ARIZONA PUBLIC SERVICE CO
For the period ended Jun 30, 2025. Filed Aug 6, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2025 · Filed Aug 6, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-03-31; filed 2025-05-01.
0000764622-25-000047
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-06-30; filed 2025-08-06.
0000764622-25-000072
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 204 previous paragraphs and 204 current paragraphs.
86 unchanged; 58 reworded; 46 added; 57 removed; 3 previous and 14 current paragraphs rearranged.
Tables are not compared: 12 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (46)
Current report
Our vision is to create a sustainable energy future for Arizona. Our mission is to serve customers with safe, reliable, and affordable energy. We are committed to delivering operational excellence at the lowest cost possible while aspiring to lower carbon emissions over time.
Current report
As energy demand in Arizona continues to grow, we remain committed to delivering reliable service to our customers. We have a goal of achieving top quartile reliability as compared to peers. Key elements to delivering reliable service include resource and transmission planning to secure resource adequacy, planning and procuring resources to ensure sufficient reserve margins, distribution automation and resiliency investments, predictive and preventative maintenance programs, seasonal readiness programs, emergency preparedness, and securing a reliable supply chain. Securing a reliable grid requires ongoing infrastructure investments in addition to investments to support new customer growth.
Current report
Balanced Energy Mix. APS strives to procure a balanced energy mix, and we believe this provides the greatest reliability at the lowest cost possible while increasing resiliency. We achieve reliability, in part, through a blend of dispatchable resources, such as natural gas and battery storage, that can provide energy when intermittent resources, such as wind and solar, are unavailable. In the most recent all-source request for proposal (“ASRFP”), APS contracted for 3,606 MW of battery storage, 517 MW of natural gas, 2,649 MW of solar, and 500 MW of wind resources. APS regularly evaluates the best mix of resources based on a changing operating environment, including changes in generation technology, economics, and policy impacts.
Current report
There is a need for additional natural gas to support reliability for customers and meet increasing energy needs and existing natural gas pipelines into Arizona are currently 100% committed. As a result, in July 2025, APS executed a gas transportation precedent agreement to secure a long-term supply of natural gas. The new pipeline is expected to be operational by late 2029 and will be owned and operated by a third-party.
Current report
Governor Hobbs signed into law a bill that requires Arizona electric utilities to develop and seek approval for wildfire mitigation plans and defines the standard of care with respect to wildfire-related claims by reference to such plans. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.
Current report
We are committed to keeping bills as low as possible for our customers while maintaining high levels of reliability. Inflation has dramatically impacted the cost of goods and services in recent years as shown by the Consumer Price Index for All Urban Consumers (“CPI-U”), which, from 2018 through 2024, rose nationally 24.9% and 32.1% in Phoenix. Despite this, APS’s average residential rates remained well-below those inflation figures, rising 16.2% for the same period according to the U.S. Energy Information Administration. In recent months, inflationary impacts have eased, with the CPI-U growing 2.7% nationally and 0.2% in Phoenix over the 12 months ended June 2025. However, APS remains cautious of potential price increases as a result of current and proposed tariffs, which could lead to higher costs and supply chain constraints.
Current report
APS’s Integrated Resource Plan (“IRP”) and competitive ASRFP processes serve important roles in providing reliable and affordable energy to APS’s customers. The IRP process helps identify the amount and type of resources required to reliably meet customer needs, while the ASRFP process seeks to meet those needs in a competitive manner based on cost, ability to meet system requirements, and commercial viability. See “Resource Planning” below for more information.
Current report
Resource Planning—Prioritizing Reliability and Affordability
Current report
As Arizona’s population and economy continue to grow at record levels, so does its need for electricity. As a result, APS is updating its clean energy goals from an aspirational “zero-carbon” approach to an aspirational “carbon-neutral” approach by 2050. This means that for any greenhouse gas emissions still produced by our generation resources as of 2050, we will aim to offset these emissions elsewhere. This goal retains APS’s interest in new innovation and market transformations that address carbon emissions. APS is also removing its interim targets to better reflect APS’s near-term need to ensure reliability and affordability, while relying on the Integrated Resource Plan (“IRP”) process to help determine the most responsible path forward. APS remains focused on providing reliable energy at the lowest cost possible while striving to lower emissions over time and continues to look for opportunities to support reliability through dispatchable resources, such as gas and the potential extension of coal beyond 2031.
Current report
Serving customers with excellence is foundational to APS’s business and remains our core focus as we adapt to evolving customer needs and emerging technology. Recognizing that every employee impacts our customer experience, we continue to provide information, tools, and resources enabling our teams to design, develop, and implement enhancements to improve our customer experience.
Current report
APS’s 24/7 call center answers 75% of customer calls within 30 seconds, and our mobile platforms enable our more than one million customers to quickly and easily find the information they need when they need it. We seek to provide relevant and valuable options for customers to manage their bill, including through rate plan options, programs that help them save energy and money, and alerts and notifications that help keep them aware of outages, payments, and usage. APS recently introduced a high-bill analyzer tool enabling phone advisors to provide customers with specific, customized guidance based on their actual usage and habits.
Current report
Developing Technologies
Current report
2025 Rate Case
Current report
On June 13, 2025, APS filed an application with the ACC (the “2025 Rate Case”) seeking a net base rate increase of $579.5 million, which represents a 13.99% net increase. The requested net increase addresses a total base revenue deficiency of $662.4 million, offset by proposed adjustor transfers of cost recovery to base rates.
Current report
The 2025 Rate Case application includes the following proposals:
Current report
•a test year comprised of the 12-month period ended on December 31, 2024, including certain pro forma adjustments;
Current report
•an original cost rate base of $12.5 billion, which approximates the ACC-jurisdictional portion of the book value of utility assets, net of accumulated depreciation and other credits;
Current report
•the following proposed capital structure and costs of capital:
Current report
•a 1% return on the increment of fair value rate base above APS’s original cost rate base, as provided for by Arizona law;
Current report
•a rate of $0.043881 per kWh for the portion of APS’s base rates attributable to fuel and purchased power costs;
Current report
•adjustments to rate designs to reduce cross-subsidization by certain customer classes;
Current report
•modification of cost allocation methodologies based on customer growth to ensure customers causing new production costs are covering those costs through rates, along with corresponding changes to adjustor mechanisms, such as for fuel and purchased power;
Current report
•implementation of a “Formula Rate Adjustment Mechanism” (“FRAM”) to assist with reducing regulatory lag and allow for rate gradualism;
Current report
•elimination of the Lost Fixed Cost Recovery Adjustment Mechanism (“LFCR”) following the first annual adjustment pursuant to the FRAM; and
Current report
•modification to the System Reliability Benefit Mechanism (“SRB”) due to the Formula Rate Adjustment Mechanism proposal.
