ROYAL GOLD INC
For the period ended Sep 30, 2025. Filed Nov 6, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2025 · Filed Nov 6, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-06-30; filed 2025-08-07.
0000085535-25-000125
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-09-30; filed 2025-11-06.
0000085535-25-000165
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 125 previous paragraphs and 141 current paragraphs.
65 unchanged; 50 reworded; 24 added; 8 removed; 2 previous and 2 current paragraphs rearranged.
Tables are not compared: 5 previous and 5 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (24)
Current report
On October 20, 2025, we closed the previously announced acquisitions to acquire all of the issued and outstanding common shares of Sandstorm Gold Ltd. (“Sandstorm” and the “Sandstorm Transaction”) and Horizon Copper Corp. (“Horizon” and the “Horizon Transaction”). Sandstorm and Horizon were global resource-based companies based in Vancouver, British Columbia, that held interests in mining assets, including royalty and stream interests, on mining projects across various stages of development.
Current report
With respect to the Sandstorm Transaction, Royal Gold issued 18.6 million shares of common stock to Sandstorm shareholders and assumed stock options exercisable for 0.7 million shares of common stock to complete the transaction and paid $380.9 million in cash to fully repay the outstanding balance drawn on the Sandstorm credit facility. Upon completion of the Sandstorm Transaction, Royal Gold's outstanding share count increased to 84.4 million shares.
Current report
With respect to the Horizon Transaction, Royal Gold paid C$127.1 million in cash consideration to the shareholders of Horizon (excluding Sandstorm) and funded Horizon's purchase of its outstanding warrants for C$40.6 million.
Current report
On September 11, 2025, Centerra Gold Inc. (“Centerra”) announced the results of a PFS for Mount Milligan which extends the life of mine (“LOM”) by approximately 10 years to 2045, supported by an optimized mine plan delivering average annual production of 150,000 ounces of gold and 69 million pounds of copper from 2026 to 2042, followed by the processing of low-grade stockpiles from 2043 to 2045. The PFS includes the construction of a second tailings storage facility that is expected to provide the potential for future raises which could add multiple decades of storage capacity beyond the 2045 LOM, and ball mill motor upgrades and flotation cells in 2028 to increase process plant throughput by about 10% to 66,300 tonnes per day and increase recovery by approximately 1%. Centerra reported that recent drilling confirms mineralization remains open to the west of the current resource pit. Centerra continues to advance exploration aimed at expanding the mineral resource and assessing opportunities to extend the mine life beyond the updated plan.
Current report
RG AG owns the right to purchase 35% of the payable gold and 18.75% of the payable copper produced from Mount Milligan (the “Milligan Stream Agreement”). Payable gold is calculated as 97% of contained gold in concentrate. Payable copper is calculated as the greater of 95% or the actual percentage paid to Centerra. The cash purchase price for gold is equal to the lesser of $435 per ounce, with no inflation adjustment, or the prevailing market price when purchased. The cash purchase price for copper is 15% of the spot price.
Current report
In February 2024, RG AG entered into a Processing Cost Support Agreement (the “Cost Support Agreement”), whereby subject to certain conditions, RG AG agreed to provide cost support payments for gold and copper deliveries under the Milligan Stream Agreement in exchange for cash consideration of $24.5 million, 50,000 ounces of gold to be delivered in the future, and a free cash flow interest in Mount Milligan. Until either 375,000 ounces of gold or 30,000 tonnes of copper have been delivered with a bill of lading date on or after January 1, 2024 (estimated to occur in approximately 2030), RG AG has agreed to provide cost support payments only when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound. In such case, and only at Centerra’s election, RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered. RG AG may recover any such payments from future cash support payments beginning after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper. In addition, after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper, RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered. Finally, following the delivery of 665,000 ounces of gold (estimated to occur in approximately 2036), RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and following the delivery of 60,000 tonnes of copper (estimated to occur in approximately 2036), RG AG has agreed to provide cost support payments, in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered. The Milligan Stream Agreement remains in place and is unaffected by the Cost Support Agreement.
Current report
In the three months ended September 30, 2025, Teck Resources Limited ("Teck") reported higher copper and gold production compared to the same period last year. According to Teck, the higher copper production was driven by higher grades and recoveries. Gold and copper grades have been generally well correlated at Andacollo. Teck also reported that Andacollo has recovered smoothly from a shutdown of the SAG mill in the quarter ended June 30, 2025.
Current report
Kansanshi
Current report
We received the first delivery of approximately 2,300 ounces of gold from Kansanshi on October 3, 2025. As previously announced on August 5, 2025, our wholly-owned subsidiary RGLD Gold AG, entered into a precious metals purchase agreement for gold deliveries referenced to copper production from Kansanshi. The first delivery includes production for the month of August starting from the transaction effective date of August 5, 2025.
Current report
Deliveries at Kansanshi lag mine production by approximately one month and are expected to be received monthly. We are expecting 2025 stream deliveries of approximately 7,500 ounces, which is lower than our initial expectation of 12,500 ounces solely due to initializing delivery mechanics for the new contract and not a shortfall in production relative to expectations.
Current report
On October 28, 2025, First Quantum Minerals Ltd. (“First Quantum”) provided an update on production and the commissioning of the S3 Expansion at the Kansanshi copper-gold mine in Zambia, which is operated and 80% owned by a subsidiary of First Quantum. According to First Quantum, the S3 Expansion project has been delivered and first concentrate was produced in August. First Quantum expects copper production at Kansanshi to increase in the fourth quarter of 2025 and exceed third quarter production driven by a faster than anticipated ramp up of S3 Expansion throughput and recoveries, and 2025 copper production guidance was revised to a narrower range of 175,000 to 185,000 tonnes, from the previous range of 160,000 to 190,000 tonnes.
