copper, $50 million for each $100 per ounce change in the average price of gold and $90 million for each $2 per pound change in the average price of molybdenum.

Current wording

Consolidated operating cash flows are expected to approximate $8.3 billion for the year 2026, net of $0.3 billion of working capital and other uses, based on current sales volume and cost estimates, and assuming average prices of $6.00 per pound of copper, $4,000 per ounce of gold and $30.00 per pound of molybdenum for the second half of 2026. Estimated consolidated operating cash flows for the year 2026 include a projected income tax provision of $2.6 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2026). The impact of price changes on consolidated operating cash flows for the second half of 2026 would approximate $150 million for each $0.10 per pound change in the average price of copper, $40 million for each $100 per ounce change in the average price of gold and $45 million for each $2 per pound change in the average price of molybdenum.

Previous wording

a. Includes $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district, and $1.6 billion for discretionary growth projects, primarily in the Grasberg minerals district for the continued development of Kucing Liar and at the Bagdad mine for tailings infrastructure.

Current wording

a. Includes $1.4 billion for planned projects, primarily associated with underground mine development and supporting mill and power capital costs in the Grasberg minerals district and a leaching project at El Abra, and $1.6 billion for discretionary growth projects, primarily in the Grasberg minerals district for the continued development of Kucing Liar and at Bagdad for tailings infrastructure.

Previous wording

Copper sales from our South America and Indonesia operations are generally based on quoted LME monthly average copper settlement prices. During first-quarter 2026, LME copper settlement prices averaged $5.83 per pound (ranging from a low of $5.36 per pound to a high of $6.28 per pound) and closed at $5.52 per pound on March 31, 2026. The LME copper settlement price was $5.90 per pound on April 30, 2026.

Current wording

Copper sales from our South America and Indonesia operations are generally based on quoted LME monthly average copper settlement prices. During second-quarter 2026, LME copper settlement prices averaged $6.05 per pound (ranging from a low of $5.51 per pound to a high of $6.39 per pound) and closed at $6.05 per pound on June 30, 2026. The LME copper settlement price was $6.28 per pound on July 31, 2026, and on August 6, 2026, the LME copper settlement price closed at an all-time high of $6.56 per pound.

Previous wording

Copper sales from our U.S. copper mines are generally based on prevailing COMEX monthly average copper settlement prices. During first-quarter 2026, COMEX copper settlement prices averaged $5.79 per pound (ranging from a low of $5.34 per pound to a high of $6.18 per pound) and closed at $5.59 per pound on March 31, 2026. The COMEX copper settlement price was $5.93 per pound on April 30, 2026.

Current wording

Copper sales from our U.S. copper mines are generally based on prevailing COMEX monthly average copper settlement prices. During second-quarter 2026, COMEX copper settlement prices averaged $6.16 per pound (ranging from a low of $5.54 per pound to a high of $6.65 per pound) and closed at $6.19 per pound on June 30, 2026. The COMEX copper settlement price was $6.44 per pound on July 31, 2026, and on August 5, 2026, the COMEX copper settlement price closed at an all-time high of $6.70 per pound.

Previous wording

We believe fundamentals for copper are favorable with growing demand supported by copper’s critical role in electrification initiatives, continued urbanization in developing countries, data centers and AI growth and growing connectivity globally.

Current wording

We believe long-term fundamentals for copper are favorable with growing demand supported by copper’s critical role in electrification initiatives, continued urbanization in developing countries, data center and AI growth and growing connectivity globally.

Previous wording

This graph presents London Bullion Market Association (London) PM gold prices from January 2016 through March 2026. The prospect of additional U.S. interest rate reductions, geopolitical tensions, trade uncertainty and strong demand from central banks around the world continued to influence gold prices in first-quarter 2026. In January 2026, the London PM gold price closed at an all-time high of $5,405 per ounce before declining as macro conditions tightened, driven by a stronger U.S. dollar, higher treasury yields and rising energy costs stemming from the conflict in the Middle East.

