PINNACLE WEST CAPITAL CORP

For the period ended Sep 30, 2024. Filed Nov 6, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Nov 6, 2024

PNW$104.22+0.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-01.

0000764622-24-000065

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-06.

0000764622-24-000079

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 239 previous paragraphs and 245 current paragraphs.

162 unchanged; 67 reworded; 11 added; 6 removed; 4 previous and 5 current paragraphs rearranged.

Tables are not compared: 14 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (11)

Current report

For example, on August 14, 2024, APS filed a request with the ACC for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter. See Note 4 for more information.

Current report

Additionally, APS was selected by the U.S. Department of Energy’s Grid Deployment Office (“GDO”) to receive up to $70 million in federal money for fire mitigation and grid infrastructure projects. This funding is part of the GDO’s Grid Resilience and Innovation Partnership Program and is contingent on APS negotiating and executing final grant agreements with GDO.

Current report

On August 14, 2024, APS filed a request with the ACC for a deferral order associated with unrecovered book value and closure costs of the remaining Cholla units. This order would authorize APS to defer, for future recovery in rates, both the expenses necessary to close and decommission coal-fired power plant infrastructure at Cholla, including but not limited to legally required site environmental remediation, coal-combustion residual (“CCR”) corrective actions, the closure of CCR management facilities, and any unrecovered plant investment and operating costs incurred through and after April 2025. APS cannot predict the outcome of this matter.

Current report

On August 14, 2024, APS filed a request with the ACC for a deferral order that would authorize APS to defer, for future recovery in rates, operations and maintenance expenses associated with wildfire management, including increased insurance costs. APS cannot predict the outcome of this matter.

Current report

The following relates to Pinnacle West’s consolidated results for the three months ended September 30, 2024 as compared to the three months ended September 30, 2023:

Current report

•an increase of $8 million related to corporate resource costs;

Current report

Operating Results — Nine-month period ended September 30, 2024, compared with nine-month period ended September 30, 2023.

Current report

The following relates to Pinnacle West’s consolidated results for the nine months ended September 30, 2024 as compared to the nine months ended September 30, 2023:

Current report

•an increase of $4 million related to corporate resource costs; and
Removed paragraphs (6)

Previous report

In addition, the IRA contains several provisions which could create additional tax liabilities for corporations, including a 15% corporate alternative minimum tax for corporations with net profits in excess of $1 billion and a 1% excise tax on stock buybacks. We currently do not believe the Company will be subject to any material tax liabilities as a result of these legislative provisions.

Previous report

APS currently plans to install more than 2,700 MW of utility scale energy storage by 2026, including through energy storage projects under PPAs and AZ Sun Program retrofits as well as through resources solicited through current and future RFPs.

Previous report

•A decrease of $4 million related to corporate resources costs;

Previous report

Operating Results — Six-month period ended June 30, 2024, compared with six-month period ended June 30, 2023.

Previous report

•A decrease of $4 million related to corporate resources costs;
Reworded paragraphs (67)

Previous wording

The Inflation Reduction Act of 2022 (“IRA”) significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury Department have issued preliminary guidance related to various provisions of the IRA that have enabled APS to claim credits related to its 2023 solar and battery investments. The Company continues to await regulations and other guidance, including with respect to the nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits. See Note 17 for more information.

Current wording

The Inflation Reduction Act of 2022 (“IRA”) significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; (iii) introduction of technology neutral clean energy ITCs and PTCs beginning in 2025; and (iv) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury Department have issued preliminary guidance related to various provisions of the IRA that have enabled APS to claim credits related to its solar and energy storage investments. The Company continues to await regulations and other guidance, including with respect to the nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits. See Note 17 for more information.

Previous wording

In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, including improving the ease-of-use of APS’s automated phone system and advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. To further improve customer communications, APS expanded the use of email and text alerts, notifications, and communications to customers related to outages and their account and service status. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.

Current wording

Recognizing that creating customer value is inextricably linked to increasing shareholder value, APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience. In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, such as improving the ease-of-use of APS’s automated phone system, improving the speed of answering customer calls, advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. To further improve customer communications, APS expanded the use of email and text alerts, notifications, and communications to customers related to outages and their account and service status. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.

