PINNACLE WEST CAPITAL CORP

For the period ended Mar 31, 2025. Filed May 1, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 1, 2025

PNW$104.22+0.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-06.

0000764622-24-000079

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-01.

0000764622-25-000047

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 245 previous paragraphs and 204 current paragraphs.

89 unchanged; 88 reworded; 25 added; 57 removed; 11 previous and 2 current paragraphs rearranged.

Tables are not compared: 14 previous and 12 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (25)

Current report

On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) pursuant to which APS procured nearly 7,300 MW of new resources to be in service from 2026 to 2028.

Current report

On November 20, 2024, APS issued an ASRFP (the “2024 ASRFP”) seeking 2,000 MW of resources. APS is seeking projects that can reach commercial operation beginning June 1, 2028 through June 1, 2030 but will consider projects that may achieve commercial operation as early as 2026. Additionally, APS is interested in projects that require longer planning, permitting, and construction and can be commercially operational after June 1, 2030. Bids for the 2024 ASRFP were due on February 5, 2025.

Current report

APS, along with other Arizona electric utilities, is exploring additional nuclear generation to provide around-the-clock carbon-free energy to meet rising energy demands in Arizona. APS has been monitoring emerging nuclear technologies, such as small modular nuclear reactors (“SMRs”). SMRs are typically designed to generate 300 MW or less of energy per unit compared to, for example, the 1,400 MW per unit generated at Palo Verde. The utilities have applied for a grant from the DOE to begin preliminary exploration of a potential site for additional nuclear energy for Arizona. The grant could support a three-year site selection process and possible preparation of an early site permit application to United States Nuclear Regulatory Commission (“NRC”).

Current report

In 2024, we leveraged an external consultant and leveraged input from employees, large customers, limited-income advocates, economic development groups, tribes, nonprofits, environmental non-governmental organizations, residential customers, and other stakeholders to identify and assess the sustainability issues that matter most. In total, 15 Priority Sustainability Issues (“PSIs”) were identified and prioritized. The top five issues that were prioritized by stakeholders are as follows: energy affordability, electric reliability, clean energy and decarbonization, workforce development, and climate resilience and adaptation. Understanding the sustainability priorities of internal and external stakeholders can help companies improve performance, identify risks and opportunities, and refine sustainability strategy.

Current report

APS expects to file an application with the ACC for its next general rate case mid-year 2025 and is continuing to evaluate the timing of such filing.

Current report

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments and held two workshops exploring ways to reduce regulatory lag, including alternative ratemaking structures such as future test years, hybrid test years, and formula rates. On December 3, 2024, the ACC approved a policy statement regarding formula rate plans. The policy statement provides regulated utilities with the opportunity to propose formula rate plans in future rate cases. On March 28, 2025, the Residential Utility Consumer Office filed a lawsuit challenging the ACC’s authority to issue the formula rate policy statement outside of Arizona’s formula rulemaking process. APS cannot predict the outcome of this matter.

Current report

Pinnacle West is the primary beneficiary of a protected cell captive insurance cell (the “Captive”). The Captive provides insurance coverage to Pinnacle West and our subsidiaries that supplements third-party insurance policies. The Captive insures Pinnacle West and its subsidiaries for terrorism coverage, excess liability including certain wildfire coverage, excess property insurance, and excess employment practice liability. The Captive policies exclude nuclear liability at Palo Verde. See Note 10. The Captive may hold investment assets in cash, cash equivalents, and equity and fixed income instruments.

Current report

The potential for enactment of federal tax reform legislation, including modification or repeal of some or all of the IRA tax provisions, has increased. Such changes may impact the availability of future potential tax benefits from the IRA and could impact the Company’s effective tax rate, cash taxes paid and other financial results such as earnings per share, gross revenues, and cash flows. We cannot predict the timing or extent of such tax-related developments which, absent appropriate regulatory treatment, may have a negative impact on our financial results.

Current report

•Equity investment in SAI Advanced Power Solutions (“SAI”), a private corporation that manufactures electrical switchgear equipment used by data centers. El Dorado accounts for this investment under the equity method, with a March 31, 2025 investment carrying value of $12.1 million. SAI has seen an increased demand for their customized switchgear products. El Dorado has no funding commitments to SAI.

Current report

(a) Operating revenues less fuel and purchased power expenses is a non-GAAP financial measure. As reconciled in the table above, this amount is derived by the difference between the GAAP financial statement line item Operating revenues less the GAAP financial statement line item Fuel and purchased power expense as presented on the Condensed Consolidated Statements of Income. Operating revenues, less fuel and purchased power expense is used by Pinnacle West to assess whether customer revenues adequately cover fuel and purchased power costs. This metric is not defined by GAAP and may differ from similar measures used by other companies. This measure is not a substitute for operating income under GAAP.

Current report

Pension and other postretirement non-service credits, net. Pension and other postretirement non-service credits, net were $9 million lower for the three months ended March 31, 2025, compared to the prior-year period primarily due to prior-service credits becoming fully amortized as of January 31, 2025. See Note 7.

Current report

Pinnacle West has an at-the-market equity distribution program (the “ATM Program”) under which Pinnacle West may offer and sell Pinnacle West common stock and enter into forward sale agreements from time to time, subject to market conditions and other factors. As of March 31, 2025, approximately $800 million of common stock is available to be issued under the ATM Program, which takes into account the forward sale agreements in effect as of March 31, 2025. Pinnacle West also has forward sale agreements from an equity offering in February 2024 in effect as of March 31, 2025. See “Financing Cash Flows and Liquidity—Equity Offerings” below and Note 12 for more information.

Current report

APS’s and Pinnacle West’s net cash provided by operating activities primarily relates to less income tax refunds at APS when compared to Pinnacle West and other changes in working capital.

