Item 1A. Risk Factors

Current report: 10-K

Period ended 2026-01-03; filed 2026-02-11.

0000217346-26-000006

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 65 previous paragraphs and 66 current paragraphs.

53 unchanged; 11 reworded; 1 added; 1 removed; 0 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (1)

Current report

Global macroeconomic conditions could negatively impact our business.
Removed paragraphs (1)

Previous report

Risks arising from uncertainty in global macroeconomic conditions may harm our business.
Reworded paragraphs (11)

Previous wording

During 2024, we derived approximately 25% of our revenues from sales to a variety of U.S. Government entities. Our revenues from the U.S. Government largely result from contracts awarded to us under various U.S. Government defense-related programs. Considerable uncertainty exists regarding how future budget and program decisions will develop. We cannot predict the impact on existing, follow-on or future programs from changes in the threat environment, defense spending levels, government priorities, political leadership, procurement practices, inflation and other macroeconomic trends, military strategy, or broader societal changes. Significant changes in national and international priorities for defense spending could affect the funding, or the timing of funding, of our programs, which could negatively impact our results of operations and financial condition.

Current wording

During 2025, we derived approximately 27% of our revenues from sales to a variety of U.S. Government entities. Our revenues from the U.S. Government largely result from contracts awarded to us under various U.S. Government defense-related programs. The MV-75 program at Bell represents a significant and growing portion of our U.S. Government revenues and backlog. Bell has significantly increased and will continue to increase its investments in the resources, facilities and personnel applied to the MV-75 program. Considerable uncertainty exists regarding how future budget and program decisions will develop. We cannot predict the impact on existing, follow-on or future programs from changes in the threat environment, defense spending levels, government priorities, political leadership, procurement practices, inflation and other macroeconomic trends, military strategy, or broader societal changes. Significant changes in national and international priorities for defense spending could affect the funding, or the timing of funding, of our programs, which could negatively impact our results of operations and financial condition. In particular, a material reduction or delay in funding of the MV-75 program could have a material adverse effect on our cash flows, results of operations and financial condition.

Previous wording

The funding of U.S. Government defense programs is subject to congressional appropriation decisions and the U.S. Government budget process which includes enacting relevant legislation, such as appropriations bills and accords on the debt ceiling. Although multiple-year contracts may be planned in connection with major procurements, Congress generally appropriates funds on a fiscal year basis even though a program may continue for several years. Consequently, programs often are only partially funded initially, and additional funds are committed only as Congress makes further appropriations. Further uncertainty with respect to ongoing programs could also result in the event that the U.S. Government finances its operations through temporary funding measures such as “continuing resolutions” rather than full-year appropriations or if a government shutdown were to occur and were to continue for an extended period of time. If we incur costs in advance or in excess of funds committed on a contract, we are at risk for non-reimbursement of those costs until additional funds are appropriated. The reduction, termination or delay in the timing of funding for U.S. Government programs for which we currently provide or propose to provide products or services from time to time has resulted and, in the future, may result in a loss of anticipated revenues. A loss of such revenues could materially and adversely impact our results of operations and financial condition. In addition, because our U.S. Government contracts generally require us to continue to perform even if the U.S. Government is unable to make timely payments, we may need to finance our continued performance for the impacted contracts from our other resources on an interim basis. An extended delay in the timely payment by the U.S. Government could have a material adverse effect on our liquidity.

Current wording

The funding of U.S. Government defense programs is subject to congressional appropriation decisions and the U.S. Government budget process which includes enacting relevant legislation, such as appropriations bills and accords on the debt ceiling. Although multiple-year contracts may be planned in connection with major procurements, Congress generally appropriates funds on a fiscal year basis even though a program may continue for several years. Consequently, programs often are only partially funded initially, and additional funds are committed only as Congress makes further appropriations. Further uncertainty with respect to ongoing programs could also result in the event that the U.S. Government finances its operations through temporary funding measures such as “continuing resolutions” rather than full-year appropriations or when a government shutdown occurs and continues for an extended period of time. If we incur costs in advance or in excess of funds committed on a contract, we are at risk for non-reimbursement of those costs until additional funds are appropriated. The reduction, termination or delay in the timing of funding for U.S. Government programs for which we currently provide or propose to provide products or services from time to time has resulted and, in the future, may result in a loss of anticipated revenues. A loss of such revenues could materially and adversely impact our results of operations and financial condition. In addition, because our U.S. Government contracts generally require us to continue to perform even if the U.S. Government is unable to make timely payments, we may need to finance our continued performance for the impacted contracts from our other resources on an interim basis. An extended delay in the timely payment by the U.S. Government could have a material adverse effect on our liquidity.

