A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Dec 10, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-09-30; filed 2024-12-04.
0000785557-24-000067
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-09-30; filed 2025-12-10.
0000785557-25-000159
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 120 previous paragraphs and 124 current paragraphs.
103 unchanged; 17 reworded; 3 added; 0 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (3)
Current report
In general, a federal government shutdown could result in our incurrence of substantial labor or other costs without reimbursement under customer contracts, the delay or cancellation of programs or the delay of contract payments, which could have a negative effect on our cash flows and adversely affect our future results of operations. During a shutdown our customers may issue stop work orders, delay new contract awards, withhold payments, or limit access to government facilities and systems. Although certain of our programs may be deemed essential and continue, others could be delayed or suspended, creating significant unreimbursed costs and deferred revenue. A prolonged shutdown or repeated lapses in funding could also postpone new procurements, reduce activity under existing contracts, and extend the time needed to resume normal operations once funding is restored. These events could materially and adversely affect our business, financial condition, and results of operations.
Current report
•unforeseen expenses, delays, or conditions imposed in connection with regulatory or contractual approvals;
Current report
•challenges in retaining key employees, business partners, or customers of an acquired company;
Reworded paragraphs (17)
Previous wording
At present, we derive 98% of our revenue from agencies of the Federal government, primarily as a prime contractor but also as a subcontractor to other Federal prime contractors. In addition, substantially all accounts receivable, including unbilled accounts receivable, are from agencies of the U.S. Government as of September 30, 2024 and 2023. We expect that Federal government contracts will continue to be our primary source of revenue for the foreseeable future. We believe that the credit risk associated with our receivables is limited due to the creditworthiness of these customers. In general, if we were suspended or debarred from contracting with the federal government or if the government otherwise ceased doing business with us or significantly decreased the amount of business it does with us, our business, financial condition and operating results would be materially and adversely affected.
Current wording
At present, we derive 99% of our revenue from agencies of the Federal government, primarily as a prime contractor but also as a subcontractor to other Federal prime contractors. In addition, substantially all accounts receivable, including unbilled accounts receivable, are from agencies of the U.S. Government as of September 30, 2025 and 2024. However, in 2025, the U.S. administration began efforts to reduce federal spending and the size of the federal workforce. In addition, the General Services Administration ("GSA") has instructed all federal agencies to review their contracts with consulting firms and technology product resellers contracting with the U.S. federal government. These and similar spending reductions and contract reviews have resulted in and are likely to continue to result in contract terminations, delays and cancellations of new procurements, and reductions in price and contract scope, which have had an adverse effect on our results, and could in the future have a material impact on our results of operations or financial condition. We expect that Federal government contracts will continue to be our primary source of revenue for the foreseeable future. We believe that the credit risk associated with our receivables is limited due to the creditworthiness of these customers. In general, if we were suspended or debarred from contracting with the federal government or if the government otherwise ceased doing business with us or significantly decreased the amount of business it does with us, our business, financial condition and operating results would be materially and adversely affected.
Previous wording
A significant portion of our revenue is concentrated in contracts with the VA and HHS. There can be no assurance as to the actual amount of services that we will ultimately provide to VA and HHS under our current contracts, or that we will be successful in recompete efforts. As described in greater detail above in "Item 1 - Business - Major Contracts", our contracts with the VA for the provision of services to its CMOP operations is currently subject to renewal solicitations which have been published as a set aside for a service-disabled veteran owned small business (“SDVOSB”) to perform as the prime contractor. DLH submitted revised proposals with its SDVOSB partner as prime contractor on certain of the opportunities. During the fiscal year ended September 30, 2024, the VA awarded one of the task orders to a SDVOSB that is unaffiliated with DLH. While the acquisition process is being conducted, DLH continues to operate as the prime contractor for the seven CMOP locations that it currently manages. Our results of operations, cash flows and financial condition would be materially adversely affected if we were unable to continue our relationship with either of these customers, if we were to lose any of our material current contracts, or if the amount of services we provide to them is materially reduced.
