Future Earnings Potential

General

Prices for electric service provided by the traditional electric operating companies and natural gas distribution service provided by the natural gas distribution utilities to retail customers are set by state PSCs or other applicable state regulatory agencies under cost-based regulatory principles. Retail rates and earnings are reviewed through various regulatory mechanisms and/or processes and may be adjusted periodically within certain limitations. Effectively operating pursuant to these regulatory mechanisms and/or processes and appropriately balancing required costs and capital expenditures with customer prices will continue to challenge the traditional electric operating companies and the natural gas distribution utilities for the foreseeable future. Prices for wholesale electricity sales, interconnecting transmission lines, and the exchange of electric power are regulated by the FERC. Southern Power continues to focus on long-term PPAs. See ACCOUNTING POLICIES – "Application of Critical Accounting Policies and Estimates – Utility Regulation" herein and Note 2 to the financial statements for additional information about regulatory matters.

Each Registrant's results of operations are not necessarily indicative of its future earnings potential. The level of the Registrants' future earnings depends on numerous factors that affect the opportunities, challenges, and risks of the Registrants' primary businesses of selling electricity and/or distributing natural gas, as described further herein. The Registrants are unable to predict changes in law, regulations, regulatory guidance, legal interpretations, policy positions, and implementation actions that may result from the change in presidential administrations.

For the traditional electric operating companies, these factors include the ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs during a time of increasing costs, including those related to projected long-term demand growth, stringent environmental standards, including CCR rules, safety, system reliability and resiliency, fuel, restoration following major storms, and capital expenditures, including constructing new electric generating plants, extending the retirement dates of certain fossil fuel plants, and expanding and improving the transmission and distribution systems; continued customer growth; and the trends of an uncertain inflationary environment and reduced electricity usage per customer, especially in residential and commercial markets.

Earnings in the electricity business will also depend upon maintaining and growing sales and pricing of large customers such that incremental costs are met with adequate incremental revenues, considering, among other things, recent trends driving projected growth in electricity consumption including the increasing digitization of the economy and growth in data centers, an increase in industrial activity in the Southern Company system's electric service territory, and continued electrification of transportation. These projected growth opportunities could be offset by energy efficiency trends in each market.

Global and U.S. economic conditions continue to be affected by higher-than-expected inflation that arose from the COVID-19 pandemic and associated policy responses of governments and central banks. In response to elevated inflation levels, the U.S. Federal Reserve raised interest rates faster than any rate increase cycle in the last 40 years, which have helped to slow the rate of inflation and curtail economic activity. In 2024, the U.S. Federal Reserve began cutting policy rates as inflation began to approach the 2% target level. Uncertainty remains as to whether the rate reductions will continue in 2025 as potential fiscal policy changes could influence inflation levels, progress to the 2% target, and subsequent policy rate decisions. This uncertainty in economic growth, interest rates, tariffs, and inflation could impact customer demand for energy and the cost of doing business. The shifting economic policy variables and weakening of historic relationships among economic activity, prices, and employment have increased the uncertainty of future levels of economic activity, which will directly impact future energy demand and operating costs. Weakening economic activity increases the risk of slowing or declining energy sales. See RESULTS OF OPERATIONS herein for information on energy sales in the Southern Company system's service territory during 2024.

The level of future earnings for Southern Power's competitive wholesale electric business depends on numerous factors including the parameters of the wholesale market and the efficient operation of its wholesale generating assets; Southern Power's ability to execute its growth strategy through the development, construction, or acquisition of renewable facilities and other energy projects while containing costs; regulatory matters; customer creditworthiness; total electric generating capacity available in Southern Power's market areas; Southern Power's ability to successfully remarket capacity as current contracts expire; renewable portfolio standards; continued availability of federal and state ITCs and PTCs, which could be impacted by future tax legislation; transmission constraints; cost of generation from units within the Southern Company power pool; and operational limitations. See

II-36

"Income Tax Matters" herein for information regarding the IRA's expansion of the availability of federal ITCs and PTCs. Also see Notes 10 and 15 to the financial statements for additional information.

The level of future earnings for Southern Company Gas' primary business of distributing natural gas and its complementary businesses in the gas pipeline investments and gas marketing services sectors depends on numerous factors. These factors include the natural gas distribution utilities' ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs, including those related to projected long-term demand growth, safety, system reliability and resiliency, natural gas, and capital expenditures, including expanding and improving the natural gas distribution systems; the completion and subsequent operation of ongoing infrastructure and other construction projects; customer creditworthiness; and certain policies to limit the use of natural gas, such as the potential in Illinois and across certain other parts of the United States for state or municipal bans on the use of natural gas or policies designed to promote electrification. The volatility of natural gas prices has an impact on Southern Company Gas' customer rates, its long-term competitive position against other energy sources, and the ability of Southern Company Gas' gas marketing services business to capture value from locational and seasonal spreads. Additionally, changes in commodity prices, primarily driven by tight gas supplies, geopolitical events, and diminished gas production, subject a portion of Southern Company Gas' operations to earnings variability and may result in higher natural gas prices. Additional economic factors may contribute to this environment. The demand for natural gas may increase, which may cause natural gas prices to rise and drive higher volatility in the natural gas markets on a longer-term basis. Alternatively, a significant drop in oil and natural gas prices could lead to a consolidation of natural gas producers or reduced levels of natural gas production.

