Future Earnings Potential
General
Prices for electric service provided by the traditional electric operating companies and natural gas distribution service provided by the natural gas distribution utilities to retail customers are set by state PSCs or other applicable state regulatory agencies under cost-based regulatory principles. Retail rates and earnings are reviewed through various regulatory mechanisms and/or processes and may be adjusted periodically within certain limitations. Effectively operating pursuant to these regulatory mechanisms and/or processes and appropriately balancing required costs and capital expenditures with customer prices will continue to challenge the traditional electric operating companies and natural gas distribution utilities for the foreseeable future. Prices for wholesale electricity sales, interconnecting transmission lines, and the exchange of electric power are regulated by the FERC. Southern Power continues to focus on long-term PPAs. See ACCOUNTING POLICIES – "Application of Critical Accounting Policies and Estimates – Utility Regulation" herein and Note 2 to the financial statements for additional information about regulatory matters.
Each Registrant's results of operations are not necessarily indicative of its future earnings potential. The level of the Registrants' future earnings depends on numerous factors that affect the opportunities, challenges, and risks of the Registrants' primary businesses of selling electricity and/or distributing natural gas, as described further herein.
For the traditional electric operating companies, these factors include the ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs during a time of increasing costs, including those related to projected long-term demand growth, stringent environmental standards, including CCR rules, safety, system reliability and resiliency, fuel, restoration following major storms, and capital expenditures, including constructing new electric generating plants and expanding and improving the transmission and distribution systems; continued customer growth; and the trends of higher inflation and reduced electricity usage per customer, especially in residential and commercial markets. For Georgia Power, other major factors are completing construction and start-up of Plant Vogtle Unit 4 and meeting the related cost and schedule projections.
Earnings in the electricity business will also depend upon maintaining and growing sales, considering, among other things, the adoption and/or penetration rates of increasingly energy-efficient technologies and increasing volumes of electronic commerce transactions, which could contribute to a net reduction in customer usage.
Global and U.S. economic conditions continue to be affected by higher-than-expected inflation that arose from the COVID-19 pandemic and associated policy responses of governments and central banks. In response to elevated inflation levels, the U.S. Federal Reserve raised interest rates faster than any rate increase cycle in the last 40 years. The actions by the U.S. Federal Reserve have helped to slow the rate of inflation and curtail economic activity. Although target levels of inflation have yet to be achieved, the U.S. Federal Reserve has indicated its current intention to pause future rate increases and evaluate rate cuts in the near term. The shifting economic policy variables and weakening of historic relationships among economic activity, prices, and employment have increased the uncertainty of future levels of economic activity, which will directly impact future energy demand and operating costs. Weakening economic activity increases the risk of slowing or declining energy sales. See RESULTS OF OPERATIONS herein for information on energy sales in the Southern Company system's service territory during 2023.
II-39
The level of future earnings for Southern Power's competitive wholesale electric business depends on numerous factors including the parameters of the wholesale market and the efficient operation of its wholesale generating assets; Southern Power's ability to execute its growth strategy through the development, construction, or acquisition of renewable facilities and other energy projects while containing costs; regulatory matters; customer creditworthiness; total electric generating capacity available in Southern Power's market areas; Southern Power's ability to successfully remarket capacity as current contracts expire; renewable portfolio standards; continued availability of federal and state ITCs and PTCs, which could be impacted by future tax legislation; transmission constraints; cost of generation from units within the Southern Company power pool; and operational limitations. See "Income Tax Matters" herein for information regarding the IRA's expansion of the availability of federal ITCs and PTCs. Also see Notes 10 and 15 to the financial statements for additional information.
The level of future earnings for Southern Company Gas' primary business of distributing natural gas and its complementary businesses in the gas pipeline investments and gas marketing services sectors depends on numerous factors. These factors include the natural gas distribution utilities' ability to maintain constructive regulatory environments that allow for the timely recovery of prudently-incurred costs, including those related to projected long-term demand growth, safety, system reliability and resiliency, natural gas, and capital expenditures, including expanding and improving the natural gas distribution systems; the completion and subsequent operation of ongoing infrastructure and other construction projects; customer creditworthiness; and certain policies to limit the use of natural gas, such as the potential in Illinois and across certain other parts of the U.S. for state or municipal bans on the use of natural gas or policies designed to promote electrification. The volatility of natural gas prices has an impact on Southern Company Gas' customer rates, its long-term competitive position against other energy sources, and the ability of Southern Company Gas' gas marketing services business to capture value from locational and seasonal spreads. Additionally, changes in commodity prices, primarily driven by tight gas supplies, geopolitical events, and diminished gas production, subject a portion of Southern Company Gas' operations to earnings variability and may result in higher natural gas prices. Additional economic factors may contribute to this environment. The demand for natural gas may increase, which may cause natural gas prices to rise and drive higher volatility in the natural gas markets on a longer-term basis. Alternatively, a significant drop in oil and natural gas prices could lead to a consolidation of natural gas producers or reduced levels of natural gas production.