Current report

Equity Offerings. Pinnacle West entered into certain equity forward sale agreements in February 2024 and has an ATM Program under which Pinnacle West may offer and sell Pinnacle West common stock and enter into equity forward sale agreements from time to time, subject to market conditions and other factors. See Note 12. The following table summarizes the activity relating to these forward sale agreements and the ATM Program as of March 31, 2025 (in thousands, except share amounts and price per share):

Current report

See Note 3 for information on the following new accounting standards that are pending adoption:

Current report

•ASU 2023-09, Income Taxes: Improvements to Income Tax Disclosures, effective for us on December 31, 2025.

Current report

•ASU 2024-03, Income Statement Reporting: Expense Disaggregation Disclosures, effective for us on December 31, 2027.
Removed paragraphs (57)

Previous report

In October 2021, APS announced plans to evaluate regional market solutions as part of the Western Markets Exploratory Group (“WMEG”). As a member of WMEG, APS explored the potential for a staged approach to new market services, including day-ahead energy sales, transmission system expansion, and other power supply and grid solutions consistent with existing regulations and known and expected market design. APS utilizes the work done by WMEG to help identify market solutions that can help achieve carbon reduction goals while supporting reliable, affordable service for customers. APS anticipates a day ahead market selection in the fourth quarter of 2024.

Previous report

On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources with a focus on in-service dates between 2026 and 2028. Bids from the 2023 ASRFP were received on September 6, 2023, and APS is negotiating on multiple projects and executed agreements on multiple others. These projects include the following facilities that APS will own and operate: a 168 MW solar facility, a 150 MW battery facility, 90 MW of natural gas at the Sundance Power Plant, and 397 MW of natural gas at the Redhawk Power Plant. In addition to the APS-owned projects, APS has also contracted for 500 MW of wind resources, 2,150 MW of solar plus storage resources, 1,100 MW of stand-alone battery resources, 150 MW of solar resources, and 30 MW via an existing natural gas toll uprate.

Previous report

The Sustainability Department engaged the Electric Power Research Institute (“EPRI”) and leveraged input from employees, large customers, limited-income advocates, economic development groups, environmental non-governmental organizations, leading sustainability academics and other stakeholders to identify and assess the sustainability issues that matter most. In total, 23 Priority Sustainability Issues (“PSIs”) were identified and prioritized. The most critical category includes four issues deemed most important and most able to be impacted by our actions: clean energy, customer experience, energy access and reliability, and safety and health. These PSIs provide the foundation for informing our strategic direction, creating a framework for incorporating best practices and driving enterprise-wide alignment and accountability. The Company also benchmarked best practices within the top four PSIs and has utilized this information to identify opportunities for improvement.

Previous report

Finally, the Company maintains an annual Corporate Responsibility Report on the Pinnacle West website (www.pinnaclewest.com/corporate-responsibility). The report provides information related to the Company’s sustainability practices and performance. The information on Pinnacle West’s website, including the Corporate Responsibility Report, is not incorporated by reference into or otherwise a part of this report.

Previous report

•a test year comprised of twelve months ended June 30, 2022, adjusted as described below;

Previous report

•an original cost rate base of $10.5 billion, which approximates the ACC-jurisdictional portion of the book value of utility assets, net of accumulated depreciation and other credits;

Previous report

•the following proposed capital structure and costs of capital:

Previous report

•a 1% return on the increment of fair value rate base above APS’s original cost rate base, as provided for by Arizona law;

Previous report

•a rate of $0.038321 per kWh for the portion of APS’s retail base rates attributable to fuel and purchased power costs;

Previous report

▪eliminate the Environmental Improvement Surcharge (“EIS”) and collect costs through base rates,

Previous report

▪eliminate the Lost Fixed Cost Recovery (“LFCR”) mechanism and collect costs through base rates and the Demand Side Management (“DSM”) Adjustment Charge (“DSMAC”),

Previous report

▪maintain as inactive the Tax Expense Adjustor Mechanism (“TEAM”),

Previous report

▪maintain the Transmission Cost Adjustment (“TCA”) mechanism,

Previous report

▪modify the Renewable Energy Adjustment Charge (“REAC”) to include recovery of capital carrying costs of APS owned renewable and storage resources;

Previous report

•changes to its limited-income program, including a second tier to provide an additional discount for customers with greater need; and

Previous report

•twelve months of post-test year plant investments to reflect used and useful projects that will be placed into service prior to July 1, 2023.

Previous report

On June 5, 2023, and June 15, 2023, the ACC Staff, the Residential Utility Consumer Office (“RUCO”) and other intervenors filed their initial written testimony with the ACC. The ACC Staff recommended, among other things, (i) a $251 million revenue increase or, as an alternative, a $312 million revenue increase, (ii) a 9.6% return on equity, (iii) a 0.0% fair value increment or, as an alternative, a 0.75% fair value increment, and (iv) a continuation of a 12-month post-test year plant. RUCO recommended, among other things, (i) an $84.9 million revenue increase, (ii) an 8.2% return on equity or, as an alternative, an 8.7% return on equity if the ACC imputes a hypothetical capital structure with a 46% equity layer, (iii) a fair value increment of 0.0%, and (iv) a reduction of post-test year plant to six months.