Previous wording

The U.S. Government typically can terminate or modify any of its contracts with us either for its convenience or if we default by failing to perform under the terms of the applicable contract. In the event of termination for the U.S. Government’s convenience, contractors are generally protected by provisions covering reimbursement for costs incurred on the contracts and profit on those costs but not the anticipated profit that would have been earned had the contract been completed. A termination arising out of our default for failure to perform could expose us to liability, including but not limited to, all costs incurred under the contract plus potential liability for re-procurement costs in excess of the total original contract amount, less the value of work performed and accepted by the customer under the contract. Such an event could also have an adverse effect on our ability to compete for future contracts and orders. If any of our contracts are terminated by the U.S. Government whether for convenience or default, our backlog would be reduced by the expected value of the remaining work under such contracts. We also enter into “fee for service” contracts with the U.S. Government where we retain ownership of, and consequently the risk of loss on, aircraft and equipment supplied to perform under these contracts. Termination of these contracts could materially and adversely impact our results of operations. On contracts for which we are teamed with others and are not the prime contractor, the U.S. Government could terminate a prime contract under which we are a subcontractor, irrespective of the quality of our products and services as a subcontractor. In addition, in the event that the U.S. Government is unable to make timely payments, failure to continue contract performance places the contractor at risk of termination for default. Any such event could have a material adverse effect on our cash flows, results of operations and financial condition.

Current wording

The U.S. Government typically can terminate or modify any of its contracts with us either for its convenience or if we default by failing to perform under the terms of the applicable contract. In the event of termination for the U.S. Government’s convenience, contractors are generally protected by provisions covering reimbursement for costs incurred on the contracts and profit on those costs. However, contractors are not automatically entitled to reimbursement for capital investments made for production facilities and other resources necessary to accommodate a large program such as the MV-75 or for the anticipated profit that would have been earned had the contract been completed. A termination arising out of our default for failure to perform could expose us to liability, including but not limited to, all costs incurred under the contract plus potential liability for re-procurement costs in excess of the total original contract amount, less the value of work performed and accepted by the customer under the contract. Such an event could also have an adverse effect on our ability to compete for future contracts and orders. If any of our contracts are terminated by the U.S. Government whether for convenience or default, our backlog would be reduced by the expected value of the remaining work under such contracts. We also enter into “fee for service” contracts with the U.S. Government where we retain ownership of, and consequently the risk of loss on, aircraft and equipment supplied to perform under these contracts. Termination of these contracts could materially and adversely impact our results of operations. On contracts for which we are teamed with others and are not the prime contractor, the U.S. Government could terminate a prime contract under which we are a subcontractor, irrespective of the quality of our products and services as a subcontractor. In addition, in the event that the U.S. Government is unable to make timely payments, failure to continue contract performance places the contractor at risk of termination for default. Any such event could have a material adverse effect on our cash flows, results of operations and financial condition.

Previous wording

We must comply with and are affected by laws and regulations relating to the formation, administration and performance of U.S. Government contracts. These laws and regulations, among other things, require certification and disclosure of all cost and pricing data in connection with contract negotiation, define allowable and unallowable costs and otherwise govern our right to reimbursement under certain cost-based U.S. Government contracts, and safeguard and restrict the use and dissemination of classified information, covered defense information, and the exportation of certain products and technical data. New laws, regulations or procurement requirements or changes to current ones (including, for example, regulations related to cybersecurity) can significantly increase our costs, reducing our profitability. Our failure to comply with procurement regulations and requirements could allow the U.S. Government to suspend or debar us from receiving new contracts for a period of time, reduce the value of existing contracts, issue modifications to a contract, withhold cash on contract payments, and control and potentially prohibit the export of our products, services and associated materials, any of which could negatively impact our results of operations, financial condition or liquidity. A number of our U.S. Government contracts contain provisions that require us to make disclosure to the Inspector General of the agency that is our customer if we have credible evidence that we have violated U.S. criminal laws involving fraud, conflict of interest, or bribery; the U.S. civil False Claims Act; or received a significant overpayment under a U.S. Government contract. Failure to properly and timely make disclosures under these provisions may result in a termination for default or cause, suspension and/or debarment, and potential fines.

