HAWAIIAN ELECTRIC CO INC

For the period ended Dec 31, 2025. Filed Feb 27, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 27, 2026

HE$8.42-0.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-24.

0000354707-25-000013

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-27.

0000354707-26-000008

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 290 previous paragraphs and 279 current paragraphs.

82 unchanged; 128 reworded; 61 added; 69 removed; 11 previous and 8 current paragraphs rearranged.

Tables are not compared: 24 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (61)

Current report

On September 5, 2025, HEI and Hawaiian Electric each amended their senior unsecured revolving credit facility (the HEI Revolving Facility and the Hawaiian Electric Revolving Facility, respectively) resulting in increased borrowing capacities and available liquidity. HEI increased its revolving commitments available under the HEI Revolving Facility to $300 million from $175 million and extended the termination date to September 5, 2030 from May 14, 2027. Hawaiian Electric increased its revolving commitments available under the Hawaiian Electric Revolving Facility to $300 million from $200 million and extended the termination date to September 4, 2026, subject to an automatic extension to the earlier of (i) such date specified in a final order or approval of the PUC and (ii) if such order or approval is obtained, September 5, 2030. The Hawaiian Electric Revolving Facility also allows for commitment increases of up to an additional $75 million, subject to customary conditions. Refer to Note 6 of the Consolidated Financial Statements for additional terms of the amended credit facilities.

Current report

In addition, on September 18, 2025, Hawaiian Electric issued $500 million in unsecured senior notes with an interest rate of 6.00% and maturing on October 1, 2033 (refer to Note 7 of the Consolidated Financial Statements for additional terms of the unsecured senior notes). A portion of the proceeds was used to repay the outstanding balance of the Utilities’ revolving and term loan facilities and the remaining proceeds are intended to be used to 1) finance capital expenditures, 2) repay long-term debt and short-term debt used to finance or refinance capital expenditures, and 3) reimburse funds used for the payment of capital expenditures.

Current report

In June 2025, the Utilities submitted a request with the PUC to terminate or suspend the ATRs. Beginning in 2024 and continuing into 2026, HEI has embarked on a strategy to divest all of its affiliated companies other than the Utilities, intending for the Utilities to be HEI’s sole operating companies. Termination of the ATRs would allow implementation of a corporate integration, under which all HEI employees would move to Hawaiian Electric. A few officer positions would manage and operate both HEI and Hawaiian Electric (dual-hatted executives) and the HEI and Hawaiian Electric boards of directors would be composed of a single set of individuals. In September 2025, the PUC dismissed the request without prejudice. In its order, the PUC provided guidance on the topics to be addressed in any future request. On October 31, 2025 HEI and Hawaiian Electric filed a revised request with the PUC to terminate or suspend the ATRs. After responding to information requests from the Consumer Advocate, the Consumer Advocate issued its statement of position on February 4, 2026. The Consumer Advocate supported the approval of the request with the condition that before any recovery of expenses related to HEI, the Utilities should give the Consumer Advocate and the PUC advance notice of likely changes to recovery. HEI and Hawaiian Electric informed the PUC that the docket was ready for decision making on February 5, 2026.

Current report

Following a hearing on December 17, 2025, at which the court orally granted final approval of the Class Settlement Agreement and no class member objected, the Maui Circuit Court entered a written order granting such final approval on January 26, 2026. The deadline to file appeals from that order was February 25, 2026, and as of February 26, 2026, no appeal appeared on the docket. As it appears no party appealed the final approval of the Class Settlement Agreement, it appears that such final approval order is now final and unappealable.

Current report

The tort Settlement Agreements do not resolve claims with insurers who have asserted or could assert subrogation claims in separate lawsuits, and such insurers are not parties to the Settlement Agreements, but resolving such claims in the manner set forth in the Settlement Agreements (summarized below) is a condition that must be satisfied before any payment is due from the defendants. On December 30, 2025, the court entered judgment in favor of the defendants in the two principal direct subrogation actions brought by various insurers as to all direct subrogation claims except for 16 such claims associated with insureds who had opted out of the class settlement and had not yet settled. On January 21, 2026, certain plaintiff insurers appealed the grant of summary judgment in these two actions. No briefing schedules in these appeals have been set. On November 5, 2025, the parties signed a binding term sheet to settle the Securities Action (the Securities Action Term Sheet) following negotiations facilitated by a mediator. On January 5, 2026, the parties executed a definitive stipulation of settlement (the Securities Action Stipulation of Settlement) that will provide for the complete resolution of the Securities Action in exchange for a payment by the Company of $47.8 million as part of the overall settlement described below. The settlement of the Securities Action is conditioned on, among other things, approval by the boards of the Company and Hawaiian Electric; the finalization and court approval of the Securities Actions stipulation of settlement; the finalization by February 26, 2026 and subsequent court approval of the stipulation of settlement in the Derivative Actions (defined and discussed below); and entry of a judgment of dismissal following final court approval. In connection with the settlement of the Securities Action, there will be no admission of liability by the Company or any defendants and the Company, the defendants, and related persons will receive a customary full release of all claims. On February 26, 2026, the United States District Court for the Northern District of California held a hearing to determine whether to preliminarily approve the Securities Action Stipulation of Settlement. Following the hearing, the court indicated that it will issue an order and set a hearing date for the final approval of the settlement.

Current report

In connection with the execution of the Securities Action Term Sheet, HEI accrued, as of December 31, 2025, $47.8 million, and concurrently recorded an insurance reimbursement receivable of an equivalent amount as the recovery of the agreed settlement payment under its directors and officers liability insurance policy is deemed probable.

Current report

In addition, on November 5, 2025, the parties signed a binding term sheet (the Derivative Litigation Term Sheet) to settle all of the outstanding derivative actions described above (the Derivative Actions). The Derivative Litigation Term Sheet was signed following negotiations facilitated by a mediator. On December 31, 2025, the parties executed a definitive settlement agreement (the Derivative Litigation Settlement Agreement) that provides for a complete resolution of the claims asserted in the Derivative Actions in exchange for a payment on behalf of the individual defendants by the Company’s insurers in the amount of $100 million, which will be used in part to pay the $47.8 million for the Securities Action Stipulation of Settlement and fees and expenses for plaintiffs’ counsel. The settlement of the Derivative Actions is conditioned on, among other things, the approval by the boards of HEI and Hawaiian Electric (including their independent directors) of the Derivative Litigation Settlement Agreement; final court approval of the Derivative Litigation Settlement Agreement; and entry of final judgment and orders of dismissal in the Derivative Actions. The plaintiffs’ counsel intends to request court approval for attorneys’ fees of 25% of the settlement proceeds, plus expenses not to exceed $475,000. In connection with the settlement of the Derivative Actions, there will be no admissions of liability, and the defendants and related persons will receive a customary full release of all claims. On March 9, 2026, the United States District Court for the District of Hawaii is scheduled to hold a hearing to determine whether to preliminarily approve the Derivative Litigation Settlement Agreement.

Current report

The Derivative Litigation Settlement Agreement calls for the settlement to be fully funded by the Company’s directors and officers liability insurance policies. As noted above, $47.8 million of the $100 million total will be used to fund the settlement of the Securities Action. The remaining amount, any award in the Derivative Actions for the plaintiffs’ attorneys’ fees and expenses, and payment of other settlement-related expenses provided for in the term sheet, is accounted for as a contingent gain which will be recognized when realized or realizable.

Current report

On February 13, 2026, Hawaiian Electric Industries, Inc., Hawaiian Electric Company, Inc., and Maui Electric Company, Limited (collectively, the Hawaiian Electric Plaintiffs) filed suit against five of their insurers: Defendants XL Insurance Company of America, Inc., Allianz Global Risks US Insurance Company, the Princeton Excess and Surplus Lines Insurance Company, and General Security Indemnity Company of Arizona (the Insurers). The Insurers are commercial property insurers that insured the Hawaiian Electric Plaintiffs at the time of the August 2023 Maui windstorm and wildfires. The Insurers have acknowledged coverage under the policies at issue for loss or damage to the Hawaiian Electric Defendants’ property and have paid a portion of the companies’ losses. However, the parties dispute the extent of the damage, the nature of coverage, and apportionment under the policies. Therefore, the Hawaiian Electric Plaintiffs seek declaratory relief regarding the extent of the Insurers’ obligations under the policies, as well as a determination that the Insurers have breached the policies.

Current report

1 HEI consolidated includes insurance recovery related to the proposed settlement of the securities class action of $47.8 million for 2025. Also, includes adjustments related to costs that are no longer probable of recovery under the insurance policies. For 2025, HEI consolidated and Electric utility adjustments amount to $7.6 million of which, $4.5 million were deferred to a regulatory asset, and are reported on the line “Deferral treatment approved by the PUC.”

Current report

Hawaii’s seasonally adjusted unemployment rate in December 2025 was 2.2%, lower than the December 2024 rate of 3.0%. The national unemployment rate in December 2025 was 4.4%, slightly higher than the December 2024 rate of 4.1%. According to a recent forecast by UHERO, issued on December 12, 2025, jobs in the State will increase by 0.5% in 2025 before decreasing by 0.3% in 2026.

Current report

At its December 10, 2025 meeting, the Federal Open Market Committee (FOMC) decided to lower the federal funds rate target range to 3.5% to 3.75%. The FOMC noted that economic growth has moderated, with job gains slowing and unemployment edging up. They further noted that uncertainty around the economic outlook remains elevated, and that they remain attentive to risks on both sides of its dual mandate of achieving maximum employment and 2 percent inflation over the longer run.

Current report

UHERO forecasts full year 2026 real GDP and real personal income to be flat, a decrease in total visitor arrivals of 1.3%, and an unemployment rate of 3.0% for the State. According to UHERO, Hawaii’s economy is edging into a mild recession, with tourism in a downturn, likely to result in job losses in 2026. Inflation is also expected to increase as the impacts of tariffs are reflected in consumer prices. Construction continues to be the only major source of economic strength in Hawaii, supported by large federal contracts and ongoing housing and infrastructure needs.

Current report

As part of HEI’s comprehensive review of strategic options for certain assets of Pacific Current, on February 7, 2025, Pacific Current entered into a Securities Purchase Agreement to sell all the membership interests in Hamakua Holdings, a then wholly owned subsidiary of Pacific Current and parent company of Hamakua Energy, to an unaffiliated third party. The sale transaction closed on March 10, 2025. As a result of the sale transaction, the Company recorded a pre-tax loss on the sale amounting to $13.2 million as of March 31, 2025. The sale of Hamakua Holdings and its subsidiary, Hamakua Energy, does not preclude Pacific Current from seeking recovery of its losses related to the aforementioned damages to its plant facilities from the fuel supplier.

