NSTAR ELECTRIC CO

For the period ended Dec 31, 2024. Filed Feb 14, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 14, 2025

ES$69.84-2.9%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-14.

0000072741-24-000005

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2024-12-31; filed 2025-02-14.

0000072741-25-000007

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 285 previous paragraphs and 298 current paragraphs.

101 unchanged; 120 reworded; 70 added; 62 removed; 2 previous and 7 current paragraphs rearranged.

Tables are not compared: 25 previous and 24 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (70)

Current report

•On January 27, 2025, Eversource entered into a definitive agreement to sell Aquarion. Subject to certain closing adjustments, the aggregate enterprise value of the sale is approximately $2.4 billion in cash, which includes approximately $1.6 billion for the equity and $800 million of net debt that will be extinguished at closing. The sale is subject to regulatory and other approvals and is expected to close in late 2025. Eversource plans to use the net proceeds from the pending sale to pay down parent company debt.

Current report

•In the third quarter of 2024, Eversource completed the sale of its 50 percent ownership share in the Sunrise Wind project to Ørsted for adjusted proceeds of $152 million and completed the sale of its 50 percent ownership share in the South Fork Wind and Revolution Wind projects to GIP for adjusted gross proceeds of $745 million. Eversource recognized an aggregate net after-tax loss on the sales of its offshore wind investments of $524 million. Eversource recorded a contingent liability of $365 million, reflecting its estimate of the future obligations under the GIP sale terms, which include an expected cost overrun sharing obligation, expected obligation to maintain GIP’s internal rate of return, and obligation for other future costs. Eversource does not have any ongoing financial obligations associated with Sunrise Wind.

Current report

(2)The 2024 loss includes an impairment charge of $297 million to write down the carrying value of the water business to fair value resulting from the expected sale of Aquarion, as well as transaction costs. For further information, see "Business Development and Capital Expenditures – Pending Sale of Aquarion" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Current report

Our water distribution segment recognized a $297 million impairment charge in 2024 as a result of writing down the carrying value of the business to fair value due to the expected sale of Aquarion. Excluding the impairment charge and transaction costs associated with the expected sale, water distribution segment earnings increased $11.5 million in 2024, as compared to 2023, due primarily to an after-tax benefit of $11.6 million recorded in 2024 to recognize the impacts of the Aquarion Water Company of Connecticut’s rate case decision from PURA. The impacts of PURA’s rate case decision on March 15, 2023 were recorded beginning in March 2024 as a result of the State of Connecticut Superior Court’s decision on the rate case appeal on March 25, 2024. The impacts primarily include a reduction to depreciation expense to reflect lower depreciation rates ordered by PURA in its final decision, partially offset by lower authorized revenues.

Current report

Eversource is currently in the process of selling its Aquarion water distribution business. For information regarding the pending sale and use of proceeds, see "Business Development and Capital Expenditures - Pending Sale of Aquarion" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Current report

In June 2024, Moody’s revised the outlook from stable to negative for CL&P citing a weaker financial profile and a challenging Connecticut regulatory environment. In December 2024, S&P downgraded the ratings for Eversource parent and its subsidiaries primarily due to S&P's negative assessment of the Connecticut regulatory construct for Eversource’s Connecticut utilities. These credit ratings and outlook changes reflect higher regulatory risk in Connecticut with the regulatory construct and adverse regulatory developments, including recent rate orders and the passage of Senate Bill 7, negatively impacting the credit quality of Eversource and its subsidiaries.

Current report

Greater Cambridge Energy Program: The Greater Cambridge Energy Program will construct Eversource’s first underground transmission substation in Cambridge, Massachusetts, along with associated transmission and distribution lines. The project will address the increased electric demand in the region, enhance the resiliency of the transmission system, and ensure a flexible grid to reliably serve customers. The flexibility to transmit and distribute mixed energy sources will support the decarbonization and electrification goals of both the City of Cambridge and the state of Massachusetts. The new 115/13.8-kV, 35,000 square foot substation will be located in an underground vault and includes three distribution power transformers supplying thirty-six distribution circuits. The project also includes five underground duct banks housing eight new 115-kV transmission lines. The Massachusetts Energy Facilities Siting Board approved the project on June 28, 2024. Additional required environmental permits are expected to be approved by the end of 2025, as well as a license from the MA DEP expected to be approved by the end of the second quarter of 2026. The initial in-service date for the project is June 2029, which includes two 115-kV transmission lines and the transmission portion of the substation. The first distribution circuits and substation distribution will be placed in-service by the end of 2029. The remaining transmission and distribution circuits will be placed in-service throughout 2030 and into 2031. The total project cost is approximately $1.84 billion, with $1.38 billion allocated for transmission and $460 million for distribution. As of December 31, 2024, $100.1 million has been spent on the project, with $70 million for transmission and $30.1 million for distribution.

Current report

Pending Sale of Aquarion: In early 2024, Eversource initiated an exploratory assessment of the potential sale of the Aquarion water distribution business. In December 2024, final bids were received, and Eversource obtained approval from its Board of Trustees to sell the Aquarion water distribution business. On January 27, 2025, Eversource entered into a definitive agreement to sell Aquarion. Subject to certain closing adjustments, the aggregate enterprise value of the sale is approximately $2.4 billion in cash, which includes approximately $1.6 billion for the equity and $800 million of net debt that will be extinguished at closing. The sale is subject to approval by PURA, DPU and the NHPUC, as well as other approvals pursuant to the Hart-Scott-Rodino Antitrust Improvements Act as well as other customary closing conditions. The sale is expected to close in late 2025. Eversource plans to use the net proceeds from the pending sale to pay down parent company debt.

Current report

In the fourth quarter of 2024, upon classifying the assets and liabilities as held for sale, Eversource concluded that the likely sale of Aquarion at a loss resulted in the requirement to test water distribution goodwill for impairment. Eversource performed an impairment test by comparing the fair value of the business to its carrying value and recorded a goodwill impairment of $297 million, as the estimated fair value of the business based on the anticipated sale was less than the carrying value. The fair value included future cash outflows of approximately $140 million of estimated income taxes as a result of the transaction. The goodwill impairment charge is presented separately within Operating Income on the Eversource statement of income for the year ended December 31, 2024.

Current report

The projected capital expenditures reflect a reduction in planned capital expenditures for Connecticut’s electric and natural gas distribution businesses due to regulatory policies in Connecticut that discourage investment, including ensuring the timely recovery of costs and the ability to earn a fair return. The continuing pattern of adverse regulatory outcomes for Connecticut utilities and associated credit downgrades from our credit rating agencies necessitated a reduction to Connecticut’s electric and natural gas distribution projected capital expenditures. These capital reductions do not impact Eversource’s commitment to safety, reliability, or critical staffing structure.

Current report

Projected capital expenditures for the water distribution business of $130 million are expected until the time of sale in late 2025 and have been factored into the water business impairment recorded as of December 31, 2024.

Current report

Offshore Wind Business: Eversource’s previous offshore wind business included 50 percent ownership interests in each of North East Offshore and South Fork Class B Member, LLC. During 2024, Eversource sold its interest in these entities, and in doing so, sold its interests in the Revolution Wind project, the South Fork Wind project, and the Sunrise Wind project. Eversource’s current offshore wind business is now comprised only of a noncontrolling tax equity investment in South Fork Wind through a 100 percent ownership in South Fork Wind Holdings, LLC Class A interests.

Current report

In September of 2023, Eversource made a $528 million investment in a tax equity interest for South Fork Wind. South Fork Wind was restructured as a tax equity investment, with Eversource purchasing 100 percent ownership of a new Class A tax equity membership interest. This investment will result in Eversource receiving cash flow benefits from investment tax credits (ITC) and other future cash flow benefits as well. As of December 31, 2024, $459 million of expected investment tax credits and other expected tax benefits were reclassified from the South Fork Wind tax equity investment balance reported in Investments in Unconsolidated Affiliates as a decrease in Accumulated Deferred Income Taxes on the Eversource balance sheet, which represented a non-cash reclassification. As a result of these investment tax credits, Eversource expects lower federal income tax payments from 2025 to 2027. As of December 31, 2024, the tax equity interest in South Fork Wind totaled $22.2 million.

Current report

On January 24, 2024, Eversource entered into an agreement with Ørsted to sell Eversource’s 50 percent share of Sunrise Wind, subject to certain conditions and regulatory approvals. On April 18, 2024, Eversource and Ørsted executed an equity and asset purchase agreement and on July 9, 2024, Eversource completed the sale of its 50 percent ownership share of Sunrise Wind to Ørsted. In accordance with the equity and asset purchase agreement and after adjustment for a reduction in capital spending compared to forecasted amounts, adjusted proceeds totaled $152 million. Ørsted paid Eversource $118 million at the closing of the sale transaction, which was used to repay parent company debt. Remaining proceeds of $34 million will be paid after onshore construction is completed and certain other construction milestones are achieved. The remaining expected proceeds have been recorded in Other Long-Term Assets on Eversource’s balance sheet as of December 31, 2024. Eversource recorded a pre-tax gain on the sale of Sunrise Wind of $377 million in 2024. With completion of the sale, Eversource does not have any ongoing financial obligations associated with Sunrise Wind.

Current report

On February 13, 2024, Eversource executed an agreement to sell its 50 percent interests in the South Fork Wind and Revolution Wind projects to Global Infrastructure Partners (GIP) for an initial gross purchase price of approximately $1.1 billion. The initial purchase price was subject to adjustment based on, among other things, the progress, timing and the construction cost of Revolution Wind, including changes in actual versus forecasted capital spending between signing the agreement and closing of the transaction. On September 30, 2024, Eversource completed the sale of its 50 percent ownership share in the South Fork Wind and Revolution Wind projects to GIP for adjusted gross proceeds of $745 million, which were received at closing. Adjusted gross proceeds from the sale were approximately $375 million lower than the previously estimated purchase price. This reduction reflects approximately $150 million resulting from lower capital spending between signing the agreement and closing, and approximately $225 million related to the final terms of the sale transaction, primarily due to the delay of the commercial operations date of Revolution Wind. Proceeds from the transaction were used to repay parent company debt.

Current report

Upon the completion of both sale transactions in 2024, the total proceeds were compared to the carrying value of the investments, including an estimate of liability for post-closing adjustment payments to GIP, and Eversource recognized an aggregate, net after-tax loss on the sales of its offshore wind investments of $524 million. The aggregate, net after-tax loss is comprised of (1) the lower proceeds related to final terms of the sale transaction to GIP of approximately $225 million related to non-construction costs for the Revolution Wind and South Fork Wind projects, primarily due to a purchase price reduction of $150 million resulting from the delay of the commercial operations date of Revolution Wind, (2) recently identified forecasted construction costs as a result of a delay in the anticipated commercial operation date related to Revolution Wind of approximately $350 million, which includes an estimate for the anticipated post-closing adjustment to GIP related to Eversource’s expected cost overrun sharing obligation, and (3) approximately $326 million, which includes an estimate for the anticipated post-closing adjustment related to Eversource’s expected obligations to GIP as a result of final economics of the Revolution Wind and South Fork Wind projects and other future costs, as well as a net $60 million increase in income tax expense including an increase in the valuation allowance for unused capital losses. These losses were partially offset by the $377 million gain on the sale of Sunrise Wind.

