EQT Corp
For the period ended Sep 30, 2024. Filed Oct 30, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Oct 30, 2024
What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2024-06-30; filed 2024-07-24.
0000033213-24-000032
Item 1A. Risk FactorsCurrent report: 10-Q
Period ended 2024-09-30; filed 2024-10-30.
0000033213-24-000047
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 6 previous paragraphs and 74 current paragraphs.
5 unchanged; 1 reworded; 68 added; 0 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
The current filing states there were no material changes to risk factors.
This is the filer’s own statement, not a conclusion from the comparison. Read its qualifications and the report it references.
Current filing’s statement
There are no material changes to the risk factors previously disclosed in the "Risk Factors" section of our Annual Report on Form 10-K for the year ended December 31, 2023 other than those listed below.
Added paragraphs (68)
Current report
Risks Related to Gathering Segment and Transmission Segment Operations
Current report
We are subject to numerous operational risks and hazards incidental to the gathering, transmission and storage of natural gas, as well as unforeseen interruptions.
Current report
Our business operations are subject to the inherent hazards and risks normally incidental to the gathering, transmission and storage of natural gas. These operating risks, some of which we have experienced and/or could experience in the future, include but are not limited to:
Current report
•aging infrastructure and mechanical or structural problems;
Current report
•failure of equipment, facilities or new technology;
Current report
•damage to pipelines, wells and storage assets, facilities, equipment, environmental controls and surrounding properties, and pipeline blockages or other operational interruptions, caused or exacerbated by natural phenomena, weather conditions, acts of sabotage, vandalism and terrorism;
Current report
•inadvertent damage from construction, vehicles, and farm and utility equipment;
Current report
•uncontrolled releases of natural gas and other hydrocarbons or of fresh, mixed or produced water, or other hazardous materials;
Current report
•leaks, migrations or losses of natural gas as a result of issues regarding pipeline and/or storage equipment or facilities and, including with respect to storage assets, as a result of undefined boundaries, geologic anomalies, limitations in then-applied industry-standard testing methodologies, operational practices (including as a result of regulatory requirements), natural pressure migration and wellbore migration or other factors relevant to such storage assets;
Current report
•other hazards that could also result in personal injury and loss of life, pollution to the environment and suspension of operations.
Current report
Any such events, certain of which we have experienced, and any of which we may experience in the future, could result in loss of human life, personal injuries, significant damage to property, environmental pollution, impairment or interruption, which could be significant, to our operations, regulatory investigations and penalties or other sanctions and substantial losses to us and could have a material adverse effect on our business, financial condition, results of operations, and liquidity, particularly if the event is not fully covered by insurance. The location of certain segments of our systems in or near populated areas, including residential areas, commercial business centers and industrial sites, could increase the damages resulting from these risks. Accidents or other operating risks have resulted, and in the future could result, in loss of service available to our customers. Customer impacts arising from service interruptions on segments of our systems and/or our assets have included and/or may include, without limitation and as applicable, curtailments, limitations on our ability to satisfy customer contractual requirements, obligations to provide reservation charge credits to customers and solicitation of our existing customers by third parties for potential new projects that would compete directly with our existing services. Such circumstances could adversely impact our ability to retain customers and negatively impact our business, financial condition, results of operations, and liquidity.
Current report
Expanding our business by constructing new midstream assets subjects us to construction, business, economic, competitive, regulatory, judicial, environmental, political and legal uncertainties that are beyond our control.