Previous wording

Additionally, APS has implemented a variety of financial assistance programs to assist customers struggling to pay their energy bills. Among these assistance programs are discounts for qualified limited-income customers, including a new tier with larger discounts added for APS’s lowest income customers added in the second quarter of 2024, and other non-income-based assistance programs, such as flexible payment arrangements and emergency utility bill assistance. To ensure our most vulnerable customers are connected to these programs, we train and partner with more than one hundred community action agencies across our service territory.

Current wording

Additionally, APS has implemented a variety of financial assistance programs to support customers struggling to pay their energy bills. Among these assistance programs are discounts for qualified limited-income customers, including a new tier with larger discounts for APS’s lowest income customers added in the second quarter of 2024 and other non-income-based assistance programs, such as flexible payment arrangements and emergency utility bill assistance. To ensure our most vulnerable customers are connected to these programs, we train and partner with more than one hundred community action agencies across our service territory.

Previous wording

While our energy mix evolves, APS’s obligation to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to those experienced in other industries.

Current wording

While our energy mix evolves, APS’s commitment to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to those experienced in other industries.

Previous wording

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). This Ten-Year Transmission Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represents a significant upgrade to APS’s transmission system. These five projects, along with other projects included in the Ten-Year Transmission Plan, are intended to support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Current wording

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). The Ten-Year Transmission Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represent a significant upgrade to our transmission system. These five projects, along with other projects included in the Ten-Year Transmission Plan, will support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Previous wording

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of best-in-class fire modelling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. APS also has implemented a public safety power shutoff (“PSPS”) program for this upcoming fire season, leveraging the additional real-time analysis provided by the new modelling software, and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. We continue to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Current wording

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of best-in-class fire modelling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. APS also has implemented a public safety power shutoff (“PSPS”) program that began in the 2024 fire season, leveraging the additional real-time analysis provided by the new modelling software, and has educated and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. APS continues to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Previous wording

Maintaining reliability and affordability for our customers during the clean energy transition is fundamental to our strategy. A balanced energy portfolio is vital to maintaining reliability, and natural gas resources play a backup role to intermittent energy resources by providing energy when solar and wind resources are less effective and/or customer demand peaks. In addition to new natural gas units at the modernized Ocotillo Power Plant in 2019 and efficiency improvements at gas units at the Redhawk, Sundance, and West Phoenix Power Plants in 2024, APS continues to evaluate and pursue options to reliably serve growing energy demand, including the potential addition of more natural gas generating units. For example, APS has contracted for two simple cycle combustion turbines (approximately 90 MW in total) at the Sundance Power Plant, which are expected to be in service in 2026.

Current wording

Maintaining reliability and affordability for customers during the clean energy transition is fundamental to APS’s strategy. Serving in an essential back-up role, dispatchable natural gas generators provide energy during times when solar and wind resource output is insufficient to meet customer demand. In addition to the previously added natural gas units at the modernized Ocotillo Power Plant in 2019 and efficiency improvements to gas units at the Redhawk, Sundance, and West Phoenix Power Plants in 2024, APS has contracted for two simple cycle combustion turbines (approximately 90 MW in total) at the Sundance Power Plant, which are expected to be in service in 2026, and eight simple cycle combustion turbines (approximately 397 MW in total) at the Redhawk Power Plant, which are expected to be in service in 2028. APS continues to evaluate and pursue options for reliably serving growing customer energy needs and demand.

Previous wording

In October 2021, APS announced plans to evaluate regional market solutions as part of the Western Markets Exploratory Group (“WMEG”). As a member of WMEG, APS explored the potential for a staged approach to new market services, including day-ahead energy sales, transmission system expansion, and other power supply and grid solutions consistent with existing regulations and known and expected market design. APS utilizes the work done by WMEG to help identify market solutions that can help achieve carbon reduction goals while supporting reliable, affordable service for customers.

Current wording

In October 2021, APS announced plans to evaluate regional market solutions as part of the Western Markets Exploratory Group (“WMEG”). As a member of WMEG, APS explored the potential for a staged approach to new market services, including day-ahead energy sales, transmission system expansion, and other power supply and grid solutions consistent with existing regulations and known and expected market design. APS utilizes the work done by WMEG to help identify market solutions that can help achieve carbon reduction goals while supporting reliable, affordable service for customers. APS anticipates a day ahead market selection in the fourth quarter of 2024.

