What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-07-26.

0000784977-24-000133

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-30; filed 2024-10-25.

0000784977-24-000167

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 228 previous paragraphs and 236 current paragraphs.

114 unchanged; 104 reworded; 13 added; 7 removed; 3 previous and 5 current paragraphs rearranged.

Tables are not compared: 20 previous and 21 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (13)

Current report

After a robust and competitive bidding process performed in accordance with Oregon's competitive bidding rules, and with the active participation of, and oversight by, an OPUC-selected third-party independent evaluator, on September 17, 2024, PGE submitted a request for acknowledgement of the final shortlist of bidders to the OPUC. On October 7, 2024, the Company filed notification that one project on the final shortlist was no longer available.

Current report

PGE constructed the final short list to provide optionality and address the Company’s future capacity need. The Company ranked the final shortlist in two groups, prioritized based on performance in the RFP price scoring evaluation, representing the optimal intersection of value to customers at the least-cost and the least-risk. These two groups together represent the final shortlist of projects recommended for regulatory acknowledgement, as follows:

Current report

•Group A, as shown below, now consists of three bids that are top performing and PGE expects to enter commercial negotiation for all of these projects. Group A includes 375 megawatts (MW) nameplate of renewable resources and 400 MW nameplate of battery storage; and

Current report

•Group B, as shown below, consists of five bids, all of which represent capacity options via BESS facilities. These projects are also high performing and PGE may enter commercial negotiations with some or all of these projects, allowing flexibility to address any remaining capacity need. Group B includes 885 MW nameplate of battery storage.

Current report

The proposals for renewable resources provide various combinations of solar and battery storage options that include PPAs along with Company-owned resources via Build Transfer Agreements (BTA). The proposals for non-emitting dispatchable capacity resources provide battery storage options that include PPAs along with Company-owned resources via BTAs.

Current report

(1) MW values do not include nameplate capacity of paired energy storage of 250 MW for project 1 and 125 MW for project 3.

Current report

(2) Hybrid commercial structure includes a PPA portion and a Company-owned portion of project resources.

Current report

PGE has begun the process of commercial negotiations and looks to execute final contracts over the course of 2025. The OPUC is scheduled to consider acknowledgement of the RFP shortlist on November 19, 2024 to enable execution of definitive agreements.

Current report

RFP final shortlist projects were evaluated and selected based on conditions as of the final shortlist date and are subject to risks and uncertainties, including, but not limited to, regulatory processes, inflationary impacts, supply chain constraints, supply cost increases (including the application of trade tariffs), and legislative uncertainty.

Current report

During the three months ended September 30, 2024 compared to the same three months of 2023, the impact of weather on Total Retail deliveries was somewhat less than in 2023. While temperatures were above average during 2024, the number of cooling degree-days recorded were 25% above average compared to 34% above in the same period of 2023.

Current report

For the nine months ended September 30, 2024, milder temperatures have resulted in somewhat lower Total Retail Energy deliveries when compared to the same period of 2023. Total heating degree days have been below the comparable totals for each quarter of 2024 when compared to 2023 and total cooling degree days, were also lower in the second and third quarters of 2024 than 2023.

Current report

For the three months ended September 30, 2024, Wholesale revenues increased $19 million, or 11%, from the three months ended September 30, 2023 as higher sales volumes were partially offset by lower average sales prices. For the nine months ended September 30, 2024, Wholesale revenues increased $144 million, or 45%, from the nine months ended September 30, 2023, reflecting a 45% increase in sales volumes and a 22% reduction in the average wholesale sales price due largely to milder weather and lower natural gas prices, along with a $34 million increase in sales of environmental credits.
Removed paragraphs (7)

Previous report

In February 2022, NewSun Energy LLC (NewSun) filed a petition for judicial review in the Marion County Circuit Court against the OPUC challenging the scoring methodology in the 2021 All-Source RFP. PGE joined in the case as an intervenor. NewSun also filed a motion to stay the 2021 All-Source RFP process, which the Court subsequently denied. The OPUC filed a motion to dismiss the case and PGE joined the OPUC’s motion to dismiss. NewSun opposed the motion. In May 2022, the Court granted the motion to dismiss to which NewSun responded in June 2022 by filing a notice of appeal with the Court of Appeals of the State of Oregon. After receiving multiple extensions, NewSun filed its opening brief in the appeal in February 2023 and PGE filed a response brief in June 2023. In August 2023, PGE filed a notice asking the Court to dismiss the case. That motion remains pending. Oral argument in this case occurred March 18, 2024. The parties await a decision from the Court.