Current report
Year-to-date production remains in line with the recently announced PFS results, and 2025 full-year gold and copper production is expected to be near the lower end of the guidance ranges of 145,000 to 160,000 ounces of gold and 50 to 60 million pounds of copper.
Current report
On August 11, 2025, Barrick Mining Corporation (“Barrick”) disclosed that the focus of the second half of 2025 is to continue ramping up process plant tonnes while delivering on recovery optimization projects. Barrick further reported that the Pueblo Viejo Mine Life Expansion continues to focus on housing, resettlement and the Naranjo tailings storage facility.
Current report
On September 16, 2025, Barrick released the results of a preliminary economic assessment ("PEA”) on the Fourmile Project, which is included in Royal Gold’s royalty interests covering the Cortez Complex. According to Barrick, the PEA indicates the potential to achieve average annual gold production levels of approximately 600,000 to 750,000 ounces over a mine life exceeding 25 years. Barrick reported that further exploration is underway and it expects to continue exploration drilling from surface in 2026, and to complete 370 kilometers of surface drilling and 80 kilometers of underground drilling by the end of 2028. Barrick also reported that it plans to have 34 kilometers of underground development in place by 2029, which will set the mine up for initial test stoping shortly thereafter. Royal Gold’s royalty interests over the Fourmile Project are equivalent to an approximate 1.6% gross smelter return royalty rate.
Current report
General and administrative costs increased to $10.2 million for the three months ended September 30, 2025, from $10.1 million for the three months ended September 30, 2024. The increase compared to the prior year period was primarily due to higher corporate costs.
Current report
For the three months ended September 30, 2025, there were $12.8 million of acquisition related costs related to the Sandstorm and Horizon acquisitions.
Current report
Interest and other income increased to $6.8 million for the three months ended September 30, 2025, from $0.6 million for the three months ended September 30, 2024. The increase was primarily due to a $4.9 million gain on the sale of restricted inventory from a non-controlling interest partner.
Current report
Nine Months Ended September 30, 2025, Compared to Nine Months Ended September 30, 2024
Current report
For the nine months ended September 30, 2025, there were $12.8 million of acquisition related costs related to the Sandstorm and Horizon acquisitions.
Current report
Interest and other income increased to $11.5 million for the nine months ended September 30, 2025, from $4.4 million for the nine months ended September 30, 2024. The increase was primarily due to a $4.9 million gain on the sale of restricted inventory from a non-controlling interest partner.
Current report
Recent Liquidity and Capital Resources Developments
Current report
Share Issuance
Current report
On October 20, 2025, Royal Gold issued 18.6 million shares of common stock as a result of the Sandstorm Transaction. Upon completion of the Sandstorm Transaction, Royal Gold's outstanding share count increased to approximately 84.4 million shares.
Current report
In October 2025, we borrowed $450.0 million under our revolving credit facility for the acquisition of Sandstorm and Horizon and have $175.0 million available.
Removed paragraphs (8)
Previous report
On July 6, 2025, we entered into arrangement agreements to acquire each of Sandstorm Gold Ltd. (“Sandstorm”) and Horizon Copper Corp. (“Horizon”). Under the terms of the agreement with Sandstorm, Royal Gold has agreed to acquire 100% of the issued share capital of Sandstorm in exchange for Royal Gold shares at an exchange ratio of 0.0625 of a share of Royal Gold common stock for each common share of Sandstorm (the “Sandstorm Transaction”), which reflected a transaction equity value of approximately $3.5 billion at the time of signing. Under the terms of the agreement with Horizon, Royal Gold has agreed to acquire 100% of the issued share capital of Horizon in exchange for cash of C$2.00 per share (the “Horizon Transaction” and together with the Sandstorm Transaction, the “Transactions”), which reflected a transaction equity value of approximately $196 million at the time of signing.
Previous report
Completion of the Transactions is subject to approval by Royal Gold's stockholders and Sandstorm's shareholders (in the case of the Sandstorm Transaction), approval by Horizon's securityholders (in the case of the Horizon Transaction), certain regulatory approvals, and other customary closing conditions. The Transactions are expected to close in the fourth quarter of 2025.
Previous report
On June 2, 2025, Teck Resources Limited ("Teck"), reported a mechanical issue at Andacollo requiring a maintenance shutdown of the SAG mill. On July 24, 2025, Teck reported that the SAG mill successfully restarted in late June and production has now resumed to full rates, and 2025 copper production guidance is unchanged from the previous guidance range of 45,000 to 55,000 tonnes. Teck does not provide gold production guidance. Teck further reported that both union contracts at Andacollo were ratified in June and July, 2025, respectively, each covering a three year period.
Previous report
On August 6, Centerra Gold Inc. ("Centerra") provided an update on second quarter production and the status of the mine life extension study at the Mount Milligan mine in British Columbia.
Previous report
Centerra reported that gold grades in the first half of 2025 were lower than anticipated, primarily attributed to certain areas within the pit with complex geology. In order to address this issue and improve geological and mine plan confidence, Centerra commenced an infill and grade control drilling program in the second quarter of 2025. As a result of the lower gold grades, Centerra updated 2025 guidance for gold production to 145,000 to 165,000 ounces, from 165,000 to 185,000 ounces previously, and reaffirmed its copper production guidance range of 50 to 60 million pounds. Both gold and copper production are expected to be weighted towards the second half of the year.