Earnings for both the electricity and natural gas businesses are subject to a variety of other factors. These factors include weather; competition; developing new and maintaining existing energy contracts and associated load requirements with wholesale customers; demand growth in data centers; customer energy conservation practices; the use of alternative energy sources by customers; government incentives to reduce overall energy usage; fuel, labor, and material prices in an environment of heightened inflation and material and labor supply chain disruptions; and the price elasticity of demand. Demand for electricity and natural gas in the Registrants' service territories is primarily driven by the pace of economic growth or decline that may be affected by changes in regional and global economic conditions, which may impact future earnings.

Mississippi Power provides service under long-term contracts with rural electric cooperative associations and a municipality located in southeastern Mississippi under requirements cost-based electric tariffs which are subject to regulation by the FERC. The contracts with these wholesale customers represented 13.9% of Mississippi Power's total operating revenues in 2024. See Note 2 to the financial statements under "Mississippi Power – Municipal and Rural Associations Tariff" for information on a rate settlement related to Mississippi Power's contract with Cooperative Energy through the end of 2035, subject to approval by the FERC.

As part of its ongoing effort to adapt to changing market conditions, Southern Company continues to evaluate and consider a wide array of potential business strategies. These strategies may include business combinations, partnerships, and acquisitions involving other utility or non-utility businesses or properties, disposition of, or the sale of interests in, certain assets or businesses, internal restructuring, or some combination thereof. Furthermore, Southern Company may engage in new business ventures that arise from competitive and regulatory changes in the utility industry. Pursuit of any of the above strategies, or any combination thereof, may significantly affect the business operations, risks, and financial condition of Southern Company. In addition, Southern Power and Southern Company Gas regularly consider and evaluate joint development arrangements as well as acquisitions and dispositions of businesses and assets as part of their business strategies. See Note 15 to the financial statements and "Construction Programs" herein for additional information.

Environmental Matters

The Southern Company system's operations are regulated by state and federal environmental agencies through a variety of laws and regulations governing air, water, land, avian and other wildlife and habitat protection, and other natural resources. The Southern Company system maintains comprehensive environmental compliance and GHG strategies to assess both current and upcoming requirements and compliance costs associated with these environmental laws and regulations. New or revised environmental laws and regulations could further affect many areas of operations for the Subsidiary Registrants. The costs required to comply with environmental laws and regulations and to achieve stated goals, including capital expenditures, operations and maintenance costs, and costs reflected in ARO liabilities, may impact future electric generating unit retirement and replacement decisions (which are generally subject to approval from the traditional electric operating companies' respective state PSCs), results of operations, cash flows, and/or financial condition. Related costs may result from the installation of additional environmental controls, closure and monitoring of CCR facilities, unit extensions or retirements and replacements, or changing fuel sources for certain existing units, as well as related upgrades to the Southern Company system's transmission and distribution (electric and natural gas) systems. A major portion of these costs is expected to be recovered through retail and wholesale rates, including existing ratemaking and billing provisions. The ultimate impact of environmental laws and regulations and the GHG goals discussed herein cannot be determined at this time and will depend on various factors, such as state adoption and

II-37 implementation of requirements, the availability and cost of any deployed technology, fuel prices, the outcome of pending and/or future legal challenges and regulatory matters, and the ability to continue recovering the related costs, through rates for the traditional electric operating companies and the natural gas distribution utilities and/or through long-term wholesale agreements for the traditional electric operating companies and Southern Power.

Alabama Power and Mississippi Power recover environmental compliance costs through separate mechanisms, Rate CNP Compliance and the ECO Plan, respectively. Georgia Power's base rates include an ECCR tariff that allows for the recovery of environmental compliance costs. The natural gas distribution utilities of Southern Company Gas generally recover environmental remediation expenditures through rate mechanisms approved by their applicable state regulatory agencies. See Notes 2 and 3 to the financial statements for additional information.

Southern Power's PPAs generally contain provisions that permit charging the counterparty for some of the new costs incurred as a result of changes in environmental laws and regulations. Since Southern Power's units are generally newer natural gas and renewable generating facilities, costs associated with environmental compliance for these facilities have been less significant than for similarly situated coal or older natural gas generating facilities. Environmental, natural resource, and land use concerns, including the applicability of air quality limitations, the potential presence of wetlands or threatened and endangered species, the availability of water withdrawal rights, uncertainties regarding impacts such as increased light or noise, and concerns about potential adverse health impacts can, however, increase the cost of siting and/or operating any type of existing or future facility. The impact of such laws, regulations, and other considerations on Southern Power and subsequent recovery through PPA provisions cannot be determined at this time.

Further, increased costs that are recovered through regulated rates could contribute to reduced demand for electricity and natural gas, which could negatively affect results of operations, cash flows, and/or financial condition. Additionally, many commercial and industrial customers may also be affected by existing and future environmental requirements, which may have the potential to affect their demand for electricity and natural gas.

Although the timing, requirements, and estimated costs could change materially as environmental laws and regulations are adopted or modified, as compliance plans are revised or updated, and as legal challenges to rules are initiated or completed, estimated capital expenditures through 2029 based on the current environmental compliance strategy for the Southern Company system and the traditional electric operating companies are as follows:

20252026202720282029Total
(in millions)
Southern Company$236$523$357$494$218$1,828
Alabama Power6711011521770579
Georgia Power1583962222661381,180
Mississippi Power111720101068

These estimates do not include compliance costs associated with regulation of GHG emissions. See "Environmental Laws and Regulations – Greenhouse Gases" herein for additional information. The Southern Company system also anticipates substantial expenditures associated with surface impoundment closure and groundwater monitoring under the CCR Rule and related state rules, which are reflected in the applicable Registrants' ARO liabilities. See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements" herein and Note 6 to the financial statements for additional information.

