Future Earnings Potential
Each Registrant's results of operations are not necessarily indicative of its future earnings potential. The level of the Registrants' future earnings depends on numerous factors that affect the opportunities, challenges, and risks of the Registrants' primary businesses of selling electricity and/or distributing natural gas, as described further herein. The Registrants are unable to predict changes in law, regulations, regulatory guidance, legal interpretations, policy positions, and implementation actions that may result from the presidential administration.
For the traditional electric operating companies, these factors include the ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs during a time of increasing costs, including those related to projected long-term demand growth, stringent environmental standards, including CCR rules, safety, system reliability and resiliency, fuel, restoration following major storms, and capital expenditures, including constructing new electric generating plants, extending the retirement dates of certain fossil fuel plants, and expanding and improving the transmission and distribution systems; continued customer growth; and the trends of an uncertain inflationary environment and reduced electricity usage per customer, especially in residential and commercial markets.
Earnings in the electricity business will also depend upon maintaining and growing sales and pricing of large customers such that incremental costs are met with adequate incremental revenues, considering, among other things, recent trends driving projected growth in electricity consumption including the increasing digitization of the economy and growth in data centers, an increase in industrial activity in the Southern Company system's electric service territory, and continued electrification of transportation. Historically, the traditional electric operating companies have entered into large contracts that support economic development and benefit existing customers; since 2023, the traditional electric operating companies have contracts with new customers covering approximately eight gigawatts of such electric load, with each contract individually representing a maximum annual electric load greater than 100 MWs, that have been signed and/or reviewed by the state regulatory commissions. These new contracts fully ramp up over several years after commencement of service. Some of these contracts are already in effect. Service under the contracts is expected to begin through 2028. The contracts contain various terms and conditions, such as minimum duration, minimum bill provisions, contribution by the customer to local construction costs, termination payment requirements, and financial security, to help ensure adequate incremental revenues associated with incremental cost to serve these customers. These growth opportunities may be affected by a variety of factors, such as energy efficiency, reliability and operational factors, customer demand, and government policies, which could increase or decrease the pace of growth associated with these opportunities. See Note (B) to the Condensed Financial Statements under "Georgia Power – Integrated Resource Plans" for additional information regarding Georgia Power's related regulatory proceedings.
Economic uncertainty and policy uncertainty have increased the volatility of future economic outlooks above historical norms. Significant changes in fiscal, monetary, or trade policies could disrupt anticipated economic outlooks. This uncertainty in economic growth, interest rates, tariffs, and inflation could impact customer demand for energy, access to capital markets, and the cost of doing business. The shifting economic policy variables and weakening of historic relationships among economic activity, prices, and employment have increased the uncertainty of future levels of economic activity, which will directly impact future energy demand and operating costs. Weakening economic activity increases the risk of slowing or declining energy sales. See RESULTS OF OPERATIONS herein for information on energy sales in the Southern Company system's service territory during the first nine months of 2025.
The level of future earnings for Southern Power's competitive wholesale electric business depends on numerous factors including the parameters of the wholesale market and the efficient operation of its wholesale generating assets; Southern Power's ability to execute its growth strategy through the development, construction, or acquisition of generating facilities and other energy projects while containing costs; regulatory matters; customer creditworthiness; total electric generating capacity available in Southern Power's market areas; Southern Power's ability to successfully remarket capacity as current contracts expire; renewable portfolio standards; continued availability of federal and state ITCs and PTCs under current and future tax legislation and U.S. Treasury guidance; transmission constraints; cost of generation from units within the Southern Company power pool; and operational limitations. See MANAGEMENT'S DISCUSSION AND ANALYSIS – FUTURE EARNINGS POTENTIAL – "Income Tax Matters" in Item 7 of the Form 10-K for information regarding the Inflation Reduction Act's expansion of the availability of federal ITCs and PTCs and "Income Tax Matters – Federal Tax Legislation" herein for information regarding the One Big Beautiful Bill Act's (OBBB) restrictions on federal ITCs and PTCs. Also see Note (K) to the Condensed Financial Statements under "Southern Power" herein for information regarding construction projects.