Current wording
A significant portion of our revenue is concentrated in contracts with the VA and HHS. There can be no assurance as to the actual amount of services that we will ultimately provide to VA and HHS under our current contracts, or that we will be successful in recompete efforts. As described in greater detail above in "Item 1 - Business - Major Contracts", our contracts with the VA for the provision of services to its CMOP operations is currently subject to renewal solicitations which have been published as a set aside for a service-disabled veteran owned small business (“SDVOSB”) to perform as the prime contractor. DLH submitted revised proposals with its SDVOSB partner as prime contractor on certain of the opportunities. During this solicitation process, the VA has awarded three task orders to SDVOSBs unaffiliated with DLH. While the acquisition process is being conducted, DLH continues to operate as the prime contractor for the remaining CMOP locations that it currently manages. In addition, our performance under a contract with HHS in support of its Head Start program was completed as of October 31, 2025 and the customer transitioned services to a new small business prime contractor unaffiliated with us. In light of the decisions by these customers to award contracts to new prime contractors on a set-aside basis, our results of operations, cash flows and financial condition have been be adversely affected. Our results of operations, cash flows and financial condition will be further adversely affected if we were unable to continue our relationship with either of these customers, if we were to lose any more of our material current contracts, or if the amount of services we provide to them is further reduced.
Previous wording
As a result of the Small Business Administration ("SBA") set-aside program, the U.S. government may decide to restrict certain procurement activity only to bidders that qualify as veteran owned, minority-owned, small, or small disadvantaged businesses. In such cases, we would not be eligible to perform as a prime contractor on those programs and would be limited to work as a subcontractor on those programs. As previously reported, various agencies within the federal government have policies that support small business goals, including the adoption of the “Rule of Two” by the VA, which provides that the agency shall award contracts by restricting competition for the contract to service-disabled or other veteran owned businesses. To restrict competition pursuant to this rule, the contracting officer must reasonably expect that at least two of these businesses, which are capable of delivering the services, will submit offers and that the award can be made at a fair and reasonable price that offers the best value to the U.S. The effect of these set-aside provisions may limit our ability to compete for prime contractor positions on programs that we have targeted for growth and to maintain our prime contractor position as current contracts are subject to renewal.
Current wording
As a result of the Small Business Administration ("SBA") set-aside program, the U.S. government may decide to restrict certain procurement activity only to bidders that qualify as veteran owned, minority-owned, small, or small disadvantaged businesses. In such cases, we would not be eligible to perform as a prime contractor on those programs and would be limited to work as a subcontractor on those programs. As previously reported and described elsewhere herein in further detail, various agencies within the federal government have policies that support small business goals, including the adoption of the “Rule of Two” by the VA, which provides that the agency shall award contracts by restricting competition for the contract to service-disabled or other veteran owned businesses. To restrict competition pursuant to this rule, the contracting officer must reasonably expect that at least two of these businesses, which are capable of delivering the services, will submit offers and that the award can be made at a fair and reasonable price that offers the best value to the U.S. The effect of these set-aside provisions may limit our ability to compete for prime contractor positions on programs that we have targeted for growth and to maintain our prime contractor position as current contracts are subject to renewal.
Previous wording
Loss of our GSA schedule contracts or other contracting vehicles could impair our ability to win new business and perform under existing contracts.
Current wording
Loss of our contracting vehicles could impair our ability to win new business and perform under existing contracts.
Previous wording
We currently hold multiple GSA schedule contracts, including a Federal supply schedule contract for professional and allied healthcare services and the logistics worldwide services contract. If we were to lose one or more of these contracts or other contracting vehicles, we could lose a significant revenue source and our operating results and financial condition could be materially and adversely affected.
Current wording
We currently hold multiple contracting vehicles, which our customers utilize to award contracts. If we were to lose one or more of these contracts or other contracting vehicles, we could lose a significant revenue source and our operating results and financial condition could be materially and adversely affected.
Previous wording
U.S. Government programs are subject to annual congressional budget authorization and appropriation processes. For many programs, Congress appropriates funds on a fiscal year basis even though the program performance period may extend over several years. Consequently, programs are often partially funded initially and additional funds are committed only as Congress makes further appropriations. In recent years, we have seen frequent debates regarding the scope of funding of our customers, thereby leading to budgetary uncertainty for our Federal customers. Changes in federal government budgetary priorities or actions taken to address government budget deficits, the national debt, and/or prevailing economic conditions, could directly affect our financial performance. Further, congressional seats may change during election years, and the balance of spending priorities may change along with them. Historically, our customers’ missions have received bipartisan support from the legislative and executive branches of the federal government. However, we anticipate that the President-Elect and new Congress will seek to implement their budget priorities, which may impact our customers’ projects and budgets.