Previous report
With respect to the PFS to extend the mine life, Centerra reported that work is on track to be completed in the third quarter of 2025. Centerra remains optimistic that it can extend the current mine life beyond 2036 with the addition of tailings capacity, and increase the annual mill throughput in the range of 10% through ball mill motor upgrades.
Previous report
Six Months Ended June 30, 2025, Compared to Six Months Ended June 30, 2024
Previous report
Recent Liquidity Developments
Reworded paragraphs (50)
Previous wording
•Acquisition and Management of Stream Interests —A metal stream is a purchase agreement that provides, in exchange for an upfront deposit payment, the right and obligation to purchase all or a portion of one or more metals produced from a mine, at a price determined for the life of the transaction by the purchase agreement. As of June 30, 2025, we owned 9 stream interests, which are on 7 producing properties and 2 development stage properties. Stream interests accounted for approximately 64% and 63% of our total revenue for the three and six months ended June 30, 2025, respectively, and 71% and 70% for the three and six months ended June 30, 2024, respectively. We expect stream interests to continue representing a significant portion of our total revenue.
Current wording
•Acquisition and Management of Stream Interests —A metal stream is a purchase agreement that provides, in exchange for an upfront deposit payment, the right and obligation to purchase all or a portion of one or more metals produced from a mine, at a price determined for the life of the transaction by the purchase agreement. As of September 30, 2025, we owned 10 stream interests, which are on 8 producing properties and 2 development stage properties. Stream interests accounted for approximately 66% and 64% of our total revenue for the three and nine months ended September 30, 2025, respectively, and 69% for the three and nine months ended September 30, 2024. We expect stream interests to continue representing a significant portion of our total revenue.
Previous wording
•Acquisition and Management of Royalty Interests —Royalties are non-operating interests in mining projects that provide the right to revenue or metals produced from the project after deducting specified costs, if any. As of June 30, 2025, we owned royalty interests on 33 producing properties, 17 development stage properties and 112 exploration stage properties, of which we consider 51 to be evaluation stage projects. We use “evaluation stage” to describe exploration stage properties that contain mineral resources and on which operators are engaged in the search for mineral reserves. Royalty interests accounted for 36% and 37% of our total revenue for the three and six months ended June 30, 2025, respectively and 29% and 30% for the three and six months ended June 30, 2024, respectively.
Current wording
•Acquisition and Management of Royalty Interests —Royalties are non-operating interests in mining projects that provide the right to revenue or metals produced from the project after deducting specified costs, if any. As of September 30, 2025, we owned royalty interests on 34 producing properties, 16 development stage properties and 112 exploration stage properties, of which we consider 50 to be evaluation stage projects. We use “evaluation stage” to describe exploration stage properties that contain mineral resources and on which operators are engaged in the search for mineral reserves. Royalty interests accounted for 34% and 36% of our total revenue for the three and nine months ended September 30, 2025, respectively, and 31% for the three and nine months ended September 30, 2024.
Previous wording
For the three and six months ended June 30, 2025 and 2024, average metal prices and percentages of revenue by metal were as follows:
Current wording
For the three and nine months ended September 30, 2025 and 2024, average metal prices and percentages of revenue by metal were as follows:
Previous wording
Agreements to Acquire Sandstorm Gold and Horizon Copper
Current wording
Closing of Sandstorm Gold and Horizon Copper Acquisitions
Previous wording
As announced on August 5, 2025, our wholly-owned subsidiary RGLD Gold AG (“RG AG”), entered into a precious metals purchase agreement for gold deliveries referenced to copper production from the Kansanshi copper-gold mine (“Kansanshi”) in the North Western Province of Zambia, operated and 80% owned by a subsidiary of First Quantum Minerals Ltd. (“First Quantum”).
Current wording
On August 5, 2025, our wholly-owned subsidiary RGLD Gold AG (“RG AG”), entered into a precious metals purchase agreement for gold deliveries referenced to copper production from the Kansanshi copper-gold mine (“Kansanshi”) in the North Western Province of Zambia, operated and 80% owned by a subsidiary of First Quantum Minerals Ltd. (“First Quantum”).
Previous wording
ii. Acceleration Option 2: If First Quantum achieves either a minimum ‘BBB-’ or equivalent senior unsecured debt rating from a rating agency, or show a Net Debt/TTM EBITDA ratio of 1.25x or less, over four consecutive quarters. and achieves certain operational conditions, it will have a one-year period to exercise the option and deliver gold worth up to $100 million over a 7-month period from the date of option exercise and reduce the stream rates and delivery thresholds by up to a further 10%.
Current wording
ii. Acceleration Option 2: If First Quantum achieves either a minimum ‘BBB-’ or equivalent senior unsecured debt rating from a rating agency, or shows a Net Debt/TTM EBITDA ratio of 1.25x or less, over four consecutive quarters and achieves certain operational conditions, it will have a one-year period to exercise the option and deliver gold worth up to $100 million over a 7-month period from the date of option exercise and reduce the stream rates and delivery thresholds by up to a further 10%.
Previous wording
The acquisition has been funded with available cash and a draw of $825 million on our revolving credit facility. Refer to Note 4 of our notes to consolidated financial statements for further discussion of our revolving credit facility.
Current wording
The acquisition was funded with available cash and a draw of $825.0 million on our revolving credit facility. Refer to Note 4 of our notes to consolidated financial statements for further discussion of our revolving credit facility.
