FREEPORT-MCMORAN INC
For the period ended Jun 30, 2024. Filed Aug 7, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2024 · Filed Aug 7, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-03-31; filed 2024-05-08.
0000831259-24-000019
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-06-30; filed 2024-08-07.
0000831259-24-000031
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 243 previous paragraphs and 256 current paragraphs.
107 unchanged; 90 reworded; 54 added; 42 removed; 4 previous and 5 current paragraphs rearranged.
Tables are not compared: 20 previous and 31 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (54)
Current report
We remain focused on execution of our operating plans, enhancing productivity, controlling costs and initiatives to build and advance optionality in our organic growth portfolio. We continue to make progress on our leach innovation initiatives, with incremental copper production from these initiatives totaling 106 million pounds for the first six months of 2024, more than double amounts for the first six months of 2023. We have a favorable long-term outlook for copper, supported by copper’s increasingly important role in the global economy and limited available supplies to meet growing demand.
Current report
During second-quarter 2024, PT Freeport Indonesia (PT-FI) began commissioning of its new copper smelter and is working to execute a safe and efficient ramp-up to full capacity by year-end 2024. Additionally, construction continues on the adjoining precious metals refinery (PMR) with full production expected by year-end 2024. Upon completion and full ramp-up of the new smelter and PMR (collectively, the new downstream processing facilities), PT-FI will be a fully integrated producer of refined copper and gold.
Current report
Our results for the second quarter and first six months of 2024 were impacted by previously announced shipping delays in Indonesia during June 2024 associated with the timing of renewing PT-FI’s copper concentrate and anode slimes export licenses, which expired on May 31, 2024. On July 2, 2024, PT-FI was granted copper concentrate and anode slimes export licenses, which are valid through December 2024 when the full ramp-up of PT-FI’s new smelter is expected.
Current report
Following is a summary of expected capital expenditures for the year 2024 (in billions):
Current report
a. Primarily includes underground mine development, supporting mill and power capital costs in the Grasberg minerals district and expansion projects in North America.
Current report
b. Excludes capitalized interest and $0.3 billion of estimated commissioning and owner’s costs. Capital expenditures for PT-FI’s new downstream processing facilities are expected to be funded with PT-FI’s cash flows from operations and availability under PT-FI’s revolving credit facility.
Current report
d. Includes net charges totaling $51 million in second-quarter 2024 and $52 million for the first six months of 2024, primarily associated with revisions to environmental obligation estimates and related litigation reserves, and nonrecurring labor-contract charges at Cerro Verde. The first six months of 2024 also include charges associated with assumed oil and gas abandonment obligations resulting from bankruptcies of other companies, offset by international tax credits.
Current report
e. Includes net charges totaling $157 million in second-quarter 2023 and $251 million for the first six months of 2023, primarily associated with charges for contested tax rulings issued by the Peruvian Supreme Court, environmental obligations, an accrual for a potential administrative fine in Indonesia, and impairments and contract-cancellation costs.
Current report
f. Working capital and other sources (uses) totaled $73 million in second-quarter 2024, $250 million in second-quarter 2023, $(24) million for the first six months of 2024 and $(202) million for the first six months of 2023.
Current report
$23 million in second-quarter 2024, $60 million in second-quarter 2023, $79 million for the first six months of 2024 and $116 million for the first six months of 2023. Refer to Note 7 for further discussion.
Current report
d. Reflects net charges associated with contested tax rulings issued by the Peruvian Supreme Court.
Current report
e. Refer to Note 3 for further discussion of net credits associated with closure of PT-FI’s 2021 corporate income tax audit and resolution of a framework for disputed tax matters.
Current report
Our consolidated copper sales volumes from North America totaled 292 million pounds in second-quarter 2024, 339 million pounds in second-quarter 2023, 623 million pounds for the first six months of 2024 and 671 million pounds for the first six months of 2023. Lower copper sales in the 2024 periods, compared with the 2023 periods, primarily reflect lower ore grades and planned mill maintenance, partly offset by improved leach recovery performance.
Current report
Our consolidated copper sales from South America operations totaled 302 million pounds in second-quarter 2024, 304 million pounds in second-quarter 2023, 586 million pounds for the first six months of 2024 and 606 million pounds for the first six months of 2023. The 2024 periods, compared to the 2023 periods reflect lower volumes of leach ore placed in stockpiles, partly offset by higher leach ore grades. The first six months of 2024, compared to the first six months of 2023, also reflect lower milling rates associated with mill maintenance.
Current report
a. Includes $0.22 per pound of copper in second-quarter 2024 and $0.11 per pound of copper for the first six months of 2024 associated with nonrecurring labor-related charges at Cerro Verde associated with a new CLA.
Current report
Regulatory Matters and Mining Rights. On May 31, 2024, export licenses expired for several exporters, including PT-FI. In second-quarter 2024, the Indonesia government issued various regulations to allow, under certain conditions, continued exports of copper concentrates and anode slimes through December 2024.
Current report
On July 2, 2024, PT-FI was granted copper concentrate and anode slimes export licenses, which are valid through December 2024 when the full ramp-up of PT-FI’s new smelter is expected. PT-FI will continue to pay a 7.5% export duty on copper concentrates during the smelter ramp-up period pursuant to Indonesia regulations.
Current report
Downstream Processing Facilities. PT-FI substantially completed construction of its new smelter in June 2024 and commenced commissioning operations. The new smelter has a capacity to process approximately 1.7 million metric tons of copper concentrate per year and is expected to begin producing copper cathodes in the coming months with ramp-up to full production targeted by year-end 2024 in line with previous expectations.
Current report
PT-FI’s consolidated copper and gold sales volumes for the second quarter and first six months of 2024 were impacted by previously announced shipping delays in Indonesia associated with the timing of renewing PT-FI’s copper concentrate and anode slimes export licenses, which expired on May 31, 2024. On July 2, 2024, PT-FI was granted copper concentrate and anode slimes export licenses, which are valid through December 2024 when the full ramp-up of PT-FI’s new smelter is expected.
Current report
PT-FI’s consolidated copper sales volumes totaled 337 million pounds in second-quarter 2024, 386 million pounds in second-quarter 2023, 830 million pounds for the first six months of 2024 and 584 million pounds for the first six months of 2023. PT-FI’s consolidated copper sales volumes for the 2024 periods benefited from higher ore grades and higher consolidated copper sales volumes for the first six months of 2024 also reflect higher mining and milling rates.
Current report
PT-FI’s consolidated gold sales volumes totaled 356 thousand ounces in second-quarter 2024, 492 thousand ounces in second-quarter 2023, 920 thousand ounces for the first six months of 2024 and 758 thousand ounces for the first six months of 2023. PT-FI’s consolidated gold sales volumes for the first six months of 2024 benefited from higher mining and milling rates.
Current report
a. Export duties of 2.5% were eliminated effective March 29, 2023, upon verification that construction progress of the new smelter exceeded 50%, and were reinstated at a rate of 7.5% in July 2023 under a revised regulation. As discussed above and in Note 7, PT-FI will continue to pay export duties of 7.5% on copper concentrates during the smelter ramp-up period pursuant to Indonesia regulations.
Current report
b. Includes charges totaling $0.10 per pound of copper in second-quarter 2024 and $0.04 per pound of copper for the first six months of 2024 for amounts capitalized in prior years associated with construction of the new downstream processing facilities.