Environmental Laws and Regulations

Air Quality

Since 1990, the Southern Company system reduced SO 2 and NOX air emissions by 99% and 92%, respectively, through 2023. Since 2005, the Southern Company system reduced mercury air emissions by 97% through 2023.

In February 2023, the EPA published a final rule disapproving 19 state implementation plans (SIPs), including SIPs submitted by the States of Alabama and Mississippi, under the interstate transport (good neighbor) provisions of the Clean Air Act for the 2015 Ozone National Ambient Air Quality Standards (NAAQS). In March 2023, the State of Mississippi and Mississippi Power challenged the EPA's disapproval of the Mississippi SIP in the U.S. Court of Appeals for the Fifth Circuit. In June 2023, the U.S. Court of Appeals for the Fifth Circuit stayed the EPA's disapproval of the Mississippi SIP, pending appeal. In April 2023, the State of Alabama, Alabama Power, and PowerSouth Energy Cooperative challenged the EPA's disapproval of the Alabama SIP in the U.S. Court of Appeals for the Eleventh Circuit. In August 2023, the U.S. Court of Appeals for the Eleventh Circuit stayed the EPA's disapproval of the Alabama SIP, pending appeal. On October 21, 2024, the U.S. Supreme Court issued an order granting review of a decision by the U.S. Court of Appeals for the Tenth Circuit transferring challenges to the EPA's disapproval of

II-38

Oklahoma's and Utah's interstate transport SIPs to the U.S. Court of Appeals for the D.C. Circuit. On October 24, 2024, the U.S. Court of Appeals for the Eleventh Circuit placed the Alabama SIP disapproval case in abeyance pending the U.S. Supreme Court's decision on the venue issue.

In June 2023, the EPA published the 2015 Ozone NAAQS Good Neighbor federal implementation plan (FIP), which requires reductions in NOX emissions from sources in 23 states, including Alabama and Mississippi, to assure those states satisfy their Clean Air Act good neighbor obligations for the 2015 Ozone NAAQS. Georgia and North Carolina have approved interstate transport SIPs addressing the 2015 Ozone NAAQS and are not subject to this rule. In June 2023, the State of Mississippi and Mississippi Power challenged the FIP for Mississippi in the U.S. Court of Appeals for the Fifth Circuit. In August 2023, the State of Alabama, Alabama Power, and PowerSouth Energy Cooperative challenged the FIP for Alabama in the U.S. Court of Appeals for the Eleventh Circuit. Both cases are being held in abeyance pending resolution of the Mississippi SIP disapproval and Alabama SIP disapproval cases, respectively. On June 27, 2024, the U.S. Supreme Court stayed the FIP pending the disposition of petitions for review of the FIP in the U.S. Court of Appeals for the D.C. Circuit and any petition for writ of certiorari to the U.S. Supreme Court. On September 12, 2024, the U.S. Court of Appeals for the D.C. Circuit granted the EPA's motion for partial voluntary remand of the FIP to address the administrative record deficiencies preliminarily identified by the U.S. Supreme Court. On December 10, 2024, the EPA published its supplemental response to comments on the FIP which addresses the administrative record deficiencies. On February 6, 2025, the EPA filed a motion in the U.S. Court of Appeals for the D.C. Circuit requesting a 60-day abeyance of the FIP challenges so that the new Trump Administration can determine how to proceed with the litigation.

In July and September 2023, the EPA published an Interim Final Rule and an updated Interim Final Rule that stays the implementation of the FIPs for states with judicially stayed SIP disapprovals, including Mississippi and Alabama, respectively. The Interim Final Rule revises the existing regulations to maintain currently applicable trading programs for those states.

The ultimate impact of the rule and associated legal matters cannot be determined at this time; however, implementation of the stayed FIPs may result in increased compliance costs.

Water Quality

In 2020, the EPA published the final steam electric ELG reconsideration rule (2020 ELG Rule), a reconsideration of the 2015 ELG rule's limits on bottom ash transport water and flue gas desulfurization wastewater that extended the latest applicability date for both discharges to December 31, 2025. The 2020 ELG Rule also updated the voluntary incentive program (VIP) and provided new subcategories for low utilization electric generating units and electric generating units that will permanently cease coal combustion by 2028. On May 9, 2024, the EPA published the final rule revising the Steam Effluent Guidelines (2024 ELG Rule), which establishes more stringent limits for flue gas desulfurization wastewater, bottom ash transport water, and combustion residual leachate to be met no later than December 31, 2029. The 2024 ELG Rule maintains the existing rule's permanent cessation of coal subcategory and the existing rule's VIP and adds a new cessation subcategory which allows units to cease coal combustion by December 31, 2034 as opposed to meeting the new more stringent requirements. The 2024 ELG Rule also establishes limitations for legacy wastewater which became effective on July 8, 2024. Numerous groups and states filed petitions for review challenging the rule in multiple federal circuit courts, and, on June 14, 2024, the challenges were consolidated in the U.S. Court of Appeals for the Eighth Circuit. On July 26, 2024, industry and state petitioners filed a motion to stay the rule pending judicial review, which was denied on October 10, 2024. The ultimate impact of the 2024 ELG Rule and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.

As required by the 2020 ELG Rule, in 2021, Alabama Power and Georgia Power each submitted initial notices of planned participation (NOPP) for applicable units seeking to qualify for these cessation of coal combustion or VIP subcategories that require compliance by December 31, 2028.