The level of future earnings for Southern Company Gas' primary business of distributing natural gas and its complementary businesses in the gas pipeline investments and gas marketing services sectors depends on numerous factors. These factors include the natural gas distribution utilities' ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs, including those related to projected long-term demand growth, safety, system reliability and resiliency, natural gas, and capital expenditures, including expanding and improving the natural gas distribution systems; the completion and subsequent operation of ongoing infrastructure and other construction projects; customer creditworthiness; and certain policies to limit the use of natural gas, such as the potential in Illinois and across certain other parts of the United States for state or municipal bans on the use of natural gas or policies designed to promote electrification. The volatility of natural gas prices has an impact on Southern Company Gas' customer rates, its long-term competitive position against other energy sources, and the ability of Southern Company Gas' gas marketing services business to capture value from locational and seasonal spreads. Additionally, changes in commodity prices, primarily driven by tight gas supplies, geopolitical events, and diminished gas production, subject a portion of Southern Company Gas' operations to earnings variability and may result in higher natural gas prices. Additional economic factors may contribute to this environment. The demand for natural gas may increase, including from large customers, which may cause natural gas prices to rise and drive higher volatility in the natural gas markets on a longer-term basis. Alternatively, a significant drop in oil and natural gas prices could lead to a consolidation of natural gas producers or reduced levels of natural gas production.
Earnings for both the electricity and natural gas businesses are subject to a variety of other factors. These factors include weather; competition; developing new and maintaining existing energy contracts and associated load requirements with wholesale customers; demand growth in data centers; customer energy conservation practices; the use of alternative energy sources by customers; government incentives to reduce overall energy usage; fuel, labor, and material prices in an environment of heightened inflation and material and labor supply chain disruptions; and the price elasticity of demand. Demand for electricity and natural gas in the Registrants' service territories is primarily driven by the pace of economic growth or decline that may be affected by changes in regional and global economic conditions, which may impact future earnings.
As part of its ongoing effort to adapt to changing market conditions, Southern Company continues to evaluate and consider a wide array of potential business strategies. These strategies may include business combinations, partnerships, joint ventures, and acquisitions involving other utility or non-utility businesses or properties, disposition of, or the sale of interests in, certain assets or businesses, internal restructuring, or some combination thereof. Furthermore, Southern Company may engage in new business ventures that arise from competitive and regulatory changes in the utility industry. Pursuit of any of the above strategies, or any combination thereof, may significantly affect the business operations, risks, and financial condition of Southern Company. In addition, Southern Power and Southern Company Gas regularly consider and evaluate joint development arrangements as well as acquisitions and/or dispositions of businesses and assets as part of their business strategies. See Note 15 to the financial statements in Item 8 of the Form 10-K, Note (K) to the Condensed Financial Statements herein, and "Construction Programs" herein for additional information.
For additional information relating to these issues, see RISK FACTORS in Item 1A and MANAGEMENT'S DISCUSSION AND ANALYSIS – FUTURE EARNINGS POTENTIAL in Item 7 of the Form 10-K.
Environmental Matters
See MANAGEMENT'S DISCUSSION AND ANALYSIS– FUTURE EARNINGS POTENTIAL– "Environmental Matters" and – FINANCIAL CONDITION AND LIQUIDITY– "Cash Requirements" in Item 7 and Note 3 to the financial statements under "Environmental Remediation" and Note 6 to the financial statements in Item 8 of the Form 10-K, as well as Note (C) to the Condensed Financial Statements under "General Litigation Matters" and "Environmental Remediation" herein, for additional information.
Environmental Laws and Regulations
Air Quality
On March 12, 2025, the EPA announced its intent to reconsider the 2015 Ozone National Ambient Air Quality Standards (NAAQS) Good Neighbor federal implementation plan (FIP) and to work with states on state implementation plans (SIPs).
On March 25, 2025, the U.S. Court of Appeals for the Fifth Circuit vacated and remanded the EPA's disapproval of the Mississippi SIP. The decision protects the State of Mississippi from the requirements of the FIP unless or until the EPA properly disapproves Mississippi's SIP.
On April 14, 2025, the U.S. Court of Appeals for the D.C. Circuit granted the EPA's motion to hold in abeyance the FIP litigation.
On June 18, 2025, the U.S. Supreme Court issued an opinion holding that the proper venue for reviewing SIP disapprovals are regional appellate courts instead of the U.S. Court of Appeals for the D.C. Circuit.
The ultimate impact of the FIP and associated legal matters cannot be determined at this time; however, implementation of the stayed FIP would likely result in increased compliance costs for the traditional electric operating companies.