Current report
c. Includes charges totaling $0.06 per pound of copper in second-quarter 2024 and $0.04 per pound of copper for the first six months of 2024 for operational readiness and startup costs associated with the new downstream processing facilities and $0.03 per pound of copper in second-quarter 2023 and $0.04 per pound of copper for the first six months of 2023 for feasibility and optimization studies.
Current report
d. Includes charges totaling $0.14 per pound of copper in second-quarter 2023 and $0.09 per pound of copper for the first six months of 2023 associated with a potential administrative fine.
Current report
Export duties totaled $75 million in second-quarter 2024, $231 million for the first six months of 2024 and $18 million for the first six months of 2023. Refer to Note 7 for further discussion of PT-FI’s export duties.
Current report
In May 2024, the U.S. Environmental Protection Agency (EPA) amended its rule establishing standards for hazardous air pollutant emissions from primary copper smelters. We are evaluating this final rule to determine to what extent we would need to modify our processes and equipment and the costs involved, which could be significant. We expect that this final rule will impact our Miami, Arizona smelter operations, which processes a significant portion of the copper concentrate produced by our North America copper mines. We have appealed the EPA’s final rule to the Court of Appeals for the D.C. Circuit, and we have filed a petition for reconsideration to EPA, including updated information on cost and implementation of the final rule. Refer to “Governmental Regulations – Environmental and Reclamation Matters” in Items 1 and 2. “Business and Properties” contained in Part I of our 2023 Form 10-K for additional information on new and revised environmental regulatory requirements that may result in substantial increased costs for our business.
Current report
On July 31, 2024, PT-FI borrowed $250 million under its revolving credit facility to fund capital expenditures for PT-FI’s new downstream processing facilities.
Current report
In July 2024, FCX acquired 1.2 million shares of its common stock for a total cost of $59 million ($50.48 average cost per share) bringing total purchases under its $5.0 billion share repurchase program to 49.0 million shares of common stock for a cost of $1.9 billion ($38.64 average cost per share). The timing and amount of share repurchases is at the discretion of management and will depend on a variety of factors. The share repurchase program may be modified, increased, suspended or terminated at any time at our Board’s discretion.
Current report
Capital Expenditures. Capital expenditures, including capitalized interest, totaled $2.4 billion for the first six months of 2024 and $2.3 billion for the first six months of 2023, including amounts for major mining projects ($0.9 billion for the first six months of 2024 and $0.8 billion for the first six months of 2023), primarily associated with underground development activities in the Grasberg minerals district and for PT-FI’s new downstream processing facilities ($0.7 billion for the first six months of 2024 and $0.8 billion for the first six months of 2023).
Current report
CRITICAL ACCOUNTING ESTIMATES
Current report
MD&A is based on our consolidated financial statements, which have been prepared in conformity with U.S. GAAP. The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. For a description of our critical accounting estimates that require us to make the most difficult, subjective or complex judgments, refer to our 2023 Form 10-K. We have not changed any of these policies from those previously disclosed in that report.
Current report
c. Includes charges totaling $14 million ($0.05 per pound of copper) for feasibility and optimization studies.
Current report
c. Includes charges totaling $26 million ($0.08 per pound of copper) for feasibility and optimization studies.
Current report
c. Includes charges totaling $30 million ($0.05 per pound of copper) for feasibility and optimization studies.
Current report
c. Includes charges totaling $53 million ($0.08 per pound of copper) for feasibility and optimization studies.
Current report
b. Includes nonrecurring charges totaling $65 million ($0.22 per pound of copper) associated with labor-related charges at Cerro Verde associated with a new CLA.
Current report
c. Includes charges totaling $12 million ($0.04 per pound of copper) for feasibility studies.
Current report
a. Includes silver sales of 1.1 million ounces ($23.02 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.
Current report
a. Includes silver sales of $1.8 million ounces ($28.49 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to FCX’s molybdenum sales company at market-based pricing.
Showing the first 40 of 54 passages. Open the source sections for the rest.
Removed paragraphs (42)
Previous report
Our results for first-quarter 2024 reflect strong operating performance, with significant increases in consolidated copper and gold sales volumes from PT Freeport Indonesia (PT-FI) compared to first-quarter 2023. We remain focused on reliable execution of our plans, enhancing our productivity and cost performance, generating strong cash flow and building value through our organic growth pipeline. Market fundamentals for copper have been positive, supported by copper’s increasingly important role in the global economy and limited available supplies to meet growing demand.
Previous report
With our solid financial position, we are a leading producer of copper with multiple options for future growth and an experienced team with a track record of accomplishment. Our near-term organic development pipeline is highlighted by our leach innovation initiatives, which we continue to advance through incorporation of new applications, technologies and data analytics to our leaching processes. Incremental copper production from these initiatives totaled 51 million pounds in first-quarter 2024, compared with 22 million pounds in first-quarter 2023.
Previous report
Construction of the Manyar smelter and precious metals refinery (PMR) (collectively, the Indonesia smelter projects) in Gresik, Indonesia, are advancing on schedule with a target of May 2024 for substantial construction completion. Once completed, the Indonesia smelter projects will complement our large-scale, long-lived, low-cost operations in the Grasberg minerals district.
Previous report
Net income attributable to common stockholders totaled $473 million in first-quarter 2024, compared with $663 million in first-quarter 2023. The decrease in first-quarter 2024, compared to first-quarter 2023, primarily reflects higher income attributable to noncontrolling interests at our Indonesia operations. Refer to “Consolidated Results” for further discussion.
Previous report
a. PT-FI’s current export licenses for copper concentrates and anode slimes extend through May 2024. Consolidated sales volume estimates include exports of copper concentrates and anode slimes by PT-FI from June 2024 through December 2024 totaling 0.4 billion pounds of copper and 0.9 million ounces of gold.
Previous report
PT-FI is working with the Indonesia government to obtain approvals to continue exports of copper concentrates and anode slimes beyond May 2024 and until the Indonesia smelter projects are fully commissioned and reach designed operating conditions, which is currently expected by year-end 2024. We cannot predict if PT-FI will obtain approval timely, if at all, to continue exports of copper concentrates and anode slimes beyond May 2024. If exports were prohibited or limited, or additional financial impacts resulting from Indonesia regulations were to be assessed prior to PT-FI’s Indonesia smelter projects becoming operational by year-end 2024, PT-FI may be required to reduce production levels or be subject to additional costs, which could adversely impact our revenues and operations.
Previous report
Capital expenditures for the Indonesia smelter projects for the remainder of 2024 are expected to be funded with availability under PT-FI’s revolving credit facility.
Previous report
d. Includes net international tax credits of $181 million, which were offset by charges of $109 million associated with assumed oil and gas abandonment obligations resulting from bankruptcies of other companies and $56 million of revisions to environmental obligation estimates and $16 million of other net charges.
Previous report
e. Includes net charges totaling $94 million, primarily associated with net adjustments to environmental obligations, contested tax matters and asset impairments in North America.
Previous report
f. Working capital and other uses totaled $97 million in first-quarter 2024 and $452 million in first-quarter 2023.
