A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Feb 25, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-02-27.
0000764622-24-000016
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-25.
0000764622-25-000023
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 121 previous paragraphs and 120 current paragraphs.
99 unchanged; 17 reworded; 2 added; 5 removed; 0 previous and 2 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (2)
Current report
We may not have adequate insurance coverage for liabilities.
Current report
The operation of power generation, transmission and distribution facilities involves hazardous activities. We may become exposed to significant liabilities for which we may not have adequate insurance coverage or risk mitigation. Additionally, through our captive insurance cell, we take certain insurance risk on our business, such as certain wildfire coverage, excess property insurance, and excess employment practice liability. We maintain an amount of insurance protection that we believe is customary, but there can be no assurance it will be sufficient or effective in light of all circumstances, hazards or liabilities to which we may be subject. Our insurance does not cover every potential risk associated with our operations. Adequate coverage at reasonable rates is not always obtainable. We cannot provide assurance that insurance coverage will continue to be available in the amounts or on terms similar to our current policies. These issues could have a material adverse effect on our business, results or operations, and financial condition.
Removed paragraphs (5)
Previous report
ACC decisions will be binding or challenged by other agencies or bodies asserting jurisdiction. In November 2021, the Arizona Court of Appeals issued an opinion that called into question the ACC-approved limitation of liability provision found in the APS Service Schedules. APS sought review of the decision at the Arizona Supreme Court, which was denied; however, the Supreme Court depublished portions of the Court of Appeals’ decision. APS is seeking revised tariff language to mitigate potential adverse impacts on APS’s future, potential litigation exposure which may result from this court decision. We are unable to predict the impact on our business and operating results from any pending or future regulatory or legislative rulemaking.
Previous report
In 1999, the ACC approved rules for the introduction of retail electric competition in Arizona. Retail competition could have a significant adverse financial impact on APS due to an impairment of assets, a loss of retail customers, lower profit margins or increased costs of capital. Although some very limited retail competition existed in APS’s service area in 1999 and 2000, there are currently no active retail competitors offering unbundled energy or other utility services to APS’s customers. This is in large part due to a 2004 Arizona Court of Appeals decision that found critical components of the ACC’s rules to be violative of the Arizona Constitution. The ruling also voided the operating authority of all the competitive providers previously authorized by the ACC. On May 9, 2013, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. The ACC subsequently opened a docket for this matter and received comments from a number of interested parties on the considerations involved in establishing retail electric deregulation in the state. One of these considerations is whether various aspects of a deregulated market, including setting utility rates on a “market” basis, would be consistent with the requirements of the Arizona Constitution. On September 11, 2013, after receiving legal advice from the ACC staff, the ACC voted 4-1 to close the current docket and await full Arizona Constitutional authority before any further examination of this matter.
Previous report
Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.0% for the year ended December 31, 2023, compared with the prior-year period. For the three years through 2023, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2024 and the average annual growth to be in the range of 1.5% to 2.5% through 2026 based on anticipated steady population growth in Arizona during that period.
Previous report
Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 1.5% for the year ended December 31, 2023, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center customers.
Previous report
For the three years through 2023, annual retail electricity sales growth averaged 2.7%, adjusted to exclude the effects of weather variations. Due to the expected growth of several large data centers and new large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 2.0% to 4.0% for 2024 and that average annual growth will be in the range of 4.0% to 6.0% through 2026, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several large data centers and new large manufacturing facilities, which are expected to contribute to 2024 growth in the range of 2.5% to 3.5% and to average annual growth in the range of 3.0% to 5.0% through 2026.
Reworded paragraphs (17)
Previous wording
APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.
Current wording
APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, labor and employment, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.
Previous wording
Changes in laws or regulations that govern APS, new interpretations of laws and regulations, or the imposition of new or revised laws or regulations could have an adverse impact on the manner in which we operate our business and our results of operations. In particular, new or revised laws or interpretations of existing laws or regulations may impact or call into question the ACC’s permissive regulatory authority, which may result in uncertainty as to jurisdictional authority within our state, and uncertainty as to whether
Current wording
Changes in laws or regulations that govern APS, new interpretations of laws and regulations, or the imposition of new or revised laws or regulations could have an adverse impact on the manner in which we operate our business and our results of operations. In particular, new or revised laws or interpretations of existing laws or regulations may impact or call into question the ACC’s permissive regulatory authority, which may result in uncertainty as to jurisdictional authority within our state, and uncertainty as to whether ACC decisions will be binding or challenged by other agencies or bodies asserting jurisdiction. We are unable to predict the impact on our business and operating results from any pending or future regulatory or legislative rulemaking.