Previous report

On July 12, 2023, APS filed rebuttal testimony addressing the ACC Staff and intervenors’ direct testimonies. The principal provisions of APS’s rebuttal testimony were:

Previous report

•reducing the revenue requirement increase to $383.1 million, which reduced the average annual customer bill impact to an increase of 11.3%;

Previous report

•reducing the increment of fair value rate base return to 0.5% from 1.0%;

Previous report

•maintaining a post-test year plant request of 12 months, plus the Four Corners Effluent Limitation Guidelines (“ELG”) project;

Previous report

•withdrawing the Payment Fee Removal Proposal (net reduction) which was originally requested in APS’s initial application;

Previous report

•maintaining the LFCR mechanism and DSMAC as separate adjustors;

Previous report

•increasing the PSA annual rate change limit from $0.004/kWh to $0.006/kWh;

Previous report

•proposing a new System Reliability Benefit (“SRB”) recovery mechanism;

Previous report

•maintaining adjustor base transfers and elimination of EIS; and

Previous report

On July 26, 2023, the ACC Staff, RUCO and other intervenors filed their surrebuttal testimony with the ACC. The ACC Staff adjusted their initial recommendations to, among other things, (i) a $281.9 million revenue increase, (ii) a 9.68% return on equity, (iii) a 0.5% fair value increment, (iv) a continuation of a 12-month post-test year plant that includes the Four Corners ELG project, and (v) support of an increase to the annual PSA increase limit to $0.006/kWh. RUCO maintained their direct position and also recommended further review of the PSA in a second phase of the 2022 Rate Case.

Previous report

On August 4, 2023, APS filed rejoinder testimony addressing the ACC Staff and intervenors’ surrebuttal testimonies. APS’s rejoinder testimony included final post-test year plant values, reducing the revenue requirement increase to $377.7 million from $383.1 million, which reduced the average annual customer bill impact to an increase of 11.2%. All other major provisions from APS’s rebuttal testimony were maintained in its rejoinder testimony.

Previous report

On November 6, 2023, and November 21, 2023, APS and stakeholders filed briefs in the 2022 Rate Case. APS’s briefs included the reduction of the total revenue requirement increase to $376.2 million and a resulting average annual customer bill impact increase of 11.1%. All other major provisions from APS’s rejoinder testimony were maintained in its briefs. ACC Staff’s briefs included a proposed total revenue requirement increase from $281.9 million to $282.7 million and also included their support of APS’s SRB mechanism, contingent on increased stakeholder outreach.

Previous report

On October 31, 2019, APS filed an application with the ACC (the “2019 Rate Case”) for an annual increase in retail base rates. On August 2, 2021, an Administrative Law Judge issued a Recommended Opinion and Order in the 2019 Rate Case (the “2019 Rate Case ROO”) and issued corrections on September 10 and September 20, 2021. Subsequently, the ACC approved an amended 2019 Rate Case ROO on November 2, 2021. See Note 4 for information regarding the 2019 Rate Case ROO.

Previous report

After the 2019 Rate Case decision, APS filed an application for rehearing of the 2019 Rate Case and later filed a Notice of Direct Appeal by APS at the Arizona Court of Appeals, requesting review of certain matters from the 2019 Rate Case decision. The Arizona Court of Appeals affirmed in part and reversed in part the ACC’s decision in the 2019 Rate Case, remanding the issue to the ACC for further proceedings. On June 14, 2023, APS and the ACC Legal Division filed a joint resolution with the ACC to allow recovery of $215.5 million in costs related to the installation of the Four Corners selective catalytic reduction (“SCR”) project, a reversal of the 20-basis point reduction to APS’s return on equity from 8.9% to 8.7% as a result of the 2019 Rate Case decision, and recovery of $59.6 million in revenue lost by APS between December 2021 and June 20, 2023. The joint resolution provides for a new Court Resolution Surcharge (“CRS”) mechanism, which is designed to recover the $59.6 million in revenue lost by APS between December 2021 and June 20, 2023, and the prospective recovery of ongoing costs related to the SCR investments and expense and the allowable return on equity difference in current base rates. On June 21, 2023, the ACC approved the joint resolution and proposals therein for recovery through the CRS mechanism, which became effective on July 1, 2023. As of September 30, 2024,$22.5 million of the $59.6 million of lost revenue has been recovered. Finally, the CRS tariff has been updated to account for changes to return on equity and depreciation and deferral adjustments approved in Decision No. 79293 in the 2022 Rate Case. See Note 4 for more information regarding the 2019 Rate Case and Four Corners SCR cost recovery.

Previous report

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments from utilities and interested parties on ways to reduce regulatory lag, including alternative ratemaking structures such as future test years and hybrid test years. APS filed comments on June 1, 2023. On March 19, 2024, the ACC held a workshop to discuss modifying the state’s rate case test year rules. Utilities, including APS, spoke about alternatives to the current rules that could reduce regulatory lag. On April 19, 2024, a letter was filed to the docket by an ACC commissioner discussing the potential benefits of modifying test year rules, including the potentiality of offering utilities to choose the type of test year that best suits them. The letter also recommended that this issue be discussed at the next possible open meeting. On July 9, 2024 at an open meeting, ACC Commissioners discussed objectives of future regulatory lag workshops and voted to schedule at least one more workshop on this topic later this year. The ACC held an additional workshop on October 3, 2024 to discuss formula rate methodologies and their use in ratemaking. The workshop included presentations from representatives of FERC, customer advocates, other stakeholders, and utilities, including APS. APS cannot predict the outcome of this matter.

Showing the first 40 of 57 passages. Open the source sections for the rest.

Reworded paragraphs (88)

Previous wording

The following discussion should be read in conjunction with Pinnacle West’s Condensed Consolidated Financial Statements and APS’s Condensed Consolidated Financial Statements and the related Combined Notes that appear in Item 1 of this report. For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Part 1, Item 1A of the 2023 Form 10-K and Part II, Item 1A of this report.

Current wording

The following discussion should be read in conjunction with Pinnacle West’s Condensed Consolidated Financial Statements and APS’s Condensed Consolidated Financial Statements and the related Combined Notes to the Condensed Consolidated Financial Statements (“Notes”) that appear in Item 1 of this report. For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Part 1, Item 1A of the 2024 Form 10-K and Part II, Item 1A of this report.