Previous report
2023 Annual Report on Sustainability. In April 2024, we published our 2023 Annual Report on Sustainability marking our 23rd year of reporting on our sustainability progress. We are committed to building upon our achievements in sustainability and our position as a leading responsible copper producer.
Previous report
Our consolidated copper sales from South America operations of 284 million pounds in first-quarter 2024 were lower than 302 million pounds in first-quarter 2023, primarily reflecting lower volumes of leach ore placed in stockpiles and lower milling rates associated with mill maintenance. Molybdenum production in first-quarter 2024 was significantly lower than first-quarter 2023 as a result of mill maintenance and the impact of certain ore types on recoveries. Copper sales from South America operations are expected to approximate 1.1 billion for the year 2024, which assume no significant impacts to water availability, which is being monitored closely in light of ongoing El Niño weather patterns. Refer to “Outlook” for projected molybdenum sales volumes.
Previous report
Regulatory Matters. Over the past several years, the Indonesia government has enacted various laws and regulations related to downstream processing of various products, including copper concentrates. In 2018, PT-FI agreed to expand its domestic smelting and refining capacity and has made substantial progress towards completion (refer to “Indonesia Smelting and Refining” below).
Previous report
PT-FI’s current export licenses for copper concentrate and anode slimes extend through May 2024. PT-FI is working with the Indonesia government to obtain approvals to continue exports of copper concentrates and anode slimes until the Indonesia smelter projects are fully commissioned and reach designed operating conditions, which is currently expected by year-end 2024.
Previous report
PT-FI also continues to discuss the applicability of the Indonesia government’s revised regulation on duties for various exported products, including copper concentrates, because of inconsistencies with its special mining license (IUPK). PT-FI is currently being assessed export duties on copper concentrates at a rate of 7.5% and incurred export duties totaling $156 million in first-quarter 2024.
Previous report
Refer to Notes 12, 13 and 14 of our 2023 Form 10-K for further discussion of Indonesia regulatory matters.
Previous report
In December 2023, PT-FI completed the installation of new milling facilities allowing it to further leverage the success of the underground mines and provide sustained large-scale production volumes. PT-FI is completing a mill recovery project with the installation of a new copper cleaner circuit in the second half of 2024.
Previous report
Indonesia Smelting and Refining. In connection with PT-FI’s 2018 agreement with the Indonesia government to secure the extension of its long-term mining rights, PT-FI agreed to expand its domestic smelting and refining capacity.
Previous report
Construction progress of the Manyar smelter in Gresik, Indonesia (with a capacity to process approximately 1.7 million metric tons of copper concentrate per year) is advancing on schedule with a target of May 2024 for substantial construction completion, which will be followed by a ramp-up period through December 2024.
Previous report
Construction of the smelter has an estimated cost of $3.0 billion, including $2.8 billion for a construction contract (excluding capitalized interest and $0.3 billion of estimated commissioning and owner’s costs) and $0.2 billion for investment in a desalination plant.
Previous report
PT-FI’s consolidated sales of 493 million pounds of copper and 564 thousand ounces of gold in first-quarter 2024 were more than double first-quarter 2023 sales of 198 million pounds of copper and 266 thousand ounces of gold, primarily reflecting higher mining and milling rates and ore grades. First-quarter 2023 sales were also impacted by weather-related disruptions and the initial deferral of sales recognition related to the PT Smelting tolling arrangement.
Previous report
a. Includes charges totaling $0.03 per pound of copper in first-quarter 2024 for the Indonesia smelter projects’ operational readiness and startup costs and $0.07 per pound of copper in first-quarter 2023 for feasibility and optimization studies.
Previous report
PT-FI is currently being assessed export duties for copper concentrates at a rate of 7.5%, compared to an export duty rate of 2.5% in first-quarter 2023. Export duties totaled $156 million in first-quarter 2024 and $17 million in first-quarter 2023. Refer to Note 13 of our 2023 Form 10-K for further discussion of PT-FI’s export duties.
Previous report
At March 31, 2024, we had no borrowings and $7 million in letters of credit issued under our $3.0 billion revolving credit facility, and there were no borrowings under PT-FI’s $1.75 billion revolving credit facility or Cerro Verde’s $350 million revolving credit facility.
Previous report
Capital Expenditures. Capital expenditures, including capitalized interest, totaled $1.3 billion in first-quarter 2024, including $0.4 billion for major mining projects, primarily associated with underground development activities in the Grasberg minerals district, and $0.5 billion for the Indonesia smelter projects.
Previous report
Capital expenditures, including capitalized interest, totaled $1.1 billion in first-quarter 2023, including $0.4 billion for major mining projects, primarily associated with underground development activities in the Grasberg minerals district, and $0.3 billion for the Indonesia smelter projects.
Previous report
Contributions from Noncontrolling Interests. We received equity contributions totaling $50 million in first-quarter 2023 from MIND ID, primarily associated with receipt of the final capital contribution in accordance with the PT-FI shareholders agreement.
Previous report
North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Previous report
b. Includes gold and silver product revenues and production costs.
Previous report
c. Includes charges totaling $15 million ($0.05 per pound of copper) for feasibility studies.
Previous report
North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Previous report
b. Includes gold and silver product revenues and production costs.
Previous report
c. Includes charges totaling $27 million ($0.08 per pound of copper) for feasibility and optimization studies and $16 million ($0.05 per pound of copper) related to asset impairments.
Previous report
South America Operations Product Revenues, Production Costs and Unit Net Cash Costs
Previous report
a. Includes silver sales of 0.8 million ounces ($24.45 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.
Previous report
South America Operations Product Revenues, Production Costs and Unit Net Cash Costs
Previous report
a. Includes silver sales of 1.0 million ounces ($23.41 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro Verde to our molybdenum sales company at market-based pricing.
Previous report
b. Includes charges totaling $9 million ($0.03 per pound of copper) for feasibility studies.
Previous report
Indonesia Operations Product Revenues, Production Costs and Unit Net Cash (Credits) Costs
Previous report
b. Includes charges totaling $15 million ($0.03 per pound of copper) for the Indonesia smelter projects’ operational readiness and startup costs.
Showing the first 40 of 42 passages. Open the source sections for the rest.
Reworded paragraphs (90)
Previous wording
Refer to Note 5 for further discussion.
Current wording
Net income attributable to common stockholders totaled $616 million in second-quarter 2024 and $1.1 billion for the first six months of 2024, compared with $343 million in second-quarter 2023 and $1.0 billion for the first six months of 2023. The increase in the 2024 periods, compared to the 2023 periods, primarily reflects higher average realized prices on copper and gold sales, and lower interest expense as a result of interest charges in 2023 recognized for Cerro Verde’s contested tax rulings issued by the Peruvian Supreme Court (refer to Note 4), partly offset by increased operating costs, and higher income tax expense and income attributable to noncontrolling interests at our South America and Indonesia operations. Refer to “Consolidated Results” for further discussion.
Previous wording
At March 31, 2024, we had consolidated debt of $9.4 billion and consolidated cash and cash equivalents of $5.2 billion, $6.1 billion including $0.9 billion of current restricted cash associated with a portion of PT-FI's export proceeds required to be temporarily deposited in Indonesia banks. Net debt totaled $0.3 billion, excluding $3.0 billion of debt for the Indonesia smelter projects. Refer to “Net Debt” for reconciliations of consolidated debt, consolidated cash and cash equivalents and current restricted cash associated with PT-FI's export proceeds to net debt.
