ARIZONA PUBLIC SERVICE CO

For the period ended Sep 30, 2025. Filed Nov 3, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2025 · Filed Nov 3, 2025

PNW$104.22+0.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-06-30; filed 2025-08-06.

0000764622-25-000072

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-03.

0000764622-25-000087

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 204 previous paragraphs and 202 current paragraphs.

115 unchanged; 80 reworded; 6 added; 4 removed; 5 previous and 1 current paragraphs rearranged.

Tables are not compared: 13 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (6)

Current report

APS has seen increasing demand from large load customers in recent years. In the 2025 Rate Case, APS requested adjustments to rate designs and modification of cost allocation methodologies to ensure growth pays for growth. See “Regulatory Overview” below for more information. In line with the 2025 Rate Case, APS has developed a subscription model it believes will allow for these large load customers to fund the incremental infrastructure needed to serve them through long-term contracts where they cover capital costs and assume development risks, accelerating their path to service and ensuring those infrastructure costs are borne by those customers rather than residential or small business customers.

Current report

Taxes other than income taxes. Taxes other than income taxes were $5 million higher for the three months ended September 30, 2025, compared to the prior-year period, primarily due to a favorable true-up recognized during the third quarter of 2024.

Current report

Income taxes. Income taxes were $4 million higher for the three months ended September 30, 2025 compared with the prior-year period, primarily due to higher pre-tax income and lower tax credits, offset by higher favorable book-tax permanent benefits.

Current report

Operating Results – Nine-month period ended September 30, 2025, compared with nine-month period ended September 30, 2024.

Current report

•ASU 2025-06, Intangibles—Goodwill and Other—Internal-Use Software: Targeted Improvements to the Accounting for Internal-Use Software, effective for us on January 1, 2028.
Removed paragraphs (4)

Previous report

In 2020, APS announced a goal to deliver 100% clean, carbon-free electricity to customers by 2050, driven by a trajectory of increasingly clean energy technologies such as solar power and energy storage, carbon-free nuclear operations, and advances in energy efficiency solutions. This goal included interim targets of a resource mix that was 65% clean by 2030, with 45% of that total coming from renewable energy, and an exit from coal-fired generation by 2031.

Previous report

Income taxes. Income taxes were $3 million higher for the three months ended June 30, 2025 compared with the prior-year period, primarily due to a one-time benefit recognized in the second quarter of 2024 related to the Los Alamitos ITC purchase, partially offset by lower pre-tax income.

Previous report

Operating Results – Six-month period ended June 30, 2025, compared with six-month period ended June 30, 2024.
Reworded paragraphs (80)

Previous wording

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $29 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Current wording

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $30 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Previous wording

Pinnacle West derives essentially all of our revenues and earnings from our principal subsidiary, APS. APS is Arizona’s largest and longest-serving electric company that generates safe, affordable and reliable electricity for approximately 1.4 million retail customers in 11 of Arizona’s 15 counties. APS is also the operator and co-owner of Palo Verde Generating Station (“Palo Verde”) — a primary source of electricity for the southwestern United States.

Current wording

Pinnacle West derives essentially all of our revenues and earnings from our principal subsidiary, APS. APS is Arizona’s largest and longest-serving electric company and generates safe, affordable and reliable electricity for approximately 1.4 million retail customers in 11 of Arizona’s 15 counties. APS is also the operator and co-owner of Palo Verde Generating Station (“Palo Verde”) — a primary source of electricity for the southwestern United States.

Previous wording

Balanced Energy Mix. APS strives to procure a balanced energy mix, and we believe this provides the greatest reliability at the lowest cost possible while increasing resiliency. We achieve reliability, in part, through a blend of dispatchable resources, such as natural gas and battery storage, that can provide energy when intermittent resources, such as wind and solar, are unavailable. In the most recent all-source request for proposal (“ASRFP”), APS contracted for 3,606 MW of battery storage, 517 MW of natural gas, 2,649 MW of solar, and 500 MW of wind resources. APS regularly evaluates the best mix of resources based on a changing operating environment, including changes in generation technology, economics, and policy impacts.

Current wording

Balanced Energy Mix. APS strives to procure a balanced energy mix, and we believe this provides the greatest reliability at the lowest cost possible while increasing resiliency. We achieve reliability, in part, through a blend of dispatchable resources, such as natural gas and battery storage, that can provide energy when intermittent resources, such as wind and solar, are unavailable. In its all-source request for proposal (“ASRFP”) issued in 2023, APS contracted for 3,606 megawatts (“MW”) of battery storage, 517 MW of natural gas, 2,649 MW of solar, and 500 MW of wind resources. APS regularly evaluates the best mix of resources based on a changing operating environment, including changes in generation technology, economics, and policy impacts.

