Item 1A. Risk Factors

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-25.

0000764622-26-000011

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 120 previous paragraphs and 115 current paragraphs.

91 unchanged; 21 reworded; 3 added; 7 removed; 1 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (3)

Current report

See “Business of Arizona Public Service Company — Environmental Matters” in Part I, Item 1 as well as Note 14 for examples of environmental laws and regulations and matters that could affect APS’s financial condition, results of operations and cash flows.

Current report

Modification of the ACC’s retail electric competition rules or other efforts of deregulation and other factors, such as customers installing behind the meter technologies or large customers developing large, utility scale generation projects to serve their energy needs, may result increased competition, which could have a significant adverse impact on APS’s business and results of operations.

Current report

Recent industry trends and projections of load growth reflect significant demand from data centers to support AI as well as onshoring of manufacturing, such as advanced semiconductor manufacturing. These data centers and large manufacturers may locate their operations within service territories other than our own. If they do choose to locate within our service territory, we may not be able to provide sufficient electric service within the time period they require due to capital or other constraints. APS may need to accelerate development plans of the related generation and transmission facilities to serve these potential customers, which may necessitate alternative financing structures, such as the novel subscription model we are pursuing in an effort to ensure growth pays for growth and reduce cross-subsidization of customer classes, as well as ACC approval. APS may not be able to secure facilities or regulatory approval to support these customers in a timely manner. Additionally, the future demand from these customers may not be realized to the extent currently projected and significant uncertainties exist regarding the future energy demand associated with data centers and AI. The difficulty in forecasting these demands and the additional risk of these arrangements could lead to stranded costs and other effects that could have material adverse impacts on APS’s financial condition, results of operations, and cash flows.
Removed paragraphs (7)

Previous report

Environmental Clean Up. APS has been named as a PRPfor Superfund sites in Phoenix, Arizona, and it could be named a PRP in the future for other environmental clean-up at sites identified by a regulatory body. APS cannot predict with certainty the amount and timing of all future expenditures related to environmental matters because of the difficulty of estimating clean-up costs. There is also uncertainty in quantifying liabilities under environmental laws that impose joint and several liability on all PRPs.

Previous report

Coal Ash. In December 2014, the EPA issued final regulations governing the handling and disposal of CCR, which are generated as a result of burning coal and consist of, among other things, fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste. APS disposes of CCR in ash ponds and dry storage areas. To the extent the rule requires the closure or modification of these CCR units, modification or changes to the manner of closure of such units, or the construction of new CCR units beyond what we currently anticipate, APS would incur significant additional costs for CCR disposal. In addition, the rule may also require corrective action to address releases from CCR disposal units or the presence of CCR constituents within groundwater near CCR disposal units above certain regulatory thresholds.

Previous report

Ozone National Ambient Air Quality Standards. In 2015, the EPA finalized revisions to the NAAQS for ozone, which set new, more stringent standards on emissions of nitrogen oxide, a precursor to ozone, in an effort to protect human health and human welfare. Depending on the final attainment designations for the new standards and the state implementation requirements, APS may be required to invest in new pollution control technologies and to generate emission offsets for new projects or facility expansions located in ozone nonattainment areas. In addition, the EPA may in the future further increase the stringency of various NAAQS, including for ozone or other pollutants, such as particulate matter. With regard to even more stringent NAAQS requirements, additional control measures and compliance costs may become necessary for APS as well as its current and potential future customers.

Previous report

In November 2018, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. On July 1 and July 2, 2019, ACC Staff issued a report and initial proposed draft rules regarding possible modifications to the ACC’s retail electric competition rules. On February 10, 2020, two ACC Commissioners filed two sets of draft proposed retail electric competition rules. On February 12,

Previous report

2020, ACC Staff issued its second report regarding possible modifications to the ACC’s retail electric competition rules. During a July 15, 2020, ACC Staff meeting, the ACC Commissioners discussed the possible development of a retail competition pilot program, but no action was taken. The ACC continues to discuss matters related to retail electric competition, including the potential for additional buy-through programs or other pilot programs. In April 2022, the Arizona Legislature passed, and the Governor signed, a bill that repealed the electric deregulation law that had been in place in Arizona since 1998. On August 27, 2024, the ACC administratively closed this docket due to inactivity and obsolescence. Modification of the ACC’s retail electric competition rules or other efforts of deregulation could result in increased competition, which could have a significant adverse impact on APS’s business and results of operations.