Current wording

This graph presents London Bullion Market Association (London) PM gold prices from January 2016 through June 2026. During second-quarter 2026, gold prices retreated from all-time highs reached at the beginning of 2026, as macroeconomic conditions tightened, driven by a stronger U.S. dollar, higher U.S. treasury yields and rising energy costs stemming from the conflict in the Middle East.

Previous wording

During first-quarter 2026, London PM gold prices averaged $4,873 per ounce (ranging from a low of $4,353 per ounce to a high of $5,405 per ounce) and closed at $4,608 per ounce on March 31, 2026. The London PM gold price closed at $4,611 per ounce on April 30, 2026.

Current wording

During second-quarter 2026, London PM gold prices averaged $4,506 per ounce (ranging from a low of $4,002 per ounce to a high of $4,871 per ounce) and closed at $4,026 per ounce on June 30, 2026. The London PM gold price closed at $4,027 per ounce on July 31, 2026.

Previous wording

During first-quarter 2026, the weekly average prices for molybdenum averaged $25.50 per pound (ranging from a low of $22.42 per pound to a high of $28.11 per pound) and closed at $26.60 per pound on March 31, 2026. The Platts Metals Daily Molybdenum Dealer Oxide weekly average price closed at $27.85 per pound on April 30, 2026.

Current wording

During second-quarter 2026, the weekly average prices for molybdenum averaged $29.40 per pound (ranging from a low of $26.67 per pound to a high of $31.29 per pound) and closed at $31.29 per pound on June 30, 2026. The Platts Metals Daily Molybdenum Dealer Oxide weekly average price closed at $32.61 per pound on July 31, 2026.

Previous wording

b. Includes favorable adjustments to prior period provisionally priced concentrate and cathode copper sales totaling $34 million ($12 million to net income attributable to common stock or $0.01 per share) in first-quarter 2026 and $70 million ($24 million to net income attributable to common stock or $0.02 per share) in first-quarter 2025. Refer to Note 5 for further discussion.

Current wording

b. Includes favorable (unfavorable) adjustments to prior period provisionally priced concentrate and cathode copper sales totaling $98 million ($35 million to net income attributable to common stock or $0.02 per share) in second-quarter 2026, $(35) million ($(10) million to net income attributable to common stock or $(0.01) per share) in second-quarter 2025, $58 million ($24 million to net income attributable to common stock or $0.02 per share) for the first six months of 2026 and $63 million ($21 million to net income attributable to common stock or $0.01 per share) for the first six months of 2025. Refer to Note 5 for further discussion.

Previous wording

c. We defer recognizing profits on intercompany sales until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions to operating income totaling $70 million ($23 million to net income attributable to common stock or $0.02 per share) in first-quarter 2026 and $114 million ($34 million to net income attributable to common stock or $0.02 per share) in first-quarter 2025.

Current wording

c. We defer recognizing profits on intercompany sales until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net (reductions) additions to operating income totaling $(18) million ($(6) million to net income attributable to common stock or less than $0.01 per share) in second-quarter 2026, $34 million ($9 million to net income attributable to common stock or $0.01 per share) in second-quarter 2025, $52 million ($17 million to net income attributable to common stock or $0.01 per share) for the first six months of 2026 and $148 million ($44 million to net income attributable to common stock or $0.03 per share) for the first six months of 2025.

Previous wording

Consolidated revenues totaled $6.2 billion in first-quarter 2026 and $5.7 billion in first-quarter 2025. Our revenues primarily include the sale of copper cathode, copper rod and copper concentrate, as well as gold and molybdenum in various forms. Refer to Note 8 for a summary of product revenues.

Current wording

Consolidated revenues totaled $7.0 billion in second-quarter 2026, $7.6 billion in second-quarter 2025 and $13.3 billion for both the first six months of 2026 and 2025. Our revenues primarily include the sale of copper cathode, copper rod and copper concentrate, as well as gold and molybdenum products in various forms. Refer to Note 8 for a summary of product revenues.

