PORTLAND GENERAL ELECTRIC CO /OR/
For the period ended Jun 30, 2025. Filed Jul 25, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2025 · Filed Jul 25, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-03-31; filed 2025-04-25.
0000784977-25-000074
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-06-30; filed 2025-07-25.
0000784977-25-000136
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 231 previous paragraphs and 252 current paragraphs.
127 unchanged; 89 reworded; 31 added; 13 removed; 2 previous and 5 current paragraphs rearranged.
Tables are not compared: 21 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (31)
Current report
•uncertainties associated with increased energy demand or significant accelerated growth in demand due to new data centers, including the concentration of data centers, and the ability to obtain regulatory approvals, environmental, and other permits to construct new facilities in a timely manner;
Current report
•impacts from the lack of legislation limiting wildfire-related liability or providing a wildfire relief fund, such as negative effects on PGE’s credit rating, which could limit PGE’s ability to access capital on terms similar to past transactions or at all and could impact PGE’s liquidity, cash flows, and capital expenditure plans;
Current report
On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The Update addresses specific inputs that may have changed since the most recent IRP was acknowledged, without attempting to fully revise the IRP. This CEP/IRP Update refreshes the analysis filed with the 2023 CEP/IRP and provides status reports on actions and requirements from Order 24-096.
Current report
The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE is not proposing any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source Request for Proposals (RFP). This approach represents the best combination of cost, risk, community benefit, and decarbonization.
Current report
To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. This reporting change increases the stated need of the 2023 CEP/IRP Action Plan from a range of 2,700 to 3,700 MW, to an updated range of 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 RFP projects, which remain under negotiation.
Current report
The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible. PGE and parties will work through the regulatory review process for the CEP/IRP Update filing (OPUC Docket LC 80) during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.
Current report
Following passage of House Resolution 1, the One Big Beautiful Bill Act (OBBB), on July 4, 2025, PGE plans to provide an opportunity for all conforming 2023 RFP bidders to refresh their pricing. PGE, in collaboration with an independent evaluator, will work to update scoring and ranking to reflect pricing changes from bidders in the coming months.
Current report
PGE continues to expect finalization of contracts from the 2023 RFP in the second half of 2025, with projects in service by the end of 2027. See“The One Big Beautiful Bill Act” section in this Overview for information regarding the impact of OBBB on the RFP process.
Current report
Following the enactment of the OBBB and related executive orders in July 2025, PGE continues to evaluate the potential impact of these federal tax credit changes on project economics and overall portfolio cost. Loss of tax credit availability could increase renewable project costs and corresponding customer prices. In response, PGE incorporated additional information requirements into the RFP to better assess tax credit eligibility, supply chain risks, and cost implications. Further detail on the federal policy changes and associated risks is provided in "The One Big Beautiful Bill Act” section in this Overview.
Current report
PGE received regulatory approval of the 2025 All Source RFP with modifications from the OPUC on July 22, 2025 and expects to issue to market in the third quarter of 2025.
Current report
The One Big Beautiful Bill Act—On July 4, 2025, the President signed the OBBB, which materially amends or repeals several renewable-energy tax incentives that were originally enacted under the IRA. It is expected that projects currently under construction and intended to be placed in service this year will remain eligible for the PTC or ITC amounts already reflected in balances; therefore, no adjustment was recorded in the quarter ended June 30, 2025. The transferability of tax credits, as provided under the IRA, also remains in effect. A July 7, 2025 executive order has added uncertainty with respect to the specific actions necessary to demonstrate a project’s start of construction. Further clarity is expected from the Secretaries of the Treasury and the Interior as it relates to their findings and actions taken under this executive order within 45 days.
Current report
The accelerated placed-in-service deadline for wind and solar, earlier phase-down for other technologies, and repeal of the permanent 10% ITC may reduce or eliminate the availability of renewable-energy credits on future projects. The Company cannot yet reasonably estimate the impact on PGE’s results of operations, financial position, and cash flows or on future capital expenditures, deferred-tax assets, current and future All-Source RFPs, and customer prices.
Current report
See“The Resource Planning Process” in this Overview for information regarding the impact of OBBB on the RFP process.
Current report
HB 3179—The Oregon Legislature in 2025 passed HB 3179 aimed at making energy bills more affordable and transparent for customers. Under the provisions of the legislation, which still awaits the Governor’s signature, the OPUC shall balance the interests of the utility investor and the consumer by considering the cumulative economic impact of the proposed price or schedule of prices on the electric or natural gas company’s residential customers. Electric or natural gas companies are required to file a multiyear rate plan on a regular interval that is no less than three and no more than seven years long. The OPUC shall require each electric and natural gas company to, at least annually, file with the OPUC, and make publicly available, a report on any price adjustments that the electric or natural gas company expects within the next 12 months. Such report must identify all price adjustment requests that an electric or natural gas company has filed or reasonably knows or anticipates to file. Any increase in residential prices may not take effect from November 1 to March 31.