Water Quality
On March 12, 2025, the EPA announced its intent to reconsider the standards finalized in the 2024 ELG Rule, including the new technology-based ELGs for leachate. On August 28, 2025, the U.S. Court of Appeals for the Eighth Circuit granted the EPA's most recent request to continue to hold the 2024 ELG Rule litigation in abeyance pending rulemaking. The EPA stated in its motion that it anticipates issuing a final rule extending certain 2024 ELG Rule compliance deadlines by the end of 2025 and also that it will issue a second more substantive rulemaking at which time it anticipates that some or all of the petitioners may decide not to continue with this litigation. On October 2, 2025, the EPA published a proposed rule and companion direct final rule to extend certain 2024 ELG Rule compliance deadlines. The ultimate impact of the 2024 ELG Rule and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.
Alabama Power has indicated plans to retire Plant Barry Unit 5 (700 MWs) by December 31, 2028. Alabama Power continues with plans to comply with the 2020 ELG rule by permanently ceasing coal combustion at Plant Barry Unit 5 by December 31, 2028. However, the need to operate Plant Barry Unit 5 on natural gas beyond that date remains under consideration. The ultimate outcome of this matter cannot be determined at this time.
Alabama Power, as agent for SEGCO, initially indicated plans to retire Plant Gaston Units 1 through 4 (1,000 MWs) by December 31, 2028. However, upon further analysis, Alabama Power, in conjunction with Georgia Power, now expects to operate Plant Gaston Units 1 through 4 through December 31, 2034. On September 17, 2025, Alabama Power submitted an Automatic Transfer Notice of Planned Participation (NOPP) authorizing compliance with the 2020 ELG rule generally applicable limits for bottom ash transport water for Plant Gaston Units 1 through 4 by December 31, 2025.
On July 15, 2025, the Georgia PSC approved Georgia Power's request in the 2025 IRP to extend the operation of Plant Scherer Unit 3 (614 MWs based on 75% ownership) through at least December 31, 2035 and Plant Gaston Units 1 through 4 (500 MWs based on 50% ownership through SEGCO) through December 31, 2034. In addition, the approved 2025 IRP assumes operation of Plant Bowen Units 1 and 2 (1,400 MWs) through at least December 31, 2035 and does not impact the scrubber wastewater compliance strategy for Plant Bowen as the scrubber wastewater system is a common environmental control for all four generating units. Georgia Power expects to submit a NOPP indicating plans to pursue compliance with the 2020 ELG rule for Plant Scherer Unit 3 through the voluntary incentive program by December 31, 2028.
Coal Combustion Residuals
On March 12, 2025, the EPA announced its intent to undertake several regulatory actions related to the CCR Rule, including reviewing the 2024 Legacy Rule and evaluating whether to grant short- and long-term relief, such as extending compliance deadlines. On August 14, 2025, the U.S. Court of Appeals for the D.C. Circuit granted the EPA's most recent motion regarding litigation over the 2024 Legacy Rule, requesting further abeyance until December 15, 2025.
On July 22, 2025, the EPA published a direct final rule and companion proposed rule extending certain deadlines for compliance for owners and operators of CCR management units. On September 4, 2025, the EPA withdrew the direct final rule. The ultimate impact of any final rule and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.
Based on compliance requirements for closure and monitoring of CCR units pursuant to state and federal CCR rules, the traditional electric operating companies have periodically updated, and expect to continue periodically updating, their related cost estimates and ARO liabilities for each CCR unit as additional information related to compliance monitoring, closure methodologies and strategies, schedules, and/or costs becomes available. Some of these updates have been, and future updates may be, material. The cost estimates for Alabama Power are based on closure-in-place for all surface impoundments. The cost estimates for Georgia Power and Mississippi Power are based on a combination of closure-in-place for some surface impoundments and closure by removal for others. Additionally, the closure designs and plans in the States of Alabama and Georgia are subject to approval by environmental regulatory agencies. Absent continued recovery of ARO costs through regulated rates, results of operations, cash flows, and financial condition for Southern Company and the traditional electric operating companies could be materially impacted.
Greenhouse Gases
On April 25, 2025, the U.S. Court of Appeals for the D.C. Circuit granted the EPA's most recent motion requesting a continuing abeyance of the litigation over the 2024 GHG Rules. The EPA states in its motion that the agency will issue a proposed reconsideration rule in spring 2025 and a final reconsideration rule by December 2025. On June 17, 2025, the EPA published a proposed rule that, if finalized, would repeal all or a portion of the 2024 GHG Rules. The proposed rule includes a primary proposal and an alternative proposal. Under the primary proposal, the EPA would repeal all emissions standards promulgated under Section 111 of the Clean Air Act based on a finding that fossil fuel-fired power plants do not contribute significantly to dangerous air pollution. Under the alternative proposal, the EPA would repeal all of the emissions guidelines for existing fossil fuel-fired steam generating units as well as the carbon capture and storage requirement for new base load stationary combustion turbines. The ultimate impact of the final rules and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.