Previous report

Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra-large commercial energy users (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra-large energy users far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs; however, there are difficulties in properly forecasting the demands of these extra-large customers due to factors such as the nascent nature of the industries (e.g., artificial intelligence) that these customers are supporting and the multiple variables that impact their usage ramp-up and ultimate level of demand. As data center and other extra-large customer opportunities evolve and develop, we may also enter into arrangements with customers and potential customers that require us to invest capital and assume credit risk related to such developments and the related generation and transmission investments before we receive any potential return. APS is implementing strategies to attempt to reduce this risk; however, the difficulty in forecasting these demands and the additional risk of these arrangements could lead to stranded costs and other effects that could have material adverse impacts on APS’s financial condition, results of operations, and cash flows.

Previous report

Pending or future federal or state legislative or regulatory activity or court proceedings could increase the costs of providing medical insurance for our employees and retirees. Any potential changes and resulting cost impacts cannot be determined with certainty at this time.
Reworded paragraphs (21)

Previous wording

APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, labor and employment, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.

Current wording

APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, executive orders and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These laws, regulations, and agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, labor and employment, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.

Previous wording

Concern over climate change has led to significant legislative and regulatory efforts to limit CO 2, which is a major byproduct of the combustion of fossil fuel, and other GHG emissions.

Current wording

Concern over climate change has led to significant legislative and regulatory efforts to limit carbon dioxide, which is a major byproduct of the combustion of fossil fuel, and other GHG emissions.

Previous wording

Potential Financial Risks — Greenhouse Gas Regulation, the Clean Power Plan and Potential Litigation. On April 25, 2024, the EPA issued new GHG emission standards for power plants. These new standards are focused on limiting power plant GHG emissions through control mechanisms that can be implemented at individual power plant facilities. The new regulations are currently being challenged in federal court. Additionally, the Trump administration has stated that it intends to reverse or substantially revise these standards. See Item 1 - Environmental Matters - Climate Change for more information.

Current wording

Potential Financial Risks — GHG Regulation, the Clean Power Plan and Potential Litigation. On April 25, 2024, EPA issued new GHG emission standards for power plants. These new standards are focused on limiting power plant GHG emissions through control mechanisms that can be implemented at individual power plant facilities. The new regulations are currently being challenged in federal court and, in 2025, EPA proposed a rule to repeal these GHG emission standards. Additionally, the Trump administration has stated that it intends to reverse or substantially revise these standards. See “Business of Arizona Public Service Company — Environmental Matters — Climate Change” in Part I, Item 1 for more information.

Previous wording

APS owns certain of its power plants and transmission facilities jointly with other owners, with varying ownership interests in such facilities. Changes in the nature of our industry and the economic viability of certain plants and facilities, including impacts resulting from types and availability of other resources, fuel costs, legislation, and regulation, together with timing considerations related to the expiration of leases or other agreements for such facilities, could result in unaligned positions among co-owners. Differences in the co-owners’ willingness or ability to continue their participation could lead to the eventual shut down of units or facilities and uncertainty related to the resulting cost recovery of such assets. See Note 3 for a discussion of the Navajo Plant and Cholla retirement and the related risks associated with APS’s continued recovery of its remaining investment in the plant.

Current wording

APS owns certain of its power plants and transmission facilities jointly with other owners, with varying ownership interests in such facilities. Changes in the nature of our industry and the economic viability of certain plants and facilities, including impacts resulting from types and availability of other resources, fuel costs, legislation, and regulation, together with timing considerations related to the expiration of leases or other agreements for such facilities, could result in unaligned positions among co-owners. Differences in the co-owners’ willingness or ability to continue their participation could lead to the eventual shut down of units or facilities and uncertainty related to the resulting cost recovery of such assets. See Note 8 for a discussion of the Navajo Plant and Cholla retirements and the related risks associated with APS’s continued recovery of its remaining investment in the plant.

Previous wording

Deregulation or restructuring of the electric industry may result in increased competition, which could have a significant adverse impact on APS’s business and its results of operations.