Current report
On June 11, 2025, to advance the goals of the President’s Unleashing American Energy executive order, the EPA proposed to repeal the 2024 GHG emissions standards for fossil fuel-fired power plants promulgated under Section 111 of CAA. The EPA also proposed to repeal specific amendments to the updated MATS, that were promulgated in 2024, including the revised filterable particulate matter emissions standard. Additionally, on June 30, 2025, the EPA proposed to update the 2024 ELG Rule to extend compliance deadlines and explore flexibilities to promote reliable and affordable power generation.
Current report
Corporate structure—On May 23, 2025, PGE filed a notice under Oregon law with the OPUC of its intent to submit a regulatory application for approval of a holding company reorganization. On July 25, 2025, the Company expects to submit the formal application to the OPUC. PGE believes that it is in the best interests of its customers and shareholders to update its corporate structure into a holding company structure. The structure currently contemplated involves placing a non-operating corporate entity over the Company’s existing structure. Additionally, this structure would allow for the formation of a subsidiary of the holding company that could hold existing and future transmission assets. The intent of the reorganization is to take advantage of the financial flexibility provided by a holding company structure, and to support construction of new transmission assets, reliability planning, and economic development.
Current report
The application is another of many steps required to complete the reorganization, which needs OPUC approval under Oregon law as well as any necessary FERC approvals. Later in the process, PGE's Board of Directors will decide whether to submit the proposed reorganization to PGE shareholders for approval. Following completion of these steps and the receipt of all required approvals, each outstanding share of PGE common stock would automatically convert into a share of the new holding company (HoldCo) common stock on a one-for-one basis. PGE shareholders, immediately prior to consummation of the reorganization would own the same relative percentages of HoldCo following consummation of the reorganization. After the reorganization, PGE would be a wholly owned subsidiary of HoldCo, which would be an Oregon corporation.
Current report
Distribution System Plan recovery mechanism—On July 25, 2025, PGE plans to submit to the OPUC a request for recovery of costs associated with the Company’s Distribution System Plan. The regulatory filing would allow PGE the opportunity to recover its revenue requirement for these capital investments outside of a general rate case while balancing the interests of customers and PGE.
Current report
As a part of the filing, PGE requests that the Distribution System Plan Alternative Recovery Mechanism be authorized for inclusion in customer prices by April 1, 2026. PGE’s request for recovery includes an annualized revenue requirement increase of $72 million, which includes a 9.34% return on equity as approved in UE 435, and a rate base increase of $335 million.
Current report
PGE and parties will work through the regulatory review process for the Distribution System Plan Alternative Recovery Mechanism during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.
Current report
Seaside Grid BESS recovery- On May 30, 2025, PGE submitted with the OPUC to request recovery of the revenue requirement associated with the Seaside Battery Energy Storage System (Seaside). The regulatory filing is pursuant to the expedited cost-recovery option introduced by the OPUC in its Order issued December 20, 2024 related to PGE's 2025 General Rate Case (OPUC Docket UE 435) and would allow PGE the opportunity to recover its revenue requirement for Seaside outside of a general rate case while balancing the interests of customers and PGE.
Current report
As a part of the filing, PGE requests that the Seaside tracker be authorized for inclusion in customer prices by October 31, 2025. PGE entered into a memorandum of understanding with intervenors, which establishes the scope of recovery mechanisms for both the Seaside BESS and the DSP. The Company is committed to continuing to collaborate with key stakeholders and providing safe, reliable service at the lowest possible cost for customers.
Current report
PGE’s request for recovery includes an annualized revenue requirement increase of $46 million, cost of capital figures based on OPUC approved amounts in UE 435, which included a 9.34% return on equity, and a rate base increase of $257 million, net of estimated Investment Tax Credit benefits of $117 million.
Current report
PGE and parties will work through the regulatory review process for the Seaside tracker filing (OPUC Docket UE 455) during the coming months. PGE cannot predict the ultimate outcome of the regulatory process.
Current report
In June 2025, the Oregon Legislature passed HB 3546 relating to large energy use facilities. HB 3546, which became effective in June 2025, directs the OPUC to provide a classification for retail customers deemed large energy use facilities. Any tariffs under the class must allocate costs to the class in a manner that is equal or proportional to the costs of serving the class, or directly assign the costs to large energy use facilities and avoid unwarranted shifting costs to other classes. HB 3546 also directs the OPUC to require that electric companies serving a large energy use facility must enter into a contract for services with such customer under terms and conditions specified by the law.
Current report
Operating and Maintenance
Current report
Business transformation and optimization expenses—PGE has incurred incremental costs, which include strategic advisory and workforce realignment expenses, focused on a multi-year cost management initiative to realize long-term benefits. Additionally, PGE has incurred incremental accounting, legal, and consulting costs related to its intent to submit a regulatory application for approval of a holding company reorganization. For more on the corporate structure see “Corporate Structure” in the Regulatory Matters section of this Overview.