Current report
APS requested that the increase become effective in the second half of 2026. The hearing for this rate case is currently scheduled to begin in May 2026. APS cannot predict the outcome of its request nor when the 2025 Rate Case will be decided by the ACC.
Current report
2022 Rate Case
Current report
(“RUCO”), the Arizona Large Customer Group (“ALCG”), and an individual customer filed a lawsuit challenging the ACC’s authority to issue the formula rate policy statement outside of Arizona’s formula rulemaking process. On June 13, 2025, the lawsuit challenging the ACC’s formula rate policy was dismissed by the Superior Court of Arizona. Following the dismissal, the plaintiffs filed an appeal with the Arizona Court of Appeals as well as a Petition for Special Action with the Arizona Supreme Court. The Supreme Court declined to exercise jurisdiction on the Petition for Special Action. The plaintiffs have also filed a Petition for Special Action with the Arizona Court of Appeals, requesting the case be sent back to the Superior Court for expedited consideration of the merits. APS cannot predict the outcome of this matter.
Current report
Fire Mitigation ACC Deferral Request
Current report
See Note 6 for more information regarding these and additional regulatory matters.
Current report
Tax Incentives
Current report
On July 4, 2025, the One Big Beautiful Bill Act (“OBBBA”), was signed into law. The OBBBA curtailed several clean energy tax credits initially passed in the IRA, including a new phase out deadline for wind and solar ITCs and PTCs that requires projects to either begin construction within one year of enactment or be placed in service by December 31, 2027. Additionally, the OBBBA contained provisions restricting clean energy projects, including energy storage, which begin construction after December 31, 2025, and receive “material assistance from a prohibited foreign entity,” from being eligible for clean energy ITCs or PTCs.
Current report
The Company believes that projects which are currently under construction will continue to qualify for IRA tax credits. The Company is continuing to analyze the OBBBA and is awaiting regulations and other guidance as to the application of these new rules to projects not currently under construction.
Current report
June 30, 2025 was $193 million, compared with consolidated net income attributable to common shareholders of $204 million for the prior-year period. The results reflect a decrease of approximately $11 million, primarily as a result of the effects of weather, higher operations and maintenance expenses, lower pension and other postretirement non-service credits, net, higher depreciation and amortization expenses mostly due to increased plant additions and intangible assets, partially offset by Cholla plant retirement impacts, higher interest charges, and higher income taxes due to lower tax credits, partially offset by lower pre-tax income. These negative factors were partially offset by the favorable impacts of higher transmission service revenues, increased customer usage and growth, higher AFUDC, and higher other income due to investment gains in El Dorado.
Current report
•a decrease of $2 million related to nuclear generation costs;
Current report
•a decrease of $3 million related to employee benefit costs; and
Current report
Income taxes. Income taxes were $3 million higher for the three months ended June 30, 2025 compared with the prior-year period, primarily due to a one-time benefit recognized in the second quarter of 2024 related to the Los Alamitos ITC purchase, partially offset by lower pre-tax income.
Current report
Operating Results – Six-month period ended June 30, 2025, compared with six-month period ended June 30, 2024.
Current report
Operations and maintenance. Operations and maintenance expenses increased $57 million for the six months ended June 30, 2025 compared with the prior-year period, primarily due to:
Current report
•a decrease of $3 million related to employee benefit costs;
Showing the first 40 of 46 passages. Open the source sections for the rest.
Removed paragraphs (57)
Previous report
Our strategy is to create a sustainable energy future for Arizona that delivers shareholder value and shared value by serving our customers with reliable, affordable, and clean energy.
Previous report
APS’s focus remains on its customers and the communities it serves. In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, such as improving the ease-of-use of APS’s automated phone system, improving the speed of answering customer calls, advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. Recently, APS redesigned its customer bills with the aim of increasing personalization and helping customers better understand their energy use and ways to save. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints as well, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.
Previous report
While our energy mix evolves, APS’s commitment to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to those experienced in other industries.
Previous report
Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). The Ten-Year Transmission Plan includes critical transmission projects that comprise the APS strategic transmission portfolio, which represent a significant upgrade to our existing transmission system. These transmission projects will support growing energy needs, strengthen reliability, and allow for the connection of new resources.
Previous report
Our advanced distribution management system allows operators to locate outages and control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid.
Previous report
Maintaining reliability and affordability for customers is fundamental to APS’s strategy. Dispatchable natural gas generators provide energy during times when intermittent resources, such as solar and wind, are insufficient to meet customer demand. In addition to the previously added natural gas units at the modernized Ocotillo Power Plant in 2019 and efficiency improvements to gas units at the Redhawk, Sundance, and West Phoenix Power Plants in 2024, APS has contracted for two simple cycle combustion turbines (approximately 90 MW in total) at Sundance, which are expected to be in service in 2026, and eight simple cycle combustion turbines (approximately 397 MW in total) at Redhawk, which are expected to be in service in 2028. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.
Previous report
APS went live with a new Energy Management System (“EMS”) in April 2024. APS expects the new EMS to provide a better foundation which will improve future integration of the renewable and energy storage assets into APS’s generation resource portfolio, allowing APS to maximize the flexibility of its resources and fully engage in the Western Energy Imbalance Market (“WEIM”). APS also believes it will better position APS to participate in market opportunities that develop over the next decade.
Previous report
APS’s key elements to delivering reliable power include resource and transmission planning, sufficient reserve margins, partnering with customers to manage peak demand, fire mitigation, and operational preparedness, among others. Seasonal readiness procedures at APS include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating with federal, state, and local agencies on fire and emergency management.