Current wording

Deregulation or restructuring of the electric industry and other factors may result in increased competition, which could have a significant adverse impact on APS’s business and its results of operations.

Previous wording

Effects of Energy Conservation Measures and Distributed Energy Resources. APS customers in energy efficiency and conservation programs and other demand-side management efforts, which in turn impact the demand for electricity. APS must also meet certain distributed renewable energy requirements. A portion of APS’s total renewable energy requirement must be met with an increasing percentage of distributed renewable energy resources (generally, small-scale renewable technologies located on customers’ properties). The distributed renewable energy requirement is 30% of the applicable RES requirement for 2012 and subsequent years (APS requested a waiver of this requirement in the 2024 and 2025 RES Implementation Plans, which have not yet been approved by the ACC). Customer participation in distributed renewable energy programs would result in lower demand since customers would be meeting some of their own energy needs.

Current wording

Effects of Energy Conservation Measures and Distributed Energy Resources. APS customers participate in energy efficiency and conservation programs and other DSM efforts, which in turn impact the demand for electricity. APS must also meet certain distributed renewable energy requirements. A portion of APS’s total renewable energy requirement must be met with an increasing percentage of distributed renewable energy resources (generally, small-scale renewable technologies located on customers’ properties). The distributed renewable energy requirement is 30% of the applicable RES requirement for 2012 and subsequent years (APS was granted a waiver of this requirement in its 2026 RES Implementation Plan). Customer participation in distributed renewable energy programs would result in lower demand since customers would be meeting some of their own energy needs.

Previous wording

Actual and Projected Customer and Sales Growth. APS’s actual sales growth, excluding weather-related variations, may differ from its projections as a result of numerous factors, such as economic conditions, customer growth, the legal, regulatory, and business environment in Arizona, usage patterns and energy conservation, slower than expected ramp-up of and/or fewer than expected data centers and large manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $24 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $6 million.

Current wording

Actual and Projected Customer and Sales Growth. Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as macroeconomic conditions, current and future economic, regulatory, business, and other conditions, such as the Arizona housing market, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer large data centers and manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $25 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $7 million.

Previous wording

The operation of power generation, transmission and distribution facilities involves certain risks, including the risk of breakdown or failure of equipment, fuel interruption, and performance below expected levels of output or efficiency. Unscheduled outages, including extensions of scheduled outages due to mechanical failures or other complications, occur from time to time and are an inherent risk of APS’s business. Because our transmission facilities are interconnected with those of third parties, the operation of our facilities could be adversely affected by unexpected or uncontrollable events occurring on the larger transmission power grid, and the operation or failure of our facilities could adversely affect the operations of others. Concerns over the physical security of these assets could include damage to certain of our facilities due to vandalism or other deliberate acts that could lead to outages or other adverse effects. If APS’s facilities operate below expectations, especially during its peak seasons, it may lose revenue or incur additional expenses, including increased purchased power expenses.

Current wording

The operation of power generation, transmission and distribution facilities involves certain risks, including the risk of breakdown or failure of equipment, fuel interruption, and performance below expected levels of output or efficiency. Unscheduled outages, including extensions of scheduled outages due to mechanical failures or other complications, occur from time to time and are an inherent risk of APS’s business. Because our transmission facilities are interconnected with those of third parties, the operation of our facilities could be adversely affected by unexpected or uncontrollable events occurring on the larger transmission power grid, and the operation or failure of our facilities could adversely affect the operations of others. Concerns over the physical security of these assets could include damage to certain of our facilities due to vandalism or other deliberate acts that could lead to outages or other adverse effects. If APS’s facilities operate below expectations, especially during its peak season, it may lose revenue or incur additional expenses, including increased purchased power expenses.

Previous wording

Additionally, as APS’s transmission infrastructure ages and its transmission system needs grow to support growth in our territory and in the Southwest, it will need to replace and expand certain portions of its transmission infrastructure, which requires significant investment of capital. Risks related to the timely completion of, and costs associated with, these projects may be exacerbated by a constrained supply chain limiting the availability of necessary parts and materials as well as APS’s use, in some cases, of older, obsolete, or unsupported equipment. Certain replacements and expansions of the transmission infrastructure will also require the acquisition or renewal of land leases, easements, or other rights-of-way that may require approvals from landowners, including individuals, governmental agencies, and, at times, tribal nations. APS is unable to predict the outcomes of any pending or future required approvals, including any related costs, which could be significant. If APS is unable to successfully manage the replacement and expansion of its transmission infrastructure, it could face increased equipment failures, power quality challenges, reputational impact, and financial loss.

