ITEM 2. PROPERTIES
Land
Our approximately 270,000 acres include portions of the San Joaquin Valley, portions of the Tehachapi Mountains and portions of the western end of the Antelope Valley. Each of our five reporting segments uses various portions of this land. A number of key transportation and utility facilities cross our land, including Interstate 5, California Highways 58, 138 and 223, the California Aqueduct (which brings water from Northern California), and various transmission lines for electricity, oil, natural gas and communication systems. Our corporate offices are located on our property.
Approximately 247,000 acres of our land are located in Kern County, California. The Kern County general plan, or the “General Plan,” for this land contemplates continued commercial, resource utilization, farming, grazing and other agricultural uses, as well as certain new developments and uses, including residential and recreational facilities. While the General Plan is intended to provide guidelines for land use and development, it is subject to amendment to accommodate changing circumstances and needs. We have three major master planned real estate projects in Kern County: MV, TRCC and Grapevine.
The remainder of our land, approximately 23,000 acres, is in Los Angeles County. This area is accessible from Interstate 5 via Highway 138. Los Angeles County has adopted general plan policies that contemplate future residential development of portions of this land, subject to further assessments of environmental and infrastructure constraints. The Centennial master planned project is on our lands in Los Angeles County.
Portions of our land consist of mountainous terrain, much of which is not presently served by paved roads or by utility or water lines. Much of this property is included within the Conservation Agreement we entered into with five major environmental organizations in June 2008. As we receive entitlement approvals over the life span of our developments, we will dedicate conservation easements on 145,000 acres of this land, which will preclude future development of the land. This acreage includes many of the most environmentally sensitive areas of our property and is home to many plant and wildlife species whose environments will remain undisturbed.
Any significant development on our currently undeveloped land would involve the construction of roads, utilities and other expensive infrastructure and would have to be done in a manner that accommodates a number of environmental concerns, including endangered species, wetlands issues, and greenhouse gas emissions. Accommodating these environmental concerns, could possibly limit development of portions of the land or result in substantial delays or certain changes to the scope of development in order to obtain governmental approval.
Water Operations
Our existing long-term water contracts with the Wheeler Ridge-Maricopa Water Storage District, or WRMWSD, provide for water entitlements and deliveries from the SWP to our agricultural and municipal/industrial operations in the San Joaquin Valley. The terms of these contracts extend to 2035. Under the contracts, we are entitled to annual water for 5,496 acres of land, or 15,547 acre-feet of water subject to SWP allocations, which is adequate for our present farming operations. It is assumed that at the end of the current contract period, all water contracts will be extended for approximately the same amount of annual water.
In addition to the WRMWSD contract water entitlements, we have an additional water entitlement from the SWP sufficient to service a substantial amount of future residential and/or commercial development in Kern County. TCWD, a local water district serving our land in the district and land we have sold in TRCC, has 5,749 acre-feet of SWP entitlement (also called Table A amount), subject to SWP allocations. In addition, TCWD has 65,005 acre-feet of water stored in Kern County water banks. Both the entitlement and the banked water are the subject of a long-term water supply contract extending to 2035 between TCWD and the Company. TCWD is the water supplier to TRCC, and will be the principal water supplier for any significant mixed-use development in MV. TCWD will also be the water district that provides services to the Grapevine and Centennial projects.
We have a 150-acre water bank consisting of nine ponds on our land in southern Kern County. Water is pumped into these ponds and then percolates into underground aquifers. Since 2006, we have banked 54,728 acre-feet of water from the Antelope Valley-East Kern Water Agency, or AVEK, which has been pumped from the California aqueduct and is currently retained in this water bank. We anticipate adding additional water to the water bank in the future, as water is available.
Over time, we have also purchased water for our future use or sale. We have secured SWP entitlement under long-term SWP water contracts within the Tulare Lake Basin Water Storage District and the Dudley-Ridge Water District, totaling 3,444 acre-feet of SWP entitlement annually, subject to SWP allocations. These contracts extend through 2035. In 2013, the Company completed the acquisition of a water purchase agreement that will allow and require the Company to purchase 6,693 acre-feet of water each year from the Nickel Family, LLC, or Nickel, through the Kern County Water Agency.