Previous wording

Sales Volumes. Consolidated copper and gold sales volumes decreased in first-quarter 2026, compared to first-quarter 2025, primarily reflecting lower operating rates at PTFI following the Mud Rush Incident. As a fully integrated producer of refined copper and gold in Indonesia, there may be variability in the timing between production and sales of refined copper and gold. Refer to “Operations” for further discussion of sales volumes at our mining operations.

Current wording

Sales Volumes. Consolidated copper and gold sales volumes decreased in the 2026 periods, compared to the 2025 periods, primarily reflecting lower operating rates at PTFI during the phased ramp-up of the Grasberg Block Cave underground mine. Refer to “Operations” for further discussion of sales volumes at our mining operations.

Previous wording

Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold and molybdenum. Our average realized prices in first-quarter 2026, compared with first-quarter 2025, were 30% higher for copper, 59% higher for gold and 16% higher for molybdenum.

Current wording

Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold and molybdenum. Our average realized prices in second-quarter 2026, compared with second-quarter 2025, were 36% higher for copper, 37% higher for gold and 36% higher for molybdenum. Average realized prices for the first six months of 2026, compared with the first six months of 2025, were 35% higher for copper, 44% higher for gold and 26% higher for molybdenum.

Previous wording

Average realized copper prices include net (unfavorable) favorable adjustments to current period provisionally priced copper sales totaling $(55) million in first-quarter 2026 and $46 million in first-quarter 2025. As discussed in Note 5, certain sales contracts for copper and gold provide final pricing in a specified future month (generally one to four months from the shipment date). We record revenues and invoice customers at the time of shipment based on then-current LME prices for copper or London PM prices for gold, which results in an embedded derivative on provisionally priced sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper and gold prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper and gold prices, the opposite occurs.

Current wording

Average realized copper prices include net favorable adjustments to current period provisionally priced copper sales totaling $40 million in second-quarter 2026, $69 million in second-quarter 2025, $59 million for the first six months of 2026 and $87 million for the first six months of 2025. As discussed in Note 5, certain sales contracts for copper and gold provide final pricing in a specified future month (generally one to four months from the shipment date). We record revenues and invoice customers at the time of shipment based on then-current LME prices for copper or London PM prices for gold, which results in an embedded derivative on provisionally priced sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper and gold prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper and gold prices, the opposite occurs.

Previous wording

Prior Period Provisionally Priced Copper Sales. Net favorable adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at December 31, 2025 and 2024) recorded in consolidated revenues totaled $34 million in first-quarter 2026 and $70 million in first-quarter 2025. Refer to Notes 5 and 8 for a summary of total adjustments to prior period and current period provisionally priced copper sales.

Current wording

2025 and 2024) recorded in consolidated revenues totaled $98 million in second-quarter 2026, $(35) million in second-quarter 2025, $58 million for the first six months of 2026 and $63 million for the first six months of 2025. Refer to Notes 5 and 8 for a summary of total adjustments to prior period and current period provisionally priced copper sales.

Previous wording

At March 31, 2026, we had provisionally priced copper sales totaling 136 million pounds (net of intercompany sales and noncontrolling interests) recorded at an average price of $5.58 per pound, subject to final LME copper settlement prices over the next several months. We estimate that each $0.05 change in the price realized from the March 31, 2026, recorded provisional price would have an approximate $12 million effect on 2026 revenues ($4 million to 2026 net income attributable to common stock). The LME copper settlement price closed at $5.90 per pound on April 30, 2026.

Current wording

At June 30, 2026, we had provisionally priced copper sales totaling 202 million pounds (99 million pounds net of intercompany sales and noncontrolling interests) recorded at an average price of $6.07 per pound, subject to final LME copper settlement prices over the next several months. We estimate that each $0.05 change in the price realized from the June 30, 2026, recorded provisional price would have an approximate $9 million effect on 2026 revenues ($3 million to 2026 net income attributable to common stock). The LME copper settlement price closed at $6.28 per pound on July 31, 2026.