Current report

Upon sale, Eversource recorded a contingent liability of $365 million, reflecting its estimate of the future obligations under the GIP sale terms, which include the expected cost overrun sharing obligation, expected obligation to maintain GIP’s internal rate of return, and obligation for other future costs. The majority of this liability is expected to be settled upon the completion of the Revolution Wind project. The long-term portion of the liability of $350 million is recorded in Other Long-Term Liabilities, and $15 million is recorded in Other Current Liabilities on Eversource’s balance sheet as of December 31, 2024.

Current report

Contingencies are evaluated using the best information available at the time the financial statements are prepared, and this assessment involves judgments and assumptions about future events. Factors that could increase the post-closing adjustment payments owed to GIP include the ultimate cost of construction and extent of cost overruns for Revolution Wind, delays in construction, which would impact the economics associated with the purchase price adjustment, and Revolution Wind’s eligibility for federal investment tax credits at a lower value than assumed and included in the purchase price.

Current report

New information or future developments that arise as construction progresses and as cost estimates are reviewed and revised will require a reassessment of the estimated liability for the post-closing adjustment payments. The Company is currently aware that construction of the offshore foundations, offshore substation and turbine tower installations could result in increased cost overruns in the future. Only preliminary construction cost projections are available for these cost overruns, and there is insufficient updated information at this point in order for Eversource to change its estimate with reasonably estimable information. Eversource will continue to assess the potential exposure and adjust the liability as needed. It is expected that updated costs estimates will become available in the first half of 2025, and adverse changes in facts and circumstances could result in additional losses that could be material. The Company believes it is reasonably possible that there is an additional loss in excess of the liability recorded, but management cannot reasonably estimate a range of loss beyond the $365 million recorded at this time.

Current report

Under the agreement with GIP, Eversource’s existing and certain additional credit support obligations for Revolution Wind are expected to roll off as the project completes construction. Under the agreement with Ørsted, Eversource’s existing credit support obligations for Sunrise Wind were either terminated or indemnified by Ørsted as a result of the sale. Eversource has entered into separate construction management agreements to manage Sunrise Wind’s and Revolution Wind’s onshore electric substation construction through completion. In this role, Eversource will be solely a service provider to Sunrise Wind and Revolution Wind.

Current report

During 2024, Eversource sold its interest in the North East Offshore and South Fork Class B, Member LLC equity method investments and recognized an aggregate, net after-tax loss on the sale of its offshore wind investments of $524 million.

Current report

On October 17, 2024, FERC issued an order on the remand of the MISO ROE proceedings. The order addressed the Court’s decision that the reintroduction of the risk-premium financial model in the ROE methodology was arbitrary and capricious by removing the risk-premium financial model from the ROE methodology. The removal of the risk-premium financial model was the only revision to FERC’s ROE methodology and resulted in a two-model approach utilizing the two-step discounted cash flow model and the capital asset pricing model. MISO was directed to provide refunds for the period November 12, 2013 to February 11, 2015 (the first MISO ROE complaint refund period) and for the period from September 28, 2016 (the date of FERC’s order on the first MISO ROE complaint) to October 17, 2024 by December 1, 2025. The order also stated that FERC does not preclude the use of the risk-premium financial model in future proceedings if the parties can demonstrate that FERC’s stated concerns around the inclusion of the model have been addressed.

Current report

On November 13, 2024, the NETOs filed a supplemental brief in their four pending ROE proceedings to explain to FERC that it cannot apply the reasoning and methodologies of the MISO ROE case to the NETOs’ cases due to the entirely different set of facts in the MISO and NETOs ROE proceedings. Doing so would violate the substance of the Court’s April 14, 2017 order and would violate the legal standard required by the Federal Power Act.

Current report

On February 4, 2025, the MISO transmission owners submitted a petition for review with the Court requesting review of the October 17, 2024 MISO ROE order on remand and a December 19, 2024 notice of denial of rehearing. The petition requests review of FERC’s decision to retroactively backdate the MISO transmission owners’ base ROE to the date of an earlier order that FERC abandoned when it issued Order No. 569, treat an underlying unlawful complaint as if it were legitimate, and order eight years of interest as part of the directed refunds.

Current report

Transmission Rates and Other Transmission Rates-Related Proceedings: CL&P, NSTAR Electric and PSNH transmission rates are calculated in accordance with a FERC-approved formula ratemaking framework and each utility is required to file an annual update on or before July 31st with resulting rates effective January 1st the following year. The formula rate framework provides for an annual reconciliation of the prior calendar year actual costs incurred related to our transmission facilities, including an allowed ROE, plus forecasted information through the next rate period. The annual update process includes formula rate protocols that provide disclosure of cost inputs, an opportunity for informal discovery procedures and a challenge process, which provides transparency to stakeholders.

Current report

CL&P Storm Filings: On March 28, 2024, PURA established a prudency review proceeding for the purpose of receiving and reviewing evidence of the costs reported by CL&P in response to catastrophic storms and pre-staging events totaling approximately $634 million that occurred between January 1, 2018 and December 31, 2021. PURA established a partial procedural schedule with hearings scheduled in the third quarter of 2025. On December 31, 2024, CL&P filed a supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for nine additional catastrophic storms and two additional pre-staging events for the period January 1, 2022 through January 31, 2023 totaling approximately $173 million. Although we cannot predict the ultimate outcome of this matter, we continue to believe these deferred storm restoration costs were prudently incurred and are probable of recovery.

Current report

CL&P RAM Filing: On April 17, 2024, PURA issued an interim decision in CL&P’s Rate Adjustment Mechanisms (RAM) filing and approved rates for six RAM components, with rates effective July 1, 2024 through April 30, 2025. The rate approvals include the recovery of NBFMCC and SBC net underrecoveries as of December 31, 2023 of $264.9 million and $86.2 million, respectively, and the recovery of expected net costs of $388.5 million for the NBFMCC and $254.4 million for the SBC for the period July 1, 2024 through April 30, 2025. The NBFMCC rate adjustment is primarily driven by long-term nuclear power purchase agreements required by state policy (Millstone and Seabrook) and the SBC rate adjustment is primarily driven by costs associated with accounts receivable hardship customer protection and the new low-income discount rate effective December 2023. On August 14, 2024, PURA issued a final decision that approved a further adjustment to the NBFMCC rate to include the recovery of incurred and deferred electric vehicle program costs from 2021 through May 31, 2024 of $44.4 million and expected electric vehicle program costs from June 1, 2024 through December 31, 2024 of $24.3 million. The $44.4 million, plus $5.4 million in carrying costs, will be recovered over a 20-month period of September 1, 2024 through April 30, 2026, and the $24.3 million will be recovered over an eight-month period of September 1, 2024 through April 30, 2025. In addition, PURA approved an incremental $3.5 million of 2024 Innovative Energy Solutions program costs and $1.5 million of Connecticut Green Bank program costs over an eight-month period of September 1, 2024 through April 30, 2025. These amounts are included in the “Public Benefits” portion of the customer bills in Connecticut.

Current report

On October 17, 2024, PURA issued a proposed final decision on recovery of the costs for AMI implementation. Written exceptions to the proposed final decision were filed on October 31, 2024, and oral arguments were presented on November 7, 2024. CL&P’s written exceptions focused on three main aspects of the proposed decision, which include (1) clarifying the prudence standard to be used in evaluating AMI investments, (2) timing of prudency reviews, and (3) cost recovery related to incremental O&M expenses. On December 4, 2024, PURA issued a final decision on the recovery of costs for AMI implementation. On December 9, 2024, CL&P filed a petition for reconsideration because PURA had not fully resolved the issues CL&P raised in its October 31, 2024 written exceptions. On January 3, 2025, PURA stated it will evaluate the merits of CL&P’s petition for reconsideration. Under state law, PURA is expected to issue its decision within 90 days of January 3, 2025.

Current report

Yankee Gas Distribution Rate Case: On November 12, 2024, Yankee Gas filed an application with PURA to amend its existing distribution rates for effect on November 1, 2025. Yankee Gas’s rate application requested approval of a distribution rate increase of $209 million, which included a base distribution rate increase of $274 million, partially offset by a reduction of $65 million in the combined Gas System Improvements and System Expansion Reconciliation rates. In addition, Yankee Gas requested approval to implement a rate credit of $37.4 million to offset the PGA rate for non-firm margin credits over one year beginning November 1, 2025. As part of the rate case, Yankee Gas proposed to implement a multi-year performance-based rate making plan with a four-year initial term from November 1, 2025 to October 31, 2029 that would adjust rates annually and includes performance metrics. A final decision by PURA is expected in October 2025.

Current report

On April 18, 2024, PURA initiated a docket to address the matters on remand. On July 31, 2024, PURA issued a final decision in this docket and increased AWC-CT’s approved revenue requirement by $0.1 million above the amount authorized in the March 15, 2023 decision. Rates went into effect on July 31, 2024. On September 13, 2024, AWC-CT filed an appeal of PURA’s July 31, 2024 final decision to the Connecticut Superior Court. A ruling on the appeal is pending.

Current report

As a result of the State of Connecticut Superior Court’s March 2024 decision on the appeal, AWC-CT recorded the impacts of the PURA rate case decision from the effective date of the order on March 15, 2023 through December 31, 2024. The impacts primarily include a reduction to depreciation expense to reflect lower depreciation rates ordered by PURA in its final decision, partially offset by lower authorized revenues. These adjustments resulted in an after-tax benefit of $11.6 million in 2024.

Current report

NSTAR Electric CIP Filing: On December 30, 2022, the DPU approved a provisional system planning tariff for the recovery of costs associated with a capital investment project (CIP) proposal submitted by NSTAR Electric for one of six geographic study areas in its service territory in accordance with DPU’s directives. The DPU established a new, provisional framework for planning and funding upgrades to the electric power system to foster development and interconnection of distributed energy facilities. Under the DPU program, NSTAR Electric has filed infrastructure upgrade proposals to be built within a four-year construction timeframe that allocate the costs of interconnection upgrades between the interconnecting distributed generation facility and distribution customers based on a technical analysis of capacity benefits. Payments made by the distributed generation facility will be applied against the total capital investment made by NSTAR Electric and NSTAR Electric will earn a return on the net investment. The amount allocated to distribution customers will be recovered through a reconciling mechanism, the Provisional System Planning Tariff. The DPU approved the first of these provisional system planning projects, the Marion-Fairhaven group study area, which will enable 141 MW of distributed energy resources (DER) to be interconnected at a total estimated cost of $120 million. Of the total $120 million, $66 million will be allocated to distribution customers, once the enabled distributed energy facilities capacity is fully subscribed by distributed energy facilities interconnecting customers. Additionally, NSTAR Electric will proceed with construction of approximately $54 million of transmission upgrades necessary to improve local reliability and integrate distribution energy resources in the Marion-Fairhaven area and recover the amount through local transmission rates.