Current wording
At June 30, 2024, we had consolidated debt of $9.4 billion and consolidated cash and cash equivalents of $5.3 billion, $6.2 billion including $0.9 billion of current restricted cash associated with a portion of PT-FI's export proceeds required to be temporarily deposited in Indonesia banks. Net debt totaled $0.3 billion, excluding $3.0 billion of debt for PT-FI’s new downstream processing facilities. Refer to “Net Debt” for reconciliations of consolidated debt, consolidated cash and cash equivalents and current restricted cash associated with PT-FI's export proceeds to net debt.
Previous wording
c. Includes 50 million pounds produced by our North America copper mines and South America operations and 34 million pounds produced by our Molybdenum mines.
Current wording
a. Includes 50 million pounds produced by our North America copper mines and South America operations and 32 million pounds produced by our Molybdenum mines.
Previous wording
Consolidated sales volumes in second-quarter 2024 are expected to approximate 1.0 billion pounds of copper, 500 thousand ounces of gold and 21 million pounds of molybdenum. Consolidated copper and gold production volumes for the year 2024 are expected to exceed 2024 sales volumes, reflecting the deferral of approximately 90 million pounds of copper and 120 thousand ounces of gold that will be processed by the Indonesia smelter projects and sold as refined metal in future periods.
Current wording
Consolidated sales volumes in third-quarter 2024 are expected to approximate 1.0 billion pounds of copper, 475 thousand ounces of gold and 20 million pounds of molybdenum. Consolidated copper and gold production volumes for the year 2024 are expected to exceed 2024 sales volumes, reflecting the deferral of approximately 100 million pounds of copper and 120 thousand ounces of gold that will be processed by PT-FI’s new downstream processing facilities and sold as refined metal in 2025.
Previous wording
Projected sales volumes are dependent on operational performance; extension of PT-FI’s export licenses for copper concentrates and anode slimes beyond May 2024; the timing of the ramp-up of the Indonesia smelter projects; weather-related conditions, including ongoing El Niño weather impacts; timing of shipments and other factors detailed in the “Cautionary Statement” below. For other important factors that could cause results to differ materially from projections, refer to “Risk Factors” contained in Part I, Item 1A. of our 2023 Form 10-K.
Current wording
Projected sales volumes are dependent on operational performance; the timing of the ramp-up of PT-FI’s new smelter in Indonesia; weather-related conditions; timing of shipments and other factors detailed in the “Cautionary Statement” below. For other important factors that could cause results to differ materially from projections, refer to “Risk Factors” contained in Part I, Item 1A. of our 2023 Form 10-K.
Previous wording
Consolidated unit net cash costs (net of by-product credits) for our copper mines are expected to average $1.57 per pound of copper for the year 2024 (including $1.57 per pound of copper in second-quarter 2024), based on achievement of current volume and cost estimates, and assuming average prices of $2,300 per ounce of gold and $20.00 per pound of molybdenum for the remainder of 2024. Quarterly unit net cash costs vary with fluctuations in sales volumes and realized prices, primarily for gold and molybdenum. The impact of price changes on consolidated unit net cash costs for the year 2024 would approximate $0.04 per pound of copper for each $100 per ounce change in the average price of gold and $0.02 per pound of copper for each $2 per pound change in the average price of molybdenum during the remainder of 2024.
Current wording
Consolidated unit net cash costs (net of by-product credits) for our copper mines are expected to average $1.63 per pound of copper for the year 2024 (including $1.71 per pound of copper in third-quarter 2024), based on achievement of current sales volume and cost estimates, and assuming average prices of $2,300 per ounce of gold and $20.00 per pound of molybdenum for the second half of 2024. Quarterly unit net cash costs vary with fluctuations in sales volumes and realized prices, primarily for gold and molybdenum. The impact of price changes on consolidated unit net cash costs for the year 2024 would approximate $0.02 per pound of copper for each $100 per ounce change in the average price of gold and $0.01 per pound of copper for each $2 per pound change in the average price of molybdenum for the second half of 2024.
Previous wording
Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors. Our consolidated operating cash flows are estimated to approximate $7.4 billion, net of $0.2 billion of working capital and other uses, for the year 2024, based on current sales volume and cost estimates, extension of PT-FI’s export licenses for copper concentrates and anode slimes beyond May 2024, and assuming average prices of $4.25 per pound for copper, $2,300 per ounce for gold and $20.00 per pound for molybdenum for the remainder of 2024. Estimated consolidated operating cash flows for the year 2024 also reflect an estimated income tax provision of $2.8 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2024). The impact of price changes on consolidated operating cash flows for the year 2024 would approximate $270 million for each $0.10 per pound change in the average price of copper, $105 million for each $100 per ounce change in the average price of gold and $90 million for each $2 per pound change in the average price of molybdenum for the remainder of 2024.
Current wording
Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum sales; production costs; income taxes; other working capital changes; and other factors. Our consolidated operating cash flows are estimated to approximate $7.2 billion for the year 2024, based on current sales volume and cost estimates, and assuming average prices of $4.25 per pound of copper, $2,300 per ounce of gold and $20.00 per pound of molybdenum for the second half of 2024. Estimated consolidated operating cash flows for the year 2024 also reflect an estimated income tax provision of $2.7 billion (refer to “Consolidated Results – Income Taxes” for further discussion of our projected income tax rate for the year 2024). The impact of price changes for the second half of 2024 on consolidated operating cash flows would approximate $200 million for each $0.10 per pound change in the average price of copper, $80 million for each $100 per ounce change in the average price of gold and $50 million for each $2 per pound change in the average price of molybdenum.
Previous wording
Capital expenditures are expected to approximate $4.6 billion for the year 2024, including $2.3 billion for major mining projects and $1.0 billion for the Indonesia smelter projects. Projected capital expenditures for the Indonesia smelter projects in 2024 exclude capitalized interest and $0.3 billion of estimated commissioning and owner’s costs. Projected capital expenditures for major mining projects include $1.1 billion for planned projects, primarily associated with underground mine development in the Grasberg minerals district and potential expansion projects in North America, and $1.2 billion for discretionary growth projects. We closely monitor market conditions and will continue to adjust our operating plans, including capital expenditures, to protect our liquidity and preserve our asset values, as necessary.
Current wording
We closely monitor market conditions and will adjust our operating plans, including capital expenditures, to protect our liquidity and preserve our asset values, as necessary.
Previous wording
This graph presents LME copper settlement prices and the combined reported stocks of copper at the LME, Commodity Exchange Inc., and the Shanghai Futures Exchange from January 2014 through March 2024. During first-quarter 2024, LME copper settlement prices ranged from a low of $3.67 per pound to a high of $4.07 per pound, averaged $3.83 per pound and settled at $3.96 per pound on March 28, 2024. Upward momentum in copper prices has continued in second-quarter 2024, and the LME copper settlement price was $4.52 per pound on April 30, 2024, bolstered by expectations of tight supplies and optimism about demand.