Current wording

Additionally, as APS’s transmission infrastructure ages and its transmission system needs to grow to support growth in our territory and in the Southwest, it will need to replace and expand certain portions of its transmission infrastructure, which requires significant investment of capital. Risks related to the timely completion of, and costs associated with, these projects may be exacerbated by a constrained supply chain limiting the availability of necessary parts and materials as well as APS’s use, in some cases, of older, obsolete, or unsupported equipment. Certain replacements and expansions of the transmission infrastructure will also require the acquisition or renewal of land leases, easements, or other rights-of-way that may require approvals from landowners, including individuals, government agencies, and, at times, tribal nations. APS is unable to predict the outcomes of any pending or future required approvals, including any related costs, which could be significant. If APS is unable to successfully manage the replacement and expansion of its transmission infrastructure, it could face increased equipment failures, power quality challenges, reputational impact, and financial loss.

Previous wording

The inability to successfully develop, acquire or operate generation resources to meet future resource needs and load forecasts in accordance with reliability requirements and other new or evolving standards and regulations could adversely impact our business.

Current wording

The inability to successfully develop, acquire or operate generation and transmission facilities to meet future resource needs and load forecasts in accordance with reliability requirements and other new or evolving standards and regulations could adversely impact our business.

Previous wording

Potential changes in regulatory standards, impacts of new and existing laws and regulations, including environmental laws and regulations, and the need to obtain various regulatory approvals create uncertainty surrounding our current and future generation portfolio. The current regulatory standards, laws, and regulations create strategic challenges as to the appropriate generation portfolio and fuel diversification mix. In addition, APS is required by the ACC to meet certain energy resource portfolio requirements, including those related to renewables development and energy efficiency measures, in addition to specific competitive resource procurement requirements. The development and operation of any generation facility is also subject to many risks, including those related to financing, siting, permitting, new and evolving technology, extreme weather events, workforce issues, cybersecurity attacks, supply chain constraints for critical spare parts, and the construction of sufficient transmission capacity to support these facilities among others. APS needs to develop or acquire new generation facilities, potentially modernize existing facilities, and/or contract for additional capacity in order to meet future resource needs and load forecasts. APS’s inability to do so could have a material adverse impact on our business and results of operations.

Current wording

Potential changes in regulatory standards, impacts of new and existing laws and regulations, including environmental laws and regulations, and the need to obtain various regulatory approvals create uncertainty surrounding our current and future generation portfolio. Current laws and regulations as well as changes to those laws and regulations, including via judicial decisions and executive orders, create strategic challenges in acquiring an appropriate generation portfolio and fuel diversification mix. APS is required by the ACC to meet certain energy resource portfolio requirements, including those related to renewables development and energy efficiency measures, in addition to specific competitive resource procurement requirements. Operating, maintaining, and developing our generation and other assets requires significant capital expenditures and operations and maintenance costs that may be difficult to maintain at adequate levels while maintaining reliability. The development and operation of these facilities is subject to other risks, including those related to financing, siting, permitting, new and evolving technology, extreme weather events, workforce issues, cybersecurity attacks, supply chain constraints for key equipment and critical spare parts, overreliance on or the existence of a small number of suppliers, access to fuel, and the construction of sufficient transmission capacity to support these facilities among others. Macroeconomic and geopolitical factors may also impact our ability to procure the generation and other equipment we need to meet customer demand. APS needs to develop or acquire new generation and other facilities, potentially modernize existing facilities, and/or contract for additional capacity in order to meet future resource needs and load forecasts. APS’s inability to do so could have a material adverse impact on our business and results of operations.

Previous wording

In January 2020, APS announced its goal to provide 100% clean, carbon-free electricity by 2050 with an intermediate 2030 target of achieving a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy. APS’s ability to successfully execute its clean energy commitment is dependent upon a number of external factors, some of which include supportive national and state energy policies, a supportive regulatory environment, sales and customer growth, the development, deployment and advancement of clean energy technologies, adequate supply chain for generation resources, and continued access to capital markets.