Current report

On June 4, 2024, the DPU approved four of the remaining five CIPs that were originally submitted by NSTAR Electric. These included the Plainfield-Blandford CIP, which will enable 40 MW of DER to be interconnected at a total estimated distribution investment of $37 million, the Dartmouth-Westport CIP which enables 60 MW of DER for a total distribution investment of $58 million, the Plymouth CIP which enables 380 MW of DER for a total distribution investment of $152 million and the Cape Cod CIP which enables 296 MW of DER for a total distribution investment of $170 million. Of the total $417 million for these four recently approved CIPs, $183 million will be allocated to distribution customers, once the enabled distributed energy facilities capacity is fully subscribed by distributed energy facilities interconnecting customers. Additionally, NSTAR Electric will proceed with construction of approximately $64 million of transmission upgrades necessary to improve local reliability and integrate distribution energy resources in the four CIP areas and recover the amount through local transmission rates. On January 27, 2025, NSTAR Electric filed a petition with the DPU to withdraw the sixth CIP project, Freetown, that was originally submitted.

Current report

On November 21, 2024, the DPU opened a second phase of the proceeding to consider a short-term ESMP-focused cost recovery mechanism and metrics. In issuing the notice of proceeding, the DPU limited the review of investment in this docket and excluded NSTAR Electric’s ESMP proposals regarding the EV Phase II extension, low and moderate income solar and the new CIPs. These investments will be reviewed in separate proceedings. This reduced the amount of company-proposed incremental capital investment to $295 million and the incremental expense to $44 million related to resiliency and grid modernization. NSTAR Electric filed its proposed tariff and testimony on December 18, 2024, and is currently in the discovery process, which will be followed by hearings and briefing with completion of the proceeding and final orders expected prior to the start of the plan in July 2025.

Current report

EGMA Distribution Rates: On November 4, 2024, EGMA submitted a revised filing for its first rate base reset for rates to be effective November 1, 2024, in accordance with an October 7, 2020 EGMA Rate Settlement Agreement approved by the DPU. The compliance filing was ordered by the DPU on October 31, 2024. The rate base reset occurring on November 1, 2024 adjusted distribution rates to account for capital additions (including the roll-in of GSEP capital additions), depreciation expense, property taxes, and return on rate base for capital additions placed into service through December 31, 2023. The total revenue requirement calculated for the first rate base reset is an increase to base distribution rates of $147.8 million, of which $34.0 million is associated with GSEP investments through December 31, 2023. Under the terms of the Rate Settlement Agreement, EGMA applied a cap on the revenue change effective November 1, 2024, and the amount in excess of the cap will be deferred for recovery through the Local Distribution Adjustment Clause (LDAC) on May 1, 2025, including carrying charges. After adjusting for the cap, the increase to base distribution rates is $85.6 million effective November 1, 2024 (of which $8.8 million is offset by a reduction in the GSEP revenue requirement and GSEP rate also taking effect on November 1, 2024 for a net distribution rate change on November 1, 2024 of $76.8 million). Base distribution rates will be increased effective November 1, 2025 to incorporate the $62.2 million remaining revenue requirement. On November 7, 2024, the DPU approved this filing.

Current report

Future of Gas Docket: In October 2020, the DPU opened Docket “DPU 20-80 The Future of Gas” to examine the role of Massachusetts natural gas local distribution companies (LDCs) in helping to meet the state’s 2050 climate goals. In December 2023, the DPU issued an order for this docket. The DPU will consider and, in some cases, require new processes and analysis for traditional natural gas investments, which may require significant changes to the LDC planning process and business models. The DPU intends to put policies and structures in place that would protect customers as Massachusetts works to decarbonize the building sector, which may involve subsequent dockets and regulatory proceedings and potentially recasting the role of LDCs in Massachusetts. The DPU preserved customer choice for energy needs and encouraged further development of decarbonized alternatives, such as the networked geothermal systems that NSTAR Gas is piloting in Framingham, Massachusetts.

Current report

On December 29, 2023, Eversource and other LDCs sought formal clarity from the DPU to fully understand the resulting impact to their natural gas businesses and the associated timing of any impacts. On April 2, 2024, the DPU issued an order responding to the request for clarification indicating that the LDCs shall implement the inclusion of a Non-Gas Pipeline Alternatives (NPA) analysis on all project authorizations effective immediately. Existing NPA analysis processes will be used until such time a formal stakeholder-based NPA analysis framework is established and approved by the DPU. Eversource, along with the other LDCs, have engaged a consultant to inform the development of the required NPA framework by conducting a stakeholder engagement process as mandated by the order. Another component of the order is the submission of climate compliance plans every five years beginning April 1, 2025. The climate compliance plan filings will include the NPA frameworks, along with energy transitions plans including details on the management of embedded infrastructure investments and cost recovery. Eversource along with the LDCs, have also contracted a consultant to model and investigate statewide cost recovery scenarios including under accelerated depreciation rates.

Current report

The DPU also indicated that NSTAR Gas and EGMA are not required to provide climate compliance performance metrics in the next PBR filing, however would be expected to propose metrics at the latest in the next base distribution rate proceeding. GHG emissions reporting was not changed from the order, however, effective November of 2024, reporting requirements have changed per the MA DEP and these requirements implement registration and GHG emissions reporting requirements for companies selling and distributing heating fuels to homes and businesses in Massachusetts, including suppliers of natural gas, fuel oil, and propane, and implement a reporting requirement for fuel storage facilities.

Current report

Eversource does not believe there is any indication of an inability to recover costs or risk of impairment of NSTAR Gas’ and EGMA’s natural gas assets at this time.

Current report

PSNH Distribution Rate Case: On June 11, 2024, PSNH filed an application with the NHPUC for approval of a temporary annual base distribution rate increase. On July 31, 2024, the NHPUC approved a settlement agreement that was reached by PSNH, New Hampshire Department of Energy, and the Office of the Consumer Advocate to implement a temporary annual base distribution rate increase of $61.2 million effective August 1, 2024.

Showing the first 40 of 70 passages. Open the source sections for the rest.

Removed paragraphs (62)

Previous report

•On February 13, 2024, we initiated an exploratory assessment of monetizing our water distribution business and are exploring the potential sale of the business.

Previous report

•On February 13, 2024, Eversource announced that it has executed an agreement to sell its existing 50 percent interests in the South Fork Wind and Revolution Wind projects to Global Infrastructure Partners (GIP). As part of this transaction, Eversource expects to receive approximately $1.1 billion of cash proceeds upon closing, which includes the sales value related to the 10 percent energy community ITC adder of approximately $170 million related to Revolution Wind, and to exit these projects while retaining certain cost sharing obligations for the construction of Revolution Wind. The purchase price is subject to future post-closing adjustment payments based on, among other things, the progress, timing and expense of construction at each project. The cost sharing obligations provide that Eversource would share equally with GIP in GIP’s funding obligations for up to approximately $240 million of incremental capital expenditure overruns incurred during the construction phase for the Revolution Wind project, after which GIP’s obligations for any additional capital expenditure overruns would be shared equally by Eversource and Ørsted. Additionally, Eversource’s financial exposure will be adjusted by certain purchase price adjustments to be made following commercial operation of the Revolution Wind project and closing of South Fork as a result of final project economics, which includes Eversource’s obligation to maintain GIP’s internal rate of return for each project as specified in the agreement. Eversource currently expects that South Fork Wind will reach full commercial operation prior to closing of the sale with GIP and Eversource does not expect any material cost sharing or other purchase price adjustment payments for South Fork Wind. Closing of the transaction is currently expected to occur in mid-2024.

Previous report

•On January 24, 2024, Ørsted signed an agreement with Eversource to acquire Eversource’s 50 percent share of Sunrise Wind. The sale is subject to the successful selection of Sunrise Wind in the ongoing New York fourth solicitation for offshore wind capacity, signing of an OREC contract with NYSERDA, finalization of sale agreements, receipt of final federal construction permits, and relevant regulatory approvals. If Sunrise Wind is not successful in the solicitation, then the existing OREC contract for Sunrise Wind will be cancelled according to the state’s requirements, and Eversource and Ørsted’s joint venture for Sunrise Wind will remain in place. In that scenario, Ørsted and Eversource would then assess their options in determining the best path forward for Sunrise Wind and its assets, which include the BOEM offshore lease area.

Previous report

•On January 25, 2024, Eversource and Ørsted submitted a new proposal for Sunrise Wind in the New York fourth offshore wind solicitation.

Previous report

•Four of South Fork Wind’s twelve turbines were installed and placed into service by January 1, 2024, meeting the project commercial operation date requirements under the power purchase agreement with LIPA. All wind turbines are expected to be installed and placed into service by the end of March 2024.

Previous report

(4) The 2021 after-tax costs are associated with the October 1, 2021 CL&P settlement agreement approved by PURA that included credits to customers and funding of various customer assistance initiatives and a 2021 storm performance penalty imposed on CL&P by PURA.

Previous report

Our water distribution segment earnings decreased $3.7 million in 2023, as compared to 2022, due primarily to higher depreciation, operations and maintenance expense and higher interest expense.

Previous report

Offshore Wind Business: Eversource’s offshore wind business includes 50 percent ownership interests in wind partnerships, which collectively hold the Revolution Wind, South Fork Wind and Sunrise Wind projects, and a tax equity investment in South Fork Wind. The offshore wind projects are being developed and constructed through joint and equal partnerships with Ørsted.

Previous report

As of December 31, 2023 and 2022, Eversource's total equity investment balance in its offshore wind business was $515.5 million and $1.95 billion, respectively.

Previous report

In September of 2023, Eversource made a contribution of $528 million using the proceeds from the lease area sale to invest in a tax equity interest for South Fork Wind. South Fork Wind was restructured as a tax equity investment, with Eversource purchasing 100 percent ownership of a new Class A tax equity membership interest. As a result of this investment, Eversource expects to receive investment tax credits after the turbines are placed in service for South Fork Wind and meet the requirements to qualify for the ITC. These credits will be utilized to reduce Eversource’s federal tax liability or generate tax refunds over the next 24 months. All of South Fork Wind’s twelve turbines are expected to be installed and placed into service by the end of March 2024.