Current wording
U.S. Government programs are subject to annual congressional budget authorization and appropriation processes. For many programs, Congress appropriates funds on a fiscal year basis even though the program performance period may extend over several years. Consequently, programs are often partially funded initially and additional funds are committed only as Congress makes further appropriations. In recent years, we have seen frequent debates regarding the scope of funding of our customers, thereby leading to budgetary uncertainty for our Federal customers. Changes in federal government budgetary priorities or actions taken to address government budget deficits, the national debt, and/or prevailing economic conditions, including government closures or shutdowns, could result in projects being reduced in scope or price, or being terminated, and may directly affect our financial performance. Further, political and economic factors, such as pending elections, the outcome of recent elections, changes in leadership among key executive or legislative decision makers, and revisions to governmental tax or other policies can affect the quantity and terms of new government contracts signed or the speed at which new contracts are signed, decrease future levels of spending and authorizations for programs that we bid, shift spending priorities to programs in areas for which we do not provide services and/or lead to changes in enforcement or how compliance with relevant rules or laws is assessed. Congressional seats may change during election years, and the balance of spending priorities may change along with them. Historically, our customers’ missions have received bipartisan support from the legislative and executive branches of the federal government. However, we anticipate that the current administration and Congress will seek to implement their budget priorities, which may impact our customers’ projects and budgets.
Previous wording
VA programs, which accounted for approximately 35.3% and 36.9% of the Company’s revenue for the years ended September 30, 2024 and 2023, respectively, were exempt from the spending caps established under Federal government sequestration targets enacted in 2013.
Current wording
VA programs, which accounted for approximately 33.8% and 35.3% of the Company’s revenue for the years ended September 30, 2025 and 2024, respectively, were exempt from the spending caps established under Federal government sequestration targets enacted in 2013.
Previous wording
The funding of U.S. government programs is subject to an annual congressional budget authorization and appropriations process. In years when the U.S. government does not complete its appropriations before the beginning of the new fiscal year on October 1, government operations are typically funded pursuant to a "continuing resolution," which allows federal government agencies to operate at spending levels approved in the previous appropriations cycle but does not authorize new spending initiatives. Currently, the U.S. government is operating under a continuing resolution (CR) which expires on December 20, 2024. When the U.S. government operates under a CR, delays can occur in the procurement of the services and solutions that we provide and may result in new initiatives being canceled. When a CR expires, unless appropriations bills have been passed by Congress and signed by the President, or a new CR is passed and signed into law, the government must cease operations, or shutdown, except in certain emergency situations or when the law authorizes continued activity. We continuously review our operations in an attempt to identify programs potentially at risk from CRs so that we can consider appropriate contingency plans. A federal government shutdown could, however, result in our incurrence of substantial labor or other costs without reimbursement under customer contracts, the delay or cancellation of programs or the delay of contract payments, which could have a negative effect on our cash flows and adversely affect our future results of operations.
Current wording
When the U.S. government operates under a CR, delays can occur in the procurement of the services and solutions that we provide and may result in new initiatives being canceled. When a CR expires, unless appropriations bills have been passed by Congress and signed by the President, or a new CR is passed and signed into law, the government must cease operations, or shutdown, except in certain emergency situations or when the law authorizes continued activity. Subsequent to the expiration of the CR that transpired on September 30, 2025, the U.S. government ceased operations until November 12, 2025 when a new stopgap spending bill was passed by Congress and signed into law by the President. This current funding measure provides funding to support U.S. government operations through January 30, 2026. We continuously review our operations in an attempt to identify programs potentially at risk from CRs so that we can consider appropriate contingency plans.
Previous wording
We derive virtually all of our revenue from service contracts with the federal government. The government may face restrictions from new legislation, regulations or government union pressures on the nature and amount of services the government may obtain from private contractors (i.e., insourcing versus outsourcing). Any reduction in the government’s use of private contractors to provide federal services could cause our actual results to differ materially and adversely from those anticipated.
Current wording
We derive a significant amount of revenues from service contracts with the federal government. The government may face restrictions from new legislation, regulations, or government union pressures, on the nature and amount of services the government may obtain from private contractors (i.e., insourcing versus outsourcing). Any reduction in the government’s use of private contractors to provide federal services could cause our actual results to differ materially and adversely from those anticipated.
Previous wording
Our systems and networks may be subject to cybersecurity breaches.
Current wording
Our systems and networks may be subject to cybersecurity breaches, data privacy failures, or other security incidents that could harm our reputation, expose us to liability, and adversely affect our business.
Previous wording
One of our potential paths to growth is to selectively pursue acquisitions. Through acquisitions, we may be able to expand our base of customers, increase the range of solutions we offer to our customers and deepen our penetration of existing markets and customers. We may not identify and execute suitable acquisitions. To the extent that management is involved in identifying acquisition opportunities or integrating new acquisitions into our business, our management may be diverted from operating our core business. Without acquisitions, we may not grow as rapidly otherwise, which could cause our actual results to differ materially and adversely from those anticipated.