Current report
For more information on the impact of these costs on quarterly results, see “Generation, transmission and distribution” and “Administrative and other” in the Results of Operations section of this Overview. The Company expects to incur business transformation and optimization expenses related to these initiatives throughout 2025 and 2026.
Current report
Wholesale revenues for the three months ended June 30, 2025 decreased $11 million, or 11%, from the three months ended June 30, 2024, as a combination of reduced environmental credit sales and a lower average wholesale sales price more than offset the 16% increase in sales volumes.
Current report
Administrative and other is as follows for the three and six months ended June 30, 2025 compared to the same periods in 2024 (in millions):
Current report
Other income, net decreased $2 million and $3 million for the three and six months ended June 30, 2025, respectively, compared to the same periods in 2024. The decreases were primarily driven by lower pension and Other Post Employment Benefits non-service costs.
Removed paragraphs (13)
Previous report
Throughout the remainder of 2023, PGE refreshed its forecasts, first in an Addendum filed in July 2023 then several times in subsequent comments in the CEP and IRP docket with the OPUC (LC 80). PGE estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to make continual progress towards meeting the Company’s clean energy targets. Through the 2021 All-Source Request for Proposals (RFP), PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.
Previous report
PGE constructed the final short list to provide optionality and address the Company’s future capacity need. The Company ranked the final shortlist in two groups, prioritized based on performance in the RFP price scoring evaluation, representing the optimal intersection of value to customers at the least-cost and the least-risk. These two groups together represented the final shortlist of projects recommended for regulatory acknowledgement. On November 19, 2024, the OPUC acknowledged, with conditions, PGE’s final shortlist of resources as follows:
Previous report
•Group A, as shown below, consisted of three bids that are top performing and PGE expected to enter commercial negotiation for all of these projects. Group A included 375 megawatts (MW) nameplate of renewable resources and 400 MW nameplate of battery storage; and
Previous report
•Group B, as shown below, consisted of five bids, all of which represent capacity options via BESS facilities. These projects are also high performing and PGE may enter commercial negotiations with some or all of these projects, allowing flexibility to address any remaining capacity need. Group B includes 885 MW nameplate of battery storage.
Previous report
The proposals for renewable resources provide various combinations of solar and battery storage options that include PPAs along with Company-owned resources via Build Transfer Agreements (BTA). The proposals for non-emitting dispatchable capacity resources provide battery storage options that include PPAs along with Company-owned resources via BTAs.
Previous report
(1) MW values do not include nameplate capacity of paired energy storage of 250 MW for project 1 and 125 MW for project 3.
Previous report
(2) Hybrid commercial structure includes a PPA portion and a Company-owned portion of project resources.
Previous report
On December 12, 2024, Project 1 in Group A notified PGE that it was withdrawing from commercial negotiations. PGE continues to negotiate with the remaining Group A projects and aims to finalize contracts over the second half of 2025.
Previous report
RFP final shortlist projects were evaluated and selected based on conditions as of the final shortlist date and are subject to risks and uncertainties, including, but not limited to, regulatory processes, inflationary impacts, supply chain constraints, supply cost increases (including the application of trade tariffs), and legislative uncertainty.
Previous report
In addition, the regulations include Disposal of Coal Combustion Residuals (CCR) from Electric Utilities – Legacy CCR Surface Impoundments. This rule builds on 2015 regulations, which apply to active power plants that dispose of coal combustion residuals in surface impoundments or landfills, by regulating inactive surface impoundments at inactive power plants, and CCR management units at active and inactive power plants. PGE has assessed the potential impact of the CCR regulation changes and believes it will not have a material impact on the Company’s current Asset Retirement Obligations.
Previous report
Administrative and other increased as follows for the three months ended March 31, 2025 compared to the same period in 2024 (in millions):
Previous report
Other income, net decreased $1 million for the three months ended March 31, 2025, compared to the same period in 2024. The decrease was primarily driven by lower non-qualified plan asset investment performance slightly offset by higher AFUDC from higher CWIP balances.
Previous report
In June 2024, Moody’s revised the Company’s outlook from Stable to Negative. This change is not expected to have a material impact on the Company’s liquidity or collateral obligations.
Reworded paragraphs (89)
Previous wording
•changes in, compliance with, and general uncertainty around environmental laws and policies;
Current wording
•changes in, compliance with, and general uncertainty around environmental laws and policies, including those related to threatened and endangered species, fish, and wildlife;
Previous wording
•employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees similar to that experienced by other employers and industries during the COVID-19 pandemic;
Current wording
•employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees;
Previous wording
The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing GHG emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:
Current wording
The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing greenhouse gas (GHG) emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:
Previous wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 227 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Current wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 225 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Previous wording
As of March 31, 2025, the Green Future Impact Program has an approved capacity of 750 megawatts (MW) nameplate, of which 482 megawatts (MW) have been subscribed. Through this voluntary program, the Company seeks to support customers’ clean energy acceleration.
