VISTA GOLD CORP
For the period ended Mar 31, 2025. Filed May 1, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2025 · Filed May 1, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-10-23.
0000783324-24-000080
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-05-01.
0000783324-25-000028
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 104 previous paragraphs and 98 current paragraphs.
61 unchanged; 26 reworded; 10 added; 15 removed; 2 previous and 1 current paragraphs rearranged.
Tables are not compared: 103 previous and 102 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (10)
Current report
We are building on the strengths of Mt Todd and working to position it as a leading development opportunity within the gold sector. We expect continued strength in the gold price.
Current report
The Company undertook a drilling program during 2024 with a total of 34 holes for 6,776 meters drilled. The program was completed in December 2024 at a cost of $1,891. Results of the program indicate the potential to increase gold mineral reserves in the Batman deposit. The results also successfully delineated the near surface portion of the South Cross Lode (“SXL”) over a 400-meter strike length. These drill results, and those from the 2020-2022 drilling program, will be included in the block model for the updated Mt Todd mineral resources estimate and 2025 FS.
Current report
The 2024 FS included mineral resource and mineral reserve estimates pursuant to Item 1300 of Regulation S-K (“S-K 1300”) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and Canadian Institute of Mining Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition Standards”) based on mine plans developed using a gold price in line with current market conditions at the time of the study.
Current report
In addition to the technical advancements of the Project, Vista has all major operating and environmental permits necessary to initiate development of Mt Todd. We have invested significant resources in water treatment and management, and environmental and social programs. We believe this has benefited our relationships with the traditional landowners, local communities, and Northern Territory, creating a strong social license.
Current report
Exploration, property evaluation and holding costs were $1,538 and $752 for the three months ended March 31, 2025 and 2024, respectively. The increase in 2025 was primarily attributable to $739 of expenses related to the 2025 FS, partially offset by lower drilling expenses of $390. The Company also capitalized $354 less of development costs in 2025.
Current report
Interest income was $169 and $103 for the three months ended March 31, 2025 and 2024, respectively. The increase in the 2025 period was due to a higher average cash balance, which resulted primarily from the proceeds received under a royalty agreement with Wheaton Precious Metals Corp in relation to Mt Todd (the “Royalty Agreement”). For additional information regarding the terms of the Royalty Agreement, see Note 6 to the Company’s unaudited condensed consolidated financial statements for the three months ended March 31, 2025.
Current report
Net cash used in operating activities was $1,820 and $1,318 for the three months ended March 31, 2025 and 2024, respectively. The increase in operating cash outflows largely resulted from higher expenditures for project programs that were expensed rather than capitalized, partially offset by sources of cash resulting from changes in working capital of $253.
Current report
The Company commenced the 2025 FS in December 2024 after completing several trade-off studies. Work is progressing as planned, with completion anticipated mid-2025.
Current report
The objective of the 2025 FS is to present an alternative development strategy based on a processing throughput rate of 15,000 tpd, compared to the 50,000 tpd 2024 FS. Vista has established several priorities for the current study:
Current report
The Mt Todd resource block model has been updated to incorporate data from the Company’s 2020-2022 and 2024 drilling programs. An updated mineral resource estimate will be completed as part of the 2025 FS. The updated resource block model will be used as the basis for the new mine plan in the 2025 FS.
Removed paragraphs (15)
Previous report
We are positioning Mt Todd as a leading development opportunity within the gold sector. Our strategy is to advance Mt Todd in ways that efficiently position the project for development while exercising the discipline necessary to best realize value at the right time.
Previous report
We expect continued strength in the gold price and believe that shovel-ready projects like Mt Todd are especially attractive development opportunities in the current environment of a strong gold market, diminishing major deposit discoveries, and depleting gold reserves.
Previous report
The Company undertook a drilling program earlier this year in connection with the technical studies for an alternative scale development plan. This planned 6,000-7,000 meter program is nearing completion and is expected to have a total cost of approximately $2,000. To date, this drilling program has successfully confirmed the extension of the core zone and the
Previous report
mineralized boundaries in the northern section of the Batman deposit and identified multiple high-grade intercepts in the South Cross Lode zone, a narrower mineralized structure adjacent to the Batman deposit that extends up to 400 meters to the northeast. Our geologists are presently working to understand the open pit and underground mining potential of this zone and develop a model for future exploration in this zone along with other known higher-grade targets northeast of the Batman deposit. For additional information on the Company’s recent exploration drilling results, see the Company’s news release dated September 14, 2024 available at www.sec.gov and under our profile at www.sedarplus.ca. This news release is referenced for informational purposes only and is not incorporated by reference into this quarterly report on Form 10-Q and should not be considered part of this or any other report filed with the SEC.