Previous report

On January 24, 2024, Ørsted signed an agreement with Eversource to acquire Eversource’s 50 percent share of Sunrise Wind. The sale is subject to the successful selection of Sunrise Wind in the ongoing New York fourth solicitation for offshore wind capacity, signing of an OREC contract with NYSERDA, finalization of sale agreements, receipt of final federal construction permits, and relevant regulatory approvals. If Sunrise Wind is not successful in the solicitation, then the existing OREC contract for Sunrise Wind will be cancelled according to the state’s requirements, and Eversource and Ørsted’s joint venture for Sunrise Wind will remain in place. In that scenario, Ørsted and Eversource would then assess their options in determining the best path forward for Sunrise Wind and its assets, which include the BOEM offshore lease area. If Sunrise Wind’s revised bid is successful in the new solicitation, Sunrise Wind would have 90 days to negotiate a new OREC agreement at the re-bid price. In a successful re-bid, Ørsted would become the sole owner of Sunrise Wind, while Eversource would remain contracted to lead the project’s onshore construction. If Sunrise Wind is successful in the re-bid, Ørsted would pay Eversource 50 percent of the negotiated purchase price upon closing the sale transaction, with the remaining 50 percent paid when onshore construction is completed and certain other milestones are achieved. On January 25, 2024, Eversource and Ørsted submitted a new proposal for Sunrise Wind in the New York fourth offshore wind solicitation.

Previous report

Closing a transaction with GIP would be subject to customary conditions, including certain regulatory approvals under the Hart Scott Rodino Act and by the New York Public Service Commission and the FERC, as well as other conditions, among which is the completion and execution of the partnership agreements between GIP and Ørsted that will govern GIP’s new ownership interest in those projects following Eversource’s divestiture. Closing of the transaction is currently expected to occur in mid-2024. If closing of the sale is delayed, additional capital contributions made by Eversource would be recovered in the sales price. Under the agreement, Eversource’s existing credit support obligations are expected to roll off for each project around the time that each project completes its expected capital spend.

Previous report

The expected cash flows arising from the anticipated sales are a significant input in the impairment evaluation. In the fourth quarter of 2023, project construction forecasts were updated, and these new forecasts reflected additional expenditures for construction and scheduling related pressures, including the availability and increased cost of installation vessels and supply chain cost increases related to foundation fabrication. In determining the current fair value of the investments, these updated projections exceeded the previously estimated projections for construction expenditures, which resulted in a revised sales price that was significantly lower than the previous bid value. Another significant assumption in the impairment evaluation includes the probability of payment of future cost overruns on the three wind projects through each project's respective commercial operation date, which would not be recovered in the expected sales price. This assumption was based on construction projections updated in the fourth quarter of 2023 exceeding prior estimates. An increase in expected cost overruns could result in a significant impairment in a future period.

Previous report

Another fourth quarter 2023 development included in the impairment evaluation is the key judgment regarding the probability of future cash inflows and outflows associated with the sale or abandonment of the Sunrise Wind project and the expected outcome of the New York fourth offshore wind solicitation in 2024. In June 2023, Sunrise Wind filed a petition with the New York State Public Service Commission for an order authorizing NYSERDA to amend the Sunrise Wind OREC contract to increase the contract price to cover increased costs and inflation. At that time, management expected the contract repricing would be successful given NYSERDA’s public support for pricing adjustments. On October 12, 2023, the New York State Public Service Commission denied this petition. Subsequent to the denial, on November 30, 2023, the general terms of an expedited offshore wind renewable energy solicitation in New York were released. A primary condition for Sunrise Wind to participate in this new solicitation was to agree to terminate its existing OREC agreement. As of December 31, 2023, Eversource and Ørsted were considering whether to submit a new bid for Sunrise Wind, the price at which a new bid would be made, and the probability of success in the new bidding process. The December 31, 2023 impairment evaluation included management’s judgment of the likelihood of possible future scenarios that included the Sunrise Wind project continuing with its existing OREC contract, the project re-bidding and being selected in the new solicitation, the project re-bidding and not being selected, or the project not moving forward. The unfavorable development of the October 2023 denial of the OREC pricing petition, management’s assessment of the likelihood of success in the competitive New York re-bidding process, and the increased costs to build the project, have resulted in management’s assumption that the Sunrise Wind project will ultimately be abandoned, and therefore, no sales value was modeled in the impairment evaluation. Additionally, in the abandonment assumption, management has assumed the loss of contingent sales value associated with any related ITC adders and has estimated future cash outflows for Eversource’s share of cancellation costs required under Sunrise Wind’s supplier contracts, partially offset by expected salvage value and expected cost overruns not incurred in the case of abandonment that are included in the fourth quarter 2023 impairment charge. An increase in expected cancellation costs could result in a significant impairment in a future period.

Previous report

Management will continue to monitor and evaluate all facts and circumstances in the offshore wind sales process and the impact on its investment balance. Adverse changes in facts and circumstances of estimates and timing of future cash flows and the factors described above could result in the recognition of additional, significant impairment charges that could be material to the financial statements.

Previous report

The impairment charge was a non-cash charge and did not impact Eversource’s cash position. Eversource will continue to make future cash expenditures for required cash contributions to its offshore wind investments up to the time of disposition of each of the offshore wind projects. Capital contributions are expected until the sales are completed and changes in the timing and amounts of these contributions would be adjusted in the sales prices and therefore not result in an additional impairment charge. Proceeds from the transactions will be used to pay off parent company debt. Eversource’s offshore wind investments do not meet the criteria to qualify for presentation as a discontinued operation.

Previous report

Contracts, Permitting and Construction of Offshore Wind Projects: The following table provides a summary of the Eversource and Ørsted major projects with announced contracts:

Previous report

The offshore wind projects require receipt of federal, state and local approvals necessary to construct and operate the projects. The federal permitting process is led by BOEM, and state approvals are required from New York, Rhode Island and Massachusetts. South Fork Wind and Revolution Wind have received all required approvals to start construction. Significant delays in the siting and permitting process resulting from the timeline for obtaining approval from BOEM and the state and local agencies could adversely impact the timing of Sunrise Wind’s' in-service date.

Previous report

Federal Siting and Permitting Process: The federal siting and permitting process for each of our offshore wind projects commence with the filing of a Construction and Operations Plan (COP) application with BOEM. BOEM provides a review schedule for the project’s COP approval and conducts environmental and technical reviews of the COP. BOEM issues an Environmental Impact Statement (EIS) that assesses the environmental, social, and economic impacts of constructing the project and recommends measures to minimize impacts. The Final EIS will inform BOEM in deciding whether to approve the project or to approve with modifications and BOEM will then issue its Record of Decision. BOEM issues its final approval of the COP following the Record of Decision.

Previous report

Revolution Wind and Sunrise Wind filed their COP applications with BOEM in March 2020 and September 2020, respectively. For the Revolution Wind project, BOEM released its Draft EIS on September 2, 2022 and its Final EIS on July 17, 2023. On August 21, 2023, BOEM issued its Record of Decision, which concluded BOEM’s environmental review of the project and identified the recommended configuration. Final approval of the Revolution Wind project was received on November 20, 2023. For the Sunrise Wind project, BOEM released its Draft EIS on December 16, 2022 and its Final EIS on December 15, 2023. The Record of Decision is expected in the first quarter of 2024 and final approval of Sunrise Wind is expected in the second quarter of 2024.

Previous report

South Fork Wind, Revolution Wind and Sunrise Wind are each designated as a “Covered Project” pursuant to Title 41 of the Fixing America’s Surface Transportation Act (FAST41) and a Major Infrastructure Project under Section 3(e) of Executive Order 13807, which provides greater federal attention on meeting the projects’ permitting timelines.

Previous report

State and Local Siting and Permitting Process: State permitting applications in Rhode Island for Revolution Wind and in New York for Sunrise Wind were filed in December 2020. On July 8, 2022, the Rhode Island Energy Facilities Siting Board issued a Final Decision and Order approving the Revolution Wind project and granting a license to construct and operate.

Previous report

On November 17, 2022, the New York Public Service Commission approved an order adopting a Joint Proposal filed by Sunrise Wind and granting a Certificate of Environmental Compatibility and Public Need. On November 18, 2022, Sunrise Wind filed its Phase 1 Environmental Management and Construction Plan (EM&CP) with the New York Public Service Commission, which details the plans on limited onshore construction activities subject to state and local jurisdiction. On March 27, 2023, Sunrise Wind filed its EM&CP for Phase 2, which covers the remainder of the project components. On June 22, 2023, Sunrise Wind received approval of the Phase 1 EM&CP. On July 13, 2023, the New York State Public Service Commission approved Sunrise Wind’s notice for authorization to proceed with construction for Phase 1. On December 18, 2023, Sunrise Wind received approval of the Phase 2 EM&CP.

Previous report

On November 9, 2022, the Towns of Brookhaven and Suffolk County executed the easements and other real estate rights necessary to construct the Sunrise Wind project. On November 28, 2022, the Town of North Kingstown and the Quonset Development Corporation approved Revolution Wind’s real estate PILOT terms and the personal property PILOT agreement necessary to construct the Revolution Wind project.

Previous report

Construction Process: South Fork Wind received all required approvals to start construction and the project entered the construction phase in early 2022. All major onshore construction activities, including the project’s underground onshore transmission line and the onshore interconnection facility located in East Hampton, New York are complete. Offshore construction activities began in the fourth quarter of 2022, and installation of the subsea transmission cable, the monopile foundations and offshore substation was completed in 2023. Installation of the project’s 11-megawatt wind turbines continued throughout 2023 and four of South Fork Wind’s twelve turbines were placed into service by January 1, 2024, meeting the project commercial operation date requirements under the power purchase agreement with LIPA. All wind turbines are expected to be installed and placed into service by the end of March 2024. South Fork Wind faces several challenges and appeals of New York State and federal agency approvals, however we believe it is probable we will be able to overcome these challenges.

Previous report

For Revolution Wind, on October 31, 2023, the joint venture made its final investment decision to advance to full onshore and offshore construction and installation, and major construction began in the fourth quarter of 2023 upon receipt of all necessary federal, state and local approvals. For Sunrise Wind, once all necessary federal, state and local approvals are received and the joint venture has made its final investment decision, informed in part by the outcome of the New York fourth solicitation, then major construction is expected to begin. Sunrise Wind has started limited onshore construction activities.

Previous report

Projected In-Service Dates: We expect the South Fork Wind project to be in-service by the end of March 2024 and the Revolution Wind project to be in-service in late 2025. For Sunrise Wind, based on the updated BOEM permit schedule outlining when BOEM will complete its review of the COP, we currently expect an in-service date in 2026.

Previous report

FERC Notice of Proposed Rulemaking on Transmission Incentives: On March 20, 2020, FERC issued a Notice of Proposed Rulemaking (NOPR) on transmission incentives. The NOPR intends to revise FERC’s electric transmission incentive policies to reflect competing uses of transmission due to generation resource mix, technological innovation and shifts in load patterns. FERC proposes to grant transmission incentives based on measurable project economics and reliability benefits to consumers rather than its current project risks and challenges framework. On July 1, 2020, Eversource filed comments generally supporting the NOPR.

Previous report

On April 15, 2021, FERC issued a Supplemental NOPR that proposes to eliminate the existing 50 basis point return on equity for utilities that have been participating in a regional transmission organization (RTO ROE incentive) for more than three years. On June 25, 2021, the NETOs jointly filed comments strongly opposing FERC’s proposal. On July 26, 2021, the NETOs filed Supplemental NOPR reply comments responding to various parties advocating for the elimination of the RTO Adder. If FERC issues a final order eliminating the RTO ROE incentive as proposed in the Supplemental NOPR, the estimated annual impact (using 2023 estimated rate base) on Eversource's after-tax earnings is approximately $19.5 million. The Supplemental NOPR contemplates an effective date 30 days from the final order.