Current wording
As of June 30, 2025, the Green Future Impact Program has an approved capacity of 750 megawatts (MW) nameplate, of which 482 MW have been subscribed. Through this voluntary program, the Company seeks to support customers’ clean energy acceleration.
Previous wording
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. Beginning January 13, 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.
Current wording
Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. In January 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.
Previous wording
On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. However, the OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the CEP/IRP Update to be filed in June 2025. PGE will continue to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP.
Current wording
Throughout the remainder of 2023, PGE refreshed its forecasts, first in an Addendum filed in July 2023, in OPUC Docket LC 80, then several times in subsequent comments provided to the OPUC. On January 25, 2024, the OPUC acknowledged PGE’s IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. The OPUC declined to acknowledge the CEP, directing the Company in Order 24-096 to revise and resubmit certain elements of the CEP with its next CEP/IRP Update.
Previous wording
•Clearwater Wind Development (Clearwater)—The 311 MW wind energy facility is part of the larger Clearwater Wind Development in Eastern Montana. PGE owns 208 MW of production capacity of the facility. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA.
Current wording
•Clearwater—PGE owns 208 MW of production capacity of the wind facility, located in Eastern Montana. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA.
Previous wording
•Seaside Grid—The 200 MW Battery Energy Storage System (BESS) facility, located in Portland, Oregon has an estimated commercial operation date of June 30, 2025 and will be owned by PGE. As of March 31, 2025, the Company has recorded $334 million, including AFUDC, in construction work-in-progress (CWIP) for the Seaside Grid.
Current wording
•Seaside Grid—The 200 MW Battery Energy Storage System (BESS) facility, located in Portland, Oregon was placed in service on July 8, 2025 and is owned by PGE. As of June 30, 2025, the Company has recorded $340 million, including AFUDC, in construction work-in-progress (CWIP) for the Seaside Grid.
Previous wording
•Constable BESS (formerly Evergreen)—The 75 MW BESS facility, located in Hillsboro, Oregon was placed in service on December 20, 2024 and is owned by PGE. As of March 31, 2025, the Company has recorded $157 million in Electric Utility Plant, net, including AFUDC.
Current wording
•Constable BESS (formerly Evergreen)—The 75 MW BESS facility, located in Hillsboro, Oregon was placed in service on December 20, 2024 and is owned by PGE.
Previous wording
The agreements related to the Clearwater Wind Development and all BESS agreements represent the final procurement from the 2021 All-Source RFP. Resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, the 2023 All-Source RFP and future RFPs.
Current wording
The agreements related to Clearwater and all BESS agreements represent the final procurement from the 2021 All-Source RFP. Resources required to meet the remaining 2030 need are anticipated to be procured through future acquisition processes, including, but not limited to, the 2023 All-Source RFP and future RFPs.
Previous wording
All BESS projects will be directly interconnected to PGE’s transmission and distribution system. In the event emissions are associated with energy obtained to charge the BESS, they are accounted for when they are emitted from the generating facility. As such, BESS projects do not add incremental emissions to the grid, and therefore, are considered non-emitting dispatchable capacity resources. The BESS facilities qualify for the federal investment tax credits (ITCs). The agreements related to the Clearwater Wind Development qualify for production tax credits (PTCs) and are eligible under Oregon’s Renewable Portfolio Standard (RPS). The agreements will be subject to prudency review by the OPUC.
Current wording
The BESS facilities qualify for federal investment tax credits (ITCs). The agreements related to Clearwater qualify for production tax credits (PTCs) and are eligible under Oregon’s Renewable Portfolio Standard (RPS) .
Previous wording
After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, on September 17, 2024, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC. On October 7, 2024, the Company filed notification that one project on the final shortlist was no longer available.
Current wording
After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, on September 17, 2024, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC. The final shortlist was acknowledged by the OPUC, with conditions, on November 19, 2024.
Previous wording
Both the 2021 and 2023 RFPs were the subject of regulatory and legal challenges initiated by NewSun Energy LLC, focused on the scoring methodology of the RFPs and OPUC acknowledgement of the final shortlists. Two of NewSun’s challenges to the 2021 RFP were dismissed as moot in recent court decisions, although NewSun has indicated it will file further appeals. PGE has joined the proceedings as an intervenor, and the remaining challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any, on its 2021 and 2023 All-Source RFP process.
Current wording
Both the 2021 and 2023 RFPs were the subject of regulatory and legal challenges initiated by NewSun Energy LLC, focused on the scoring methodology of the RFPs and OPUC acknowledgement of the final shortlists. Two of NewSun’s challenges to the 2021 RFP were dismissed as moot in recent court decisions. Although NewSun filed for review by the Oregon Supreme Court, in both cases the petitions for review were denied. PGE has joined the proceedings as an intervenor, and the remaining challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any, on its 2021 and 2023 All-Source RFP process.