Previous wording

There is a need for additional natural gas to support reliability for customers and meet increasing energy needs and existing natural gas pipelines into Arizona are currently 100% committed. As a result, in July 2025, APS executed a gas transportation precedent agreement to secure a long-term supply of natural gas. The new pipeline is expected to be operational by late 2029 and will be owned and operated by a third-party.

Current wording

There is a need for additional natural gas to support reliability for customers and meet increasing energy needs and existing natural gas pipelines into Arizona are currently 100% committed. As a result, in July 2025, APS executed a gas transportation precedent agreement to secure a long-term supply of natural gas. The new pipeline is expected to be operational by late 2029 and will be owned and operated by a third-party. APS also plans to develop a site near Gila Bend, Arizona that is capable of adding up to 2,000 MW of generation to the state’s energy portfolio. The Desert Sun Power Plant will be a natural gas facility designed to meet Arizona’s rapidly growing needs and support unprecedented demand from large load energy users. This project is planned in two phases, with the first phase expected to serve existing customers and business-as-usual growth through our competitive ASRFP process, and the second phase to enable a new subscription model for large load customers, like data centers and large manufacturers. This subscription model is a commercial construct designed to ensure growth pays for growth while protecting affordability for other customers.

Previous wording

Palo Verde, one of the nation’s largest carbon-free energy resources, serves as a foundational part of APS’s resource portfolio. The plant is a critical asset to the Southwest, generating more than 32 million MWh annually – enough power for roughly 3.4 million households, or approximately 8.5 million people. Its continued operation is important to a carbon-neutral future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy. APS owns or leases 29.1% of Units 1, 2, and 3 Palo Verde. For Unit 2, APS currently leases nearly 12.1% through three separate sale-leaseback agreements, which have lease terms ending in 2033. In June 2025, APS entered into agreements to purchase two of the three leased interests, representing approximately 7%, or 94 MW, of Unit 2, subject to customary closing conditions, including approval by FERC. See Note 8 for more information. The 2025 Rate Case (as defined below) includes pro forma adjustments to account for these acquisitions. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.

Current wording

Palo Verde, one of the nation’s largest carbon-free energy resources, serves as a foundational part of APS’s resource portfolio. The plant is a critical asset to the Southwest, generating more than 32 million megawatt-hours annually – enough power for roughly 3.4 million households, or approximately 8.5 million people. Its continued operation is important to a carbon-neutral future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy. APS owns or leases 29.1% of Units 1, 2, and 3 Palo Verde. In June 2025, APS entered into agreements to purchase two of the three leased interests in Unit 2. The two subject leased interests represented approximately 7% or 94 MW of Unit 2. The transaction closed in September 2025, leaving one remaining lease for approximately 5.2% of Unit 2 that expires in 2033. See Note 8 for more information. The 2025 Rate Case (as defined below) includes pro forma adjustments to account for these acquisitions. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.

Previous wording

Wildfire Efforts. As discussed above, wildfire safety remains a critical focus for APS and other utilities. APS has increased investment in fire mitigation efforts to clear defensible space around its infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders, and educate customers and communities. APS also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With wildfire events in Hawaii, California, and across North America over the last few years, APS has been devoting and intends to continue to devote substantial efforts to analyzing and developing enhancements to its systems and processes to mitigate fire risk within its service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities.

Current wording

Wildfire Efforts. Wildfire safety remains a critical focus for APS and other utilities. APS has increased investment in fire mitigation efforts to clear defensible space around its infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders, and educate customers and communities. APS also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With wildfire events in Hawaii, California, and across North America over the last few years, APS has been devoting and intends to continue to devote substantial efforts to analyzing and developing enhancements to its systems and processes to mitigate fire risk within its service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities.

Previous wording

APS was selected by the U.S. Department of Energy’s (“DOE”) Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO. Additionally, on May 12, 2025, Arizona

Current wording

APS was selected by the U.S. Department of Energy’s (“DOE”) Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO. Additionally, on May 12, 2025, Arizona Governor Hobbs signed into law a bill that requires Arizona electric utilities to develop and seek approval for wildfire mitigation plans and defines the standard of care with respect to wildfire-related claims by reference to such plans. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Previous wording

We are committed to keeping bills as low as possible for our customers while maintaining high levels of reliability. Inflation has dramatically impacted the cost of goods and services in recent years as shown by the Consumer Price Index for All Urban Consumers (“CPI-U”), which, from 2018 through 2024, rose nationally 24.9% and 32.1% in Phoenix. Despite this, APS’s average residential rates remained well-below those inflation figures, rising 16.2% for the same period according to the U.S. Energy Information Administration. In recent months, inflationary impacts have eased, with the CPI-U growing 2.7% nationally and 0.2% in Phoenix over the 12 months ended June 2025. However, APS remains cautious of potential price increases as a result of current and proposed tariffs, which could lead to higher costs and supply chain constraints.