Previous wording
On May 21, 2025, our wholly-owned subsidiary, RG AG, entered into a gold purchase agreement ("Gold Stream Agreement"), and a separate net smelter return ("NSR") royalty agreement ("Royalty Agreement") for all metals, with wholly owned subsidiaries of Solaris Resources, Inc. (collectively "Solaris") for metals produced from the Warintza Project ("Warintza"). The advance payment for the acquisition totals $200 million in cash consideration, including $100 million paid upon closing, $50 million payable after technical approval of the environmental impact assessment and publication of a pre-feasibility study ("PFS"), and $50 million payable one year after closing, subject to security perfection in Ecuador. The $100 million cash consideration paid at closing was funded with available cash on hand.
Current wording
On May 21, 2025, RG AG entered into a gold purchase agreement ("Gold Stream Agreement") with Solaris Resources Inc., and a separate net smelter return ("NSR") royalty agreement ("Royalty Agreement") covering all metals with Solaris Resources AG, a wholly owned subsidiary of Solaris Resources, Inc. (collectively, "Solaris") for metals produced from the Warintza Project ("Warintza") located in Southeastern Ecuador. The advance payment for the acquisition totals $200.0 million in cash consideration, including $100.0 million paid upon closing, $50.0 million payable after technical approval of the environmental impact assessment and publication of a pre-feasibility study for the project, which are expected to be completed in the fourth quarter of 2025, and $50.0 million payable one year after closing, subject to certain conditions including registration of security in Ecuador. The $100.0 million cash consideration paid at closing was funded with available cash on hand.
Previous wording
Deliveries under the Gold Stream Agreement will be in an amount equal to 20 ounces of gold per million pounds of recovered copper in return for a cash payment for each ounce delivered of 20% of the spot gold price until the delivery of 90,000 ounces, and 60% of the spot gold price thereafter. The Gold Stream Agreement may be subject to early termination at the option of RG AG or Solaris if a change of control of Solaris or Warintza occurs, or by RG AG if deliveries have not begun by May 21, 2033. The area of interest for the Gold Stream Agreement covers approximately 31 square kilometers, and will expand to 186 square kilometers if the early termination provisions have not been exercised and the first delivery has not been received by May 21, 2033.
Current wording
Deliveries under the Gold Stream Agreement will be in an amount equal to 20 ounces of gold per million pounds of recovered copper in return for a cash payment for each ounce delivered of 20% of the spot gold price until the delivery of 90,000 ounces, and 60% of the spot gold price thereafter. The Gold Stream Agreement may be subject to termination with the full return of the advance payment at the option of RG AG or Solaris if a change of control of Solaris or Warintza occurs, or by RG AG if deliveries have not begun by May 21, 2033. The area of interest for the Gold Stream Agreement covers approximately 31 square kilometers, and will expand to 186 square kilometers if the termination provisions have not been exercised and the first delivery has not been received by May 21, 2033.
Previous wording
RG AG received a 0.30% NSR royalty for all metals produced from an area of interest of approximately 186 square kilometers. The NSR rate will increase by 0.0375% per year until the earlier to occur of the first delivery under the Gold Stream Agreement or May 21, 2033, to a maximum of 0.60% NSR. If the Gold Stream Agreement is subject to early termination, the NSR rate will be the rate in place at the time of exercise if the early termination is exercised by RG AG, or 0.60% if the early termination is exercised by Solaris.
Current wording
RG AG received a 0.30% NSR royalty for all metals produced from an area of interest of approximately 186 square kilometers. The NSR rate will increase by 0.0375% per year until the earlier to occur of the first delivery under the Gold Stream Agreement or May 21, 2033, to a maximum of 0.60% NSR. If the Gold Stream Agreement is subject to termination for any of the events referenced above, the NSR rate will be the rate in place at the time of exercise if the termination is exercised by RG AG, or 0.60% if the termination is exercised by Solaris. The area of interest will reduce to approximately 31 square kilometers if the termination is exercised by RG AG.
Previous wording
RG AG will also maintain certain rights to participate in any future stream, royalty or similar production-based financing on the Warintza land package.
Current wording
RG AG holds certain rights to participate in any future stream, royalty or similar production-based financing on the Warintza land package.
Previous wording
On March 28, 2025, we entered into an additional precious metals purchase agreement (“Additional Stream”) with Ero Gold Corporation, a wholly owned subsidiary of Ero Copper Corporation, and certain of its affiliates for gold produced from the Xavantina mine for an advance payment of $50 million. The Additional Stream is incremental to the precious metals purchase agreement dated June 29, 2021 (“Base Stream”), and significantly extends the area of interest.
Current wording
On March 28, 2025, we entered into an additional precious metals purchase agreement (“Additional Stream”) with Ero Gold Corporation, a wholly owned subsidiary of Ero Copper Corporation, and certain of its affiliates for gold produced from the Xavantina mine for an advance payment of $50.0 million. The Additional Stream is incremental to the precious metals purchase agreement dated June 29, 2021 (“Base Stream”), and significantly extends the area of interest.
Previous wording
When considered with the Base Stream, the Additional Stream effectively increases the threshold for stream deliveries at the 25% stream rate from 93,000 ounces to 160,000 ounces, with deliveries payable at a cash price of 40% of the spot gold price. As of June 30, 2025, 48,400 ounces of gold have been delivered under the Base Stream at a cash purchase price of 20% of the spot gold price for each ounce delivered, which will increase to 40% of the spot gold price for each ounce delivered upon the delivery of 49,000 ounces.