Current report
The development and construction by us or our joint ventures of pipeline and storage facilities and the optimization of such assets involve numerous construction, business, economic, competitive, regulatory, judicial, environmental, political and legal uncertainties that are beyond our control, require the expenditure of significant amounts of capital and expose us to risks. Those risks include, but are not limited to: (i) physical construction conditions, such as topographical, or unknown or unanticipated geological, conditions and impediments; (ii) construction site access logistics; (iii) crew availability and productivity and ability to adhere to construction workforce drawdown plans; (iv) adverse weather conditions; (v) project opposition, including delays caused by landowners, advocacy groups or activists opposed to our projects and/or the natural gas industry through lawsuits or intervention in regulatory proceedings; (vi) environmental protocols and evolving regulatory or legal requirements and related impacts therefrom, including additional costs of compliance; (vii) the application of time of year or other regulatory restrictions affecting construction, (viii) failure to meet customer contractual requirements; (ix) environmental hazards; (x) vandalism; (xi) the lack of available skilled labor, equipment and materials (or escalating costs in respect thereof, including as a result of inflation); (xii) issues regarding availability of or access to connecting infrastructure; and (xiii) the inability to obtain necessary rights-of-way or approvals and permits from regulatory agencies on a timely basis or at all (and maintain such rights-of-way, approvals and permits once obtained, including by reason of judicial hostility or activism). Risks inherent in the construction of these types of projects, such as unanticipated geological conditions, challenging terrain in certain of our construction areas and severe or continuous adverse weather conditions, have adversely affected, and in the future could adversely affect, project timing, completion and cost, as well as increase the risk of loss of human life, personal injuries, significant damage to property or environmental pollution. Most notably, certain of these risks have been realized in the construction of the MVP project, including construction-related risks and adverse weather conditions, and such risks or other risks may be realized in the future which may further adversely affect the timing and/or cost of the MVP and the MVP Southgate project.
Current report
Given such risks and uncertainties, our midstream projects or those of our joint ventures may not be completed on schedule, within budgeted cost or at all. As a further example, public participation, including by pipeline infrastructure opponents, in the review and permitting process of projects, through litigation or otherwise, has previously introduced, and in the future can introduce, uncertainty and adversely affect project timing, completion and cost. See also Item 1A., "Risk Factors – The regulatory approval process for the construction of new transmission assets is very challenging, and, as demonstrated with the MVP pipeline, has resulted in significantly increased costs and delayed targeted in-service dates, and decisions by regulatory and/or judicial authorities in pending or potential proceedings relevant to the development of midstream assets, particularly any litigation instituted in the Fourth Circuit, such as regarding the MVP Southgate project and/or expansions or extensions of the MVP, are likely to impact our or the MVP Joint Venture's ability to obtain or maintain in effect all approvals and authorizations, including as may be necessary to complete certain projects in a timely manner or at all, or our ability to achieve the expected investment returns on the projects." Further, civil protests regarding environmental justice and social issues or challenges in project permitting processes related to such issues, including proposed construction and location of infrastructure associated with fossil fuels, poses an increased risk and may lead to increased litigation, legislative and regulatory initiatives and review at federal, state, tribal and local levels of government or permitting delays that can prevent or delay the construction of such infrastructure and realization of associated revenues.
Current report
Additionally, construction expenditures on projects generally occur over an extended period, yet we will not receive revenues from, or realize any material increases in cash flow as a result of, the relevant project until it is placed into service. Moreover, our cash flow from a project may be delayed or may not meet our expectations, including as a result of taxes which could potentially be calculated based on excess expenditures, inclusive of maintenance, incurred during extended court-driven construction delays. Furthermore, we may construct facilities to capture anticipated future growth in production and/or demand in a region in which such growth does not materialize or is delayed beyond our expectations. As a result, new facilities may not be able to attract enough throughput to achieve our expected investment return. Such issues in respect of the construction of midstream assets could adversely affect our business, financial condition, results of operations and liquidity.
Current report
The regulatory approval process for the construction of new transmission assets is very challenging, and, as demonstrated with the MVP pipeline, has resulted in significantly increased costs and delayed targeted in-service dates, and decisions by regulatory and/or judicial authorities in pending or potential proceedings relevant to the development of midstream assets, particularly any litigation instituted in the Fourth Circuit, such as regarding the MVP Southgate project and/or expansions or extensions of the MVP, are likely to impact our or the MVP Joint Venture's ability to obtain or maintain in effect all approvals and authorizations, including as may be necessary to complete certain projects in a timely manner or at all, or our ability to achieve the expected investment returns on the projects.