Current wording

We must comply with and are affected by laws and regulations relating to the formation, administration and performance of U.S. Government contracts. These laws and regulations, among other things, require certification and disclosure of all cost and pricing data in connection with contract negotiation, define allowable and unallowable costs and otherwise govern our right to reimbursement under certain cost-based U.S. Government contracts, and safeguard and restrict the use and dissemination of classified information, covered defense information, and the exportation of certain products and technical data. New laws, regulations or procurement requirements or changes to current ones (including, for example, regulations related to cybersecurity and the recently issued Executive Order relating to underperformance of U.S. defense contracts, investment in defense production capacity and possible limitations on dividends and share buybacks) can significantly increase our costs, thereby reducing our profitability or otherwise adversely impacting our results of operations, financial condition, or shareholder returns. Our failure to comply with procurement regulations and requirements could allow the U.S. Government to suspend or debar us from receiving new contracts for a period of time, reduce the value of existing contracts, issue modifications to a contract, withhold cash on contract payments, and control and potentially prohibit the export of our products, services and associated materials, any of which could negatively impact our results of operations, financial condition or liquidity. A number of our U.S. Government contracts contain provisions that require us to make disclosure to the Inspector General of the agency that is our customer if we have credible evidence that we have violated U.S. criminal laws involving fraud, conflict of interest, or bribery; the U.S. civil False Claims Act; or received a significant overpayment under a U.S. Government contract. Failure to properly and timely make disclosures under these provisions may result in a termination for default or cause, suspension and/or debarment, and potential fines.

Previous wording

To continue to grow our revenues and segment profit, we must successfully develop new products and technologies or modify our existing products and technologies for our current and future markets. Our future performance depends, in part, on our ability to identify emerging technological trends and customer requirements and to develop and maintain competitive products and services. Delays or cost overruns in the development and acceptance of new products or certification of new aircraft and other products occur from time to time and could adversely affect our results of operations. These delays or cost overruns could be caused by unanticipated technological hurdles, production changes to meet customer demands, unanticipated difficulties in obtaining required regulatory certifications of new aircraft or other products, or failure on the part of our suppliers to deliver components as agreed. We also could be adversely affected if our research and development efforts are less successful than expected or if these efforts require significantly more funding to achieve our goals than anticipated. In particular, the success of Textron eAviation depends in large part, on our ability to develop and certify new electric and hybrid electric aircraft products in order to achieve our long-term strategy of offering a family of sustainable aircraft for urban air mobility, general aviation, cargo and special mission roles. In addition, new products and technologies could generate unanticipated safety or other concerns resulting in expanded product liability risks, potential product recalls and other regulatory issues that could have an adverse impact on us. Furthermore, because of the lengthy research and development cycle involved in bringing certain of our products to market, we cannot predict the economic conditions that will exist when any new product is complete, and the market for our product offerings does not always develop or continue to expand as we anticipate.

Current wording

To continue to grow our revenues and segment profit, we must successfully develop new products and technologies or modify our existing products and technologies for our current and future markets. Our future performance depends, in part, on our ability to identify emerging technological trends and customer requirements and to develop and maintain competitive products and services. Artificial intelligence technologies have developed rapidly and our business may be adversely affected if we cannot successfully integrate the technology into our internal business processes and product and service offerings in a timely, cost-effective, compliant and responsible manner. Delays or cost overruns in the development and acceptance of new products or certification of new aircraft and other products occur from time to time and could adversely affect our results of operations. These delays or cost overruns could be caused by unanticipated technological hurdles, production changes to meet customer demands, unanticipated difficulties in obtaining required regulatory certifications of new aircraft or other products, or failure on the part of our suppliers to deliver components as agreed. We also could be adversely affected if our research and development efforts are less successful than expected or if these efforts require significantly more funding to achieve our goals than anticipated. In particular, the success of the business activities and research and development initiatives begun at Textron eAviation depends in large part, on our ability to develop and certify new electric and hybrid electric aircraft products in order to achieve our long-term strategy of offering a family of sustainable aircraft for urban air mobility, general aviation, cargo and special mission roles. In addition, new products and technologies could generate unanticipated safety or other concerns resulting in expanded product liability risks, potential product recalls and other regulatory issues that could have an adverse impact on us. Furthermore, because of the lengthy research and development cycle involved in bringing certain of our products to market, we cannot predict the economic conditions that will exist when any new product is complete, and the market for our product offerings does not always develop or continue to expand as we anticipate.