Alabama Power submitted its NOPP to the Alabama Department of Environmental Management (ADEM) indicating plans to retire Plant Barry Unit 5 (700 MWs) and to cease using coal and begin operating solely on natural gas at Plant Barry Unit 4 (350 MWs) and Plant Gaston Unit 5 (880 MWs). Alabama Power, as agent for SEGCO, indicated plans to retire Plant Gaston Units 1 through 4 (1,000 MWs). However, Alabama Power, in conjunction with Georgia Power, is evaluating extending the operation of Plant Gaston Units 1 through 4 beyond the indicated retirement date. The NOPP submittals are subject to the review of the ADEM. Plant Barry Unit 4 ceased using coal and began to operate solely on natural gas in December 2022. See Notes 2 and 7 to the financial statements under "Georgia Power – Integrated Resource Plans" and "SEGCO," respectively, for additional information.

The remaining assets for which Alabama Power has indicated retirement, due to early closure or repowering of the unit to natural gas, have net book values totaling approximately $944 million (excluding capitalized asset retirement costs which are recovered through Rate CNP Compliance) at December 31, 2024. Based on an Alabama PSC order, Alabama Power is authorized to establish a regulatory asset to record the unrecovered investment costs, including the plant asset balance and the site removal and closure costs, associated with unit retirements caused by environmental regulations (Environmental Accounting Order). Under the

II-39

Environmental Accounting Order, the regulatory asset would be amortized and recovered over an affected unit's remaining useful life, as established prior to the decision regarding early retirement, through Rate CNP Compliance. See Note 2 to the financial statements under "Alabama Power – Rate CNP Compliance" and " – Environmental Accounting Order" for additional information.

Georgia Power submitted its NOPP to the Georgia Environmental Protection Division (EPD) indicating plans to retire Plant Wansley Units 1 and 2 (926 MWs based on 53.5% ownership), which occurred in August 2022, Plant Bowen Units 1 and 2 (1,400 MWs), and Plant Scherer Unit 3 (614 MWs based on 75% ownership) on or before the compliance date of December 31, 2028. Georgia Power also submitted a NOPP indicating plans to pursue compliance with the 2020 ELG Rule for Plant Scherer Units 1 and 2 (137 MWs based on 8.4% ownership) through the VIP by no later than December 31, 2028. Georgia Power intends to comply with the ELG rules for Plant Bowen Units 3 and 4 through the generally applicable requirements by December 31, 2025; therefore, no NOPP submission was required for these units. The NOPP submittals and generally applicable requirements are subject to the review of the Georgia EPD and decisions related to retirement or continued operation of units are subject to Georgia PSC approval.

On January 31, 2025, Georgia Power filed its 2025 IRP, which includes a request to extend the operation of Plant Scherer Unit 3 through at least December 31, 2035 and Plant Gaston Units 1 through 4 (500 MWs based on 50% ownership through SEGCO) through at least December 31, 2034. As in the 2023 IRP Update as well as the 2025 IRP, Plant Bowen Units 1 and 2 were also assumed to operate through at least the end of 2035. See Notes 2 and 7 to the financial statements under "Georgia Power – Integrated Resource Plans" and "SEGCO," respectively, for additional information.

Coal Combustion Residuals

In 2015, the EPA finalized non-hazardous solid waste regulations for the management and disposal of CCR, including coal ash and gypsum, in landfills and surface impoundments at active electric generating power plants. The CCR Rule requires landfills and surface impoundments to be evaluated against a set of performance criteria and potentially closed if certain criteria are not met. Closure of existing landfills and surface impoundments requires installation of equipment and infrastructure to manage CCR in accordance with the CCR Rule. In addition to the federal CCR Rule, the States of Alabama and Georgia finalized state regulations regarding the management and disposal of CCR within their respective states. In 2019, the State of Georgia received partial approval from the EPA for its state CCR permitting program, which has broader applicability than the federal rule. The State of Mississippi has not developed a state CCR permit program.

On June 7, 2024, the EPA published a final determination to deny the ADEM's CCR permit program. Alabama Power's permits to close its CCR facilities remain valid under state law. In the absence of an EPA-approved state permit program, CCR facilities in Alabama will remain subject to both the federal and state CCR rules. The ultimate impact of this action cannot be determined at this time; however, it may result in significant compliance costs.

The Holistic Approach to Closure: Part A rule, finalized in 2020, revised the deadline to stop sending CCR and non-CCR wastes to unlined surface impoundments to April 11, 2021 and established a process for the EPA to approve extensions to the deadline. The traditional electric operating companies stopped sending CCR and non-CCR wastes to their unlined surface impoundments prior to April 11, 2021 and, therefore, did not submit requests for extensions. Beginning in January 2022, the EPA issued numerous Part A determinations that state its current positions on a variety of CCR Rule compliance requirements, such as criteria for groundwater corrective action and CCR unit closure. The traditional electric operating companies are working with state regulatory agencies to determine whether the EPA's current positions may impact closure and groundwater monitoring plans.

In April 2022, the Utilities Solid Waste Activities Group and a group of generating facility operators filed petitions for review in the U.S. Court of Appeals for the D.C. Circuit challenging whether the EPA's January 2022 actions establish new legislative rules that should have gone through notice-and-comment rulemaking. On June 28, 2024, the U.S. Court of Appeals for the D.C. Circuit issued a decision dismissing the challenges to the EPA's January 2022 actions and interpretations related to the closure performance standards in the 2015 CCR rule. The ultimate impact of this decision and the EPA's current positions cannot be determined at this time; however, it may result in significant compliance costs.

