Skip to main content

TUTOR PERINI CORP

For the period ended Dec 31, 2024. Filed Feb 27, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 27, 2025

TPC$94.70+5.4%Stored close · as of Nov 9, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-28.

0000077543-24-000015

Item 1A. Risk Factors

Current report: 10-K

Period ended 2024-12-31; filed 2025-02-27.

0000077543-25-000025

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 73 previous paragraphs and 69 current paragraphs.

55 unchanged; 14 reworded; 0 added; 4 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Removed paragraphs (4)

Previous report

As a result of the “spring-forward” maturity provision in our Revolver and Term Loan B facility, we will need to repay, refinance, or obtain amendments or waivers with respect to some or all of our substantial outstanding indebtedness. If we are unsuccessful, the maturity of our Revolver and Term Loan B facility will accelerate, and a failure to repay then-outstanding amounts would cause us to be in default, which would materially and adversely affect our business and our financial condition.

Previous report

Under the terms of our 2020 Credit Agreement, as amended, if any of the 2017 Senior Notes are outstanding on January 30, 2025 (which is 91 days prior to the maturity of the 2017 Senior Notes), the maturity date of 10.2% of the outstanding Term Loan B principal and any amounts outstanding under the Revolver would accelerate to January 30, 2025, and the commitments available under the Revolver would be reduced to zero on January 30, 2025. The maturity of the remaining 89.8% of the outstanding Term Loan B principal would accelerate to April 21, 2025 (which is 10 days prior to the maturity of the 2017 Senior Notes), if any of the 2017 Senior Notes are outstanding as of this date. We refer to this as the “spring-forward maturity” provision of our 2020 Credit Agreement. Absent the applicability of the spring-forward maturity provision, the maturity date of the Term Loan B is August 18, 2027 and of the Revolver is August 18, 2025.

Previous report

As a result of the spring-forward maturity provision, after January 30, 2024, any outstanding indebtedness under the Revolver and 10.2% of outstanding indebtedness under the Term Loan B will be reclassified as current indebtedness. After April 21, 2024, the remaining 89.8% of outstanding indebtedness under the Term Loan B will be reclassified as current indebtedness. We will need to repay, refinance, or obtain amendments or waivers with respect to our indebtedness related to the 2020 Credit Agreement and/or the 2017 Senior Notes before the January 30, 2025 and, if applicable, April 21, 2025 acceleration dates.

Previous report

While our cash collections have improved significantly since 2021 and are expected to remain strong, we do not currently have available cash and borrowings sufficient to repay the 2017 Senior Notes, which have an outstanding balance of $500.0 million as of December 31, 2023. If we are unable to pay off or refinance the 2017 Senior Notes prior to the above-mentioned acceleration dates, or to otherwise address the acceleration of outstanding indebtedness under our 2020 Credit Agreement due to the spring-forward maturity provision, our liquidity, business, operations and financial condition will be materially and adversely affected. In this event, we may not have sufficient funds available for timely repayment of our indebtedness, and we may not have the ability to borrow or obtain sufficient funds to replace the indebtedness on terms acceptable to us, or at all, in which case an event of default would occur under our 2020 Credit Agreement. We are working to refinance the 2017 Senior Notes and anticipate that we will complete a refinancing transaction by the end of April 2024, although there can be no assurance that we will be able to complete a refinancing on terms that we consider acceptable. We expect the terms of any refinanced debt to include interest rates that are higher than those of our current issuances under the 2017 Senior Notes.
Reworded paragraphs (14)

Previous wording

We are involved in various lawsuits, including the legal proceedings described under Note 8 of the Notes to Consolidated Financial Statements. Litigation is inherently uncertain, and it is not possible to accurately predict what the final outcome will be of any legal proceeding. We must make certain assumptions and rely on estimates, which are inherently subject to risks and uncertainties, regarding potential outcomes of legal proceedings in order to determine an appropriate contingent liability and charge to income. Any adverse legal proceeding outcome or settlement that is materially different from our expectations and estimates could have a material adverse effect on our financial condition, results of operations and cash flows. This may include requiring us to record an expense or reduce revenue that we previously recorded based on our expectations or estimates, requiring us to pay damages or reducing cash collections that we had expected to receive. For example, in April 2023, we received an adverse decision from the U.S. Court of Appeals for the Second Circuit involving a long-standing dispute on a completed mixed-use project in New York, which resulted in a non-cash charge of $83.6 million. In addition, any future adverse judgments could harm our reputation and preclude us from bidding on future projects.

