Skip to main content

AMERICAN ELECTRIC POWER CO INC

For the period ended Mar 31, 2024. Filed Apr 30, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2024 · Filed Apr 30, 2024

AEP$126.53-0.2%Stored close · as of Nov 6, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Item 2. RESULTS OF OPERATIONS

Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential2,5292,532
Commercial3,3072,744
Industrial3,2733,108
Miscellaneous151138
Total Retail9,2608,522
Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)161141
Normal – Heating (b)195194
Actual – Cooling (c)146271
Normal – Cooling (b)137127

(c)Cooling degree days are calculated on a 70 degree temperature base.

AEP Texas Inc. and Subsidiaries
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$47.6
Changes in Revenues:
Retail Revenues28.8
Transmission Revenues9.6
Other Revenues(1.5)
Total Change in Revenues36.9
Changes in Expenses and Other:
Other Operation and Maintenance8.4
Depreciation and Amortization(5.7)
Taxes Other Than Income Taxes3.5
Interest Income0.1
Allowance for Equity Funds Used During Construction2.3
Non-Service Cost Components of Net Periodic Benefit Cost(1.1)
Interest Expense(4.6)
Total Change in Expenses and Other2.9
Income Tax Expense(7.7)
First Quarter of 2024$79.7

Retail Revenues increased $29 million primarily due to the following:

A $20 million increase in weather-normalized revenues primarily in the residential and commercial classes.

A $16 million increase in revenue from rate riders.

An $8 million decrease in weather-related usage primarily due to a 46% decrease in cooling degree days.

Transmission Revenues increased $10 million due to interim rate increases driven by increased transmission investments.

Other Operation and Maintenance expenses decreased $8 million primarily due to the following:

A $5 million decrease in distribution-related expenses.

A $3 million decrease in recoverable transmission expenses.

Depreciation and Amortization expenses increased $6 million primarily due to a higher depreciable base.

Income Tax Expense increased $8 million primarilydue to an increase in pretax book income.