Current report

As part of HEI’s comprehensive review of strategic options for certain assets of Pacific Current, on August 1, 2025, Pacific Current, through an indirect subsidiary, sold all of the membership interests in Mauo, LLC, Alenuihaha Developments, LLC, Kaʻieʻie Waho Company, LLC and Upena, LLC. See Note 3 of the Consolidated Financial Statements for more information.

Current report

The Company has taken additional prudent measures to strengthen its financial position while continuing to provide reliable service to its customers and reinforcing HEI’s commitment to serving the community for the long term, including the Utilities entering into an asset-based credit facility in May 2024 that allows the Utilities to borrow up to $250 million (see Note 6 of the Consolidated Financial Statements), and HEI registering with the SEC in September 2024 an at-the-market offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program. In addition, HEI paid down a ratable portion of each of HEI’s senior notes in April 2025 amounting to $384 million, using the proceeds from the December 2024 sale of ASB. Additional proactive measures included suspending the quarterly cash dividend on HEI’s common stock after payment of the second quarter dividend in September 2023, repaying its revolving credit facilities and reducing or eliminating discretionary costs.

Current report

1 Pursuant to an HEI and Hawaiian Electric Intercompany Borrowing and Investment Policy which provides Hawaiian Electric a borrowing commitment of $75 million. Hawaiian Electric currently has no borrowings under this policy. See Note 6 of the Consolidated Financial Statements for a description of the HEI and Hawaiian Electric Intercompany Borrowing and Investment Policy.

Current report

2 As of December 31, 2025, the Utilities had no commercial paper outstanding. Hawaii Electric Light and Maui Electric had no short-term borrowings from Hawaiian Electric but had long-term intercompany loans from Hawaiian Electric in the amount of $25 million and $90 million, respectively, as of December 31, 2025.

Current report

1 Amounts do not include $54 million related to Mahipapa debt which are included in liabilities held for sale as of December 31, 2025. See Note 3 of the Consolidated Financial Statements.

Current report

2 Amounts do not include $4 million of interest on Mahipapa debt which is included in liabilities held for sale as of December 31, 2025. See Note 3 of the Consolidated Financial Statements.

Current report

3 As of December 31, 2025, HEI and Hawaiian Electric recorded $48 million and $40 million, respectively, of insurance reimbursement receivable related to the securities class action settlement and tort settlement, respectively. See Note 2 of the Consolidated Financial Statements.

Current report

4 Amounts do not include $6 million related to Mahipapa leases which are included in liabilities held for sale as of December 31, 2025. See Note 3 of the Consolidated Financial Statements.

Current report

On September 19, 2024, HEI filed a shelf registration statement with the SEC for an at-the-market offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program.

Current report

For the full year 2025, the Utilities generated net income of approximately$168.2 million compared to net loss of$1.2 billion in 2024. See “Results of operations” below for variance explanations.

Current report

For the full year 2025, kWh sales volume increased 2.5% from 2024 levels. The increase reflects warmer weather as well as the continuing economic recovery since the Maui windstorm and wildfires and increased pumping loads as Maui energy consumption increased 6.6% from 2024 to 2025.

Current report

Customer accounts receivable decreased in 2025 by $27 million, or 14%with arrears balance 1-30 days decreasing by 18% since December 31, 2024. The decrease in accounts receivable was primarily driven by receipt of government arrears. In addition, arrears balances have declined to pre-pandemic levels as the Utilities returned to pre-pandemic collection policies, except on Maui, where the moratorium on disconnections remain in place. Further at year-end, the Utilities pledged $1 million to assist customers with larger arrears balances who may be facing financial hardship, particularly on Maui, and decreased accounts receivable accordingly. See “Financial Condition—Liquidity and capital resources” below for additional information.

Current report

Legislation. On June 6, 2025, Governor Josh Green signed Senate Bill 1501, now known as Act 191, which allows the State to “step-in” for the Utilities in the case of utility financial distress, ensuring project owners receive payment, addressing concerns of some independent power producers’ ability to procure low-cost financing for new renewable energy and storage projects due to the Utilities’ credit ratings. On July 1, 2025, the Governor signed into law Senate Bill 897, now known as Act 258, which directs the PUC to study the viability of a wildfire relief fund, establish an aggregate liability cap on economic damages from future wildfires and authorizes securitization to finance wildfire safety and resilience infrastructure improvements. On July 8, 2025, the Governor signed House Bill 1001, now known as Act 301, which appropriates funds to address the State of Hawaii’s settlement of claims related to the Maui wildfire and windstorm tort litigation settlement. Act 258 is expected to help support the Utilities’ financial stability to move forward, while Act 301 provides a resolution to those affected by the Maui windstorm and wildfires and provides assurance for a global settlement to move forward. Act 191 supports the Utilities’ ability to procure energy in order to provide customers and communities with safe, reliable and affordable clean energy.

Current report

On July 2, 2025, the Governor signed Senate Bill 589, now known as Act 266. Among other things, Act 266 authorizes wheeling of renewable energy and requires the PUC to establish policies and procedures to implement wheeling of renewable electricity for a capacity of not more than two megawatts, as well as microgrid service tariffs, by January 1, 2027. Act 266 also requires the PUC to establish an installation goal for new customer-sited distributed energy resources and establish tariffs to achieve the installation goal and for grid service programs, microgrids, and community-based renewable energy. The Utilities are currently assessing the potential impact related to wheeling as the PUC works to establish the provisions and terms for the implementation of wheeling in compliance with Act 266. For more information on wheeling, see discussion in “Investigation on the establishment of wheeling” below.

Current report

The One Big Beautiful Act signed into law by President Trump on July 4, 2025 may impact the ability of the Utilities’ recently selected and new wind and solar projects to qualify for federal tax credits. Regulations continue to be developed, so the complete scope of potential impacts remains unknown at this time. Any loss in renewable energy tax credits could lead to project risk for new wind and solar projects in development and will likely result in higher prices for such projects, developers of which rely extensively on federal tax credits to finance such projects. It is also possible that the sunsetting of these tax credits will impact the supply chain for projects throughout the U.S. as developers rush to meet the four-year safe harbor timeline. The legislature is expected to consider legislation to provide a state tax credit to fill the void left by the expiration of the federal solar tax credit. However, due to budget shortfalls, the likelihood of its passage is limited.

Current report

Trade policies. Impacts to the Utilities from trade policies imposed by the U.S. or its trading partners are uncertain at this time. The Utilities estimated that in 2024, more than 90% of the Utilities’ capital goods were domestically sourced. However, the Utilities and their independent power producers procure capital goods that flow through global supply chains and may include raw materials, sub-components, or components sourced or assembled outside the U.S. Utility capital costs and the cost of power procured from independent power producers may increase due to new trade policies and changes in trade policy from the U.S. and its trading partners, based on the amount of foreign content of capital goods. It is also possible that trade policies could impact commodities and raw materials costs, leading to inflation of utility capital costs indirectly through the broader supply chain. Utility-scale battery projects planned by both Hawaiian Electric and independent power producers may see significant cost increases or supply chain challenges, as the majority of battery components are currently manufactured in, or have significant supply chain exposure to, the People’s Republic of China. The Utilities are still assessing the potential impact of the trade policies.

Current report

Re-basing. In its order issued on February 27, 2025, the PUC concluded that Utilities’ target revenues should be re-based for the next MRP (MRP2) and allowed the Utilities to file a single, consolidated application that presents their requested adjustment to target revenues. The proceeding to re-base the Utilities’ target revenues for MRP2 shall be bifurcated into two tracks, with the first track focused on reaching a decision on the Utilities’ revenue requirements prior to the commencement of MRP2 and the second track focused on making a final determination on the revenue requirement and addressing the rate design component.

Current report

On August 28, 2025, the Utilities filed a request to extend the time to file a rate case in order to allow collaboration among the PBR working group parties on an alternative rate re-basing proposal that could eliminate the need for a general rate case application and process. Confirmation was also sought that if a non-rate case re-basing proposal is explored but does not result in a proposal supported by the Utilities, they could file a rate case in the second half of 2026 utilizing a 2027 test year. Effectively, this alternative process would pick up on previous PBR working group re-basing discussions. This would also mean, however, that the Utilities would not file their rate case application in December 2025. This alternative approach could also address concern that re-basing and consideration of other PBR Framework modifications be done in a more synchronized manner. Upon review and consideration of the record and circumstances, the PUC granted Hawaiian Electric’s Letter Request on September 29, 2025, subject to certain conditions. During the fourth quarter of 2025, the Utilities continued to meet with the PBR working group to develop an alternative rate re-basing proposal.

Current report

On December 8, 2025, the Utilities, together with support from certain PBR parties, filed a request to extend the time to submit the alternative rate re-basing proposal by 30 days to February 6, 2026, with a corresponding extension to February 13, 2026, for statements from any party who opposes or does not agree with any submitted alternative proposal describing their opposition and the reasons. On December 16, 2025, the PUC granted the Utilities’ request to extend the deadline for the submission of an alternative re-basing proposal from January 7, 2026 to February 6, 2026 and affirmed (i) that any proposal submitted by this deadline must comport with the PUC’s prior guidance, (ii) if the parties are unsuccessful at developing an alternative proposal for the PUC’s review or if the PUC ultimately rejects any submitted alternative proposal, the Utilities shall resume work on their re-basing application utilizing a 2027 test year and file the re-basing application in the second half of 2026. The PUC correspondingly modified the deadline for parties to submit a statement of opposition to any alternative proposal from January 14, 2026 to February 13, 2026. See “Regulatory proceedings” in Note 4 of the Consolidated Financial Statements for additional discussions.

Current report

On January 28, 2026, the Utilities requested a final extension to file the alternative PBR re-basing proposal on May 7, 2026 to allow for additional time for the working group parties to develop PIMs and other PBR framework modifications. On February 12, 2026, the Utilities filed a written update with the PUC, which explained that the additional time requested will allow the parties to explore re-basing and consideration of other PBR Framework modifications in a more synchronized manner, streamline Phase 6 (the examination of proposal for modifications to the PBR Framework) and potentially save time and resources for both the PUC and parties. On February 24, 2026, the PUC granted in part the Utilities’ extension request, extending the deadline to submit an alternative re-basing proposal to March 6, 2026, to allow the PUC to promptly proceed with its review of the re-basing proposal. The PUC also extended the deadline for parties to submit any opposition to the alternative re-basing proposal to March 13, 2026. The PUC confirmed that it will resume Phase 6 following resolution of the alternative re-basing proposal.