Previous report

Base Distribution Rates: In Connecticut, electric, natural gas and water utilities serving more than seventy-five thousand customers are required to file a distribution rate case within four years of the last rate case. PURA can elect to convene a general rate hearing at an interval of less than four years unless prohibited from doing so by an agency decision or other law. CL&P's and Yankee Gas' base distribution rates were each established in 2018 PURA-approved rate case settlement agreements. On October 27, 2021, PURA approved a settlement agreement for CL&P that included a current base distribution rate freeze until no earlier than January 1, 2024. The approval of the settlement agreement satisfied the Connecticut statute of rate review requirements that requires electric utilities to file a distribution rate case within four years of the last rate case.

Previous report

In New Hampshire, PSNH's base distribution rates were established in a December 2020 NHPUC-approved rate case settlement agreement. Aquarion's base distribution rates were established in a July 2022 NHPUC-approved rate case settlement agreement, with a single step adjustment approved on January 19, 2023. Rates were effective March 1, 2023.

Previous report

CL&P Storm Filing: On December 22, 2023, CL&P initiated a docket seeking a prudency review of approximately $634 million of catastrophic storm costs for twenty-four weather events from January 1, 2018 to December 31, 2021. In the filing, CL&P requested PURA establish a rate to collect $50 million annually from customers from the date of the final decision in this proceeding. This rate would be effective until the next distribution rate case and would replenish the under-collected storm reserve and reduce future carrying charges for customers.

Previous report

Termination of Park City Wind’s Power Purchase Agreement with CL&P: On October 2, 2023, Park City Wind LLC and CL&P signed an agreement to terminate the Park City Wind offshore wind generation PPA, at the request of Park City Wind LLC. The termination agreement was effective on October 13, 2023, the date of PURA approval. In October 2023, Park City Wind LLC paid a termination payment of $12.9 million to CL&P resulting from the termination of the PPA, which CL&P will return to customers.

Previous report

NSTAR Electric Distribution Rates: On November 30, 2022, the DPU issued its decision in the NSTAR Electric distribution rate case and approved a base distribution rate increase of $64 million effective January 1, 2023.

Previous report

Termination of SouthCoast Wind’s Power Purchase Agreements with NSTAR Electric: On August 28, 2023, SouthCoast Wind Energy LLC and NSTAR Electric signed agreements to terminate three SouthCoast Wind offshore wind generation PPAs, at the request of SouthCoast Wind Energy LLC. The termination agreements were effective on September 29, 2023, the date of DPU approval. In October 2023, SouthCoast Wind Energy, LLC paid a termination payment totaling $32.5 million to NSTAR Electric resulting from the termination of the PPAs, which NSTAR Electric will return to customers.

Previous report

Termination of Commonwealth Wind’s Power Purchase Agreement with NSTAR Electric: On July 13, 2023, Commonwealth Wind, LLC and NSTAR Electric signed an agreement to terminate the Commonwealth Wind offshore wind generation PPA, at the request of Commonwealth Wind, LLC. The termination agreement was effective on August 23, 2023, the date of DPU approval. In October 2023, Commonwealth Wind, LLC paid a termination payment of $25.9 million to NSTAR Electric, which NSTAR Electric will return to customers.

Previous report

PSNH Pole Acquisition Approval: On November 18, 2022, the NHPUC issued a decision that approved a proposed purchase agreement between PSNH and Consolidated Communications, in which, PSNH would acquire both jointly-owned and solely-owned poles and pole assets. The NHPUC also authorized PSNH to recover certain expenses associated with the operation and maintenance of the transferred poles, pole inspections, and vegetation management expenses through a new cost recovery mechanism, the PPAM, subject to consummation of the purchase agreement. The purchase agreement was finalized on May 1, 2023 for a purchase price of $23.3 million. Upon consummation of the purchase agreement, PSNH established a regulatory asset of $16.9 million for operation and maintenance expenses and vegetation management expenses associated with the purchased poles incurred from February 10, 2021 through April 30, 2023 that PSNH is authorized to collect through the PPAM regulatory tracking mechanism. The establishment of the PPAM regulatory asset resulted in a pre-tax benefit recorded in Amortization expense on the PSNH statement of income in 2023.

Previous report

PSNH Energy Efficiency Plan: On February 24, 2022, a state law was enacted that directed that the joint utility energy efficiency plan and programming framework in effect on January 1, 2021 be utilized going forward, including utility performance incentive payments, lost base revenue calculations, and Evaluation, Measurement, and Verification process. Additionally, the law established a process for future plan proposals, including the 2024 through 2026 triennial plan, and includes a mechanism for future rate increases based on the consumer price index.

Previous report

On November 30, 2023, the NHPUC approved a three-year joint utility energy efficiency plan for 2024 through 2026, of which, $158 million is the PSNH program budget over the next three years. Additionally, on December 22, 2023, the NHPUC approved the annual LBR rate for 2024, allowing PSNH to recover approximately $14 million in revenue that would have been collected if not for the implementation of energy efficiency measures.

Previous report

Connecticut: On June 29, 2023, Connecticut enacted Public Act No. 23-102 (Substitute Senate Bill No. 7) (the Act) that encompasses 40 sections. The Act prohibits recovery in retail rates of certain costs incurred by utilities, including costs for consultants and outside counsel for rate cases, membership dues, and lobbying. None of the rate-setting provisions will result in an immediate change to rates, as all will require some future process, primarily a general distribution rate proceeding before PURA.

Showing the first 40 of 62 passages. Open the source sections for the rest.

Reworded paragraphs (120)

Previous wording

The only common equity securities that are publicly traded are common shares of Eversource. Our earnings discussion includes financial measures that are not recognized under GAAP (non-GAAP) referencing our earnings and EPS excluding the impairment charges for the offshore wind investments, a loss on the disposition of land that was initially acquired to construct the Northern Pass Transmission project and was subsequently abandoned, certain transaction and transition costs, and our earnings and EPS excluding charges at CL&P related to an October 2021 settlement agreement that included credits to customers and funding of various customer assistance initiatives and a 2021 storm performance penalty imposed on CL&P by PURA. EPS by business is also a non-GAAP financial measure and is calculated by dividing the Net Income Attributable to Common Shareholders of each business by the weighted average diluted Eversource common shares outstanding for the period. The earnings and EPS of each business do not represent a direct legal interest in the assets and liabilities of such business, but rather represent a direct interest in our assets and liabilities as a whole.

Current wording

The only common equity securities that are publicly traded are common shares of Eversource. Our earnings discussion includes financial measures that are not recognized under GAAP (non-GAAP) referencing our earnings and EPS excluding losses on the sales and impairments of the offshore wind equity method investments, a loss on the pending sale of the Aquarion water distribution business, a loss on the disposition of land that was initially acquired to construct the Northern Pass Transmission project and was subsequently abandoned, and certain transaction and transition costs. EPS by business is also a non-GAAP financial measure and is calculated by dividing the Net Income Attributable to Common Shareholders of each business by the weighted average diluted Eversource common shares outstanding for the period. The earnings and EPS of each business do not represent a direct legal interest in the assets and liabilities of such business, but rather represent a direct interest in our assets and liabilities as a whole.

Previous wording

We use these non-GAAP financial measures to evaluate and provide details of earnings results by business and to more fully compare and explain our results without including these items. This information is among the primary indicators we use as a basis for evaluating performance and planning and forecasting of future periods. We believe the impacts of the impairment charges for the offshore wind investments, the loss on the disposition of land associated with an abandoned project, transaction and transition costs, and the CL&P October 2021 settlement agreement, and the 2021 storm performance penalty imposed on CL&P by PURA are not indicative of our ongoing costs and performance. We view these charges as not directly related to the ongoing operations of the business and therefore not an indicator of baseline operating performance. Due to the nature and significance of the effect of these items on Net Income Attributable to Common Shareholders and EPS, we believe that the non-GAAP presentation is a more meaningful representation of our financial performance and provides additional and useful information to readers of this report in analyzing historical and future performance of our business. These non-GAAP financial measures should not be considered as alternatives to reported Net Income Attributable to Common Shareholders or EPS determined in accordance with GAAP as indicators of operating performance.

Current wording

We use these non-GAAP financial measures to evaluate and provide details of earnings results by business and to more fully compare and explain our results without including these items. This information is among the primary indicators we use as a basis for evaluating performance and planning and forecasting of future periods. We believe the impacts of the losses on the offshore wind equity method investments, the loss on the pending sale of the Aquarion water distribution business, the loss on the disposition of land associated with an abandoned project, and transaction and transition costs are not indicative of our ongoing costs and performance. We view these charges as not directly related to the ongoing operations of the business and therefore not an indicator of baseline operating performance. Due to the nature and significance of the effect of these items on Net Income Attributable to Common Shareholders and EPS, we believe that the non-GAAP presentation is a more meaningful representation of our financial performance and provides additional and useful information to readers of this report in analyzing historical and future performance of our business. These non-GAAP financial measures should not be considered as alternatives to reported Net Income Attributable to Common Shareholders or EPS determined in accordance with GAAP as indicators of operating performance.

Previous wording

•We had a loss of $442.2 million, or $1.26 per share, in 2023, compared with earnings of $1.40 billion, or $4.05 per share, in 2022. Our 2023 results include after-tax impairment charges of $1.95 billion, or $5.58 per share, recorded at Eversource parent to reflect our current estimate of the fair value of the offshore wind projects. Our 2023 results also include after-tax land abandonment and other charges recorded at Eversource parent of $6.9 million, or $0.02 per share. Our 2022 results include after-tax transaction and transition costs of $15.0 million, or $0.04 per share. Excluding the offshore wind impairments and these other charges, our non-GAAP earnings were $1.52 billion, or $4.34 per share, in 2023, compared with $1.42 billion, or $4.09 per share, in 2022.

Current wording

•We earned $811.7 million, or $2.27 per share, in 2024, compared with a loss of $442.2 million, or $1.26 per share, in 2023. Our 2024 results include an aggregate, net after-tax loss on the sales of our offshore wind investments of $524.0 million, or $1.47 per share, and an after-tax loss resulting from the expected sale of Aquarion of $298.3 million, or $0.83 per share. Our 2023 results included after-tax impairment charges on our offshore wind investments of $1.95 billion, or $5.58 per share. Our 2023 results also included after-tax land abandonment and other charges of $6.9 million, or $0.02 per share. Excluding these charges, our non-GAAP earnings were $1.63 billion, or $4.57 per share, in 2024, compared with non-GAAP earnings of $1.52 billion, or $4.34 per share, in 2023.