Previous report

In October 2022, NewSun filed a petition in Deschutes County Circuit Court seeking review of the OPUC order acknowledging, with conditions, PGE’s 2021 All-Source RFP shortlist. PGE intervened in this case and, in March 2023, filed a motion to dismiss. In September 2023, the judge granted PGE’s motion to dismiss. In November 2023, NewSun filed a notice of appeal in the Court of Appeals of the State of Oregon. Opening briefs in the Appeal were filed March 1, 2024, with PGE and OPUC responses filed July 12, 2024. Oral arguments are expected to occur in late 2024 or early 2025.

Previous report

For the six months ended June 30, 2024, milder temperatures have resulted in lower Total Retail Energy deliveries when compared to the same six months of 2023. During the three-month period ended March 31, 2024 compared to the same three months of 2023, the impact of weather on Total Retail deliveries was negative with overall warmer than average, and considerably warmer than the prior year, temperatures experienced. In the three-month period ended June 30, 2024, total heating degree-days were comparable to the same period of 2023, as warmer temperatures in April 2024 were largely offset by cooler temperatures the following month, while both years were, in total for the quarter, warmer than average. May 2023 produced an unusually high number of cooling degree-days and elevated deliveries occurred, which resulted in weather having an overall negative impact on deliveries in the second quarter of 2024 compared to the same period of 2023.

Previous report

For the three months ended June 30, 2024, Wholesale revenues increased $37 million, or 60%, from the three months ended June 30, 2023 driven primarily by a $28 million increase that resulted from higher sales volumes.

Previous report

Wholesale revenues for the six months ended June 30, 2024 increased $125 million, or 83%, from the six months ended June 30, 2023, as a 50% increase in sales volumes added $76 million to revenues and the average wholesale sales price was up 22%, due largely to the market conditions surrounding the January 2024 storm event in the region.
Reworded paragraphs (104)

Previous wording

(PGE, or the Company) expectations, beliefs, and projections are expressed in good faith and are believed by the Company to have a reasonable basis including, but not limited to, management’s examination of historical operating trends and data contained either in internal records or available from third parties, but there can be no assurance that PGE’s expectations, beliefs, or projections will be achieved or accomplished.

Current wording

Forward-looking statements are not guarantees of future performance and involve risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed. Portland General Electric Company’s (PGE, or the Company) expectations, beliefs, and projections are expressed in good faith and are believed by the Company to have a reasonable basis including, but not limited to, management’s examination of historical operating trends and data contained either in internal records or available from third parties, but there can be no assurance that PGE’s expectations, beliefs, or projections will be achieved or accomplished.

Previous wording

•changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through rates and earn its authorized return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from Electricity Service Suppliers (ESSs) or the adoption of community choice aggregation;

Current wording

•changing customer expectations and choices that may reduce customer demand for PGE’s services may impact the Company’s ability to make and recover its investments through prices and earn its authorized return on equity, including the impact of growing distributed and renewable generation resources, changing customer demand for enhanced electric services, and an increasing risk that customers procure electricity from Electricity Service Suppliers (ESSs) or the adoption of community choice aggregation;

Previous wording

•cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts that cause damage to the Company’s generation, transmission, or distribution facilities, information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;

Current wording

•cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts against the Company or against Company vendors that cause damage to the Company’s facilities or information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;

Previous wording

•PGE’s ability to effectively implement a public safety power shutoff (PSPS) and de-energize its system in the event of heightened wildfire risk or implement effective system hardening programs, the inability of which could lead to potential liability if energized systems are involved in wildfires that cause harm, as well as the risk that damages from wildfires may not be recoverable through rates or insurance, resulting in impact to the financial condition, results of operations, or reputation of the Company;