Previous wording

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $26 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Current wording

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $27 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Previous wording

Recognizing that creating customer value is inextricably linked to increasing shareholder value, APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience. In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, such as improving the ease-of-use of APS’s automated phone system, improving the speed of answering customer calls, advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. To further improve customer communications, APS expanded the use of email and text alerts, notifications, and communications to customers related to outages and their account and service status. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.

Current wording

APS’s focus remains on its customers and the communities it serves. In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, such as improving the ease-of-use of APS’s automated phone system, improving the speed of answering customer calls, advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. Recently, APS redesigned its customer bills with the aim of increasing personalization and helping customers better understand their energy use and ways to save. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints as well, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.

Previous wording

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). The Ten-Year Transmission Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represent a significant upgrade to our transmission system. These five projects, along with other projects included in the Ten-Year Transmission Plan, will support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Current wording

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). The Ten-Year Transmission Plan includes critical transmission projects that comprise the APS strategic transmission portfolio, which represent a significant upgrade to our existing transmission system. These transmission projects will support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Previous wording

Our advanced distribution management system allows operators to locate outages and control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid. The system will also integrate a new meter data management system that will increase grid visibility and give customers access to more of their energy usage data.

Current wording

Our advanced distribution management system allows operators to locate outages and control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid.

Previous wording

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of best-in-class fire modelling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. APS also has implemented a public safety power shutoff (“PSPS”) program that began in the 2024 fire season, leveraging the additional real-time analysis provided by the new modelling software, and has educated and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Current wording

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii, California, and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of fire modeling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. In 2024, APS began installing a system of artificial intelligence-based fire sensing cameras with the ability to detect and alert on fire ignitions. These alerts are sent both to APS and fire response dispatch centers to speed fire response in APS’s service territory regardless of the cause of the fire. APS also implemented a public safety power shutoff (“PSPS”) program on certain feeders that began in the 2024 fire season, leveraging the additional real-time analysis provided by the new modeling software, and has educated and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Previous wording

For example, on August 14, 2024, APS filed a request with the ACC for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter. See Note 4 for more information.

Current wording

For example, on August 14, 2024, APS filed a request with the Arizona Corporation Commission (“ACC”) for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter. See Note 6 in Part I of this quarterly report for more information.

Previous wording

Additionally, APS was selected by the U.S. Department of Energy’s Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO.

Current wording

Additionally, APS was selected by the U.S. Department of Energy’s (“DOE”) Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO.

Previous wording

Maintaining reliability and affordability for customers during the clean energy transition is fundamental to APS’s strategy. Serving in an essential back-up role, dispatchable natural gas generators provide energy during times when solar and wind resource output is insufficient to meet customer demand. In addition to the previously added natural gas units at the modernized Ocotillo Power Plant in 2019 and efficiency improvements to gas units at the Redhawk, Sundance, and West Phoenix Power Plants in 2024, APS has contracted for two simple cycle combustion turbines (approximately 90 MW in total) at the Sundance Power Plant, which are expected to be in service in 2026, and eight simple cycle combustion turbines (approximately 397 MW in total) at the Redhawk Power Plant, which are expected to be in service in 2028. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.

Current wording

Maintaining reliability and affordability for customers is fundamental to APS’s strategy. Dispatchable natural gas generators provide energy during times when intermittent resources, such as solar and wind, are insufficient to meet customer demand. In addition to the previously added natural gas units at the modernized Ocotillo Power Plant in 2019 and efficiency improvements to gas units at the Redhawk, Sundance, and West Phoenix Power Plants in 2024, APS has contracted for two simple cycle combustion turbines (approximately 90 MW in total) at Sundance, which are expected to be in service in 2026, and eight simple cycle combustion turbines (approximately 397 MW in total) at Redhawk, which are expected to be in service in 2028. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.

Previous wording

APS went live with a new Energy Management System (“EMS”) in April 2024. APS expects the new EMS to provide a better foundation which will improve future integration of the renewable and energy storage assets into APS’s generation resource portfolio, allowing APS to maximize the flexibility of its resources and fully engage in the Energy Imbalance Market. APS also believes it will better position APS to participate in market opportunities that develop over the next decade.

Current wording

APS went live with a new Energy Management System (“EMS”) in April 2024. APS expects the new EMS to provide a better foundation which will improve future integration of the renewable and energy storage assets into APS’s generation resource portfolio, allowing APS to maximize the flexibility of its resources and fully engage in the Western Energy Imbalance Market (“WEIM”). APS also believes it will better position APS to participate in market opportunities that develop over the next decade.

Previous wording

APS’s key elements to delivering reliable power include resource planning, sufficient reserve margins, partnering with customers to manage peak demand, fire mitigation, and operational preparedness, among others. Seasonal readiness procedures at APS include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating with federal, state, and local agencies on fire and emergency management.

Current wording

APS’s key elements to delivering reliable power include resource and transmission planning, sufficient reserve margins, partnering with customers to manage peak demand, fire mitigation, and operational preparedness, among others. Seasonal readiness procedures at APS include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating with federal, state, and local agencies on fire and emergency management.

Previous wording

APS continues to focus on mitigating the cost pressures related to the current inflationary environment. Overall inflation grew by 2.3% in Phoenix and 2.5% nationally over the twelve months ended August 2024. Although inflationary impacts to APS have begun to slow in 2024, APS is still managing the previously high inflationary market.

Current wording

APS continues to focus on mitigating the cost pressures related to inflation and other factors, such as tariffs. Overall inflation grew by 1.8% in Phoenix and 2.8% nationally over the twelve months ended February 2025. Although inflationary impacts to APS have slightly eased in recent months, APS remains cautious of potential price increases as a result of current and proposed tariffs, which could lead to higher costs and supply chain constraints.