On May 8, 2024, the EPA published the final legacy CCR surface impoundments rule which regulates two new categories of federally regulated CCR, legacy surface impoundments and CCR management units (CCRMUs). The rule requires legacy surface impoundments and CCRMUs to meet certain existing regulatory requirements, including a requirement to initiate closure within 42 months after the effective date of the final rule for legacy surface impoundments and within 54 months after the effective date of the final rule for CCRMUs. The final rule also includes an option to defer closure of previously closed units where certain criteria have been met. The final rule also includes enhanced reporting requirements. The EPA is also finalizing an alternative provision for closure by removal that will allow certifying completion of closure of a unit while conducting groundwater monitoring and corrective action during post-closure care. Numerous industry groups, electric generators, and states filed petitions for review challenging the rule in the U.S. Court of Appeals for the D.C. Circuit. On August 19, 2024, an industry petitioner filed

II-40 a motion seeking to stay the legacy CCR rule pending judicial review, which was denied by the U.S. Court of Appeals for the D.C. Circuit on November 1, 2024. On November 5, 2024, the industry petitioner filed an emergency stay application with the U.S. Supreme Court, which was denied on December 11, 2024. On February 13, 2025, the U.S. Court of Appeals for the D.C. Circuit placed the legacy CCR rule challenges in abeyance for 120 days so that the new Trump Administration can determine how to proceed with the litigation. The ultimate impact of the final rule and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.

Based on requirements for closure and monitoring of landfills and surface impoundments pursuant to the CCR Rule and applicable state rules, the traditional electric operating companies have periodically updated, and expect to continue periodically updating, their related cost estimates and ARO liabilities for each CCR unit as additional information related to compliance monitoring, closure methodologies and strategies, schedules, and/or costs becomes available. Some of these updates have been, and future updates may be, material. Additionally, the closure designs and plans in the States of Alabama and Georgia are subject to approval by environmental regulatory agencies. Absent continued recovery of ARO costs through regulated rates, results of operations, cash flows, and financial condition for Southern Company and the traditional electric operating companies could be materially impacted. See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements" herein, Notes 2 and 3 to the financial statements under "Georgia Power – Rate Plans" and "General Litigation Matters – Alabama Power," respectively, and Note 6 to the financial statements for additional information.

Greenhouse Gases

On May 9, 2024, the EPA published the final GHG rules for existing fossil fuel-fired steam electric generating units and new fossil fuel-fired combustion turbines and combined cycle generation facilities, which requires GHG limits for subcategories of both new and existing units. The new rules do not include standards for existing fossil fuel-fired combustion turbines and combined cycle generation facilities, which have been deferred to a future rulemaking. Requirements for existing coal-fired units are based on technologies such as carbon capture and sequestration (CCS) and natural gas co-firing. States have 24 months after the rule's publication to submit state plans for existing units. The rule allows states to consider remaining useful life and other factors to specify alternative, unit-specific emissions limits and compliance timelines for existing units, as needed to address reliability and other concerns. Existing source compliance will begin as early as January 1, 2030, depending on the subcategory. The final rule incorporates some limited reliability mechanisms including a provision for short-term grid emergencies and a "reliability assurance mechanism" that allows for a one-time, up to one year, extension of existing coal unit retirement dates specified in an approved state plan. The standards for new combustion turbines and combined cycles include subcategories for low, intermediate, and base load operations. Compliance with new source standards begins when the unit comes online, with requirements for CCS beginning on January 1, 2032. The EPA also simultaneously repealed the Affordable Clean Energy rule. Numerous industry groups, electric generators, and states have filed petitions for review challenging the rule in the U.S. Court of Appeals for the D.C. Circuit. A total of eight stay motions were filed seeking a stay of the rule pending judicial review, which were denied by the U.S. Court of Appeals for the D.C. Circuit on July 19, 2024. On February 5, 2025, the EPA filed a motion in the U.S. Court of Appeals for the D.C. Circuit requesting a 60-day abeyance of the challenges so that the new Trump Administration can determine how to proceed with the litigation. On October 16, 2024, the U.S. Supreme Court denied emergency stay applications filed by numerous industry groups, electric generators, and states. The ultimate impact of the final rules and associated legal matters cannot be determined at this time; however, it may result in significant compliance costs.

In 2021, the United States officially rejoined the Paris Agreement. The Paris Agreement establishes a non-binding universal framework for addressing GHG emissions based on nationally determined emissions reduction contributions and sets in place a process for tracking progress towards the goals every five years. On January 20, 2025, President Trump issued an executive order directing the United States to withdraw from the Paris Agreement and revoke commitments made by the United States under the United Nations Framework Convention on Climate Change.

Additional GHG policies, including legislation, may emerge in the future requiring the United States to accelerate its transition to a lower GHG emitting economy; however, associated impacts are currently unknown. The Southern Company system has transitioned from an electric generating mix of 70% coal, 15% natural gas, and 14% nuclear in 2007 to a mix of 18% coal, 52% natural gas, and 20% nuclear in 2024. This transition has been supported in part by the Southern Company system retiring over 6,700 MWs of coal-fired generating capacity since 2010 and converting 3,700 MWs of generating capacity from coal to natural gas since 2015, as well as the addition of over 1,100 MWs of nuclear generating capacity (based on Georgia Power's ownership interest in Plant Vogtle Units 3 and 4) since 2023. In addition, the Southern Company system's capacity mix consists of over 12,500 MWs of renewable and storage facilities through ownership (including 100% of the nameplate capacity of Southern Power's facilities owned with partners) and long-term PPAs. See "Environmental Laws and Regulations – Water Quality" herein for information on plans to retire or convert to natural gas additional coal-fired generating capacity. In addition, Southern Company Gas has replaced over 6,000 miles of pipe material that was more prone to fugitive emissions (unprotected steel and

II-41 cast-iron pipe), resulting in mitigation of more than 3.3 million metric tons of CO 2 equivalents from its natural gas distribution system since 1998.