Previous report
The Batman deposit at Mt Todd hosts proven and probable mineral reserves of 6.98 million ounces as reported in the March 2024 feasibility study (the “Mt Todd FS”). There is opportunity to add gold mineral resources beyond presently defined mineral reserves through further exploration. Exploration at Mt Todd has identified additional growth targets immediately outside the Batman deposit along a 5.4 kilometer trend within the Company’s mining licenses and other precious and base metals prospects within the broader footprint of the Company’s exploration licenses.
Previous report
The Mt Todd FS was completed in conjunction with our annual reporting of mineral resources and mineral reserves as disclosed in the Company’s Annual Report on Form 10-K for the year ended December 31, 2023, as required pursuant to Item 1300 of Regulation S-K (“S-K 1300”) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”). The updated feasibility study reflects changes in project economics since the feasibility study filed in February 2022. Material capital and operating cost components were updated with quotes obtained in the first quarter of 2024. The updated study also reflects the outlook for the long-term gold price and foreign exchanges rates as of the first quarter of 2024, and the Royalty (as defined below). Mt Todd mineral resources and mineral reserves, mine plans, gold recoveries, and gold production schedules remain unchanged.
Previous report
Gain on Grant of Royalty Interest in Mineral Titles
Previous report
The Company recognized a gain on grant of royalty interest in mineral titles of $16,909 in June 2024. The gain comprises the previously deferred gain on instalment payments totaling $10,000 and the gain on $10,000 received for the final instalment, net of the associated mineral property carrying value of $3,091 as of the date the final instalment was received.
Previous report
Exploration, property evaluation and holding costs were $1,099 and $848 for the three months ended September 30, 2024 and 2023, respectively; and $2,509 and $2,334 for the nine months ended September 30, 2024 and 2023, respectively. The increase in 2024 for the comparable three-month and nine-month periods was primarily attributable to expenses related to the 2024 drilling program that did not qualify as development drilling and greater focus by corporate personnel on site-related projects.
Previous report
Interest income was $230 and $68 for the three months ended September 30, 2024 and 2023, respectively; and $496 and $207 for the nine months ended September 30, 2024 and 2023, respectively. The increases in the 2024 periods were due to higher average cash balances, which resulted primarily from the proceeds received under the Royalty Agreement (as defined below).
Previous report
Net cash used in operating activities was $3,808 and $4,090 for the nine months ended September 30, 2024 and 2023, respectively. The decrease in operating cash outflows largely resulted from net changes in working capital components and capitalization of direct labor costs associated with the development drilling program that were recognized as investing activities.
Previous report
The Company announced the results of updated SK-1300 and NI 43-101 feasibility studies in March and April 2024, respectively. The updated feasibility studies reflect changes in project economics since the feasibility study report filed in February 2022. Material capital and operating cost components have been updated with quotes obtained during the first quarter of 2024. The studies reflect the current outlook for the long-term gold price and foreign exchange rates, and the Wheaton Royalty. Mt Todd mineral resources and mineral reserves, mine plans, gold recoveries, and gold production schedules remain unchanged. The technical data and economic conclusions of the NI 43-101 report are materially identical to the results of the S-K 1300 report, with differences in the formatting of the reports and details of certain assumptions resulting only from the respective disclosure requirements of NI 43-101 and S-K 1300.
Previous report
In December 2023, the Company announced a royalty agreement with Wheaton Precious Metals Corp. (the “Royalty Agreement” and “Wheaton”) whereby Vista granted a 1% gross revenue royalty, subject to adjustment, on future gold production from Mt Todd to Wheaton in exchange for cash payments totaling $20 million (the “Royalty”). As of June 30, 2024, the entire $20 million had been received by Vista.