Current report

Affiliate transactions. In June 2025, the Utilities submitted a request with the PUC to terminate or suspend the Affiliate Transaction Requirements (ATRs). Beginning in 2024 and continuing into 2026, HEI has embarked on a strategy to divest all of its affiliated companies other than the Utilities, intending for the Utilities to be HEI’s sole operating companies. Termination of the ATRs would allow implementation of a corporate integration, under which all HEI employees would move to Hawaiian Electric. A few officer positions would manage and operate both HEI and Hawaiian Electric (dual-hatted executives) and the HEI and Hawaiian Electric boards of directors would be composed of a single set of individuals. In September 2025, the PUC dismissed the request without prejudice. In its order, the PUC provided guidance on the topics to be addressed in any future request. On October 31, 2025 HEI and Hawaiian Electric filed a revised request with the PUC to terminate or suspend the ATRs. After responding to information requests from the Consumer Advocate, the Consumer Advocate issued its statement of position on February 4, 2026. The Consumer Advocate supported the approval of the request with the condition that before any recovery of expenses related to HEI, the Utilities should give the Consumer Advocate and the PUC advance notice of likely changes to recovery. HEI and Hawaiian Electric informed the PUC that the docket was ready for decision making on February 5, 2026.

Current report

Hawaii Island has two generators out of service for extended maintenance, one of which is expected to return to service in the second quarter of 2026. While these units are unavailable for maintenance, during certain periods there may be reductions in generation reserve margins and failure of other generators, which could risk generation shortfalls.

Current report

During the time that EDRP was available, Bring Your Own Device Level 1 was launched on April 1, 2025, to succeed EDRP, which closed on July 1, 2024, on Oahu. The Bring Your Own Device Level 1 later evolved into Bring Your Own Device Plus, which began on May 15, 2025. Enrollment for the Bring Your Own Device Plus program will be available until total enrolled program capacity reaches 50 MW statewide.

Current report

The first phase includes five projects currently in operation (3,270 kW on Oahu, 28.32 kW on Maui, 750 kW on Hawaii and 250 kW on Molokai).

Current report

In 2021 and 2022, the Utilities opened their Phase 2, Tranche 1 RFPs and low-to-moderate income RFPs for Oahu, Maui and Hawaii Island, as well as RFPs for Molokai and Lanai. This second phase includes 12.5 MW of dedicated-Low-to-Moderate Income projects, which were expected to become operational in 2026 but have since been delayed.

Showing the first 40 of 61 passages. Open the source sections for the rest.

Removed paragraphs (69)

Previous report

Recent developments. On August 8, 2023, a number of brush fires in the West Maui (Lahaina) and Upcountry Maui areas caused widespread property damage, including damage to property of the Utilities, and 102 confirmed fatalities in Lahaina (the Maui windstorm and wildfires). The Maui windstorm and wildfires were fueled by extreme winds and drought-like conditions in those parts of Maui.

Previous report

As of February 14, 2025, HEI and the Utilities have each been named in approximately 783 lawsuits related to the Maui windstorm and wildfires. These civil and putative class action lawsuits are pending in the Maui Circuit Court against HEI, the Utilities, and other defendants, including the County of Maui, the State of Hawaii and related state entities, private landowners and developers, and telecommunications companies (collectively, tort-related legal claims). One putative class action is also pending in federal court. Most of these lawsuits allege that the defendants were responsible for, and/or negligent in failing to prevent or respond to, the wildfires that led to the property destruction and loss of life. Other claims include, among other things, personal injury, wrongful death, emotional distress and inverse condemnation. One lawsuit asserting similar theories and claims was filed by the County of Maui against HEI and the Utilities, one lawsuit was filed by Spectrum Oceanic, LLC against HEI and the Utilities and other defendants, and other lawsuits were filed by approximately 160 subrogation insurers against HEI, the Utilities, a private landowner, and telecommunications companies. Additional lawsuits may be filed against the Company and other defendants in the future. The plaintiffs seek to recover damages and other costs, including punitive damages. Defendants have asserted cross-claims against one another for indemnification, contribution, and subrogation.

Previous report

Effective November 1, 2024, HEI and Hawaiian Electric entered into two definitive settlement agreements (collectively, the Settlement Agreements) to settle the tort-related legal claims in the litigation arising out of the Maui windstorm and wildfires (expressly excluding securities and derivative actions) on a global basis without any admission of liability. Under the Settlement Agreements, subject to certain conditions (including those described below), HEI and Hawaiian Electric, along with other defendants (the State of Hawaii, the County of Maui, Kamehameha Schools, entities affiliated with the West Maui Land

Previous report

Co., Hawaiian Telcom, and Spectrum/Charter Communications) have agreed to settle the claims of those who filed lawsuits in state and federal courts, or who may have claims but have not yet filed lawsuits, in connection with the Maui windstorm and wildfires. One Settlement Agreement is between the defendants, class counsel, and class plaintiffs (the Class Settlement Agreement), and the other is between the defendants and over 30 lawyers representing numerous individual plaintiffs who have brought their own lawsuits (the Individual Settlement Agreement). The Settlement Agreements do not resolve claims with insurers who have asserted or could assert subrogation claims in separate lawsuits and such insurers are not parties to the Settlement Agreements, but resolving such claims in the manner set forth in the Settlement Agreements (described below) is a condition that must be satisfied before any payment is due from the defendants. Both Settlement Agreements remain subject to court approval and other conditions, including those set out below.

Previous report

Under the Settlement Agreements, HEI and Hawaiian Electric are obligated to contribute a total of $1.99 billion (out of a total defendant contribution of approximately $4.04 billion), which includes $75 million previously contributed for the One ‘Ohana Initiative(a humanitarian aid fund to provide payments outside of litigation to the beneficiaries of those who died, as well as compensation for personal injury damages). The total settlement amount is to be divided between two settlement funds, one for the benefit of individual plaintiffs, and the other for the benefit of the class plaintiffs. HEI and Hawaiian Electric must pay such amounts in four equal annual installments of approximately $479 million, with the first installment expected to be made no earlier than the fourth quarter of 2025. HEI and Hawaiian Electric have the option to accelerate the payments, in whole or in part, with such accelerated payments to be discounted at a rate of 5.5% per annum. HEI transferred the amount of the first payment, $479 million, into a new subsidiary, which is restricted from disbursing such funds except in connection with the initial payment to the settlement funds. Additionally, under the Settlement Agreements, HEI and Hawaiian Electric are obligated to contribute a share to the settlement administration fees only if certain other sources are exhausted when those fees are due, for which $3.5 million was accrued as of December 31, 2024 based on the best estimate at that time.

Previous report

The Settlement Agreements are intended to resolve all of the tort-related legal claims related to the Maui windstorm and wildfires. The Class Settlement Agreement provides releases by plaintiffs to the defendants, and among defendants, for acts and omissions relating to the Maui windstorm and wildfires. The Individual Settlement Agreement provides that individual plaintiffs who elect to accept the settlement will sign releases. The releases in the Settlement Agreements, including those among defendants (subject to certain conditions), are effective on the initial payment due date. The Settlement Agreements also provide that $500 million of the total settlement payments will be reserved and made available to defendants to defray the cost to resolve any claims brought by plaintiffs who do not release claims as part of the settlements. Defendants have the right to terminate the Settlement Agreements under certain circumstances, including if more than specified thresholds of plaintiffs choose not to participate in the settlement.

Previous report

The Settlement Agreements contain multiple conditions that must be met before any payment from HEI and Hawaiian Electric to the settlement funds are due. Those conditions include, among others, resolving claims of the insurers (either through agreement or a final court order stating that the insurers cannot maintain independent lawsuits against the defendants), legislation appropriating money from the state, and court approval of the Settlement Agreements.

Previous report

The Settlement Agreements do not resolve claims with insurers who have asserted subrogation claims in separate lawsuits, and such insurers are not parties to the Settlement Agreements. However, the Settlement Agreements provide that all subrogation claims by insurers that have been or could be brought against defendants arising out of the Maui windstorm and wildfires must be resolved in order for HEI and Hawaiian Electric’s payment obligation to arise. The Settlement Agreements include a condition to the defendants’ obligations providing that by May 19, 2025, either (a) insurers that have brought claims arising out of the Maui windstorm and wildfires enter into a written agreement that provides for releases of all claims against the defendants, or (b) that there is a final and unappealable court order providing that if the final definitive agreement between the plaintiffs and the defendants becomes effective, then those same insurers’ exclusive remedy for any claims against the defendants would be limited to asserting liens against the settlement amounts obtained by the individual plaintiffs. On February 6, 2025, after briefing was complete, the Supreme Court of Hawaii heard argument on three reserved questions regarding the scope of Hawaii subrogation law concerning the condition described in this paragraph in the manner described in (b) above. On February 10, 2025, the Hawaii Supreme Court issued an order regarding the reserved questions providing that, once the settlement becomes final, the exclusive remedy for insurers seeking to recover amounts paid to settling plaintiffs is to assert liens against their policyholders pursuant to HRS 663-10. The Hawaii Supreme Court is expected to issue a written opinion providing further detail on its decision in the coming weeks.

Previous report

The Company intends to vigorously defend itself in the litigation if a definitive settlement is ultimately not achieved. There is no assurance that the Company will be successful in the defense of the litigation or that insurance will be available or adequate to fund any potential settlements, judgments, or costs associated with the litigation. If additional liabilities were to be incurred, the loss could be material to the Company’s results of operations, financial position and cash flows and could result in violations of the financial covenants in the Company’s debt agreements. If any such losses were to be sufficiently high, the

Previous report

Company may not have liquidity or the ability to access liquidity at levels necessary to satisfy such losses. However, any possible loss in excess of the amount recorded cannot reasonably be estimated at this time.

Previous report

The foregoing descriptions of the Settlement Agreements do not purport to be complete and are qualified in their entirety by reference to the full text of the Settlement Agreements attached as exhibits to the Form 8-K that was filed with the SEC on November 5, 2024.

Previous report

HEI and Hawaiian Electric determined that making payments under the terms of the Settlement Agreements in four equal annual installments is the most viable option and have classified the first $479 million installment as a current liability based on expected timing of the payment and the remaining $1.44 billion as a noncurrent liability on HEI’s and the Utilities’ Consolidated Balance Sheets. The Settlement Agreements contain no admission of any liability by HEI or the Utilities and reflect the collective efforts of the State, HEI and the Utilities, and other defendants to seek a comprehensive resolution of the litigation arising out of the Maui windstorm and wildfires. The Utilities have recorded an additional $40 million in “Accounts receivable and unbilled revenues, net” and “Other accounts receivable, net” on HEI’s and the Utilities’ Consolidated Balance Sheets, respectively, as of December 31, 2024, based on the amounts expected to be remaining under the applicate insurance policies at time of settlement payment.

Previous report

In an effort to finance the first settlement payment, on September 25, 2024, HEI completed the sale of 62.2 million shares of common stock. The shares were issued under a registration statement registering up to $575 million of common stock. The net proceeds from the sale of common stock amounted to approximately $557.7 million. In addition, on September 19, 2024, HEI filed with the SEC an at-the-market (ATM) offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program. HEI is working with its financial advisors on additional financing plans to raise capital necessary to fund the remaining $1.44 billion settlement amount.