The following table provides the Registrants' 2023 and preliminary 2024 Scope 1 GHG emissions based on equity share of facilities:

2023Preliminary 2024
(in million metric tons of CO2 equivalent)
Southern Company(*)7979
Alabama Power2830
Georgia Power2424
Mississippi Power99
Southern Power1312
Southern Company Gas(*)22

(*)Includes GHG emissions attributable to disposed assets through the date of the applicable disposition. See Note 15 to the financial statements for additional information.

Southern Company system management has established an intermediate goal of a 50% reduction in GHG emissions from 2007 levels by 2030 and a long-term goal of net zero GHG emissions by 2050. Based on the preliminary 2024 emissions, the Southern Company system has achieved an estimated GHG emission reduction of 49% since 2007. Although electric generation increased, GHG emissions remained flat in 2024 when compared to 2023 due to an increase in lower carbon generation, including from Plant Vogtle Units 3 and 4, as discussed further under RESULTS OF OPERATIONS – "Southern Company – Electricity Business" herein. While none of Southern Company's subsidiaries are currently subject to renewable portfolio standards or similar requirements, management of the traditional electric operating companies is working with applicable regulators through their IRP processes to continue the generating fleet transition in a manner responsible to customers, communities, employees, and other stakeholders. The natural gas distribution utilities also engage in long-term planning processes in accordance with their state regulatory processes and are investing in programs and efforts to reduce GHG emissions associated with the delivery and use of natural gas, such as advanced leak detection and repair and renewable natural gas. Achievement of these goals is dependent on various factors, many of which the Southern Company system does not control, including load growth across the Southern Company system's service territory, energy policy and regulations, natural gas prices, and the pace and extent of development and deployment of low- to no-GHG energy technologies and negative carbon concepts. Southern Company system management plans to continue to economically transition the Southern Company system's generating fleet through a diverse portfolio of resources including low-carbon and carbon-free resources; making the necessary related investments in transmission and distribution systems; continuing to implement effective energy efficiency and demand response programs; customer demand for carbon-free energy; implementing initiatives to reduce natural gas distribution emissions; continuing research and development with a focus on technologies that lower GHG emissions, including methods of removing carbon from the atmosphere; and constructively engaging with policymakers, regulators, investors, customers, and other stakeholders to support outcomes leading to a net zero future. There is no guarantee that the Southern Company system will achieve these goals.

Environmental Remediation

The Southern Company system must comply with environmental laws and regulations governing the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and Southern Company Gas conduct studies to determine the extent of any required cleanup and have recognized the estimated costs to clean up known impacted sites in their financial statements. Amounts for cleanup and ongoing monitoring costs were not material for any year presented. The traditional electric operating companies and the natural gas distribution utilities in Illinois and Georgia (which represent substantially all of Southern Company Gas' accrued remediation costs) have all received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental remediation costs through regulatory mechanisms. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies. The traditional electric operating companies and Southern Company Gas may be liable for some or all required cleanup costs for additional sites that may require environmental remediation. See Note 3 to the financial statements under "Environmental Remediation" for additional information.

II-42

Regulatory Matters

See OVERVIEW – "Recent Developments" herein and Note 2 to the financial statements for a discussion of regulatory matters related to Alabama Power, Georgia Power, Mississippi Power, and Southern Company Gas, including items that could impact the applicable Registrants' future earnings, cash flows, and/or financial condition.

Construction Programs

The Southern Company system strategy continues to include developing and constructing new electric generating facilities, expanding and improving the electric transmission and electric and natural gas distribution systems, and undertaking projects to comply with environmental laws and regulations.

The traditional electric operating companies are engaged in continuous construction programs to accommodate existing and estimated future loads on their respective systems. Major generation construction projects are subject to state PSC approval in order to be included in retail rates. See Note 2 to the financial statements under "Georgia Power – Integrated Resource Plans" for information regarding Georgia Power's construction of three simple cycle combustion turbines at Plant Yates and additional capacity through its 2022 IRP and 2023 IRP Update sought through RFPs.

Southern Power's construction program includes the Millers Branch solar project and the Kay Wind repowering project. The Kay Wind repowering project results in accelerated depreciation related to the equipment being replaced that will continue until commercial operation of the project, which is projected to occur in the third quarter 2026. Pre-tax accelerated depreciation, net of noncontrolling interest impacts, is projected to total approximately $100 million in 2025 and $40 million in 2026. See Note 15 to the financial statements under "Southern Power" for information relating to Southern Power's construction of renewable energy facilities.

Southern Company Gas is engaged in various infrastructure improvement programs designed to update or expand the natural gas distribution systems of the natural gas distribution utilities to improve reliability and resiliency, reduce emissions, and meet operational flexibility and growth. The natural gas distribution utilities recover their investment and a return associated with these infrastructure programs through their regulated rates. See Note 2 to the financial statements under "Southern Company Gas – Infrastructure Replacement Programs and Capital Projects" for additional information on Southern Company Gas' construction program.

SNG is developing an approximately $3 billion proposed pipeline project, designed to meet customer demand by increasing SNG's existing pipeline capacity by approximately 1.3 billion cubic feet per day. Subject to the satisfaction or waiver of various conditions, including the receipt of all required approvals by regulators, including the FERC, the operator of the joint venture anticipates the project will be completed in 2029. Southern Company Gas' share of the total project costs would be 50%. The ultimate outcome of this matter cannot be determined at this time. See Note 7 to the financial statements under "Southern Company Gas" for additional information on SNG.