Current wording

We are involved in various lawsuits, including the legal proceedings described under Note 8 of the Notes to Consolidated Financial Statements. Litigation is inherently uncertain, and it is not possible to accurately predict what the final outcome will be of any legal proceeding. We must make certain assumptions and rely on estimates, which are inherently subject to risks and uncertainties, regarding potential outcomes of legal proceedings in order to determine an appropriate contingent liability and charge to income. Any adverse legal proceeding outcome or settlement that is materially different from our expectations and estimates could have a material adverse effect on our financial condition, results of operations and cash flows. This may include requiring us to record an expense or reduce revenue that we previously recorded based on our expectations or estimates, requiring us to pay damages or reducing cash collections that we had expected to receive. For example, in October 2024, we received an unexpected adverse arbitration decision on a legacy dispute related to a completed Civil segment bridge project in California that resulted in a non-cash charge of $101.6 million, which we are appealing. In addition, any future adverse judgments could harm our reputation and negatively impact our ability to win future projects.

Previous wording

If we are unable to accurately estimate contract risks, revenue or costs, economic factors such as inflation, the timing of new awards, or the pace of project execution, we may incur a loss or achieve lower than anticipated profit.

Current wording

If we are unable to accurately estimate contract risks; revenue or costs; economic factors such as inflation and tariffs; the timing of new awards; or the pace of project execution we may incur a loss or achieve lower than anticipated profit.

Previous wording

Accounting for contract-related revenue and costs requires management to make significant estimates and assumptions that may change substantially throughout the project lifecycle, which has previously resulted, and in the future could result, in a material impact to our consolidated financial statements. In addition, cost overruns, including unanticipated cost increases on fixed price contracts and guaranteed maximum price contracts, have previously resulted, and in the future may result, in lower profits or losses. Economic factors, including inflation, have also previously subjected us, and could in the future subject us, to higher costs, which we may not be able to fully recover in future projects that we are bidding, and may also decrease profit on our existing contracts, in particular with respect to our fixed price, unit price and guaranteed maximum price contracts. Changes in laws, policies or regulations, including tariffs and taxes, have previously impacted, and in the future could impact, the prices for materials or equipment. Further, our results of operations have historically fluctuated, and may continue to fluctuate, quarterly and annually depending on when new awards occur and the commencement and progress of work on projects already awarded.

Current wording

Accounting for contract-related revenue and costs requires management to make significant estimates and assumptions that may change substantially throughout the project lifecycle, which has previously resulted, and in the future could result, in a material impact to our consolidated financial statements. In addition, cost overruns, including unanticipated cost increases on fixed price contracts and guaranteed maximum price contracts, have previously resulted, and in the future may result, in lower profits or losses. Economic factors, including inflation and tariffs, have also previously subjected us, and could in the future subject us, to higher costs, which we may not be able to fully recover in future projects that we are bidding, and may also decrease profit on our existing contracts, in particular with respect to our fixed price, unit price and guaranteed maximum price contracts. Changes in laws, policies or regulations, including tariffs and taxes, such as the recently announced Trump administration tariffs, have previously impacted, and in the future could impact, the prices for materials or equipment. Further, our results of operations have historically fluctuated, and may continue to fluctuate, quarterly and annually depending on when new awards occur and the commencement and progress of work on projects already awarded.

Previous wording

In preparing our financial statements, we are required under generally accepted accounting principles in the United States (“GAAP”) to make estimates and assumptions as of the date of the financial statements. These estimates and assumptions affect the reported values of assets, liabilities, revenue and expenses, and the disclosure of contingent assets and liabilities. Areas requiring significant estimates by our management include, but are not limited to:

Current wording

In preparing our financial statements, we are required under generally accepted accounting principles in the United States (“GAAP”) to make estimates and assumptions as of the date of the financial statements. These estimates and assumptions affect the reported values of assets, liabilities, revenue and expenses, and the disclosure of contingent assets and liabilities. Areas requiring significant estimates or assumptions by our management include, but are not limited to:

Previous wording

Our actual business and financial results could differ from our estimates of such results. These differences, including those which have resulted, and in the future could result, from unfavorable litigation or arbitration outcomes and settlements in which we agree to accept less than previously estimated amounts, have had and could continue to have a material adverse impact on our financial condition and reported results of operations. Our decision in 2022 to prioritize efforts to seek faster resolution of certain disputed matters, primarily in the Specialty Contractors segment in New York, and convert related balances to cash more quickly has resulted, and may in the future result, in other situations where amounts that we collect are lower than estimated amounts, even in cases where our estimates have taken into account the recent shift in our operational priorities.