Previous report
APS continues to focus on mitigating the cost pressures related to inflation and other factors, such as tariffs. Overall inflation grew by 1.8% in Phoenix and 2.8% nationally over the twelve months ended February 2025. Although inflationary impacts to APS have slightly eased in recent months, APS remains cautious of potential price increases as a result of current and proposed tariffs, which could lead to higher costs and supply chain constraints.
Previous report
In addition to managing the cost of electricity generation, APS has continued building upon existing cost management efforts, including a customer affordability initiative launched in 2019. The initiative was implemented company-wide to thoughtfully and deliberately assess our business processes and organizational approaches to completing high-value work and achieving internal efficiencies. APS continues to drive this initiative by identifying opportunities to streamline its business processes, mitigate cost increases, increase employee retention, and improve customer satisfaction.
Previous report
Clean Energy Commitment
Previous report
We are committed to doing our part to build a clean and carbon-free future. As Arizona stewards, we do what is right for the people and prosperity of Arizona. Our vision is to create a sustainable energy future for Arizona by providing reliable, affordable, and clean energy to our customers. We can accomplish our vision by collaborating with customers, communities, employees, policymakers, shareholders, and other stakeholders. Our clean energy commitment is based on sound science and supports continued growth and economic development while maintaining reliability and affordable prices for APS’s customers.
Previous report
APS’s clean energy commitment consists of three parts:
Previous report
•A 2050 goal to provide 100% clean, carbon-free electricity;
Previous report
•A 2030 target to achieve a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy; and
Previous report
APS’s ability to successfully execute its clean energy commitment depends upon a number of important external factors, including a supportive regulatory environment, sales and customer growth, development of clean energy technologies, and continued access to capital markets, among others.
Previous report
2050 Goal: 100% Clean, Carbon-Free Electricity. Achieving a fully clean, carbon-free energy mix by 2050 is our aspiration. Achieving this 2050 goal will require, among other things, innovative thinking, emergent clean energy and storage technologies, upgrades and expansions to the grid, and supportive public policy.
Previous report
2030 Goal: 65% Clean Energy. APS has an energy mix that is approximately 54% clean and plans to continue to add more renewables and energy storage. By building on those plans, APS intends to attain an energy mix that is 65% clean by 2030, with 45% of APS’s generation portfolio coming from renewable energy. “Clean” is measured as percent of energy mix, which includes all carbon-free resources like nuclear, renewables, and demand-side management. “Renewable” energy includes generation resources such as solar, wind, and biomass, and is measured in accordance with the ACC Renewable Energy Standard as a percentage of retail sales. This target will serve as a checkpoint for our resource planning, investment strategy, and customer affordability efforts as APS moves toward a 100% clean, carbon-free energy mix by 2050.
Previous report
2031 Goal: Exit Coal-Fired Generation. The plan to exit coal-fired generation by 2031 will require APS to stop relying on coal-generation at Four Corners Power Plant (“Four Corners”). APS has permanently retired more than 1,000 MW of coal-fired electric generating capacity. These closures and other measures taken by APS have resulted in annual carbon emissions that were 34% lower in 2024 compared to 2005. In addition, APS has ceased generating electricity at the Cholla Power Plant (“Cholla”) in March 2025, in accordance with federal regulations and due to increasing costs that have made the plant uneconomical to operate. On April 8, 2025, President Trump issued coal-related executive orders aimed at increasing domestic energy production. APS is monitoring the executive orders and related regulatory actions.
Previous report
In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners as early as fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation, one generating unit would be shut down during seasons when electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the date of this report, APS has elected not to begin seasonal operation due to market conditions.
Previous report
Renewables. APS’s IRP identifies a diverse mix of resources adequate to maintain grid reliability while serving increasing future customer energy needs. Our IRP shows that renewable and clean resources are an important part of a reliable, cost effective portfolio. APS seeks market-based pricing of procured resources through regular solicitation of project bids using its competitive ASRFP process.
Previous report
APS has a diverse portfolio of existing and planned resources, including solar, wind, energy storage, nuclear, geothermal, biomass and biogas, that supports our commitment to clean energy. This commitment is already strengthened by Palo Verde, one of the nation’s largest carbon-free, clean energy resources, which provides the foundation for reliable and affordable service for APS customers. APS’s longer-term clean energy strategy includes pursuing the right mix of purchased power contracts for new resources, procurement of new resources to be owned by APS, and the ongoing development of distributed energy resources. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible.
Previous report
The following table summarizes the resources in APS’s renewable energy portfolio that are in operation, planned or under development as of the date of this report. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting, and interconnection of the projects to the electric grid.
Previous report
(a) Includes rooftop solar facilities owned by third parties. DG is produced in direct current and is converted to alternating current for reporting purposes.
Previous report
(b) Applications received by APS that are not yet installed and online.
Previous report
Energy Storage. APS deploys a number of advanced technologies on its system, including energy storage. Energy storage provides capacity, improves power quality, can be utilized for system regulation and, in certain circumstances, be used to defer certain traditional infrastructure investments. Energy storage also aids in integrating renewable generation by storing excess energy when system demand is low and renewable production is high and then releasing the stored energy during peak demand hours later in the day and after sunset. APS is utilizing grid-scale energy storage projects to meet customer reliability requirements, increase renewable utilization, and to further our understanding of how storage works with other advanced technologies and the grid.
Previous report
The following table summarizes the resources in APS’s energy storage portfolio that are in operation, planned or under development as of the date of this report. Agreements for the development and completion of future resources are subject to various conditions.
Previous report
(a) Includes 0.3 MW of APS-owned customer-sited energy storage.
Previous report
Developing Clean Energy Technologies
Previous report
New Nuclear Generation
Previous report
As a part of the Arizona statewide transportation electrification plan (“TE Plan”) adopted in 2021, the ACC approved a target of 450,000 light-duty electric vehicles (“EVs”) in APS’s service territory by 2030. APS’s Take Charge AZ (“TCAZ”) program has helped to deploy Level 2 EV charging stations on customer properties for fleet, public, and workplace EV charging. As of March 31, 2025, APS has installed 829 energized Level 2 charging ports at 197 customer locations. Additionally, APS has energized direct current fast charging stations that are owned and operated by APS at five locations in Arizona: Sedona, Prescott, Globe, Show Low, and Payson. Effective December 12, 2023, the TCAZ program was discontinued by the ACC. As part of that decision, APS was permitted to complete certain projects that were in process as of December 12, 2023.