Previous wording

Sales of Purchased Copper. We purchase copper cathode primarily for processing by our U.S. Rod & Refining operations. The volumes of copper purchases vary depending on cathode production from our operations and totaled 10 million pounds in first-quarter 2026 and 66 million pounds in first-quarter 2025. Revenues associated with the sale of purchased copper vary with the volume of copper purchases and changes in copper prices. During first-quarter 2026, we were able to meet customer demand for copper rod primarily using copper cathode produced by our U.S. and South America mining operations, resulting in a decrease in purchased copper volumes.

Current wording

Sales of Purchased Copper. We purchase copper cathode primarily for processing by our U.S. Rod & Refining operations. The volumes of copper purchases vary depending on cathode production from our operations and totaled 37 million pounds in second-quarter 2026, 35 million pounds in second-quarter 2025, 47 million pounds for the first six months of 2026 and 101 million pounds for the first six months of 2025. Revenues associated with the sale of purchased copper vary with the volume of copper purchases and changes in copper prices.

Previous wording

Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges, which will vary with market conditions, sales volumes and the price of copper. Treatment charges totaled $2 million in first-quarter 2026, compared to $28 million in first-quarter 2025, primarily reflecting lower treatment charge rates as a result of favorable market conditions and the lack of copper concentrate sales volumes in Indonesia now that PTFI is a fully integrated producer of refined copper and gold.

Current wording

Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges, which will vary with market conditions, sales volumes and the price of copper. Treatment charges totaled $8 million in second-quarter 2026, $16 million in second-quarter 2025, $10 million for the first six months of 2026 and $43 million for the first six months of 2025. The 2026 periods primarily reflect lower treatment charge rates as a result of favorable market conditions and the lack of copper concentrate sales volumes in Indonesia as PTFI is now a fully integrated producer of refined copper, gold and silver.

Previous wording

Export Duties and Royalties. Prior to the expiration of its export license in September 2025, PTFI was assessed export duties on copper concentrate sales at a rate of 7.5%. PTFI incurred export duties totaling $55 million in first-quarter 2025. Refer to Note 11 of the 2025 Form 10-K for further discussion.

Current wording

Export Duties. Prior to the expiration of its export license in September 2025, PTFI was assessed export duties on copper concentrate sales at a rate of 7.5%. PTFI incurred export duties totaling $146 million in second-quarter 2025 and $202 million for the first six months of 2025. Refer to Note 11 of our 2025 Form 10-K for further discussion.

Previous wording

PTFI pays royalties on all copper and gold sales, the amount of which varies with sales volumes and metal prices. Royalties totaled $53 million in first-quarter 2026 and $68 million in first-quarter 2025.

Current wording

Royalties. PTFI pays royalties on all copper and gold sales, the amount of which varies with sales volumes and metal prices. Royalties totaled $60 million in second-quarter 2026, $135 million in second-quarter 2025, $113 million for the first six months of 2026 and $203 million for the first six months of 2025.

Previous wording

Following the Mud Rush Incident and until PTFI’s operations return to normal capacity, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. First-quarter 2026 included $406 million of idle facility and restoration costs associated with the Mud Rush Incident, and first-quarter 2025 included charges totaling $73 million associated with a planned maintenance turnaround at the Miami smelter.

Current wording

Consolidated production and delivery costs totaled $4.3 billion in both second-quarter 2026 and 2025, $8.4 billion for the first six months of 2026 and $8.0 billion for the first six months of 2025. The 2026 periods, compared with the 2025 periods, primarily reflect higher costs of copper purchases at Atlantic Copper and higher costs for supplies, diesel fuel and other consumables at our mining operations, partly offset by the impact of reduced operating rates at PTFI following the September 2025 external mud rush incident. The first six months of 2025 also included charges totaling $73 million associated with a planned maintenance turnaround at the Miami smelter.