Previous report
The Company undertook a drilling program earlier this year as a precursor to beginning a feasibility study for an alternate development plan. This program is nearing completion of the planned 6,000-7,000 meter program. To date, this drilling program has successfully confirmed the extension of the core zone and the mineralized boundaries in the northern section of the Batman deposit and identified multiple high-grade intercepts in the South Cross Lode zone, a narrower mineralized structure that intersects the Batman deposit and extends up to 400 meters northeast.
Previous report
The Northern Territory’s Aboriginal Areas Protection Authority (“AAPA”) is investigating the potential surface impacts of drilling undertaken by Vista from 2020 through 2022. The Company is cooperating with the AAPA.
Reworded paragraphs (26)
Previous wording
The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements for the three and nine months ended September 30, 2024, and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States. This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors. See section heading “Note Regarding Forward-Looking Statements” below.
Current wording
The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements for the three months ended March 31, 2025, and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors. See section heading “Note Regarding Forward-Looking Statements” below.
Previous wording
Our flagship asset is the Mt Todd Gold Project (“Mt Todd” or the “Project”), a shovel-ready development-stage gold deposit located in the Tier-1 jurisdiction of Northern Territory, Australia (the “NT”). Mt Todd offers significant scale, development optionality, growth opportunities, advanced local infrastructure, community support, and demonstrated economic feasibility.
Current wording
Our flagship asset is the Mt Todd Gold Project (“Mt Todd” or the “Project”), a ready-to-build development-stage gold deposit located in the Tier-1 jurisdiction of Northern Territory, Australia (the “NT”). Mt Todd offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility.
Previous wording
The Project offers strategic optionality through development as a large or mid-scale project and has all major operating and environmental permits necessary to initiate development. A feasibility study for Mt Todd was completed in 2022 with project costs updated in 2024 demonstrating strong economics for development of a 50,000 tonnes per day (“ktpd”), nominally 17.5 million tonnes per annum (“mtpa”), operation.
Current wording
The Project offers strategic optionality through development as a large or mid-scale project and has all major operating and environmental permits necessary to initiate development. A feasibility study for Mt Todd was completed in 2022, with material project costs and economic returns updated in 2024 (the “2024 FS”). The 2024 FS demonstrated strong economics for development of a 50,000 tonnes per day (“tpd”), nominally 17.5 million tonnes per annum (“tpa”), operation.
Previous wording
In view of the substantial investment required to develop Mt Todd as a large-scale project, we completed an internal scoping study in 2023 for an alternative 15 ktpd operation, nominally 5.2 mtpa. A project of this scale could reduce financing, development, and operating risks.
Current wording
Given the substantial investment required to develop Mt Todd as a large-scale project, we completed an internal scoping study in 2023 for an alternative 15,000 tpd operation, nominally 5.2 million tpa. In 2024, we undertook additional internal assessments and trade-off studies to evaluate the economic potential for a range of processing and mining rates. The assessments identified the 15,000 tpd operation as the optimal alternative scale project. A project of this scale could reduce financing, development, and operating risks.
Previous wording
We are finalizing trade-off studies and preliminary evaluations for Mt Todd and anticipate moving forward with a feasibility study targeting throughput in the range of 12-17 ktpd (4-6 mtpa), with 150,000 to 200,000 ounces (150-200 “koz”) of annual gold production, an initial capital cost of less than $400 million, and a mineral reserve grade of approximately 1 gram gold per tonne (“g Au/t”). By using contract mining, third-party power generation, and construction practices commonly used in Australia, we believe there is opportunity to maintain high capital efficiency at this project scale. The feasibility study will leverage prior technical studies and the work completed for the 50 ktpd feasibility study, preserve the potential for future expansion, and demonstrate the opportunity for Mt Todd to deliver substantial economic returns in a range of development scenarios. A decision to commence the feasibility study is expected prior to the end of the year.
Current wording
In December 2024, Vista commenced a new Mt Todd feasibility study focused on developing a 15,000 tpd or 5.2 million tpa operation (the “2025 FS”). The study aims to increase the reserve grade to 1 gram gold per tonne (“g Au/t”) by applying a higher cut-off grade. It will also incorporate mine scheduling optimization strategies that prioritize higher grade ore during the early years of operation. The study targets initial capex of about $400 million, a 60% reduction compared to the previous study. Projected average annual gold production ranges from 150,000 – 200,000 ounces. By using contract mining, third-party power generation, and design/construction practices commonly used in Australia, we believe there is opportunity to maintain high capital efficiency at this project scale. The 2025 FS will leverage prior technical studies and the work completed for the 2024 FS, preserve the potential for future expansion, and demonstrate the opportunity for Mt Todd to deliver attractive economic returns. The 2025 FS is progressing as planned, with completion anticipated mid-2025.