Previous wording

•We project that we will earn within a 2024 non-GAAP earning guidance range of between $4.50 per share and $4.67 per share, which excludes the impact of the expected sales of our 50 percent interests in three jointly-owned offshore wind projects and related transaction costs. We also project that our long-term EPS growth rate through 2028 from our regulated utility businesses will be in a 5 to 7 percent range.

Current wording

•We project that we will earn within a 2025 earning guidance range of between $4.67 per share and $4.82 per share. We also project that our long-term EPS growth rate through 2029 will be in a 5 to 7 percent range, using 2024 non-GAAP EPS of $4.57 per share as the base year.

Previous wording

•Cash flows provided by operating activities totaled $1.65 billion in 2023, compared with $2.40 billion in 2022. Investments in property, plant and equipment totaled $4.34 billion in 2023 and $3.44 billion in 2022.

Current wording

•Cash flows provided by operating activities totaled $2.16 billion in 2024, compared with $1.65 billion in 2023. Investments in property, plant and equipment totaled $4.48 billion in 2024, compared with $4.34 billion in 2023.

Previous wording

•Cash and Cash Equivalents totaled $53.9 million as of December 31, 2023, compared with $374.6 million as of December 31, 2022. Our available borrowing capacity under our commercial paper programs totaled $512.3 million as of December 31, 2023.

Current wording

•Cash totaled $26.7 million as of December 31, 2024, compared with $53.9 million as of December 31, 2023. Our available borrowing capacity under our commercial paper programs totaled $607.2 million as of December 31, 2024.

Previous wording

•In 2023, we issued $5.20 billion of new long-term debt and we repaid $2.01 billion of long-term debt.

Current wording

•In 2024, we issued $4.50 billion of new long-term debt and we repaid $1.95 billion of long-term debt.

Previous wording

•In 2023, we paid dividends totaling $2.70 per common share, compared with dividends of $2.55 per common share in 2022. Our quarterly common share dividend payment was $0.675 per share in 2023, as compared to $0.6375 per share in 2022. On January 31, 2024, our Board of Trustees approved a common share dividend payment of $0.715 per share, payable on March 29, 2024 to shareholders of record as of March 5, 2024.

Current wording

•In 2024, we paid dividends totaling $2.86 per common share, compared with dividends of $2.70 per common share in 2023. Our quarterly common share dividend payment was $0.715 per share in 2024, as compared to $0.675 per share in 2023. On January 29, 2025, our Board of Trustees approved a common share dividend payment of $0.7525 per share, payable on March 31, 2025 to shareholders of record as of March 4, 2025.

Previous wording

•We project to make capital expenditures of $23.12 billion from 2024 through 2028, of which we expect $9.71 billion to be in our electric distribution segment, $5.44 billion to be in our natural gas distribution segment, $5.77 billion to be in our electric transmission segment, and $1.08 billion to be in our water distribution segment. We also project to invest $1.12 billion in information technology and facilities upgrades and enhancements.

Current wording

•We project to make capital expenditures of $24.17 billion from 2025 through 2029, of which we expect $10.22 billion to be in our electric distribution segment, $6.00 billion to be in our natural gas distribution segment, and $6.81 billion to be in our electric transmission segment. We also project to invest $1.15 billion in information technology and facilities upgrades and enhancements.

Previous wording

Consolidated: Below is a summary of our earnings/(loss) by business, which also reconciles the non-GAAP financial measures of consolidated non-GAAP earnings and EPS, as well as EPS by business, to the most directly comparable GAAP measures of consolidated Net (Loss)/Income Attributable to Common Shareholders and diluted EPS.

Current wording

Consolidated: Below is a summary of our earnings/(loss) by business, which also reconciles the non-GAAP financial measures of consolidated non-GAAP earnings and EPS, as well as EPS by business, to the most directly comparable GAAP measures of consolidated Net Income/(Loss) Attributable to Common Shareholders and diluted EPS.

Previous wording

(1)We recorded impairment charges resulting from the expected sales of our offshore wind investments and to reflect our current estimate of the fair value of the offshore wind projects. For further information, see "Business Development and Capital Expenditures – Offshore Wind Business" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Current wording

(1)In 2024, we recorded a loss on the sales of our offshore wind equity method investments. In 2023, we recorded impairment charges resulting from the expected sales of these offshore wind investments. For further information, see "Business Development and Capital Expenditures – Offshore Wind Business" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Previous wording

(2)The 2023 charges primarily include a loss on the disposition of land. The land was initially acquired to construct the Northern Pass Transmission project and was subsequently abandoned.

Current wording

(3)The 2023 charges primarily include a loss on the disposition of abandoned land intended to be used for the cancelled Northern Pass Transmission project.

Previous wording

(3) Transaction costs in 2022 and 2021 primarily include costs associated with the transition of systems as a result of our purchase of the assets of Columbia Gas of Massachusetts (CMA) on October 9, 2020 and integrating the CMA assets onto Eversource’s systems.

Current wording

(4)Transaction costs in 2022 primarily include costs associated with the transition of systems as a result of our purchase of the assets of Columbia Gas of Massachusetts (CMA) on October 9, 2020 and integrating the CMA assets onto Eversource’s systems.

Previous wording

Our electric distribution segment earnings increased $15.2 million in 2023, as compared to 2022, due primarily to a base distribution rate increase effective January 1, 2023 at NSTAR Electric, higher earnings from CL&P's capital tracking mechanism due to increased electric system improvements, an increase in interest income primarily on regulatory deferrals, the impact of a new regulatory tracking mechanism at PSNH that allows for the recovery of previously incurred operating expenses associated with poles acquired on May 1, 2023, and higher AFUDC equity income. Those earnings increases were partially offset by higher operations and maintenance expense, higher interest expense, higher property and other tax expense, higher depreciation expense and lower pension income.

Current wording

Our electric distribution segment earnings increased $23.7 million in 2024, as compared to 2023, due primarily to higher revenues from base distribution rate increases at NSTAR Electric effective January 1, 2024 and at PSNH effective August 1, 2024 and from CL&P's capital tracking mechanism due to increased electric system improvements, and an increase in interest income primarily on regulatory deferrals. Those earnings increases were partially offset by higher operations and maintenance expense primarily driven by higher employee benefit costs, higher interest expense, higher depreciation expense, the absence of a prior year benefit at PSNH related to the establishment of a new regulatory tracking mechanism that allowed for the recovery of previously incurred operating expenses associated with poles acquired on May 1, 2023, higher property tax expense, and a higher effective tax rate.

Previous wording

Our electric transmission segment earnings increased $46.8 million in 2023, as compared to 2022, due primarily to a higher transmission rate base as a result of our continued investment in our transmission infrastructure and a lower effective tax rate.

Current wording

Our electric transmission segment earnings increased $81.2 million in 2024, as compared to 2023, due primarily to a higher transmission rate base as a result of our continued investment in our transmission infrastructure and the impact of the annual rate reconciliation filing with FERC, partially offset by a higher effective tax rate.

Previous wording

Our natural gas distribution segment earnings decreased $9.4 million in 2023, as compared to 2022, due primarily to higher depreciation expense, higher interest expense, a higher effective tax rate, an unfavorable regulatory adjustment resulting from NSTAR Gas’ GSEP reconciliation filing, higher operations and maintenance expense arising primarily from higher uncollectible expense, and higher property tax expense. Those earnings decreases were partially offset by higher earnings from capital tracking mechanisms due to continued investments in natural gas infrastructure, base distribution rate increases effective November 1, 2023 and November 1, 2022 at NSTAR Gas and effective November 1, 2022 at EGMA, and an increase in interest income primarily on regulatory deferrals.

Current wording

Our natural gas distribution segment earnings increased $66.2 million in 2024, as compared to 2023, due primarily to higher revenues from base distribution rate increases effective November 1, 2024 at EGMA and effective November 1, 2024 and November 1, 2023 at NSTAR Gas and capital tracking mechanisms due to continued investments in natural gas infrastructure. Earnings also benefited from lower operations and maintenance expense, the absence of a prior year unfavorable regulatory adjustment resulting from NSTAR Gas’ GSEP reconciliation filing, and a lower effective tax rate. Those earnings increases were partially offset by higher depreciation expense, higher interest expense, and higher property tax expense.

Previous wording

Eversource Parent and Other Companies: Eversource parent and other companies’ losses increased $1.90 billion in 2023, as compared to 2022, due primarily to the 2023 impairments of Eversource parent’s offshore wind investments, which resulted in a total after-tax charge of $1.95 billion, or $5.58 per share. Earnings were also unfavorably impacted by higher interest expense and a loss on the disposition of land in 2023 that was initially acquired to construct the Northern Pass Transmission project and was subsequently abandoned. Earnings benefited by a lower effective tax rate as a result of the ability to utilize tax credits and benefits in 2023, as well as a decrease in after-tax transaction and transition costs. Additionally, 2023 earnings were favorably impacted from the liquidation of Eversource parent’s equity method investment in a renewable energy fund, partially offset by a charitable contribution made with a portion of the proceeds from the liquidation in 2023.

Current wording

Eversource Parent and Other Companies: Eversource parent and other companies’ losses decreased $1.37 billion in 2024, as compared to 2023, due primarily to the loss on the sale of Eversource parent’s offshore wind investments in 2024, which resulted in an after-tax charge of $524.0 million, as compared to an impairment charge on these investments in 2023 of $1.95 billion. Results for 2023 also include a loss on the disposition of land that was initially acquired to construct the Northern Pass Transmission project and was subsequently abandoned and other charges recorded of $6.9 million. Excluding these charges, Eversource parent and other companies earnings decreased by $66.3 million due primarily to higher interest expense and the absence of a benefit in 2023 from the liquidation of Eversource parent’s equity method investment in a renewable energy fund, partially offset by the absence of a charitable contribution made in 2023 with a portion of the proceeds from the liquidation, and a lower effective tax rate.

Previous wording

Eversource, CL&P, NSTAR Electric and PSNH each uses its available capital resources to fund its respective construction expenditures, meet debt requirements, pay operating costs, including storm-related costs, pay dividends, and fund other corporate obligations, such as pension contributions. Eversource's regulated companies recover their electric, natural gas and water distribution construction expenditures as the related project costs are depreciated over the life of the assets. This impacts the timing of the revenue stream designed to fully recover the total investment plus a return on the equity and debt used to finance the investments. Eversource's regulated companies spend a significant amount of cash on capital improvements and construction projects that have a long-term return on investment and recovery period. In addition, Eversource uses its capital resources to fund investments in its offshore wind business, which are recognized as long-term assets. These factors have resulted in current liabilities exceeding current assets by $2.09 billion, $308.5 million and $143.6 million at Eversource, NSTAR Electric and PSNH, respectively, as of December 31, 2023.