Current wording

•PGE’s ability to effectively implement a public safety power shutoff (PSPS) and de-energize its system in the event of heightened wildfire risk or implement effective system hardening programs, the inability of which could lead to potential liability if energized systems are involved in wildfires that cause harm, as well as the risk that damages from wildfires may not be recoverable through prices or insurance, resulting in impact to the financial condition, results of operations, or reputation of the Company;

Previous wording

•delays in the supply chain and increased supply costs, failure to complete capital projects on schedule or within budget, inability to complete negotiations on contracts for capital projects, failure of counterparties to perform under agreements, or the abandonment of capital projects, any of which could result in the Company’s inability to recover project costs or impact PGE’s competitive position, market share, or results of operations in a material way;

Current wording

•delays in the supply chain and increased supply costs, failure to complete capital projects on schedule or within budget, inability to complete negotiations on contracts for capital projects, failure of counterparties to perform under agreements, or the abandonment of capital projects, any of which could result in the

Previous wording

•volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;

Current wording

•volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements and other price risk management instruments;

Previous wording

•employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees similar to that experienced by other employers and industries since the beginning of the COVID-19 pandemic;

Current wording

•employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees;

Previous wording

•failure to achieve the Company’s greenhouse gas emission goals or being perceived to have either failed to act responsibly with respect to the environment or effectively respond to legislative requirements concerning greenhouse gas emission reductions, any of which could lead to adverse publicity and have adverse effects on the Company's operations and/or damage the Company's reputation;

Current wording

•failure to achieve the Company’s greenhouse gas (GHG) emission goals or being perceived to have either failed to act responsibly with respect to the environment or effectively respond to legislative requirements concerning GHG emission reductions, any of which could lead to adverse publicity and have adverse effects on the Company's operations and/or damage the Company's reputation;

Previous wording

PGE is a vertically-integrated electric utility engaged in the generation, transmission, distribution, and retail sale of electricity. The Company participates in wholesale markets by purchasing and selling electricity and natural gas in an effort to meet the needs of, and obtain reasonably-priced power for, its retail customers, manage risk, and administer its long-term wholesale contracts. In addition, PGE continues to develop products and service offerings for the benefit of retail and wholesale customers. The Company generates revenues and cash flows primarily from the sale and distribution of electricity to retail customers in its service territory in the State of Oregon (State).

Current wording

PGE is a vertically-integrated electric utility engaged in the generation, transmission, distribution, and retail sale of electricity. The Company participates in wholesale markets by purchasing and selling electricity, natural gas, and environmental credits in an effort to meet the needs of, and obtain reasonably-priced power for, its retail customers, manage risk, and administer its long-term wholesale contracts. In addition, PGE continues to develop products and service offerings for the benefit of retail and wholesale customers. The Company generates revenues and cash flows primarily from the sale and distribution of electricity to retail customers in its service territory in the State of Oregon (State).

Previous wording

The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing greenhouse gas emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:

Current wording

The Company exists to power the advancement of society. PGE energizes lives, strengthens communities, and fosters energy solutions that promote social, economic, and environmental progress. The Company is committed to being a clean energy leader and delivering steady growth and returns to shareholders. PGE is focused on working with customers, communities, policy makers, and other stakeholders to deliver affordable, safe, reliable electricity service to all, while increasing opportunities to deliver clean and renewable energy, reducing GHG emissions, and responding to evolving customer expectations. At the same time, the Company is building an increasingly smart, integrated, and interconnected grid that spans from residential customers to other utilities within the region. PGE is transforming all aspects of its business to empower its workforce to be even more results oriented to serve customers well. To create a clean energy future, PGE is focused on the following strategic imperatives:

Previous wording

•Decarbonize Power—Reduce greenhouse gas (GHG) emissions associated with electricity served to retail customers by at least 80% by 2030 and 100% by 2040;

Current wording

•Decarbonize Power—Reduce GHG emissions associated with electricity served to retail customers by at least 80% by 2030 and 100% by 2040;

Previous wording

State-mandated GHG emissions reduction targets—In June 2021, the Oregon legislature passed House Bill (HB) 2021, establishing a 100% clean electricity by 2040 framework for PGE and other investor-owned utilities and electric service suppliers in the State. A number of provisions in the bill align with PGE’s strategic direction and highlight Oregon’s ambitious, economy-wide goals to combat climate change. The GHG emissions reduction targets applicable to these regulated entities are an 80% reduction in GHG emissions by 2030, 90% by 2035, and 100% by 2040 and every year thereafter. For more information regarding HB 2021 and the baseline to which the target reductions apply, see“HB 2021” in the “Laws and Regulations” section of this Overview.