In 2009, the EPA finalized its determination that concentration of certain GHGs in the atmosphere represent a danger to public health and welfare, and such endangerment finding is a prerequisite for regulation of GHG emissions from electric generating units. On March 21, 2025, the EPA announced its intent to ask for public comment on its reconsideration of this endangerment finding. On July 29, 2025, the EPA released a proposed rule to repeal the 2009 endangerment finding with regard to motor vehicles. In the proposal, the EPA acknowledged that other Clean Air Act rulemakings, including those for electric generating units, have partially relied on the 2009 endangerment finding, and the EPA said it would address any overlapping issues in separate rulemakings. The ultimate impact of this proposal cannot be determined at this time.
Regulatory Matters
See Note 2 to the financial statements in Item 8 of the Form 10-K, OVERVIEW – "Recent Developments" herein, and Note (B) to the Condensed Financial Statements herein for a discussion of regulatory matters related to Alabama Power, Georgia Power, Mississippi Power, and Southern Company Gas, including items that could impact the applicable Registrants' future earnings, cash flows, and/or financial condition.
Construction Programs
The Southern Company system strategy continues to include developing and constructing new electric generating and battery energy storage facilities, expanding and improving the electric transmission and electric and natural gas distribution systems, and undertaking projects to comply with environmental laws and regulations.
The traditional electric operating companies are engaged in continuous construction programs to accommodate existing and estimated future loads on their respective systems. Major generation construction projects are subject to state PSC approval in order to be included in retail rates, through which the traditional electric operating companies recover their investment and a return. See Note 2 to the financial statements under "Georgia Power – Integrated Resource Plans" in Item 8 of the Form 10-K and Note (B) to the Condensed Financial Statements under "Georgia Power – Integrated Resource Plans" and " – Other Construction" herein for information regarding Georgia Power's future and current construction projects.
Alabama Power executed an agreement to build a battery energy storage facility at the former Plant Gorgas site in Walker County, Alabama. The new Gorgas battery facility is designed to have the capacity to store up to 150 MWs of electricity generated by other Alabama Power resources. Construction is expected to begin in the fourth quarter 2025, with estimated completion by 2027.
Southern Power's construction program includes the Millers Branch solar project and the Kay Wind, Grant Plains, Grant Wind, and Wake Wind repowering projects. The repowering projects result in accelerated depreciation related to the equipment being replaced that will continue until the commercial operation dates of the projects, which are projected to occur between the third quarter 2026 and the second quarter 2027. At September 30, 2025, the remaining pre-tax accelerated depreciation, net of noncontrolling interest impacts, is projected to total approximately $100 million in 2025, $320 million in 2026, and $25 million in 2027. The ultimate outcome of this matter cannot be determined at this time. See Note (K) to the Condensed Financial Statements under "Southern Power" herein for information relating to Southern Power's construction of renewable energy facilities.
Southern Company Gas is engaged in various infrastructure improvement programs designed to update or expand the natural gas distribution systems of the natural gas distribution utilities to improve reliability and resiliency, reduce emissions, and meet operational flexibility and growth. The natural gas distribution utilities recover their investment and a return associated with these infrastructure programs through their regulated rates, as approved by their applicable state regulatory agency. See Note 2 to the financial statements in Item 8 of the Form 10-K for additional information on Southern Company Gas' construction program.
See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements" herein for additional information regarding the Registrants' capital requirements for their construction programs.
Income Tax Matters
See Note (G) to the Condensed Financial Statements herein and MANAGEMENT'S DISCUSSION AND ANALYSIS – FUTURE EARNINGS POTENTIAL – "Income Tax Matters" in Item 7 of the Form 10-K for additional information.