Previous wording

APS’s key elements to delivering reliable power include resource planning, sufficient reserve margins, partnering with customers to manage peak demand, fire mitigation, and operational preparedness, among others. Seasonal readiness procedures at APS also include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating on fire and emergency management with federal, state, and local agencies.

Current wording

APS’s key elements to delivering reliable power include resource planning, sufficient reserve margins, partnering with customers to manage peak demand, fire mitigation, and operational preparedness, among others. Seasonal readiness procedures at APS include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating with federal, state, and local agencies on fire and emergency management.

Previous wording

APS continues to focus on mitigating the cost pressures related to the current inflationary environment. Overall inflation grew by 2.7% in Phoenix and 3.0% nationally over the twelve months ended June 2024. While inflationary impacts to APS have begun to slow in 2024, select categories have seen increases up to 24% in the quarter ended June 30, 2024, due to increased labor costs and costs of certain materials. Additionally, APS has seen inflationary impacts in select equipment, particularly those that contain semiconductor components or that are labor intensive. Inflation continues to impact service rates and spend categories through pass-through costs, such as suppliers’ increased material costs, cost of insurance, and wage rates.

Current wording

APS continues to focus on mitigating the cost pressures related to the current inflationary environment. Overall inflation grew by 2.3% in Phoenix and 2.5% nationally over the twelve months ended August 2024. Although inflationary impacts to APS have begun to slow in 2024, APS is still managing the previously high inflationary market.

Previous wording

There are also external opportunities under APS’s customer affordability initiative, such as APS’s participation in the Western Energy Imbalance Market (“WEIM”). WEIM continues to be a tool for creating savings for APS’s customers from the real-time, voluntary market. APS continues to expect that its participation in WEIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool that was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024. APS also participated in the design and drafting of the tariff for the CAISO’s Extended Day-Ahead Market, which was approved by FERC in December 2023. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool. These regional efforts are driven by three objectives of reducing customer cost, improving reliability, and incorporating more clean energy on APS’s system.

Current wording

There are also external opportunities under APS’s customer affordability initiative, such as APS’s participation in the Western Energy Imbalance Market (“WEIM”). WEIM continues to be a tool for creating savings for APS’s customers from the real-time, voluntary market. APS continues to expect that its participation in WEIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS participated in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool that was filed with the U.S. Federal Energy Regulatory Commission (“FERC”) on March 29, 2024. The Markets+ Tariff is currently pending approval at FERC with an expected order in November 2024. APS also participated in the design and drafting of the tariff for the CAISO’s Extended Day-Ahead Market, which was approved by FERC in December 2023. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool and is transitioning to full binding participation as early as summer 2027. These regional efforts are driven by three objectives of reducing customer cost, improving reliability, and incorporating more clean energy on APS’s system.

Previous wording

In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan (“IRP”), to identify what resources will be necessary to safely and reliably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, new resource technology availability, and weather impact the amount and type of resources required to reliably meet customer needs. These inputs are then used to develop a plan that identifies a balanced mix of energy generating resources that reliably serves customers’ future energy needs in the most affordable and sustainable manner possible. Ensuring that the most affordable and reliable resources are selected to meet future customer needs, APS issued competitive solicitations through all-source request for proposals (“RFPs”) in 2022 and 2023. These RFPs were open to all resource types, including customer-scale (behind the meter) and utility-scale (front of the meter) resources. Through this process, APS has consistently found that clean resources like wind, solar, and energy storage technology, are important elements of a least cost portfolio. Over the long term, these resources are expected to provide value as part of a diverse energy mix.

Current wording

In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan (“IRP”), to identify what resources will be necessary to safely and reliably meet the demand and energy needs of its customers over the next 15 years. In November 2023, APS released its latest IRP, which identified forecasted customer demand and energy needs growing at an unprecedented rate. In developing the IRP, APS considered how factors such as forecasted economic growth, new resource technology availability, and weather impact the amount and type of resources required to reliably meet customer needs. These factors, among others, were used to develop a plan that identified a balanced mix of diverse energy generating resources to reliably serve customers’ future energy needs in the most affordable and sustainable manner possible. To help ensure competitive costs for resources procured by APS, APS regularly issues competitive bid solicitations through an all-source request for proposal (“ASRFP”) process, with the most recent ASRFPs being issued in 2022 and 2023. These ASRFPs are open to bids for all resource types, including customer-scale (behind the meter) and utility-scale (in front of the meter) resources. Through the ASRFP process, APS has found that clean resources like wind, solar, and energy storage technology, are important elements of a least cost portfolio. During the clean energy transition, dispatchable resources will play a vital role in maintaining grid reliability by serving as a back-up to intermittent energy resources when output is insufficient to meet customer needs. Over the long term, each resource in a balanced and diverse portfolio is expected to provide complementary value and contribute to sustained delivery of reliable electric service.