See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements – Capital Expenditures" herein for additional information regarding the Registrants' capital requirements for their construction programs, including estimated totals for each of the next five years.

Southern Power's Power Sales Agreements

General

Southern Power has PPAs with certain of the traditional electric operating companies, other investor-owned utilities, IPPs, municipalities, electric cooperatives, and other load-serving entities, as well as commercial and industrial customers. The PPAs are expected to provide Southern Power with a stable source of revenue during their respective terms.

Many of Southern Power's PPAs have provisions that require Southern Power or the counterparty to post collateral or an acceptable substitute guarantee if (i) S&P, Fitch, or Moody's downgrades the credit ratings of the respective company to an unacceptable credit rating, (ii) the counterparty is not rated, or (iii) the counterparty fails to maintain a minimum coverage ratio. See FINANCIAL CONDITION AND LIQUIDITY – "Credit Rating Risk" herein for additional information.

Southern Power works to maintain and expand its share of the wholesale market. During 2024, Southern Power continued to be successful in remarketing up to 1,014 MWs of annual natural gas and solar generation capacity to load-serving entities through several PPAs extending over the next 16 years. Market demand is being driven by load-serving entities replacing expired purchase contracts and/or retired generation, as well as planning for future growth.

II-43

Southern Power's electricity sales from natural gas facilities are primarily through long-term PPAs that consist of two types of agreements. The first type, referred to as a unit or block sale, is a customer purchase from a dedicated generating unit where all or a portion of the generation from that unit is reserved for that customer. Southern Power typically has the ability to serve the unit or block sale customer from an alternate resource. The second type, referred to as requirements service, provides that Southern Power serve the customer's capacity and energy requirements from a combination of the customer's own generating units and from Southern Power resources not dedicated to serve unit or block sales. Southern Power has rights to purchase power provided by the requirements customers' resources when economically viable.

As a general matter, substantially all of the PPAs provide that the purchasers are responsible for either procuring the fuel (tolling agreements) or reimbursing Southern Power for substantially all of the cost of fuel or purchased power relating to the energy delivered under such PPAs. To the extent a particular generating facility does not meet the operational requirements contemplated in the PPAs, Southern Power may be responsible for excess fuel costs. With respect to fuel transportation risk, most of Southern Power's PPAs provide that the counterparties are responsible for the availability of fuel transportation to the particular generating facility.

Capacity charges that form part of the PPA payments are designed to recover fixed and variable operation and maintenance costs based on dollars-per-kilowatt year. In general, to reduce Southern Power's exposure to certain operation and maintenance costs, Southern Power has LTSAs. See Note 1 to the financial statements under "Long-Term Service Agreements" for additional information.

Solar and Wind

Southern Power's electricity sales from solar and wind generating facilities are also primarily through long-term PPAs; however, these PPAs do not have a capacity charge and customers either purchase the energy output of a dedicated renewable facility through an energy charge or provide Southern Power a certain fixed price for the electricity sold to the grid. As a result, Southern Power's ability to recover fixed and variable operations and maintenance expenses is dependent upon the level of energy generated from these facilities, which can be impacted by weather conditions, equipment performance, transmission constraints, and other factors. Generally, under the renewable generation PPAs, the purchasing party retains the right to keep or resell the associated renewable energy credits.

Income Tax Matters

Consolidated Income Taxes

The impact of certain tax events at Southern Company and/or its other subsidiaries can, and does, affect each Registrant's ability to utilize certain tax credits. See "Tax Credits" and ACCOUNTING POLICIES – "Application of Critical Accounting Policies and Estimates – Accounting for Income Taxes" herein and Note 10 to the financial statements for additional information.

Tax Credits

Southern Company receives ITCs and PTCs in connection with investments in solar, wind, fuel cell, advanced nuclear, hydroelectric, and battery energy storage facilities primarily at Southern Power, Georgia Power, and Alabama Power.

Southern Power's ITCs relate to its investment in new solar facilities and battery energy storage facilities (co-located with existing solar facilities) that are acquired or constructed and its PTCs relate to the first 10 years of energy production from its wind and solar facilities, which have had, and may continue to have, a material impact on Southern Power's cash flows and net income. At December 31, 2024, Southern Company and Southern Power had approximately $765 million and $384 million, respectively, of unutilized federal ITCs and PTCs, which are currently projected to be fully utilized by 2028 but could be further delayed. Since 2018, Southern Power has utilized tax equity partnerships for certain wind, solar, and battery energy storage projects, where the tax equity partner takes significantly all of the respective federal tax benefits. These tax equity partnerships are consolidated in Southern Company's and Southern Power's financial statements using the HLBV methodology to allocate partnership gains and losses.

In the third quarter 2023 and the second quarter 2024, Georgia Power started generating advanced nuclear PTCs for Plant Vogtle Units 3 and 4, respectively, beginning on each unit's respective in-service date. PTCs are recognized as an income tax benefit based on KWH production. In addition, pursuant to the Vogtle Joint Ownership Agreements (as defined in Note 2 to the financial statements under "Georgia Power – Nuclear Construction – Cost and Schedule"), Georgia Power is purchasing advanced nuclear PTCs for Plant Vogtle Units 3 and 4 from the other Vogtle Owners. The gain recognized on the purchase of the joint owner PTCs is recognized as an income tax benefit. See Note 2 to the financial statements under "Georgia Power – Nuclear Construction" for additional information regarding Plant Vogtle Units 3 and 4.