Previous wording

There are also external opportunities under APS’s customer affordability initiative, such as APS’s participation in the Western Energy Imbalance Market (“WEIM”). WEIM continues to be a tool for creating savings for APS’s customers from the real-time, voluntary market. APS continues to expect that its participation in WEIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool that was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024. The Markets+ Tariff is currently pending approval at FERC with an expected order in November 2024. APS also participated in the design and drafting of the tariff for the CAISO’s Extended Day-Ahead Market, which was approved by FERC in December 2023. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and is transitioning to full binding participation as early as summer 2027. These regional efforts are driven by three objectives of reducing customer cost, improving reliability, and incorporating more clean energy on APS’s system.

Current wording

There are also external opportunities that allow APS to deliver more affordable energy to customers, such as APS’s participation in western energy markets and programs. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool (“SPP”). The Markets+ tariff was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024 and was approved on January 16, 2025. APS is a funding party to the implementation phase of Markets+ and expects to go live in the market in 2027. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and is transitioning to full-binding participation as early as summer 2027. These regional efforts are driven by the objectives of reducing customer cost and improving reliability. Until the transition to Markets+, APS will continue to participate in WEIM as a tool for creating savings for APS’s customers from the real-time only, voluntary market. APS expects that its participation in WEIM and future participation in Markets+ will lower its fuel and purchased-power costs, improve situational awareness for systems operations in the Western Interconnection power grid, and improve integration of APS’s clean resources.

Previous wording

In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan (“IRP”), to identify what resources will be necessary to safely and reliably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, new resource technology availability, and weather impact the amount and type of resources required to reliably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy generating resources to reliably serve customers’ future energy needs in the most affordable and sustainable manner possible. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through an all-source request for proposal (“ASRFP”) process, with the most recent ASRFPs being issued in 2022 and 2023. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources. Through the ASRFP process, APS has found that clean resources like wind, solar, and energy storage technology, are important elements of a least cost portfolio. During the clean energy transition, dispatchable resources will play a vital role in maintaining grid reliability by serving as a back-up to intermittent energy resources when output is insufficient to meet customer needs. Over the long term, each resource in a balanced and diverse portfolio is expected to provide complementary value and contribute to sustained delivery of reliable electric service.

Current wording

In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan (“IRP”), to identify what resources will be necessary to safely and reliably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, impacts from weather, and new resource technology availability impact the amount and type of resources required to reliably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy generating resources to reliably serve customers’ future energy needs in the most affordable and sustainable manner possible. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through the all-source request for proposal (“ASRFP”) process, with the most recent ASRFPs being issued in 2022, 2023, and 2024. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources. Through the ASRFP process, APS has found that clean resources like wind, solar, and energy storage technology, are important elements of a least cost portfolio. During the clean energy transition, dispatchable resources will play a vital role in maintaining grid reliability by serving as a back-up to intermittent energy resources when output is insufficient to meet customer needs. Over the long term, each resource in a balanced and diverse portfolio is expected to provide complementary value and contribute to sustained delivery of reliable electric service.

Previous wording

In addition to managing the cost of electricity generation, APS has continued building upon existing cost management efforts, including a customer affordability initiative launched in 2019. The initiative was implemented Company-wide to thoughtfully and deliberately assess our areas ranging from our business processes and organizational approaches to completing high-value work and achieving internal efficiencies. APS continues to drive this initiative by identifying opportunities to streamline its business processes, mitigate cost increases, increase employee retention, and improve customer satisfaction.

Current wording

In addition to managing the cost of electricity generation, APS has continued building upon existing cost management efforts, including a customer affordability initiative launched in 2019. The initiative was implemented company-wide to thoughtfully and deliberately assess our business processes and organizational approaches to completing high-value work and achieving internal efficiencies. APS continues to drive this initiative by identifying opportunities to streamline its business processes, mitigate cost increases, increase employee retention, and improve customer satisfaction.

Previous wording

2030 Goal: 65% Clean Energy. APS has an energy mix that is already more than 50% clean and plans to continue to add more renewables and energy storage. By building on those plans, APS intends to attain an energy mix that is 65% clean by 2030, with 45% of APS’s generation portfolio coming from renewable energy. “Clean” is measured as percent of energy mix, which includes all carbon-free resources like nuclear, renewables, and demand-side management. “Renewable” energy includes generation resources such as solar, wind, and biomass, and is measured in accordance with the Arizona Corporation Commission’s (the “ACC”) Renewable Energy Standard as a percentage of retail sales. This target will serve as a checkpoint for our resource planning, investment strategy, and customer affordability efforts as APS moves toward a 100% clean, carbon-free energy mix by 2050.

Current wording

2030 Goal: 65% Clean Energy. APS has an energy mix that is approximately 54% clean and plans to continue to add more renewables and energy storage. By building on those plans, APS intends to attain an energy mix that is 65% clean by 2030, with 45% of APS’s generation portfolio coming from renewable energy. “Clean” is measured as percent of energy mix, which includes all carbon-free resources like nuclear, renewables, and demand-side management. “Renewable” energy includes generation resources such as solar, wind, and biomass, and is measured in accordance with the ACC Renewable Energy Standard as a percentage of retail sales. This target will serve as a checkpoint for our resource planning, investment strategy, and customer affordability efforts as APS moves toward a 100% clean, carbon-free energy mix by 2050.

Previous wording

2031 Goal: Exit Coal-Fired Generation. The plan to exit coal-fired generation by 2031 will require APS to stop relying on coal-generation at the Four Corners Power Plant (“Four Corners”). APS has permanently retired more than 1,000 MW of coal-fired electric generating capacity. These closures and other measures taken by APS have resulted in annual carbon emissions that were 36% lower in 2023 compared to 2005. In addition, APS has committed to end the use of coal at its remaining Cholla Power Plant units during 2025.