Previous wording

Renewables. APS’s IRP identifies a diverse mix of resources adequate to maintain grid reliability while serving increasing future customer energy needs. Our IRP shows that renewable and clean resources are an important part of a reliable, cost effective portfolio. APS seeks market-based pricing of procured resources through regular solicitation of project bids using its competitive RFP process.

Current wording

Renewables. APS’s IRP identifies a diverse mix of resources adequate to maintain grid reliability while serving increasing future customer energy needs. Our IRP shows that renewable and clean resources are an important part of a reliable, cost effective portfolio. APS seeks market-based pricing of procured resources through regular solicitation of project bids using its competitive ASRFP process.

Previous wording

APS has a diverse portfolio of existing and planned resources, including solar, wind, energy storage, nuclear, geothermal, biomass and biogas, that supports our commitment to clean energy. This commitment is already strengthened by Palo Verde, one of the nation’s largest carbon-free, clean energy resource, which provides the foundation for reliable and affordable service for APS customers. APS’s longer-term clean energy strategy includes pursuing the right mix of purchased power contracts for new resources, procurement of new resources to be owned by APS, and the ongoing development of distributed energy resources. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible.

Current wording

APS has a diverse portfolio of existing and planned resources, including solar, wind, energy storage, nuclear, geothermal, biomass and biogas, that supports our commitment to clean energy. This commitment is already strengthened by Palo Verde, one of the nation’s largest carbon-free, clean energy resources, which provides the foundation for reliable and affordable service for APS customers. APS’s longer-term clean energy strategy includes pursuing the right mix of purchased power contracts for new resources, procurement of new resources to be owned by APS, and the ongoing development of distributed energy resources. Maintaining a balanced and diverse portfolio of resources will ensure continued reliable service to our customers in the most affordable manner possible.

Previous wording

APS uses competitive RFPs to pursue market-priced resources that meet its system needs and offer the best value for customers. APS selects projects based on cost, ability to meet system requirements and commercial viability, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Guided by IRP-established timelines and quantities, APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the RFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection to the electric grid.

Current wording

APS uses competitive ASRFPs to pursue market-priced resources that meet its system needs and offer the best value for customers. APS selects projects based on cost, ability to meet system requirements and commercial viability, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Guided by IRP-established timelines and quantities, APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the ASRFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection to the electric grid.

Previous wording

On June 30, 2023, APS issued an RFP (the “2023 RFP”) seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources with a focus on in-service dates between 2026 and 2028. Bids from the 2023 RFP were received on September 6, 2023, and APS is negotiating on multiple projects and executed agreements on multiple others, including a 500 MW wind facility power purchase agreement (“PPA”) and a 168 MW solar facility that APS will own and operate.

Current wording

On June 30, 2023, APS issued an ASRFP (the “2023 ASRFP”) seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources with a focus on in-service dates between 2026 and 2028. Bids from the 2023 ASRFP were received on September 6, 2023, and APS is negotiating on multiple projects and executed agreements on multiple others. These projects include the following facilities that APS will own and operate: a 168 MW solar facility, a 150 MW battery facility, 90 MW of natural gas at the Sundance Power Plant, and 397 MW of natural gas at the Redhawk Power Plant. In addition to the APS-owned projects, APS has also contracted for 500 MW of wind resources, 2,150 MW of solar plus storage resources, 1,100 MW of stand-alone battery resources, 150 MW of solar resources, and 30 MW via an existing natural gas toll uprate.

Previous wording

The following table summarizes the resources in APS’s renewable energy portfolio that are in operation or under development as of June 30, 2024. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting, and interconnection of the projects to the electric grid.

Current wording

The following table summarizes the resources in APS’s renewable energy portfolio that are in operation, planned or under development as of the date of this report. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting, and interconnection of the projects to the electric grid.