Previous wording
APS is, or may become, subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions of conventional pollutants and GHGs, water quality, discharges of wastewater and waste streams originating from fly ash and bottom ash handling facilities, solid waste, hazardous waste, and coal combustion products, which consist of bottom ash, fly ash, and air pollution control wastes. These laws and regulations can result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emissions obligations. These laws and regulations generally require APS to obtain and comply with a wide variety of environmental licenses, permits, and other approvals. If there is a delay or failure to obtain any required environmental regulatory approval, or if APS fails to obtain, maintain, or comply with any such approval, operations at affected facilities could be suspended or subject to additional expenses. In addition, failure to comply with applicable environmental laws and regulations could result in civil liability as a result of government enforcement actions or private claims or criminal penalties. Both public officials and private individuals may seek to enforce applicable environmental laws and regulations. APS cannot predict the outcome (financial or operational) of any related litigation that may arise.
Current wording
APS is, or may become, subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions of conventional pollutants and GHGs, water quality, discharges of wastewater and waste streams originating from fly ash and bottom ash handling facilities, solid waste, hazardous waste, and coal combustion products, which consist of bottom ash, fly ash, and air pollution control wastes. These laws and regulations can result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emissions obligations. They could also impact the overall business environment in Arizona and affect APS’s customer and sales growth rates. Additionally, these laws and regulations generally require APS to obtain and comply with a wide variety of environmental licenses, permits, and other approvals. If there is a delay or failure to obtain any required environmental regulatory approval, or if APS fails to obtain, maintain, or comply with any such approval, operations at affected facilities could be suspended or subject to additional expenses. In addition, failure to comply with applicable environmental laws and regulations could result in civil liability as a result of government enforcement actions or private claims or criminal penalties. Both public officials and private individuals may seek to enforce applicable environmental laws and regulations. APS cannot predict the outcome (financial or operational) of any related litigation that may arise.
Previous wording
Coal Ash. In December 2014, the EPA issued final regulations governing the handling and disposal of CCR, which are generated as a result of burning coal and consist of, among other things, fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste. APS currently disposes of CCR in ash ponds and dry storage areas at Cholla and Four Corners. To the extent the rule requires the closure or modification of these CCR units, modification or changes to the manner of closure of such units, or the construction of new CCR units beyond what we currently anticipate, APS would incur significant additional costs for CCR disposal. In addition, the rule may also require corrective action to address releases from CCR disposal units or the presence of CCR constituents within groundwater near CCR disposal units above certain regulatory thresholds.
Current wording
Coal Ash. In December 2014, the EPA issued final regulations governing the handling and disposal of CCR, which are generated as a result of burning coal and consist of, among other things, fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste. APS disposes of CCR in ash ponds and dry storage areas. To the extent the rule requires the closure or modification of these CCR units, modification or changes to the manner of closure of such units, or the construction of new CCR units beyond what we currently anticipate, APS would incur significant additional costs for CCR disposal. In addition, the rule may also require corrective action to address releases from CCR disposal units or the presence of CCR constituents within groundwater near CCR disposal units above certain regulatory thresholds.
Previous wording
Potential Financial Risks — Greenhouse Gas Regulation, the Clean Power Plan and Potential Litigation. Following a U.S. Supreme Court decision on June 30, 2022, which substantially narrowed EPA’s authority to regulate power plant GHG emissions under the Clean Air Act, on May 23, 2023, EPA proposed new GHG emission standards for power plants. In contrast to measures finalized in 2015, EPA’s May 2023 proposal is focused on limiting power plant GHG emissions through control mechanisms that can be implemented at individual power plant facilities. These mechanisms would include carbon capture and sequestration, hydrogen co-firing, natural gas co-firing, and limits on facility output, among other measures. EPA expects to take final action on this proposal in the spring or summer of 2024.
Current wording
Potential Financial Risks — Greenhouse Gas Regulation, the Clean Power Plan and Potential Litigation. On April 25, 2024, the EPA issued new GHG emission standards for power plants. These new standards are focused on limiting power plant GHG emissions through control mechanisms that can be implemented at individual power plant facilities. The new regulations are currently being challenged in federal court. Additionally, the Trump administration has stated that it intends to reverse or substantially revise these standards. See Item 1 - Environmental Matters - Climate Change for more information.