Previous wording

We are sensitive to global macroeconomic conditions. Negative macroeconomic factors may have an adverse effect on our business, results of operations and financial condition, as well as on our distributors, customers, subcontractors and suppliers, and on activity in many of the industries and markets we serve. We cannot predict changes in worldwide or regional economic or political conditions and government policies as such factors are highly volatile and beyond our control. If current macroeconomic pressures, including from inflation and labor and supply chain challenges, continue or if global macroeconomic conditions deteriorate and remain at depressed levels for extended periods, our business, results of operations and financial condition could be materially adversely affected. In addition, changes in laws or policies governing the terms of foreign trade, and in particular increased trade restrictions, tariffs or taxes on imports from countries where we manufacture or sell our products or from where we import products or raw materials (either directly or through our suppliers) could adversely impact our competitive position, business operations and financial results.

Current wording

Global macroeconomic conditions have negatively impacted our business in the past and could in the future negatively impact our business. Negative macroeconomic factors may have an adverse effect on our business, results of operations and financial condition, as well as on our distributors, customers, subcontractors and suppliers, and on activity in many of the industries and markets we serve. We cannot predict changes in worldwide or regional economic or political conditions and government policies as such factors are highly volatile and beyond our control. If current macroeconomic pressures, including from inflation and labor and supply chain challenges, continue or if global macroeconomic conditions deteriorate and remain at depressed levels for extended periods, our business, results of operations and financial condition could be materially adversely affected. In addition, changes in laws or policies governing the terms of foreign trade, including increased trade restrictions, tariffs or taxes on imports from countries where we manufacture or sell our products or from where we import products or raw materials (either directly or through our suppliers) could adversely impact our competitive position, business operations or financial results. In particular, recent changes to global tariff policies have created significant uncertainty with respect to trade policies, treaties and tariffs. Our aircraft products, subassemblies, parts and components manufactured in Canada and Mexico are largely qualified under the rules of the United States-Mexico-Canada Agreement (USMCA) for preferential treatment on tariffs imposed by the U.S. on imports from Canada and Mexico. In 2026, the USMCA is subject to a mandatory six-year joint review, during which the United States, Canada, and Mexico will assess whether the agreement continues to serve their respective economic and strategic interests. There can be no assurance that this review will conclude with the continuation of the trilateral agreement in its current form or at all. The termination of the agreement or renegotiation of the agreement with terms less favorable to us could result in the loss or reduction of preferential tariff treatment which could increase our costs and create compliance and supply-chain disruption risks. These developments could adversely impact us, our distributors, customers, subcontractors or suppliers, which could have a material adverse effect on our financial position, results of operations or cash flows. See Management's Discussion and Analysis of Financial Condition and Results of Operations for further discussion of the impact of these tariffs.

Previous wording

Our information technology (IT) and related systems are critical to the efficient operation of our business and essential to our ability to perform day to day processes. We routinely face persistent security threats, including threats to our IT infrastructure and unlawful attempts to gain access to our confidential, classified or otherwise proprietary information via phishing/malware campaigns and other cyberattack methods, as well as threats to the physical security of our facilities and employees. The threats we face vary from those common to most industries, to attacks by more advanced and persistent, highly organized adversaries, including nation state actors, which target us for the national security information in our possession, for our role in developing advanced technology systems or with the goal of committing fraudulent activity. Our customers, suppliers and subcontractors are likewise targeted, and attack methods continue to evolve. Some cyberattacks depend on human error or manipulation, including phishing attacks or schemes that use social engineering or artificial intelligence to gain access to systems or carry out disbursement of funds or other frauds. Developments in artificial intelligence and machine learning provide threat actors with the capability to use more sophisticated means to attack our systems and may exacerbate cybersecurity risk.

Current wording

Our information technology (IT) and related systems are critical to the efficient operation of our business and essential to our ability to perform day-to-day processes. We routinely face persistent security threats, including threats to our IT infrastructure and unlawful attempts to gain access to our confidential, classified or otherwise proprietary information via phishing/malware campaigns and other cyberattack methods, as well as threats to the physical security of our facilities and employees. The threats we face are continuous, evolving and vary in degree of severity and sophistication. These threats include advanced, persistent threats from highly organized adversaries, including cybercrime syndicates, nation state actors and hacktivists, which target us for the national security information in our possession, for our role in developing advanced technology systems or with the goal of committing fraudulent activity. Some of these threats are related to the geopolitical environment and have, therefore, grown in number and changed in focus due to recent and evolving conflicts. Our customers, suppliers and subcontractors are likewise targeted, and attack methods continue to evolve. Some cyberattacks depend on human error or manipulation, including phishing attacks or schemes that use social engineering or artificial intelligence to gain access to systems or carry out disbursement of funds or other frauds. Developments in artificial intelligence and machine learning provide threat actors with the capability to use more sophisticated means to attack our systems and may exacerbate cybersecurity risk.