Current wording

2031 Goal: Exit Coal-Fired Generation. The plan to exit coal-fired generation by 2031 will require APS to stop relying on coal-generation at Four Corners Power Plant (“Four Corners”). APS has permanently retired more than 1,000 MW of coal-fired electric generating capacity. These closures and other measures taken by APS have resulted in annual carbon emissions that were 34% lower in 2024 compared to 2005. In addition, APS has ceased generating electricity at the Cholla Power Plant (“Cholla”) in March 2025, in accordance with federal regulations and due to increasing costs that have made the plant uneconomical to operate. On April 8, 2025, President Trump issued coal-related executive orders aimed at increasing domestic energy production. APS is monitoring the executive orders and related regulatory actions.

Previous wording

In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners as early as fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation, one generating unit would be shut down during seasons where electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the date of this report, APS has elected not to begin seasonal operation due to market conditions.

Current wording

In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners as early as fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation, one generating unit would be shut down during seasons when electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the date of this report, APS has elected not to begin seasonal operation due to market conditions.

Previous wording

(a) Includes rooftop solar facilities owned by third parties. Distributed generation is produced in Direct Current and is converted to Alternating Current for reporting purposes.

Current wording

(a) Includes rooftop solar facilities owned by third parties. DG is produced in direct current and is converted to alternating current for reporting purposes.

Previous wording

As a part of the statewide transportation electrification plan (“TE Plan”) adopted in 2021, the ACC approved a target of 450,000 light-duty electric vehicles (“EVs”) in its service territory by 2030. APS’s Take Charge AZ (“TCAZ”) program has helped to deploy Level 2 EV charging stations on customer properties for fleet, public, and workplace EV charging. As of September 30, 2024, APS energized 825 Level 2 charging ports at 196 customer locations. Additionally, APS has energized direct current fast charging (“DCFC”) stations that are owned and operated by APS at five locations in Arizona: Sedona, Prescott, Globe, Show Low, and Payson. Effective December 12, 2023, the TCAZ program was discontinued by the ACC. As part of that decision, APS was permitted to complete certain projects that were in process as of December 12, 2023.

Current wording

As a part of the Arizona statewide transportation electrification plan (“TE Plan”) adopted in 2021, the ACC approved a target of 450,000 light-duty electric vehicles (“EVs”) in APS’s service territory by 2030. APS’s Take Charge AZ (“TCAZ”) program has helped to deploy Level 2 EV charging stations on customer properties for fleet, public, and workplace EV charging. As of March 31, 2025, APS has installed 829 energized Level 2 charging ports at 197 customer locations. Additionally, APS has energized direct current fast charging stations that are owned and operated by APS at five locations in Arizona: Sedona, Prescott, Globe, Show Low, and Payson. Effective December 12, 2023, the TCAZ program was discontinued by the ACC. As part of that decision, APS was permitted to complete certain projects that were in process as of December 12, 2023.

Previous wording

Additionally, as part of APS’s DSM Implementation Plan, APS launched the EV Charging Demand Management Pilot to proactively address the growing electric demand from charging as EVs become more widely adopted. The EV programs in the DSM Implementation Plan include APS SmartCharge (an EV data gathering program), Fleet Advisory Services, and a $100 rebate to home builders for new homes to be built EV-ready with 240V receptacle. APS previously offered a $250 residential rebate to customers that purchased a qualifying home Level 2 charger. Effective December 12, 2023, APS discontinued this rebate per the ACC decision. See the discussion above.

Current wording

Additionally, as part of APS’s DSM Implementation Plan, APS launched the EV Charging Demand Management Pilot to proactively address the growing electric demand from charging as EVs become more widely adopted. The EV programs in the DSM Implementation Plan include APS SmartCharge (an EV data gathering program), Fleet Advisory Services, and a $100 rebate to homebuilders for new homes to be built EV-ready with 240V receptacle. APS previously offered a $250 residential rebate to customers that purchased a qualifying home Level 2 charger. Effective December 12, 2023, APS discontinued this rebate per the ACC decision. See the discussion above. APS has also filed, and the ACC has approved, an application for a new Bring-Your-Own-Device (“BYOD”) Battery Pilot Plan of Administration as required by Decision No. 79293. This plan allows APS to work with residential customers to enable APS to dispatch participating batteries and use them to provide demand response capacity to the grid. The BYOD program will be incorporated into future DSM Implementation Plan filings.

Previous wording

APS filed its 2024 DSM Implementation Plan on November 30, 2023. The 2024 DSM Implementation Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs: an expanded residential EV Managed Charging program and a Commercial EV Make-Ready Program. On April 26, 2024, APS filed an amended 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget of $90.9 million to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The amended 2024 DSM Plan is still pending ACC review and approval. APS will not file a 2025 DSM Implementation Plan, pending ACC review of the amended 2024 DSM Implementation Plan. APS cannot predict the outcome of this proceeding. See Note 4 for more information.

Current wording

APS filed its 2024 DSM Implementation Plan on November 30, 2023. The 2024 DSM Implementation Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs that were initially proposed in the 2023 DSM Implementation Plan: an expanded residential EV Managed Charging program and a Commercial EV Make-Ready Program. On April 26, 2024, APS filed an amended 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget of $90.9 million to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The amended 2024 DSM Implementation Plan is still pending ACC review and approval. APS does not intend to file a 2025 DSM Implementation Plan, pending ACC review of the amended 2024 DSM Implementation Plan. APS cannot predict the outcome of this proceeding.

Previous wording

Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology, particularly in regard to the U.S. Environmental Protection Agency’s (“EPA”) proposed Greenhouse Gas (“GHG”) rule. On April 25, 2024, the EPA issued a final rule that, among other things, requires the installation of carbon capture technology for certain classifications of coal, oil, and natural gas fired electricity generating units dependent upon certain factors, including retirement date and operating capacity. See Note 8 for more information.

Current wording

Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO 2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology.

Previous wording

In 2020, in support of our clean energy commitment and the growing focus on sustainability within our organization, we increased our focus on sustainability by dedicating a new Sustainability Department at Pinnacle West responsible for integrating responsible business practices into the everyday work of the Company.