Previous wording
Depending on the outcome of future carbon emission rulemaking under the Clean Air Act targeting new and existing power plants, the utility industry may become subject to more stringent and expansive regulations. Depending on the means of compliance with federal emission performance standards, the electric utility industry may be forced to incur substantial costs necessary to achieve compliance. In addition, we anticipate that such regulations will be challenged in federal court prior to their implementation. Depending on the outcome of such judicial review, the utility industry may face alternative efforts from private parties seeking to establish alternative GHG emission limitations from power plants. Alternative GHG emission limitations may arise from litigation under either federal or state common laws or citizen suit provisions of federal environmental statutes that attempt to force federal agency rulemaking or impose direct facility emission limitations. Such lawsuits may also seek damages from harm alleged to have resulted from power plant GHG emissions.
Current wording
Depending on the outcome of carbon emission rulemaking under the Clean Air Act targeting new and existing power plants, the utility industry may become subject to more stringent and expansive regulations. Depending on the means of compliance with federal emission performance standards, the electric utility industry may be forced to incur substantial costs necessary to achieve compliance. In addition, we anticipate that such regulations will be challenged in federal court prior to their implementation. Depending on the outcome of such judicial review, the utility industry may face alternative efforts from private parties seeking to establish alternative GHG emission limitations from power plants. Alternative GHG emission limitations may arise from litigation under either federal or state common laws or citizen suit provisions of federal environmental statutes that attempt to force federal agency rulemaking or impose direct facility emission limitations. Such lawsuits may also seek damages from harm alleged to have resulted from power plant GHG emissions.
Previous wording
In November 2018, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. On July 1 and July 2, 2019, ACC Staff issued a report and initial proposed draft rules regarding possible modifications to the ACC’s retail electric competition rules. On February 10, 2020, two ACC Commissioners filed two sets of draft proposed retail electric competition rules. On February 12, 2020, ACC Staff issued its second report regarding possible modifications to the ACC’s retail electric competition rules. During a July 15, 2020, ACC Staff meeting, the ACC Commissioners discussed the possible development of a retail competition pilot program, but no action was taken. The ACC continues to discuss matters related to retail electric competition, including the potential for additional buy-through programs or other pilot programs. In April 2022, the Arizona Legislature passed and the Governor signed a bill that repealed the electric deregulation law that had been in place in Arizona since 1998.
Current wording
2020, ACC Staff issued its second report regarding possible modifications to the ACC’s retail electric competition rules. During a July 15, 2020, ACC Staff meeting, the ACC Commissioners discussed the possible development of a retail competition pilot program, but no action was taken. The ACC continues to discuss matters related to retail electric competition, including the potential for additional buy-through programs or other pilot programs. In April 2022, the Arizona Legislature passed, and the Governor signed, a bill that repealed the electric deregulation law that had been in place in Arizona since 1998. On August 27, 2024, the ACC administratively closed this docket due to inactivity and obsolescence. Modification of the ACC’s retail electric competition rules or other efforts of deregulation could result in increased competition, which could have a significant adverse impact on APS’s business and results of operations.
Previous wording
Higher temperatures may decrease the snowpack, which might result in lowered soil moisture and an increased threat of forest fires. Forest fires could threaten APS’s communities and electric transmission lines and facilities. Any damage caused as a result of forest fires could negatively impact APS’s financial condition, results of operations, or cash flows. In addition, the decrease in snowpack can also lead to reduced water supplies in the areas where APS relies upon non-renewable water resources to supply cooling and process water for electricity generation. Prolonged and extreme drought conditions can also affect APS’s long-term ability to access the water resources necessary for thermal electricity generation operations. Reductions in the availability of water for power plant cooling could negatively impact APS’s financial condition, results of operations, or cash flows.
Current wording
Higher temperatures may decrease the snowpack, which might result in lowered soil moisture and an increased threat of wildfires. Wildfires could threaten APS’s communities and electric transmission lines and facilities. Any damage caused as a result of wildfires could negatively impact APS’s financial condition, results of operations, or cash flows. In addition, the decrease in snowpack can also lead to reduced water supplies in the areas where APS relies upon non-renewable water resources to supply cooling and process water for electricity generation. Prolonged and extreme drought conditions can also affect APS’s long-term ability to access the water resources necessary for thermal electricity generation operations. Reductions in the availability of water for power plant cooling could negatively impact APS’s financial condition, results of operations, or cash flows.