Previous wording

During 2024, we derived approximately 29% of our revenues from international business, including U.S. exports. Conducting business internationally exposes us to additional risks than if we conducted our business solely within the U.S. We maintain manufacturing facilities, service centers, supply centers and other facilities worldwide, including in various emerging market countries. Risks related to international operations include import, export, economic sanctions and other trade restrictions; changing U.S. and foreign procurement policies and practices; changes in international trade policies, including higher tariffs on imported goods and materials and renegotiation of free trade agreements; potential retaliatory tariffs imposed by foreign countries against U.S. goods; impacts on our non-U.S. suppliers and customers due to acts of war or terrorism occurring internationally; restrictions on technology transfer; difficulties in protecting intellectual property; increasing complexity of employment and environmental, health and safety regulations; foreign investment laws; exchange controls; repatriation of earnings or cash settlement challenges; compliance with increasingly rigorous data privacy and protection laws; competition from foreign and multinational firms with home country advantages; economic and government instability; acts of industrial espionage, acts of war and terrorism and related safety concerns. The impact of any one or more of these or other factors could adversely affect our business, financial condition or operating results.

Current wording

changing U.S. and foreign procurement policies and practices; changes in international trade policies, including higher tariffs on imported goods and materials and renegotiation of free trade agreements; potential retaliatory tariffs imposed by foreign countries against U.S. goods; impacts on our non-U.S. suppliers and customers due to acts of war or terrorism occurring internationally; restrictions on technology transfer; difficulties in protecting intellectual property; increasing complexity of employment and environmental, health and safety regulations; foreign investment laws; exchange controls; repatriation of earnings or cash settlement challenges; compliance with increasingly rigorous data privacy and protection laws; competition from foreign and multinational firms with home country advantages; economic and government instability; acts of industrial espionage, acts of war and terrorism and related safety concerns. The impact of any one or more of these or other factors could adversely affect our business, financial condition or operating results.

Previous wording

As a distributor of consumer products in the U.S., certain of our products are subject to the Consumer Product Safety Act, which empowers the U.S. Consumer Product Safety Commission (CPSC) to exclude from the market products that are found to be unsafe or hazardous. Under certain circumstances, the CPSC has in the past and could require in the future us to repair, replace or refund the purchase price of one or more of our products, or potentially even discontinue entire product lines. We also may voluntarily take such action and, from time to time, have done so, but within strictures recommended by the CPSC. The CPSC also can impose fines or penalties on a manufacturer for non-compliance with its requirements. Furthermore, failure to timely notify the CPSC of a potential safety hazard can result in significant fines being assessed against us. Any repurchases or recalls of our products or an imposition of fines or penalties could be costly to us and could damage the reputation or the value of our brands. Additionally, laws regulating certain consumer products exist in some states, as well as in other countries in which we sell our products, and more restrictive laws and regulations could be adopted in the future.

Current wording

As a distributor of consumer products in the U.S., certain of our products are subject to the Consumer Product Safety Act, which empowers the U.S. Consumer Product Safety Commission (CPSC) to exclude from the market products that are found to be unsafe or hazardous. Under certain circumstances, the CPSC has in the past and could in the future require us to repair, replace or refund the purchase price of one or more of our products, or potentially even discontinue entire product lines. We also may voluntarily take such action and, from time to time, have done so, but within strictures recommended by the CPSC. The CPSC also can impose fines or penalties on a manufacturer for non-compliance with its requirements. Furthermore, failure to timely notify the CPSC of a potential safety hazard can result in significant fines being assessed against us. Any repurchases or recalls of our products or an imposition of fines or penalties could be costly to us and could damage the reputation or the value of our brands. Additionally, laws regulating certain consumer products exist in some states, as well as in other countries in which we sell our products, and more restrictive laws and regulations could be adopted in the future.