Earnings for both the electricity and natural gas businesses are subject to a variety of other factors. These factors include weather; competition; developing new and maintaining existing energy contracts and associated load requirements with wholesale customers; customer energy conservation practices; the use of alternative energy sources by customers; government incentives to reduce overall energy usage; fuel, labor, and material prices in an environment of heightened inflation and material and labor supply chain disruptions; and the price elasticity of demand. Demand for electricity and natural gas in the Registrants' service territories is primarily driven by the pace of economic growth or decline that may be affected by changes in regional and global economic conditions, which may impact future earnings.
Mississippi Power provides service under long-term contracts with rural electric cooperative associations and a municipality located in southeastern Mississippi under requirements cost-based electric tariffs which are subject to regulation by the FERC. The contracts with these wholesale customers represented 14.0% of Mississippi Power's total operating revenues in 2023.
As part of its ongoing effort to adapt to changing market conditions, Southern Company continues to evaluate and consider a wide array of potential business strategies. These strategies may include business combinations, partnerships, and acquisitions involving other utility or non-utility businesses or properties, disposition of, or the sale of interests in, certain assets or businesses, internal restructuring, or some combination thereof. Furthermore, Southern Company may engage in new business ventures that arise from competitive and regulatory changes in the utility industry. Pursuit of any of the above strategies, or any combination thereof, may significantly affect the business operations, risks, and financial condition of Southern Company. In addition, Southern Power and Southern Company Gas regularly consider and evaluate joint development arrangements as well as acquisitions and dispositions of businesses and assets as part of their business strategies. See Note 15 to the financial statements for additional information.
Environmental Matters
The Southern Company system's operations are regulated by state and federal environmental agencies through a variety of laws and regulations governing air, water, land, avian and other wildlife and habitat protection, and other natural resources. The Southern Company system maintains comprehensive environmental compliance and GHG strategies to assess both current and upcoming requirements and compliance costs associated with these environmental laws and regulations. New or revised environmental laws and regulations could further affect many areas of operations for the Subsidiary Registrants. The costs required to comply with environmental laws and regulations and to achieve stated goals, including capital expenditures, operations and maintenance costs, and costs reflected in ARO liabilities, may impact future electric generating unit retirement and replacement decisions (which are generally subject to approval from the traditional electric operating companies' respective state PSCs), results of operations, cash flows, and/or financial condition. Related costs may result from the installation of additional environmental controls, closure and monitoring of CCR facilities, unit retirements, or changing fuel sources for certain existing
II-40 units, as well as related upgrades to the Southern Company system's transmission and distribution (electric and natural gas) systems. A major portion of these costs is expected to be recovered through retail and wholesale rates, including existing ratemaking and billing provisions. The ultimate impact of environmental laws and regulations and the GHG goals discussed herein cannot be determined at this time and will depend on various factors, such as state adoption and implementation of requirements, the availability and cost of any deployed technology, fuel prices, the outcome of pending and/or future legal challenges and regulatory matters, and the ability to continue recovering the related costs, through rates for the traditional electric operating companies and the natural gas distribution utilities and/or through long-term wholesale agreements for the traditional electric operating companies and Southern Power.
Alabama Power and Mississippi Power recover environmental compliance costs through separate mechanisms, Rate CNP Compliance and the ECO Plan, respectively. Georgia Power's base rates include an ECCR tariff that allows for the recovery of environmental compliance costs. The natural gas distribution utilities of Southern Company Gas generally recover environmental remediation expenditures through rate mechanisms approved by their applicable state regulatory agencies. See Notes 2 and 3 to the financial statements for additional information.
Southern Power's PPAs generally contain provisions that permit charging the counterparty for some of the new costs incurred as a result of changes in environmental laws and regulations. Since Southern Power's units are generally newer natural gas and renewable generating facilities, costs associated with environmental compliance for these facilities have been less significant than for similarly situated coal or older natural gas generating facilities. Environmental, natural resource, and land use concerns, including the applicability of air quality limitations, the potential presence of wetlands or threatened and endangered species, the availability of water withdrawal rights, uncertainties regarding impacts such as increased light or noise, and concerns about potential adverse health impacts can, however, increase the cost of siting and/or operating any type of existing or future facility. The impact of such laws, regulations, and other considerations on Southern Power and subsequent recovery through PPA provisions cannot be determined at this time.
Further, increased costs that are recovered through regulated rates could contribute to reduced demand for electricity and natural gas, which could negatively affect results of operations, cash flows, and/or financial condition. Additionally, many commercial and industrial customers may also be affected by existing and future environmental requirements, which may have the potential to affect their demand for electricity and natural gas.