Current wording

State-mandated GHG emissions reduction targets—In 2021, the Oregon legislature passed House Bill (HB) 2021, establishing a 100% clean electricity by 2040 framework for PGE and other investor-owned utilities and electric service suppliers in the State. A number of provisions in the bill align with PGE’s strategic direction and highlight Oregon’s ambitious, economy-wide goals to combat climate change. The GHG emissions reduction targets applicable to these regulated entities are an 80% reduction in GHG emissions by 2030, 90% by 2035, and 100% by

Previous wording

Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 228 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.

Current wording

Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 230 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.

Previous wording

As of June 30, 2024, the Green Future Impact Program has an approved capacity of 750 MW nameplate. Through this voluntary program, the Company seeks to support customers’ clean energy acceleration.

Current wording

As of September 30, 2024, the Green Future Impact Program has an approved capacity of 750 megawatts (MW) nameplate, of which 482 megawatts (MW) have been subscribed. Through this voluntary program, the Company seeks to support customers’ clean energy acceleration.

Previous wording

The Climate Pledge—In 2021, PGE joined The Climate Pledge, a commitment to be net-zero annual carbon emissions by 2040, which is a decade ahead of the Paris Agreement’s goal of 2050. As a signatory to The Climate Pledge, PGE agrees to: i) measure and report GHG emissions on a regular basis; ii) implement decarbonization strategies in line with the Paris Agreement through real business changes and innovations, including efficiency improvements, renewable energy, materials reductions, and other carbon emission elimination strategies; and iii) neutralize any remaining emissions with additional, quantifiable, real, permanent, and socially-beneficial offsets.

Current wording

The Climate Pledge—In 2021, PGE joined The Climate Pledge, a commitment to be net-zero annual carbon emissions by 2040, which is a decade ahead of the Paris Agreement’s goal of 2050. As a signatory to The Climate Pledge, the Company agrees to: i) measure and report GHG emissions on a regular basis; ii) implement decarbonization strategies in line with the Paris Agreement through real business changes and innovations, including efficiency improvements, renewable energy, materials reductions, and other carbon emission elimination strategies; and iii) neutralize any remaining emissions with additional, quantifiable, real, permanent, and socially-beneficial offsets.

Previous wording

Severe weather—In recent years, PGE’s territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. On January 13, 2024, the Company’s service territory encountered the first of a series of severe winter weather events, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section of this Item 2. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.

Current wording

Severe weather—In recent years, PGE’s service territory has experienced unprecedented heat, historic ice and snowstorms, and wildfires. Beginning January 13, 2024, the Company’s service territory encountered a severe winter weather event, including snow, ice, and high winds that caused catastrophic damage to physical assets and resulted in widespread customer power outages. For more information regarding the January 2024 severe winter weather event, see “Declared States of Emergency” within this Overview section. In August 2023 the region experienced a record-breaking heat wave with temperatures reaching all-time recorded highs for the month. This resulted in a peak load demand of 4,498 MW, exceeding the Company’s previous all-time peak load demand, and surpassing the prior summer peak load by nearly 6%. The increase and severity of weather events highlights the importance of combating the effects of climate change through decarbonizing the power supply and investing in a more reliable and resilient grid.

Previous wording

The Resource Planning Process— PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to meet the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was filed in connection with, the Company’s 2023 Integrated Resource Plan (IRP). PGE filed its first combined IRP and CEP with the OPUC in March 2023. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to the new HB 2021 emissions reduction requirements.