Previous report
Additionally, as part of APS’s DSM Implementation Plan, APS launched the EV Charging Demand Management Pilot to proactively address the growing electric demand from charging as EVs become more widely adopted. The EV programs in the DSM Implementation Plan include APS SmartCharge (an EV data gathering program), Fleet Advisory Services, and a $100 rebate to homebuilders for new homes to be built EV-ready with 240V receptacle. APS previously offered a $250 residential rebate to customers that purchased a qualifying home Level 2 charger. Effective December 12, 2023, APS discontinued this rebate per the ACC decision. See the discussion above. APS has also filed, and the ACC has approved, an application for a new Bring-Your-Own-Device (“BYOD”) Battery Pilot Plan of Administration as required by Decision No. 79293. This plan allows APS to work with residential customers to enable APS to dispatch participating batteries and use them to provide demand response capacity to the grid. The BYOD program will be incorporated into future DSM Implementation Plan filings.
Previous report
APS filed its 2024 DSM Implementation Plan on November 30, 2023. The 2024 DSM Implementation Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs that were initially proposed in the 2023 DSM Implementation Plan: an expanded residential EV Managed Charging program and a Commercial EV Make-Ready Program. On April 26, 2024, APS filed an amended 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget of $90.9 million to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The amended 2024 DSM Implementation Plan is still pending ACC review and approval. APS does not intend to file a 2025 DSM Implementation Plan, pending ACC review of the amended 2024 DSM Implementation Plan. APS cannot predict the outcome of this proceeding.
Previous report
Carbon Capture
Previous report
Sustainability Practices
Previous report
In 2020, in support of our clean energy commitment, we created a Sustainability Department at Pinnacle West responsible for integrating responsible business practices into the everyday work of the Company.
Previous report
In 2024, we leveraged an external consultant and leveraged input from employees, large customers, limited-income advocates, economic development groups, tribes, nonprofits, environmental non-governmental organizations, residential customers, and other stakeholders to identify and assess the sustainability issues that matter most. In total, 15 Priority Sustainability Issues (“PSIs”) were identified and prioritized. The top five issues that were prioritized by stakeholders are as follows: energy affordability, electric reliability, clean energy and decarbonization, workforce development, and climate resilience and adaptation. Understanding the sustainability priorities of internal and external stakeholders can help companies improve performance, identify risks and opportunities, and refine sustainability strategy.
Previous report
Artificial Intelligence
Previous report
APS expects to file an application with the ACC for its next general rate case mid-year 2025 and is continuing to evaluate the timing of such filing.
Previous report
2022 Retail Rate Case
Showing the first 40 of 57 passages. Open the source sections for the rest.
Reworded paragraphs (58)
Previous wording
Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $27 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.
Current wording
Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $29 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.
Previous wording
Palo Verde. Palo Verde, one of the nation’s largest carbon-free, clean energy resources, will continue to be a foundational part of APS’s resource portfolio. Palo Verde is not just the cornerstone of our current clean energy mix; it also is a significant provider of clean energy to the southwestern United States. The plant is a critical asset to the Southwest, generating more than 32 million MWh annually – enough power for roughly 3.4 million households, or approximately 8.5 million people. Its continued operation is important to a carbon-free and clean energy future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy.
Current wording
Palo Verde, one of the nation’s largest carbon-free energy resources, serves as a foundational part of APS’s resource portfolio. The plant is a critical asset to the Southwest, generating more than 32 million MWh annually – enough power for roughly 3.4 million households, or approximately 8.5 million people. Its continued operation is important to a carbon-neutral future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy. APS owns or leases 29.1% of Units 1, 2, and 3 Palo Verde. For Unit 2, APS currently leases nearly 12.1% through three separate sale-leaseback agreements, which have lease terms ending in 2033. In June 2025, APS entered into agreements to purchase two of the three leased interests, representing approximately 7%, or 94 MW, of Unit 2, subject to customary closing conditions, including approval by FERC. See Note 8 for more information. The 2025 Rate Case (as defined below) includes pro forma adjustments to account for these acquisitions. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.
Previous wording
Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii, California, and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of fire modeling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. In 2024, APS began installing a system of artificial intelligence-based fire sensing cameras with the ability to detect and alert on fire ignitions. These alerts are sent both to APS and fire response dispatch centers to speed fire response in APS’s service territory regardless of the cause of the fire. APS also implemented a public safety power shutoff (“PSPS”) program on certain feeders that began in the 2024 fire season, leveraging the additional real-time analysis provided by the new modeling software, and has educated and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.
Current wording
Wildfire Efforts. As discussed above, wildfire safety remains a critical focus for APS and other utilities. APS has increased investment in fire mitigation efforts to clear defensible space around its infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders, and educate customers and communities. APS also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With wildfire events in Hawaii, California, and across North America over the last few years, APS has been devoting and intends to continue to devote substantial efforts to analyzing and developing enhancements to its systems and processes to mitigate fire risk within its service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities.
Previous wording
Additionally, APS was selected by the U.S. Department of Energy’s (“DOE”) Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO.
Current wording
APS was selected by the U.S. Department of Energy’s (“DOE”) Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO. Additionally, on May 12, 2025, Arizona
Previous wording
APS’s customer affordability initiative includes internal opportunities, such as training and mentoring employees on identifying efficiency opportunities; maintaining an inventory to take advantage of lower pricing and avoid expediting fees; entering into long-term contracts to hedge against price volatility, which has allowed APS to mitigate against procurement spend areas such as transformers; and implementing automation technologies to enhance efficiencies and increase data-oriented decision making.