Previous wording
The Company continues to prioritize a low overall spending profile and efficient use of resources to advance Mt Todd. Our funding strategy is to maintain adequate liquidity while minimizing dilution as we seek to preserve, enhance, and realize value from Mt Todd. The Company periodically raises funds in the capital markets and considers alternative strategies and possible corporate opportunities as means to enhance its liquidity and deliver shareholder value.
Current wording
The Company continues to prioritize the efficient use of resources to advance Mt Todd. Our funding strategy is to maintain adequate liquidity while minimizing share dilution as we seek to preserve, enhance, and realize value from Mt Todd. The Company periodically raises funds in the capital markets and considers alternative strategies and possible corporate opportunities as ways to enhance its liquidity and deliver shareholder value.
Previous wording
The Mt Todd FS contemplates a plant processing 50 ktpd and demonstrates the underlying value potential of a large-scale gold project. Highlights include:
Current wording
The 2024 FS contemplated a plant processing 50,000 tpd and demonstrated the underlying value potential of a large-scale gold project. Highlights include:
Previous wording
After completing the Mt Todd FS, the NT enacted the Mineral Royalties Act 2024 (“Royalties Act”) effective July 1, 2024. The Royalties Act replaces the prior net profits royalty regime with an ad valorem royalty regime for new mines. A 3.5% ad valorem royalty rate will be applied under the Royalties Act to gold production from Mt Todd. This represents a nearly
Current wording
After Vista completed the 2024 FS, the NT enacted the Mineral Royalties Act 2024 (“Royalties Act”) effective July 1, 2024. The Royalties Act replaces the prior net profits royalty regime with an ad valorem royalty regime for new mines. Under the Royalties Act, a 3.5% ad valorem royalty rate will be applied to gold production from Mt Todd. This represents a nearly 50% reduction in payable NT royalties compared to the 2024 FS and should result in improved project economics. Under the previous net profits royalty regime, our base case economic analysis at an $1,800 gold price estimated the payment of $765 million in NT royalties over the life of the mine.
Previous wording
The tables below present the estimated mineral resources and mineral reserves for the Project. The following mineral resources and mineral reserves were prepared in accordance with S-K 1300 as set forth in the Mt Todd FS, which is available as Exhibit 96.1 to the Company’s Annual Report on Form 10-K as filed with the SEC on March 14, 2024.
Current wording
The tables below present the estimated mineral resources and mineral reserves for the Project. The following mineral resources and mineral reserves were prepared in accordance with S-K 1300 as set forth in the 2024 FS, which is available as Exhibit 96.1 to the Company’s Annual Report on Form 10-K as filed with the SEC on March 14, 2024.
Previous wording
The Mt Todd FS is the technical report summary, prepared pursuant to S-K 1300, that was filed with the SEC on March 14, 2024 and is entitled “S-K 1300 Technical Report Summary – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia” with an effective date of March 12, 2024 and an issue date of March 14, 2024. The technical report summary remains current in all material respects.
Current wording
The 2024 FS is the technical report summary, prepared pursuant to S-K 1300, that was filed with the SEC on March 14, 2024 and is entitled “S-K 1300 Technical Report Summary – Mt Todd Gold Project – 50,000 tpd Feasibility Study –
Previous wording
A companion feasibility study for Canadian purposes, pursuant to National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), was prepared in accordance with Canadian Institute of Mining, Metallurgy and Petroleum definition standards (“CIM Definition Standards”) for reporting of mineral resources and mineral reserves and was filed on SEDAR on April 16, 2024 and is entitled “NI 43-101 Technical Report – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia” with an effective date of March 12, 2024 and an issue date of April 16, 2024. The companion report is referenced herein for informational purposes only. The mineral resources and mineral reserves for this report are the same as the mineral resources and mineral reserves for the report prepared in accordance with S-K 1300.