Current wording

We are committed to keeping bills as low as possible for our customers while maintaining high levels of reliability. Inflation has dramatically impacted the cost of goods and services in recent years as shown by the Consumer Price Index for All Urban Consumers (“CPI-U”), which from 2018 through 2024 rose nationally 24.9% and 32.1% in Phoenix. Despite this, APS’s average residential rates remained well-below those inflation figures, rising 16.2% for the same period according to the U.S. Energy Information Administration. In recent months, inflationary impacts have eased, with the CPI-U growing 2.9% nationally and 1.4% in Phoenix over the 12 months ended August 2025. As a result of increased tariffs and supply chain constraints, APS amended several of its agreements from its ASRFP issued in 2023 to mitigate these cost impacts. However, APS remains cautious of potential price increases as a result of current and proposed tariffs, which could lead to higher costs and supply chain constraints.

Previous wording

APS’s Integrated Resource Plan (“IRP”) and competitive ASRFP processes serve important roles in providing reliable and affordable energy to APS’s customers. The IRP process helps identify the amount and type of resources required to reliably meet customer needs, while the ASRFP process seeks to meet those needs in a competitive manner based on cost, ability to meet system requirements, and commercial viability. See “Resource Planning” below for more information.

Current wording

APS’s Integrated Resource Plan (“IRP”) and competitive ASRFP processes serve important roles in providing reliable and affordable energy to APS’s customers. The IRP process helps identify the amount and type of resources required to reliably meet customer needs, while the ASRFP process seeks to meet those needs in a competitive manner based on cost, ability to meet system requirements, and commercial viability. See “Resource Planning—Prioritizing Reliability and Affordability” below for more information.

Previous wording

There are also external opportunities that allow APS to deliver more affordable energy to customers, such as APS’s participation in western energy markets and programs. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool (“SPP”). The Markets+ tariff was filed with FERC on March 29, 2024 and was approved on January 16, 2025. APS is a funding party to the implementation phase of Markets+ and expects to go live in the market in October 2027. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and plans to transition to full-binding participation as early as summer 2027. These regional efforts are driven by the objectives of reducing customer cost and improving reliability. Until the transition to Markets+, APS will continue to participate in Western Energy Imbalance Market (“WEIM”) as a tool for creating savings for APS’s customers from the real-time only, voluntary market. APS expects that its participation in WEIM and future participation in Markets+ will lower its fuel and purchased-power costs, improve situational awareness for systems operations in the Western Interconnection, and improve integration of APS’s resources.

Current wording

There are also external opportunities that allow APS to deliver more affordable energy to customers, such as APS’s participation in western energy markets and programs. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool (“SPP”). The Markets+ tariff was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024 and was approved on January 16, 2025. APS is a funding party to the implementation phase of Markets+ and expects to go live in the market in October 2027. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and plans to transition to full-binding participation as early as summer 2027. These regional efforts are driven by the objectives of reducing customer cost and improving reliability. Until the transition to Markets+, APS will continue to participate in Western Energy Imbalance Market (“WEIM”) as a tool for creating savings for APS’s customers from the real-time only, voluntary market. APS expects that its participation in WEIM and future participation in Markets+ will lower its fuel and purchased-power costs, improve situational awareness for systems operations in the Western Interconnection, and improve integration of APS’s resources.

Previous wording

As Arizona’s population and economy continue to grow at record levels, so does its need for electricity. As a result, APS is updating its clean energy goals from an aspirational “zero-carbon” approach to an aspirational “carbon-neutral” approach by 2050. This means that for any greenhouse gas emissions still produced by our generation resources as of 2050, we will aim to offset these emissions elsewhere. This goal retains APS’s interest in new innovation and market transformations that address carbon emissions. APS is also removing its interim targets to better reflect APS’s near-term need to ensure reliability and affordability, while relying on the Integrated Resource Plan (“IRP”) process to help determine the most responsible path forward. APS remains focused on providing reliable energy at the lowest cost possible while striving to lower emissions over time and continues to look for opportunities to support reliability through dispatchable resources, such as gas and the potential extension of coal beyond 2031.