Current wording

Resource Planning Process— PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to meet the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was filed in connection with, the Company’s 2023 Integrated Resource Plan (IRP). PGE filed its first combined IRP and CEP with the OPUC in March 2023. That filing projected PGE’s resource and capacity needs over the next

Previous wording

PGE estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to meet the Company’s 2030 emissions reduction target. Through the 2021 All-Source RFP, PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.

Current wording

PGE estimates a total resource need of approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity in order to meet the Company’s 2030 emissions reduction target. Through the 2021 All-Source Request for Proposals (RFP), PGE procured 311 MW of wind resources and 475 MW of capacity, leaving a remaining need to procure approximately 2,700 to 3,700 MW.

Previous wording

On January 25, 2024, the OPUC acknowledged PGE’s 2023 IRP, subject to certain conditions, providing regulatory support for the Company to pursue the near-term resource additions articulated in the Action Plan. However, the OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the combined CEP/IRP Update to be filed in the first quarter of 2025. PGE will continue to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP.

Current wording

The OPUC declined to acknowledge the CEP, directing the Company to provide additional forecast of its emission reductions based on new analysis in the combined CEP/IRP Update to be filed in the first quarter of 2025. PGE has continued to pursue its 2023 All-Source RFP while revising forecasts of emissions in the CEP.

Previous wording

Pursuant to the 2021 All-Source RFP process, seeking approximately 1,000 MW of renewable resources and non-emitting dispatchable capacity, PGE entered into agreements to acquire resources as follows:

Current wording

Pursuant to the 2021 All-Source RFP process, which sought approximately 1,000 MW of renewable resources and non-emitting dispatchable capacity, PGE entered into agreements to acquire resources as follows:

Previous wording

•Clearwater Wind Development (Clearwater)—PGE and NextEra Energy Resources, LLC, a subsidiary of NextEra Energy, Inc. entered into agreements to construct a 311 MW wind energy facility in Eastern Montana. PGE owns 208 MW of production capacity of the facility. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA. The company owned portion of the project was placed in-service during the first quarter of 2024 with a total cost of $424 million, including AFUDC.

Current wording

•Clearwater Wind Development (Clearwater)—PGE and NextEra Energy Resources, LLC, a subsidiary of NextEra Energy, Inc. entered into agreements to construct a 311 MW wind energy facility in Eastern Montana. PGE owns 208 MW of production capacity of the facility. Subsidiaries of NextEra Energy Resources, LLC, which operates the facility, owns the remaining 103 MW of production capacity and sells their portion of the output to PGE under a 30-year PPA. The company owned portion of the facility was placed in-service during the first quarter of 2024. As of September 30, 2024, the Company has recorded $418 million in Electric Utility Plant, net, including Allowance for funds used during construction (AFUDC).

Previous wording

•Seaside Grid—PGE entered into an agreement to construct a 200 MW Battery Energy Storage System (BESS) in Portland, Oregon. PGE will own the resource, with an investment of approximately $360 million, excluding AFUDC. The project has an estimated commercial operation date of June 30, 2025. As of June 30, 2024, the Company has recorded $129 million, including AFUDC, in CWIP for the Seaside Grid.

Current wording

•Seaside Grid—PGE entered into an agreement to construct a 200 MW Battery Energy Storage System (BESS) in Portland, Oregon. PGE will own the resource, with an investment of approximately $360 million, excluding AFUDC. The project has an estimated commercial operation date of June 30, 2025. As of September 30, 2024, the Company has recorded $165 million, including AFUDC, in construction work-in-progress (CWIP) for the Seaside Grid.

Previous wording

•Constable BESS (formerly Evergreen)—PGE entered into an agreement to construct a 75 MW BESS in Hillsboro, Oregon. PGE will own the resource, with an investment of approximately $150 million, excluding AFUDC. The project has an estimated commercial operation date of December 31, 2024. As of June 30, 2024, the Company has recorded $103 million, including AFUDC, in CWIP for the Constable BESS.

Current wording

•Constable BESS (formerly Evergreen)—PGE entered into an agreement to construct a 75 MW BESS in Hillsboro, Oregon. PGE will own the resource, with an investment of approximately $150 million, excluding AFUDC. The project has an estimated commercial operation date of December 31, 2024. As of September 30, 2024, the Company has recorded$127 million, including AFUDC, in CWIP for the Constable BESS.