Previous wording

The following table summarizes the resources in APS’s energy storage portfolio that are in operation or under development as of June 30, 2024. Agreements for the development and completion of future resources are subject to various conditions.

Current wording

The following table summarizes the resources in APS’s energy storage portfolio that are in operation, planned or under development as of the date of this report. Agreements for the development and completion of future resources are subject to various conditions.

Previous wording

As a part of the statewide transportation electrification plan (“TE Plan”) adopted in 2021, the ACC approved a target of 450,000 light-duty electric vehicles (“EVs”) in its service territory by 2030. APS’s Take Charge AZ (“TCAZ”) program has helped to deploy Level 2 EV charging stations on customer properties for fleet, public, and workplace EV charging. As of June 30, 2024, APS energized 809 Level 2 charging ports at 193 customer locations. Additionally, APS has energized direct current fast charging (“DCFC”) stations that are owned and operated by APS at five locations in Arizona: Sedona, Prescott, Globe, Show Low, and Payson. Effective December 12, 2023, the TCAZ program was discontinued by the ACC. As part of that decision, APS was permitted to complete certain projects that were in process as of December 12, 2023.

Current wording

As a part of the statewide transportation electrification plan (“TE Plan”) adopted in 2021, the ACC approved a target of 450,000 light-duty electric vehicles (“EVs”) in its service territory by 2030. APS’s Take Charge AZ (“TCAZ”) program has helped to deploy Level 2 EV charging stations on customer properties for fleet, public, and workplace EV charging. As of September 30, 2024, APS energized 825 Level 2 charging ports at 196 customer locations. Additionally, APS has energized direct current fast charging (“DCFC”) stations that are owned and operated by APS at five locations in Arizona: Sedona, Prescott, Globe, Show Low, and Payson. Effective December 12, 2023, the TCAZ program was discontinued by the ACC. As part of that decision, APS was permitted to complete certain projects that were in process as of December 12, 2023.

Previous wording

APS filed its 2024 DSM Implementation Plan on November 30, 2023. The 2024 DSM Implementation Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs: an expanded residential EV Managed Charging program and a Commercial EV Make-Ready Program. On April 26, 2024, APS filed an amended 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The amended 2024 DSM Plan is still pending ACC review and approval. APS cannot predict the outcome of this proceeding. See Note 4.

Current wording

APS filed its 2024 DSM Implementation Plan on November 30, 2023. The 2024 DSM Implementation Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs: an expanded residential EV Managed Charging program and a Commercial EV Make-Ready Program. On April 26, 2024, APS filed an amended 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget of $90.9 million to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The amended 2024 DSM Plan is still pending ACC review and approval. APS will not file a 2025 DSM Implementation Plan, pending ACC review of the amended 2024 DSM Implementation Plan. APS cannot predict the outcome of this proceeding. See Note 4 for more information.

Previous wording

On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an RFP, and (viii) recovery of all DSM costs through the DSMAC rather than through base rates.

Current wording

On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an ASRFP, and (viii) recovery of all DSM costs through the DSMAC rather than through base rates.

Previous wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association, Solar Energy Industries Association, and Vote Solar for the limited purpose of reviewing arguments concerning the GAC. Specifically, rehearing was ordered as to whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. The parties seeking rehearing had 30 days after the denial or granting of a request for rehearing to file a notice of appeal to the Arizona Court of Appeals. No party filed a notice of appeal within the 30-day period. A limited rehearing is scheduled to begin on November 5, 2024 for the purpose of reviewing the GAC. APS cannot predict the outcome of these proceedings.

Current wording

Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association, Solar Energy Industries Association, and Vote Solar for the limited purpose of reviewing arguments concerning the GAC. Specifically, rehearing was ordered as to whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. The parties seeking rehearing had 30 days after the denial or granting of a request for rehearing to file a notice of appeal to the Arizona Court of Appeals. No party filed a notice of appeal within the 30-day period. A limited rehearing was scheduled for the purpose of reviewing the GAC. Written testimony from APS and intervenors for the limited rehearing was filed on September 24, 2024, and rebuttal testimony from parties was filed on October 18, 2024. The limited rehearing began on October 28, 2024. APS cannot predict the outcome of these proceedings.