Current wording
Prices for copper, gold and molybdenum are affected by numerous factors beyond our control and can fluctuate significantly (for further discussion refer to “Risk Factors” contained in Part I, Item 1A. of our 2023 Form 10-K). The following graphs present the London Metal Exchange (LME) copper settlement price, the London Bullion Market Association (London) PM gold price, and the Platts Metals Daily Molybdenum Dealer Oxide weekly average price since January 2014. This graph presents LME copper settlement prices and the combined reported stocks of copper at the LME, Commodity Exchange Inc., and the Shanghai Futures Exchange from January 2014 through June 2024. During second-quarter 2024, LME copper settlement prices ranged from a low of $4.05 per pound to a record high of $4.92 per pound, averaged $4.42 per pound and settled at $4.30 per pound on June 28, 2024. The decline in copper prices from the highs in May 2024, reflect market uncertainties in China. The LME copper settlement price was $4.09 per pound on July 31, 2024.
Previous wording
We believe fundamentals for copper are favorable and that future demand will be supported by copper’s critical role in the global transition to renewable power, electric vehicles and other carbon-reduction initiatives, continued urbanization in developing countries and growing connectivity globally.
Current wording
We believe fundamentals for copper are favorable with limited available supplies and growing demand supported by copper’s critical role in the global transition to renewable power, electric vehicles and other carbon-reduction initiatives, continued urbanization in developing countries and growing connectivity globally.
Previous wording
This graph presents London PM gold prices from January 2014 through March 2024. During first-quarter 2024, London PM gold prices ranged from a low of $1,985 per ounce to a high of $2,214 per ounce, averaged $2,070 per ounce and closed at $2,214 per ounce on March 28, 2024. Gold prices hit a record high during first-quarter 2024, propelled by U.S. interest rate cut expectations and strong safe-haven demand. In April 2024, a new record high was reached ($2,402 per ounce on April 12, 2024) and the London PM gold price was $2,307 per ounce on April 30, 2024.
Current wording
This graph presents London PM gold prices from January 2014 through June 2024. During second-quarter 2024, London PM gold prices ranged from a low of $2,265 per ounce to a record high of $2,427 per ounce, averaged $2,338 per ounce and closed at $2,331 per ounce on June 28, 2024. Record high gold prices in second-quarter 2024 were propelled by U.S. interest rate cut expectations and strong safe-haven demand. The London PM gold price was $2,426 per ounce on July 31, 2024.
Previous wording
This graph presents the Platts Metals Daily Molybdenum Dealer Oxide weekly average price from January 2014 through March 2024. During first-quarter 2024, the weekly average price of molybdenum ranged from a low of $19.34 per pound to a high of $20.42 per pound, averaged $19.93 per pound and was $19.81 per pound on March 28, 2024. During first-quarter 2024, overall global demand for molybdenum was mixed with steady demand from energy, power generation, aerospace and defense sectors, and some weakness in the construction sector. We believe fundamentals for molybdenum are positive with favorable demand drivers and limited supply. The Platts Metals Daily Molybdenum Dealer Oxide weekly average price was $20.63 per pound on April 26, 2024.
Current wording
This graph presents the Platts Metals Daily Molybdenum Dealer Oxide weekly average price from January 2014 through June 2024. During second-quarter 2024, the weekly average price of molybdenum ranged from a low of $19.57 per pound to a high of $23.52 per pound, averaged $21.78 per pound and was $22.74 per pound on June 28, 2024. Overall global demand for molybdenum is driven by energy, power generation, aerospace, defense and construction sectors. We believe fundamentals for molybdenum are positive with favorable demand drivers and limited supply. The Platts Metals Daily Molybdenum Dealer Oxide weekly average price was $22.25 per pound on July 26, 2024.
Previous wording
b. Includes (unfavorable) favorable adjustments to prior period provisionally priced concentrate and cathode copper sales totaling $(7) million ($(2) million to net income attributable to common stock) in first-quarter 2024 and $210 million ($72 million to net income attributable to common stock) in first-quarter 2023. Refer to Note 6 for further discussion.
Current wording
b. Includes favorable (unfavorable) adjustments to prior period provisionally priced concentrate and cathode copper sales totaling $166 million ($56 million to net income attributable to common stock) in second-quarter 2024, $(118) million ($(45) million to net income attributable to common stock) in second-quarter 2023, $28 million ($9 million to net income attributable to common stock) for the first six months of 2024 and $182 million ($61 million to net income attributable to common stock) for the first six months of 2023. Refer to Note 5 for further discussion.
Previous wording
c. We defer recognizing profits on intercompany sales until final sales to third parties occur. Refer to “Operations – Smelting and Refining” for a summary of net impacts from changes in these deferrals.
Current wording
c. We defer recognizing profits on intercompany sales until final sales to third parties occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions (reductions) to operating income totaling $137 million ($41 million to net income attributable to common stock) in second-quarter 2024, $(39) million ($(21) million to net income attributable to common stock) in second-quarter 2023, $120 million ($36 million to net income attributable to common stock) for the first six months of 2024 and $72 million ($27 million to net income attributable to common stock) for the first six months of 2023. Refer to “Operations – Smelting and Refining.”
Previous wording
a. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines, before net noncash and other costs. For reconciliations of per pound unit net cash costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Product Revenues and Production Costs.”
Current wording
a. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all copper mines, before net noncash and other costs. For reconciliations of per pound unit net cash costs (credits) by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Product Revenues and Production Costs.”
Previous wording
Consolidated revenues totaled $6.3 billion in first-quarter 2024 and $5.4 billion in first-quarter 2023. Revenues from our mining operations and processing facilities primarily include the sale of copper in concentrate, copper cathode, copper rod, gold in concentrate and anode slimes, and molybdenum. Refer to Note 9 for a summary of product revenues.
Current wording
Consolidated revenues totaled $6.6 billion in second-quarter 2024, $5.7 billion in second-quarter 2023, $12.9 billion for the first six months of 2024 and $11.1 billion for the first six months of 2023. Revenues from our mining operations and processing facilities primarily include the sale of copper cathode, copper in concentrate, copper rod, gold in concentrate and anode slimes, and molybdenum. Refer to Note 8 for a summary of product revenues.
Previous wording
Sales Volumes. Consolidated copper and gold sales volumes increased in first-quarter 2024, compared to first-quarter 2023, primarily reflecting higher mining and milling rates and ore grades at PT-FI.
Current wording
Sales Volumes. Consolidated sales volumes for the second quarter and first six months of 2024 were impacted by previously announced shipping delays in Indonesia associated with the timing of renewing PT-FI’s copper concentrate and anode slimes export licenses, which expired on May 31, 2024. On July 2, 2024, PT-FI was granted copper concentrate and anode slimes export licenses, which are valid through December 2024 when the full ramp-up of PT-FI’s new smelter is expected. The increase in consolidated copper and gold sales volumes for the first six months of 2024, compared to the first six months of 2023, primarily reflects higher mining and milling rates and ore grades at PT-FI.
Previous wording
Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold and molybdenum. Average realized prices in first-quarter 2024, compared with first-quarter 2023, were 4% lower for copper, 10% higher for gold and 33% lower for molybdenum.
Current wording
Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of copper, gold and molybdenum. Average realized prices in second-quarter 2024, compared with second-quarter 2023, were 17% higher for copper, 18% higher for gold and 11% lower for molybdenum. Average realized prices for the first six months of 2024, compared with the first six months of 2023, were 9% higher for copper, 15% higher for gold and 23% lower for molybdenum.