Current wording

In 2020, in support of our clean energy commitment, we created a Sustainability Department at Pinnacle West responsible for integrating responsible business practices into the everyday work of the Company.

Previous wording

To address the rapid advancement of artificial intelligence technology risk and opportunities, APS has developed a cross functional governance structure with leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams. This cross functional structure assesses both the opportunities and risks during the technology intake process to ensure compliance with data security and reliability requirements, while observing market trends in this rapidly evolving area.

Current wording

To address the rapid advancement of artificial intelligence technology risks and opportunities, APS has developed a cross functional governance structure with leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams. This cross functional structure assesses the opportunities and risks in alignment with enterprise strategy to ensure compliance with data security and reliability requirements as well as our Code of Ethical Conduct, while observing market trends in this rapidly evolving area.

Previous wording

APS filed an application with the ACC on October 28, 2022 (the “2022 Rate Case”) seeking an increase in annual retail base rates on the date rates become effective (“Day 1”) of a net $460 million. This Day 1 net impact would have represented a total base revenue deficiency of $772 million, offset by proposed adjustor transfers of cost recovery to annual retail rates and adjustor mechanism modifications. The average annual customer bill impact of APS’s request on Day 1 would have been an increase of 13.6%.

Current wording

APS filed an application with the ACC on October 28, 2022 (the “2022 Rate Case”) seeking an increase in annual retail base rates.

Previous wording

On January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order in the 2022 Rate Case, as corrected on February 6, 2024 (the “2022 Rate Case ROO”). The 2022 Rate Case ROO recommended, among other things, (i) a $523.1 million increase in the annual base rate revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.36%, (v) 12 months of post-test year plant and the inclusion of the Four Corners ELG project, (vi) the approval of APS’s SRB proposal with certain procedural and other modifications, (vii) no additional CCT funding, (viii) a 5.0% return on the prepaid pension asset and a return of 5.35% on the OPEB liability, and (ix) no disallowances on APS’s coal contracts.

Current wording

On January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order (“ROO”) in the 2022 Rate Case, as corrected on February 6, 2024 (the “2022 Rate Case ROO”). The 2022 Rate Case ROO recommended, among other things, (i) a $523.1 million increase in the annual base rate revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.36%, (v) 12 months of post-test year plant and the inclusion of the Four Corners Effluent Limitations Guideline (“ELG”) project, (vi) the approval of APS’s System Reliability Benefit (“SRB”) proposal with certain procedural and other modifications, (vii) no additional Coal Community Transition (“CCT”) funding, (viii) a 5.0% return on the prepaid pension asset and a return of 5.35% on the Other Post-Employment Benefits liability, and (ix) no disallowances on APS’s coal contracts.

Previous wording

The 2022 Rate Case ROO also recommended a number of changes to existing adjustors, including (i) the approval of modified DSM performance incentives and the requested DSM transfer to base rates, (ii) the retention of $1.9 million of REAC in the adjustor rather than base rates, (iii) a partial transfer of $27.1 million of LFCR funds to base rates, and (iv) the adoption of an increase in the annual PSA cap to $0.006/kWh.

Current wording

The 2022 Rate Case ROO also recommended a number of changes to existing adjustors, including (i) the approval of modified DSM performance incentives and the requested DSM transfer to base rates, (ii) the retention of $1.9 million of Renewable Energy Adjustment Charge (“REAC”) in the adjustor rather than base rates, (iii) a partial transfer of $27.1 million of Lost Fixed Cost Recovery Mechanism (“LFCR”) funds to base rates, and (iv) the adoption of an increase in the annual Power Supply Adjustor (“PSA”) cap to $0.006/kWh.

Previous wording

On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an ASRFP, and (viii) recovery of all DSM costs through the DSMAC rather than through base rates.

Current wording

On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an ASRFP, and (viii) recovery of all DSM costs through the DSM Adjustment Charge (“DSMAC”) rather than through base rates.

Previous wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association, Solar Energy Industries Association, and Vote Solar for the limited purpose of reviewing arguments concerning the GAC. Specifically, rehearing was ordered as to whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. The parties seeking rehearing had 30 days after the denial or granting of a request for rehearing to file a notice of appeal to the Arizona Court of Appeals. No party filed a notice of appeal within the 30-day period. A limited rehearing was scheduled for the purpose of reviewing the GAC. Written testimony from APS and intervenors for the limited rehearing was filed on September 24, 2024, and rebuttal testimony from parties was filed on October 18, 2024. The limited rehearing began on October 28, 2024. APS cannot predict the outcome of these proceedings.

Current wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association (“AriSEIA”), Solar Energy Industries Association (“SEIA”), and Vote Solar specifically to review whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. A limited rehearing was held October 28 through November 1, 2024. Following the limited rehearing, an Administrative Law Judge issued a ROO (the “Limited Rehearing ROO”) on December 3, 2024. The Limited Rehearing ROO recommended affirming the GAC as just and reasonable and that the GAC is not discriminatory to solar customers and the absence of a GAC is not discriminatory to non-solar customers. On December 17, 2024, the ACC approved the Limited Rehearing ROO with an amendment that requires APS in its next rate case to propose a revenue allocation based on a site-load cost of service study in order to bring further parity in revenue collection between solar and non-solar customers. SEIA, AriSEIA, Vote Solar, the Arizona Attorney General, and two individual customers have filed requests for rehearing of the Commission’s December 17, 2024 decision on the rehearing. The Commission has taken no action on these requests. In addition, each of these parties have subsequently filed notices of appeal to the Arizona Court of Appeals seeking review of the ACC’s decisions regarding the GAC and on rehearing. APS cannot predict the outcome of these proceedings.