Previous report

The Company is also named in securities class action and shareholder lawsuits related to the Maui windstorm and wildfires. An unsuccessful mediation was held on January 22, 2025. There is no assurance that the Company will be successful in the defense of the litigation or that insurance will be available or adequate to fund any potential settlement or judgment or the litigation costs of the action. The Company is unable to predict the ultimate outcome and is unable to make a reasonable estimate of the amount or range of loss, if any, that could result from any unfavorable outcome.

Previous report

On April 16, 2024, the County of Maui Department of Fire and Public Safety (MFD) released its After-Action Report (AAR) on the Maui windstorm and wildfires, the purpose of which was to enable future enhancements to mitigate the impact of future similar major events. The AAR identified 17 issues that the MFD faced during the Maui windstorm and wildfires or needs to address and provided 111 recommendations to consider for addressing these challenges. The issues and recommendations focus on the MFD. Some of the key areas for improvement include addressing the lack of apparatus, personnel and fire stations and the need for mutual aid and communication programs. The AAR did not address the cause or origin of the fires.

Previous report

On April 17, 2024, the Hawaii Attorney General released the first of three reports regarding its investigation into the Maui windstorm and wildfires (the first AG report). The first AG report chronologically details the major events and response efforts related to the Maui windstorm and wildfires, with a focus on the events concerning the Lahaina area between 2:55 p.m. on August 8, 2023, and 8:30 a.m. on August 9, 2023. It did not address the cause or origin of the fires.

Previous report

On September 13, 2024, the Hawaii Attorney General released the second of three reports, concerning the timeline and facts of the Maui windstorm and wildfires (the second AG report). The second AG report focused on the events that occurred prior to, during, and immediately following the fire in Lahaina in the afternoon of August 8, 2023, including preparedness efforts, weather and its impact to infrastructure, and other fires occurring on Maui. It did not address the cause or origin of the fires.

Previous report

On October 2, 2024, the MFD released its Origin and Cause Report on the fires in Lahaina on August 8, 2023, incorporating the investigative report by the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF). The MFD/ATF reports conclude that the afternoon Lahaina fire on August 8, 2023 was a rekindle of the morning fire, and that the morning fire was caused by a damaged Maui Electric powerline that emitted sparks that ignited overgrown vegetation. The MFD/ATF reports classified the cause of the fire as “accidental.”

Previous report

On January 14, 2025, the Hawaii Attorney General released the third of three reports, which, according to a press release issued the same day by the Attorney General, “organizes the findings from the first AG report and the second AG report and prioritizes a list of action items the state and all counties can use to make improvements to Hawaii’s future preparation for and response to wildfires, including recommendations on how to address each priority.”

Previous report

In 2024, Governor Josh Green announced the creation of a Hawaii Climate Advisory Team (CAT), which the Governor’s office stated in a news release would “recommend steps to create a durable fund to mitigate the impacts of dynamic climate change and to develop a fair and comprehensive structure to resolve claims related to future disasters” including “develop[ing] a customized go-forward fund structure and related claims settlement mechanics.”

Previous report

In January 2025, the CAT released a report titled “Policy Recommendations on Climate Disaster Resilience, Recovery and Funding.” The report recommends the creation of a $500 million disaster recovery fund, which would provide funding to certain low-income individuals for wildfires, hurricanes, floods, or other natural disasters that meet an aggregate damages threshold. Separately, the report notes that the CAT is “supportive of efforts to establish a separate disaster mitigation fund that would provide benefits to Hawaii residents,” with participation by utilities.

Previous report

See “Recent developments” in Hawaiian Electric’s MD&A for additional updates.

Previous report

Hawaii’s seasonally adjusted unemployment rate in December 2024 was 3.0%, consistent with the rate observed in December 2023. The national unemployment rate in December 2024 was 4.1% compared to 3.8% in December 2023. According to the most recent forecast by UHERO, issued on December 13, 2024, job growth in the state will decrease to 0.7% for 2025 and 0.6% for 2026. Although visitor recovery after the wildfires was somewhat stronger than expected, that recovery has now stalled as Maui hotels are seeing historically low occupancy rates. Similarly, the labor market on Maui remains constrained by post-fire disruptions and outmigration, with employment remaining well below pre-wildfire levels. Unemployment in Maui County is predicted to recede to 3.2% in 2025 and 2026.

Previous report

At its December 18, 2024 meeting, the Federal Open Market Committee (FOMC) decided to lower the federal funds rate target range by 1/4 percentage point to 4.25% - 4.5%. The FOMC’s decision reflects their judgement that the risks to achieving its goals of maximum employment and an inflation rate of 2 percent over the longer run, are roughly in balance. The Federal Reserve stated that it will continue to reduce its holdings of Treasury securities, agency debt, and agency mortgage-backed securities.

Previous report

UHERO forecasts full year 2025 real GDP growth of 2.9%, an increase in total visitor arrivals of 2.8%, an increase in real personal income of 1.7%, and an unemployment rate of 2.8% for the state. The post-wildfire recovery of the Maui visitor industry has stalled, while tourism across the rest of the state has been flat. Although the 2024 U.S. economy continued to expand, supported by consumer and government spending, some deceleration is expected as consumers face weakening employment conditions and rising financial stress.

Previous report

As part of HEI’s comprehensive review of strategic options for certain assets of Pacific Current, on February 7, 2025, Pacific Current entered into a Securities Purchase Agreement to sell all the membership interests in Hamakua Holdings, LLC, a wholly owned subsidiary of Pacific Current, to an unaffiliated third party for cash consideration to be determined under the provisions of the agreement. Hamakua Holdings, LLC has two wholly-owned subsidiaries: Hamakua Energy, LLC, which owns a 60-MW combined cycle power plant that sells power to Hawaii Electric Light under an existing power purchase agreement, and HAESP, LLC (created in connection with the current on-going Stage 3 RFP process). Upon closing, both Hamakua Energy and HAESP, LLC as wholly-owned subsidiaries of Hamakua Holdings will no longer be owned by Pacific Current. The close of the transaction is subject to the satisfaction of certain customary closing conditions and is expected to be finalized in March 2025. The sale transaction is not expected to have a material impact to the Company’s consolidated financial statements.

Previous report

As of December 31, 2024, HEI and Hawaiian Electric had $173 million and $166 million, respectively, drawn on their revolving credit facilities and no commercial paper outstanding. As of December 31, 2024, the total amount of available borrowing capacity under HEI’s and Hawaiian Electric’s revolving credit facilities was $2 million and $34 million, respectively (see Note 6 of the Consolidated Financial Statements for additional information). As of December 31, 2024, HEI consolidated had $2.8 billion of long-term debt, net, of which $110 million is due within 12 months and $263 million is due within 24 months (see Note 7 of the Consolidated Financial Statements for additional information).

Previous report

As of December 31, 2024, the Utilities accrued estimated wildfire liabilities of approximately $1.92 billion (pre-tax), related to the settlement of the Maui windstorm and wildfire tort-related claims (see Note 2 of the Consolidated Financial Statements). For 2024, HEI and its subsidiaries incurred net losses from continuing operations of approximately $1.32 billion.

Previous report

When preparing financial statements for each annual and interim reporting period, management has the responsibility to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company’s ability to continue as a going concern within one year after the date that the financial statements are issued. In making their evaluation, the Company considers, among other things, risks and/or uncertainties related to their results of operations, contractual obligations, near-term debt maturities, dividend requirements, debt covenant compliance, or other factors impacting the Company’s liquidity and capital resources.

Previous report

The Company previously concluded that as of June 30, 2024, conditions existed that raised substantial doubt about its ability to continue as a going concern, and that while the Company was working with its financial advisors on a financing plan to raise the capital necessary to mitigate those conditions, there was no assurance that management’s plans would be successful. As a result, the Company disclosed in the condensed consolidated financial statements included in the Company’s Quarterly Report on Form 10-Q for the quarter ending June 30, 2024 there was substantial doubt about the Company’s, including the Utilities’, ability to continue as a going concern.

Previous report

On December 31, 2024, HEI completed the sale of 90.1% of the common stock of ASB, amounting to $405.5 million, to various investors including certain officers and directors of ASB, while retaining a 9.9% noncontrolling investment in ASB amounting to $44.6 million. No investor acquired more than 9.9% of the common stock of ASB. The proceeds from the sale will be used to pay down HEI’s debt in 2025.

Previous report

1 The Electric Utilities’ total undrawn credit amounts to $348 million; however, due to certain financial covenant requirements, the temporary available credit is limited to approximately $150 million. The Utilities subsequently paid off $47 million of long-term debt that became due on January 1, 2025, which would increase the total available credit to $200 million.

Previous report

For the Utilities, while fuel prices have moderated from their highs in 2022, they remain elevated and have increased the cost of carrying fuel inventory and higher customer accounts receivable balances as fuel is consumed and billed to customers. While the accounts receivable balance has decreased since December 2023, it remains elevated coming out of the pandemic and has led to higher bad debt expense and higher write-offs in 2023 and 2024, following the end of the moratorium on disconnections. The higher bad debt expense is expected to continue until the Utilities return to pre-pandemic accounts receivable balances, along with a decrease in volume, for delinquent accounts. The Maui windstorm and wildfires have not and are not anticipated to materially impact accounts receivable, however, it has and will continue to lead to higher bad debt expense. As of December 31, 2024, approximately $18.3 million of the Utilities’ accounts receivables were over 30 days past due, which is a decrease of approximately 17% since December 2023. In addition to the cash flow impact from delayed collection of accounts receivable, lower kWh sales relative to the level of kWh sales approved in the last rate case generally result in delayed timing of cash flows, resulting in higher working capital requirements (see “Recent Developments” in the Electric utility section below).

Previous report

See Note 4 of the Consolidated Financial Statements for a discussion of the Utilities’ commitments.

Previous report

On September 19, 2024, HEI filed with the SEC an at-the-market (ATM) offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program.

Previous report

In 2024, the Utilities accrued estimated wildfire liabilities of approximately $1.92 billion (pre-tax) related to the settlement of the Maui windstorm and wildfire tort-related legal claims(see Note 2 of the Consolidated Financial Statements). For the full year 2024, the Utilities incurred net losses of approximately $1.23 billion.

Previous report

For the full year 2024, operation and maintenance expenses were higher by approximately $76 million, or 14%, as compared to 2023. The increase was mainly due to an agreement to settle indemnification claims asserted by the State of Hawaii, higher property and general liability insurance costs, wildfire mitigation program expenditures primarily related to inspections, and higher outside services for legal, engineering and grant management, partially offset by labor and associated costs for the Maui windstorm and wildfires incurred in 2023.

Previous report

For the full year 2024, kWh sales volume decreased 0.1% from 2023 levels. The slight decrease reflects the impacts of the Maui windstorm and wildfires. Maui consumption showed a year-over-year decrease of 6.0% in the first half of 2024 due to the reduction in sales after the wildfires, and a 4.3% increase over the second half due to the partial recovery relative to the months immediately following the wildfires.