Current wording
When considered with the Base Stream, the Additional Stream effectively increases the threshold for stream deliveries at the 25% stream rate from 93,000 ounces to 160,000 ounces, with deliveries payable at a cash price of 40% of the spot gold price. As of September 30, 2025, 50,400 ounces of gold have been delivered under the Base Stream and Additional Stream at a cash purchase price of 20% of the spot gold price for the first 49,000 ounces delivered , and 40% of the spot gold price for each ounce delivered over the 49,000 ounces.
Previous wording
Gold stream deliveries from Andacollo were approximately 5,100 ounces for the three months ended June 30, 2025, compared to approximately 5,800 ounces for the three months ended June 30, 2024. Stream deliveries typically occur approximately five months after mine production. We receive stream deliveries based on a fixed payability factor of 89%.
Current wording
Gold stream deliveries from Andacollo were approximately 8,000 ounces for the three months ended September 30, 2025, compared to approximately 5,200 ounces for the three months ended September 30, 2024. Stream deliveries typically occur approximately five months after mine production. Higher deliveries in this period relate to higher grades, recoveries and throughput in the three months ended March 31, 2025, compared to the prior year period when deliveries were impacted by lower production caused by water shortages due to drought conditions. Gold stream deliveries are based on a fixed payability factor of 89%.
Previous wording
The mine life of Andacollo is expected to continue until 2037, although Teck has reported that additional environmental permits will be required to extend the mine life beyond 2031.
Current wording
Teck expects the mine life of Andacollo to continue until 2037, although Teck has reported that additional environmental permits will be required to extend the mine life beyond 2031.
Previous wording
Gold stream deliveries from Mount Milligan were approximately 8,200 ounces for the three months ended June 30, 2025, compared to approximately 9,800 ounces for the three months ended June 30, 2024. Copper stream deliveries from Mount Milligan were approximately 1.4 million pounds during the three months ended June 30, 2025, compared to approximately 2.5 million pounds during the three months ended June 30, 2024. Decreased gold and copper deliveries in the current period primarily resulted from differences in the timing of shipments and settlements during the periods, as well as lower throughput, grades, and recovery experienced at the mine in the fourth quarter of 2024. Deliveries at Mount Milligan lag mine production by approximately five months. Gold stream deliveries are based on a fixed payability factor of 97% and copper stream deliveries are based on a minimum payability factor of 95%.
Current wording
Gold stream deliveries from Mount Milligan were approximately 14,800 ounces for the three months ended September 30, 2025, compared to approximately 22,100 ounces for the three months ended September 30, 2024. Copper stream deliveries from Mount Milligan were approximately 2.6 million pounds during the three months ended September 30, 2025, compared to approximately 3.9 million pounds during the three months ended September 30, 2024. Deliveries at Mount
Previous wording
Gold stream deliveries from Pueblo Viejo were approximately 6,100 ounces for the three months ended June 30, 2025, compared to approximately 7,000 ounces for the three months ended June 30, 2024. Gold stream deliveries are based on a fixed payability factor of 99.9%. Decreased gold deliveries in the current period resulted primarily from lower throughput and gold grade.
Current wording
Gold stream deliveries from Pueblo Viejo were approximately 8,400 ounces for the three months ended September 30, 2025, compared to approximately 6,000 ounces for the three months ended September 30, 2024. The increase in gold deliveries was primarily due to higher throughput following the throughput optimization projects and higher grades processed driven by mine and stockpile feed sequencing. Gold stream deliveries are based on a fixed payability factor of 99.9%.
Previous wording
Silver stream deliveries were approximately 196,900 ounces for the three months ended June 30, 2025, compared to approximately 332,700 ounces for the three months ended June 30, 2024. Silver stream deliveries are based on a fixed payability factor of 99.0%. Decreased silver deliveries in the current period resulted primarily from lower throughput, silver grade and recovery.
Current wording
Silver stream deliveries were approximately 258,700 ounces for the three months ended September 30, 2025, compared to approximately 89,600 ounces for the three months ended September 30, 2024. The increase in silver deliveries was primarily due to higher throughput and recovery. Silver stream deliveries are based on a fixed payability factor of 99.0%.
Previous wording
Gold and silver deliveries are quarterly and typically occur one to three months after mine production.
Current wording
Gold and silver deliveries are made quarterly and typically occur one to three months after mine production.
Previous wording
Production attributable to our royalty interest at the Cortez Complex was approximately 176,900 ounces of gold for the three months ended June 30, 2025, of which 27,900 ounces were attributable to the Legacy Zone, and 149,000 ounces were attributable to the CC Zone, compared to approximately 162,400 ounces of gold for the three months ended June 30, 2024, of which 42,600 ounces were attributable to the Legacy Zone, and 119,800 ounces were attributable to the CC Zone.
Current wording
Production attributable to our royalty interest at the Cortez Complex was approximately 202,200 ounces of gold for the three months ended September 30, 2025, of which 20,600 ounces were attributable to the Legacy Zone, and 181,600 ounces were attributable to the CC Zone, compared to approximately 161,800 ounces of gold for the three months ended September 30, 2024, of which 45,300 ounces were attributable to the Legacy Zone, and 116,500 ounces were attributable to the CC Zone.
Previous wording
For the three months ended June 30, 2025, we recorded net income and comprehensive income attributable to Royal Gold stockholders (“net income”) of $132.3 million, or $2.01 per basic and diluted share, as compared to net income of $81.2 million, or $1.23 per basic and diluted share, for the three months ended June 30, 2024. The increase in net income was primarily attributable to higher revenue and lower tax expense, each discussed below.