Three Months Ended March 31,
20242023
REVENUES
Electric Transmission and Distribution$463.0$427.7
Sales to AEP Affiliates1.31.2
Other Revenues2.10.6
TOTAL REVENUES466.4429.5
EXPENSES
Other Operation140.8146.9
Maintenance22.124.4
Depreciation and Amortization116.7111.0
Taxes Other Than Income Taxes40.043.5
TOTAL EXPENSES319.6325.8
OPERATING INCOME146.8103.7
Other Income (Expense):
Interest Income0.50.4
Allowance for Equity Funds Used During Construction8.66.3
Non-Service Cost Components of Net Periodic Benefit Cost3.74.8
Interest Expense(61.5)(56.9)
INCOME BEFORE INCOME TAX EXPENSE98.158.3
Income Tax Expense18.410.7
NET INCOME$79.7$47.6
The common stock of AEP Texas is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
Net Income$79.7$47.6
OTHER COMPREHENSIVE INCOME (LOSS), NET OF TAXES
Cash Flow Hedges, Net of Tax of $1.0 and $0 in 2024 and 2023, Respectively3.9—
Amortization of Pension and OPEB Deferred Costs, Net of Tax of $0 and $(0.1) in 2024 and 2023, Respectively—(0.6)
TOTAL OTHER COMPREHENSIVE INCOME (LOSS)3.9(0.6)
TOTAL COMPREHENSIVE INCOME$83.6$47.0
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Paid-inCapital · RetainedEarnings · Accumulated Other Comprehensive Income (Loss) · Total
TOTAL COMMON SHAREHOLDER’S EQUITY – DECEMBER 31, 2022$1,558.2$2,354.7$(8.6)$3,904.3
Capital Contribution from Parent100.0100.0
Net Income47.647.6
Other Comprehensive Loss(0.6)(0.6)
TOTAL COMMON SHAREHOLDER’S EQUITY – MARCH 31, 2023$1,658.2$2,402.3$(9.2)$4,051.3
TOTAL COMMON SHAREHOLDER’S EQUITY – DECEMBER 31, 2023$2,079.6$2,725.1$(8.6)$4,796.1
Net Income79.779.7
Other Comprehensive Income3.93.9
TOTAL COMMON SHAREHOLDER’S EQUITY – MARCH 31, 2024$2,079.6$2,804.8$(4.7)$4,879.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$0.1$0.1
Restricted Cash (March 31, 2024 and December 31, 2023 Amounts Include $42.7 and $34, Respectively, Related to Transition Funding and Restoration Funding)42.734.0
Advances to Affiliates7.07.1
Accounts Receivable:
Customers167.8176.5
Affiliated Companies21.223.8
Accrued Unbilled Revenues85.282.3
Miscellaneous0.70.8
Allowance for Uncollectible Accounts(4.2)(4.9)
Total Accounts Receivable270.7278.5
Materials and Supplies194.0190.4
Prepayments and Other Current Assets10.610.0
TOTAL CURRENT ASSETS525.1520.1
PROPERTY, PLANT AND EQUIPMENT
Electric:
Transmission6,896.66,812.6
Distribution5,903.85,798.8
Other Property, Plant and Equipment1,148.81,145.9
Construction Work in Progress1,062.7904.6
Total Property, Plant and Equipment15,011.914,661.9
Accumulated Depreciation and Amortization1,932.51,887.9
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET13,079.412,774.0
OTHER NONCURRENT ASSETS
Regulatory Assets317.4315.3
Securitized Assets(March 31, 2024 and December 31, 2023 Amounts Include $183.1 and $202.9, Respectively, Related to Transition Funding and Restoration Funding)183.1202.9
Deferred Charges and Other Noncurrent Assets262.5178.4
TOTAL OTHER NONCURRENT ASSETS763.0696.6
TOTAL ASSETS$14,367.5$13,990.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
March 31,December 31,
20242023
CURRENT LIABILITIES
Advances from Affiliates$267.9$103.7
Accounts Payable:
General253.5192.3
Affiliated Companies30.927.7
Long-term Debt Due Within One Year – Nonaffiliated(March 31, 2024 and December 31, 2023 Amounts Include $96.2 and $95.9, Respectively, Related to Transition Funding and Restoration Funding)96.296.0
Accrued Taxes139.599.1
Accrued Interest(March 31, 2024 and December 31, 2023 Amounts Include $1.7 and $2, Respectively, Related to Transition Funding and Restoration Funding)81.549.2
Obligations Under Operating Leases24.728.7
Other Current Liabilities147.7152.7
TOTAL CURRENT LIABILITIES1,041.9749.4
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated(March 31, 2024 and December 31, 2023 Amounts Include $114 and $125.9, Respectively, Related to Transition Funding and Restoration Funding)5,782.55,793.8
Deferred Income Taxes1,238.71,227.8
Regulatory Liabilities and Deferred Investment Tax Credits1,261.21,261.4
Obligations Under Operating Leases50.150.9
Deferred Credits and Other Noncurrent Liabilities113.4111.3
TOTAL NONCURRENT LIABILITIES8,445.98,445.2
TOTAL LIABILITIES9,487.89,194.6
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
COMMON SHAREHOLDER’S EQUITY
Paid-in Capital2,079.62,079.6
Retained Earnings2,804.82,725.1
Accumulated Other Comprehensive Income (Loss)(4.7)(8.6)
TOTAL COMMON SHAREHOLDER’S EQUITY4,879.74,796.1
TOTAL LIABILITIES AND COMMON SHAREHOLDER’S EQUITY$14,367.5$13,990.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$79.7$47.6
Adjustments to Reconcile Net Income to Net Cash Flows from Operating Activities:
Depreciation and Amortization116.7111.0
Deferred Income Taxes6.66.4
Allowance for Equity Funds Used During Construction(8.6)(6.3)
Mark-to-Market of Risk Management Contracts(0.2)0.4
Property Taxes(84.3)(88.8)
Change in Other Noncurrent Assets(17.2)(18.3)
Change in Other Noncurrent Liabilities3.0(0.8)
Changes in Certain Components of Working Capital:
Accounts Receivable, Net7.824.6
Materials and Supplies(3.6)(1.1)
Accounts Payable11.63.6
Accrued Taxes, Net42.644.5
Accrued Interest32.323.9
Other Current Assets1.40.9
Other Current Liabilities(20.0)(10.9)
Net Cash Flows from Operating Activities167.8136.7
INVESTING ACTIVITIES
Construction Expenditures(331.2)(450.4)
Change in Advances to Affiliates, Net0.10.1
Other Investing Activities21.17.3
Net Cash Flows Used for Investing Activities(310.0)(443.0)
FINANCING ACTIVITIES
Capital Contribution from Parent—100.0
Change in Advances from Affiliates, Net164.2354.3
Retirement of Long-term Debt – Nonaffiliated(11.9)(136.7)
Principal Payments for Finance Lease Obligations(1.8)(1.8)
Other Financing Activities0.40.3
Net Cash Flows from Financing Activities150.9316.1
Net Increase in Cash, Cash Equivalents and Restricted Cash8.79.8
Cash, Cash Equivalents and Restricted Cash at Beginning of Period34.132.8
Cash, Cash Equivalents and Restricted Cash at End of Period$42.8$42.6
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$26.9$31.6
Noncash Acquisitions Under Finance Leases1.11.8
Construction Expenditures Included in Current Liabilities as of March 31,158.3177.5
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