Federal Tax Legislation
The OBBB was signed into law on July 4, 2025. It extends many of the Tax Cuts and Jobs Act's provisions that were set to expire and makes some of them permanent. The OBBB includes major changes to tax incentives for renewable energy projects. The legislation restricts the ITCs and PTCs for solar and wind power projects, which were originally set to run through 2032. Such projects must now either begin construction by July 2026 or be fully operational by the end of 2027 in order to claim the applicable tax credits. Nuclear, hydropower, and geothermal energy projects maintain tax credits under the new law. Battery energy storage projects retain their full tax credit through 2033, with a gradual phase-out by 2036. The OBBB adds new restrictions for tax credits for renewable facilities that are owned or influenced by a prohibited foreign entity or receive material assistance from a prohibited foreign entity. Pursuant to an executive order, the U.S. Treasury issued a notice on August 15, 2025, making changes to the start-of-construction guidance for wind and solar projects that begin construction after September 1, 2025. The Southern Company system is implementing the guidance in its plans for future renewable projects. Additionally, the IRS is expected to issue significant guidance on the tax provisions in the OBBB. The Southern Company system is still assessing and will continue to monitor the impacts of the OBBB. The ultimate outcome of this legislation cannot be determined at this time.
Corporate Alternative Minimum Tax
On June 2, 2025 and September 30, 2025, the U.S. Treasury and the IRS issued guidance on the application of the CAMT. Southern Company has filed its consolidated 2024 federal income tax return and determined it was not subject to CAMT. Southern Company is still assessing the issued guidance and is not expecting to be subject to CAMT for the 2025 tax year. The ultimate outcome of this legislation cannot be determined at this time.
Natural Gas Safe Harbor Method
In April 2023, the IRS issued Revenue Procedure 2023-15, which provides a safe harbor tax method of accounting that taxpayers may use to determine whether certain expenditures to maintain, repair, replace, or improve natural gas transmission and distribution property must be capitalized or allowed as repair deductions. The revenue procedure allows multiple alternatives for implementation. In April 2024, the IRS issued Revenue Procedure 2024-23, which gives additional implementation guidance on the natural gas safe harbor tax method of accounting for qualifying repair deductions. Southern Company and Southern Company Gas submitted a tax accounting method change for qualifying expenditures with the filing of its consolidated 2024 federal income tax return. The new tax method of accounting resulted in a material net positive cash flow for Southern Company Gas. This method change did not have an impact on the net income of Southern Company or Southern Company Gas.
Zero-Emission Nuclear Power Production Tax Credit
Alabama Power and Georgia Power have nuclear generating facilities that qualify for Internal Revenue Code §45U PTCs for the 2024 tax year. The base credit amounts are $75 million, $36 million, and $39 million for Southern Company, Alabama Power, and Georgia Power, respectively, which have been recorded as a regulatory liability. Additionally, each company claimed the prevailing wage multiplier on its consolidated 2024 federal income tax return, for a total credit claimed of $373 million, $180 million, and $193 million for Southern Company, Alabama Power, and Georgia Power, respectively. Southern Company has not received a full acceptance letter from the IRS. The §45U PTC is available for tax years 2024 to 2032 and is subject to a phase-out. As such, Southern Company, Alabama Power, and Georgia Power will each evaluate annually whether it qualifies for the credit. The ultimate outcome of this matter cannot be determined at this time. See Note (B) to the Condensed Financial Statements under "Alabama Power – Nuclear Production Tax Credits Order" and "Georgia Power –2022 ARP" and Note (G) to the Condensed Financial Statements under "Unrecognized Tax Benefits" herein for additional information.
Georgia State Tax Legislation
On April 15, 2025, the State of Georgia enacted tax legislation that reduced the corporate income tax rate from 5.39% to 5.19% effective for the 2025 tax year. This legislation reduced the amount of Southern Company's and certain subsidiaries' income tax expense in the State of Georgia and existing state net accumulated deferred tax liabilities, increased regulatory liabilities at Georgia Power and Southern Company Gas, and reduces Georgia Power's ability to utilize certain state tax credits in the State of Georgia. The legislation did not have a material impact on the net income of the applicable Registrants in 2025.
General Litigation and Other Matters
The Registrants are involved in various matters being litigated and/or regulatory and other matters that could affect future earnings, cash flows, and/or financial condition. The ultimate outcome of such pending or potential litigation against each Registrant and any subsidiaries or regulatory and other matters cannot be determined at this time; however, for current proceedings and/or matters not specifically reported herein or in Notes (B) and (C) to the Condensed Financial Statements herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings and/or matters would have a material effect on such Registrant's financial statements. See Notes (B) and (C) to the Condensed Financial Statements for a discussion of various contingencies, including matters being litigated, regulatory matters, and other matters which may affect future earnings potential.