Previous wording

Mining Unit Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations primarily include labor, energy and other commodity-based inputs, such as sulfuric acid, steel, reagents, liners, tires and explosives. Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mines averaged $3.29 per pound of copper in first-quarter 2026 and $2.59 per pound of copper in first-quarter 2025. First-quarter 2026 consolidated unit site production and delivery costs exclude $0.62 per pound of copper for idle facility and restoration costs associated with the Mud Rush Incident. Refer to “Operations” for further discussion of unit net cash costs associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated statements of income.

Current wording

Mining Unit Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations primarily include labor, energy and other commodity-based inputs, such as sulfuric acid, steel, reagents, liners, tires and explosives. Consolidated unit site production and delivery costs (before net noncash and other costs) for our copper mines averaged $3.28 per pound of copper in second-quarter 2026 and for the first six months of 2026, compared to $2.71 per pound of copper in second-quarter 2025 and $2.65 per pound of copper for the first six months of 2025.

Previous wording

Following the Mud Rush Incident and until PTFI’s operations return to normal capacity, a portion of PTFI’s production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs, which were excluded from PTFI's unit net cash credits, totaled $406 million ($4.93 per pound of copper) in first-quarter 2026.

Current wording

During the phased ramp-up period of the Grasberg Block Cave underground mine and until PTFI’s operations return to normal capacity, a portion of PTFI's production and delivery costs will be recognized as idle facility costs, which are non-inventoriable. Idle facility and restoration costs totaled $284 million ($0.40 per pound of copper) in second-quarter 2026 and $690 million ($0.50 per pound of copper) for the first six months of 2026, which were excluded from consolidated net cash costs.

Previous wording

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $514 million in first-quarter 2026 (which included $93 million of non-inventoriable idle facility costs associated with the Mud Rush Incident) and $466 million in first-quarter 2025. The increase in first-quarter 2026 DD&A, compared to first-quarter 2025, primarily reflects higher depreciation associated with placing assets into service at our U.S. copper mines and at PTFI in 2025, partly offset by lower UOP depreciation as a result of lower operating rates at PTFI.

Current wording

Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $523 million in second-quarter 2026, $668 million in second-quarter 2025, $1.0 billion for the first six months of 2026 and $1.1 billion for the first six months of 2025. The decrease in DD&A in the 2026 periods, compared to the 2025 periods, primarily reflects lower UOP depreciation as a result of lower operating rates at PTFI, partly offset by higher depreciation associated with placing assets into service at our U.S. copper mines and at PTFI in 2025.

Previous wording

Based on current sales volume estimates, consolidated DD&A is estimated to approximate $2.3 billion for the year 2026, including $0.3 billion for idle facility costs associated with the Mud Rush Incident.

Current wording

Based on current sales volume estimates, consolidated DD&A is estimated to approximate $2.3 billion for the year 2026, including $0.3 billion recognized as idle facility costs associated with the September 2025 external mud rush incident. Refer to Note 7 for further discussion of idle facility costs.

Previous wording

Environmental obligation costs reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care-and-maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations.

Current wording

Environmental obligations reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care-and-maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations.

Previous wording

Net charges for environmental obligations and shutdown costs totaled $17 million in first-quarter 2026 and $10 million in first-quarter 2025.

Current wording

Net charges for environmental obligations and shutdown costs totaled $13 million in second-quarter 2026, $27 million in second-quarter 2025, $30 million for the first six months of 2026 and $37 million for the first six months of 2025.

Previous wording

In first-quarter 2026, PTFI recognized a gain of $0.7 billion for an insurance settlement associated with the Mud Rush Incident under its property and business interruption policies. PTFI collected this settlement in April 2026.

Current wording

In first-quarter 2026, PTFI recognized a gain of $0.7 billion ($0.2 billion after taxes and noncontrolling interests) for an insurance settlement associated with the September 2025 external mud rush incident under its property and business interruption policies. PTFI collected the proceeds from this settlement in April 2026.