Although the timing, requirements, and estimated costs could change as environmental laws and regulations are adopted or modified, as compliance plans are revised or updated, and as legal challenges to rules are initiated or completed, estimated capital expenditures through 2028 based on the current environmental compliance strategy for the Southern Company system and the traditional electric operating companies are as follows:
| 2024 | 2025 | 2026 | 2027 | 2028 | Total | |
|---|---|---|---|---|---|---|
| (in millions) | ||||||
| Southern Company | $150 | $141 | $112 | $92 | $30 | $525 |
| Alabama Power | 45 | 47 | 40 | 35 | 19 | 186 |
| Georgia Power | 92 | 80 | 60 | 32 | 10 | 274 |
| Mississippi Power | 13 | 13 | 12 | 26 | 1 | 65 |
These estimates do not include compliance costs associated with potential regulation of GHG emissions or the proposed ELG Supplemental Rule. See "Environmental Laws and Regulations – Greenhouse Gases" and " – Water Quality" herein for additional information. The Southern Company system also anticipates substantial expenditures associated with ash pond closure and groundwater monitoring under the CCR Rule and related state rules, which are reflected in the applicable Registrants' ARO liabilities. See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements" herein and Note 6 to the financial statements for additional information.
Environmental Laws and Regulations
Air Quality
Since 1990, the Southern Company system reduced SO 2 and NOX air emissions by 99% and 92%, respectively, through 2022. Since 2005, the Southern Company system reduced mercury air emissions by 97% through 2022.
On February 13, 2023, the EPA published a final rule disapproving 19 state implementation plans (SIPs), including the States of Alabama and Mississippi, under the interstate transport (good neighbor) provisions of the Clean Air Act for the 2015 Ozone National Ambient Air Quality Standards (NAAQS). On March 14, 2023 and March 15, 2023, the State of Mississippi and Mississippi Power, respectively, challenged the EPA's disapproval of the Mississippi SIP in the U.S. Court of Appeals for the
II-41
Fifth Circuit. On June 8, 2023, the U.S. Court of Appeals for the Fifth Circuit stayed the EPA's disapproval of the Mississippi SIP, pending appeal. On April 13, 2023 and April 14, 2023, the State of Alabama, Alabama Power, and PowerSouth Energy Cooperative challenged the EPA's disapproval of the Alabama SIP in the U.S. Court of Appeals for the Eleventh Circuit. On August 17, 2023, the U.S. Court of Appeals for the Eleventh Circuit stayed the EPA's disapproval of the Alabama SIP, pending appeal.
On June 5, 2023, the EPA published the 2015 Ozone NAAQS Good Neighbor federal implementation plan (FIP), which requires reductions in NOX emissions from sources in 23 states, including Alabama and Mississippi, to assure those states satisfy their Clean Air Act good neighbor obligations for the 2015 Ozone NAAQS. Georgia and North Carolina have approved interstate transport SIPs addressing the 2015 Ozone NAAQS and are not subject to this rule. On June 16, 2023 and June 27, 2023, the State of Mississippi and Mississippi Power, respectively, challenged the FIP for Mississippi in the U.S. Court of Appeals for the Fifth Circuit. On August 4, 2023, the State of Alabama, Alabama Power, and PowerSouth Energy Cooperative challenged the FIP for Alabama in the U.S. Court of Appeals for the Eleventh Circuit. Both cases are being held in abeyance pending resolution of the Mississippi SIP disapproval and Alabama SIP disapproval cases, respectively.
In July and September 2023, the EPA published an Interim Final Rule and an updated Interim Final Rule that stays the implementation of the FIPs for states with judicially stayed SIP disapprovals, including Mississippi and Alabama, respectively. The Interim Final Rule revises the existing regulations to maintain currently applicable trading programs for those states.
The ultimate impact of the rule and associated legal matters cannot be determined at this time; however, implementation of the FIPs will likely result in increased compliance costs for the traditional electric operating companies.
Water Quality
In 2020, the EPA published the final steam electric ELG reconsideration rule (ELG Reconsideration Rule), a reconsideration of the 2015 ELG rule's limits on bottom ash transport water and flue gas desulfurization wastewater that extended the latest applicability date for both discharges to December 31, 2025. The ELG Reconsideration Rule also updated the voluntary incentive program and provided new subcategories for low utilization electric generating units and electric generating units that will permanently cease coal combustion by 2028. On March 29, 2023, the EPA published a proposed ELG Supplemental Rule revising certain effluent limits of the 2020 and 2015 ELG rules. The proposal imposes more stringent requirements for flue gas desulfurization wastewater, bottom ash transport water, and combustion residual leachate to be met no later than December 31, 2029. The EPA is also proposing that a limited number of facilities already achieving compliance with the 2020 ELG Reconsideration Rule be allowed to elect retirement or repowering by December 31, 2032 as opposed to meeting the new more stringent requirements. The proposal maintains the 2020 ELG Reconsideration Rule's permanent cessation of coal combustion subcategory allowing units to continue to operate until the end of 2028 without having to install additional technologies. The proposal also maintains the Voluntary Incentive Program (VIP) subcategory, which allows units to comply with VIP limits by December 31, 2028. A final rule is anticipated in 2024. The ultimate impact of this proposal cannot be determined at this time; however, it may result in significant compliance costs.