Current wording
A companion feasibility study for Canadian purposes, pursuant to National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), was prepared in accordance with CIM Definition Standards for reporting of mineral resources and mineral reserves and was filed on SEDAR on April 16, 2024 and is entitled “NI 43-101 Technical Report – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia” with an effective date of March 12, 2024 and an issue date of April 16, 2024. The companion report is referenced herein for informational purposes only. The mineral resources and mineral reserves for this report are the same as the mineral resources and mineral reserves for the report prepared in accordance with S-K 1300.
Previous wording
The Mt Todd FS is available for review at www.sec.gov and under our profile at www.sedarplus.ca. The Mt Todd FS is not incorporated by reference into this quarterly report on Form 10-Q.
Current wording
The 2024 FS is available for review at www.sec.gov and under our profile at www.sedarplus.ca. The 2024 FS is not incorporated by reference into this quarterly report on Form 10-Q.
Previous wording
Cash totaled $18,954 and working capital was $18,083 at September 30, 2024. See “Liquidity and Capital Resources”. The Company had no debt as of September 30, 2024.
Current wording
Cash totaled $14,970 and working capital was $13,974 at March 31, 2025. See “Liquidity and Capital Resources”. The Company had no debt as of March 31, 2025.
Previous wording
Consolidated net loss for the three months ended September 30, 2024 and 2023 was $1,638 and $1,454, or $0.01 and $0.01 per basic share, respectively. Consolidated net income (loss) for the nine months ended September 30, 2024 and 2023 was $12,922 and ($4,928), or $0.11 and ($0.04) per basic share, respectively. The principal components of the period-over-period changes are discussed below.
Current wording
Consolidated net loss for the three months ended March 31, 2025 and 2024 was $2,708 and $1,073, or $0.02 and $0.01 per basic share, respectively. The principal components of the period-over-period changes are discussed below.
Previous wording
Corporate administration costs were $720 and $666 during the three months ended September 30, 2024 and 2023, respectively; and $2,726 and $2,712 for the nine months ended September 30, 2024 and 2023, respectively. The increase in 2024 for the comparable three-month periods was partially due to personnel costs being higher by $67. The total expenses in the comparable nine-month periods were substantially unchanged.
Current wording
Corporate administration costs were $1,298 and $1,256 during the three months ended March 31, 2025 and 2024, respectively. The total expenses in the comparable three-month periods were substantially unchanged.
Previous wording
Net cash provided by (used in) investing activities was $16,139 and ($43) for the nine months ended September 30, 2024 and 2023, respectively. The Company received the second instalment payment of $7,000 and final instalment payment of $10,000 under the Royalty Agreement and $802 for the sale of certain used mill equipment, net of selling costs, in the 2024 period. These inflows were partially offset by expenditures for capitalized development drilling costs of $1,503.
Current wording
Net cash provided by (used in) investing activities was ($184) and $7,247 for the three months ended March 31, 2025 and 2024, respectively. Investing cash flows were higher in 2024 because the Company received the second Royalty Agreement instalment payment of $7,000 and $802 for the sale of certain used mill equipment, net of selling costs, both of which only occurred in 2024. These inflows were partially offset by expenditures for higher capitalized development costs of $354 in 2024.
Previous wording
During the nine months ended September 30, 2024 and 2023, net cash of $554 and $871, respectively, was provided by financing activities. Cash provided by financing activities during the nine months ended September 30, 2024 was $639 of net proceeds under the ATM Program (as defined below) offset by payments of $85 for employee withholding tax obligations in lieu of issuing common shares of the Company (“Common Shares”) earned from the vesting of restricted share unit awards. Cash provided by financing activities during the nine months ended September 30, 2023 was $1,013 of net proceeds under the ATM Program offset by payments of $142 for employee withholding tax obligations in lieu of issuing Common Shares earned from the vesting of restricted share unit awards.
Current wording
During the three months ended March 31, 2025 and 2024, net cash of $24 and ($85), respectively, was provided by/(used in) financing activities. Cash provided by financing activities during the three months ended March 31, 2025 was $269 of net proceeds under the ATM Program (as defined below) offset by payments of $245 for employee withholding taxes in lieu of issuing common shares of the Company (“Common Shares”) earned from the vesting of restricted share unit awards. Cash used by financing activities during the three months ended March 31, 2024 was for payments for employee withholding taxes in lieu of issuing Common Shares earned from the vesting of restricted share unit awards.