Previous wording
NewSun was an intervenor in the Clearwater RAC proceeding in Docket UE 427, in which the OPUC rejected NewSun’s proposals to change the RFP oversight process but adopted conditions proposed by OPUC staff on how PGE should recognize Clearwater’s capacity factor and transmission assumptions in its AUT and PCAM beginning in 2025. While PGE is seeking review of the OPUC’s February 21, 2025 order adopting the conditions, PGE cannot predict the outcome or potential impact, if any, on future RFP, AUT, or PCAM proceedings.
Current wording
NewSun was an intervenor in the Clearwater RAC proceeding in Docket UE 427, in which the OPUC rejected NewSun’s proposals to change the RFP oversight process, but adopted conditions proposed by OPUC staff on how PGE should recognize Clearwater’s capacity factor and transmission assumptions in its AUT and PCAM beginning in 2025. PGE sought and received clarification of the OPUC’s February 21, 2025 order (Order 25-075) adopting the conditions, in Order 25-223, which granted certain of PGE’s requests and denied others. PGE has a Petition for Judicial Review of Order 25-075 pending at the Oregon Court of Appeals. PGE cannot predict the outcome or potential impact, if any, on future RFP, AUT, or PCAM proceedings.
Previous wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP. PGE filed the draft 2025 All-Source RFP on April 17, 2025.
Current wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP on April 17, 2025.
Previous wording
In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.
Current wording
In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP Update, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.
Previous wording
On May 28, 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties have entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. On August 6, 2024, the project was awarded a $700 million grant from the U.S. Department of Energy’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Current wording
In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. Department of Energy’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Previous wording
The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources, access to enhanced wholesale markets, and ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to meet those load-service needs.
Current wording
The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources and enhanced wholesale markets, and ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to meet those load-service needs.
Previous wording
•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The 2025 WMP Update forecasts $53 to $57 million in operations and maintenance costs and an additional $57 to $78 million in capital investments, for the year ending 2025, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the three months ended March 31, 2025, PGE invested $8.5 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2025 WMP.
Current wording
•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The 2025 WMP Update forecasts $53 to $57 million in operations and maintenance costs and an additional $57 to $78 million in capital investments, for the year ending 2025, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the six months ended June 30, 2025, PGE invested $24 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2025 WMP Update.
Previous wording
•Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These Distributed Energy Resources and flexible loads are the foundation of PGE’s VPP that increasingly provides a growing suite of grid and system services over time. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. Customer participation in the VPP helps avoid customer service interruptions and reduces exposure to scarcity pricing in energy markets. On July 8, 2024, customer actions, orchestrated through the VPP, reduced load by more than 100 MW. As their participation in PGE’s VPP grows, customer actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Current wording
•Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These Distributed Energy Resources and flexible loads are the foundation of PGE’s VPP that increasingly provides a growing suite of grid and system services over time. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in PGE’s VPP grows, their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Previous wording
•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in meeting PGE’s clean energy goals.
Current wording
•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirements. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see“Distribution System Plan recovery mechanism”in the Regulatory Matters section of this Overview.
Previous wording
Electrify the economy—To help Oregon reach its decarbonization goals, PGE is committed to increasing electrification of buildings and supporting vehicle electrification for customers, as well as its own vehicle fleet.
Current wording
Electrify the economy—To help Oregon reach its decarbonization goals, PGE is committed to increasing electrification of buildings and supporting vehicle electrification for customers.
Previous wording
In October 2023, the OPUC accepted PGE’s second TE plan, which covers the 2023 to 2025 time period and considers current and planned activities, along with forecasted EV loads. To date, PGE has incurred $10 million in capital expenditures under the current TE plan. PGE is planning to submit its draft 2026-2028 TE plan in July 2025.
Current wording
In October 2023, the OPUC accepted PGE’s second TE plan, which covers the 2023 to 2025 time period and considers current and planned activities, along with forecasted EV loads. To date, PGE has incurred $11 million in capital expenditures under the current TE plan. PGE expects to submit its draft 2026-2028 TE plan on July 25, 2025.
Previous wording
Trade Tariffs—Recently, trade tariffs were imposed through presidential executive orders. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect. Trade tariffs may increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. For example, the cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances that are ultimately issued out to capital projects. Similarly, prices may rise for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, which could include project delays, cost increases, and obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Current wording
Trade Tariffs—Recently, trade tariffs were imposed through presidential executive orders. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect. Trade tariffs may increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Previous wording
Federal Grants—In November 2021, the $1.2 trillion IIJA, which includes approximately $550 billion of new federal spending, was signed into law. PGE continues to pursue multiple areas under the IIJA, and other state and federal programs, for potential grant funding of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, hydrogen production, and regional transmission capacity constraints.
Current wording
Federal Grants—In November 2021, the $1.2 trillion Infrastructure Investment and Jobs Act (IIJA), which includes approximately $550 billion of new federal spending, was signed into law. PGE continues to pursue multiple areas under the IIJA, and other state and federal programs, for potential grant funding of projects. These projects target improvements in electrical system reliability and resiliency, wildfire situational awareness and mitigation, greater communications capabilities, advancements in customer usage analytics using artificial intelligence, renewable resources and advanced electrical grid support, hydro generation operations, and regional transmission capacity constraints.