As required by the ELG Reconsideration Rule, in 2021, Alabama Power and Georgia Power each submitted initial notices of planned participation (NOPP) for applicable units seeking to qualify for these cessation of coal combustion or VIP subcategories that require compliance by December 31, 2028.
Alabama Power submitted its NOPP to the Alabama Department of Environmental Management (ADEM) indicating plans to retire Plant Barry Unit 5 (700 MWs) and to cease using coal and begin operating solely on natural gas at Plant Barry Unit 4 (350 MWs) and Plant Gaston Unit 5 (880 MWs). Alabama Power, as agent for SEGCO, indicated plans to retire Plant Gaston Units 1 through 4 (1,000 MWs). However, Alabama Power, in conjunction with Georgia Power, is evaluating extending the operation of Plant Gaston Units 1 through 4 beyond the indicated retirement date. The NOPP submittals are subject to the review of the ADEM. Plant Barry Unit 4 ceased using coal and began to operate solely on natural gas in December 2022. See Notes 2 and 7 to the financial statements under "Georgia Power – Integrated Resource Plans" and "SEGCO," respectively, for additional information.
The remaining assets for which Alabama Power has indicated retirement, due to early closure or repowering of the unit to natural gas, have net book values totaling approximately $1.2 billion (excluding capitalized asset retirement costs which are recovered through Rate CNP Compliance) at December 31, 2023. Based on an Alabama PSC order, Alabama Power is authorized to establish a regulatory asset to record the unrecovered investment costs, including the plant asset balance and the site removal and closure costs, associated with unit retirements caused by environmental regulations (Environmental Accounting Order). Under the Environmental Accounting Order, the regulatory asset would be amortized and recovered over an affected unit's remaining useful life, as established prior to the decision regarding early retirement, through Rate CNP Compliance. See Note 2 to the financial statements under "Alabama Power – Rate CNP Compliance" and " – Environmental Accounting Order" for additional information.
II-42
Georgia Power submitted its NOPP to the Georgia Environmental Protection Division (EPD) indicating plans to retire Plant Wansley Units 1 and 2 (926 MWs based on 53.5% ownership), which occurred in August 2022, Plant Bowen Units 1 and 2 (1,400 MWs), and Plant Scherer Unit 3 (614 MWs based on 75% ownership) on or before the compliance date of December 31, 2028. Georgia Power also submitted a NOPP indicating plans to pursue compliance with the ELG Reconsideration Rule for Plant Scherer Units 1 and 2 (137 MWs based on 8.4% ownership) through the voluntary incentive program by no later than December 31, 2028. Georgia Power intends to comply with the ELG Rules for Plant Bowen Units 3 and 4 through the generally applicable requirements by December 31, 2025; therefore, no NOPP submission was required for these units. The NOPP submittals and generally applicable requirements are subject to the review of the Georgia EPD and decisions related to retirement or continued operation of units are subject to Georgia PSC approval. See Note 2 to the financial statements under "Georgia Power – Integrated Resource Plans" for additional information.
Coal Combustion Residuals
In 2015, the EPA finalized non-hazardous solid waste regulations for the management and disposal of CCR, including coal ash and gypsum, in landfills and surface impoundments (ash ponds) at active electric generating power plants. The CCR Rule requires landfills and ash ponds to be evaluated against a set of performance criteria and potentially closed if certain criteria are not met. Closure of existing landfills and ash ponds requires installation of equipment and infrastructure to manage CCR in accordance with the CCR Rule. In addition to the federal CCR Rule, the States of Alabama and Georgia finalized state regulations regarding the management and disposal of CCR within their respective states. In 2019, the State of Georgia received partial approval from the EPA for its state CCR permitting program, which has broader applicability than the federal rule. The State of Mississippi has not developed a state CCR permit program.
On August 14, 2023, the EPA published a proposal to deny the ADEM's CCR permit program application. Alabama Power's permits to close its CCR facilities remain valid under state law. In the absence of an EPA-approved state permit program, CCR facilities in Alabama will remain subject to both the federal and state CCR rules.
The Holistic Approach to Closure: Part A rule, finalized in 2020, revised the deadline to stop sending CCR and non-CCR wastes to unlined surface impoundments to April 11, 2021 and established a process for the EPA to approve extensions to the deadline. The traditional electric operating companies stopped sending CCR and non-CCR wastes to their unlined impoundments prior to April 11, 2021 and, therefore, did not submit requests for extensions. Beginning in January 2022, the EPA issued numerous Part A determinations that state its current positions on a variety of CCR Rule compliance requirements, such as criteria for groundwater corrective action and CCR unit closure. The traditional electric operating companies are working with state regulatory agencies to determine whether the EPA's current positions may impact closure and groundwater monitoring plans.