Previous report

Customer accounts receivable decreased in 2024 by $44 million, or 18% with the number of accounts past due greater than 90 days decreasing by 29% since December 31, 2023. The decrease in accounts receivables was primarily driven by receipt of government and other program assistance, higher cash receipts associated with increased disconnection efforts and a change in bill due date from 19 days to 15 days in March 2024, along with lower customer bills resulting from lower fuel prices. At this time, while accounts receivable balances continue to remain elevated compared to pre-pandemic levels, it has been trending down closer to pre-pandemic levels, with the exception for Maui County, and the decrease in accounts receivable balances since the beginning of the year has reduced working capital requirements and benefited the Utilities’ liquidity. See “Financial Condition—Liquidity and capital resources” for additional information.

Previous report

System reliability. On March 25, 2024, the Utilities called on Hawaii Island customers to reduce or shift their electricity usage, and in certain instances initiated rolling outages due to a generation capacity shortfall. The situation was due to Hamakua Energy’s unexpected plant shutdown in late February 2024 and also due to the unavailability of generators that have experienced mechanical problems, were at reduced output, or were undergoing maintenance. During that time, generation margins were below targeted levels, especially when wind, solar and hydroelectric output were lower than forecasted. On April 24, 2024, the Utilities lifted their request to conserve electricity as several of the Utilities’ large generators returned to service and on June 3, 2024 Hamakua Energy completed replacement of one combustion turbine and returned it to service. The second combustion turbine returned to service on September 9, 2024. See above in “HEI MD&A-“All Other” segment” for discussion relating to Hamakua Energy’s unexpected plant shutdown. While Hamakua Energy has returned to service, their total output remains restricted due to needed fuel system inspections and repairs that will not be completed until mid Q1 2025. However, adequate generation margins are expected based on forecasted load and maintenance schedules.

Showing the first 40 of 69 passages. Open the source sections for the rest.

Reworded paragraphs (128)

Previous wording

Executive overview and strategy. HEI is a holding company with operations primarily focused on Hawaii’s electric utility sector after selling its bank operations on December 31, 2024. In 2017, HEI formed Pacific Current to make investments in non-regulated renewable energy and sustainable infrastructure projects. On December 30, 2024, HEI, ASB, and ASB Hawaii, a wholly owned subsidiary of HEI and ASB’s parent holding company, entered into investment agreements to sell 90.1% of the common stock of ASB to various investors, including certain ASB officers and directors of ASB. The sale transaction closed on December 31, 2024 and no investor acquired more than 9.9% of the common stock of ASB. The proceeds from the sale will be used to primarily strengthen the Company’s balance sheet and promote long-term financial stability which may include partially paying down its long-term debt, funding the wildfire settlement amount, and/or for other corporate purposes. Subsequent to the sale, HEI has one reportable segment: Electric utility. HEI and its other subsidiaries which are not reportable segments are grouped and reported as an “All Other” non-reportable segment.

Current wording

Executive overview and strategy. HEI is a holding company with operations primarily focused on Hawaii’s electric utility sector after selling its bank operations on December 31, 2024. In 2017, HEI formed Pacific Current to make investments in non-regulated renewable energy and sustainable infrastructure projects. On December 30, 2024, HEI, ASB, and ASB Hawaii, a wholly owned subsidiary of HEI and ASB’s parent holding company, entered into investment agreements to sell 90.1% of the common stock of ASB to various investors, including certain ASB officers and directors of ASB. The sale transaction closed on December 31, 2024 and no investor acquired more than 9.9% of the common stock of ASB. The proceeds from the sale were used to repay a ratable portion of each of HEI’s senior notes in April 2025. Subsequent to the sale, HEI has one reportable segment: Electric utility. HEI and its other subsidiaries which are not reportable segments are grouped and reported as an “All Other” non-reportable segment.

Previous wording

All Other. The All Other segment primarily comprises the results of Pacific Current, which invested in non-regulated clean energy and sustainable infrastructure in the State of Hawaii to help reach the state’s sustainability goals, and HEI’s corporate-level operating, general and administrative expenses. However, subsequent to the Maui windstorm and wildfires, HEI and Pacific Current have suspended any new investments while undertaking a comprehensive review of strategic options for certain assets of Pacific Current.

Current wording

All Other. The All Other segment primarily comprises the results of Pacific Current, which invested in non-regulated clean energy and sustainable infrastructure in the State of Hawaii to help reach the state’s sustainability goals, and HEI’s corporate-level operating, general and administrative expenses. Subsequent to the Maui windstorm and wildfires, HEI and Pacific Current have suspended new investments and undertook a comprehensive review of strategic options for the assets of Pacific Current. As part of HEI’s comprehensive review of strategic options for Pacific Current, all investments of Pacific Current that were made through its subsidiaries were sold in 2025, except for Mahipapa, its remaining operating subsidiary which is in the process of being sold. The All Other segment also includes ASB Hawaii, which previously owned ASB, and a 40% interest in GLST1, an entity created for the specific purpose of holding HEI’s and Hawaiian Electric’s first liability installment payment pursuant to the settlement agreements to settle the tort-related claims in the litigation arising out of the Maui windstorm and wildfires.

Previous wording

While a major focus of HEI’s financial strategy is to grow core earnings/profitability at the Utilities and Pacific Current in a controlled risk manner and optimize operating, capital and tax efficiencies in order to support its dividend and deliver shareholder value, HEI is working on strategic financing plans to raise capital necessary to fund the settlement of wildfire tort claims.

Current wording

A major focus of HEI’s financial strategy is to grow core earnings/profitability at the Utilities in a controlled risk manner and optimize operating, capital and tax efficiencies in order to support its dividend and deliver shareholder value. HEI also continues to work on strategic financing plans to raise capital necessary to fund the settlement of wildfire tort claims.

Previous wording

Sustainability. At HEI, sustainability principles have long been embedded as applicable within the Company’s activities and are integral to the Company’s efforts to create value for all of its stakeholders. With all of its operations isolated in the middle of the Pacific Ocean, the Company’s long-term health and financial performance is inextricably linked with the strength of the Hawaii economy, its communities, and the environment. That is why long-term shareholder and broader stakeholder value are both served by the Company’s efforts to serve as a catalyst for a better Hawaii.

Current wording

Sustainability. At HEI, sustainability principles have long been embedded as applicable within the Company’s activities and are integral to the Company’s efforts to create value for all of its stakeholders. With all of its operations isolated in the middle of the Pacific Ocean, the Company’s long-term health and financial performance are inextricably linked with the strength of the Hawaii economy, its communities, and the environment. That is why long-term shareholder and broader stakeholder value are both served by the Company’s efforts to serve as a catalyst for a better Hawaii.

Previous wording

•ensuring resilience, including safety, as the Company adapts to a changing climate, which is exacerbating conditions that can lead to increasing risk of droughts, severe storms, flooding, wildfires and other extreme weather events and natural disasters;

Current wording

•ensuring resilience, including safety, as the Company adapts to evolving climate dynamics, which are exacerbating conditions that can lead to increasing risk of droughts, severe storms, flooding, wildfires and other extreme weather events and natural disasters;

Previous wording

The Company has also focused on ensuring that sustainability considerations are appropriately integrated into governance structures, strategies and risk management. This includes:

Current wording

The Company has integrated sustainability considerations as appropriate into governance structures, strategies and risk management. This includes:

Previous wording

•integration of Board oversight of important sustainability matters into its existing governance structures and processes across companies. This includes full HEI Board review of sustainability-related strategies, Audit & Risk Committee oversight of sustainability-related risks, Compensation & Human Capital Management Committee responsibility for sustainability-related compensation matters and human capital management and Nominating and Corporate Governance Committee responsibility for ensuring an appropriate board governance framework is in place with respect to sustainability.

Current wording

•full HEI Board review of sustainability-related strategies, Audit & Risk Committee oversight of sustainability-related risks, Compensation & Human Capital Management Committee responsibility for sustainability-related compensation matters and human capital management and Nominating and Corporate Governance Committee responsibility for ensuring an appropriate board governance framework is in place with respect to sustainability.

Previous wording

•robust sustainability and risk management expertise among board members, including directors with direct experience in renewable energy, climate change policy and strategy, and risk and environmental management.

Current wording

•robust sustainability and risk management expertise among board members, including directors with direct experience in renewable energy, policy and strategy in the context of evolving climate dynamics, and risk and environmental management.

Previous wording

•sustainability goals as part of HEI and Utility executive incentive compensation.

Current wording

•sustainability goals incorporated as part of HEI and Utility executive incentive compensation as appropriate.

Previous wording

The Company is committed to transparency and providing information to allow customers, community leaders, investors and other stakeholders to understand how the Company’s strategies and operations advance sustainability objectives and contribute to long-term stakeholder value creation.

Current wording

The Company is committed to transparency and providing information to allow customers, community leaders, investors and other stakeholders to understand how the Company’s strategies and operations advance sustainability and long-term stakeholder value creation.

Previous wording

The Company issued its first consolidated sustainability report in September 2020. The report was aligned with Sustainability Accounting Standards Board guidance. The Company has since further developed its sustainability reporting to include disclosures regarding risks and opportunities related to climate change, as well as associated risk management and governance processes, based on recommendations from the Task Force on Climate-related Financial Disclosures. It has also outlined key impacts for the Company under two climate scenarios, including a scenario targeted to limit global temperature rise to two degrees Celsius or lower. The Company’s most recent reports include HEI’s enterprise-wide GHG emissions inventory, providing the basis to further guide the Company's strategies and enable greater transparency around its progress on climate issues. Net enterprise-wide GHG emissions in measured categories have decreased over time, driven largely by reductions in the utility’s generation-related emissions intensity. The Company’s sustainability reports can be found at www.hei.com/sustainability.

Current wording

The Company issued its first consolidated sustainability report in September 2020. The report was aligned with Sustainability Accounting Standards Board guidance. The Company has since further developed its sustainability reporting to include disclosures regarding risks and opportunities related to evolving climate dynamics, as well as associated risk management and governance processes, based on recommendations from the Task Force on Climate-related Financial Disclosures. It has also outlined key impacts for the Company under two climate scenarios, including a scenario targeted to limit global temperature rise to two degrees Celsius or lower. The Company’s most recent reports include HEI’s enterprise- wide GHG emissions inventory. Net enterprise-wide GHG emissions in measured categories have decreased over time, driven largely by reductions in the utility’s generation-related emissions intensity. The Company’s sustainability reports can be found at www.hei.com/sustainability.