Previous wording
Effects of Energy Conservation Measures and Distributed Energy Resources. APS customers in energy efficiency and conservation programs and other demand-side management efforts, which in turn impact the demand for electricity. APS must also meet certain distributed renewable energy requirements. A portion of APS’s total renewable energy requirement must be met with an increasing percentage of distributed renewable energy resources (generally, small-scale renewable technologies located on customers’ properties). The distributed renewable energy requirement is 30% of the applicable RES requirement for 2012 and subsequent years (this requirement has been waived by the ACC for 2023). Customer participation in distributed renewable energy programs would result in lower demand since customers would be meeting some of their own energy needs.
Current wording
Effects of Energy Conservation Measures and Distributed Energy Resources. APS customers in energy efficiency and conservation programs and other demand-side management efforts, which in turn impact the demand for electricity. APS must also meet certain distributed renewable energy requirements. A portion of APS’s total renewable energy requirement must be met with an increasing percentage of distributed renewable energy resources (generally, small-scale renewable technologies located on customers’ properties). The distributed renewable energy requirement is 30% of the applicable RES requirement for 2012 and subsequent years (APS requested a waiver of this requirement in the 2024 and 2025 RES Implementation Plans, which have not yet been approved by the ACC). Customer participation in distributed renewable energy programs would result in lower demand since customers would be meeting some of their own energy needs.
Previous wording
Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer data centers and large manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $20 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $5 million.
Current wording
Actual and Projected Customer and Sales Growth. APS’s actual sales growth, excluding weather-related variations, may differ from its projections as a result of numerous factors, such as economic conditions, customer growth, the legal, regulatory, and business environment in Arizona, usage patterns and energy conservation, slower than expected ramp-up of and/or fewer than expected data centers and large manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $24 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $6 million.
Previous wording
Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra-large commercial energy users (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra-large energy users far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. In April 2023, APS notified prospective extra-large customers without existing commitments from APS that it is not able to commit at this time to their future extra-large projects (over 25 MW). Because of the high growth in demand for such projects, APS has developed a prioritization queue that identifies and prioritizes projects while maintaining system reliability and affordability for existing APS customers. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs.
Current wording
Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra-large commercial energy users (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra-large energy users far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs; however, there are difficulties in properly forecasting the demands of these extra-large customers due to factors such as the nascent nature of the industries (e.g., artificial intelligence) that these customers are supporting and the multiple variables that impact their usage ramp-up and ultimate level of demand. As data center and other extra-large customer opportunities evolve and develop, we may also enter into arrangements with customers and potential customers that require us to invest capital and assume credit risk related to such developments and the related generation and transmission investments before we receive any potential return. APS is implementing strategies to attempt to reduce this risk; however, the difficulty in forecasting these demands and the additional risk of these arrangements could lead to stranded costs and other effects that could have material adverse impacts on APS’s financial condition, results of operations, and cash flows.
Previous wording
Wildfires have the potential to affect communities within APS’s service territory and the surrounding areas, as well as APS’s vast network of electric transmission and distribution lines and facilities. The potential likelihood of wildfires has increased due to many of the same weather and climate change impacts existing in Arizona as those that led to catastrophic wildfires in California. The continued expansion of the wildland urban interface has also increased wildfire risk to surrounding communities. APS currently intends to implement a public safety power shutoff (“PSPS”) program in addition to its current fire mitigation efforts. While such technology is intended to mitigate fire risk, it also introduces additional risks to APS and its customers, such as claims for damages, and the timing and effectiveness of such fire mitigation efforts may be insufficient to prevent wildfires in APS’s expansive service territory and surrounding areas. APS could be held liable for damages incurred as a result of wildfires regardless of fault and may not be able to recover all or a substantial portion of any such damages or costs from insurance or through rates. In addition, we could also experience credit rating downgrades, reputational harm, volatility in the market for our common stock, and significant financial distress upon the occurrence of a wildfire event. Furthermore, any damage caused to our assets, loss of service to our customers, or liability imposed as a result of wildfires could negatively impact APS’s financial condition, results of operations, or cash flows.