In April 2022, the Utilities Solid Waste Activities Group and a group of generating facility operators filed petitions for review in the U.S. Court of Appeals for the D.C. Circuit challenging whether the EPA's January 2022 actions establish new legislative rules that should have gone through notice-and-comment rulemaking. A decision by the court is expected in 2024. The ultimate impacts of the EPA's current positions are subject to the outcome of the pending litigation and any potential future rulemaking and cannot be determined at this time.
On May 18, 2023, the EPA published a proposed rule to establish two new categories of federally regulated CCR, legacy surface impoundments and CCR management units (CCRMUs). The proposal establishes accelerated compliance deadlines for legacy surface impoundments to meet regulatory requirements, including a requirement to initiate closure within 12 months after the effective date of the final rule. The EPA is also proposing a definition for CCRMUs. The EPA's proposal would also require facility evaluations to be completed at both active facilities and inactive facilities with one or more legacy surface impoundment to determine the presence or absence of CCRMUs. CCRMUs must comply with the CCR Rule's provisions for groundwater monitoring, corrective action, closure, and post-closure activities. On November 14, 2023, the EPA published a Notice of Data Availability supplementing the proposed rule, which sought comment on new data and a supplemental risk assessment that could be used to support final rulemaking. A final rule is anticipated in 2024. The ultimate impact of this proposal cannot be determined at this time; however, it may result in significant compliance costs.
Based on requirements for closure and monitoring of landfills and ash ponds pursuant to the CCR Rule and applicable state rules, the traditional electric operating companies have periodically updated, and expect to continue periodically updating, their related cost estimates and ARO liabilities for each CCR unit as additional information related to closure methodologies, schedules, and/or costs becomes available. Some of these updates have been, and future updates may be, material. Additionally, the closure designs and plans in the States of Alabama and Georgia are subject to approval by environmental regulatory agencies. Absent continued recovery of ARO costs through regulated rates, results of operations, cash flows, and financial condition for Southern Company and the traditional electric operating companies could be materially impacted. See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements," Notes 2 and 3 to the financial statements under "Georgia Power – Rate Plans" and "General Litigation Matters – Alabama Power," respectively, and Note 6 to the financial statements for additional information.
II-43
Greenhouse Gases
On May 23, 2023, the EPA published proposed GHG standards and state plan guidelines for fossil fuel-fired power plants, which would require GHG limits for subcategories of both new and existing units based on technologies such as carbon capture and sequestration, low-GHG hydrogen co-firing, and natural gas co-firing. The proposed standards for new combustion turbines include subcategories for different operational uses including peaking, intermediate, and base load. Compliance with new source standards, once finalized, begins when the unit comes online. The proposed state plan guidelines for existing units include subcategories based on unit type, retirement date, size, and capacity factor. The EPA is proposing a 24-month state plan submission deadline for the existing unit implementation and may allow states to implement some limited form of trading and averaging for the state plans. Existing source compliance is proposed to begin as early as January 1, 2030, depending on the unit type and subcategory. The EPA also proposes to simultaneously repeal the Affordable Clean Energy rule. On November 17, 2023, the EPA published a final rule updating the regulations governing the processes and timelines for state and federal plans to implement existing source GHG performance standards. While this rule establishes the general requirements and timelines for states to follow in implementing the EPA's emissions guidelines, the pending final rule for GHG emissions from fossil fuel-fired power plants is expected to include schedules and other implementation requirements that will supersede these general provisions. On November 20, 2023, the EPA published a Supplemental Notice of Proposed Rulemaking for the pending rules for fossil fuel-fired power plants requesting additional input on how the EPA should address reliability concerns in the final rules. A final rule is anticipated in 2024. The ultimate impact of this proposal cannot be determined at this time; however, it may result in significant compliance costs.
In 2021, the United States officially rejoined the Paris Agreement. The Paris Agreement establishes a non-binding universal framework for addressing GHG emissions based on nationally determined emissions reduction contributions and sets in place a process for tracking progress towards the goals every five years. In 2021, President Biden announced a new target for the United States to achieve a 50% to 52% reduction in economy-wide GHG emissions from 2005 levels by 2030. The target was accepted by the United Nations as the United States' nationally determined emissions reduction contribution under the Paris Agreement.
Additional GHG policies, including legislation, may emerge in the future requiring the United States to accelerate its transition to a lower GHG emitting economy; however, associated impacts are currently unknown. The Southern Company system has transitioned from an electric generating mix of 70% coal and 15% natural gas in 2007 to a mix of 17% coal and 54% natural gas in 2023. This transition has been supported in part by the Southern Company system retiring over 6,700 MWs of coal-fired generating capacity since 2010 and converting 3,700 MWs of generating capacity from coal to natural gas since 2015. In addition, the Southern Company system's capacity mix consists of over 11,600 MWs of renewable and storage facilities through ownership and long-term PPAs. See "Environmental Laws and Regulations – Water Quality" herein for information on plans to retire or convert to natural gas additional coal-fired generating capacity. In addition, Southern Company Gas has replaced over 6,000 miles of pipe material that was more prone to fugitive emissions (unprotected steel and cast-iron pipe), resulting in mitigation of more than 3.3 million metric tons of CO 2 equivalents from its natural gas distribution system since 1998.