Previous wording
As of March 31, 2025, PGE has been associated with the submission of 42 grant applications as the recipient or Sub-recipient and has been awarded 16 grants totaling $319 million, including the following:
Current wording
As of June 30, 2025, PGE has been associated with the submission of 42 grant applications as the recipient or subrecipient and has been awarded 10 grants totaling $313 million, including the following:
Previous wording
The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency.
Current wording
•U.S. DOE Grid Edge Devices—The U.S. DOE selected and subsequently entered into an agreement on October 1, 2024 with PGE leading a consortium for a $50 million grant for the Grid Edge Devices project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency.
Previous wording
Inflation Reduction Act of 2022—The Inflation Reduction Act of 2022 (IRA) was signed into law in August 2022 with a majority of the provisions effective for tax years beginning after December 31, 2022.
Current wording
Inflation Reduction Act of 2022—The IRA was signed into law in August 2022 with a majority of the provisions effective for tax years beginning after December 31, 2022.
Previous wording
The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. In December 2023, PGE received approval from the OPUC to transfer 2023 PTCs and record any difference in the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, the Company transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On December 11, 2024, PGE received approval from the OPUC to transfer 2024 ITCs and return the net proceeds from the sale to PGE customers. PGE has entered into agreements to transfer 2023 to 2025 tax credits and transferred $112 million, net of discounts, for cash proceeds in 2024. The Company expects to generate and transfer approximately $158 million in tax credits in 2025.
Current wording
The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. In December 2023, PGE received approval from the OPUC to transfer 2023 PTCs and record any difference in the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, the Company transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On December 11, 2024, PGE received approval from the OPUC to transfer 2024 ITCs and return the net proceeds from the sale to PGE customers. PGE has entered into agreements to transfer 2023 through 2025 tax credits and transferred $13 million and $112 million, net of discounts, for cash proceeds in the first half of 2025 and in 2024, respectively. The Company expects to generate and transfer approximately $168 million in tax credits in 2025.
Previous wording
The Company believes the tax incentives in the IRA provide additional investment opportunities for PGE and provide benefits to customers. Increased capital expenditures in such investment opportunities would likely result in additional financing needs through debt and equity instruments. PGE continues to monitor for potential impacts to its business due to executive orders that may change tax incentives under IRA programs. Potential modifications to or repeal of the IRA tax credits, normalization rules, and transferability of credits, may substantially influence renewable energy development and ongoing generation and battery storage investments. Such changes could have a material impact on PGE’s results of operations, financial position, and cash flows.
Current wording
The Company believes the tax incentives in the IRA provide additional investment opportunities for PGE and provide benefits to customers. Increased capital expenditures in such investment opportunities would likely result in additional financing needs through debt and equity instruments.
Previous wording
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent with each IRP. In reviewing a CEP, the OPUC must ensure that utilities create a plan that is in the public interest, demonstrate continual progress toward meeting the targets, and take actions as soon as practicable that facilitate rapid reduction of GHG emissions. Further, the CEP must result in an affordable, reliable, and clean electric system. The law does not require particular GHG percentage reductions be attained until 2030. The law contains a cost cap and reliability related provisions that can slow or pause compliance with the GHG targets, if implicated. The OPUC has a current open docket, UM 2273, in which provisions regarding the cost cap are being investigated.
Current wording
HB 2021 requires utilities to develop a CEP for meeting the reduction targets, concurrent with each IRP. In reviewing a CEP, the OPUC must ensure that utilities take action as soon as practicable that facilitates rapid reduction of GHG emissions, demonstrate continual progress toward meeting the targets, and create a plan that is in the public interest. Further, the CEP must result in an affordable, reliable, and clean electric system. The law does not require particular GHG percentage reductions be attained until 2030. The law contains a cost cap and reliability related provisions that can slow or pause compliance with the GHG targets, if implicated. The OPUC has a current open docket, UM 2273, in which provisions regarding the cost cap are being investigated.
Previous wording
•GHG regulations for new natural gas-based turbines and existing coal-based units, pursuant to section 111 of the Clean Air Act (CAA). The rule finalized: i) guidelines for GHG emissions from existing fossil fuel-fired steam generating electric units; and ii) revisions to existing performance standards for new, reconstructed, or heavily modified fossil fuel-fired stationary combustion turbine electric generating units.
Current wording
•GHG regulations for new natural gas-based turbines and existing coal-based units, pursuant to section 111 of the Clean Air Act (CAA);
Previous wording
•Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category (the ELG Rule), which applied to wastewater discharges from coal-based generating units and established pollution control requirements, building upon the 2015 and 2020 ELG Rules. The rule included a subcategory of requirements for coal plants that will be retired or repowered by the end of 2028 and provides additional compliance pathways for coal plants that retire by the end of 2034.