Current wording
Wildfires have the potential to affect communities within APS’s service territory and the surrounding areas, as well as APS’s vast network of electric transmission and distribution lines and facilities. The potential likelihood and severity of wildfires has increased due to many of the same weather and climate change impacts existing in Arizona as those that led to catastrophic wildfires in other states. The continued expansion of the wildland urban interface has also increased wildfire risk to surrounding communities. Extreme weather events such as severe storms and strong wind gusts may also increase the likelihood of a wildfire in our service territory. APS has a Comprehensive Wildfire Mitigation Plan (“CWMP”) that employs various strategies designed to prevent, mitigate, and respond to wildfire risks. APS’s CWMP includes vegetation management and clearing protocols, operational measures and a public safety power shut off program (“PSPS”) on certain feeders, among other practices. However, APS’s fire mitigation efforts may be insufficient to prevent wildfires in APS’s expansive service territory and surrounding areas and could result in claims alleging damages due to the use, non-use, timing, or effectiveness of such measures. In addition, APS could be sued regardless of fault for damages incurred as a result of wildfires and may not be able to recover all or a substantial portion of any such damages or costs from insurance or through rates. In addition, we could also experience credit rating downgrades, reputational harm, volatility in the market for our common stock, and significant financial distress upon the occurrence of a wildfire event. Furthermore, any damage caused to our assets, loss of service to our customers, or liability imposed as a result of wildfires could negatively impact APS’s financial condition, results of operations, or cash flows.
Previous wording
We rely extensively on IT systems, networks, and services, including internet sites, data hosting and processing facilities, and other hardware, software and technical applications and platforms. Some of these systems are managed, hosted, provided, or used by third parties to assist in conducting our business. Malicious actors may attack vendors to disrupt the services these vendors provide to us or to use those vendors as a cyber conduit to attack us. As more third parties are involved in the operation of our business, there is a risk the confidentiality, integrity, privacy, or security of data held by, or accessible to, third parties may be compromised.
Current wording
Malicious actors may attack vendors to disrupt the services these vendors provide to us or to use those vendors as a cyber conduit to attack us. As more third parties are involved in the operation of our business, there is a risk the confidentiality, integrity, privacy, or security of data held by, or accessible to, third parties may be compromised.
Previous wording
APS has an ownership interest in and operates on behalf of a group of participants, Palo Verde, which is the largest nuclear electric generating facility in the United States. Palo Verde constitutes approximately 18% of APS’s owned and leased generation capacity. Palo Verde is subject to environmental, health and financial risks, such as the ability to obtain adequate supplies of nuclear fuel; the ability to dispose of spent nuclear fuel; the ability to maintain adequate reserves for decommissioning; potential liabilities arising out of the operation of these facilities; the costs of securing the facilities against possible terrorist attacks; and unscheduled outages due to equipment and other problems. APS maintains nuclear decommissioning trust funds and external insurance coverage to minimize its financial exposure to some of these risks; however, it is possible that damages could exceed the amount of insurance coverage. APS may be required under federal law to pay up to $144.9 million (but not more than $21.6 million per year) of liabilities arising out of a nuclear incident not only at Palo Verde, but at any other nuclear power plant in the United States. In addition, APS is subject to retrospective premium adjustments under its nuclear property insurance policies with Nuclear Electric Insurance Limited (“NEIL”) for approximately $22.4 million if NEIL’s losses in any policy year exceed accumulated funds and if the retrospective premium assessment is declared by NEIL’s Board of Directors. Although APS has no reason to anticipate a serious nuclear incident at Palo Verde, if an incident did occur, it could materially and adversely affect our results of operations and financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.
Current wording
APS has an ownership interest in and operates on behalf of a group of participants, Palo Verde, which is the largest nuclear electric generating facility in the western United States. Palo Verde constitutes approximately 18% of APS’s owned and leased generation capacity. Palo Verde is subject to environmental, health and financial risks, such as the ability to obtain adequate supplies of nuclear fuel; the ability to dispose of spent nuclear fuel; the ability to maintain adequate reserves for decommissioning; potential liabilities arising out of the operation of these facilities; the costs of securing the facilities against possible terrorist attacks; and unscheduled outages due to equipment and other problems. APS maintains nuclear decommissioning trust funds and external insurance coverage to minimize its financial exposure to some of these risks; however, it is possible that damages could exceed the amount of insurance coverage. APS may be required under federal law to pay up to $144.9 million (but not more than $21.6 million per year) of liabilities arising out of a nuclear incident not only at Palo Verde, but at any other nuclear power plant in the United States. In addition, APS is subject to retrospective premium adjustments under its nuclear property insurance policies with Nuclear Electric Insurance Limited (“NEIL”) for approximately $23.1 million if NEIL’s losses in any policy year exceed accumulated funds and if the retrospective premium assessment is declared by NEIL’s Board of Directors. Although APS has no reason to anticipate a serious nuclear incident at Palo Verde, if an incident did occur, it could materially and adversely affect our results of operations and financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.