The following table provides the Registrants' 2022 and preliminary 2023 Scope 1 GHG emissions based on equity share of facilities:
| 2022 | Preliminary 2023 | |
|---|---|---|
| (in million metric tons of CO2 equivalent) | ||
| Southern Company(*) | 85 | 80 |
| Alabama Power(*) | 35 | 28 |
| Georgia Power | 23 | 24 |
| Mississippi Power | 9 | 9 |
| Southern Power | 13 | 13 |
| Southern Company Gas(*) | 2 | 2 |
(*)Includes GHG emissions attributable to disposed assets through the date of the applicable disposition and to acquired assets beginning with the date of the applicable acquisition. See Note 15 to the financial statements for additional information.
Southern Company system management has established an intermediate goal of a 50% reduction in GHG emissions from 2007 levels by 2030 and a long-term goal of net zero GHG emissions by 2050. Based on the preliminary 2023 emissions, the Southern Company system has achieved an estimated GHG emission reduction of 49% since 2007. GHG emissions decreased in 2023 when compared to 2022 as coal generation was displaced by lower carbon generation, including from Plant Vogtle Unit 3, as discussed further under RESULTS OF OPERATIONS – "Southern Company – Electricity Business" herein. Southern Company system management expects to achieve GHG reductions of greater than 50% as early as 2025, five years earlier than the established interim goal, and remain close to 50% through the late 2020s, followed thereafter by continued reductions. While none
II-44 of Southern Company's subsidiaries are currently subject to renewable portfolio standards or similar requirements, management of the traditional electric operating companies is working with applicable regulators through their IRP processes to continue the generating fleet transition in a manner responsible to customers, communities, employees, and other stakeholders. Achievement of these goals is dependent on many factors, including natural gas prices and the pace and extent of development and deployment of low- to no-GHG energy technologies and negative carbon concepts. Southern Company system management plans to continue to pursue a diverse portfolio including low-carbon and carbon-free resources and energy efficiency resources; continue to transition the Southern Company system's generating fleet and make the necessary related investments in transmission and distribution systems; implement initiatives to reduce natural gas distribution operational emissions; continue its research and development with a particular focus on technologies that lower GHG emissions, including methods of removing carbon from the atmosphere; and constructively engage with policymakers, regulators, investors, customers, and other stakeholders to support outcomes leading to a net zero future.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations governing the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and Southern Company Gas conduct studies to determine the extent of any required cleanup and have recognized the estimated costs to clean up known impacted sites in their financial statements. Amounts for cleanup and ongoing monitoring costs were not material for any year presented. The traditional electric operating companies and the natural gas distribution utilities in Illinois and Georgia (which represent substantially all of Southern Company Gas' accrued remediation costs) have all received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental remediation costs through regulatory mechanisms. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies. The traditional electric operating companies and Southern Company Gas may be liable for some or all required cleanup costs for additional sites that may require environmental remediation. See Note 3 to the financial statements under "Environmental Remediation" for additional information.
Regulatory Matters
See OVERVIEW – "Recent Developments" herein and Note 2 to the financial statements for a discussion of regulatory matters related to Alabama Power, Georgia Power, Mississippi Power, and Southern Company Gas, including items that could impact the applicable Registrants' future earnings, cash flows, and/or financial condition.
On July 14, 2023, Alabama Power issued a request for proposals of between 100 MWs and 1,200 MWs of capacity beginning no later than December 1, 2028, with consideration for commencement as early as 2025. Any purchases will depend upon the cost competitiveness of the respective offers, as well as other options available to Alabama Power, and would ultimately require approval by the Alabama PSC. The ultimate outcome of this matter cannot be determined at this time.
Construction Programs
The Subsidiary Registrants are engaged in continuous construction programs to accommodate existing and estimated future loads on their respective systems. The Southern Company system strategy continues to include developing and constructing new electric generating facilities, expanding and improving the electric transmission and electric and natural gas distribution systems, and undertaking projects to comply with environmental laws and regulations.
For the traditional electric operating companies, major generation construction projects are subject to state PSC approval in order to be included in retail rates. The largest construction project currently underway in the Southern Company system is Plant Vogtle Unit 4. See Note 2 to the financial statements under "Georgia Power – Nuclear Construction" for additional information. Also see Note 2 to the financial statements under "Georgia Power – Integrated Resource Plans" for information regarding Georgia Power's request with the Georgia PSC to develop, own, and operate three simple cycle combustion turbines at Plant Yates.