Current report
Certain of our projects require regulatory approval from federal, state and/or local authorities prior to and/or in the course of construction, including any extensions from, expansions of or additions to our and the MVP Joint Venture's gathering, transmission and storage systems, as applicable. The approval process for certain projects has become increasingly slower and more difficult, due in part to federal, state and local concerns related to exploration and production, transmission and gathering activities and associated environmental impacts, and the increasingly negative public perception regarding, and opposition to, the oil and gas industry, including major pipeline projects like the MVP and MVP Southgate. Further, regulatory approvals and authorizations, even when obtained, have increasingly been subject to judicial challenge by activists requesting that issued approvals and authorizations be stayed and vacated.
Current report
Accordingly, authorizations needed for our or the MVP Joint Venture's projects, including any expansion of the MVP project and the MVP Southgate project or other extensions, may not be granted or, if granted, such authorizations may include burdensome or expensive conditions or may later be stayed or revoked or vacated, as was repeatedly the case with the construction of the MVP project, particularly in respect of litigation in the Fourth Circuit. Significant delays in the regulatory approval process for projects, as well as stays and losses of critical authorizations and permits, should they be experienced, have the potential to significantly increase costs, delay targeted in-service dates and/or affect operations for projects (among other adverse effects), as has happened with the MVP and the originally contemplated MVP Southgate projects and could occur in the future in the case of authorizations required for our or the MVP Joint Venture's current or future projects, including in respect of developing expansions or extensions, such as expansion of the MVP project and the MVP Southgate project.
Current report
Any such adverse developments and uncertainties could adversely affect our ability, and/or, as applicable, the ability for the MVP Joint Venture and its owners, including us, to achieve expected investment returns, adversely affect our willingness or ability and/or that of our joint venture partners to continue to pursue projects, and/or cause impairments, including to our equity investment in the MVP Joint Venture.
Current report
We have experienced and may further experience increased opposition with respect to our and the MVP Joint Venture's projects from activists in the form of lawsuits, intervention in regulatory proceedings and otherwise, which could result in adverse impacts to our business, financial condition, results of operations and liquidity. In particular, opponents were successful in past challenges with respect to the MVP project and certain challenges with respect to MVP project authorizations remain outstanding. Opposition is ongoing regarding the MVP Southgate project and is expected for future projects, including any expansions of the MVP. If ongoing or future challenges are successful, it could result in significant, adverse impacts to our business, financial condition, results of operations and liquidity. Such opposition has made it increasingly difficult to complete projects and place them in service and, following any in-service, may also affect operations or affect extensions and/or expansions of projects. Further, such opposition and/or adverse court rulings and regulatory determinations may have the effect of increasing the timeframe on necessary agency action to address actual or perceived concerns in prior adverse court rulings, or may have the effect of increasing the risk that at a future point joint venture partners may elect not to continue to pursue or fund a project, which could, absent additional project sponsors, significantly imperil the ability to complete the project. See also Item 1A., "Risk Factors – We have entered into joint ventures, and may in the future enter into additional or modify existing joint ventures, that might restrict our operational and corporate flexibility and divert our management's time and our resources. In addition, we exercise no control over joint venture partners and it may be difficult or impossible for us to cause these joint ventures or partners to take actions that we believe would be in our or the joint venture's best interests and these joint ventures are subject to many of the same risks to which we are subject." Challenges to our projects could adversely affect our business (including by increasing the possibility of investor activism), financial condition, results of operations, and liquidity.
Current report
Increased competition from other companies that provide gathering, transmission and storage of natural gas, or from alternative fuel or energy sources, could negatively impact demand for our services, which could adversely affect our financial results.