Current wording
One of our potential paths to growth is to selectively pursue acquisitions. Through acquisitions, we may be able to expand our base of customers, increase the range of solutions we offer to our customers and deepen our penetration of existing markets and customers. We may be unable to identify or complete attractive strategic transactions for many reasons, including competition from other acquirers, and high valuations of potential targets. Even when we identify suitable candidates and reach agreement on terms, regulatory approvals, antitrust reviews, and other legal or contractual restrictions may delay or prevent completion. To the extent that management is involved in identifying acquisition opportunities or integrating new acquisitions into our business, our management may be diverted from operating our core business. Without acquisitions, we may not grow as rapidly otherwise, which could cause our actual results to differ materially and adversely from those anticipated.
Previous wording
With respect to our acquisition of DLH, LLC (formerly, Grove Resource Solutions, LLC) in December 2022, the benefits of the acquisition will depend, in part, on our ability to successfully combine our businesses and realize the anticipated benefits, including business opportunities and growth prospects from combining our businesses. We may not achieve these objectives within the anticipated time frame or may never realize these benefits and the value of our common stock may be harmed. The acquisition involves the integration of the acquired business with our existing business, which was a costly and time-consuming process. If we are ultimately unable to successfully or efficiently integrate our operations with those of the acquired business, we may incur unanticipated liabilities and be unable to realize the revenue growth, synergies, and other anticipated benefits resulting from the acquisition, and our business, results of operations, and financial condition could be materially adversely affected.
Current wording
If we are ultimately unable to successfully or efficiently integrate our operations with those of the acquired business, we may incur unanticipated liabilities and be unable to realize the revenue growth, synergies, and other anticipated benefits resulting from the acquisition, and our business, results of operations, and financial condition could be materially adversely affected.
Previous wording
Following our acquisition of DLH, LLC (formerly, Grove Resource Solutions, LLC) in December 2022, we amended and restated our credit agreement with First National Bank of Pennsylvania and certain other lenders (the “Credit Agreement”) and incurred additional indebtedness. The Credit Agreement requires compliance with a number of financial covenants and contains restrictions on our ability to engage in certain transactions, including limitations on: granting liens; incurring other indebtedness; disposing assets; making investments in other entities; and completing other mergers and consolidations. Also, the Credit Agreement requires us to comply with certain financial covenants including a minimum fixed charge coverage ratio and a maximum total leverage ratio. In addition, the Credit Agreement also requires prepayments of a percentage of excess cash flow. Accordingly, a portion of our cash flow from operations was dedicated to the repayment of our indebtedness and we expect future cash flow to be used to reduce our indebtedness. The Credit Agreement provides for customary events of default, including, among other things, a payment default, covenant default or defaults on other indebtedness or judgments in excess of a stipulated amount, change of control events, suspension or disbarment from contracting with the federal government and the material inaccuracy of our representations and warranties. If we are unable to make the scheduled principal and interest payments on the Credit Agreement or maintain compliance with other debt covenants, we may be in default under the Credit Agreement, which if not waived, could cause our debt to become immediately due and payable and enable the lenders to enforce their rights under the Credit Agreement. Such an event would likely have a material adverse effect on our business, financial condition and results of operations.
Current wording
Following our acquisition of DLH, LLC (formerly, Grove Resource Solutions, LLC) in December 2022, we amended and restated our credit agreement with First National Bank of Pennsylvania and certain other lenders and incurred additional indebtedness. We amended our credit agreement (as amended, the “Credit Agreement”) in November 2024 to modify the financial covenants and adjust the borrowing capacity of the revolving credit facility. The Credit Agreement requires compliance with a number of financial covenants and contains restrictions on our ability to engage in certain transactions, including limitations on: granting liens; incurring other indebtedness; disposing assets; making investments in other entities; and completing other mergers and consolidations. Also, the Credit Agreement requires us to comply with certain financial covenants including a minimum fixed charge coverage ratio and a maximum total leverage ratio. In addition, the Credit Agreement also requires prepayments of a percentage of excess cash flow. Accordingly, a portion of our cash flow from operations was dedicated to the repayment of our indebtedness and we expect future cash flow to be used to reduce our indebtedness. The Credit Agreement provides for customary events of default, including, among other things, a payment default, covenant default or defaults on other indebtedness or judgments in excess of a stipulated amount, change of control events, suspension or disbarment from contracting with the federal government and the material inaccuracy of our representations and warranties. If we are unable to make the scheduled principal and interest payments on the Credit Agreement or maintain compliance with other debt covenants, we may be in default under the Credit Agreement, which if not waived, could cause our debt to become immediately due and payable and enable the lenders to enforce their rights under the Credit Agreement. Such an event would likely have a material adverse effect on our business, financial condition and results of operations.