Previous wording

After the 2019 Rate Case decision, APS filed an application for rehearing of the 2019 Rate Case and later filed a Notice of Direct Appeal by APS at the Arizona Court of Appeals, requesting review of certain matters from the 2019 Rate Case decision. The Arizona Court of Appeals affirmed in part and reversed in part the ACC’s decision in the 2019 Rate Case, remanding the issue to the ACC for further proceedings. On June 14, 2023, APS and the ACC Legal Division filed a joint resolution with the ACC to allow recovery of $215.5 million in costs related to the installation of the Four Corners selective catalytic reduction (“SCR”) project, a reversal of the 20-basis point reduction to APS’s return on equity from 8.9% to 8.7% as a result of the 2019 Rate Case decision, and recovery of $59.6 million in revenue lost by APS between December 2021 and June 20, 2023. The joint resolution provides for a new Court Resolution Surcharge (“CRS”) mechanism, which is designed to recover the $59.6 million in revenue lost by APS between December 2021 and June 20, 2023, and the prospective recovery of ongoing costs related to the SCR investments and expense and the allowable return on equity difference in current base rates. On June 21, 2023, the ACC approved the joint resolution and proposals therein for recovery through the CRS mechanism, which became effective on July 1, 2023. As of June 30, 2024,$16.8 million of the $59.6 million of lost revenue has been recovered. Finally, the CRS tariff has been updated to account for changes to return on equity and depreciation and deferral adjustments approved in Decision No. 79293 in the 2022 Rate Case. See Note 4 for more information regarding the 2019 Rate Case and Four Corners SCR cost recovery.

Current wording

After the 2019 Rate Case decision, APS filed an application for rehearing of the 2019 Rate Case and later filed a Notice of Direct Appeal by APS at the Arizona Court of Appeals, requesting review of certain matters from the 2019 Rate Case decision. The Arizona Court of Appeals affirmed in part and reversed in part the ACC’s decision in the 2019 Rate Case, remanding the issue to the ACC for further proceedings. On June 14, 2023, APS and the ACC Legal Division filed a joint resolution with the ACC to allow recovery of $215.5 million in costs related to the installation of the Four Corners selective catalytic reduction (“SCR”) project, a reversal of the 20-basis point reduction to APS’s return on equity from 8.9% to 8.7% as a result of the 2019 Rate Case decision, and recovery of $59.6 million in revenue lost by APS between December 2021 and June 20, 2023. The joint resolution provides for a new Court Resolution Surcharge (“CRS”) mechanism, which is designed to recover the $59.6 million in revenue lost by APS between December 2021 and June 20, 2023, and the prospective recovery of ongoing costs related to the SCR investments and expense and the allowable return on equity difference in current base rates. On June 21, 2023, the ACC approved the joint resolution and proposals therein for recovery through the CRS mechanism, which became effective on July 1, 2023. As of September 30, 2024,$22.5 million of the $59.6 million of lost revenue has been recovered. Finally, the CRS tariff has been updated to account for changes to return on equity and depreciation and deferral adjustments approved in Decision No. 79293 in the 2022 Rate Case. See Note 4 for more information regarding the 2019 Rate Case and Four Corners SCR cost recovery.

Previous wording

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments from utilities and interested parties on ways to reduce regulatory lag, including alternative ratemaking structures such as future test years and hybrid test years. APS filed comments on June 1, 2023. On March 19, 2024, the ACC held a workshop to discuss modifying the state’s rate case test year rules. Utilities, including APS, spoke about alternatives to the current rules that could reduce regulatory lag. The ACC plans to hold another workshop on this topic and has invited further comments from stakeholders. On April 19, 2024, a letter was filed to the docket by an ACC commissioner discussing the potential benefits of modifying test year rules, including the potentiality of offering utilities to choose the type of test year that best suits them. The letter also recommended that this issue be discussed at the next possible open meeting. On July 9, 2024, at an open meeting, ACC Commissioners discussed objectives of future regulatory lag workshops and voted to schedule at least one more workshop on this topic later this year. The ACC scheduled a workshop for October 3, 2024. APS cannot predict the outcome of this matter.