Current wording

APS has an aspirational goal to be carbon-neutral by 2050. This means that for any greenhouse gas emissions still produced by our generation resources as of 2050, we will aim to offset these emissions elsewhere. This goal reflects APS’s interest in new innovation and market transformations that address carbon emissions, while relying on the IRP process to help determine the most responsible path forward. APS remains focused on providing reliable energy at the lowest cost possible while striving to lower emissions over time and continues to look for opportunities to support reliability through dispatchable resources, such as gas and the potential extension of coal beyond 2031.

Previous wording

APS has a diverse portfolio of existing and planned resources, including biomass, biogas, coal, energy storage, geothermal, natural gas, nuclear, solar, and wind. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible. Every three years, APS performs a comprehensive study, called an IRP, to identify what resources will be necessary to safely, reliably, and affordably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, impacts from weather, and new resource technology availability impact the amount and type of resources required to reliably and affordably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy-generating resources to reliably serve customers’ future energy needs. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through the all-source request for proposal (“ASRFP”) process, with the most recent ASRFP being issued in 2024. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources.

Current wording

APS has a diverse portfolio of existing and planned resources, including biomass, biogas, coal, energy storage, geothermal, natural gas, nuclear, solar, and wind. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible. Every three years, APS performs an IRP, a comprehensive study to identify what resources will be necessary to safely, reliably, and affordably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, impacts from weather, and new resource technology availability impact the amount and type of resources required to reliably and affordably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy-generating resources to reliably serve customers’ future energy needs. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through the ASRFP process, with the most recent ASRFP being issued in 2024. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources.

Previous wording

On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) pursuant to which APS procured 3,606 MW of battery storage, 517 MW of natural gas, 2,649 of solar, and 500 MW of wind resources expected to be in service from 2026 to 2028.

Current wording

On June 30, 2023, APS issued an ASRFP pursuant to which APS procured 3,606 MW of battery storage, 517 MW of natural gas, 2,649 MW of solar, and 500 MW of wind resources expected to be in service from 2026 to 2028.

Previous wording

APS’s 24/7 call center answers 75% of customer calls within 30 seconds, and our mobile platforms enable our more than one million customers to quickly and easily find the information they need when they need it. We seek to provide relevant and valuable options for customers to manage their bill, including through rate plan options, programs that help them save energy and money, and alerts and notifications that help keep them aware of outages, payments, and usage. APS recently introduced a high-bill analyzer tool enabling phone advisors to provide customers with specific, customized guidance based on their actual usage and habits.

Current wording

APS’s 24/7 call center answers more than 75% of customer calls within 30 seconds, and our mobile platforms enable our more than one million customers to quickly and easily find the information they need when they need it. We seek to provide relevant and valuable options for customers to manage their bill, including through rate plan options, programs that help them save energy and money, and alerts and notifications that help keep them aware of outages, payments, and usage. APS recently introduced a high-bill analyzer tool enabling phone advisors to provide customers with specific, customized guidance based on their actual usage and habits.

Previous wording

New Nuclear Generation. APS, along with other Arizona electric utilities, is exploring additional nuclear generation to provide around-the-clock carbon-free energy to meet rising energy demands in Arizona. APS has been monitoring emerging nuclear technologies, such as small modular nuclear reactors (“SMRs”). SMRs are typically designed to generate 300 MW or less of energy per unit compared to, for example, the 1,400 MW per unit generated at Palo Verde. The utilities have applied for a grant from the DOE to begin preliminary exploration of a potential site for additional nuclear energy for Arizona. The grant could support a three-year site selection process and possible preparation of an early site permit application to United States Nuclear Regulatory Commission (“NRC”).

Current wording

New Nuclear Generation. Along with other Arizona electric utilities, APS is exploring additional nuclear generation to provide around-the-clock carbon-free energy to meet rising energy demands in Arizona. APS has been monitoring emerging nuclear technologies, such as small modular nuclear reactors (“SMRs”). SMRs are typically designed to generate 300 MW or less of energy per unit compared to, for example, the 1,400 MW per unit generated at Palo Verde. The utilities have applied for a grant from DOE to begin preliminary exploration of a potential site for additional nuclear energy for Arizona. The grant could support a three-year site selection process and possible preparation of an early site permit application to U.S. Nuclear Regulatory Commission (“NRC”).

Previous wording

Carbon Capture. Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology.

Current wording

Carbon Capture. Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could potentially reduce carbon emissions from fossil fuel-fired generation.