See Note 15 to the financial statements under "Southern Power" for information relating to Southern Power's construction of renewable energy facilities.
Southern Company Gas is engaged in various infrastructure improvement programs designed to update or expand the natural gas distribution systems of the natural gas distribution utilities to improve reliability and resiliency, reduce emissions, and meet operational flexibility and growth. The natural gas distribution utilities recover their investment and a return associated with these infrastructure programs through their regulated rates. See Note 2 to the financial statements under "Southern Company Gas – Infrastructure Replacement Programs and Capital Projects" for additional information on Southern Company Gas' construction program.
II-45
See FINANCIAL CONDITION AND LIQUIDITY – "Cash Requirements" herein for additional information regarding the Registrants' capital requirements for their construction programs, including estimated totals for each of the next five years.
Southern Power's Power Sales Agreements
General
Southern Power has PPAs with some of the traditional electric operating companies, other investor-owned utilities, IPPs, municipalities, and other load-serving entities, as well as commercial and industrial customers. The PPAs are expected to provide Southern Power with a stable source of revenue during their respective terms.
Many of Southern Power's PPAs have provisions that require Southern Power or the counterparty to post collateral or an acceptable substitute guarantee if (i) S&P or Moody's downgrades the credit ratings of the respective company to an unacceptable credit rating, (ii) the counterparty is not rated, or (iii) the counterparty fails to maintain a minimum coverage ratio. See FINANCIAL CONDITION AND LIQUIDITY – "Credit Rating Risk" herein for additional information.
Southern Power works to maintain and expand its share of the wholesale market. During 2023, Southern Power continued to be successful in remarketing up to 438 MWs of annual natural gas generation capacity to load-serving entities through several PPAs extending over the next 16 years. Market demand is being driven by load-serving entities replacing expired purchase contracts and/or retired generation, as well as planning for future growth.
Southern Power's electricity sales from natural gas facilities are primarily through long-term PPAs that consist of two types of agreements. The first type, referred to as a unit or block sale, is a customer purchase from a dedicated generating unit where all or a portion of the generation from that unit is reserved for that customer. Southern Power typically has the ability to serve the unit or block sale customer from an alternate resource. The second type, referred to as requirements service, provides that Southern Power serve the customer's capacity and energy requirements from a combination of the customer's own generating units and from Southern Power resources not dedicated to serve unit or block sales. Southern Power has rights to purchase power provided by the requirements customers' resources when economically viable.
As a general matter, substantially all of the PPAs provide that the purchasers are responsible for either procuring the fuel (tolling agreements) or reimbursing Southern Power for substantially all of the cost of fuel or purchased power relating to the energy delivered under such PPAs. To the extent a particular generating facility does not meet the operational requirements contemplated in the PPAs, Southern Power may be responsible for excess fuel costs. With respect to fuel transportation risk, most of Southern Power's PPAs provide that the counterparties are responsible for the availability of fuel transportation to the particular generating facility.
Capacity charges that form part of the PPA payments are designed to recover fixed and variable operation and maintenance costs based on dollars-per-kilowatt year. In general, to reduce Southern Power's exposure to certain operation and maintenance costs, Southern Power has LTSAs. See Note 1 to the financial statements under "Long-Term Service Agreements" for additional information.
Solar and Wind
Southern Power's electricity sales from solar and wind generating facilities are also primarily through long-term PPAs; however, these PPAs do not have a capacity charge and customers either purchase the energy output of a dedicated renewable facility through an energy charge or provide Southern Power a certain fixed price for the electricity sold to the grid. As a result, Southern Power's ability to recover fixed and variable operations and maintenance expenses is dependent upon the level of energy generated from these facilities, which can be impacted by weather conditions, equipment performance, transmission constraints, and other factors. Generally, under the renewable generation PPAs, the purchasing party retains the right to keep or resell the associated renewable energy credits.
Income Tax Matters
Consolidated Income Taxes
The impact of certain tax events at Southern Company and/or its other subsidiaries can, and does, affect each Registrant's ability to utilize certain tax credits. See "Tax Credits" and ACCOUNTING POLICIES – "Application of Critical Accounting Policies and Estimates – Accounting for Income Taxes" herein and Note 10 to the financial statements for additional information.
II-46
Tax Credits
Southern Company has received ITCs and PTCs in connection with investments in solar, wind, fuel cell, advanced nuclear, and battery energy storage facilities (co-located with existing solar facilities) primarily at Southern Power and Georgia Power.