Previous wording

All BESS projects will be directly interconnected to PGE’s system. Emissions associated with energy used to charge the BESS are accounted for when they are emitted from the generating facility. BESS projects do not add incremental emissions to the grid, and therefore, are non-emitting dispatchable capacity resources. The BESS projects will qualify for the federal investment tax credit (ITC). The Clearwater agreements qualify for production tax credits (PTCs) and are eligible under Oregon’s Renewable Portfolio Standard (RPS). The agreements will be subject to prudency review by the OPUC.

Current wording

All BESS facilities will be directly interconnected to PGE’s transmission and distribution system. In the event emissions are associated with energy obtained to charge the BESS, they are accounted for when they are emitted from the generating facility. As such, BESS facilities do not add incremental emissions to the grid, and therefore, are non-emitting dispatchable capacity resources. The BESS facilities will qualify for the federal investment tax credit (ITC). The Clearwater agreements qualify for production tax credits (PTCs) and are eligible under Oregon’s Renewable Portfolio Standard (RPS). The agreements will be subject to prudency review by the OPUC.

Previous wording

PGE filed notice with the OPUC in January 2023 that an RFP in 2023 was needed to procure resources to meet a forecasted 2026 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP. PGE filed the draft 2023 All-Source RFP with the OPUC in May 2023 and regulatory approval was granted in January 2024. The Company issued the RFP to market on February 2, 2024, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation. Bids were submitted in the first quarter of 2024 and are currently being evaluated based on the OPUC-approved scoring methodology. PGE plans to file for acknowledgement of a proposed final shortlist in the third quarter of 2024 with a final selection currently planned for late 2024 or early 2025.

Current wording

PGE filed notice with the OPUC in January 2023 that an RFP was needed to procure resources to meet forecasted capacity shortfalls and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan. PGE filed the draft 2023 All-Source RFP with the OPUC in May 2023 and regulatory approval was granted in January 2024. The Company issued the 2023 All-Source RFP to market in February 2024, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.

Previous wording

PGE cannot predict the outcome of these proceedings or potential impact, if any, to its 2021 All-Source RFP process.

Current wording

Both the 2021 and 2023 RFPs are the subject of regulatory and legal challenges initiated by NewSun Energy LLC, focused on the scoring methodology of the RFPs and OPUC acknowledgement of the final shortlists. PGE has joined these proceedings as an intervenor, and the challenges are in various stages of litigation or regulatory review. PGE cannot predict the outcome of these proceedings or potential impact, if any, to either its 2021 or 2023 All-Source RFP processes.

Previous wording

In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, and address growing customer demand.

Current wording

In alignment with local and regional transmission plans, the 2023 IRP Action Plan, and CEP, PGE is evaluating and implementing upgrades to existing transmission resources and expansions of current transmission networks. Transmission resource actions are intended to alleviate congestion, improve regional adequacy and reliability, enable decarbonization goals, increase access to renewable generation, and address growing customer demand.

Previous wording

On May 28, 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties will now work to finalize definitive agreements regarding the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project.

Current wording

On May 28, 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties have entered negotiations with the U.S. DOE to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. On August 6, 2024, the project was awarded a $700 million grant from the U.S. Department of Energy’s Grid Resilience and Innovation Partnerships program to further support its development and would reduce the overall total investment of the project.

Previous wording

The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. The transmission line would provide PGE with 600 MW of transfer capacity, access to diverse energy resources, enhanced wholesale markets, and ease congestion on the existing western transmission system.

Current wording

The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. The transmission line would provide PGE with 600 MW of transfer capacity, access to diverse energy resources, and enhanced wholesale markets, and ease congestion on the existing western transmission system.

Previous wording

•U.S. Department of Energy (DOE) Bethel-Round Butte Transmission Line Upgrade—The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), in partnership with PGE, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project will accelerate the development of transmission capacity, enabling new carbon-free generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS Tribal communities by increasing resources available to CTWS to support adaptation and response strategies. The U.S DOE, CTWS, and PGE are negotiating the final funding and scope for the line upgrade as part of a multi-year process.