Previous wording

In 2024, net income (loss) from continuing operations for HEI common stock decreased to $(1,323) million compared to $146 million in 2023, due to $(1,420) million lower net income at the Utilities as a result of recording $1,875 million of provision, net, for wildfire tort-related claims in 2024. In 2023, income from continuing operations decreased 9% to $146 million ($1.33 diluted earnings per share), compared to $161 million ($1.47 diluted earnings per share) in 2022, due to $20 million higher net loss at the “All Other” segment, partly offset by $5 million higher net income at the Utilities. The decrease in the “All Other” segment’s 2023 net income compared to 2022 was primarily due to Maui windstorm and wildfires related costs and higher operating expenses at Pacific Current. The increase in the Utilities’ 2023 net income compared to 2022 was principally due to higher ARA revenues, which included the customer dividend delivered to customers, partially offset by higher operating expenses. See “Electric utility” and “HEI Consolidated—All Other segment” sections below for additional information on year-to-year fluctuations.

Current wording

In 2025, income (loss) from continuing operations for HEI common stock increased to $123 million compared to $(1,323) million in 2024, due to $1,395 million lower net income in 2024 at the Utilities as a result of recording $1,875 million of provision, net, for wildfire tort-related claims in 2024. In 2024, income (loss) from continuing operations for HEI common stock decreased to $(1,323) million compared to $146 million in 2023, due to $(1,420) million lower net income at the Utilities as a result of recording $1,875 million of provision, net, for wildfire tort-related claims in 2024. See “Electric utility” and “HEI Consolidated—All Other segment” sections below for additional information on year-to-year fluctuations.

Previous wording

The Company’s effective tax rate (combined federal and state income tax rates) was at 26% tax benefit in 2024, compared to 19% tax expense in 2023, primarily due to the substantial pretax loss resulting from the accrual of the loss contingencies related to the Maui windstorm and wildfires tort-related claims and the impact of permanent items on the effective tax rates including federal research and development tax credit claims in 2024, partially offset by an increase in excess taxes related to vesting of share-based awards and lower amortization in 2024 of the Utilities’ regulatory liability related to certain excess deferred income taxes resulting from the Tax Act’s decrease in the federal income tax rate.

Current wording

The Company’s effective tax rate (combined federal and state income tax rates) was 24% (tax expense) in 2025, compared to 26% (tax benefit) in 2024. The Company’s effective tax rate was lower than 2024 primarily due to the substantial pre-tax loss in 2024 resulting from the Utilities’ accrual of the loss contingencies related to the wildfire tort-related claims and because the impact of permanent items had a smaller impact on the effective tax rate in 2024, partially offset by recapture of investment tax credits and lower research and development tax credit claims in 2025.

Previous wording

3 Related to the PUC’s order, received on December 27, 2023, approving deferred accounting treatment for the Utilities’ incremental non-labor expenses related to the August 2023 Maui windstorm and wildfires. Amounts were reclassified to a regulatory asset. See “Risk Factors” in Item 1A. for further discussion of regulatory risks. See Note 2 of the Consolidated Financial Statements.

Current wording

2 Related to the PUC’s order, received on December 27, 2023, approving deferred accounting treatment for the Utilities’ incremental non-labor expenses related to the August 2023 Maui windstorm and wildfires incurred through December 31, 2024. Pursuant to the PUC order received on February 12, 2025, deferral accounting treatment limited to insurance premiums and outside services and legal costs associated with the asset-based lending facility credit agreement incurred in 2025 was granted. Applicable amounts were deferred to a regulatory asset. See “Risk Factors” in Item 1A. for further discussion of regulatory risks. See Note 2 of the Consolidated Financial Statements.

Previous wording

1 Represents the provision to record the Utilities’ settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2024. See Note 2 of the Consolidated Financial Statements.

Current wording

3 Represents the provision to record the Utilities’ settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2024. See Note 2 of the Consolidated Financial Statements.

Previous wording

2 Includes $18.4 million ($16.6 million by the Utilities) pursuant to an agreement to settle indemnification claims asserted by the State of Hawaii, for 2024. Also includes $3.5 million accrual related to the Utilities’ share of settlement administration fees for 2024. See Note 2 of the Consolidated Financial Statements.

Current wording

4 Includes $18.4 million ($16.6 million by the Utilities) pursuant to an agreement to settle indemnification claims asserted by the State of Hawaii, for 2024. Also includes $3.5 million accrual related to the Utilities’ share of settlement administration fees for 2024. See Note 2 of the Consolidated Financial Statements.

Previous wording

4 Excludes expenses related to discontinued operations amounting to $1.3 million and $11.3 million for the years ended December 31, 2024 and 2023, respectively.

Current wording

5 Excludes expenses related to discontinued operations amounting to $1.3 million and $11.3 million for 2024 and 2023, respectively.

Previous wording

Note: All Other segment Maui windstorm and wildfires related expenses - legal, outside services and other are included in “Expenses-Other” and interest expense is included in “Interest expense, net” on the HEI and subsidiaries Consolidated Statements of Income. See Electric utility section below for more detail.

Current wording

Note: All Other segment Maui windstorm and wildfires related expenses (legal, outside services, wildfire securities-related claims and other) and insurance recoveries are included in “Expenses-Other” and interest expense is included in “Interest expense, net” on the HEI and subsidiaries Consolidated Statements of Income. See Electric utility section below for more detail.

Previous wording

From August 8, 2023 through December 31, 2024, HEI and its subsidiaries have incurred approximately $2.2 billion of Maui windstorm and wildfires related expenses, including the Utilities’ estimate of the losses related to a settlement of all wildfire tort-related legal claims and cross claims and the One ‘Ohana Initiative contribution. Certain of these costs are reimbursable under excess liability insurance, professional liability and directors and officers liability insurance policies. As of December 31, 2024, HEI and its subsidiaries have approximately $13 million, nil and $122 million of insurance coverage remaining under the excess liability, professional liability and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs and recognized as a receivable as of year-end.

Current wording

From August 8, 2023 through December 31, 2025, HEI and its subsidiaries have incurred approximately $2.3 billion of Maui windstorm and wildfires related expenses, including the Utilities’ estimate of the losses related to a settlement of all wildfire tort-related legal claims and cross claims, the One ‘Ohana Initiative contribution and $47.8 million related to the securities class action settlement. Certain of these costs are reimbursable under excess liability insurance, professional liability insurance, and directors and officers liability insurance policies. As of December 31, 2025, HEI and its subsidiaries have approximately $10 million, nil and $71 million of insurance coverage remaining under the excess liability, professional liability, and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs, including the securities class action settlement, and recognized as a receivable as of year-end.

Previous wording

With the Company accruing its losses related to a settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2024, the Company expects the Electric utility and HEI to use the remaining $13 million of insurance coverage under its excess liability policy primarily for legal expenditures, in excess of amounts deferred, in connection with the Maui windstorm and wildfires.

Current wording

With the Company accruing its losses related to a settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2025, the Company expects the Electric utility and HEI to use the remaining $10 million of insurance coverage under its excess liability policy primarily for legal expenditures, in excess of amounts deferred, in connection with the Maui windstorm and wildfires.

Previous wording

In the fourth quarter, the average daily passenger count was 4.2% higher than the comparable period in the prior year. The recovery in total passenger counts from the low levels in 2020, which occurred under COVID-19 restrictions, thus far has been driven by domestic travelers, with international travelers, including Japanese travelers, remaining at lower levels. In the fourth quarter, international visitor arrivals (excluding Japan) remained 18.9% below 2019 pre-COVID-19 levels. Due to the weak yen, Japanese visitors are 41.8% below 2019 pre-COVID-19 levels.

Current wording

In the fourth quarter of 2025, the average daily passenger count was 2.0% lower than the comparable period in the prior year. The recovery in total passenger counts from the low levels in 2020, which occurred under COVID-19 restrictions, thus far has been driven by domestic travelers, with international travelers, including Japanese travelers, remaining at lower levels. In the fourth quarter, international visitor arrivals (excluding Japan) remained 18.0% below 2019 levels. Due to the weak yen, Japanese visitors are 36.6% below 2019 levels.

Previous wording

Hawaii real estate activity through December 2024, as indicated by Oahu’s home resale market, resulted in an increase in the median sales price of 1.3% for condominiums and an increase of 4.8% for single-family homes compared to the same period in 2023, with the December median single-family home price of $1,054,500, below the record $1,153,500 set in May 2022. The number of closed sales through December 2024 decreased 2.5% for condominiums and increased 9.1% for single-family residential homes compared to the same period in 2023.

Current wording

Hawaii real estate activity through December 2025, as indicated by Oahu’s home resale market, resulted in a 1.5% decrease in the median sales price for condominiums and an increase of 3.5% for single-family homes compared to the same period in 2024. The median single-family home price was $1,100,000 in December 2025, slightly lower than the all-time high of $1,185,000, set earlier this year in February 2025. The number of closed sales through December 2025 saw a 1.1% decrease for condominiums and a 3.5% increase for single-family residential homes compared to the same period in 2024.

Previous wording

Hawaii’s petroleum product prices relate to the crude oil in international markets. The price of crude oilhas decreased about 10.9% over the same quarter in the prior year.

Current wording

Hawaii’s petroleum product prices relate to the crude oil in international markets. The price of crude oilhas decreased 14.7% over the same quarter in the prior year.

Previous wording

All Other segment. The “All Other” business segment (loss)/income includes results of the stand-alone corporate operations of HEI, ASB Hawaii, GLST1, and Pacific Current.

Current wording

All Other segment. The “All Other” business segment (loss)/income includes results of the stand-alone corporate operations of HEI, ASB Hawaii, GLST1, and Pacific Current, including the results of Hamakua Energy and the solar and battery energy storage system facilities up until the close of their respective sales in 2025.

Previous wording

1 Hamakua Energy’s sales to Hawaii Electric Light (a regulated affiliate) are eliminated in consolidation.

Current wording

1 Hamakua Energy’s sales to Hawaii Electric Light (a regulated affiliate) up until the close of its sale on March 10, 2025 are eliminated in consolidation.

Previous wording

In late February 2024, Hamakua Energy’s first combustion turbine (CT1) and its leased combustion turbine (leased CT) unexpectedly sustained damages resulting in a plant shut down on Hawaii Island. Due to the generation capacity shortfall on Hawaii Island, unit age and extensive timeline and cost to repair CT1, in April 2024, Hamakua Energy purchased a new combustion turbine and installed the unit in May 2024 at a total cost of approximately $8.3 million. The new CT1 was placed into service in June 2024. The leased CT was returned to the lessor and a new leased CT had been delivered and placed into service in September 2024 bringing Hamakua Energy back to full capacity. Pursuant to the lease pool program agreement, Hamakua Energy is reimbursing the lessor for damages of the leased CT and accordingly, accrued $4.9 million of estimated repair costs as of December 31, 2024. Hamakua Energy’s second combustion turbine (CT2) is currently in a scheduled overhaul which has incurred delays due to supply shortages. The CT2 overhaul is expected to be completed and the unit placed back into service in the first quarter of 2025. After conducting an investigation into the root cause of the damages, it was determined that contaminated fuel led to the turbine damages. Hamakua Energy is currently working with its legal counsel and insurance company on seeking recovery of its losses related to damages sustained to its plant facilities.