Current wording

In August 2025, APS announced an update to its clean energy goal from zero-carbon to carbon-neutral by 2050. APS’s ability to successfully execute its clean energy goal is dependent upon a number of external factors, some of which include supportive national and state energy policies, a supportive regulatory environment, sales and customer growth, the development, deployment and advancement of clean energy technologies, adequate supply chain for generation resources, and continued access to capital markets.

Previous wording

Assured supplies of water are important for APS’s generating plants. Water in the southwestern United States is limited, and various parties have made conflicting claims regarding the right to access and use such limited supplies of water. Both groundwater and surface water in areas important to the operation of APS’s generating plants have been and are the subject of inquiries, claims and legal proceedings. In addition, the region in which APS’s power plants are located suffers from prolonged drought conditions, which could potentially affect the plants’ water supplies. Climate change is also projected to exacerbate such drought conditions. In addition, Colorado River water supplies for Arizona are subject to a Tier 1 shortage declaration, which substantially limits the quantity of water available for the state. APS’s inability to access sufficient supplies of water, along with that of its customers, could have a material adverse impact on our business and results of operations.

Current wording

Assured supplies of water are important for APS’s generating plants. Water in the southwestern United States is limited, and various parties have made conflicting claims regarding the right to access and use such limited supplies of water. Both groundwater and surface water in areas important to the operation of APS’s generating plants have been and are the subject of inquiries, claims and legal proceedings. In addition, the region in which APS’s power plants are located suffers from prolonged drought conditions, which could potentially affect the plants’ water supplies. Climate change is projected to exacerbate such drought conditions. Colorado River water supplies for Arizona are subject to shortage declarations that substantially limit the quantity of water available to the state. Due to stressed surface water and groundwater supplies, there is focus on the increased use of treated effluent to supplement statewide water supplies, which could increase competition for the treated effluent that some APS generating plants rely on. APS’s inability to access sufficient supplies of water, along with that of its customers, could have a material adverse impact on our business and results of operations.

Previous wording

We are subject to cybersecurity risks and risks of unauthorized access to our systems that could adversely affect our business and financial condition.

Current wording

We are subject to risk related to cybersecurity, IT systems, and unauthorized access to our systems that could adversely affect our business and financial condition.

Previous wording

We rely extensively on IT systems, networks, and services, including internet sites, data hosting and processing facilities, and other hardware, software and technical applications and platforms. Some of these systems are managed, hosted, provided, or used by third parties to assist in conducting our business.

Current wording

We rely extensively on IT systems, networks, and services, including internet sites, data hosting and processing facilities, and other hardware, software and technical applications and platforms. Some of these systems are managed, hosted, provided, or used by third parties to assist in conducting our business. Malicious actors may attack vendors to disrupt the services these vendors provide to us or to use those vendors as a cyber conduit to attack us. As more third parties are involved in the operation of our business, there is a risk the confidentiality, integrity, privacy, or security of data held by, or accessible to, third parties may be compromised. In addition to the involvement of third parties and the associated security risks, we also face risks when integrating new IT systems, such as those associated with costs, operational efficiency, and security compliance. Our IT systems introduce layers of execution complexity and resource risks across the entire organization.

Previous wording

If a significant cybersecurity event or breach were to occur, we may not be able to fulfill critical business functions and we could (i) experience property damage, disruptions to our business, theft of or unauthorized access to customer, employee, financial or system operation information or other information; (ii) experience loss of revenue or incur significant costs for repair, remediation and breach notification, and increased capital and operating costs to implement increased security measures; and (iii) be subject to increased regulation, litigation and reputational damage. If such disruptions or breaches are not detected quickly, their effects could be compounded or could delay our response or the effectiveness of our response and ability to limit our exposure to potential liability. These types of events would also require significant management attention and resources and could have a material adverse impact on our financial condition, results of operations, or cash flows.

Current wording

If a significant cybersecurity event or breach were to occur, we may not be able to fulfill critical business functions and we could (i) experience property damage, disruptions to our business, theft of or unauthorized access to customer, employee, financial or system operation information or other information; (ii) experience loss of revenue or incur significant costs for repair, remediation and breach notification, and increased capital and operating costs to implement increased security measures; and (iii) be subject to increased regulation, litigation and reputational damage. If such disruptions or breaches are not detected quickly, their effects could be compounded or could delay our response or the effectiveness of our response and ability to limit our exposure to potential liability. These types of events as well as the impacts of integrating new IT systems could also require significant management attention and resources and could have a material adverse impact on our financial condition, results of operations, or cash flows.