Previous wording

Artificial Intelligence. To address the rapid advancement of artificial intelligence (“AI”) technology risks and opportunities, APS has developed an AI strategy that responsibly utilizes AI to advance our business strategy, enhance customer and employee experiences, and optimize operational reliability. At the core of our AI strategy is a robust governance model that develops guidance, policies, and relevant sub-strategies for the execution of AI projects at the Company. To ensure compliance with data security, reliability requirements, and our Code of Ethical Conduct, governance and oversight are provided by leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams.

Current wording

Artificial Intelligence. To address the rapid advancement of artificial intelligence (“AI”) technology risks and opportunities, APS has developed an AI strategy to responsibly utilize AI to advance our business strategy, enhance customer and employee experiences, and optimize operational reliability. At the core of our AI strategy is a robust governance model that develops guidance, policies, and relevant sub-strategies for the execution of AI projects at the Company. To ensure compliance with data security, reliability requirements, and our Code of Ethical Conduct, governance and oversight are provided by leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams.

Previous wording

•a rate of $0.043881 per kWh for the portion of APS’s base rates attributable to fuel and purchased power costs;

Current wording

•a rate of $0.043881 per kilowatt-hour (“kWh”) for the portion of APS’s base rates attributable to fuel and purchased power costs;

Previous wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association (“AriSEIA”), Solar Energy Industries Association (“SEIA”), and Vote Solar specifically to review whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. A limited rehearing was held October 28 through November 1, 2024. Following the limited rehearing, an Administrative Law Judge issued a ROO (the “Limited Rehearing ROO”) on December 3, 2024. The Limited Rehearing ROO recommended affirming the GAC as just and reasonable and that the GAC is not discriminatory to solar customers and the absence of a GAC is not discriminatory to non-solar customers. On December 17, 2024, the ACC approved the Limited Rehearing ROO with an amendment that requires APS in its next rate case to propose a revenue allocation based on a site-load cost of service study in order to bring further parity in revenue collection between solar and non-solar customers. SEIA, AriSEIA, Vote Solar, the Arizona Attorney General, and two individual customers have filed requests for rehearing of the Commission’s December 17, 2024 decision on the rehearing. The Commission has taken no action on these requests. In addition, each of these parties have subsequently filed an appeal to the Arizona Court of Appeals seeking review of the ACC’s decisions regarding the GAC and on rehearing. APS cannot predict the outcome of these proceedings.

Current wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and Coal Community Transition funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association (“AriSEIA”), Solar Energy Industries Association (“SEIA”), and Vote Solar specifically to review whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. A limited rehearing was held October 28 through November 1, 2024. Following the limited rehearing, an Administrative Law Judge issued a ROO (the “Limited Rehearing ROO”) on December 3, 2024. The Limited Rehearing ROO recommended affirming the GAC as just and reasonable and that the GAC is not discriminatory to solar customers and the absence of a GAC is not discriminatory to non-solar customers. On December 17, 2024, the ACC approved the Limited Rehearing ROO with an amendment that requires APS in its next rate case to propose a revenue allocation based on a site-load cost of service study in order to bring further parity in revenue collection between solar and non-solar customers. SEIA, AriSEIA, Vote Solar, the Arizona Attorney General, and two individual customers have filed requests for rehearing of the ACC’s December 17, 2024 decision on the rehearing. The ACC has taken no action on these requests. In addition, each of these parties has subsequently filed an appeal to the Arizona Court of Appeals seeking review of the ACC’s decisions regarding the GAC and on rehearing. APS cannot predict the outcome of these proceedings.

Previous wording

(“RUCO”), the Arizona Large Customer Group (“ALCG”), and an individual customer filed a lawsuit challenging the ACC’s authority to issue the formula rate policy statement outside of Arizona’s formula rulemaking process. On June 13, 2025, the lawsuit challenging the ACC’s formula rate policy was dismissed by the Superior Court of Arizona. Following the dismissal, the plaintiffs filed an appeal with the Arizona Court of Appeals as well as a Petition for Special Action with the Arizona Supreme Court. The Supreme Court declined to exercise jurisdiction on the Petition for Special Action. The plaintiffs have also filed a Petition for Special Action with the Arizona Court of Appeals, requesting the case be sent back to the Superior Court for expedited consideration of the merits. APS cannot predict the outcome of this matter.