Current wording

In late February 2024, Hamakua Energy’s combustion turbine (CT) and its leased combustion turbine (leased CT) unexpectedly sustained damages resulting in a plant shut down on Hawaii Island. As a result, in April 2024, Hamakua Energy purchased a new CT which was placed into service in June 2024. The leased CT was returned to the lessor and a new leased CT had been delivered and placed into service in September 2024 bringing Hamakua Energy back to full capacity. After conducting an investigation into the root cause of the damages, it was determined that contaminated fuel led to the turbine damages. Pacific Current is currently working with its legal counsel on seeking recovery of its losses related to damages sustained to its plant facilities.

Previous wording

In March 2024, a fire destroyed the cooling tower at the Mahipapa facility on Kauai. The fire was ignited from a vendor’s welding activities being performed on the cooling tower during its scheduled maintenance. As a result, the plant was shut down while repairs were being performed. Mahipapa completed repairs to its facility and commenced operations in early December 2024 with an expectation to ramp up to full capacity in the first quarter of 2025. As of December 31, 2024, Mahipapa has received initial insurance proceeds of $0.8 million under its business interruption policy. In addition to working with its insurance company, Mahipapa is currently working with its legal counsel on seeking reimbursement of its losses related to damages sustained to its plant facilities.

Current wording

In March 2024, a fire destroyed the cooling tower at the Mahipapa facility on Kauai. The fire was ignited from a vendor’s welding activities being performed on the cooling tower during its scheduled maintenance. As a result, the plant was shut down while repairs were being performed. Mahipapa completed repairs to its facility and commenced operations in early December 2024 and returned to full capacity in the first quarter of 2025. In the first quarter of 2025, Mahipapa received insurance proceeds of $1.4 million under its business interruption policy. In addition to working with its insurance company, Mahipapa is currently working with its legal counsel on seeking reimbursement of its losses related to damages sustained to its plant facilities.

Previous wording

Liquidity and capital resources. HEI’s and the Utilities’ future results of operations involve significant risks and uncertainties. Factors that could affect HEI’s and the Utilities’ future operating results and could cause actual results to vary materially from expectations include, but are not limited to, access to capital, ability to attract and retain key personnel, and pending or threatened litigation (including recent wildfire related litigation noted above).

Current wording

Liquidity and capital resources. HEI’s and the Utilities’ future results of operations involve significant risks and uncertainties. Factors that could affect HEI’s and the Utilities’ future operating results and could cause actual results to vary materially from expectations include, but are not limited to, access to capital, ability to attract and retain key personnel, and pending or threatened litigation (including wildfire related litigation noted above).

Previous wording

The Company’s objective continues to be to operate a strong, financially healthy enterprise to empower a thriving future for Hawaii. While the fundamentals of its businesses remain strong, the Company took prudent and measured actions to reinforce its commitment to serving the community for the long term. In August 2023, HEI and Hawaiian Electric fully drew down $175 million and $200 million, respectively, on their existing revolving credit facilities. The cash proceeds were primarily invested in highly liquid short-term investments and used for general corporate purposes. The Company has taken additional prudent measures to strengthen its financial position while continuing to provide reliable service to its customers and reinforcing HEI’s commitment to serving the community for the long term. Some of these proactive measures include suspending the quarterly cash dividend on HEI’s common stock after payment of the second quarter dividend in September 2023 and reducing or eliminating discretionary costs.

Current wording

The Company’s objective continues to be to operate a strong, financially healthy enterprise to empower a thriving future for Hawaii. While the fundamentals of its businesses remain strong, the Company took prudent and measured actions to reinforce its commitment to serving the community for the long term. Subsequent to the Maui windstorm and wildfires, in August 2023, HEI and Hawaiian Electric fully drew down $175 million and $200 million, respectively, on their previously existing revolving credit facilities. On September 5, 2025, HEI and Hawaiian Electric each entered into a fourth amended and restated credit agreement with a syndicate of eight financial institutions, increasing each of their committed capacities to $300 million (see Note 6 of the Consolidated Financial Statements for additional information). As of December 31, 2025, HEI and Hawaiian Electric had $20 million and nil, respectively, drawn on their revolving credit facilities and no commercial paper outstanding.

Previous wording

In the third quarter of 2024, the Company determined that making payments under the terms of the Settlement Agreements in four equal annual installments is the most viable option and have classified the first $479 million installment as a current liability based on expected timing of the payment and the remaining $1.44 billion as a noncurrent liability on the Consolidated Balance Sheet. To finance the first installment payment, in September 2024, HEI completed the sale of 62.2 million shares of common stock. The shares were issued under a registration statement registering up to $575 million of common stock. The net proceeds from the sale of common stock amounted to approximately $557.7 million. In addition, HEI filed with the SEC an at-the-market (ATM) offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program. In November 2024, HEI transferred the first installment payment to GLST1, a wholly-owned subsidiary created for the specific purpose of holding the first installment payment pursuant to the settlement of the Maui windstorm and wildfire tort-related legal claims (see Note 2 of the Consolidated Financial Statements). The cash of the first installment payment is classified as restricted cash on the Consolidated Balance Sheet as of December 31, 2024.

Current wording

As of December 31, 2025, HEI consolidated had $2.4 billion of long-term debt, of which $125 million is due or expected to be repaid within 12 months. In addition, as of December 31, 2025, the Utilities accrued estimated wildfire liabilities of approximately $1.92 billion (pre-tax), related to the settlement of the Maui windstorm and wildfire tort-related legal claims (see Note 2 of the Consolidated Financial Statements). HEI and Hawaiian Electric determined that making payments under the terms of the Settlement Agreements in four equal annual installments is the most viable option and have classified the first $479 million installment as a current liability based on expected timing of the payment and the remaining $1.44 billion as a noncurrent liability on the Company’s and the Utilities’ Consolidated Balance Sheets. To finance the first installment payment, in September 2024, HEI completed the sale of 62.2 million shares of common stock. The shares were issued under a registration statement registering up to $575 million of common stock. The net proceeds from the sale of common stock amounted to approximately $557.7 million. In November 2024, HEI transferred the first installment payment to GLST1, a wholly owned subsidiary created for the specific purpose of holding the first installment payment pursuant to the settlement of the Maui windstorm and wildfire tort-related legal claims (see Note 2 of the Consolidated Financial Statements). The cash for the first installment payment is classified as restricted cash on the Consolidated Balance Sheet as of December 31, 2025.

Previous wording

At December 31, 2024, the Company’s consolidated total available liquidity, was approximately$1,153 million. The following table provides the components of available liquidity at December 31, 2024. See “Liquidity and capital resources” in Hawaiian Electric’s MD&A below for components of its available credit.

Current wording

At December 31, 2025, the Company’s consolidated total available liquidity was approximately $1,572 million. The following table provides the components of available liquidity at December 31, 2025. See “Liquidity and capital resources” in Hawaiian Electric’s MD&A below for components of its available liquidity under existing credit facilities as of December 31, 2025.

Previous wording

Management believes the Company’s cash and cash equivalents amount of $751 million and GLST1’s restricted cash amount of $479 million, both as of December 31, 2024, the available capacity on Hawaiian Electric’s asset-based lending facility (ABL Facility) (see Note 6 of the Consolidated Financial Statements), additional liquidity under HEI’s recently registered ATM program as well as expenditure reduction efforts effectively alleviate any conditions that caused there to be substantial doubt regarding HEI’s and Utilities’ ability to continue as a going concern. The Company has adequate cash to meet its financial obligations and sustain operations in the short term, including available sufficient liquidity to fund the first installment of the settlement of wildfire tort claims expected to be made no earlier than the fourth quarter of 2025 and its other cash obligations for the next 12 months following the issuance of its December 31, 2024 financial statements. The plans that have been implemented have mitigated the conditions that previously caused the substantial doubt about the Company’s ability to continue as a going concern since the date of filing its 2024 second quarter financial statements.

Current wording

Management believes with the Company’s cash and cash equivalents amount of $502 million and GLST1’s restricted cash amount of $479 million, both as of December 31, 2025, the available capacity on Hawaiian Electric’s ABL Facility, HEI’s and Hawaiian Electric’s increased borrowing capacities of their unsecured lines of credit, and additional liquidity under HEI’s registered at-the-market offering program, the Company has adequate cash to meet its financial obligations and sustain operations in the short term, including available sufficient liquidity to fund the first installment of the settlement of wildfire tort claims (expected to be made no sooner than early 2026) and its other cash obligations for the next 12 months following the issuance of its financial statements.

Previous wording

The Company expects that liquidity will continue to be impacted in the long term primarily due to the remaining liability payments to settle wildfire claims; the result of the August 2023 downgrades of their credit ratings to below investment grade which prevents the Company from accessing unsecured, short-term borrowings and continues to restrict access to the capital markets and other sources of debt and equity financing in a timely manner and on acceptable terms; and higher working capital requirements resulting from inflation and elevated fuel prices. Although the Company has raised sufficient cash to pay the first installment of the settlement of wildfire tort claims, the Company is currently working with its financial advisors on a financing plan to raise the additional capital necessary to fund the remaining settlement of wildfire tort claims. While management believes the Company will be able to raise the necessary capital, there is no assurance that management’s plans will be successful. If the financing plans are unsuccessful, the Company may need to consider other strategic alternatives. See further discussion in “Risk Factors” in Item 1A.

Current wording

The Company expects that liquidity will continue to be impacted in the long term primarily due to the remaining liability payments to settle wildfire claims; the result of the August 2023 downgrades of their credit ratings to below investment grade which limits the Company from accessing unsecured, short-term borrowings and continues to restrict access to the capital markets and other sources of debt and equity financing on favorable terms; and higher working capital requirements resulting from inflation and elevated fuel prices. Although the Company has raised sufficient cash to pay the first installment of the settlement of wildfire tort claims, the Company is currently working with its financial advisors on a financing plan to raise the additional capital necessary to fund the remaining settlement of wildfire tort claims. While management believes the Company will be able to raise the necessary capital, there is no assurance that management’s plans will be successful. If the financing plans are unsuccessful, the Company may need to consider other strategic alternatives. See further discussion in “Risk Factors” in Item 1A.

Previous wording

If further liquidity is deemed necessary in the short term, Hawaiian Electric could also use its available capacity on its $250 million ABL Facility, reduce the pace of capital spending related to non-essential projects, manage O&M expenses, seek borrowings on a secured basis, and explore asset sales.

Current wording

If further liquidity is deemed necessary in the short term, Hawaiian Electric could also reduce the pace of capital spending related to non-essential projects, manage O&M expenses, seek borrowings on a secured basis, and explore asset sales.