Current wording
For the three months ended September 30, 2025, we recorded net income and comprehensive income attributable to Royal Gold stockholders (“net income”) of $126.8 million, or $1.92 per basic and diluted share, as compared to net income of $96.2 million, or $1.46 per basic and diluted share, for the three months ended September 30, 2024. The increase in net income was primarily attributable to higher revenue offset by acquisition related costs and higher interest expense and income tax expense, each discussed below.
Previous wording
For the three months ended June 30, 2025, we recognized total revenue of $209.6 million, comprised of stream revenue of $133.2 million and royalty revenue of $76.5 million at an average gold price of $3,280 per ounce, an average silver price of $33.68 per ounce and an average copper price of $4.32 per pound. This is compared to total revenue of $174.1 million for the three months ended June 30, 2024, comprised of stream revenue of $123.0 million and royalty revenue of $51.1 million, at an average gold price of $2,338 per ounce, an average silver price of $28.84 per ounce and an average copper price of $4.42 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the three months ended June 30, 2025, compared to the three months ended June 30, 2024, are as follows:
Current wording
For the three months ended September 30, 2025, we recognized total revenue of $252.1 million, comprised of stream revenue of $166.1 million and royalty revenue of $86.0 million at an average gold price of $3,457 per ounce, an average silver price of $39.40 per ounce and an average copper price of $4.44 per pound. This is compared to total revenue of $193.8 million for the three months ended September 30, 2024, comprised of stream revenue of $133.1 million and royalty revenue of $60.8 million, at an average gold price of $2,474 per ounce, an average silver price of $29.43 per ounce and an average copper price of $4.18 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the three months ended September 30, 2025, compared to the three months ended September 30, 2024, were as follows:
Previous wording
The increase in our total revenue resulted primarily from higher average gold and silver prices compared to the prior period. Higher gold production from Peñasquito and Manh Choh (included within "Other" royalty revenue in the table above) also contributed to the increase. These increases were partially offset by lower gold sales from Xavantina (included within "Other" stream revenue in the table above) when compared to the prior year period.
Current wording
The increase in our total revenue resulted primarily from higher average gold, silver and copper prices compared to the prior period. Higher gold sales at Andacollo and Rainy River (included within "Other" stream revenue in the table above) and higher production from Peñasquito (included within "Other" royalty revenue in the table above) also contributed to the increase. These increases were partially offset by lower gold sales from Xavantina (included within "Other" stream revenue in the table above) when compared to the prior year period.
Previous wording
(1)Pueblo Viejo silver purchases for the three months ended June 30, 2025 do not include 165,700 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.1 million ounces at June 30, 2025, and the timing for the delivery of this deferred amount is uncertain.
Current wording
(1)Pueblo Viejo silver purchases for the three months ended September 30, 2025 do not include 151,000 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.3 million ounces at September 30, 2025, and the timing for the delivery of this deferred amount is uncertain.
Previous wording
Cost of sales, which excludes depreciation, depletion and amortization, was $24.2 million for the three months ended June 30, 2025 and 2024. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds and if requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement refer to our 2024 10-K.
Current wording
Cost of sales, which excludes depreciation, depletion and amortization, increased to $31.4 million for the three months ended September 30, 2025, from $27.2 million for the three months ended September 30, 2024. The increase compared to the prior year period was primarily due to higher payments for stream deliveries resulting from higher metal prices (except for gold at Mount Milligan), higher gold sales at Andacollo and Rainy River, and higher silver sales at Khoemacau. These increases were partially offset by lower gold sales at Xavantina when compared to the prior year period. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds and if requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement refer to our 2024 10-K.
Previous wording
Depreciation, depletion and amortization decreased to $31.2 million for the three months ended June 30, 2025, from $35.7 million for the three months ended June 30, 2024. The decrease was primarily due to lower stream depletion rates as a result of proven and probable mineral reserve increases by our operators and lower gold sales from Xavantina compared to the prior year period. These decreases were partially offset by higher production at Voisey's Bay and Manh Choh when compared to the prior year period.
Current wording
Depreciation, depletion and amortization decreased to $32.9 million for the three months ended September 30, 2025, from $36.2 million for the three months ended September 30, 2024. The decrease was primarily due to lower stream depletion rates as a result of proven and probable mineral reserve increases by our operators and lower gold sales from Xavantina compared to the prior year period. These decreases were partially offset by higher production at Voisey's Bay when compared to the prior year period.
Previous wording
Interest and other expense decreased to $2.7 million for the six months ended June 30, 2025, from $7.1 million for the six months ended June 30, 2024. The decrease was primarily due to lower interest expense as a result of lower average amounts outstanding under our revolving credit facility compared to the prior year period. For the six months ended June 30, 2025, there was no outstanding debt , compared to average amounts outstanding of $156 million at an average all-in borrowing rate of 6.5% for the prior year period.
Current wording
Interest and other expense increased to $8.6 million for the three months ended September 30, 2025, from $1.2 million for the three months ended September 30, 2024. The increase was primarily due to higher interest expense as a result of higher average amounts outstanding under our revolving credit facility compared to the prior year period. For the three months ended September 30, 2025, amounts outstanding under our revolving credit facility averaged $534.5 million at an average all-in borrowing rate of 5.7% compared to average amounts outstanding of $13.9 million at an average all-in borrowing rate of 6.5% for the prior year period.
Previous wording
For the three months ended June 30, 2025, we recorded income tax expense of $10.5 million, compared to $19.0 million for the three months ended June 30, 2024. The income tax expense resulted in an effective tax rate of 7.4% in the current period, compared with 18.9% for the three months ended June 30, 2024. The lower income tax expense for the three months ended June 30, 2025, included a $9.3 million discrete benefit related to a withholding tax refund on a foreign royalty and a discrete tax benefit of $4.3 million attributable to the release of a valuation allowance.