Current wording

The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), in partnership with PGE, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project will accelerate the development of transmission capacity, enabling new carbon-free generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to CTWS to support adaptation and response strategies. See“Federal Grants” in this Overview for further discussion.

Previous wording

•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by state law, to coordinate activities across the Company and with state-wide stakeholders. The 2024 WMP forecasts $45 million in operations and maintenance costs and an additional $43 to $49 million in capital investments in the current year to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by reducing the risk that the Company’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the six months ended June 30, 2024, PGE invested $15 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2024 WMP.

Current wording

•Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. The 2024 WMP forecasts $45 million in operations and maintenance costs and an additional $43 to $49 million in capital investments in the current year to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by reducing the risk that the Company’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the nine months ended September 30, 2024, PGE invested $30 million in capital projects related to wildfire mitigation and resiliency and utility asset management, consistent with the 2024 WMP.

Previous wording

•Virtual Power Plant (VPP)—PGE’s VPP is a production resource comprised of Distributed Energy Resources (DERs) and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to energy efficiency and flexible load programs, rooftop solar, battery storage, and electric vehicle charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These DERs and flexible loads are the foundation of PGE’s VPP that will provide a growing suite of grid and system services over time. When coordinated through the Company’s DER Management Systems, the various DERs and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. In 2023, PGE saw record energy demand of 4,498 MW on August 14. Customer actions that day, orchestrated through the VPP, reduced load by more than 90 MW, helping avoid customer service interruptions and reducing exposure to scarcity pricing in energy markets.

Current wording

•Virtual Power Plant (VPP)— PGE’s VPP is a production resource comprised of Distributed Energy Resources (DERs) and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. These DERs and flexible loads are the foundation of PGE’s VPP that will provide a growing suite of grid and system services over time. When coordinated through the Company’s DER Management Systems, the various DERs and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. Customer participation in the VPP helps avoid customer service interruptions and reduces exposure to scarcity pricing in energy markets. On August 14, 2023, customer actions, orchestrated through the VPP, reduced load by more than 90 MW. On July 8, 2024, increased participation reduced load by more than 100 MW. As their participation in PGE’s VPP grows, customer actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.

Previous wording

•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. While the OPUC Staff is in the process of reviewing whether to modify the current DSP guidelines, PGE plans to file its next DSP in the fourth quarter of 2024. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as electric vehicles (EVs) and Solar Photovoltaic installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in meeting PGE’s clean energy goals.

Current wording

•Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. While the OPUC Staff finalizes their review of potential modifications to the current DSP guidelines, PGE plans to file its next DSP in the fourth quarter of 2024. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and Solar Photovoltaic installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in meeting PGE’s clean energy goals.

Previous wording

Transportation electrification is one of the most significant ways to reduce GHG emissions in Oregon. PGE is engaged with customers and communities to manage EV charging load, develop infrastructure projects aimed at improving accessibility to electric vehicle charging stations, build fleet partnerships, and offer programs to encourage customers to advance transportation electrification.

Current wording

Transportation electrification (TE) is one of the most significant ways to reduce GHG emissions in Oregon. PGE is engaged with customers and communities to manage EV charging load, develop infrastructure projects aimed at improving accessibility to EV charging stations, build fleet partnerships, and offer programs to encourage customers to advance transportation electrification.

Previous wording

In 2021, the Oregon legislature enacted HB 2165, ensuring the OPUC has clear and broad authority to allow electric company investments in infrastructure to support transportation electrification.

Current wording

In 2021, the Oregon legislature enacted HB 2165, ensuring the OPUC has clear and broad authority to allow electric company investments in infrastructure to support TE.

Previous wording

In 2023, PGE’s second Transportation Electrification (TE) plan was filed and accepted by the OPUC. This second TE plan considers current and planned activities, along with forecasted EV loads and potential system impacts. The 2023 TE plan represents a continuation of the approach and programmatic efforts found within PGE’s 2019 TE plan while also outlining the Company’s current strategy to integrate TE into utility business in order to plan, service, and manage EV load.