Current wording
APS’s customer affordability initiative includes internal opportunities, such as training and mentoring employees on identifying efficiency opportunities; maintaining inventory to take advantage of lower pricing and avoid expediting fees; entering into long-term contracts to hedge against price volatility, which has allowed APS to mitigate against procurement spend on critical items such as transformers; and implementing automation technologies to enhance efficiencies and increase data-oriented decision making. APS is also seeking to reduce cross-subsidization of customer classes and ensure that growth pays for growth by requesting modifications to its cost allocation methodologies in the 2025 Rate Case. APS continues to seek opportunities to streamline its business processes, mitigate cost increases, increase employee retention, and improve customer satisfaction.
Previous wording
There are also external opportunities that allow APS to deliver more affordable energy to customers, such as APS’s participation in western energy markets and programs. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool (“SPP”). The Markets+ tariff was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024 and was approved on January 16, 2025. APS is a funding party to the implementation phase of Markets+ and expects to go live in the market in 2027. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and is transitioning to full-binding participation as early as summer 2027. These regional efforts are driven by the objectives of reducing customer cost and improving reliability. Until the transition to Markets+, APS will continue to participate in WEIM as a tool for creating savings for APS’s customers from the real-time only, voluntary market. APS expects that its participation in WEIM and future participation in Markets+ will lower its fuel and purchased-power costs, improve situational awareness for systems operations in the Western Interconnection power grid, and improve integration of APS’s clean resources.
Current wording
There are also external opportunities that allow APS to deliver more affordable energy to customers, such as APS’s participation in western energy markets and programs. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool (“SPP”). The Markets+ tariff was filed with FERC on March 29, 2024 and was approved on January 16, 2025. APS is a funding party to the implementation phase of Markets+ and expects to go live in the market in October 2027. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and plans to transition to full-binding participation as early as summer 2027. These regional efforts are driven by the objectives of reducing customer cost and improving reliability. Until the transition to Markets+, APS will continue to participate in Western Energy Imbalance Market (“WEIM”) as a tool for creating savings for APS’s customers from the real-time only, voluntary market. APS expects that its participation in WEIM and future participation in Markets+ will lower its fuel and purchased-power costs, improve situational awareness for systems operations in the Western Interconnection, and improve integration of APS’s resources.
Previous wording
•A plan to exit from coal-fired generation by 2031.
Current wording
In 2020, APS announced a goal to deliver 100% clean, carbon-free electricity to customers by 2050, driven by a trajectory of increasingly clean energy technologies such as solar power and energy storage, carbon-free nuclear operations, and advances in energy efficiency solutions. This goal included interim targets of a resource mix that was 65% clean by 2030, with 45% of that total coming from renewable energy, and an exit from coal-fired generation by 2031.
Previous wording
In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan (“IRP”), to identify what resources will be necessary to safely and reliably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, impacts from weather, and new resource technology availability impact the amount and type of resources required to reliably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy generating resources to reliably serve customers’ future energy needs in the most affordable and sustainable manner possible. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through the all-source request for proposal (“ASRFP”) process, with the most recent ASRFPs being issued in 2022, 2023, and 2024. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources. Through the ASRFP process, APS has found that clean resources like wind, solar, and energy storage technology, are important elements of a least cost portfolio. During the clean energy transition, dispatchable resources will play a vital role in maintaining grid reliability by serving as a back-up to intermittent energy resources when output is insufficient to meet customer needs. Over the long term, each resource in a balanced and diverse portfolio is expected to provide complementary value and contribute to sustained delivery of reliable electric service.
Current wording
APS has a diverse portfolio of existing and planned resources, including biomass, biogas, coal, energy storage, geothermal, natural gas, nuclear, solar, and wind. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible. Every three years, APS performs a comprehensive study, called an IRP, to identify what resources will be necessary to safely, reliably, and affordably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, impacts from weather, and new resource technology availability impact the amount and type of resources required to reliably and affordably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy-generating resources to reliably serve customers’ future energy needs. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through the all-source request for proposal (“ASRFP”) process, with the most recent ASRFP being issued in 2024. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources.
Previous wording
APS uses competitive ASRFPs to pursue market-priced resources that meet its system needs and offer the best value for customers. APS selects projects based on cost, ability to meet system requirements and commercial viability, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Guided by IRP-established timelines and quantities, APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the ASRFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection to the electric grid.
Current wording
APS selects projects out of ASRFPs based on cost, ability to meet system requirements, and commercial viability, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Guided by IRP-established timelines and quantities, APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the ASRFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection to the electric grid.
Previous wording
On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) pursuant to which APS procured nearly 7,300 MW of new resources to be in service from 2026 to 2028.
Current wording
On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) pursuant to which APS procured 3,606 MW of battery storage, 517 MW of natural gas, 2,649 of solar, and 500 MW of wind resources expected to be in service from 2026 to 2028.
Previous wording
Additionally, APS has implemented a variety of financial assistance programs to support customers struggling to pay their energy bills. Among these assistance programs are discounts for qualified limited-income customers, including a new tier with larger discounts for APS’s lowest income customers added in the second quarter of 2024 and other non-income-based assistance programs, such as flexible payment arrangements and emergency utility bill assistance. To ensure our most vulnerable customers are connected to these programs, we train and partner with more than one hundred community action agencies across our service territory.
Current wording
Additionally, APS offers a customer assistance program, including up to a 60% bill discount for vulnerable customers, flexible payment arrangements, and emergency utility bill assistance. To ensure customers in need are connected to these programs, we partner with more than one hundred community action agencies across our service territory to train representatives who serve our shared customers.
Previous wording
APS, along with other Arizona electric utilities, is exploring additional nuclear generation to provide around-the-clock carbon-free energy to meet rising energy demands in Arizona. APS has been monitoring emerging nuclear technologies, such as small modular nuclear reactors (“SMRs”). SMRs are typically designed to generate 300 MW or less of energy per unit compared to, for example, the 1,400 MW per unit generated at Palo Verde. The utilities have applied for a grant from the DOE to begin preliminary exploration of a potential site for additional nuclear energy for Arizona. The grant could support a three-year site selection process and possible preparation of an early site permit application to United States Nuclear Regulatory Commission (“NRC”).