Previous wording

Other income, net, which totaled $11 million in first-quarter 2026 and $58 million in first-quarter 2025, primarily includes amounts associated with interest income, currency exchange gains and losses, and mark-to-market impacts of trust assets used to satisfy financial assurance obligations for our New Mexico mining operations. Lower other income, net, in first-quarter 2026, compared to first-quarter 2025, primarily reflects currency exchange losses, partly offset by a gain of $22 million recognized in first-quarter 2026 for interest to be collected by Cerro Verde associated with the closure of its 2020 income tax audit.

Current wording

Other income, net, primarily includes amounts associated with interest income, currency exchange gains and losses, and mark-to-market impacts associated with investments and trust assets used to satisfy financial assurance obligations for our New Mexico mining operations.

Showing the first 40 of 116 pairs. Open the source sections for the rest.

Rearranged current paragraphs (14)

Current report — wording carried from elsewhere

Prior Period Provisionally Priced Copper Sales. Net favorable (unfavorable) adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at March 31, 2026 and 2025, and December 31,

Current report — wording carried from elsewhere

Refer to “Operations” for further discussion of unit net cash costs associated with our operating divisions, and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated statements of income.

Current report — wording carried from elsewhere

Financial Information by Business Division and Segment (continued)

Current report — wording carried from elsewhere

In June 2026, PTFI submitted its application for extension of its IUPK, and we and PTFI are working with the Indonesia government to complete the formal license process. The extension of operating rights and other terms are subject to, among other things, the Indonesia government’s issuance of an amended IUPK and entry into definitive agreements.

Current report — wording carried from elsewhere

PTFI continues to advance activities for a planned future restart of Production Block 1S and risk mitigation strategies associated with drainage and cave management technologies.

Current report — wording carried from elsewhere

We defer recognizing profits on sales from our mining operations to Atlantic Copper until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net (reductions)

Current report — wording carried from elsewhere

c. Primarily represents tolling costs paid to PT Smelting.

Current report — wording carried from elsewhere

d. Primarily represents tolling costs paid to PT Smelting, and excludes idle facility related tolling fees that are included in noncash and other costs, net (refer to note c above).

Current report — wording carried from elsewhere

c. Primarily represents tolling costs paid to PT Smelting.

Current report — wording carried from elsewhere

d. Represents the combined total for U.S. copper mines, South America operations, Molybdenum mines, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

Current report — wording carried from elsewhere

Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs

Current report — wording carried from elsewhere

a. Reflects sales of the Molybdenum mines’ production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.

Current report — wording carried from elsewhere

c. Represents the combined total for U.S. copper mines, South America and Indonesia operations, U.S. Rod & Refining and Atlantic Copper as presented in “Business Divisions and Segments.”

Current report — wording carried from elsewhere

d. Represents Corporate, other & eliminations as presented in “Business Divisions and Segments,” which also includes amounts associated with our molybdenum sales company, including sales of molybdenum produced by the Molybdenum mines and by certain of the U.S. copper mines and the Cerro Verde mine.
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

We believe fundamentals for copper are favorable with growing demand supported by copper’s critical role in electrification initiatives, continued urbanization in developing countries, data centers and artificial intelligence (AI) growth and growing connectivity globally.

Previous report — wording carried elsewhere

In first-quarter 2026, PTFI recognized a gain of $0.7 billion for an insurance settlement associated with the Mud Rush Incident under its property and business interruption policies. PTFI collected this settlement in April 2026.

Previous report — wording carried elsewhere

a. Reflects sales of molybdenum produced by certain of the U.S. copper mines to our molybdenum sales company at market-based pricing.

Previous report — wording carried elsewhere

a. Reflects sales of molybdenum produced by certain of the U.S. copper mines to our molybdenum sales company at market-based pricing.

Previous report — wording carried elsewhere