Current wording

In 2023, PGE’s second TE plan was filed and accepted by the OPUC. This second TE plan considers current and planned activities, along with forecasted EV loads and potential system impacts. The 2023 TE plan represents a continuation of the approach and programmatic efforts found within PGE’s 2019 TE plan while also outlining the Company’s current strategy to integrate TE into utility business in order to plan, service, and manage EV load.

Previous wording

As of June 30, 2024, PGE has been associated with the submission of 38 grant applications as the Prime or Sub-recipient/Supporter and has been awarded 11 grants totaling $307.8 million, including the following:

Current wording

As of September 30, 2024, PGE has been associated with the submission of 42 grant applications as the Prime or Sub-recipient/Supporter and has been awarded 16 grants totaling $319 million, including the following:

Previous wording

•U.S. DOE Smart Grid Chip—The U.S. DOE selected a PGE led consortium for a $50 million grant for the Smart Grid Chip project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency. The DOE and PGE are negotiating the final funding and scope for the line upgrade as part of a multi-year process.

Current wording

•U.S. DOE Grid Edge Devices—The U.S. DOE selected a PGE led consortium for a $50 million grant for the Grid Edge Devices project. The project will enable real-time information at each meter to improve the visibility of the electrical system to grid operators, providing detection of potential operational problems and shorten outage times, ultimately helping to anticipate and mitigate the impacts of extreme weather on grid resiliency.

Previous wording

PGE is in the process of assessing the impacts of these federal grants on the Company’s results of operations. Although PGE continues to apply for additional grants, the Company cannot predict the ultimate timing and success of securing funding from federal programs.

Current wording

PGE is in the process of assessing the impacts of these federal grants on the Company’s financial position and results of operations. Although PGE continues to apply for additional grants, the Company cannot predict the ultimate timing and success of securing funding from federal programs.

Previous wording

The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. On December 12, 2023, PGE received approval from the OPUC to transfer 2023 production tax credits and record any difference in the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, PGE transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 16, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference in the full value and the discounted value in a property balancing account. PGE has entered into an agreement to transfer 2024 and 2025 PTCs and expects to generate and transfer approximately $58 million in PTCs in 2024.

Current wording

The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer. In December 2023, PGE received approval from the OPUC to transfer 2023 PTCs and record any difference between the full value and the discounted value in a property balancing account. Consistent with options available under the IRA, the Company transferred 2023 credits with the final transfer occurring in the first quarter of 2024. On April 16, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. PGE has entered into an agreement to transfer 2024 and 2025 PTCs and expects to generate and transfer approximately $58 million in PTCs in 2024.

Showing the first 40 of 104 pairs. Open the source sections for the rest.

Rearranged current paragraphs (5)

Current report — wording carried from elsewhere

Company’s inability to recover project costs or impact PGE’s competitive position, market share, or results of operations in a material way;

Current report — wording carried from elsewhere

2040 and every year thereafter. For more information regarding HB 2021 and the baseline to which the target reductions apply, see“HB 2021” in the “Laws and Regulations” section of this Overview.

Current report — wording carried from elsewhere

20 years and proposed an Action Plan to meet near-term needs, subject to the HB 2021 emissions reduction requirements.

Current report — wording carried from elsewhere

Additional details of the 2023 RFP (OPUC Docket UM 2274) are available on the OPUC website at www.oregon.gov/puc.

Current report — wording carried from elsewhere

•U.S. Department of Energy (DOE) Bethel-Round Butte Transmission Line Upgrade—The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), in partnership with PGE, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The U.S DOE, CTWS, and PGE are negotiating the final funding and scope for the line upgrade as part of a multi-year process. See“Transmission Upgrades” in this Overview for further discussion.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Forward-looking statements are not guarantees of future performance and involve risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed. Portland General Electric Company’s

Previous report — wording carried elsewhere

PGE ceased coal fired operation at its Boardman generating facility (Boardman) in 2020 and decommissioning of the plant is substantially complete. The Company has a 20% ownership share in Colstrip Units 3 and 4 coal-fired generation plant (Colstrip) and, in response to SB 1547, has accelerated depreciation of Colstrip to December 31,

Previous report — wording carried elsewhere

December 31, 2022, with OPUC approval, PGE is collecting $5 million in customer prices over a one-year period that began January 1, 2024.