Current wording
New Nuclear Generation. APS, along with other Arizona electric utilities, is exploring additional nuclear generation to provide around-the-clock carbon-free energy to meet rising energy demands in Arizona. APS has been monitoring emerging nuclear technologies, such as small modular nuclear reactors (“SMRs”). SMRs are typically designed to generate 300 MW or less of energy per unit compared to, for example, the 1,400 MW per unit generated at Palo Verde. The utilities have applied for a grant from the DOE to begin preliminary exploration of a potential site for additional nuclear energy for Arizona. The grant could support a three-year site selection process and possible preparation of an early site permit application to United States Nuclear Regulatory Commission (“NRC”).
Previous wording
Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology.
Current wording
Carbon Capture. Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology.
Previous wording
To address the rapid advancement of artificial intelligence technology risks and opportunities, APS has developed a cross functional governance structure with leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams. This cross functional structure assesses the opportunities and risks in alignment with enterprise strategy to ensure compliance with data security and reliability requirements as well as our Code of Ethical Conduct, while observing market trends in this rapidly evolving area.
Current wording
Artificial Intelligence. To address the rapid advancement of artificial intelligence (“AI”) technology risks and opportunities, APS has developed an AI strategy that responsibly utilizes AI to advance our business strategy, enhance customer and employee experiences, and optimize operational reliability. At the core of our AI strategy is a robust governance model that develops guidance, policies, and relevant sub-strategies for the execution of AI projects at the Company. To ensure compliance with data security, reliability requirements, and our Code of Ethical Conduct, governance and oversight are provided by leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams.
Previous wording
On January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order (“ROO”) in the 2022 Rate Case, as corrected on February 6, 2024 (the “2022 Rate Case ROO”). The 2022 Rate Case ROO recommended, among other things, (i) a $523.1 million increase in the annual base rate revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.36%, (v) 12 months of post-test year plant and the inclusion of the Four Corners Effluent Limitations Guideline (“ELG”) project, (vi) the approval of APS’s System Reliability Benefit (“SRB”) proposal with certain procedural and other modifications, (vii) no additional Coal Community Transition (“CCT”) funding, (viii) a 5.0% return on the prepaid pension asset and a return of 5.35% on the Other Post-Employment Benefits liability, and (ix) no disallowances on APS’s coal contracts.
Current wording
•12 months of post-test year plant placed into service from January 1, 2025 through December 31, 2025;
Previous wording
On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an ASRFP, and (viii) recovery of all DSM costs through the DSM Adjustment Charge (“DSMAC”) rather than through base rates.
Current wording
On February 22, 2024, the ACC approved the 2022 Rate Case ROO with certain amendments that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an ASRFP, and (viii) recovery of all Demand Side Management (“DSM”) costs through the DSM Adjustment Charge (“DSMAC”) rather than through base rates.
Previous wording
The ACC’s decision results in an expected total net annual revenue increase for APS of approximately $253.4 million and a roughly 8% increase to the typical residential customer’s bill. The ACC issued the final order for the 2022 Rate Case on March 5, 2024, with the new rates becoming effective for all service rendered on or after March 8, 2024.
Current wording
The ACC issued the final order for the 2022 Rate Case on March 5, 2024, with the new rates becoming effective for all service rendered on or after March 8, 2024.
Previous wording
Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association (“AriSEIA”), Solar Energy Industries Association (“SEIA”), and Vote Solar specifically to review whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. A limited rehearing was held October 28 through November 1, 2024. Following the limited rehearing, an Administrative Law Judge issued a ROO (the “Limited Rehearing ROO”) on December 3, 2024. The Limited Rehearing ROO recommended affirming the GAC as just and reasonable and that the GAC is not discriminatory to solar customers and the absence of a GAC is not discriminatory to non-solar customers. On December 17, 2024, the ACC approved the Limited Rehearing ROO with an amendment that requires APS in its next rate case to propose a revenue allocation based on a site-load cost of service study in order to bring further parity in revenue collection between solar and non-solar customers. SEIA, AriSEIA, Vote Solar, the Arizona Attorney General, and two individual customers have filed requests for rehearing of the Commission’s December 17, 2024 decision on the rehearing. The Commission has taken no action on these requests. In addition, each of these parties have subsequently filed notices of appeal to the Arizona Court of Appeals seeking review of the ACC’s decisions regarding the GAC and on rehearing. APS cannot predict the outcome of these proceedings.
Current wording
Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association (“AriSEIA”), Solar Energy Industries Association (“SEIA”), and Vote Solar specifically to review whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. A limited rehearing was held October 28 through November 1, 2024. Following the limited rehearing, an Administrative Law Judge issued a ROO (the “Limited Rehearing ROO”) on December 3, 2024. The Limited Rehearing ROO recommended affirming the GAC as just and reasonable and that the GAC is not discriminatory to solar customers and the absence of a GAC is not discriminatory to non-solar customers. On December 17, 2024, the ACC approved the Limited Rehearing ROO with an amendment that requires APS in its next rate case to propose a revenue allocation based on a site-load cost of service study in order to bring further parity in revenue collection between solar and non-solar customers. SEIA, AriSEIA, Vote Solar, the Arizona Attorney General, and two individual customers have filed requests for rehearing of the Commission’s December 17, 2024 decision on the rehearing. The Commission has taken no action on these requests. In addition, each of these parties have subsequently filed an appeal to the Arizona Court of Appeals seeking review of the ACC’s decisions regarding the GAC and on rehearing. APS cannot predict the outcome of these proceedings.
Previous wording
On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments and held two workshops exploring ways to reduce regulatory lag, including alternative ratemaking structures such as future test years, hybrid test years, and formula rates. On December 3, 2024, the ACC approved a policy statement regarding formula rate plans. The policy statement provides regulated utilities with the opportunity to propose formula rate plans in future rate cases. On March 28, 2025, the Residential Utility Consumer Office filed a lawsuit challenging the ACC’s authority to issue the formula rate policy statement outside of Arizona’s formula rulemaking process. APS cannot predict the outcome of this matter.