The initial term of the water purchase agreement with Nickel runs through 2044 and includes a Company option to extend the contract for an additional 35 years. This contract allows us to purchase water each year. The purchase cost of water in 2023 was $928 per acre-foot. Purchase costs are subject to annual cost increases based on the greater of the consumer price index or 3%, resulting in a 2024 purchase cost of $956 per acre-foot.
The water purchased will ultimately be used in the development of the Company’s land for commercial/industrial development, residential development, and farming. Interim uses may include the sale of portions of this water to third party users on an annual basis, until the water is fully used for the Company’s internal uses.
During 2023, SWP allocations were 100% of contract levels, and WRMWSD was able to supply us with water from various sources that, when combined with our water sources provided sufficient water to meet our farming and real estate demands. In some years, there is also sufficient runoff from local mountain streams to allow us to capture some of this water in reservoirs and utilize it to offset some of the SWP water. In years where the supply of water is sufficient, both WRMWSD and TCWD are able to bank (percolate into underground aquifers) some of their excess supplies for future use. At this time, Wheeler Ridge expects to be able to deliver our entire contract water entitlement in any year that the SWP allocations exceed 30% by drawing on its ground water wells and water banking assets. Based on historical records of water availability, we believe we have no material problems with our water supply. However, if SWP allocations are less than 30% of our entitlement in any year, or if shortages continue for a sustained period of several years, then WRMWSD may not be able to deliver 100% of our entitlement and we will have to rely on our own ground water sources, mountain stream runoff, water transfer from other sources, and water banking assets to supply the needs of our farming and development activities. Water from these sources may be more expensive than SWP water because of pumping costs and/or transfer costs. A 15% preliminary SWP water allocation has been made by the California Department of Water Resources, or DWR, for 2024. The current 15% allocation of SWP water will allow us to have sufficient water for our farming needs for the next year.
All SWP water contracts require annual payments related to the fixed and variable costs of the SWP and each water district, whether or not water is used or available. WRMWSD and TCWD contracts also establish a lien on benefited land.
Portions of our property also have available groundwater, which we believe would be sufficient to supply commercial development in the Interstate 5 corridor and support current agricultural operations. Ground water in the Antelope Valley Basin is subject to an adjudication of the water basin that limits groundwater pumping.
The Sustainable Groundwater Management Act, or SGMA, is a sustainable groundwater framework that became effective January 1, 2015. For the water districts in which the Company participates in the San Joaquin Valley, Groundwater Sustainability Plans have been developed and submitted to the DWR for review. Through these plans, it will have to be demonstrated to the satisfaction of the DWR that the groundwater within the basins is sustainably managed by 2040 or 2042. To achieve sustainability, the GSPs could impose limitations on the use of groundwater. The Company's Kern County lands are located in the Kern Subbasin, the White Wolf Subbasin and the Castac Lake Basin. The Kern Subbasin is designated by DWR as a high priority, critically overdrafted basin, and its GSP was required to be submitted to DWR by January of 2020. After their initial submittal to DWR of their GSPs, DWR notified the Groundwater Sustainability Agencies in the Kern Subbasin of deficiencies in their GSPs, which were to be addressed to DWR’s satisfaction by July of 2022. The GSAs met that deadline. Upon evaluation of resubmitted plans, however, DWR determined that the basin is inadequate. DWR has initiated consultation with the State Water Resources Control Board for possible State intervention. The White Wolf Subbasin is designated by DWR as a medium priority, non-critically overdrafted basin, and its GSP was required to be submitted to DWR by January 2022. The Board of Directors of the White Wolf GSA adopted the GSP for the White Wolf Subbasin and submitted it to DWR. In October 2023, DWR announced the approval of the GSP with only four minor correction items to be corrected in the five-year plan update due by 2027. The Castac Basin is a low priority basin, so there is no anticipation at this time of any restriction related to use of groundwater under SGMA. Regardless of any limitations on groundwater use that might result from SGMA, the Company's lands are in relatively good condition because of the diverse inventory of surface water supplies and banked water that the Company has access, to as mentioned above.