Previous wording

HEI Consolidated material cash requirements. Material cash requirements of HEI Consolidated include: payments related to settlement of tort-related legal claims and cross claims; Utility related capital expenditures (including capital expenditures related to wildfires and wildfire mitigations), labor and benefits costs, O&M expenses, legal and consulting costs related to the Maui windstorm and wildfires, fuel and purchase power costs, and debt and interest payments; HEI related labor and benefits costs, debt and interest payments and legal and consulting costs related to the Maui windstorm and wildfires; and HEI equity contributions to support Pacific Current’s sustainable infrastructure investments.

Current wording

HEI Consolidated material cash requirements. Material cash requirements of HEI Consolidated include: payments related to settlement of tort-related legal claims and cross claims; Utility related capital expenditures (including capital expenditures related to wildfires and wildfire mitigations), labor and benefits costs, O&M expenses, legal and consulting costs related to the Maui windstorm and wildfires, fuel and purchase power costs, and debt and interest payments; HEI related labor and benefits costs, debt and interest payments and legal and consulting costs related to the Maui windstorm and wildfires; and HEI equity contributions to support Pacific Current’s remaining operating subsidiary.

Previous wording

Forecasted HEI consolidated “net cash used in investing activities” consists primarily of the net capital expenditures of the Utilities principally related to maintaining and modernizing the grid to allow for the integration of more renewable energy, improved customer reliability, greater system efficiency and enhanced resilience. The Utilities’ capital expenditures are forecasted to be funded primarily through a combination of retained earnings and proceeds from other sources of debt financings (see also discussion regarding other material cash requirements under “Financial Condition–Liquidity and capital resources,” contained in the “Electric utility” section below). In addition to the funds required for the Utilities’ construction programs and debt maturities, with respect to HEI, approximately $50 million will be required in the fourth quarter of 2025 to repay maturing long-term debt if not refinanced. In the future, if the Company is unable to refinance scheduled maturing debt, then debt maturities are expected to be repaid with the proceeds from existing cash on hand, other medium- or long-term debt, and/or dividends from subsidiaries. The ability of Hawaiian Electric to pay dividends or make other distributions to HEI are subject to contractual and regulatory restrictions (see Note 15 of the Consolidated Financial Statements). Additional debt and/or equity financing, if available, may be utilized to invest in the Utilities or Pacific Current; to pay down commercial paper or other short-term borrowings, if any; to pay interest costs; or to fund unanticipated expenditures, such as increases in the costs of, or an acceleration of, the construction of capital projects of the Utilities or unanticipated utility capital expenditures. In addition, existing debt may be refinanced prior to maturity with additional debt or equity financing (or both).

Current wording

Forecasted HEI consolidated “net cash used in investing activities” consists primarily of the net capital expenditures of the Utilities principally related to maintaining and modernizing the grid to allow for the integration of more renewable energy, improved customer reliability, greater system efficiency and enhanced resilience. The Utilities’ capital expenditures are forecasted to be funded primarily through a combination of retained earnings and proceeds from other sources of debt financings (see also discussion regarding other material cash requirements under “Financial Condition–Liquidity and capital resources,” contained in the “Electric utility” section below). In the future, if the Company is unable to refinance scheduled maturing debt, then debt maturities are expected to be repaid with the proceeds from existing cash on hand, other medium- or long-term debt, and/or dividends from subsidiaries. The ability of Hawaiian Electric to pay dividends or make other distributions to HEI are subject to contractual and regulatory restrictions (see Note 15 of the Consolidated Financial Statements). Additional debt and/or equity financing, if available, may be utilized to invest in the Utilities; to pay down commercial paper or other short-term borrowings, if any; to pay interest costs; or to fund unanticipated expenditures, such as increases in the costs of, or an acceleration of, the construction of capital projects of the Utilities or unanticipated utility capital expenditures. In addition, existing debt may be refinanced prior to maturity with additional debt or equity financing (or both).

Previous wording

Certain Maui windstorm and wildfires legal-related costs of HEI and the Utilities are recoverable under $165 million of excess liability insurance, $25 million of miscellaneous professional liability insurance, and $145 million of directors and officers liability insurance policies (see further information in Note 2 of the Consolidated Financial Statements). As of December 31, 2024, HEI and the Utilities have approximately $13 million, nil and $122 million of insurance coverage remaining under the excess liability, professional liability and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs and recognized as a receivable as of year-end.

Current wording

Certain Maui windstorm and wildfires legal-related costs of HEI and the Utilities are recoverable under $165 million of excess liability insurance, $25 million of professional liability insurance, and $145 million of directors and officers liability insurance policies (see further information in Note 2 of the Consolidated Financial Statements). As of December 31, 2025, HEI and the Utilities have approximately $10 million, nil and $71 million of insurance coverage remaining under the excess liability, professional liability, and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs, including the securities class action settlement, and recognized as a receivable as of year-end.

Previous wording

1 Includes contractual obligations and commitments for capital expenditures and expense amounts.

Current wording

5 Includes contractual obligations and commitments for capital expenditures and expense amounts.

Showing the first 40 of 128 pairs. Open the source sections for the rest.

Rearranged current paragraphs (8)

Current report — wording carried from elsewhere

Recent developments. See also “Recent developments” in Hawaiian Electric’s MD&A and Note 2 of the Consolidated Financial Statements which includes recent updates and disclosures relating to the Maui windstorm and wildfires.

Current report — wording carried from elsewhere

1 As of December 31, 2024. In March 2025, S&P revised HEI’s outlook to “Positive” from “Negative” and affirmed the “B-” issuer credit rating.

Current report — wording carried from elsewhere

continued transformation, and are updated regularly to adapt to changing technology, costs, and other factors. While there is no financial penalty for failure to achieve the Utilities’ long-range aspirational objectives, the Utilities recognize that there are environmental and social costs from the continued use of fossil fuels.

Current report — wording carried from elsewhere

Deployment was planned in two phases. The Utilities completed Phase 1 deployment of 447,000 advanced meters, servicing approximately 95% of the customers in 2024 and are recovering associated costs under the MPIR mechanism. Since GMS Phase 1 Project completion, the Utilities continue to deploy advanced meters as part of normal meter shop operations under the recovery of Annual Revenue Adjustment mechanism.

Current report — wording carried from elsewhere

PUC stated that it intended to address matters using lessons learned in the initial three docket phases to explore implementation of an intragovernmental wheeling policy and an evaluation of retail wheeling in subsequent phases, as appropriate.

Current report — wording carried from elsewhere

Hawaiian Electric’s effective tax rate (combined federal and state income tax rates) in 2025 was 22% (tax expense) compared to 26% (tax benefit) in 2024. The effective tax rate in 2025 was lower than 2024 primarily due to the substantial pre- tax loss in 2024 resulting from the accrual of the loss contingencies related to the wildfire tort-related claims and because the impact of permanent items had a smaller impact on the effective tax rate in 2024, partially offset by lower research and development tax credit claims in 2025.

Current report — wording carried from elsewhere

The following table provides the components of available liquidity under existing facilities.

Current report — wording carried from elsewhere

1 As of December 31, 2024. In March 2025, S&P revised Hawaiian Electric’s outlook to “Positive” from “Negative” and affirmed the “B-” issuer credit rating
Rearranged previous paragraphs (11)

Previous report — wording carried elsewhere

The table above does not include other categories of obligations and commitments, such as deferred taxes, certain trade payables, amounts that will become payable in future periods under collective bargaining and other employment agreements and employee benefit plans, potential settlements of securities class action and shareholder lawsuits, and potential refunds of amounts collected from ratepayers (e.g., under the earnings sharing mechanism). As of December 31, 2024, the fair value of the assets held in trusts to satisfy the obligations of the Company’s retirement benefit plans did not exceed the retirement benefit plans’ benefit obligation. Minimum funding requirements for retirement benefit plans have not been included in the table above; however, see Note 11 of the Consolidated Financial Statements for 2025 estimated retirement benefit plan obligations and contributions.

Previous report — wording carried elsewhere

In December 2024, the consumer price index increased 2.9% over the last 12 months. In Hawaii, the November 2024

Previous report — wording carried elsewhere

Hawaiian Electric’s effective tax rate (combined federal and state income tax rates) in 2024 and 2023 was 26%.

Previous report — wording carried elsewhere

•Under a request for proposal process governed by the PUC and monitored by independent observers, in February 2018, the Utilities issued Stage 1 Renewable RFPs for 220 MW of renewable generation on Oahu, 50 MW of renewable generation on Hawaii Island, and 60 MW of renewable generation on Maui. To date, the Utilities filed seven requests with the PUC for approval of amendments related to previously-approved PPAs for changes in pricing and/or guaranteed commercial operations dates to support completion of the projects while maintaining system reliability. The PUC has approved all seven amendments. AES West Oahu Solar project on Oahu and AES Kuihelani Solar project on Maui reached commercial operations on March 28, 2024 and May 31, 2024, respectively. See also “Purchase commitments” in Note 4 of the Consolidated Financial Statements. To date, five projects reached commercial operations.

Previous report — wording carried elsewhere

The Utilities have received PUC approvals to recover the total projected annual payment of $66.4 million for the seven PPAs through the PPAC to the extent such costs are not included in base rates.

Previous report — wording carried elsewhere

Project delays have resulted in Guaranteed Commercial Operations Date being missed.

Previous report — wording carried elsewhere

A summary of the Stage 3 PPAs is as follows:

Previous report — wording carried elsewhere

At December 31, 2024, the Utilities’ total available liquidity was approximately $334 million. The following table provides the components of available liquidity at December 31, 2024.

Previous report — wording carried elsewhere

On January 17, 2025, the Utilities requested PUC approval to issue during the three-year period 2025 through 2027, unsecured obligations bearing taxable interest (Hawaiian Electric up to $900 million, Hawaii Electric Light up to $115 million and Maui Electric up to $150 million), to finance capital expenditures, repay long-term and/or short-term debt used to finance capital expenditures, and/or to reimburse funds used for payment of capital expenditures. If approved, the Utilities would forgo the remaining authorized amounts noted in the table above. The Utilities requested PUC approval by July 31, 2025.

Previous report — wording carried elsewhere

Equity. On December 20, 2022, the Utilities received PUC approval to issue and sell each utility’s common stock over a four-year period from January 1, 2023 through December 31, 2026 (Hawaiian Electric’s sale/s to HEI of up to $75 million, Hawaii Electric Light sale/s to Hawaiian Electric of up to $25 million, and Maui Electric sale/s to Hawaiian Electric of up to $55 million) and the purchase of Hawaii Electric Light and Maui Electric common stock by Hawaiian Electric from 2023 through December 31, 2026. As of December 31, 2024, Hawaiian Electric, Hawaii Electric Light, and Maui Electric have $75 million, $25 million, and nil, respectively, of unused common stock authorization.

Previous report — wording carried elsewhere

1 Includes contractual obligations and commitments for capital expenditures and expense amounts.