Current wording
On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments and held two workshops exploring ways to reduce regulatory lag, including alternative ratemaking structures such as future test years, hybrid test years, and formula rates. On December 3, 2024, the ACC approved a policy statement regarding formula rate plans. The policy statement provides regulated utilities with the opportunity to propose formula rate plans in future rate cases. On March 28, 2025, the Residential Utility Consumer Office
Previous wording
On August 14, 2024, APS filed a request with the ACC for a deferral order associated with unrecovered book value and closure costs of Cholla Units 1 and 3. This order would authorize APS to defer, for future recovery in rates, both the expenses necessary to close and decommission coal-fired power plant infrastructure at Cholla, including legally required site environmental remediation, coal combustion residuals (“CCR”) corrective actions, the closure of CCR management facilities, and any unrecovered plant investment and operating costs incurred through and after April 2025. APS cannot predict the outcome of this matter.
Current wording
On August 14, 2024, APS filed a request with the ACC for a deferral order associated with unrecovered book value and closure costs of Cholla Units 1 and 3. This order would authorize APS to defer, for future recovery in rates, both the expenses necessary to close and decommission coal-fired power plant infrastructure at Cholla, including legally required site environmental remediation, coal combustion residuals (“CCR”) corrective actions, the closure of CCR management facilities, and any unrecovered plant investment and operating costs incurred through and after April 2025. On July 8, 2025, APS withdrew its deferral application, requesting that the costs that would have been covered in the deferral order request instead be addressed in the 2025 Rate Case.
Previous wording
On August 14, 2024, APS filed a request with the ACC for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter.
Current wording
On August 14, 2024, APS filed a request with the ACC for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. On June 18, 2025, the ACC denied APS’s request and recommended that wildfire related expenses be recovered in APS’s 2025 Rate Case.
Previous wording
The Inflation Reduction Act of 2022 (“IRA”) significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury Department have issued guidance related to various provisions of the IRA that have enabled APS to claim credits related to its solar and energy storage investments. The Company continues to await regulations and other guidance, including with respect to the nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits. See Note 17 for more information.
Current wording
The Inflation Reduction Act of 2022 (“IRA”) significantly expanded the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions included (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032.
Previous wording
PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates. The DOE’s GDO selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-
Current wording
PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the TransCanyon partners’ utility affiliates. The DOE’s GDO selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.
Previous wording
PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term PPAs. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.
Current wording
PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term power purchase agreements. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.
Previous wording
•$25 million investment in the Energy Impact Partners fund, of which approximately $19.1 million has been funded as of March 31, 2025. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.
Current wording
•$25 million investment in the Energy Impact Partners fund, of which approximately $19.5 million has been funded as of June 30, 2025. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.
Previous wording
•Equity investment in SAI Advanced Power Solutions (“SAI”), a private corporation that manufactures electrical switchgear equipment used by data centers. El Dorado accounts for this investment under the equity method, with a March 31, 2025 investment carrying value of $12.1 million. SAI has seen an increased demand for their customized switchgear products. El Dorado has no funding commitments to SAI.
Current wording
•Equity investment in SAI Advanced Power Solutions (“SAI”), a private corporation that manufactures electrical switchgear equipment used by data centers. El Dorado accounts for this investment under the equity method, with a June 30, 2025 investment carrying value of $18.6 million. El Dorado has no further funding commitments to SAI.
Previous wording
Electric Operating Revenues. For the years 2022 through 2024, retail electric revenues averaged approximately 92% of our total operating revenues. Our electric operating revenues are affected by customer growth or decline, variations in weather from period to period, customer mix, average usage per customer and the impacts of energy efficiency programs, distributed energy additions, electricity rates and tariffs, the recovery of PSA deferrals and the operation of other recovery mechanisms. Our revenues are affected by the availability of excess generation or other energy resources and wholesale market conditions, including competition, demand, and prices.
Current wording
Electric Operating Revenues. For the years 2022 through 2024, retail electric revenues averaged approximately 92% of our total operating revenues. Our electric operating revenues are affected by customer growth or decline, variations in weather from period to period, customer mix, average usage per customer and the impacts of energy efficiency programs, distributed energy additions, electricity rates and tariffs, the recovery of Power Supply Adjustor (“PSA”) deferrals and the operation of other recovery mechanisms. Our revenues are affected by the availability of excess generation or other energy resources and wholesale market conditions, including competition, demand, and prices.
Previous wording
Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.3% for the period ended March 31, 2025, compared with the prior-year period. For the three years through 2024, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2025 and the average annual growth to be in the range of 1.5% to 2.5% through 2027 based on anticipated steady population growth in Arizona during that period.
Current wording
Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.4% for the period ended June 30, 2025 compared with the prior-year period. For the three years through 2024, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2025 and the average annual growth to be in the range of 1.5% to 2.5% through 2027 based on anticipated steady population growth in Arizona during that period.
Previous wording
Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 2.1% for the period ended March 31, 2025, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the continued ramp-up of new data center and large manufacturing customers. As extra high load factor customers, such as data centers and large manufacturers, have continued to grow as a proportion of our business, we have updated our procedures with respect to estimates of unbilled revenues for our customer classes. As a result, we have made an adjustment in the first quarter of 2025 to recalibrate accrued unbilled revenues, offsetting year-to-date sales growth by 1.9%. Even with this offset to sales growth in the first quarter, we do not anticipate any change to our expected range of sales growth for the full year 2025.
Current wording
Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 3.8% for the period ended June 30, 2025 compared with the prior-year period. While steady customer growth was somewhat offset by lower usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of increased revenues for this period were continued strong sales to commercial and industrial customers and the continued ramp-up of new data center and large manufacturing customers. As extra high load factor customers, such as data centers and large manufacturers, have continued to grow as a proportion of our business, we have updated our procedures with respect to estimates of unbilled revenues for our customer classes. As a result, we have made an adjustment in the first quarter of 2025 to recalibrate accrued unbilled revenues, offsetting year-to-date sales growth by 0.9%. Even with this offset to sales growth in the first quarter, we do not anticipate any change to our expected range of sales growth for the full year 2025.
Previous wording
Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer large data centers and manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $24 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $6 million.
Current wording
Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer large data centers and manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in distributed generation, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $24 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $6 million.