Current wording
•Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category (the ELG Rule), which applied to wastewater discharges from coal-based generating units and established pollution control requirements, building upon the 2015 and 2020 ELG Rules; and
Previous wording
•Updated Mercury and Air Toxics Standards (MATS), pursuant to section 112 of the CAA, which set emissions limits for filterable particulate matter for coal-based generating units. The rule reduced those limits from the standards that were originally set in 2012.
Current wording
•Updated Mercury and Air Toxics Standards (MATS), pursuant to section 112 of the CAA, which set emissions limits for filterable particulate matter for coal-based generating units.
Previous wording
Colstrip with proposed compliance dates that may not be achievable or require the use of unproven technology, resulting in significant impacts to costs of Colstrip. The final MATS and GHG Rules require compliance as early as 2027 and 2032, respectively, however a substantial number of legal challenges have been filed regarding these rules. In challenges to all three rules, at the EPA’s request, the courts have granted stays to allow new EPA leadership to reevaluate the rule. In a March 2025 press release, the EPA announced that these rules were among several that the EPA will target for reconsideration. On April 8, 2025, the President issued a proclamation, Regulatory Relief for Certain Stationary Sources to Promote American Energy, granting a two-year compliance exemption pursuant to the CAA Section 112(i)(4) for the Agency’s final rule. The EPA subsequently notified companies whether their sources had been granted the exemption. Colstrip was granted an exemption until July 8, 2029. These challenges, or attempts by the federal government to withdraw or modify the regulations, if successful, could affect the applicability to PGE and Colstrip specifically.
Current wording
PGE continues to evaluate each of these rules to assess the impact it may have on the Company’s continuing investment in Colstrip, which could be material. Compliance with the 2024 rules could require material upgrades at Colstrip with proposed compliance dates that may not be achievable or require the use of unproven technology, resulting in significant impacts to costs of Colstrip. If upheld, the 2024 MATS and GHG Rules would require compliance as early as 2027 and 2032, respectively. In addition to the EPA’s proposed rulemakings, several legal challenges have been filed regarding these rules. In challenges to all three rules, at the EPA’s request, the courts have granted stays to allow new EPA leadership to reevaluate the rule.
Previous wording
Given the uncertainty surrounding applicability of these laws and regulations, PGE cannot reasonably estimate the impact to its results of operations, financial position, and cash flows, however, if the MATS Rule and GHG Rule are ultimately enforced, it would likely result in additional material compliance costs. To the extent these regulations result in increased compliance costs, the Company expects to seek recovery of those costs through the ratemaking process.
Current wording
These challenges, or attempts by the federal government to withdraw or modify the regulations, if successful, could affect the applicability to PGE and Colstrip specifically. Given the uncertainty surrounding applicability of these laws and regulations, PGE cannot reasonably estimate the impact to its results of operations, financial position, and cash flows, however, if the MATS Rule and GHG Rule are ultimately enforced, it would likely result in additional material compliance costs. To the extent these regulations result in increased compliance costs, the Company expects to seek recovery of those costs through the ratemaking process.
Previous wording
Declared states of emergency—The OPUC has approved a pre-authorized deferral of costs associated with qualifying declared states of emergency, which would include federal or state declared emergencies with impacts on PGE’s service territory. Under this mechanism, PGE could provide notice of an event that qualifies within 30 days of the declared state of emergency and would not need to seek OPUC approval to apply deferred accounting treatment for incremental costs related to the emergency, subject to an earnings test. The OPUC maintains responsibility to review utility requests to amortize deferred amounts in customer prices, including a review of utility prudence in a future proceeding, among other requirements.
Current wording
Declared states of emergency—The OPUC has approved a pre-authorized deferral of costs associated with qualifying declared states of emergency, which would include federal or state declared emergencies with impacts on PGE’s service territory. Under this mechanism, PGE could provide notice of an event that qualifies within 30 days of the declared state of emergency and would not need to seek OPUC approval to apply deferred accounting treatment for incremental costs related to the emergency. The OPUC maintains responsibility to review utility requests to amortize deferred amounts in customer prices, including, among other requirements, a review of utility prudence and application of an earnings test, in a future proceeding.
Previous wording
Beginning January 13, 2024, the Company’s service territory encountered a severe winter weather event that included snow, ice, and high winds over several days that caused catastrophic damage to physical assets and resulted in widespread customer power outages. Along with over a dozen mutual assistance crews, PGE repaired damage and restored power to over 500,000 customers throughout the storm and the days that followed. As a result of the historic winter storm, Oregon’s Governor declared a state of emergency on January 18, 2024, which allows PGE to seek recovery of incremental storm expenses through the previously filed emergency deferral. On February 9, 2024, PGE filed a Notice of Deferral with the OPUC under Docket UM 2190 for emergency restoration costs related to the January storm. As of March 31, 2025, PGE had deferred $46 million, including interest, as a regulatory asset for costs associated with repairing damage to transmission and distribution systems and restoring power to customers.