Summary of Investment in Transmission Assets for AEPTCo

As of March 31,
20242023
(in millions)
Plant In Service$14,335.9$12,971.3
Construction Work in Progress1,805.01,831.9
Accumulated Depreciation and Amortization1,362.71,091.2
Total Transmission Property, Net$14,778.2$13,712.0
AEP Transmission Company, LLC and Subsidiaries
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$162.7
Changes in Transmission Revenues:
Transmission Revenues41.2
Total Change in Transmission Revenues41.2
Changes in Expenses and Other:
Other Operation and Maintenance(1.3)
Depreciation and Amortization(10.7)
Taxes Other Than Income Taxes1.4
Interest Income0.4
Allowance for Equity Funds Used During Construction1.5
Interest Expense(9.6)
Total Change in Expenses and Other(18.3)
Income Tax Expense(4.4)
First Quarter of 2024$181.2

The major components of the increase in Transmission Revenues, which consists of wholesale sales to affiliates and nonaffiliates, were as follows:

Transmission Revenues increased $41 million primarily due to continued investment in transmission assets.

Expenses and Other changed between years as follows:

Depreciation and Amortization expenses increased $11 million primarily due to a higher depreciable base.

Interest Expense increased $10 million due to higher long-term debt balances and interest rates.

Three Months Ended March 31,
20242023
REVENUES
Transmission Revenues$98.4$90.0
Sales to AEP Affiliates389.4357.4
Provision for Refund – Affiliated(6.0)(4.8)
Provision for Refund – Nonaffiliated(1.4)(1.0)
Other Revenues2.4—
TOTAL REVENUES482.8441.6
EXPENSES
Other Operation29.929.0
Maintenance5.34.9
Depreciation and Amortization105.995.2
Taxes Other Than Income Taxes73.474.8
TOTAL EXPENSES214.5203.9
OPERATING INCOME268.3237.7
Other Income (Expense):
Interest Income - Affiliated1.91.5
Allowance for Equity Funds Used During Construction17.916.4
Interest Expense(54.8)(45.2)
INCOME BEFORE INCOME TAX EXPENSE233.3210.4
Income Tax Expense52.147.7
NET INCOME$181.2$162.7
AEPTCo is wholly-owned by AEP Transmission Holdco.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN MEMBER’S EQUITY