Current wording

Our actual business and financial results could differ from our estimates of such results. These differences, including those which have resulted, and in the future could result, from unfavorable litigation or arbitration outcomes and settlements in which we agree to accept less than previously estimated amounts, have had and could continue to have a material adverse impact on our financial condition and reported results of operations. Our past decisions to prioritize efforts to seek faster resolution of certain disputed matters and convert related balances to cash more quickly has resulted, and may in the future result, in other situations where amounts that we collect are lower than estimated amounts, even in cases where our estimates have taken into account the recent shift in our operational priorities.

Previous wording

The execution of our business strategies also substantially depends on our ability to retain several key members of our management. Losing any of these individuals could adversely affect our business. The majority of these key individuals are not bound by employment agreements. Volatility or lack of positive performance in our stock price may adversely affect our ability to retain key individuals to whom we have provided share-based compensation. We have experienced changes in senior management in the past. Our long-time Chairman and CEO has agreed to transition to the role of Executive Chairman at the end of 2024, and we will have a new CEO. Changes in management, including as a result of succession or voluntary or involuntary termination, including as a result of retirement, death or disability, could adversely affect our business and financial results, particularly if we are not able to identify, engage, and retain qualified successors or if our business, customers, or employees do not respond positively to such changes.

Current wording

The execution of our business strategies also substantially depends on our ability to retain several key members of our management. Losing any of these individuals could adversely affect our business. The majority of these key individuals are not bound by employment agreements. Volatility or lack of positive performance in our stock price may adversely affect our ability to retain key individuals to whom we have provided share-based compensation. We have experienced changes in senior management in the past. Our long-time Chairman and CEO transitioned to the role of Executive Chairman, and we have a new CEO, both effective as of January 1, 2025. Changes in management, including as a result of succession or voluntary or involuntary termination, including as a result of retirement, death or disability, could adversely affect our business and financial results, particularly if we are not able to identify, engage, and retain qualified successors or if our business, customers, or employees do not respond positively to such changes.

Previous wording

For the year ended December 31, 2023, we derived $442.3 million of revenue from our work on projects located outside of the United States. Our international operations expose us to risks inherent in doing business in certain hostile regions outside the United States, including political risks; risks of loss due to acts of war; unstable economic, financial and market conditions; potential incompatibility with foreign subcontractors and vendors; foreign currency controls and fluctuations; trade restrictions; economic and trade sanctions; logistical challenges; variations in taxes; and changes in labor conditions, labor strikes and difficulties in staffing and managing international operations. Failure to successfully manage risks associated with our international operations could result in higher operating costs than anticipated or could delay or limit our ability to generate revenue and income from construction operations in key international markets.

Current wording

For the year ended December 31, 2024, we derived $583.4 million, or 13%, of revenue from our work on projects located outside of the United States. Our international operations expose us to risks inherent in doing business in regions outside the United States, including political risks; risks of loss due to acts of war; unstable economic, financial and market conditions; potential incompatibility with foreign subcontractors and vendors; foreign currency controls and fluctuations; trade restrictions; economic and trade sanctions; logistical challenges; variations in taxes; and changes in labor conditions, labor strikes and difficulties in staffing and managing international operations. Failure to successfully manage risks associated with our international operations could result in higher operating costs than anticipated or could delay or limit our ability to generate revenue and income from construction operations in key international markets.

Previous wording

The civil construction and public-works building markets are dependent on the amount of work funded by various government agencies, which depends on many factors, including the condition of the existing infrastructure and buildings; the need for new or expanded infrastructure and buildings; and federal, state and local government spending levels. As a result, our future operating results could be negatively impacted by any decrease in demand for public projects or decrease or delay in government funding (even with the passage of the BIL), which could result from a variety of factors, including extended government shutdowns, delays in the sale of voter-approved bonds, budget shortfalls, credit rating downgrades or long-term impairment in the ability of state and local governments to raise capital in the municipal bond market.