Previous wording

APS has an ownership interest in and operates on behalf of a group of participants, Palo Verde, which is the largest nuclear electric generating facility in the western United States. Palo Verde constitutes approximately 18% of APS’s owned and leased generation capacity. Palo Verde is subject to environmental, health and financial risks, such as the ability to obtain adequate supplies of nuclear fuel; the ability to dispose of spent nuclear fuel; the ability to maintain adequate reserves for decommissioning; potential liabilities arising out of the operation of these facilities; the costs of securing the facilities against possible terrorist attacks; and unscheduled outages due to equipment and other problems. APS maintains nuclear decommissioning trust funds and external insurance coverage to minimize its financial exposure to some of these risks; however, it is possible that damages could exceed the amount of insurance coverage. APS may be required under federal law to pay up to $144.9 million (but not more than $21.6 million per year) of liabilities arising out of a nuclear incident not only at Palo Verde, but at any other nuclear power plant in the United States. In addition, APS is subject to retrospective premium adjustments under its nuclear property insurance policies with Nuclear Electric Insurance Limited (“NEIL”) for approximately $23.1 million if NEIL’s losses in any policy year exceed accumulated funds and if the retrospective premium assessment is declared by NEIL’s Board of Directors. Although APS has no reason to anticipate a serious nuclear incident at Palo Verde, if an incident did occur, it could materially and adversely affect our results of operations and financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.

Current wording

APS has an ownership interest in and operates on behalf of a group of participants, Palo Verde, which is the largest nuclear electric generating facility in the western United States. Palo Verde constitutes approximately 18% of APS’s owned and leased generation capacity. Palo Verde is subject to environmental, health and financial risks, such as the ability to obtain adequate supplies of nuclear fuel; the ability to dispose of spent nuclear fuel; the ability to maintain adequate reserves for decommissioning; potential liabilities arising out of the operation of these facilities; the costs of securing the facilities against possible terrorist attacks; and unscheduled outages due to equipment and other problems. APS maintains nuclear decommissioning trust funds and external insurance coverage to minimize its financial exposure to some of these risks; however, it is possible that damages could exceed the amount of insurance coverage. APS may be required under federal law to pay up to $144.9 million (but not more than $21.6 million per year) of liabilities arising out of a nuclear incident not only at Palo Verde, but at any other nuclear power plant in the United States. In addition, APS is subject to retrospective premium adjustments under its nuclear property insurance policies with NEIL for approximately$24.2 million if NEIL’s losses in any policy year exceed accumulated funds and if the retrospective premium assessment is declared by NEIL’s Board of Directors. Although APS has no reason to anticipate a serious nuclear incident at Palo Verde, if an incident did occur, it could materially and adversely affect our results of operations and financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.

Previous wording

Like many companies in the electric utility industry, our workforce is maturing, with approximately 27.4% of employees eligible to retire by the end of 2029. Although we have undertaken efforts to recruit, train and develop new employees, we face increased competition for talent. We are subject to other employee workforce factors, such as the availability and retention of qualified personnel and the need to negotiate collective bargaining agreements with union employees. These or other employee workforce factors could negatively impact our business, financial condition, or results of operations.

Current wording

Like many companies in the electric utility industry, our workforce is maturing, with approximately 26.1% of employees eligible to retire by the end of 2030. Although we have undertaken efforts to recruit, train and develop new employees, we face increased competition for talent. We are subject to other employee workforce factors, such as the availability and retention of qualified personnel and the need to negotiate collective bargaining agreements with union employees. These or other employee workforce factors could negatively impact our business, financial condition, or results of operations.