Current report
Our ability to renew or replace existing contracts or add new contracts at rates sufficient to maintain or grow our Gathering segment and Transmission segment revenues and cash flows could be adversely affected by the activities of our midstream competitors. Our midstream systems compete primarily with other interstate and intrastate pipelines and storage facilities in the gathering, transmission and storage of natural gas. Some of our competitors have greater financial resources and may be better positioned to compete, including if the midstream industry moves towards greater consolidation. Some of these competitors may expand or construct gathering systems, transmission and storage systems that would create additional competition for the services we provide to our customers. In addition, certain of our customers have developed or acquired their own gathering infrastructure, and may acquire or develop gathering, transmission or storage infrastructure in the future, which could have a negative impact on the demand for our services depending on the location of such systems relative to our assets and our producer customers' drilling plans, commodity prices, existing contracts and other factors.
Current report
The policies of the FERC promoting competition in natural gas markets continue to have the effect of increasing the natural gas transmission and storage options for our customer base. As a result, in the future we could experience "turnback" of firm capacity as existing agreements expire. If we are unable to remarket this capacity or can remarket it only at substantially discounted rates compared to previous contracts, we may have to bear the costs associated with the turned back capacity. Increased competition could reduce the volumes of natural gas transported or stored on our systems or, in cases where we do not have long-term firm contracts, could force us to lower our transmission or storage rates.
Current report
Further, natural gas as a fuel competes with other forms of energy available to end-users, including coal, liquid fuels and, increasingly, renewable and alternative energy. Increases, whether driven by legislation, regulation or consumer preferences, in the availability and demand for renewable and alternative energy at the expense of natural gas (or increases in the demand for other sources of energy relative to natural gas based on price and other factors) could adversely affect our producer customers and lead to a reduction in demand for our natural gas gathering, transmission and storage services.
Current report
In addition, competition, including from renewable and alternative energy, could intensify the negative impact of factors that decrease demand for natural gas in the markets served by our systems, such as adverse economic conditions, weather, higher fuel costs and taxes or other governmental or regulatory actions that directly or indirectly increase the cost or limit the use of natural gas.
Current report
All of these competitive pressures could make it more difficult for us to retain our existing customers and/or attract new customers and/or additional volumes from existing customers as we seek to maintain and expand our business, which could have a material adverse effect on our business, financial condition, results of operations, and liquidity.
Current report
We may not be able to renew or replace expiring gathering, transmission or storage contracts at favorable rates, on a long-term basis or at all, and disagreements have occurred and may arise with contractual counterparties on the interpretation of existing or future contractual terms.
Current report
One of our exposures to market risk occurs at the time our existing gathering, transmission and storage contracts expire and are subject to renegotiation and renewal. As these contracts expire, we may have to negotiate extensions or renewals with existing customers or enter into new contracts with existing customers or other customers. We may be unable to do so on favorable commercial terms, if at all. Further, we also may be unable to maintain the economic structure of a particular contract with an existing customer or the overall mix of our contract portfolio. The extension or renewal of existing contracts and entry into new contracts depends on a number of factors beyond our control, including, but not limited to: (i) the level of existing and new competition to provide services to our markets; (ii) macroeconomic factors affecting natural gas economics for our current and potential customers; (iii) the balance of supply and demand, on a short-term, seasonal and long-term basis, in our markets; (iv) the extent to which the customers in our markets are willing to contract on a long-term basis or require capacity on our systems; (v) customers' existing and future downstream commitments; and (vi) the effects of federal, state or local regulations on the contracting practices of our customers and us. Additionally, disagreements may arise with contractual counterparties on the interpretation of contractual provisions, including during the negotiation, for example, of contract amendments required to be entered into upon the occurrence of specified events.
Current report
Any failure to extend or replace a significant portion of our existing contracts or to extend or replace our significant contracts, or extending or replacing contracts at unfavorable or lower rates or with lower or no associated firm reservation fee revenues, or other disadvantageous terms relative to the prior contract structure, or disagreements or disputes on the interpretation of existing or future contractual terms, could have a material adverse effect on our business, financial condition, results of operations, and liquidity.
Current report
We may not be able to increase our customer throughput and resulting revenue due to competition and other factors, which could limit our ability to grow our Gathering segment and Transmission segment.