II-44

See Note 1 to the financial statements under "General" for additional information on the HLBV methodology and Note 1 to the financial statements under "Income Taxes" and Note 10 to the financial statements under "Deferred Tax Assets and Liabilities – Tax Credit Carryforwards" and "Effective Tax Rate" for additional information regarding utilization and amortization of credits and the tax benefit related to associated basis differences.

Inflation Reduction Act

In 2022, the IRA was signed into law. The IRA extends, expands, and increases ITCs and PTCs for clean energy projects, allows PTCs for solar projects, adds ITCs for stand-alone energy storage projects with an option to elect out of the tax normalization requirement, and allows for the transferability of the tax credits. The IRA extends and increases the tax credits for CCS projects and adds tax credits for clean hydrogen and nuclear projects. Additional ITC and PTC amounts are available if the projects meet domestic content requirements or are located in low-income or energy communities. The IRA also enacted a 15% CAMT on book income, with material adjustments for pension costs and tax depreciation. The 15% CAMT on book income can be reduced by tax credits.

For solar projects placed in service in 2022 through 2032, the IRA provides for a 30% ITC and an option to claim a PTC instead of an ITC. Starting in 2023 and through 2032, the IRA provides for a 30% ITC for stand-alone energy storage projects. For wind projects placed in service in 2022 through 2032, the IRA provides for a 100% PTC, adjusted for inflation annually. For projects placed in service before 2022, the 2024 PTC rate is 2.9 cents per KWH. For projects placed in service in 2022 and later, the 2024 PTC rate is 3 cents per KWH. The same PTC rate applies for solar projects for which the PTC option has been elected. To realize the full value of ITCs and PTCs, the IRA requires satisfaction of prevailing wage and apprenticeship requirements.

In April 2024, the IRS issued final regulations related to the transfer of tax credits. In 2024, Alabama Power, Georgia Power, and Southern Power entered into purchase and sale agreements with non-affiliated parties to sell ITCs and PTCs at a discount to the generated credit value in 2024, 2025, and 2026. The discount will be recorded as a reduction in tax credits recognized in the financial statements. The Southern Company system continues to explore the ability to efficiently monetize tax credits through third-party transferability agreements. See Note 10 to the financial statements for additional information.

Alabama Power and Georgia Power have nuclear generating facilities that may qualify to generate and claim PTCs under the IRA beginning in 2024.

On September 12, 2024, the U.S. Treasury Department and the IRS issued a notice of proposed regulations that would address the application of the CAMT. Southern Company is evaluating the proposed regulations and is subject to the CAMT for the 2024 tax year, primarily driven by tax deductions for Georgia Power's storm restoration costs and the natural gas safe harbor tax accounting method change, based on interpretations of the early CAMT guidance. The CAMT will primarily be satisfied by tax credits for the 2024 tax year. The CAMT impacts operating cash flows of certain Registrants but will not impact the Registrants' net income. See Note 2 to the financial statements under "Georgia Power – Storm Damage Recovery" for additional information on Georgia Power's storm restoration costs. Also see "Natural Gas Safe Harbor Method" herein and Note 10 to the financial statements for additional information.

Implementation of the IRA provisions related to existing nuclear generating facilities and CAMT is subject to the issuance of additional guidance by the U.S. Treasury Department and the IRS. The Registrants are still evaluating the impacts, and the ultimate outcome of this matter cannot be determined at this time.

Georgia State Tax Legislation

On April 18, 2024, the State of Georgia enacted tax legislation that reduced the corporate income tax rate from 5.75% to 5.39% effective for the 2024 tax year. This legislation reduced the amount of Southern Company's and certain subsidiaries' income tax expense in the State of Georgia and existing state net accumulated deferred tax liabilities, increased regulatory liabilities at Georgia Power and Southern Company Gas, and reduces Georgia Power's ability to utilize certain state tax credits in the State of Georgia. The legislation did not have a material impact on the net income of the applicable Registrants.

Natural Gas Safe Harbor Method

In April 2023, the IRS issued Revenue Procedure 2023-15, which provides a safe harbor tax method of accounting that taxpayers may use to determine whether certain expenditures to maintain, repair, replace, or improve natural gas transmission and distribution property must be capitalized or allowed as repair deductions. The revenue procedure allows multiple alternatives for implementation which will result in a tax accounting method change for Southern Company Gas' eligible expenditures. On April 30, 2024, the IRS issued Revenue Procedure 2024-23, which gives additional implementation guidance on the natural gas safe harbor tax method of accounting for qualifying repair deductions. Southern Company and Southern Company Gas intend to submit a tax accounting method change for qualifying expenditures with the filing of the 2024 federal income tax return. The new tax method of accounting is expected to result in a material net positive cash flow for Southern Company Gas; however, the

II-45 timing of this positive cash flow will be delayed by application of the CAMT. This method change will not have an impact on the net income of Southern Company and Southern Company Gas. See Note 10 to the financial statements under "Deferred Tax Assets and Liabilities – Tax Credit Carryforwards" for additional information.

General Litigation and Other Matters

The Registrants are involved in various matters being litigated and/or regulatory and other matters that could affect future earnings, cash flows, and/or financial condition. The ultimate outcome of such pending or potential litigation against each Registrant and any subsidiaries or regulatory and other matters cannot be determined at this time; however, for current proceedings and/or matters not specifically reported herein or in Notes 2 and 3 to the financial statements, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings and/or matters would have a material effect on such Registrant's financial statements. See Notes 2 and 3 to the financial statements for a discussion of various contingencies, including matters being litigated, regulatory matters, and other matters which may affect future earnings potential.