Previous wording
Average realized copper prices include net favorable adjustments to current period provisionally priced copper sales totaling $73 million in first-quarter 2024 and $21 million in first-quarter 2023. As discussed in Note 6, substantially all of our copper concentrate and some cathode sales contracts provide final copper pricing in a specified future month (generally one to four months from the shipment date). We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs.
Current wording
Average realized copper prices include net favorable (unfavorable) adjustments to current period provisionally priced copper sales totaling $15 million in second-quarter 2024, $(52) million in second-quarter 2023, $219 million for the first six months of 2024 and $(121) million for the first six months of 2023. As discussed in Note 5, substantially all of our copper concentrate and some cathode sales contracts provide final copper pricing in a specified future month (generally one to four months from the shipment date). We record revenues and invoice customers at the time of shipment based on then-current LME prices, which results in an embedded derivative on provisionally priced concentrate and cathode sales that is adjusted to fair value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement. To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to contracts entered into in prior periods; in times of falling copper prices, the opposite occurs.
Previous wording
Prior Period Provisionally Priced Copper Sales. Net (unfavorable) favorable adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at December 31, 2023 and 2022) recorded in consolidated revenues totaled $(7) million in first-quarter 2024 and $210 million in first-quarter 2023. Refer to Notes 6 and 9 for a summary of total adjustments to prior period and current period provisionally priced sales.
Current wording
Prior Period Provisionally Priced Copper Sales. Net favorable (unfavorable) adjustments to prior periods’ provisionally priced copper sales (i.e., provisionally priced sales at March 31, 2024 and 2023, and December 31, 2023 and 2022) recorded in consolidated revenues totaled $166 million in second-quarter 2024, $(118) million in second-quarter 2023, $28 million for the first six months of 2024 and $182 million for the first six months of 2023. Refer to Notes 5 and 8 for a summary of total adjustments to prior period and current period provisionally priced sales.
Previous wording
At March 31, 2024, we had provisionally priced copper sales totaling 229 million pounds of copper (net of intercompany sales and noncontrolling interests) recorded at an average of $4.01 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the March 31, 2024, recorded provisional price would have an approximate $22 million effect on 2024 revenues ($7 million to our 2024 net income attributable to common stock). The LME copper price settled at $4.52 per pound on April 30, 2024.
Current wording
At June 30, 2024, we had provisionally priced copper sales totaling 188 million pounds (net of intercompany sales and noncontrolling interests) recorded at an average of $4.33 per pound, subject to final pricing over the next several months. We estimate that each $0.05 change in the price realized from the June 30, 2024, recorded provisional price would have an approximate $18 million effect on 2024 revenues ($6 million to 2024 net income attributable to common stock). The LME copper price settled at $4.09 per pound on July 31, 2024.
Previous wording
Atlantic Copper Revenues. Atlantic Copper revenues totaled $673 million in first-quarter 2024, compared with $756 million in first-quarter 2023. Lower revenues in first-quarter 2024, compared with first-quarter 2023, primarily reflect lower copper prices and sales volumes.
Current wording
Atlantic Copper Revenues. Atlantic Copper revenues totaled $900 million in second-quarter 2024 and $1.6 billion for the first six months of 2024, compared with $748 million in second-quarter 2023 and $1.5 billion for the first six months of 2023. Higher revenues in the 2024 periods, compared with the 2023 periods, primarily reflect higher copper prices and sales volumes.
Previous wording
Purchased Copper. We purchase copper cathode primarily for processing by our Rod & Refining operations. Lower revenues associated with purchased copper in first-quarter 2024, compared to first-quarter 2023, primarily reflects
Current wording
Purchased Copper. We purchase copper cathode primarily for processing by our Rod & Refining operations. Higher revenues associated with purchased copper in second-quarter 2024, compared to second-quarter 2023, primarily reflects higher volumes. The volumes of copper purchases vary depending on cathode production from our operations and totaled 64 million pounds in second-quarter 2024, 19 million pounds in second-quarter 2023, 106 million for the first six months of 2024 and 67 million for the first six months of 2023.
Previous wording
Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges (i.e., fees paid to smelters that are generally negotiated annually), which will vary with the sales volumes and the price of copper. The increase in treatment charges in first-quarter 2024, compared to first-quarter 2023, primarily reflects higher copper sales volumes.
Current wording
Treatment Charges. Revenues from our copper concentrate sales are recorded net of treatment charges (i.e., fees paid to smelters that are generally negotiated annually), which will vary with the sales volumes and the price of copper. The decrease in treatment charges in the 2024 periods, compared to the 2023 periods, primarily reflects lower copper concentrate sales volumes because of previously announced shipping delays in Indonesia associated with the timing of renewing PT-FI’s copper concentrate export license.
Previous wording
Royalties and Export Duties. Royalties and export duties are primarily associated with PT-FI sales. Royalties will vary with the volume of metal sold and the prices of copper and gold. PT-FI is currently being assessed export duties for copper concentrates at a rate of 7.5%, compared to an export duty rate of 2.5% in first-quarter 2023. PT-FI incurred export duties totaling $156 million in first-quarter 2024 and $17 million in first-quarter 2023. Refer to Note 13 of our 2023 Form 10-K for further discussion of export duties.
Current wording
Royalties and Export Duties. Royalties and export duties are primarily associated with PT-FI sales. Royalties will vary with the volume of metal sold and the prices of copper and gold. Indonesia export duties of 2.5% were eliminated effective March 29, 2023, upon verification that construction progress of the new smelter exceeded 50%, and were reinstated at a rate of 7.5% in July 2023 under a revised regulation. As discussed in Note 7, PT-FI will continue to pay export duties of 7.5% on copper concentrates during the smelter ramp-up period pursuant to Indonesia regulations. PT-FI incurred export duties totaling $75 million in second-quarter 2024, $231 million for the first six months of 2024 and $18 million for the first six months of 2023.
Previous wording
Consolidated production and delivery costs totaled $3.8 billion in first-quarter 2024 and $3.2 billion in first-quarter 2023. Higher costs in first-quarter 2024, compared to first-quarter 2023, primarily reflected increased operating rates, particularly at PT-FI. Additionally, first-quarter 2024 included charges totaling $109 million associated with assumed oil and gas abandonment obligations resulting from bankruptcies of other companies (refer to Note 8 for further discussion).
Current wording
Consolidated production and delivery costs totaled $3.9 billion in second-quarter 2024, $3.5 billion in second-quarter 2023, $7.7 billion for the first six months of 2024 and $6.7 billion for the first six months of 2023. Higher costs in the 2024 periods, compared to the 2023 periods, primarily reflect higher costs of copper purchases at our downstream operations. Additionally, the first six months of 2024 included higher operating rates at PT-FI and charges totaling $98 million associated with assumed oil and gas abandonment obligations resulting from bankruptcies of other companies (refer to Note 7 for further discussion).
Previous wording
Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations primarily include labor, energy and other commodity-based inputs, such as sulfuric acid, explosives, steel, reagents, liners and tires. Lower consolidated site production and delivery costs (before net noncash and other costs) for our copper mines of $2.32 per pound of copper in first-quarter 2024, compared to $2.57 per pound of copper in first-quarter 2023, primarily reflects higher metal volumes in Indonesia. Refer to “Operations – Unit Net Cash Costs” and “Operations – Unit Net Cash (Credits) Costs” for further discussion of unit net cash costs (credits) associated with our operating divisions and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements.