There have been many environmental challenges regarding the movement of SWP water through the Sacramento Delta. Operation of the Delta pumps are of primary importance to the California water system, because these pumps are part of the system that moves water from Northern California to Southern California. Biological Opinions, or BiOps, issued by the U.S. Fish and Wildlife Service, or FWS, and National Marine Fisheries Service, or NMFS, in 2008 and 2009 contained restrictions on pumping from the Delta and were challenged in the courts by both water agencies and environmental groups, which challenges were, for the most part unsuccessful. Since then, a number of developments have occurred that affect or potentially affect SWP supplies from the Delta.
One of these developments relates to the Coordinated Operation Agreement, or COA, that DWR and the Bureau of Reclamation, or the Bureau, which operates pumps in the Delta to supply water to its Central Valley Project, or CVP, entered into in 1986. The COA governs the concurrent state and federal pumping operations in the Delta. DWR and the Bureau renegotiated the COA in late 2018 to bring the COA up to date with various physical and legal changes that occurred over the course of thirty years. The renegotiated COA has generally resulted in reduced deliveries to SWP contractors.
Another development is DWR’s plan for construction of a facility to convey water through the Delta in the form of a tunnel system that would divert water at or near the northern end of the Delta and convey the water underground via tunnel for delivery at or near the southern end of the Delta. Originally envisioned as a two-tunnel system known as California WaterFix, that project was rescinded and has been replaced with a proposed downsized single-tunnel system referred to as the Delta Conveyance Project, or DCP. In January of 2020, DWR began the environmental review process for the DCP by issuance of a Notice of Preparation of an EIR under CEQA. DWR circulated the Draft EIR for the DCP and the public comment period on the DEIR closed on December 16, 2022. DWR reviewed the comments received and has approved the Final EIR for DCP. DWR and the SWP Contractors will continue to work on executing amendments to the water supply contracts that provide for addition of the DCP to the SWP. The DCP is intended to increase the amount of water available for delivery across the Delta, particularly in wet years.
A third development is the Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project. This is a process that DWR and the Bureau of Reclamation, or Bureau, jointly requested in 2016 and that resulted in new federal FWS and NMFS Biological Opinions, or BiOps, under Federal Endangered Species Act, or ESA, in 2019. The 2019 BiOps were intended to enhance reliability of water available for pumping out of the Delta based on updated best available science. The State of California and various non-governmental organizations filed a legal challenge to the new BiOps. Shortly after the 2019 BiOps were finalized, the State of California issued an Incidental Take Permit, or ITP, pursuant to the California Endangered Species Act, or CESA, which is generally more restrictive on pumping out of the Delta in comparison to the BiOps. Several SWP Contractors, and others, filed litigation challenging ITP on several grounds, including CEQA and breach of contract. Additionally, the Bureau has reinitiated further consultation relative to the proposed actions in the federal BiOps. An interim operations plan for the Delta has been introduced that would govern Delta operations in the absence of final BiOps, and that plan is also the subject of legal challenges. It is expected that new biological options will be issued in 2024.
Other Activities
TRPFFA is a joint powers authority formed by Kern County and TCWD to finance public infrastructure within the Company’s Kern County developments. TRPFFA has created two Community Facilities Districts, or CFDs, the West CFD and the East CFD. The West CFD has placed liens on 420 acres of the Company’s land to secure payment of special taxes related to $19,540,000 of outstanding bond debt sold by TRPFFA for TRCC-West. The East CFD has placed liens on 1,931 acres of the Company’s land to secure payments of special taxes related to $72,055,000 of outstanding bond debt sold by TRPFFA for TRCC-East. At TRCC-West, the West CFD has no additional bond debt approved for issuance. At TRCC-East, the East CFD has $44,035,000 of additional bond debt authorized by TRPFFA. Proceeds from the sales of these bonds are to reimburse the Company for public infrastructure related to TRCC-East.
We paid $2,775,000 and $2,899,000 in special taxes related to the CFDs in 2023 and 2022, respectively. As development continues to occur at TRCC, new owners of land and new lease tenants, through triple net leases, will bear an increasing portion of the assessed special tax. It is expected that we will have special tax payments in 2024 of $2,803,000, but this could change in the future based on the amount of bonds outstanding within each CFD and the amount of taxes paid by other owners and tenants. The assessment of each individual property sold or leased is not determinable at this time, because it is based on the current tax rate and the assessed value of the property at the time of sale or on its assessed value at the time it is leased to a third-party. Accordingly, the Company is not required to recognize an obligation at December 31, 2023.