Previous wording
In addition, persons associated with Wynnefield Capital, Inc. currently serve on our Board of Directors. As a result of this share ownership and relationships on our Board of Directors, our largest stockholder will be able to influence all affairs and actions of our company, including matters requiring stockholder approval such as the election of directors and approval of significant corporate transactions. The interests of our principal stockholders may differ from the interests of the other stockholders.
Current wording
In addition, a person associated with Wynnefield Capital, Inc. currently serves on our Board of Directors. As a result of this share ownership and relationships on our Board of Directors, our largest stockholder will be able to influence all affairs and actions of our company, including matters requiring stockholder approval such as the election of directors and approval of significant corporate transactions. The interests of our principal stockholders may differ from the interests of the other stockholders.
Previous wording
Our success to date has resulted in part from the significant contributions of our executive officers. Our executive officers are expected to continue to make important contributions to our success. As of September 30, 2024, certain of our officers are under employment contracts. However, we do not maintain "key personnel" life insurance on any of our executive officers. Loss for any reason of the services of our key personnel could materially affect our operations.
Current wording
Our success to date has resulted in part from the significant contributions of our executive officers, who have been instrumental in shaping the strategic direction of the Company. Our executive officers are expected to continue to make important contributions to our success. From time to time, there may be changes in our executive management team resulting from the hiring or departure of executives, potentially disrupting our business. As of September 30, 2025, certain of our officers are under employment contracts. However, we do not maintain "key personnel" life insurance on any of our executive officers. Loss for any reason of the services of our key personnel could materially affect our operations.
Previous wording
The accounting treatment of these tax law changes is complex, and some of the changes may affect both current and future periods. Consistent with guidance from the SEC, our consolidated financial statements reflect our estimates of the tax effects of the current tax laws and regulations.
Current wording
Changes in tax rates or exposure to additional tax liabilities or assessments could affect our profitability, and audits by tax authorities could lead to additional tax payments. Determining our tax provisions requires significant judgment, and many transactions and calculations involve the application of tax laws whose interpretation is uncertain. The accounting treatment of tax law changes is complex, and some changes may affect both current and future periods. Consistent with SEC guidance, our consolidated financial statements reflect our estimates of the tax effects of the current tax laws and regulations.
Previous wording
We face various risks related to health epidemics, pandemics, and similar outbreak. The COVID-19 pandemic and the mitigation efforts to control its spread created significant volatility, uncertainty and economic disruption and adversely impacted the U.S. and global economies. The extent to which future health epidemics or pandemics impacts our business, operations and financial results will depend on numerous factors that we may not be able to accurately predict or control, including: the duration and scope of the pandemic; governmental, business and individuals’ actions that have may be taken in response to such events, including our ability to fully perform on our contracts as a result of government actions; the impact on economic activity and actions taken in response; the effect on our customers and customer demand for our services and solutions; our ability to sell and provide our services and solutions; and any closures of our and our customers’ offices and facilities. Furthermore, the significant increase in remote working of our employees may exacerbate certain risks to our business, including an increased demand for information technology resources and the increased risk of malicious technology-related events, such as cyberattacks and phishing attacks. Any of these events could materially adversely affect our business, financial condition, results of operations and the market price of our common stock.
Current wording
We face various risks related to health epidemics, pandemics, and similar outbreak. The occurrence of a pandemic and the mitigation efforts to control its spread would be expected to create significant volatility, uncertainty and economic disruption and adversely impact the U.S. and global economies. The extent to which future health epidemics or pandemics impacts our business, operations and financial results will depend on numerous factors that we may not be able to accurately predict or control, including: the duration and scope of the pandemic; governmental, business and individuals’ actions that have may be taken in response to such events, including our ability to fully perform on our contracts as a result of government actions; the impact on economic activity and actions taken in response; the effect on our customers and customer demand for our services and solutions; our ability to sell and provide our services and solutions; and any closures of our and our customers’ offices and facilities. Furthermore, the significant increase in remote working of our employees may exacerbate certain risks to our business, including an increased demand for information technology resources and the increased risk of malicious technology-related events, such as cyberattacks and phishing attacks. Any of these events could materially adversely affect our business, financial condition, results of operations and the market price of our common stock.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
The funding of U.S. government programs is subject to an annual congressional budget authorization and appropriations process. In years when the U.S. government does not complete its appropriations before the beginning of the new fiscal year on October 1, government operations are typically funded pursuant to a "continuing resolution," which allows federal government agencies to operate at spending levels approved in the previous appropriations cycle but does not authorize new spending initiatives. The U.S. government had been operating under a continuing resolution (CR) which expired on September 30, 2025.