Current wording

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments and held two workshops exploring ways to reduce regulatory lag, including alternative ratemaking structures such as future test years, hybrid test years, and formula rates. On December 3, 2024, the ACC approved a policy statement regarding formula rate plans. The policy statement provides regulated utilities with the opportunity to propose formula rate plans in future rate cases. On March 28, 2025, the Residential Utility Consumer Office (“RUCO”), the Arizona Large Customer Group (“ALCG”), and an individual customer filed a lawsuit challenging the ACC’s authority to issue the formula rate policy statement outside of Arizona’s formula rulemaking process. On June 13, 2025, the lawsuit challenging the ACC’s formula rate policy was dismissed by the Superior Court of Maricopa County. Following the dismissal, the plaintiffs filed an appeal with the Arizona Court of Appeals as well as a Petition for Special Action with the Arizona Supreme Court. The Supreme Court declined to exercise jurisdiction on the Petition for Special Action. The plaintiffs have also filed a Petition for Special Action with the Arizona Court of Appeals, which has accepted jurisdiction to determine whether the case should be remanded back to the Superior Court for expedited consideration of the merits. Further special action proceedings remain pending at this time. APS cannot predict the outcome of this matter.

Previous wording

Pinnacle West is the primary beneficiary of a protected cell captive insurance cell (the “Captive”). The Captive provides insurance coverage to Pinnacle West and our subsidiaries that supplements third-party insurance policies. The Captive insures Pinnacle West and its subsidiaries for terrorism coverage, excess liability including certain wildfire coverage, excess property insurance, and excess employment practice liability. The Captive policies exclude nuclear liability at Palo Verde. See Note 8. The Captive may hold investment assets in cash, cash equivalents, and equity and fixed income instruments.

Current wording

Pinnacle West is the primary beneficiary of a protected cell captive insurance cell (the “Captive”). The Captive provides insurance coverage to Pinnacle West and our subsidiaries that supplements commercial and mutual insurance coverage. The Captive insures Pinnacle West and its subsidiaries for terrorism coverage, excess liability including certain wildfire coverage, excess property insurance, and excess employment practice liability. The Captive policies exclude nuclear liability at Palo Verde. See Note 8. The Captive may hold investment assets in cash, cash equivalents, and equity and fixed income instruments.

Previous wording

The Company believes that projects which are currently under construction will continue to qualify for IRA tax credits. The Company is continuing to analyze the OBBBA and is awaiting regulations and other guidance as to the application of these new rules to projects not currently under construction.

Current wording

The Company believes that its projects which are currently under construction will continue to qualify for IRA tax credits. The Company is continuing to analyze the OBBBA and is awaiting regulations and other guidance as to the application of these new rules to projects not currently under construction.

Previous wording

On August 4, 2023, Pinnacle West entered into a purchase and sale agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary Bright Canyon Energy Corporation (“BCE”) to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. The final closing of the BCE Sale was completed on January 12, 2024. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to Pinnacle West Power, LLC (“PNW Power”), a wholly-owned subsidiary of Pinnacle West.

Current wording

On August 4, 2023, Pinnacle West entered into an agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary Bright Canyon Energy Corporation (“BCE”) to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. The final closing of the BCE Sale was completed on January 12, 2024. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to Pinnacle West Power, LLC (“PNW Power”), a wholly-owned subsidiary of Pinnacle West.

Previous wording

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the TransCanyon partners’ utility affiliates. The DOE’s GDO selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Current wording

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the TransCanyon partners’ utility affiliates. The DOE’s GDO selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024; however, on September 5, 2025, TransCanyon sent a notice to terminate the agreement that will be effective November 4, 2025. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Previous wording

•$25 million investment in the Energy Impact Partners fund, of which approximately $19.5 million has been funded as of June 30, 2025. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Current wording

•$25 million investment in the Energy Impact Partners fund, of which approximately $20 million has been funded as of September 30, 2025. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Previous wording

•$25 million investment in AZ-VC (formerly invisionAZ Fund), of which approximately $14.3 million has been funded as of June 30, 2025. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

Current wording

•$25 million investment in AZ-VC Fund I, LLC (formerly invisionAZ Fund) (“AZ-VC”), of which approximately $14.3 million has been funded as of September 30, 2025. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

Previous wording

•$7.5 million investment in Westly Seed Fund, of which approximately $1.2 million has been funded as of June 30, 2025. Westly Seed Fund is focused on supporting entrepreneurs involved in the energy, mobility, building, and industrial sectors.

Current wording

•$7.5 million investment in Westly Seed Fund, of which approximately $1.5 million has been funded as of September 30, 2025. Westly Seed Fund is focused on supporting entrepreneurs involved in the energy, mobility, building, and industrial sectors.

Previous wording

•Equity investment in SAI Advanced Power Solutions (“SAI”), a private corporation that manufactures electrical switchgear equipment used by data centers. El Dorado accounts for this investment under the equity method, with a June 30, 2025 investment carrying value of $18.6 million. El Dorado has no further funding commitments to SAI.