Current wording
Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations primarily include labor, energy and other commodity-based inputs, such as sulfuric acid, explosives, steel, reagents, liners and tires. Consolidated site production and delivery costs (before net noncash and other costs) for our copper mines averaged $2.56 per pound of copper in second-quarter 2024, $2.39 per pound of copper in second-quarter 2023, $2.43 per pound of copper for the first six months of 2024 and $2.47 per pound of copper for the first six months of 2023. Refer to “Operations – Unit Net Cash Costs” and “Operations – Unit Net Cash (Credits) Costs” for further discussion of unit net cash costs (credits) associated with our operating divisions and to “Product Revenues and Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated financial statements.
Previous wording
Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Increased consolidated depreciation, depletion and amortization (DD&A) of $595 million in first-quarter 2024, compared to $399 million in first-quarter 2023, primarily reflects higher sales volumes at PT-FI.
Current wording
Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled $509 million in second-quarter 2024, $547 million in second-quarter 2023, $1.1 billion for the first six months of 2024 and $0.9 billion for the first six months of 2023.
Previous wording
Environmental obligation costs reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care-and-maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations. Net charges for environmental obligations and shutdown costs totaled $56 million in both first-quarter 2024 and 2023. Refer to Note 8 for further discussion.
Current wording
Environmental obligation costs reflect net revisions to our long-term environmental obligations, which vary from period to period because of changes to environmental laws and regulations, the settlement of environmental matters and/or circumstances affecting our operations that could result in significant changes in our estimates. Shutdown costs include care-and-maintenance costs and any litigation, remediation or related expenditures associated with closed facilities or operations. Net revisions to long-term historical environmental obligations totaled
Previous wording
Consolidated interest costs (before capitalization) totaled $175 million in first-quarter 2024 and $207 million in first-quarter 2023, which included $25 million associated with Cerro Verde’s contested tax rulings issued by the Peru Supreme Court in first-quarter 2023.
Current wording
Consolidated interest costs (before capitalization) totaled $181 million in second-quarter 2024 and $356 million for the first six months of 2024, compared to $234 million in second-quarter 2023 and $441 million for the first six months of 2023, which included $50 million in second-quarter 2023 and $74 million for the first six months of 2023 associated with Cerro Verde’s contested tax rulings issued by the Peru Supreme Court.
Previous wording
Capitalized interest varies with the level of qualifying assets associated with our development projects and average interest rates on our borrowings. Higher capitalized interest of $86 million in first-quarter 2024, compared to $56 million in first-quarter 2023 resulted from increased construction and development projects in process, primarily for the Indonesia smelter projects. Refer to “Capital Resources and Liquidity – Investing Activities” for discussion of capital expenditures associated with our major development projects.
Current wording
Capitalized interest varies with the level of qualifying assets associated with our development projects and average interest rates on our borrowings. Capitalized interest totaled $93 million in second-quarter 2024, $62 million in second-quarter 2023, $179 million for the first six months of 2024 and $119 million for the first six months of 2023. The increase in capitalized interest costs in the 2024 periods, compared to the 2023 periods, resulted from increased construction and development projects in process, primarily related to PT-FI’s new downstream processing facilities. Refer to “Capital Resources and Liquidity – Investing Activities” for discussion of capital expenditures associated with our major development projects.
Previous wording
Other income, net, totaled $129 million in first-quarter 2024 and $88 million in first-quarter 2023. The increase in other income, net, primarily reflects a credit of $26 million in first-quarter 2024 associated with the reduction in the accrual to indemnify PT Mineral Industri Indonesia (MIND ID) from potential losses arising from historical tax disputes (refer to Note 4 for additional discussion) and higher foreign currency exchange gains.
Current wording
Other income, net, totaled $69 million in second-quarter 2024, $24 million in second-quarter 2023, $198 million for the first six months of 2024 and $112 million for the first six months of 2023. The 2023 periods include a $69 million charge associated with Cerro Verde’s contested tax rulings issued by the Peruvian Supreme Court. The first six months of 2024 include a credit of $26 million associated with the reduction in the accrual to indemnify PT Mineral Industri Indonesia (MIND ID) from potential losses arising from historical tax disputes (refer to Note 3).
Previous wording
b. In addition to our North America Copper Mines, which had operating income of $153 million in first-quarter 2024 and $364 million in first-quarter 2023 (refer to Note 9), the U.S. jurisdiction reflects legacy non-operating sites and corporate-level expenses, which include interest expense associated with FCX’s senior notes and general and administrative expenses. Additionally, first-quarter 2024 also included charges of $109 million associated with assumed oil and gas abandonment obligations, and both first-quarter 2024 and 2023 included charges of $56 million for revisions to environmental obligation estimates.
Current wording
b. In addition to our North America Copper Mines, which had operating income of $417 million for the first six months of 2024 and $668 million for the first six months of 2023 (refer to Note 8), the U.S. jurisdiction reflects non-operating sites and corporate-level expenses, which include interest expense associated with FCX’s senior notes and general and administrative expenses. The U.S. jurisdiction also includes net charges associated with oil and gas abandonment obligations and revisions to environmental obligation estimates.
Previous wording
Assuming achievement of current sales volume and cost estimates, and average prices of $4.25 per pound for copper, $2,300 per ounce for gold and $20.00 per pound for molybdenum for the remainder of 2024, we estimate our consolidated effective tax rate for the year 2024 would approximate 35% (which reflects an estimated effective tax rate of 37% for the remainder of 2024). Changes in projected sales volumes and average prices during 2024 would incur tax impacts at estimated effective rates of 39% for Peru, 36% for Indonesia and 0% for the U.S. Our projected estimated effective tax rate of 0% for the U.S. for the year 2024 may be adjusted as additional guidance is released by the U.S. Department of the Treasury on key provisions of the U.S. Inflation Reduction Act of 2022 (refer to Note 4 for further discussion).
Current wording
Assuming achievement of current sales volume and cost estimates and average prices of $4.25 per pound of copper, $2,300 per ounce of gold and $20.00 per pound of molybdenum for the second half of 2024, we estimate our consolidated effective tax rate for the year 2024 would approximate 36% (which reflects an estimated effective tax rate of 38% for the second half of 2024). Changes in projected sales volumes and average prices during 2024 would incur tax impacts at estimated effective rates of 39% for Peru, 36% for Indonesia and 0% for the U.S., which excludes any impact from the U.S. Inflation Reduction Act of 2022. Our projected estimated effective tax rate of 0% for the U.S. for the year 2024 may be adjusted as regulations and additional guidance are released by the Internal Revenue Service and U.S. Department of the Treasury on key provisions of the Act (refer to Note 3).
Previous wording
Net income attributable to noncontrolling interests, which is primarily associated with our noncontrolling shareholders at PT-FI, Cerro Verde and El Abra, totaled $689 million in first-quarter 2024 and $386 million in first-quarter 2023 (refer to Note 9 for net income attributable to noncontrolling interests for each of our business segments).
Current wording
Net income attributable to noncontrolling interests, which is primarily associated with our noncontrolling shareholders at PT-FI, Cerro Verde and El Abra, totaled $0.7 billion in second-quarter 2024, $0.4 billion in second-quarter 2023, $1.4 billion for the first six months of 2024 and $0.8 billion for the first six months of 2023 (refer to Note 8 for net income attributable to noncontrolling interests for each of our business segments).