Southern Power's ITCs relate to its investment in new solar facilities and battery energy storage facilities (co-located with existing solar facilities) that are acquired or constructed and its PTCs relate to the first 10 years of energy production from its wind facilities, which have had, and may continue to have, a material impact on Southern Power's cash flows and net income. At December 31, 2023, Southern Company and Southern Power had approximately $0.8 billion and $0.5 billion, respectively, of unutilized federal ITCs and PTCs, which are currently expected to be fully utilized by 2029, but could be further delayed. Since 2018, Southern Power has been utilizing tax equity partnerships for wind, solar, and battery energy storage projects, where the tax equity partner takes significantly all of the respective federal tax benefits. These tax equity partnerships are consolidated in Southern Company's and Southern Power's financial statements using the HLBV methodology to allocate partnership gains and losses.
In the third quarter 2023, Georgia Power started generating advanced nuclear PTCs for Plant Vogtle Unit 3 beginning on the in-service date of July 31, 2023. PTCs are recognized as an income tax benefit based on KWH production. In addition, pursuant to the Global Amendments to the Vogtle Joint Ownership Agreements (as defined in Note 2 to the financial statements under "Georgia Power – Nuclear Construction – Joint Owner Contracts"), Georgia Power is purchasing advanced nuclear PTCs for Plant Vogtle Unit 3 from the other Vogtle Owners. The gain recognized on the purchase of the joint owner PTCs is recognized as an income tax benefit. See Note 2 to the financial statements under "Georgia Power – Nuclear Construction" for additional information regarding Plant Vogtle Units 3 and 4.
See Note 1 to the financial statements under "General" for additional information on the HLBV methodology and Note 1 to the financial statements under "Income Taxes" and Note 10 to the financial statements under "Deferred Tax Assets and Liabilities – Tax Credit Carryforwards" and "Effective Tax Rate" for additional information regarding utilization and amortization of credits and the tax benefit related to associated basis differences.
Inflation Reduction Act
In August 2022, the IRA was signed into law. The IRA extends, expands, and increases ITCs and PTCs for clean energy projects, allows PTCs for solar projects, adds ITCs for stand-alone energy storage projects with an option to elect out of the tax normalization requirement, and allows for the transferability of the tax credits. The IRA extends and increases the tax credits for carbon capture and sequestration projects and adds tax credits for clean hydrogen and nuclear projects. Additional ITC and PTC amounts are available if the projects meet domestic content requirements or are located in low-income or energy communities. The IRA also enacted a 15% corporate minimum tax on book income, with material adjustments for pension costs and tax depreciation. The 15% corporate minimum tax on book income can be reduced by energy tax credits.
For solar projects placed in service in 2022 through 2032, the IRA provides for a 30% ITC and an option to claim a PTC instead of an ITC. Starting in 2023 and through 2032, the IRA provides for a 30% ITC for stand-alone energy storage projects. For wind projects placed in service in 2022 through 2032, the IRA provides for a 100% PTC, adjusted for inflation annually. For projects placed in service before 2022, the 2023 PTC rate is 2.8 cents per KWH. For projects placed in service in 2022 and later, the 2023 PTC rate is 2.75 cents per KWH. The same PTC rate applies for solar projects for which the PTC option has been elected. To realize the full value of ITCs and PTCs, the IRA requires satisfaction of prevailing wage and apprenticeship requirements.
In June 2023, the IRS issued temporary regulations related to the transferability of tax credits. During the fourth quarter 2023, Southern Power executed an agreement to transfer certain PTCs generated in 2023. The discount recognized was booked through income tax expense and was immaterial. Southern Company and certain subsidiaries are considering the sale of additional tax credits that are eligible to be transferred.
Implementation of the IRA provisions is subject to the issuance of additional guidance by the U.S. Treasury Department and the IRS. The Registrants are still evaluating the impacts and the ultimate outcome of this matter cannot be determined at this time.
II-47
Natural Gas Safe Harbor Method
In April 2023, the IRS issued Revenue Procedure 2023-15, which provides a safe harbor tax method of accounting that taxpayers may use to determine whether certain expenditures to maintain, repair, replace, or improve natural gas transmission and distribution property must be capitalized or allowed as repair deductions. The revenue procedure allows multiple alternatives for implementation which will result in a tax accounting method change for Southern Company Gas' eligible expenditures. Due to the complexity of analysis needed and the various implementation options allowed under the revenue procedure, Southern Company and Southern Company Gas are still evaluating the impacts and the ultimate outcome of this matter cannot be determined at this time. See Note 10 to the financial statements under "Deferred Tax Assets and Liabilities – Tax Credit Carryforwards" for additional information.
General Litigation and Other Matters
The Registrants are involved in various matters being litigated and/or regulatory and other matters that could affect future earnings, cash flows, and/or financial condition. The ultimate outcome of such pending or potential litigation against each Registrant and any subsidiaries or regulatory and other matters cannot be determined at this time; however, for current proceedings and/or matters not specifically reported herein or in Notes 2 and 3 to the financial statements, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings and/or matters would have a material effect on such Registrant's financial statements. See Notes 2 and 3 to the financial statements for a discussion of various contingencies, including matters being litigated, regulatory matters, and other matters which may affect future earnings potential.