Previous wording

On August 14, 2024, APS filed a request with the ACC for a deferral order associated with unrecovered book value and closure costs of the remaining Cholla units. This order would authorize APS to defer, for future recovery in rates, both the expenses necessary to close and decommission coal-fired power plant infrastructure at Cholla, including but not limited to legally required site environmental remediation, coal-combustion residual (“CCR”) corrective actions, the closure of CCR management facilities, and any unrecovered plant investment and operating costs incurred through and after April 2025. APS cannot predict the outcome of this matter.

Current wording

On August 14, 2024, APS filed a request with the ACC for a deferral order associated with unrecovered book value and closure costs of Cholla Units 1 and 3. This order would authorize APS to defer, for future recovery in rates, both the expenses necessary to close and decommission coal-fired power plant infrastructure at Cholla, including legally required site environmental remediation, coal combustion residuals (“CCR”) corrective actions, the closure of CCR management facilities, and any unrecovered plant investment and operating costs incurred through and after April 2025. APS cannot predict the outcome of this matter.

Previous wording

The Inflation Reduction Act of 2022 (“IRA”) significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury Department have issued preliminary guidance related to various provisions of the IRA that have enabled APS to claim credits related to its solar and energy storage investments. The Company continues to await regulations and other guidance, including with respect to the nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits. See Note 17 for more information.

Current wording

The Inflation Reduction Act of 2022 (“IRA”) significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury Department have issued guidance related to various provisions of the IRA that have enabled APS to claim credits related to its solar and energy storage investments. The Company continues to await regulations and other guidance, including with respect to the nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits. See Note 17 for more information.

Previous wording

Pinnacle West and APS currently have ample borrowing capacity under their respective credit facilities and may readily access these facilities ensuring adequate liquidity for each company. Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

Current wording

We believe that Pinnacle West and APS currently have ample borrowing capacity under their respective credit facilities and may readily access these facilities ensuring adequate liquidity for each company. Capital expenditures are anticipated to be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

Previous wording

Pinnacle West Power, LLC (“PNW Power”). On August 4, 2023, Pinnacle West entered into a purchase and sale agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary BCE to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. The final closing of the BCE Sale was completed on January 12, 2024. See Note 16 for additional details. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to PNW Power, a wholly-owned subsidiary of Pinnacle West.

Current wording

On August 4, 2023, Pinnacle West entered into a purchase and sale agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary Bright Canyon Energy Corporation (“BCE”) to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. The final closing of the BCE Sale was completed on January 12, 2024. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to Pinnacle West Power, LLC (“PNW Power”), a wholly-owned subsidiary of Pinnacle West.

Previous wording

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western

Current wording

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates. The DOE’s GDO selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-

Previous wording

Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates. The U.S. Department of Energy’s Grid Deployment Office selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Current wording

Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Previous wording

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term power purchase agreements (“PPAs”). PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

Current wording

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term PPAs. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

Previous wording

El Dorado Investment Company (“El Dorado”). El Dorado is a wholly-owned subsidiary of Pinnacle West. El Dorado owns debt investments and minority interests in several energy-related investments and Arizona community-based ventures. In particular, El Dorado has committed to the following:

Current wording

El Dorado is a wholly-owned subsidiary of Pinnacle West. El Dorado owns debt investments and minority interests in several energy-related investments and Arizona community-based ventures. In particular, El Dorado has committed to and/or holds the following:

Previous wording

•$25 million investment in the Energy Impact Partners fund, of which approximately $18.3 million has been funded as of September 30, 2024. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Current wording

•$25 million investment in the Energy Impact Partners fund, of which approximately $19.1 million has been funded as of March 31, 2025. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Showing the first 40 of 88 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

Electric Vehicles and Demand Side Management (“DSM”)

Current report — wording carried from elsewhere

El Dorado Investment Company (“El Dorado”)
Rearranged previous paragraphs (11)

Previous report — wording carried elsewhere

•an increase of $8 million related to corporate resource costs;

Previous report — wording carried elsewhere

•an increase of $4 million related to non-nuclear generation costs, primarily due to higher operating costs;

Previous report — wording carried elsewhere

The following table presents net income attributable to common shareholders compared with the prior year for Pinnacle West consolidated and for APS consolidated:

Previous report — wording carried elsewhere

The following relates to Pinnacle West’s consolidated results for the nine months ended September 30, 2024 as compared to the nine months ended September 30, 2023:

Previous report — wording carried elsewhere

Operating revenues less fuel and purchased power expenses. Operating revenues less fuel and purchased power expenses were $317 million higher for the nine months ended September 30, 2024, compared with the prior-year period. The following table summarizes the major components of this change:

Previous report — wording carried elsewhere

•an increase of $17 million related to transmission, distribution, and customer service costs;

Previous report — wording carried elsewhere

•an increase of $17 million related to employee benefit costs;

Previous report — wording carried elsewhere

•an increase of $10 million related to information technology costs;

Previous report — wording carried elsewhere

Depreciation and amortization. Depreciation and amortization expenses were $75 million higher for the nine months ended September 30, 2024, compared to the prior-year period, primarily due to increased plant in service and intangible assets.

Previous report — wording carried elsewhere

Other income and expenses, net. Other income and expenses, net were $16 million higher for the nine months ended September 30, 2024, compared to the prior-year period, primarily due to the gain on the sale of BCE (see Note 16) partially offset by lower PSA interest income. The difference between APS’s and Pinnacle West’s other income and expense, net is primarily related to Pinnacle West’s gain on the sale of BCE.

Previous report — wording carried elsewhere

Interest charges, net of allowance for borrowed funds and equity funds used during construction. Interest charges, net of allowance for funds used during construction, were $49 million higher for the nine months ended September 30, 2024, compared to the prior-year period, primarily due to higher debt balances and higher interest rates in the current period, higher allowance for borrowed funds and lower allowance for equity funds.