Current wording
For the three months ended September 30, 2025, we recorded income tax expense of $28.7 million, compared to $21.5 million for the three months ended September 30, 2024. The income tax expense resulted in an effective tax rate of 17.9% in the current period, compared with 18.3% for the three months ended September 30, 2024.
Previous wording
For the six months ended June 30, 2025, we recorded net income of $245.8 million, or $3.73 per basic and diluted share, as compared to net income of $128.4 million, or $1.95 per basic and diluted share, for the six months ended June 30, 2024. The increase in net income was primarily attributable to higher revenue and lower tax expense, each discussed below.
Current wording
For the nine months ended September 30, 2025, we recorded net income of $372.7 million, or $5.66 per basic share and $5.65 per diluted share, as compared to net income of $224.6 million, or $3.41 per basic and diluted share, for the nine months ended September 30, 2024. The increase in net income was primarily attributable to higher revenue and lower tax expense offset by acquisition related costs, each discussed below.
Previous wording
For the six months ended June 30, 2025, we recognized total revenue of $403.1 million, comprised of stream revenue of $255.7 million and royalty revenue of $147.4 million at an average gold price of $3,067 per ounce, an average silver price of $32.76 per ounce and an average copper price of $4.28 per pound. This is compared to total revenue of $323.0 million for the six months ended June 30, 2024, comprised of stream revenue of $225.5 million and royalty revenue of $97.5 million, at an average gold price of $2,203 per ounce, an average silver price of $26.07 per ounce and an average copper price of $4.12 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the six months ended June 30, 2025, compared to the six months ended June 30, 2024, are as follows:
Current wording
For the nine months ended September 30, 2025, we recognized total revenue of $655.1 million, comprised of stream revenue of $421.7 million and royalty revenue of $233.4 million at an average gold price of $3,201 per ounce, an average silver price of $35.05 per ounce and an average copper price of $4.33 per pound. This is compared to total revenue of $516.8 million for the nine months ended September 30, 2024, comprised of stream revenue of $358.5 million and royalty revenue of $158.3 million, at an average gold price of $2,296 per ounce, an average silver price of $27.22 per ounce and an average copper price of $4.14 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the nine months ended September 30, 2025, compared to the nine months ended September 30, 2024, were as follows:
Previous wording
(1)Reported production relates to the amount of stream metal sales and the metal sales attributable to our royalty interests for the six months ended June 30, 2025, and 2024, and may differ from the operators’ public reporting due to a number of factors, including the timing of the operator’s concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal. Refer to Note 6 to the notes to consolidated financial statements.
Current wording
(1)Reported production relates to the amount of stream metal sales and the metal sales attributable to our royalty interests for the nine months ended September 30, 2025, and 2024, and may differ from the operators’ public reporting due to a number of factors, including the timing of the operator’s concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal. Refer to Note 6 to the notes to consolidated financial statements.
Previous wording
The increase in our total revenue resulted primarily from higher average gold, silver and copper prices, higher gold production from Peñasquito and Manh Choh, and higher gold sales from Pueblo Viejo. The increase was partially offset by lower gold sales from Xavantina compared to the prior year period.
Current wording
The increase in our total revenue resulted primarily from higher average gold, silver and copper prices, higher production from Peñasquito and Manh Choh, La Ronde and Voisey's Bay (each included in "Other" royalty revenue in the above table). The increase was partially offset by lower gold sales from Xavantina (included in "Other" stream revenue in the above table) compared to the prior year period.
Previous wording
Gold and silver ounces and copper pounds purchased and sold during the six months ended June 30, 2025, and 2024, and gold and silver ounces and copper pounds in inventory as of June 30, 2025, and December 31, 2024, for our streaming interests were as follows:
Current wording
Gold and silver ounces and copper pounds purchased and sold during the nine months ended September 30, 2025, and 2024, and gold and silver ounces and copper pounds in inventory as of September 30, 2025, and December 31, 2024, for our streaming interests were as follows:
Previous wording
(1)Pueblo Viejo silver purchases for the six months ended June 30, 2025 do not include 465,900 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.1 million ounces at June 30, 2025, and the timing for the delivery of this deferred amount is uncertain.
Current wording
(1)Pueblo Viejo silver purchases for the nine months ended September 30, 2025 do not include 616,900 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.3 million ounces at September 30, 2025, and the timing for the delivery of this deferred amount is uncertain.
Previous wording
Cost of sales, which excludes depreciation, depletion and amortization, increased to $48.7 million for the six months ended June 30, 2025, from $45.9 million for the six months ended June 30, 2024. The increase was primarily due to higher gold sales from Pueblo Viejo, partially offset by lower gold sales from Xavantina compared to the prior year period. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the existing stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the existing stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds but only as requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement, refer to our 2024 10-K.
Current wording
Cost of sales, which excludes depreciation, depletion and amortization, increased to $80.1 million for the nine months ended September 30, 2025, from $73.1 million for the nine months ended September 30, 2024. The increase was primarily due to higher payments for stream deliveries resulting from higher metal prices (except for gold at Mount Milligan) and higher gold sales from Pueblo Viejo and Rainy River, partially offset by lower gold sales from Xavantina compared to the prior year period. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the existing stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the existing stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds but only as requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement, refer to our 2024 10-K.