Previous wording

Our current ratings are set forth in “Liquidity and Capital Resources — Credit Ratings” in Item 7. We cannot be sure that any of our current ratings will remain in effect for any given period of time or that a rating will not be lowered or withdrawn entirely by a rating agency if, in its judgment, circumstances in the future so warrant. Any downgrade or withdrawal could adversely affect the market price of Pinnacle West’s and APS’s securities, limit our access to capital and increase our borrowing costs, which would adversely impact our financial results. We could be required to pay a higher interest rate for future financings, and our potential pool of investors and funding sources could decrease. In addition, borrowing costs under our existing credit facilities depend on our credit ratings. A downgrade could also require us to provide additional support in the form of letters of credit or cash or other collateral to various counterparties. If our short-term ratings were to be lowered, it could severely limit access to the commercial paper market. We note that the ratings from rating agencies are not recommendations to buy, sell or hold our securities and that each rating should be evaluated independently of any other rating.

Current wording

Our current ratings are set forth in “Liquidity and Capital Resources — Credit Ratings” in Part II, Item 7. We cannot be sure that any of our current ratings will remain in effect for any given period of time or that a rating will not be lowered or withdrawn entirely by a rating agency if, in its judgment, circumstances in the future so warrant. Any downgrade or withdrawal could adversely affect the market price of Pinnacle West’s and APS’s securities, limit our access to capital and increase our borrowing costs, which would adversely impact our financial results. We could be required to pay a higher interest rate for future financings, and our potential pool of investors and funding sources could decrease. In addition, borrowing costs under our existing credit facilities depend on our credit ratings. A downgrade could also require us to provide additional support in the form of letters of credit or cash or other collateral to various counterparties. If our short-term ratings were to be lowered, it could severely limit access to the commercial paper market. We note that the ratings from rating agencies are not recommendations to buy, sell or hold our securities and that each rating should be evaluated independently of any other rating.

Previous wording

Investment performance, changing interest rates, new rules or regulations and other economic, social, and political factors could decrease the value of our benefit plan assets, nuclear decommissioning trust funds and other special use funds or increase the valuation of our related obligations, resulting in significant additional funding requirements. We are also subject to risks related to the provision of employee healthcare benefits and healthcare reform legislation. Any inability to fully recover these costs in our utility rates would negatively impact our financial condition.

Current wording

Investment performance, changing interest rates, new rules or regulations and other economic, social, and political factors could decrease the value of our benefit plan assets, nuclear decommissioning trust funds and other special use funds or increase the valuation of our related obligations, resulting in significant additional funding requirements.

Previous wording

General economic factors that are beyond the Company’s control impact the Company’s forecasts and actual performance. These factors include interest rates; recession; inflation; stagflation; deflation; supply chain constraints; unemployment trends; sanctions, trade restrictions, military interventions and the threat or possibility of war; terrorism or other global or national unrest; and political or financial instability. In particular, in recent years the United States’ economy experienced a substantial rise in the inflation rate and more recently in 2025, the Trump administration has implemented tariffs and discussed additional tariffs, which would further increase costs. Additionally, supply chains have been impacted and could be further impacted by inflation, tariffs, and other sociopolitical factors, resulting in equipment delays and increased costs. A failure to recover these potential increased costs through our rates could have a material adverse impact on our financial condition, results of operations, or cash flows.

Current wording

General economic factors that are beyond the Company’s control impact the Company’s forecasts and actual performance. These factors include interest rates; recession; inflation; stagflation; deflation; supply chain constraints; unemployment trends; sanctions, trade restrictions, military interventions and the threat or possibility of war; terrorism or other global or national unrest; and political or financial instability. In particular, in recent years the United States’ economy experienced a substantial rise in the inflation rate and more recently in 2025 the Trump administration has implemented tariffs and discussed additional tariffs, which would further increase costs. The Company is currently evaluating the impact of the recent U.S. Supreme Court’s decision regarding the validity of certain tariffs previously imposed under the International Emergency Powers Act, including whether any or all of the tariffs will be eligible for a refund as well as the potential for replacement tariffs under separate statutory authorities. Additionally, supply chains have been impacted and could be further impacted by inflation, tariffs, and other sociopolitical factors, resulting in equipment delays and increased costs. Any failure to recover these potential increased costs through our rates could have a material adverse impact on our financial condition, results of operations, or cash flows.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Malicious actors may attack vendors to disrupt the services these vendors provide to us or to use those vendors as a cyber conduit to attack us. As more third parties are involved in the operation of our business, there is a risk the confidentiality, integrity, privacy, or security of data held by, or accessible to, third parties may be compromised.