Previous wording
Based on achievement of current sales volume and cost estimates, extension of PT-FI’s export licenses for copper concentrates and anode slimes beyond May 2024, and assuming average prices of $4.25 per pound of copper, $2,300 per ounce of gold and $20.00 per pound of molybdenum for the remainder of 2024, we estimate that net income attributable to noncontrolling interests will approximate $2.7 billion for the year 2024. The impact of price changes on net income attributable to noncontrolling interests for the year 2024 would approximate $0.2 billion for each $0.25 per pound change in the average price of copper for the remainder of 2024. The actual amount will depend on many factors, including relative performance of each business segment, commodity prices, costs and other factors.
Current wording
Based on achievement of current sales volume and cost estimates, and assuming average prices of $4.25 per pound of copper, $2,300 per ounce of gold and $20.00 per pound of molybdenum for the second half of 2024, we estimate that net income attributable to noncontrolling interests will approximate $2.6 billion for the year 2024. The impact of price changes on net income attributable to noncontrolling interests for the year 2024 would approximate $0.1 billion for each $0.25 per pound change in the average price of copper for the second half of 2024. The actual amount will depend on many factors, including relative performance of each business segment, commodity prices, costs and other factors.
Previous wording
We are continuing to advance a series of initiatives across our North America and South America operations to incorporate new applications, technologies and data analytics to our leaching processes. In late 2023, we achieved our initial annual run rate target of approximately 200 million pounds of copper. Incremental copper production from these initiatives totaled 51 million pounds in first-quarter 2024, compared with 22 million pounds in first-quarter 2023. We are pursuing opportunities to apply recent operational enhancements on a larger scale and are testing new technology applications that we believe have the potential for significant increases in recoverable metal beyond the current run rate.
Current wording
We are continuing to advance a series of initiatives across our North America and South America operations to incorporate new applications, technologies and data analytics to our leaching processes. In late 2023, we achieved our initial annual run rate target of approximately 200 million pounds of copper. Incremental copper production from these initiatives totaled 55 million pounds in second-quarter 2024 (compared with 29 million pounds in second-quarter 2023) and 106 million pounds for the first six months of 2024 (compared with 51 million pounds for the first six months of 2023). We are pursuing opportunities to apply recent operational enhancements on a larger scale and we are testing new innovative technology applications that we believe have the potential for significant increases in recoverable metal beyond the current run rate.
Previous wording
We are engaged in various studies associated with potential future expansion projects primarily at our mining operations. The costs for these studies are charged to production and delivery costs as incurred and totaled
Current wording
We are engaged in various studies associated with potential future expansion projects primarily at our mining operations. The costs for these studies are charged to production and delivery costs as incurred and totaled $38 million in second-quarter 2024, $51 million in second-quarter 2023, $72 million for the first six months of 2024 and $101 million for the first six months of 2023. We estimate the costs of these studies will approximate $200 million for the year 2024, subject to market conditions and other factors.
Previous wording
We manage seven copper operations in North America – Morenci, Bagdad, Safford (including Lone Star), Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. All of the North America operations are wholly owned, except for Morenci. We record our 72% undivided joint venture interest in Morenci using the proportionate consolidation method.
Current wording
We manage seven copper operations in North America – Morenci, Bagdad, Safford (including Lone Star), Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. We also operate a copper smelter in Miami, Arizona. In addition to copper, certain of these operations produce molybdenum concentrate, gold and silver. All of the North America operations are wholly owned, except for Morenci. We record our 72% undivided joint venture interest in Morenci using the proportionate consolidation method.
Previous wording
We have a potential expansion project to more than double the concentrator capacity of the Bagdad operation in northwest Arizona. Bagdad’s reserve life currently exceeds 80 years and supports an expanded operation. In late 2023, we completed technical and economic studies, which indicated the opportunity to construct new concentrating facilities to increase copper production by 200 to 250 million pounds per year, which is more than double Bagdad’s current annual production rate. Estimated incremental project capital costs approximate $3.5 billion (excluding infrastructure that would be required in the long-range plans). Expanded operations would provide improved efficiency and reduce unit net cash costs through economies of scale. Project economics indicate that the expansion would require an incentive copper price in the range of $3.50 to $4.00 per pound and would require approximately three to four years to complete. The decision to proceed and timing of the potential expansion will take into account overall copper market conditions, availability of labor and other factors, including progress on conversion of the existing haul truck fleet to autonomous and expanding housing alternatives to support long-range plans. In parallel, we are advancing activities for expanded tailings infrastructure projects required under long-range plans in order to advance the potential construction timeline.
Current wording
We have a potential expansion project to more than double the concentrator capacity of the Bagdad operation in northwest Arizona. Bagdad’s reserve life currently exceeds 80 years and supports an expanded operation. In late 2023, we completed technical and economic studies, which indicated the opportunity to construct new concentrating facilities to increase copper production by 200 to 250 million pounds per year, which is more than double Bagdad’s current annual production rate. Estimated incremental project capital costs approximate $3.5 billion. Expanded operations would provide improved efficiency and reduce unit net cash costs through economies of scale. Project economics indicate that the expansion would require an incentive copper price in the range of $3.50 to $4.00 per pound and approximately three to four years to complete. The decision of whether to proceed and timing of the potential expansion will take into account overall copper market conditions, availability of labor and other factors, including progress on conversion of the existing haul truck fleet to autonomous and expanding housing alternatives to support long-range plans. In parallel, we are advancing activities for expanded tailings infrastructure projects required under long-range plans in order to advance the potential construction timeline.
Showing the first 40 of 90 pairs. Open the source sections for the rest.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
c. Represents the combined total for our other segments as presented in Note 8.
Current report — wording carried from elsewhere
c. Represents tolling costs paid to PT Smelting.
Current report — wording carried from elsewhere
Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs
Current report — wording carried from elsewhere
a. Reflects sales of the Molybdenum mines’ production to our molybdenum sales company at market-based pricing. On a consolidated basis, realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of molybdenum will differ from the amounts reported in this table.
Current report — wording carried from elsewhere
b. Represents the combined total for our other segments as presented in Note 8. Also includes amounts associated with our molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America copper mines.
Rearranged previous paragraphs (4)
Previous report — wording carried elsewhere
Prices for copper, gold and molybdenum are affected by numerous factors beyond our control and can fluctuate significantly (for further discussion refer to “Risk Factors” contained in Part I, Item 1A. of our 2023 Form 10-K). The following graphs present the London Metal Exchange (LME) copper settlement price, the London Bullion Market Association (London) PM gold price, and the Platts Metals Daily Molybdenum Dealer Oxide weekly average price since January 2014.
Previous report — wording carried elsewhere
lower volumes. The volumes of copper purchases vary depending on cathode production from our operations and totaled 42 million pounds in first-quarter 2024 and 48 million pounds in first-quarter 2023.
Previous report — wording carried elsewhere
$34 million in first-quarter 2024, compared with $50 million in first-quarter 2023. We estimate the costs of these studies will approximate $200 million for the year 2024, subject to market conditions and other factors.
Previous report — wording carried elsewhere
a. Does not foot because of rounding.