Current report
Our ability to increase our customer-subscribed capacity and throughput and resulting revenue is subject to numerous factors beyond our control, including competition from producers' existing contractual obligations to competitors, the location of our assets relative to those of competitors for existing or potential producer customers (or such producer customers' own midstream assets), takeaway capacity constraints out of the Appalachian Basin, commodity prices, producers' optionality in utilizing our (relative to third-party) systems to fill downstream commitments, and the extent to which we have available capacity when and where shippers require it. To the extent that we lack available capacity on our systems for volumes, or we cannot economically increase capacity, we may not be able to compete effectively with third-party systems for additional natural gas production in our areas of operation and capacity constraints, as well as commodity prices, may, as has occurred in the past, adversely affect the degree to which natural gas production occurs in the Appalachian Basin, and relatedly the degree to which our systems are utilized.
Current report
Our efforts to attract new customers or larger commitments from existing customers may be adversely affected by our desire to provide services pursuant to long-term firm contracts and contracts with MVCs. Our potential customers may prefer to obtain services under other forms of contractual arrangements which could require volumetric exposure or potentially direct commodity exposure, and we may not be willing to agree to such other forms of contractual arrangements.
Current report
If third-party pipelines and other facilities interconnected to our pipelines and facilities become unavailable to transport or process natural gas or do not accept deliveries of natural gas from us, our business, financial condition, results of operations, and liquidity could be adversely affected.
Current report
We depend on third-party pipelines and other facilities that provide receipt and delivery options to and from our transmission and storage systems. For example, our storage system and the MVP Joint Venture's transmission system interconnect, as applicable, with the following third-party interstate pipelines: Transcontinental Gas Pipe Line Company, LLC, East Tennessee Natural Gas, Texas Eastern, Eastern Gas Transmission, Columbia Gas Transmission, Tennessee Gas Pipeline Company, Rockies Express Pipeline LLC, National Fuel Gas Supply Corporation and ET Rover Pipeline, LLC, as well as multiple distribution companies. Similarly, our gathering systems have multiple delivery interconnects to multiple interstate pipelines. In the event that our or the MVP Joint Venture's access to such systems is impaired (or any third-party refuses to accept our or any of the MVP Joint Venture's deliveries), our or the MVP Joint Venture's operations could be adversely affected, resulting in adverse economic impact to us or the MVP Joint Venture.
Current report
Because we do not own these third-party pipelines or facilities, their continuing operation and access requirements are not within our control. If these or any other pipeline connections or facilities were to become unavailable for current or future volumes of natural gas due to repairs, damage to the facility, lack of capacity or any other reason, our or the MVP Joint Venture's ability to operate efficiently and ship natural gas to end markets could be restricted, as has occurred in the past. Any temporary or permanent interruption at any key pipeline interconnect or facility could have a material adverse effect on our business, financial condition, results of operations, and liquidity.
Current report
A substantial majority of the services we provide on our transmission and storage system are subject to long-term, fixed-price "negotiated rate" contracts that are subject to limited or no adjustment, even if our cost to perform such services exceeds the revenues received from such contracts, and, as a result, our costs could exceed our revenues received under such contracts, we could be unable to achieve the expected investment return under such contracts, and/or our business, financial condition, results of operations, and liquidity could be adversely affected.
Showing the first 40 of 68 passages. Open the source sections for the rest.
Reworded paragraphs (1)
Previous wording
We have incurred and are expected to continue to incur a number of non-recurring costs associated with the Equitrans Midstream Merger, combining the operations of the two companies and achieving desired synergies. These fees and costs have been, and will continue to be, substantial and could have an adverse effect on our financial condition and operating results.
Current wording
We have incurred and are expected to continue to incur a number of non-recurring costs associated with the Equitrans Midstream Merger, combining the operations of the two companies and achieving desired synergies. These fees and costs have been, and will continue to be, substantial and could have an adverse effect on our financial condition and operating results. For the three and nine months ended September 30, 2024, we recognized $274.6 million and $298.7 million, respectively, of transaction costs related to the Equitrans Midstream Merger. Of this amount, for the three months ended September 30, 2024, we recognized severance and other termination benefits and stock-based compensation costs of $161.0 million.