Previous wording
APS continues to pursue and implement advanced grid technologies, including transmission and distribution system technologies and digital meters enabling two-way communications between the utility and its customers. Many of the products and processes resulting from these and other alternative technologies, including energy storage technologies, have not yet been widely used or tested on a long-term basis, and their use on large-scale systems is not as established or mature as APS’s existing technologies and equipment. The implementation of new and additional technologies adds complexity to our information technology and operational technology systems, which could require additional infrastructure and resources. Widespread installation and acceptance of new technologies could also enable the entry of new market participants, such as technology companies, into the interface between APS and its customers and could have other unpredictable effects on APS’s traditional business model.
Current wording
APS continues to pursue and implement advanced grid technologies, including transmission and distribution system technologies and digital meters enabling two-way communications between the utility and its customers. Many of the products and processes resulting from these and other alternative technologies, including energy storage technologies, have not yet been widely used or tested on a long-term basis, and their use on large-scale systems is not as established or mature as APS’s existing technologies and equipment. The implementation of new and additional technologies adds complexity to our information technology and operational technology systems, which could require additional infrastructure and resources. APS’s strategy, including the timing of such strategy, in adopting new technologies, such as artificial intelligence, could also adversely impact APS’s business. For example, if APS fails to strategically implement artificial intelligence, it could miss the opportunity for cost savings, face increasing costs on legacy systems, insufficiently integrate internal and external data sets, or invest in low data quality, risk misusing artificial intelligence, impact employee satisfaction with its implementation of or failure to implement artificial intelligence and other technologies. Widespread installation and acceptance of new technologies could also enable the entry of new market participants, such as technology companies, into the interface between APS and its customers and could have other unpredictable effects on APS’s traditional business model.
Previous wording
Like many companies in the electric utility industry, our workforce is maturing, with approximately 28% of employees eligible to retire by the end of 2028. Although we have undertaken efforts to recruit, train and develop new employees, we face increased competition for talent. We are subject to other employee workforce factors, such as the availability and retention of qualified personnel and the need to negotiate collective bargaining agreements with union employees. These or other employee workforce factors could negatively impact our business, financial condition, or results of operations.
Current wording
Like many companies in the electric utility industry, our workforce is maturing, with approximately 27.4% of employees eligible to retire by the end of 2029. Although we have undertaken efforts to recruit, train and develop new employees, we face increased competition for talent. We are subject to other employee workforce factors, such as the availability and retention of qualified personnel and the need to negotiate collective bargaining agreements with union employees. These or other employee workforce factors could negatively impact our business, financial condition, or results of operations.
Previous wording
General economic factors that are beyond the Company’s control impact the Company’s forecasts and actual performance. These factors include interest rates; recession; inflation; stagflation; deflation; supply chain constraints; unemployment trends; sanctions, trade restrictions, military interventions and the threat or possibility of war; terrorism or other global or national unrest; and political or financial instability. In particular, from 2021 to 2023, the United States’ economy has experienced a substantial rise in the inflation rate. There is increased uncertainty as to whether the rise in inflation will continue and for how long. Increases in inflation raise the Company’s costs for commodities, labor, materials and services. Additionally, global supply chains have been impacted, resulting in equipment delays and increased costs. A failure to recover the increased costs caused by increased inflation and supply chain constraints through our rates could have a material adverse impact on our financial condition, results of operations, or cash flows.
Current wording
General economic factors that are beyond the Company’s control impact the Company’s forecasts and actual performance. These factors include interest rates; recession; inflation; stagflation; deflation; supply chain constraints; unemployment trends; sanctions, trade restrictions, military interventions and the threat or possibility of war; terrorism or other global or national unrest; and political or financial instability. In particular, in recent years the United States’ economy experienced a substantial rise in the inflation rate and more recently in 2025, the Trump administration has implemented tariffs and discussed additional tariffs, which would further increase costs. Additionally, supply chains have been impacted and could be further impacted by inflation, tariffs, and other sociopolitical factors, resulting in equipment delays and increased costs. A failure to recover these potential increased costs through our rates could have a material adverse impact on our financial condition, results of operations, or cash flows.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
In November 2018, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. On July 1 and July 2, 2019, ACC Staff issued a report and initial proposed draft rules regarding possible modifications to the ACC’s retail electric competition rules. On February 10, 2020, two ACC Commissioners filed two sets of draft proposed retail electric competition rules. On February 12,
Current report — wording carried from elsewhere
We rely extensively on IT systems, networks, and services, including internet sites, data hosting and processing facilities, and other hardware, software and technical applications and platforms. Some of these systems are managed, hosted, provided, or used by third parties to assist in conducting our business.