Previous wording

Increased worldwide public awareness and concern regarding global climate change has resulted and is likely to continue to result in more legislative and regulatory efforts, in the U.S., the European Union and in other jurisdictions in which we operate, in an effort to address the negative impacts of climate change. Recently enacted laws and regulations include, and future such laws and regulations may include, more prescriptive required reporting on environmental metrics, climate change related risks and associated financial and other impacts, as well as increased oversight of and reporting on our supply chain and other compliance requirements. We expect that compliance with such laws and regulations will require additional internal and external resources. Stricter limits on greenhouse gas emissions generated by our facilities or by our products that produce carbon emissions, carbon pricing mechanisms and/or energy taxes could also be imposed. Compliance with stricter limits may necessitate larger investment in product development and manufacturing equipment and/or facilities, as well as sourcing from new suppliers and/or higher costs from existing suppliers. These increased regulatory requirements are expected to increase our direct and indirect costs and could negatively impact our business, results of operations, financial condition and competitive position. Our failure to adequately comply with such laws and regulations could jeopardize our ability to receive contract awards from the U.S. government and other customers.

Current wording

Increased worldwide public awareness and concern regarding global climate change has resulted and is likely to continue to result in more legislative and regulatory efforts, in the U.S., the European Union and in other jurisdictions in which we operate, to address the negative impacts of climate change. Recently enacted laws and regulations include, and future such laws and regulations may include, more prescriptive required reporting on environmental metrics, climate change related risks and associated financial and other impacts, as well as increased oversight of and reporting on our supply chain and other compliance requirements. We expect that compliance with such laws and regulations will require additional internal and external resources. Stricter limits on greenhouse gas emissions generated by our facilities or by our products that produce carbon emissions, carbon pricing mechanisms and/or energy taxes could also be imposed. Compliance with stricter limits may necessitate larger investment in product development and manufacturing equipment and/or facilities, as well as sourcing from new suppliers and/or higher costs from existing suppliers. These increased regulatory requirements are expected to increase our direct and indirect costs and could negatively impact our business, results of operations, financial condition and competitive position. Our failure to adequately comply with such laws and regulations could jeopardize our ability to receive contract awards from the U.S. government and other customers.

Previous wording

Approximately 7,400, or 28%, of our U.S. employees are represented by labor unions under various collective bargaining agreements with varying durations and expiration dates, and many of our non-U.S. employees are represented by organized councils. From time to time, our collective bargaining agreements expire and are subject to renegotiation at that time. We may not be able to negotiate successor collective bargaining agreements upon expiration without experiencing labor disputes, including strikes or work stoppages, or we may be unable to renegotiate such contracts on favorable terms. For example, on September 21, 2024, Textron Aviation’s largest union rejected a proposed new contract and engaged in a strike that had an adverse effect on Textron Aviation's ability to meet its production and delivery schedules, and negatively impacted revenues and segment profit in 2024. If we experience any extended interruption of operations at any of our facilities as a result of labor disputes, strikes or other work stoppages, our business, financial condition or results of operations could be adversely affected. In addition, the workforces of many of our suppliers and customers are represented by labor unions. Work stoppages or strikes at the plants of our key suppliers could disrupt our manufacturing processes; similar actions at the plants of our customers could result in delayed or canceled orders for our products. Any of these events could adversely affect our results of operations.

Current wording

Approximately 7,700, or 29%, of our U.S. employees are represented by labor unions under various collective bargaining agreements with varying durations and expiration dates, and many of our non-U.S. employees are represented by organized councils. Our collective bargaining agreements expire in accordance with their terms and are subject to renegotiation at that time. We may not be able to negotiate successor collective bargaining agreements upon expiration without experiencing labor disputes, including strikes or work stoppages, or we may be unable to renegotiate such contracts on favorable terms. For example, on September 21, 2024, Textron Aviation’s largest union rejected a proposed new contract and engaged in a strike that had an adverse effect on Textron Aviation's ability to meet its production and delivery schedules, and negatively impacted revenues and segment profit in 2024. If we again experience any extended interruption of operations at any of our facilities as a result of labor disputes, strikes or other work stoppages, our business, financial condition or results of operations could be adversely affected. In addition, the workforces of many of our suppliers and customers are represented by labor unions. Work stoppages or strikes at the plants of our key suppliers could disrupt our manufacturing processes; similar actions at the plants of our customers could result in delayed or canceled orders for our products. Any of these events could adversely affect our results of operations.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

During 2025, we derived approximately 31% of our revenues from international business, including U.S. exports. Conducting business internationally exposes us to additional risks than if we conducted our business solely within the U.S. We maintain manufacturing facilities, service centers, supply centers and other facilities worldwide, including in various emerging market countries. Risks related to international operations include import, export, economic sanctions and other trade restrictions;