Current wording

•Equity investment in SAI Advanced Power Solutions, Inc. (“SAI”), a private corporation that manufactures electrical switchgear equipment used by data centers. El Dorado accounts for this investment under the equity method and has an investment carrying value of $16.7 million as of September 30, 2025.

Previous wording

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.4% for the period ended June 30, 2025 compared with the prior-year period. For the three years through 2024, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2025 and the average annual growth to be in the range of 1.5% to 2.5% through 2027 based on anticipated steady population growth in Arizona during that period.

Current wording

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.4% for the period ended September 30, 2025 compared with the prior-year period. For the three years through 2024, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 2.0% to 2.5% for 2025 and the average annual growth to be in the range of 1.5% to 2.5% through 2030 based on anticipated steady population growth in Arizona during that period.

Previous wording

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 3.8% for the period ended June 30, 2025 compared with the prior-year period. While steady customer growth was somewhat offset by lower usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of increased revenues for this period were continued strong sales to commercial and industrial customers and the continued ramp-up of new data center and large manufacturing customers. As extra high load factor customers, such as data centers and large manufacturers, have continued to grow as a proportion of our business, we have updated our procedures with respect to estimates of unbilled revenues for our customer classes. As a result, we have made an adjustment in the first quarter of 2025 to recalibrate accrued unbilled revenues, offsetting year-to-date sales growth by 0.9%. Even with this offset to sales growth in the first quarter, we do not anticipate any change to our expected range of sales growth for the full year 2025.

Current wording

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 4.5% for the period ended September 30, 2025 compared with the prior-year period. While steady customer growth was somewhat offset by lower usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of increased revenues for this period were continued strong sales to commercial and industrial customers and the continued ramp-up of new data center and large manufacturing customers. As large load customers, such as data centers and large manufacturers, have continued to grow as a proportion of our business, we have updated our procedures with respect to estimates of unbilled revenues for our customer classes. As a result, we made an adjustment in the first quarter of 2025 to recalibrate accrued unbilled revenues, offsetting year-to-date sales growth by 0.5%. Even with this offset to sales growth in the first quarter, we do not anticipate any change to our expected range of sales growth for the full year 2025.

Previous wording

For the three years through 2024, annual retail electricity sales growth averaged 3.2%, adjusted to exclude the effects of weather variations. Due to the expected growth of several data centers and large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 4.0% to 6.0% for 2025 and that average annual growth will be in the range of 4.0% to 6.0% through 2027, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several data centers and large manufacturing facilities, which are expected to contribute to 2025 growth in the range of 3.0% to 5.0% and to average annual growth in the range of 3.0% to 5.0% through 2027.

Current wording

For the three years through 2024, annual retail electricity sales growth averaged 3.2%, adjusted to exclude the effects of weather variations. Due to the expected growth of several data centers and large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 4.0% to 6.0% for 2025 and that average annual growth will be in the range of 5.0% to 7.0% through 2030, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several data centers and large manufacturing facilities, which are expected to contribute to 2025 growth in the range of 3.0% to 5.0% and to average annual growth in the range of 4.0% to 6.0% through 2030.

Previous wording

Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra high load factor customers (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra high load factor customers far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. In April 2023, APS notified prospective extra high load factor customers without existing commitments from APS that it is not able to commit at this time to future extra large projects of over 25 MW. Because of the high growth in demand for such projects, APS has developed a prioritization queue that identifies and prioritizes projects while maintaining system reliability and affordability for existing APS customers. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs.

Current wording

Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from large load customers with very high energy demands that persist virtually around-the-clock. These incremental requests for service by large load customers far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. Because of the high growth in demand for such projects, APS has developed a queue that identifies and prioritizes projects while maintaining system reliability and affordability for existing APS customers. APS is also exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs, including a new subscription model for large load customers. The subscription model is part of the company’s “growth pays for growth” strategy where large load customers would enter into a long-term special contract to pay for the costs associated with the incremental infrastructure needed to provide service without compromising reliability and affordability for existing customers.

Previous wording

Income Taxes. Income taxes are affected by the amount of pretax book income, income tax rates, certain deductions, certain credits and non-taxable items, such as allowance for funds used during construction (“AFUDC”). In addition, income taxes may also be affected by the settlement of issues with taxing authorities.

Current wording

Income Taxes. Income taxes are affected by the amount of pretax book income, income tax rates, certain deductions, certain credits and non-taxable items, such as allowance for borrowed funds used during construction (“AFUDC”). In addition, income taxes may also be affected by the settlement of issues with taxing authorities.