Current wording

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments from utilities and interested parties on ways to reduce regulatory lag, including alternative ratemaking structures such as future test years and hybrid test years. APS filed comments on June 1, 2023. On March 19, 2024, the ACC held a workshop to discuss modifying the state’s rate case test year rules. Utilities, including APS, spoke about alternatives to the current rules that could reduce regulatory lag. On April 19, 2024, a letter was filed to the docket by an ACC commissioner discussing the potential benefits of modifying test year rules, including the potentiality of offering utilities to choose the type of test year that best suits them. The letter also recommended that this issue be discussed at the next possible open meeting. On July 9, 2024 at an open meeting, ACC Commissioners discussed objectives of future regulatory lag workshops and voted to schedule at least one more workshop on this topic later this year. The ACC held an additional workshop on October 3, 2024 to discuss formula rate methodologies and their use in ratemaking. The workshop included presentations from representatives of FERC, customer advocates, other stakeholders, and utilities, including APS. APS cannot predict the outcome of this matter.

Previous wording

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates. The U.S. Department of Energy’s Grid Deployment Office selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Current wording

Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates. The U.S. Department of Energy’s Grid Deployment Office selected TransCanyon to enter into capacity contract negotiations for up to 25% of the Cross-Tie 500-kilovolt transmission line (“Cross-Tie”) as part of the Transmission Facilitation Program. The agreement was executed on June 12, 2024. The proposed Cross-Tie project includes a 214-mile transmission line connecting Utah and Nevada that is intended to help improve grid reliability and relieve congestion on other transmission lines.

Previous wording

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term PPAs. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

Current wording

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term power purchase agreements (“PPAs”). PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

Previous wording

•$25 million investment in the Energy Impact Partners fund, of which $18.1 million has been funded as of June 30, 2024. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Current wording

•$25 million investment in the Energy Impact Partners fund, of which approximately $18.3 million has been funded as of September 30, 2024. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.

Previous wording

•$25 million investment in AZ-VC (formerly invisionAZ Fund), of which $10.5 million has been funded as of June 30, 2024. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

Current wording

•$25 million investment in AZ-VC (formerly invisionAZ Fund), of which approximately $10.9 million has been funded as of September 30, 2024. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

Previous wording

•$7.5 million investment in Westly Seed Fund, of which $0.8 million has been funded as of June 30, 2024. Westly Seed Fund is focused on supporting entrepreneurs who are revolutionizing the energy, mobility, building, and industrial sectors.

Current wording

•$7.5 million investment in Westly Seed Fund, of which approximately $0.8 million has been funded as of September 30, 2024. Westly Seed Fund is focused on supporting entrepreneurs who are revolutionizing the energy, mobility, building, and industrial sectors.

Previous wording

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.0% for the six-month period ended June 30, 2024, compared with the prior-year period. For the three-year period ended 2023, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2024 and the average annual growth to be in the range of 1.5% to 2.5% through 2026 based on anticipated steady population growth in Arizona during that period.

Current wording

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.1% for the nine-month period ended September 30, 2024, compared with the prior-year period. For the three-year period ended 2023, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2024 and 2025 and that average annual growth will be in the range of 1.5% to 2.5% through 2027 based on anticipated steady population growth in Arizona during that period.

Previous wording

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 5.6% for thesix-month period ended June 30, 2024, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center customers.

Current wording

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 5.7% for the nine-month period ended September 30, 2024, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center and large manufacturing customers.

Previous wording

For the three-year period ended 2023, annual retail electricity sales growth averaged 2.6%, adjusted to exclude the effects of weather variations. Due to the expected growth of several large data centers and new large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 2.0% to 4.0% for 2024 and that average annual growth will be in the range of 4.0% to 6.0% through 2026, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several large data centers and new large manufacturing facilities, which are expected to contribute to 2024 growth in the range of 2.5% to 3.5% and to average annual growth in the range of 3.0% to 5.0% through 2026.

Current wording

For the three-year period ended 2023, annual retail electricity sales growth averaged 2.6%, adjusted to exclude the effects of weather variations. Due to the expected growth of several large data centers and new large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 4.0% to 6.0% for 2024 and 2025 and that average annual growth will be in the range of 4.0% to 6.0% through 2027, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several large data centers and new large manufacturing facilities, which are expected to contribute to 2024 and 2025 growth in the range of 3.0% to 5.0% and to average annual growth in the range of 3.0% to 5.0% through 2027.