Current wording

Eversource, CL&P, NSTAR Electric and PSNH each uses its available capital resources to fund its respective construction expenditures, meet debt requirements, pay operating costs, including storm-related costs, pay dividends, and fund corporate obligations. Eversource's regulated companies recover their electric, natural gas and water distribution construction expenditures as the related project costs are depreciated over the life of the assets. This impacts the timing of the revenue stream designed to fully recover the total investment plus a return on the equity and debt used to finance the investments. Eversource's regulated companies spend a significant amount of cash on capital improvements and construction projects that have a long-term return on investment and recovery period. These factors have resulted in current liabilities exceeding current assets by $1.64 billion, $291.7 million and $112.0 million at Eversource, NSTAR Electric and PSNH, respectively, as of December 31, 2024.

Previous wording

As of December 31, 2023, $1.95 billion of Eversource's long-term debt, including $1.35 billion at Eversource parent and $139.8 million at CL&P, matures within the next 12 months. Eversource, with its solid credit ratings, has several options available in the financial markets to repay or refinance these maturities with the issuance of new long-term debt. Eversource, CL&P, NSTAR Electric and PSNH will reduce their short-term borrowings with operating cash flows or with the issuance of new long-term debt, determined by considering capital requirements and maintenance of Eversource's credit rating and profile.

Current wording

As of December 31, 2024, $1.40 billion of Eversource's long-term debt, including $600.0 million at Eversource parent, $400.0 million at CL&P and $250.0 million at NSTAR Electric, matures within the next 12 months. Eversource, with its current credit ratings, has several options available in the financial markets to repay or refinance these maturities with the issuance of new long-term debt. Eversource, CL&P, NSTAR Electric and PSNH will reduce their short-term borrowings with operating cash flows or with the issuance of new long-term debt, determined by considering capital requirements and maintenance of Eversource's credit rating and profile.

Previous wording

Cash and Cash Equivalents totaled $53.9 million as of December 31, 2023, compared with $374.6 million as of December 31, 2022.

Current wording

Cash totaled $26.7 million as of December 31, 2024, compared with $53.9 million as of December 31, 2023.

Previous wording

NSTAR Electric has a $650 million commercial paper program allowing NSTAR Electric to issue commercial paper as a form of short-term debt. NSTAR Electric is also a party to a five-year $650 million revolving credit facility, which terminates on October 13, 2028, and serves to backstop NSTAR Electric's $650 million commercial paper program.

Current wording

NSTAR Electric has a $650 million commercial paper program allowing NSTAR Electric to issue commercial paper as a form of short-term debt. NSTAR Electric is also a party to a five-year $650 million revolving credit facility, which terminates on October 11, 2029, that serves to backstop NSTAR Electric's $650 million commercial paper program.

Previous wording

CL&P and PSNH have uncommitted line of credit agreements totaling $375 million and $250 million, respectively, which will expire in 2024. There are no borrowings outstanding on either the CL&P or PSNH uncommitted line of credit agreements as of December 31, 2023.

Current wording

CL&P and PSNH have uncommitted line of credit agreements totaling $375 million and $250 million, respectively, all of which will expire in either May 2025, September 2025 or October 2025. There are no borrowings outstanding on either the CL&P or PSNH uncommitted line of credit agreements as of December 31, 2024.

Previous wording

Amounts outstanding under the commercial paper programs are included in Notes Payable and classified in current liabilities on the Eversource and NSTAR Electric balance sheets, as all borrowings are outstanding for no more than 364 days at one time. As a result of the CL&P long-term debt issuance in January 2024, $207.3 million of commercial paper borrowings under the Eversource parent commercial paper program were reclassified as Long-Term Debt on Eversource parent’s balance sheet as of December 31, 2023.

Current wording

Amounts outstanding under the commercial paper programs are included in Notes Payable and classified in current liabilities on the Eversource and NSTAR Electric balance sheets, as all borrowings are outstanding for no more than 364 days at one time. As a result of the CL&P long-term debt issuance in January 2024, $207.3 million of commercial paper borrowings under the Eversource parent commercial paper program were reclassified to Long-Term Debt on Eversource parent’s balance sheet as of December 31, 2023.

Previous wording

Intercompany Borrowings: Eversource parent uses its available capital resources to provide loans to its subsidiaries to assist in meeting their short-term borrowing needs. Eversource parent records intercompany interest income from its loans to subsidiaries, which is eliminated in consolidation. Intercompany loans from Eversource parent to its subsidiaries are eliminated in consolidation on Eversource's balance sheets. As of December 31, 2023, there were intercompany loans from Eversource parent to CL&P of $457.0 million and to PSNH of $233.0 million. As of December 31, 2022, there were intercompany loans from Eversource parent to PSNH of $173.3 million. Eversource parent charges interest on these intercompany loans at the same weighted-average interest rate as its commercial paper program. Intercompany loans from Eversource parent are included in Notes Payable to Eversource parent and classified in current liabilities on the respective subsidiary's balance sheets, as these intercompany borrowings are outstanding for no more than 364 days at one time. As a result of the CL&P long-term debt issuance in January 2024, $207.3 million of CL&P’s intercompany borrowings were reclassified to Long-Term Debt on CL&P’s balance sheet as of December 31, 2023.

Current wording

Intercompany Borrowings: Eversource parent uses its available capital resources to provide loans to its subsidiaries to assist in meeting their short-term borrowing needs. Eversource parent records intercompany interest income from its loans to subsidiaries, which is eliminated in consolidation. Intercompany loans from Eversource parent to its subsidiaries are eliminated in consolidation on Eversource's balance sheets. As of December 31, 2024, there were intercompany loans from Eversource parent to CL&P of $280.0 million and to PSNH of $131.1 million. As of December 31, 2023, there were intercompany loans from Eversource parent to CL&P of $457.0 million and to PSNH of $233.0 million. Eversource parent charges interest on these intercompany loans at the same weighted-average interest rate as its commercial paper program. Intercompany loans from Eversource parent are included in Notes Payable to Eversource Parent and classified in current liabilities on the respective subsidiary's balance sheets, as these intercompany borrowings are outstanding for no more than 364 days at one time. As a result of the CL&P long-term debt issuance in January 2024, $207.3 million of CL&P’s intercompany borrowings were reclassified to Long-Term Debt on CL&P’s balance sheet as of December 31, 2023.

Previous wording

Availability under Long-Term Debt Issuance Authorizations: On June 14, 2022, the DPU approved NSTAR Gas’ request for authorization to issue up to $325 million in long-term debt through December 31, 2024. On November 30, 2022, the PURA approved CL&P's request for authorization to issue up to $1.15 billion in long-term debt through December 31, 2024. As a result of CL&P’s January 2024 long-term debt issuance, CL&P has now fully utilized this authorization. On June 7, 2023, PURA approved Yankee Gas’ request for authorization to issue up to $350 million in long-term debt through December 31, 2024. On November 21, 2023, NSTAR Electric petitioned the DPU requesting authorization to issue up to $2.4 billion in long-term debt through December 31, 2026. On February 8, 2024, the NHPUC approved PSNH’s request for authorization to issue up to $300 million in long-term debt through December 31, 2024.

Current wording

Availability under Long-Term Debt Issuance Authorizations: On May 1, 2024, the DPU approved NSTAR Electric’s request for authorization to issue up to $2.40 billion in long-term debt through December 31, 2026. On July 24, 2024, PURA approved CL&P’s request for authorization to issue up to $1.00 billion in long-term debt through December 31, 2025. On August 12, 2024, the DPU approved EGMA’s request for authorization to issue up to $325 million in long-term debt through December 31, 2026. On December 18, 2024, the DPU approved NSTAR Gas’ request for authorization to issue up to $475 million in long-term debt through December 31, 2027. On January 28, 2025, Yankee Gas submitted an application to PURA requesting authorization to issue up to $360 million in long-term debt through December 31, 2026. PSNH has utilized its long-term debt authorizations in place with NHPUC.

Previous wording

As a result of the CL&P and Eversource parent long-term debt issuances in January 2024, $139.8 million and $990.9 million, respectively, of current portion of long-term debt were reclassified as Long-Term Debt on CL&P’s and Eversource parent’s balance sheets as of December 31, 2023.

Current wording

As a result of the CL&P long-term debt issuance in January 2025, $397.1 million of current portion of long-term debt was reclassified to Long-Term Debt on Eversource’s and CL&P’s balance sheets as of December 31, 2024.

Previous wording

Rate Reduction Bonds: PSNH's RRB payments consist of principal and interest and are paid semi-annually. PSNH paid $43.2 million of RRB principal payments in each of 2023 and 2022, and paid $16.2 million and $17.6 million of interest payments in 2023 and 2022, respectively.

Current wording

Rate Reduction Bonds: PSNH's RRB payments consist of principal and interest and are paid semi-annually. PSNH paid $43.2 million of RRB principal payments in each of 2024 and 2023, and paid $14.9 million and $16.2 million of interest payments in 2024 and 2023, respectively.

Previous wording

Common Share Issuances and 2022 Equity Distribution Agreement: On May 11, 2022, Eversource entered into an equity distribution agreement pursuant to which it may offer and sell up to $1.2 billion of its common shares from time to time through an “at-the-market” (ATM) equity offering program. In 2023, no shares were issued under this agreement. In 2022, Eversource issued 2,165,671 common shares, which resulted in proceeds of $197.1 million, net of issuance costs. Eversource used the net proceeds received for general corporate purposes.

Current wording

Common Share Issuances: Eversource had an equity distribution agreement pursuant to which it could offer and sell up to $1.2 billion of its common shares from time to time through an “at-the-market” (ATM) equity offering program. In 2024, Eversource issued 15,740,294 common shares, which resulted in proceeds of $989.4 million, net of issuance costs. Eversource used the net proceeds received for general corporate purposes. In 2023, no shares were issued under this agreement. Eversource completed the program in October 2024.

Previous wording

Cash Flows: Cash flows from operating activities primarily result from the transmission and distribution of electricity, and the distribution of natural gas and water. Cash flows provided by operating activities totaled $1.65 billion in 2023, compared with $2.40 billion in 2022. Operating cash flows were unfavorably impacted by an increase in regulatory under-recoveries driven primarily by the timing of collections for the CL&P non-bypassable FMCC and other regulatory tracking mechanisms, the timing of cash payments made on our accounts payable, a $26.7 million increase in cash payments to vendors for storm costs, an $11.9 million increase in cost of removal expenditures, and the timing of other working capital items. In 2023, CL&P increased the flow back to customers of net revenues generated by long-term state-approved energy contracts by providing these credits to customers through the non-bypassable FMCC retail rate. The reduction in the CL&P non-bypassable FMCC retail rate decreased the regulatory over-recovery balance and created an under-recovery balance as of December 31, 2023, which resulted in a decrease to amortization expense of $802.3 million in 2023, as compared to 2022, and is presented as a cash outflow in Amortization on the statement of cash flows. The impacts of regulatory collections are included in both Regulatory Recoveries and Amortization on the statements of cash flows. These unfavorable impacts were partially offset by the timing of cash collections on our accounts receivable, the absence in 2023 of $78.4 million of payments in 2022 related to withheld property taxes at our Massachusetts companies, a decrease of $76.3 million in pension contributions made in 2023 compared to 2022, the absence in 2023 of $72.0 million of customer credits distributed in 2022 at CL&P as a result of the October 2021 settlement agreement and the 2021 storm performance penalty for CL&P’s response to Tropical Storm Isaias, and a $38.7 million increase in operating cash flows due to lower income tax payments.