Current wording
In January 2024, the Company’s service territory encountered a severe winter weather event that included snow, ice, and high winds over several days that caused catastrophic damage to physical assets and resulted in widespread customer power outages. As a result of the historic winter storm, Oregon’s Governor declared a state of emergency on January 18, 2024, which allows PGE to seek recovery of incremental storm expenses through the previously filed emergency deferral. On February 9, 2024, PGE filed a Notice of Deferral with the OPUC under Docket UM 2190 for emergency restoration costs related to the January storm. As of June 30, 2025, PGE had a deferred balance of $47 million, including interest, as a regulatory asset for costs associated with repairing damage to transmission and distribution systems and restoring power to customers.
Previous wording
PGE believes that the full amount of the deferral is probable of recovery and anticipates submitting a request for recovery early in the third quarter of 2025, with price changes to be effective during 2026. The OPUC has significant discretion in making the final determination of recovery based on its determination of prudency and interpretation of the earnings test application, either of which could result in all, or a portion of, the deferral being disallowed. As of December 31, 2024, PGE's preliminary return on equity, based on actual results, did not exceed the OPUC's authorized rate of return. Any disallowance would be a charge to earnings, which could be material to the Company’s financial condition, results of operations, or cash flows. For further information, see “January 2024 storm and damage”in the Regulatory Assets and Liabilities section of Note 3, Balance Sheet Components in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Current wording
PGE believes that the full amount of the deferral is probable of recovery and submitted a request for recovery early in the third quarter of 2025, with price changes to be effective over a two-year period beginning April 1, 2026. The OPUC has significant discretion in making the final determination of recovery based on its assessment of prudency and interpretation of the earnings test application, either of which could result in all, or a portion of, the deferral being disallowed. As of December 31, 2024, PGE's preliminary return on equity, based on actual results, did not exceed the OPUC's authorized rate of return. Any disallowance would be a charge to earnings, which could be material to the Company’s financial condition, results of operations, or cash flows. For further information, see “January 2024 storm and damage”in the Regulatory Assets and Liabilities section of Note 3, Balance Sheet Components in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Showing the first 40 of 89 pairs. Open the source sections for the rest.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
On April 8, 2025, the President issued a proclamation, Regulatory Relief for Certain Stationary Sources to Promote American Energy, granting a two-year compliance exemption pursuant to the CAA Section 112(i)(4) for the EPA’s MATS rule. The EPA subsequently notified companies whether their sources had been granted the exemption. Colstrip was granted an exemption until July 8, 2029.
Current report — wording carried from elsewhere
Under the RAC, during 2023, the Company submitted a filing in OPUC Docket UE 427 for Clearwater proposing to defer the revenue requirement, net of NVPC benefits, from the in-service date of January 2024 until Clearwater was reflected in customer prices, which was March 1, 2025. For the twelve month period ending December 31, 2024, PGE deferred the revenue requirement, net of NVPC benefits resulting in a net regulatory liability of $40 million, which began amortizing as a refund to customers on March 1, 2025 over a twelve month period, as approved by the OPUC in Order 25-075 issued February 21, 2025.
Current report — wording carried from elsewhere
Actual deliveries to Direct Access customers of energy supplied by ESSs represented 11% and 10%of PGE’s total retail energy deliveries for the first six months of 2025 and 2024, respectively. The OPUC, under docket UM 2024, has undertaken an investigation of long-term Direct Access with program caps being one of the issues under consideration. This regulatory proceeding is expected to conclude in early 2026.
Current report — wording carried from elsewhere
Net income for the three months ended June 30, 2025 decreased $10 million, or 14%, compared to the same period of 2024. Retail revenues increased primarily due to price changes as authorized by the OPUC. The increase in Purchased power and fuel reflects higher average variable power costs per MWh. Generation, transmission and distribution expenses were up primarily due to vegetation management, inspection, wildfire mitigation, and distribution maintenance expenses. While total Administrative and General expense remained flat compared to 2024, a total of $15 million business transformation and optimization expenses was recorded in 2025 of which $14 million is reflected in Administration and General Expense with the balance being in Generation, transmission and distribution expense. Increases in Depreciation and amortization expense, driven by higher depreciable asset balances, and Interest expense, net, due to higher long-term debt balances, were largely anticipated and somewhat offset in net income by increased revenues. Income tax expense was up due to lower PTC benefits.
Current report — wording carried from elsewhere
For the three months ended June 30, 2025, the $20 million increase related to the change in average variable power cost per MWh was driven by an 18% increase in the average cost of purchased power and a 12% decrease in the average cost for the Company’s own generation. The $1 million increase related to total system load was comprised of a 7% decrease of energy obtained from purchased power, offset by an 18% increase in the Company’s own generation.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
•U.S. DOE Grid Edge Devices—The U.S. DOE selected and subsequently entered into an agreement on October 1, 2024 with PGE leading a consortium for a $50 million grant for the Grid Edge Devices project.
Previous report — wording carried elsewhere
PGE continues to evaluate each of these rules to assess the impact it may have on the Company’s continuing investment in Colstrip, which could be material. Compliance with the rules would require material upgrades at