Previous wording

Our consolidated net income attributable to common shareholders for the three months ended June 30, 2024, was $204 million, compared with consolidated net income attributable to common shareholders of $107 million for the prior-year period. The results reflect an increase of approximately $97 million, primarily as a result of the impacts of new customer rates, the effects of weather, increased customer usage and growth, and higher CRS revenue. These positive factors were partially offset by higher depreciation and amortization expense mostly due to increased plant and intangible assets, higher interest charges, net of AFUDC, and higher income taxes, partially offset by the favorable timing of recognition for permanent items and credits.

Current wording

Our consolidated net income attributable to common shareholders for the three months ended September 30, 2024 was $395 million, compared with consolidated net income attributable to common shareholders of $398 million for the prior-year period. The results reflect a decrease of approximately $3 million, primarily as a result of higher operations and maintenance expense, depreciation and amortization expense mostly due to increased plant and intangible assets, higher interest charges, higher income taxes and the timing of recognition for permanent items, partially offset by higher tax credits. These negative factors were partially offset by the favorable impacts of new customer rates and the effects of weather.

Previous wording

Operating revenues less fuel and purchased power expenses. Operating revenues less fuel and purchased power expenses were $158 million higher for the three months ended June 30, 2024, compared with the prior-year period. The following table summarizes the major components of this change:

Current wording

Operating revenues less fuel and purchased power expenses. Operating revenues less fuel and purchased power expenses were $115 million higher for the three months ended September 30, 2024, compared with the prior-year period. The following table summarizes the major components of this change:

Previous wording

Operations and maintenance. Operations and maintenance expenses decreased $5 million for the three months ended June 30, 2024, compared with the prior-year period, primarily due to:

Current wording

Operations and maintenance. Operations and maintenance expenses increased $58 million for the three months ended September 30, 2024, compared with the prior-year period, primarily due to:

Previous wording

•An increase of $2 million related to transmission, distribution, and customer service costs;

Current wording

•an increase of $15 million related to transmission, distribution, and customer service costs;

Previous wording

•An increase of $2 million related to employee benefit costs;

Current wording

•an increase of $15 million related to employee benefit costs;

Previous wording

•An increase of $4 million related to costs for renewable energy and similar regulatory programs, which are partially offset in operating revenues and purchased power;

Current wording

•an increase of $8 million related to costs for renewable energy and similar regulatory programs, which are partially offset in operating revenues and purchased power;

Previous wording

•A decrease of $4 million related to non-nuclear generation costs, primarily due to lower operating costs;

Current wording

•an increase of $4 million related to non-nuclear generation costs, primarily due to higher operating costs;

Showing the first 40 of 67 pairs. Open the source sections for the rest.

Rearranged current paragraphs (5)

Current report — wording carried from elsewhere

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western

Current report — wording carried from elsewhere

Other income and expenses, net. Other income and expenses, net were $7 million lower for the three months ended September 30, 2024, compared to the prior-year period, primarily due to the gain on the sale of BCE (see Note 16) and lower PSA interest income. The difference between APS’s and Pinnacle West’s other income and expense, net is primarily related to Pinnacle West’s gain on the sale of BCE.

Current report — wording carried from elsewhere

•an increase of $17 million related to transmission, distribution, and customer service costs;

Current report — wording carried from elsewhere

•an increase of $17 million related to employee benefit costs;

Current report — wording carried from elsewhere

ACC requesting to increase Pinnacle West’s permitted yearly equity infusions to equal up to 2.5% of Pinnacle West’s consolidated assets each calendar year on a three-year rolling average basis. APS cannot predict the outcome of this matter.
Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

Recognizing that creating customer value is inextricably linked to increasing shareholder value, APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience. This multi-year objective includes incrementally improving APS’s J.D. Power (“JDP”) overall customer satisfaction ratings to achieve a first quartile ranking in its peer set comprised of large investor-owned utilities. APS’s progress on this front has continued in 2024.

Previous report — wording carried elsewhere

As noted above, on June 30, 2023, APS issued the 2023 RFP seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources, including energy storage, with a focus on in-service dates between 2026 and 2028. From those bids, APS has since executed agreements for a 150 MW energy storage facility that APS will own and operate and a 150 MW energy storage PPA.

Previous report — wording carried elsewhere

•A decrease of $4 million related to nuclear generation costs;

Previous report — wording carried elsewhere

•A decrease of $1 million for other miscellaneous factors.