Current wording

Cash Flows: Cash flows from operating activities primarily result from the transmission and distribution of electricity, and the distribution of natural gas and water. Cash flows provided by operating activities totaled $2.16 billion in 2024, compared with $1.65 billion in 2023. Operating cash flows were favorably impacted by the timing of cash payments made on our accounts payable, a $108.8 million increase due to income tax refunds received in 2024 as compared to income tax payments made in 2023, an improvement in regulatory under-recoveries driven primarily by the timing of collections for the CL&P non-bypassable FMCC and other regulatory tracking mechanisms partially offset by the unfavorable impact in the timing of collections for energy supply costs, a $20.7 million decrease in cost of removal expenditures, a $12.4 million decrease in cash payments to vendors for storm costs, and the timing of other working capital items. The impacts of regulatory collections are included in both Regulatory Recoveries and Amortization on the statements of cash flows. These favorable impacts were partially offset by the timing of cash collections on our accounts receivable.

Previous wording

In 2023, we paid cash dividends of $919.0 million and issued non-cash dividends of $23.4 million in the form of treasury shares, totaling dividends of $942.4 million, or $2.70 per common share. In 2022, we paid cash dividends of $860.0 million and issued non-cash dividends of $23.1 million in the form of treasury shares, totaling dividends of $883.1 million, or $2.55 per common share. Our quarterly common share dividend payment was $0.675 per share in 2023, as compared to $0.6375 per share in 2022. On January 31, 2024, our Board of Trustees approved a common share dividend payment of $0.715 per share, payable on March 29, 2024 to shareholders of record as of March 5, 2024.

Current wording

In 2024, we paid cash dividends of $1.00 billion and issued non-cash dividends of $23.5 million in the form of treasury shares, totaling dividends of $1.03 billion, or $2.86 per common share. In 2023, we paid cash dividends of $919.0 million and issued non-cash dividends of $23.4 million in the form of treasury shares, totaling dividends of $942.4 million, or $2.70 per common share. Our quarterly common share dividend payment was $0.715 per share in 2024, as compared to $0.675 per share in 2023. On January 29, 2025, our Board of Trustees approved a common share dividend payment of $0.7525 per share, payable on March 31, 2025 to shareholders of record as of March 4, 2025.

Previous wording

In 2023, CL&P, NSTAR Electric and PSNH paid $330.4 million, $327.4 million and $112.0 million, respectively, in common stock dividends to Eversource parent.

Current wording

In 2024, CL&P, NSTAR Electric and PSNH paid $333.8 million, $643.9 million and $62.0 million, respectively, in common stock dividends to Eversource parent.

Previous wording

Investments in Property, Plant and Equipment on the statements of cash flows do not include amounts incurred on capital projects but not yet paid, cost of removal, AFUDC related to equity funds, and the capitalized and deferred portions of pension and PBOP income/expense. In 2023, investments for Eversource, CL&P, NSTAR Electric, and PSNH were $4.34 billion, $1.09 billion, $1.38 billion and $605.1 million, respectively. Capital expenditures were primarily for continuing projects to maintain and improve infrastructure and operations, including enhancing reliability to the transmission and distribution systems.

Current wording

Investments in Property, Plant and Equipment on the statements of cash flows do not include amounts incurred on capital projects but not yet paid, cost of removal, AFUDC related to equity funds, and the capitalized and deferred portions of pension and PBOP income/expense. In 2024, investments for Eversource, CL&P, NSTAR Electric, and PSNH were $4.48 billion, $978.5 million, $1.56 billion and $608.8 million, respectively. Capital expenditures were primarily for continuing projects to maintain and improve infrastructure and operations, including enhancing reliability to the transmission and distribution systems.

Previous wording

Our commitments to make payments in addition to these contractual obligations include other liabilities reflected on our balance sheets, future funding of our offshore wind equity method investments until the expected sales are completed, and guarantees of certain obligations primarily associated with our offshore wind investments. The future funding and guarantee obligations associated with our offshore wind investments will be impacted by the expected sales of our offshore wind investments and related developments.

Current wording

Our commitments to make payments in addition to these contractual obligations include other liabilities reflected on our balance sheets, and guarantees of certain obligations primarily associated with construction of our previously owned offshore wind investments.

Previous wording

For information regarding our projected capital expenditures over the next five years, see "Business Development and Capital Expenditures - Projected Capital Expenditures" and for further information on the expected sales of our offshore wind investments, see “Business Development and Capital Expenditures - Offshore Wind Business" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Current wording

For information regarding our projected capital expenditures over the next five years, see "Business Development and Capital Expenditures - Projected Capital Expenditures" included in this Management's Discussion and Analysis of Financial Condition and Results of Operations.

Previous wording

Our consolidated capital expenditures, including amounts incurred but not paid, cost of removal, AFUDC, and the capitalized and deferred portions of pension and PBOP income/expense (all of which are non-cash factors), totaled $4.59 billion in 2023, $3.79 billion in 2022, and $3.54 billion in 2021. These amounts included $214.4 million in 2023, $266.5 million in 2022, and $238.0 million in 2021 related to information technology and facilities upgrades and enhancements, primarily at Eversource Service and The Rocky River Realty Company.

Current wording

Our consolidated capital expenditures, including amounts incurred but not paid, cost of removal, AFUDC, and the capitalized and deferred portions of pension and PBOP income/expense (all of which are non-cash factors), totaled $4.64 billion in 2024, $4.59 billion in 2023, and $3.79 billion in 2022. These amounts included $260.5 million in 2024, $214.4 million in 2023, and $266.5 million in 2022 related to information technology and facilities upgrades and enhancements, primarily at Eversource Service and The Rocky River Realty Company.

Previous wording

Electric Transmission Business: Our consolidated electric transmission business capital expenditures increased by $240.8 million in 2023, as compared to 2022. A summary of electric transmission capital expenditures by company is as follows:

Current wording

Electric Transmission Business: Our consolidated electric transmission business capital expenditures decreased by $120.0 million in 2024, as compared to 2023. A summary of electric transmission capital expenditures by company is as follows:

Previous wording

Our transmission projects are designed to improve the reliability of the electric grid, meet customer demand for power and increases in electrification of municipal infrastructure, strengthen the electric grid's resilience against extreme weather and other safety and security threats, and enable integration of increasing amounts of clean power generation from renewable sources, such as solar, battery storage, and offshore wind. In Connecticut, Massachusetts and New Hampshire, our transmission projects include transmission line upgrades, the installation of new transmission interconnection facilities, substations and lines, and transmission substation enhancements.

Current wording

Our transmission projects are designed to improve the reliability of the electric grid, meet customer demand for power, and strengthen the electric grid's resilience against extreme weather and other safety and security threats. In Connecticut, Massachusetts and New Hampshire, our transmission projects include transmission line upgrades, the installation of new transmission interconnection facilities, substations and lines, and transmission substation enhancements.

Previous wording

Projected Capital Expenditures: A summary of the projected capital expenditures for the regulated companies' electric transmission and for the total electric distribution, natural gas distribution and water distribution for 2024 through 2028, including information technology and facilities upgrades and enhancements on behalf of the regulated companies, is as follows:

Current wording

Projected Capital Expenditures: A summary of the projected capital expenditures for the regulated companies' electric transmission and for the total electric distribution and natural gas distribution for 2025 through 2029, including information technology and facilities upgrades and enhancements on behalf of the regulated companies, is as follows:

Previous wording

The projections do not include investments related to offshore wind projects. Actual capital expenditures could vary from the projected amounts for the companies and years above.

Current wording

Actual capital expenditures could vary from the projected amounts for the companies and years above.

Previous wording

Expected Sales of Offshore Wind Investments: On May 25, 2023, Eversource announced that it had completed a strategic review of its offshore wind investments and determined that it would pursue the sale of its offshore wind investments. On September 7, 2023, Eversource completed the sale of its 50 percent interest in an uncommitted lease area consisting of approximately 175,000 developable acres located 25 miles off the south coast of Massachusetts to Ørsted for $625 million in an all-cash transaction.

Current wording

On May 25, 2023, Eversource announced that it had completed a strategic review of its offshore wind investments and determined that it would pursue the sale of its offshore wind investments. On September 7, 2023, Eversource completed the sale of its 50 percent interest in an uncommitted lease area consisting of approximately 175,000 developable acres located 25 miles off the south coast of Massachusetts to Ørsted for $625 million in an all-cash transaction.

Showing the first 40 of 120 pairs. Open the source sections for the rest.

Rearranged current paragraphs (7)

Current report — wording carried from elsewhere

Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order.

Current report — wording carried from elsewhere

We continue to monitor developments in this proceeding, and at this time, we cannot predict the ultimate outcome of this proceeding and the resulting impact to CL&P.

Current report — wording carried from elsewhere

NSTAR Gas Distribution Rates: NSTAR Gas’ PBR mechanism allows for an annual adjustment to base distribution rates for inflation and exogenous events. On September 16, 2024, NSTAR Gas submitted its annual PBR Adjustment filing for a $12.7 million increase to base distribution rates for effect on November 1, 2024. On October 30, 2024, the DPU approved this filing.

Current report — wording carried from elsewhere

We use judgment when recording regulatory assets and liabilities; however, regulatory commissions can reach different conclusions about the recovery of costs, and those conclusions could have a material impact on our financial statements. The ultimate outcome of regulatory rate proceedings could have a significant effect on our ability to recover costs or earn an adequate return. Established rates are also often subject to subsequent prudency reviews by state regulators, whereby various portions of rates could be adjusted, subject to refund or disallowed.

Current report — wording carried from elsewhere

NSTAR Electric’s PBR mechanism allows for an annual adjustment to base distribution rates for inflation, exogenous events and future capital additions based on a historical five-year average of total capital additions. On December 26, 2023, the DPU approved a $104.9 million increase to NSTAR Electric’s base distribution rates effective January 1, 2024.

Current report — wording carried from elsewhere

The variance in tracked distribution revenues in 2024, as compared to 2023, is due primarily to the following:

Current report — wording carried from elsewhere

•The increase at PSNH was due to higher property taxes as a result of higher utility plant balances.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

On March 15, 2023, PURA issued a final decision that rejected Aquarion Water Company of Connecticut’s (AWC-CT) application with PURA to amend its existing rate schedules. AWC-CT filed an appeal on the decision and on May 25, 2023, the State of Connecticut Superior Court granted a permanent stay of certain orders affecting base rates, which will keep existing rates in place until the appeal is completed. For further information, see "Regulatory Developments and Rate Matters - Connecticut," below.

Previous report — wording carried elsewhere

•The decrease at NSTAR Electric was due to the deferral adjustment, which reflects the actual costs of energy efficiency programs compared to the amounts billed to customers, and the timing of the recovery of energy efficiency costs.