Previous wording
General and administrative costs decreased to $10.3 million for the three months ended June 30, 2025, from $10.5 million for the three months ended June 30, 2024. The decrease compared to the prior year period was primarily due to lower non-cash stock compensation expense.
Current wording
General and administrative costs decreased to $31.5 million for the nine months ended September 30, 2025, from $32.0 million for the nine months ended September 30, 2024. The decrease was primarily due to lower non-cash stock compensation expense compared to the prior year period.
Previous wording
Depreciation, depletion and amortization decreased to $64.1 million for the six months ended June 30, 2025, from $74.5 million for the six months ended June 30, 2024. The decrease was primarily due to lower stream depletion rates, as a result of proven and probable mineral reserve increases by our operators when compared to the prior year period, lower gold sales from Xavantina and lower gold production from the Cortez Legacy Zone.
Current wording
Depreciation, depletion and amortization decreased to $97.1 million for the nine months ended September 30, 2025, from $110.7 million for the nine months ended September 30, 2024. The decrease was primarily due to lower stream depletion rates, as a result of proven and probable mineral reserve increases by our operators when compared to the prior year period, lower gold sales from Xavantina and lower gold production from Dolores. These decreases were partially offset by higher production at Peñasquito and Voisey's Bay when compared to the prior year period.
Previous wording
Interest and other expense decreased to $1.5 million for the three months ended June 30, 2025, from $2.5 million for the three months ended June 30, 2024. The decrease was primarily due to lower interest expense as a result of lower average amounts outstanding under our revolving credit facility compared to the prior year period. For the three months ended
Current wording
Interest and other expense increased to $11.3 million for the nine months ended September 30, 2025, from $8.3 million for the nine months ended September 30, 2024. The increase was primarily due to higher interest expense as a result of higher average amounts outstanding under our revolving credit facility compared to the prior year period. For the nine months ended September 30, 2025, amounts outstanding under our revolving credit facility averaged $180.1 million at an average all-in borrowing rate of 5.7%, compared to average amounts outstanding of $108.6 million at an average all-in borrowing rate of 6.5% for the prior year period.
Previous wording
For the six months ended June 30, 2025, we recorded income tax expense of $20.9 million, compared with income tax expense of $46.0 million for the six months ended June 30, 2024. The income tax expense resulted in an effective tax rate of 7.8% in the current period, compared with 26.4% for the six months ended June 30, 2024. The six months ended June 30, 2025, included a $12.0 million discrete benefit for additional recoverable basis in foreign jurisdictions, a discrete tax benefit of $4.3 million attributable to the release of a valuation allowance, and a $11.0 million discrete benefit related to withholding tax refunds on foreign royalties. The higher income tax expense for the six months ended June 30, 2024, was primarily attributable to a $13.0 million discrete income tax expense related to the consideration from the Mount Milligan Cost Support Agreement.
Current wording
For the nine months ended September 30, 2025, we recorded income tax expense of $49.6 million, compared with income tax expense of $67.5 million for the nine months ended September 30, 2024. The income tax expense resulted in an effective tax rate of 11.6% in the current period, compared with 23.1% for the nine months ended September 30, 2024. The nine months ended September 30, 2025, included a $12.0 million discrete benefit for additional recoverable basis in foreign jurisdictions, a discrete tax benefit of $4.3 million attributable to the release of a valuation allowance, and a $11.0 million discrete benefit related to withholding tax refunds on foreign royalties. The higher income tax expense for the nine months ended September 30, 2024, was primarily attributable to a $13.0 million discrete income tax expense related to the consideration from the Mount Milligan Cost Support Agreement.
Previous wording
At June 30, 2025, we had current assets of $342.0 million compared to current liabilities of $76.1 million, which resulted in working capital of $265.9 million. This compares to current assets of $275.3 million and current liabilities of $85.2 million at December 31, 2024, resulting in working capital of $190.1 million. The increase in working capital was primarily due to an increase in our available cash, which primarily resulted from higher net cash proceeds from our stream and royalty interests, partially offset by $100 million paid for the Warintza stream project, $50 million paid for the additional Xavantina stream and $12.5 million paid for the additional Lawyers-Ranch royalty during the current period.
Current wording
At September 30, 2025, we had current assets of $287.4 million compared to current liabilities of $99.5 million, which resulted in working capital of $187.9 million. This compares to current assets of $275.3 million and current liabilities of $85.2 million at December 31, 2024, resulting in working capital of $190.1 million. The decrease in working capital was primarily due to $1.2 billion paid for additional stream and royalty interests (see Note 2 in the notes to consolidated financial statements) during the nine months ended September 30, 2025, partially offset by cash received from borrowing $825.0 million under our revolving credit facility and higher net cash proceeds from our stream and royalty interests in the current period.
Showing the first 40 of 50 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
Mount Milligan Pre-Feasibility Study ("PFS")
Current report — wording carried from elsewhere
Milligan lag mine production by approximately five months. The decrease in deliveries in this period was primarily due to lower grades, recoveries and throughput in the three months ended March 31, 2025, compared to the prior year period. Gold stream deliveries are based on a fixed payability factor of 97% and copper stream deliveries are based on a minimum payability factor of 95%.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
June 30, 2025, there was no outstanding debt compared to average amounts outstanding of $91.5 million at an average all-in borrowing rate of 6.5% for the prior year period.
Previous report — wording carried elsewhere
General and administrative costs decreased to $21.3 million for the six months ended June 30, 2025, from $21.9 million for the six months ended June 30, 2024. The decrease was primarily due to lower non-cash stock compensation expense compared to the prior year period.