Current wording

The civil construction and public-works building markets are dependent on the amount of work funded by various government agencies, which depends on many factors, including the condition of the existing infrastructure and buildings; the need for new or expanded infrastructure and buildings; and federal, state and local government spending levels. As a result, our future operating results could be negatively impacted by any decrease in demand for public projects or decrease or delay in government funding, which could result from a variety of factors, including extended government shutdowns, delays in the sale of voter-approved bonds, budget shortfalls, credit rating downgrades or long-term impairment in the ability of state and local governments to raise capital in the municipal bond market.

Previous wording

As of December 31, 2023, our backlog of uncompleted construction work was approximately $10.2 billion. The revenue currently projected in our backlog may not be fully realized and, in some cases, if realized, may not result in profits or may be less profitable than expected. The cancellation or reduction in scope of significant projects included in our backlog could have a material adverse effect on our financial condition, results of operations and cash flows.

Current wording

As of December 31, 2024, our backlog of uncompleted construction work was approximately $18.7 billion. The revenue currently projected in our backlog may not be fully realized and, if realized, may not result in profits or may be less profitable than expected. The cancellation or reduction in scope of significant projects included in our backlog could have a material adverse effect on our financial condition, results of operations and cash flows.

Previous wording

New project awards are determined through either a competitive bid basis or on a negotiated basis. Projects may be awarded based solely upon price, but often take into account other factors, such as technical qualifications, proposed project team, schedule and past performance on similar projects. Within our industry, we compete with many international, regional and local construction firms. If we are unable to compete successfully in such markets, our relative market share and profits could be reduced.

Current wording

New project awards are determined through either a competitive bid basis or on a negotiated basis. Projects may be awarded based solely upon price, but often take into account other factors, such as technical qualifications, proposed project team, schedule and past performance on similar projects. Within our industry, we compete with many international, regional and local construction firms. If we are unable to compete successfully in such markets, our relative market share and profits could be reduced. In addition, evolving changes in the construction industry, such as the trend toward an increased use of the progressive design-build project delivery method that may reduce project risks for both owners and contractors, could result in increased competition and potentially lower margins on certain projects in the future.

Previous wording

Our contracts with U.S. federal, as well as state, local and foreign, government entities are subject to various procurement regulations and other requirements relating to their formation, administration and performance. We are subject to audits and investigations relating to our government contracts, and any violations could result in various civil and criminal penalties and administrative sanctions, including termination of contract, refunding or suspending of payments, forfeiture of profits, payment of fines and suspension or debarment from future government business. In addition, most of these contracts provide for termination or renegotiation by the government at any time, without cause, which could have an adverse effect on our business and operations. The percentage of our business coming from government entities has continued to increase in recent years, and as of December 31, 2023 accounted for nearly 90% of our backlog. As a result, the risks of adverse consequences related to government contracting and procurement are increasingly fundamental to our business.

Current wording

Our contracts with U.S. federal, as well as state, local and foreign, government entities are subject to various procurement regulations and other requirements relating to their formation, administration and performance. We are subject to audits and investigations relating to our government contracts, and any violations could result in various civil and criminal penalties and administrative sanctions, including termination of contract, refunding or suspending of payments, forfeiture of profits, payment of fines and suspension or debarment from future government business. In addition, most of these contracts provide for termination or renegotiation by the government at any time, without cause, which could have an adverse effect on our business and operations. The percentage of our business coming from government entities has continued to increase in recent years, and as of December 31, 2024 accounted for 85% of our backlog. As a result, the risks of adverse consequences related to government contracting and procurement are increasingly fundamental to our business.