Previous wording

Interest Expense. Interest expense is affected by the amount of debt outstanding and the interest rates on that debt. See Note 5 for further details. The primary factors affecting borrowing levels are expected to be our capital expenditures, long-term debt maturities, equity issuances and internally generated cash flow. An allowance for borrowed funds used during construction offsets a portion of interest expense while capital projects are under construction. We stop accruing AFUDC on a project when it is placed into service.

Current wording

Interest Expense. Interest expense is affected by the amount of debt outstanding and the interest rates on that debt. See Note 5 for further details. The primary factors affecting borrowing levels are expected to be our capital expenditures, long-term debt maturities, equity issuances and internally generated cash flow. AFUDC offsets a portion of interest expense while capital projects are under construction. We stop accruing AFUDC on a project when it is placed into service.

Previous wording

June 30, 2025 was $193 million, compared with consolidated net income attributable to common shareholders of $204 million for the prior-year period. The results reflect a decrease of approximately $11 million, primarily as a result of the effects of weather, higher operations and maintenance expenses, lower pension and other postretirement non-service credits, net, higher depreciation and amortization expenses mostly due to increased plant additions and intangible assets, partially offset by Cholla plant retirement impacts, higher interest charges, and higher income taxes due to lower tax credits, partially offset by lower pre-tax income. These negative factors were partially offset by the favorable impacts of higher transmission service revenues, increased customer usage and growth, higher AFUDC, and higher other income due to investment gains in El Dorado.

Current wording

September 30, 2025 was $413 million, compared with consolidated net income attributable to common shareholders of $395 million for the prior-year period. The results reflect an increase of approximately $18 million, primarily as a result of increased customer usage, customer growth and related pricing, higher transmission service revenues, lower operations and maintenance expenses, higher AFUDC, lower depreciation and amortization expenses mostly due to operations ceasing at the Cholla plant, partially offset by increased plant additions and intangible assets. These positive factors were partially offset by the unfavorable impacts of the effects of weather, higher interest charges, lower pension and other postretirement non-service credits, net, higher other taxes and higher income taxes due to higher pre-tax income and lower tax credits, offset by higher favorable book-tax permanent benefits.

Previous wording

(a) Operating revenues less fuel and purchased power expenses is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power expenses as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power expenses is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.

Current wording

(a) Operating revenues less fuel and purchased power is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.

Previous wording

Operating revenues less fuel and purchased power. Operating revenues less fuel and purchased power expenses were $10 million higher for the three months ended June 30, 2025 compared with the prior-year period. The following table summarizes the major components of this change (dollars in millions):

Current wording

Operating revenues less fuel and purchased power. Operating revenues less fuel and purchased power expenses were $27 million higher for the three months ended September 30, 2025 compared with the prior-year period. The following table summarizes the major components of this change (dollars in millions):

Previous wording

Operations and maintenance. Operations and maintenance expenses increased $15 million for the three months ended June 30, 2025 compared with the prior-year period primarily due to:

Current wording

Operations and maintenance. Operations and maintenance expenses decreased $8 million for the three months ended September 30, 2025 compared with the prior-year period primarily due to:

Previous wording

•a decrease of $3 million related to employee benefit costs;

Current wording

•a decrease of $12 million related to employee benefit costs;

Previous wording

•a decrease of $2 million related to nuclear generation costs;

Current wording

•an increase of $2 million related to nuclear generation costs;

Showing the first 40 of 80 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

•an increase of $2 million related to nuclear generation costs;
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

Governor Hobbs signed into law a bill that requires Arizona electric utilities to develop and seek approval for wildfire mitigation plans and defines the standard of care with respect to wildfire-related claims by reference to such plans. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Previous report — wording carried elsewhere

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments and held two workshops exploring ways to reduce regulatory lag, including alternative ratemaking structures such as future test years, hybrid test years, and formula rates. On December 3, 2024, the ACC approved a policy statement regarding formula rate plans. The policy statement provides regulated utilities with the opportunity to propose formula rate plans in future rate cases. On March 28, 2025, the Residential Utility Consumer Office

Previous report — wording carried elsewhere

•an increase of $1 million related to non-nuclear generation costs, primarily due to higher planned outage;

Previous report — wording carried elsewhere

Other income and expense, net. Other income and expense, net were $2 million lower for the six months ended June 30, 2025 compared to the prior-year period, primarily due to the gain on the sale of

Previous report — wording carried elsewhere

The ACC has authorized a limit on yearly equity infusions into APS equal to 2.5% of APS’s total assets each calendar year on a three-year rolling average basis, subject to APS’s equity ratio remaining below the most recently approved rate case capital structure plus 50 basis points.