Skip to main content

ROYAL GOLD INC

For the period ended Feb 18, 2026. Filed Feb 18, 2026.

View on SEC.gov

About this filing

A notice of a major event between regular reports, such as results, a deal or a change of executives. It is often the first formal record of the news.

Feb 18, 2026 · Filed Feb 18, 2026

RGLD$265.81+1.7%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · EMEA

EMEA

Three Months EndedDecember 31, · Twelve Months EndedDecember 31,
Stream/RoyaltyMetal(s)Current Stream/Royalty Interest*2025202420252024
Kansanshi**Gold75 ounces of gold per million pounds of recovered copper produced$32,279$–$32,279$–
KhoemacauSilver100% of payable silver14,3469,44746,59333,595
WassaGold10.5% of payable gold13,96413,21551,77348,537
BonikroGold6% of gold produced5,156–5,156–
HoundéGold2.0% NSR2,149–2,149–
Other - EMEAVariousVarious1,530–1,531–
Total revenue - EMEA$69,424$22,662$139,480$82,132
* For a full description of the Company’s stream and royalty interests as of March 31, 2025, refer to the 2024 Asset Handbook, published on April 22, 2025 and available on our website. Information about the Company’s stream and royalty interests acquired subsequent to March 31, 2025 will be included in the Company’s 2025 Asset Handbook, expected to be available in March 2026.
** Principal Property

Kansanshi: On January 15, 2026, First Quantum reported that the S3 Expansion plant was declared to be in commercial production as of December 1, 2025 and copper production in 2025 was its highest annual production since 2021. Further, First Quantum provided copper production guidance ranges of 175,000 to 205,000 tonnes in 2026, 210,000 to 240,000 tonnes in 2027 and 230,000 to 260,000 tonnes in 2028, with the increase over the three-year guidance period underpinned by the ramp-up and grade profile of S3 Expansion feed, which is expected to be sourced evenly from low-grade stockpiles and higher-grade ore from the South East Dome deposit. From 2027 onward, the feed is expected to primarily consist of fresh ore with higher grades from the pit. At the current stream rate of 75 ounces of gold per million pounds of recovered copper produced, this is expected to result in gold sales attributable to our stream interest of approximately 26,000 to 31,000 ounces in 2026, rising to 38,000 to 43,000 ounces in 2028.

Khoemacau: On January 22, 2026, MMG Limited ("MMG") confirmed that the feasibility study for the expansion was approved by the MMG Board in December 2025, with construction of the expansion scheduled to begin in 2026 and production of first concentrate expected in the first half of 2028. MMG reported that annual production from Khoemacau after the expansion is expected to increase to 130,000 tonnes of copper with silver output ranging from 4.0 to 4.5 million ounces. Royal Gold's exposure to this expansion includes ore produced from the Zone 5 and Mango NE deposits, and we expect approximately 60% of the 4.0 to 4.5 million ounce annual silver production will be applicable to our silver stream. MMG expects 2026 production of silver contained in concentrate to be in the range of 1.45 to 1.55 million ounces, which compares to production of 1.4 million ounces in 2025. After applying the 90% stream payability factor to this production, we expect production applicable to the silver stream to range between 1.3 and 1.4 million ounces.

Houndé: On December 2, 2025, Endeavour Mining plc ("Endeavour") provided its exploration outlook over the next 5 years. Endeavour is targeting the discovery of 1.5 to 2.0 million gold ounces of mineral resources over the 2026 to 2030 period. Exploration efforts are currently focused on the Vindaloo Deeps deposit, adjacent to the Houndé processing plant, where a maiden resource is expected in the first quarter of 2026. Further exploration along the Kari Fault and at the Karba and Kari Deeps targets is also being prioritized to identify potential extensions to the mineralization of the existing Kari deposit.

Platreef: On January 12, 2026, Ivanhoe Mines Ltd. (“Ivanhoe”) reported that development of the Platreef project continues to progress on schedule. Ivanhoe reported that the ramp-up of the Phase 1 concentrator is advancing as expected and the first sale of concentrate was completed late in the fourth quarter. According to Ivanhoe, Shaft #3 remains on track for completion in April 2026, at which point hoisting capacity is expected to increase roughly five‑fold to approximately 5 million tonnes per year, providing the flexibility to hoist both ore and waste to surface and supporting the Phase 1 and Phase 2 expansions. Ivanhoe is targeting completion of the Phase 2 expansion, which will increase production levels, in the fourth quarter of 2027. Royal Gold expects to recognize first revenue from Platreef in the first half of 2026.

Hod Maden (30% joint venture interest): On January 29, 2026, SSR Mining Inc. ("SSR") announced the results of a feasibility study on Hod Maden which considers an underground mine with a processing rate of 800,000 tonnes per annum. The study outlines a mine life of 10 years with average annual production of 159,000 ounces of gold per year at an average grade of 7.6 g/t Au, and 21 million pounds of copper per year at an average grade of 1.3%. The average recovery is expected to be 87% for gold and 97% for copper. Capital costs are estimated at approximately $910 million. SSR is targeting a project decision in 2026 following receipt of appropriate approvals.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.