Previous wording
Fuel and Purchased Power Costs. Fuel and purchased power costs included on our Consolidated Statements of Income are impacted by our electricity sales volumes, existing contracts for purchased power and generation fuel, our power plant performance, transmission availability or constraints, prevailing market prices, new generating plants being placed in service in our market areas, changes in our generation resource allocation, our hedging program for managing such costs and PSA deferrals and the related amortization.
Current wording
Fuel and Purchased Power Expenses. Fuel and purchased power expenses included on our Condensed Consolidated Statements of Income are impacted by our electricity sales volumes, existing contracts for purchased power and generation fuel, our power plant performance, transmission availability or constraints, prevailing market prices, new generating plants being placed in service in our market areas, changes in our generation resource allocation, our hedging program for managing such costs and PSA deferrals and the related amortization.
Previous wording
Our consolidated net loss attributable to common shareholders for the three months ended
Current wording
Our consolidated net income attributable to common shareholders for the three months ended
Previous wording
(a) Operating revenues less fuel and purchased power expenses is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power expense as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power expense is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.
Current wording
(a) Operating revenues less fuel and purchased power expenses is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power expenses as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power expenses is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.
Previous wording
Operating revenues less fuel and purchased power expenses. Operating revenues less fuel and purchased power expenses were $58 million higher for the three months ended March 31, 2025, compared with the prior-year period. The following table summarizes the major components of this change (dollars in millions):
Current wording
Operating revenues less fuel and purchased power. Operating revenues less fuel and purchased power expenses were $10 million higher for the three months ended June 30, 2025 compared with the prior-year period. The following table summarizes the major components of this change (dollars in millions):
Previous wording
Operations and maintenance. Operations and maintenance expenses increased $42 million for the three months ended March 31, 2025, compared with the prior-year period primarily due to:
Current wording
Operations and maintenance. Operations and maintenance expenses increased $15 million for the three months ended June 30, 2025 compared with the prior-year period primarily due to:
Previous wording
•an increase of $4 million related to corporate resource costs; and
Current wording
•an increase of $12 million related to corporate resource costs;
Previous wording
•an increase of $13 million related to information technology costs;
Current wording
•an increase of $6 million related to information technology costs;
Previous wording
•an increase of $17 million related to non-nuclear generation costs, primarily due to higher planned outage;
Current wording
•an increase of $1 million related to non-nuclear generation costs, primarily due to higher planned outage;
Previous wording
•an increase of $2 million for other miscellaneous factors.
Current wording
•an increase of $3 million for other miscellaneous factors.
Previous wording
Depreciation and amortization. Depreciation and amortization expenses were $25 million higher for the three months ended March 31, 2025, compared to the prior-year period primarily due to increased plant in service and intangible assets.
Current wording
Depreciation and amortization. Depreciation and amortization expenses were $4 million higher for the three months ended June 30, 2025 compared to the prior-year period, primarily due to increased plant in service and intangible assets, partially offset by lower depreciation expense related to the Cholla plant retirement.
Showing the first 40 of 58 pairs. Open the source sections for the rest.
Rearranged current paragraphs (14)
Current report — wording carried from elsewhere
APS uses fire modeling software to identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. In 2024, APS began installing a system of artificial intelligence-based fire sensing cameras with the ability to detect and alert on fire ignitions. These alerts are sent both to APS and fire response dispatch centers to speed fire response in APS’s service territory regardless of the cause of the fire. APS also implemented a public safety power shutoff (“PSPS”) program on certain feeders that began in the 2024 fire season, leveraging the additional real-time analysis provided by the modeling software. APS has educated and will continue education outreach to customers and communities that may potentially be impacted by the PSPS program.
Current report — wording carried from elsewhere
On October 28, 2022, APS filed an application with the ACC (the “2022 Rate Case”) for an increase in retail base rates, and on January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order (“ROO”), as corrected on February 6, 2024 (the “2022 Rate Case ROO”).
Current report — wording carried from elsewhere
•a decrease of $2 million related to transmission, distribution, and customer service costs;
Current report — wording carried from elsewhere
Our consolidated net income attributable to common shareholders for the six months ended
Current report — wording carried from elsewhere
The following table presents net income attributable to common shareholders compared with the prior year for Pinnacle West consolidated and for APS consolidated:
Current report — wording carried from elsewhere
(a) Operating revenues less fuel and purchased power expenses is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power expenses as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power expenses is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.
Current report — wording carried from elsewhere
Operating revenues less fuel and purchased power. Operating revenues less fuel and purchased power expenses were $68 million higher for the six months ended June 30, 2025 compared with the prior-year period. The following table summarizes the major components of this change:
Current report — wording carried from elsewhere
•an increase of $19 million related to information technology costs;
Current report — wording carried from elsewhere
•an increase of $18 million related to non-nuclear generation costs, primarily due to increased planned outages;
Current report — wording carried from elsewhere
•an increase of $16 million related to corporate resource costs;
Current report — wording carried from elsewhere
•an increase of $3 million for other miscellaneous factors.
Current report — wording carried from elsewhere
Pension and other postretirement non-service credits, net. Pension and other postretirement non-service credits, net were $17 million lower for the six months ended June 30, 2025 compared to the prior-year period primarily, due to prior-service credits becoming fully amortized as of January 31, 2025.
Current report — wording carried from elsewhere
BCE recognized during the first quarter of 2024 and lower PSA interest income, partially offset by investment gains in El Dorado. The difference between APS’s and Pinnacle West’s other income and expense, net is primarily related to Pinnacle West’s gain on the sale of BCE and the gain in investment in El Dorado.
Current report — wording carried from elsewhere
Interest charges, net of allowance for borrowed funds and equity funds used during construction. Interest charges, net of allowance for funds used during construction, were $4 million higher for the six months ended June 30, 2025 compared to the prior-year period, primarily due to higher debt balances and higher allowance for borrowed funds, partially offset by higher allowance for equity funds.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
For example, on August 14, 2024, APS filed a request with the Arizona Corporation Commission (“ACC”) for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter. See Note 6 in Part I of this quarterly report for more information.
Previous report — wording carried elsewhere
Electric Vehicles and Demand Side Management (“DSM”)
Previous report — wording carried elsewhere
Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.