Previous wording
The Company considers available cash, cash equivalents, and any short-term investments to be its primary measure of liquidity. Our cash liquidity position as of September 30, 2024, comprising cash and cash equivalents of $18,954, reflected a net increase of $12,885 during the nine months ended September 30, 2024.
Current wording
The Company considers available cash, cash equivalents, and any short-term investments to be its primary measure of liquidity. Our cash liquidity position as of March 31, 2025, comprised cash and cash equivalents of $14,970, reflected a net decrease of $1,980 during the three months ended March 31, 2025.
Previous wording
Current assets, net of current liabilities (“Working Capital”), is a secondary measure of liquidity for the Company. The Company had Working Capital of $18,083 and $5,576 at September 30, 2024 and December 31, 2023, respectively.
Current wording
Current assets, net of current liabilities (“Working Capital”), is a secondary measure of liquidity for the Company. The Company had Working Capital of $13,974 and $16,457 at March 31, 2025 and December 31, 2024, respectively. This represents a net decrease of $2,483 during the three months ended March 31, 2025.
Previous wording
During the nine months ended September 30, 2024, the Company’s primary sources of cash inflows were: $17,000 from its grant of the Royalty on Mt Todd; $802 upon sale of a portion of its used mill equipment; $639 from equity financings, and $496 from interest income. As of September 30, 2024, Vista has received the entire $20,000 as set forth in the Royalty Agreement. Cash received from Wheaton is only for the purposes of advancing Mt Todd and general corporate purposes. These sources of cash were offset by net operating cash outflows of $3,808 and other expenditures of $1,748. Recurring costs for corporate administration and Mt Todd maintenance were most of the Company’s net operating cash outflows during the nine months ended September 30, 2024. Of the other expenditures, $1,503 related to Vista’s development drilling program at Mt Todd. Additional details regarding 2024 financial results are presented in the “Results from Operations” section above and the preceding discussions in this section regarding operating activities, investing activities, and financing activities.
Current wording
During the three months ended March 31, 2025, the Company’s primary sources of cash inflows were $269 from equity financing activity and interest income of $169. These sources of cash were offset by net operating cash outflows, excluding interest, of $1,989 and other expenditures of $429. Recurring costs for corporate administration and Mt Todd maintenance, and spending on project programs were most of the Company’s net operating cash outflows during the three months ended March 31, 2025. Of the other expenditures, $150 related to Vista’s mineral resources development activities at Mt Todd. Additional details regarding 2024 financial results are presented in the “Results from Operations” section above and the preceding discussions in this section regarding operating activities, investing activities, and financing activities.
Previous wording
For the ensuing 12 months following September 30, 2024, the Company estimates net recurring costs will be approximately $6,400, plus $4,200 relates to work plans at Mt Todd for the finalization of a 6,000-7,000-meter drilling program; purchase of equipment for a water evaporation system; various technical studies, and several planned maintenance projects. Management expects to fund Vista’s activities during the next twelve months from existing Working Capital and interest income.
Current wording
For the 12-month period following March 31, 2025, the Company estimates net recurring costs will be approximately $6,500, plus $3,000 related to work plans at Mt Todd for: the 2025 FS; purchase of equipment for expansion of Mt Todd’s enhanced water evaporation system; and various planned maintenance projects. Management expects to fund Vista’s activities during the next twelve months from existing Working Capital and interest income. Equity financing may also be utilized to supplement the Company’s Working Capital.
Previous wording
In addition to Vista’s existing capital resources, we are a party to an at-the-market offering agreement (the “ATM Agreement”) with H. C. Wainwright & Co., LLC (“Wainwright”) to provide balance sheet flexibility at a potentially lower cost than other means of equity issuances. Under the ATM Agreement, the Company can, but is not obligated to, issue and sell Common Shares through Wainwright for aggregate gross proceeds of up to $10,000 (the “ATM Program”). During the nine months ended September 30, 2024, the Company issued 1,018,564 Common Shares under the ATM Program for net proceeds of $639. As of September 30, 2024, $8,042 remained available under the ATM Program.