Previous wording

We currently have, and expect to continue to have, a substantial amount of indebtedness. As of December 31, 2023, our total debt was $899.7 million, with $117.4 million classified as current debt. A significant amount of debt under our credit agreement contains financial covenants, including one covenant to maintain a maximum First Lien Net Leverage Ratio (as defined in the 2020 Credit Agreement (as defined below)), which has required us to obtain two amendments, the First Amendment, dated as of October 31, 2022 and the Second Amendment, dated as of March 10, 2023, to the 2020 Credit Agreement in order to remain in compliance with this covenant. There is a risk that we may need to seek further amendments to this covenant or other covenants in the future should our operating results or financial condition differ materially from our projections. If we are unable to meet the terms of the financial covenants or fail to comply with any of the other restrictions contained in the agreements governing our indebtedness, an event of default could occur, causing the debt related to such agreements to become immediately due. If such acceleration occurs, we may not be able to repay such indebtedness as required. Since indebtedness under our credit agreement entered into on August 18, 2020 (as amended, the “2020 Credit Agreement”) with BMO Harris Bank N.A., as Administrative Agent, Swing Line Lender and L/C Issuer and other lenders is secured by substantially all of our assets, acceleration of this debt could result in foreclosure of those assets and a negative impact on our operations. In addition, a failure to meet the terms of our 2020 Credit Agreement could result in a reduction of future borrowing capacity or additional restrictions under the 2020 Credit Agreement that could negatively impact our liquidity and financial condition. A loss of liquidity could adversely impact our ability to execute projects in our backlog, obtain new projects, engage subcontractors, and attract and retain key employees. Furthermore, we had approximately $373.5 million of outstanding borrowings at December 31, 2023 with variable interest rates. Higher market interest rates could also negatively impact our liquidity and financial condition.

Current wording

We currently have, and expect to continue to have, a substantial amount of indebtedness. As of December 31, 2024, our total debt was $534.1 million, with $24.1 million classified as current debt. A significant amount of debt under our credit agreement contains financial covenants, including one covenant to maintain a maximum First Lien Net Leverage Ratio (as defined in the 2020 Credit Agreement (as defined below)), which has required us to obtain two amendments, the First Amendment, dated as of October 31, 2022 and the Second Amendment, dated as of March 10, 2023, to the 2020 Credit Agreement in order to remain in compliance with this covenant. There is a risk that we may need to seek further amendments to this covenant or other covenants in the future should our operating results or financial condition differ materially from our projections. If we are unable to meet the terms of the financial covenants or fail to comply with any of the other restrictions contained in the agreements governing our indebtedness, an event of default could occur, causing the debt related to such agreements to become immediately due. If such acceleration occurs, we may not be able to repay such indebtedness as required. Since indebtedness under our credit agreement entered into on August 18, 2020 (as amended, the “2020 Credit Agreement”) with BMO Harris Bank N.A., as Administrative Agent, Swing Line Lender and L/C Issuer and other lenders is secured by substantially all of our assets, acceleration of this debt could result in foreclosure of those assets and a negative impact on our operations. In addition, a failure to meet the terms of our 2020 Credit Agreement could result in a reduction of future borrowing capacity or additional restrictions under the 2020 Credit Agreement that could negatively impact our liquidity and financial condition. A loss of liquidity could adversely impact our ability to execute projects in our backlog, obtain new projects, engage subcontractors, and attract and retain key employees. Furthermore, we had approximately $127.6 million of outstanding borrowings at December 31, 2024 with variable interest rates. Higher market interest rates could also negatively impact our liquidity and financial condition.

Previous wording

Our chairman and chief executive officer could exert influence over the Company due to his position and significant ownership interest.

Current wording

Our executive chairman could exert influence over the Company due to his position and significant ownership interest.

Previous wording

As of December 31, 2023, our chairman and chief executive officer, Ronald N. Tutor, and three trusts controlled by Mr. Tutor (the “Tutor Group”) owned approximately 14% of the outstanding shares of our common stock. Additionally, one of our current directors was appointed by Mr. Tutor pursuant to Mr. Tutor’s right to nominate one member to our Board of Directors, so long as the Tutor Group owns at least 11.25% of the outstanding shares of our common stock. Accordingly, Mr. Tutor could exert influence over the outcome of a range of corporate matters, including the election of directors and the approval or rejection of other extraordinary transactions, such as a takeover attempt or sale of the Company or its assets.

Current wording

Our executive chairman, Ronald N. Tutor, and three trusts he controls (the “Tutor Group”) own approximately 14% of the outstanding shares of our common stock as of December 31, 2024. Additionally, one of our current directors was appointed by Mr. Tutor pursuant to Mr. Tutor’s right to nominate one member to our Board of Directors, so long as the Tutor Group owns at least 11.25% of the outstanding shares of our common stock. Accordingly, Mr. Tutor could exert influence over the outcome of a range of corporate matters, including the election of directors and the approval or rejection of other extraordinary transactions, such as a takeover attempt or sale of the Company or its assets.