Current wording
Vista is a party to an at-the-market offering agreement (the “ATM Agreement”) with H. C. Wainwright & Co., LLC (“Wainwright”) to provide balance sheet flexibility at a potentially lower cost than other means of equity issuances. Under the ATM Agreement, the Company can, but is not obligated to, issue and sell Common Shares through Wainwright for aggregate gross proceeds of up to $8,000 (the “ATM Program”). During the three months ended March 31, 2025, the Company issued 400,000 Common Shares under the ATM Program for net proceeds of $269. As of March 31, 2025, $7,506 remained available under the ATM Program.
Previous wording
financing and sales of non-core assets, will be sufficient to fund our currently planned corporate expenses, Mt Todd holding costs, and anticipated discretionary programs for at least one year from the date of issuance of this quarterly report on Form 10-Q.
Current wording
We believe our Working Capital as of March 31, 2025, together with interest income, other potential future sources of financing and sales of non-core assets, will be sufficient to fund our currently planned corporate expenses, Mt Todd holding costs, and other anticipated Mt Todd programs for at least one year from the date of issuance of this quarterly report on Form 10-Q.
Previous wording
Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd. We seek to maintain adequate liquidity and minimize dilution as we advance our primary objective to maximize returns to our shareholders by preserving, enhancing, and realizing value from Mt Todd. Our funding strategy is to maintain a low expenditure profile, realize value from our remaining non-core assets and, when considered appropriate, issue additional equity or find other means of financing. Vista also considers possible corporate opportunities as a means to enhance our liquidity. The underlying value and recoverability of the amounts shown as mineral properties and plant and equipment as presented in our Condensed Consolidated Balance Sheets depend on market and industry conditions, our ability to attract sufficient capital resources to execute our strategy, and the ultimate success of our programs to enhance and realize value at Mt Todd.
Current wording
Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd. We seek to maintain adequate liquidity and minimize share dilution as we advance our primary objective to maximize returns to our shareholders by preserving, enhancing, and realizing value from Mt Todd. Our funding strategy is to maintain a low expenditure profile, realize value from our remaining non-core assets and, when considered appropriate, issue additional equity or utilize other means of financing. Vista also considers possible corporate opportunities as a means to enhance our liquidity. The underlying value and recoverability of the amounts shown as mineral properties and plant and equipment as presented in our Condensed Consolidated Balance Sheets depend on market and industry conditions, our ability to attract sufficient capital resources to execute our strategy, and the ultimate success of our programs to enhance and realize value at Mt Todd.
Previous wording
Vista expects to incur expenditures of approximately $2,500 for its Mt Todd site management and environmental stewardship activities and $4,200 for discretionary programs for the ensuing 12 months following September 30, 2024, most of which relates to the 2024 drilling program.
Current wording
Vista expects to incur expenditures of approximately $2,400 for its Mt Todd site management and environmental stewardship activities and $3,000 for discretionary programs for the ensuing 12 months following March 31, 2025, most of which relates to the 2025 FS.
Previous wording
This quarterly report on Form 10-Q contains “forward-looking statements” within the meaning of thePrivate Securities Litigation Reform Act of 1995 and forward-looking information under Canadian securities laws that are intended to be covered by the safe harbor created by such legislation. All statements, other than statements of historical facts, included in this quarterly report on Form 10-Q, our other filings with the Securities and Exchange Commission and Canadian securities commissions and in press releases and public statements by our officers or representatives that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements and forward-looking information, including, but not limited to, such things as those listed below.
Current wording
This quarterly report on Form 10-Q contains “forward-looking statements” within the meaning of thePrivate Securities Litigation Reform Act of 1995 and forward-looking information under Canadian securities laws that are intended to be covered by the safe harbor created by such legislation. All statements, other than statements of historical facts, included in this quarterly report on Form 10-Q, our other filings with the SEC and Canadian securities commissions and in press releases and public statements by our officers or representatives that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements and forward-looking information, including, but not limited to, such things as those listed below.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Northern Territory, Australia” with an effective date of March 12, 2024 and an issue date of March 14, 2024. The technical report summary remains current in all material respects.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
50% reduction in payable NT royalties compared to the Mt Todd FS and is expected to result in improved project economics. Under the previous net profits royalty regime, our base case economic analysis at an $1,800 gold price estimated the payment of $765 million in NT royalties over the life of the mine.
Previous report — wording carried elsewhere
We believe our Working Capital as of September 30, 2024, together with interest income, other potential future sources of