Paid-inCapital · RetainedEarnings · Total
TOTAL MEMBER'S EQUITY – DECEMBER 31, 2022$3,022.3$2,850.7$5,873.0
Capital Contribution from Member25.025.0
Dividends Paid to Member(55.0)(55.0)
Net Income162.7162.7
TOTAL MEMBER'S EQUITY – MARCH 31, 2023$3,047.3$2,958.4$6,005.7
TOTAL MEMBER'S EQUITY – DECEMBER 31, 2023$3,043.4$3,289.9$6,333.3
Capital Contribution from Member25.025.0
Dividends Paid to Member(40.0)(40.0)
Net Income181.2181.2
TOTAL MEMBER'S EQUITY – MARCH 31, 2024$3,068.4$3,431.1$6,499.5
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Advances to Affiliates$298.0$67.1
Accounts Receivable:
Customers80.682.2
Affiliated Companies131.1125.5
Total Accounts Receivable211.7207.7
Prepayments and Other Current Assets11.24.0
TOTAL CURRENT ASSETS520.9278.8
TRANSMISSION PROPERTY
Transmission Property13,832.413,723.9
Other Property, Plant and Equipment503.5501.4
Construction Work in Progress1,805.01,563.7
Total Transmission Property16,140.915,789.0
Accumulated Depreciation and Amortization1,362.71,291.3
TOTAL TRANSMISSION PROPERTY – NET14,778.214,497.7
OTHER NONCURRENT ASSETS
Regulatory Assets2.43.1
Deferred Property Taxes250.1286.4
Deferred Charges and Other Noncurrent Assets7.46.5
TOTAL OTHER NONCURRENT ASSETS259.9296.0
TOTAL ASSETS$15,559.0$15,072.5
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

LIABILITIES AND MEMBER’S EQUITY

March 31,December 31,
20242023
(in millions)
CURRENT LIABILITIES
Advances from Affiliates$28.8$174.3
Accounts Payable:
General289.6274.7
Affiliated Companies120.7107.9
Long-term Debt Due Within One Year – Nonaffiliated145.095.0
Accrued Taxes505.3568.6
Accrued Interest56.839.6
Obligations Under Operating Leases1.31.3
Other Current Liabilities20.424.7
TOTAL CURRENT LIABILITIES1,167.91,286.1
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated5,715.75,319.4
Deferred Income Taxes1,175.41,147.7
Regulatory Liabilities809.4783.7
Obligations Under Operating Leases1.21.4
Deferred Credits and Other Noncurrent Liabilities189.9200.9
TOTAL NONCURRENT LIABILITIES7,891.67,453.1
TOTAL LIABILITIES9,059.58,739.2
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
MEMBER’S EQUITY
Paid-in Capital3,068.43,043.4
Retained Earnings3,431.13,289.9
TOTAL MEMBER’S EQUITY6,499.56,333.3
TOTAL LIABILITIES AND MEMBER’S EQUITY$15,559.0$15,072.5
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$181.2$162.7
Adjustments to Reconcile Net Income to Net Cash Flows from Operating Activities:
Depreciation and Amortization105.995.2
Deferred Income Taxes25.020.6
Allowance for Equity Funds Used During Construction(17.9)(16.4)
Property Taxes36.334.6
Change in Other Noncurrent Assets(0.4)0.9
Change in Other Noncurrent Liabilities(6.1)6.6
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(4.0)(12.5)
Materials and Supplies—(4.1)
Accounts Payable5.441.0
Accrued Taxes, Net(63.2)(59.9)
Other Current Assets1.01.0
Other Current Liabilities10.829.6
Net Cash Flows from Operating Activities274.0299.3
INVESTING ACTIVITIES
Construction Expenditures(336.5)(439.7)
Change in Advances to Affiliates, Net(230.9)(293.1)
Other Investing Activities7.8(0.8)
Net Cash Flows Used for Investing Activities(559.6)(733.6)
FINANCING ACTIVITIES
Capital Contribution from Member25.025.0
Issuance of Long-term Debt – Nonaffiliated446.1689.2
Change in Advances from Affiliates, Net(145.5)(224.9)
Dividends Paid to Member(40.0)(55.0)
Net Cash Flows from Financing Activities285.6434.3
Net Change in Cash and Cash Equivalents——
Cash and Cash Equivalents at Beginning of Period——
Cash and Cash Equivalents at End of Period$—$—
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$33.3$16.2
Construction Expenditures Included in Current Liabilities as of March 31,191.0305.4
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential3,2653,059
Commercial1,4751,403
Industrial2,1022,109
Miscellaneous211200
Total Retail7,0536,771
Wholesale654489
Total KWhs7,7077,260
Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)981859
Normal – Heating (b)1,3101,321
Actual – Cooling (c)28
Normal – Cooling (b)66
Appalachian Power Company and Subsidiaries
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$112.5
Changes in Revenues:
Retail Revenues90.4
Off-system Sales(0.6)
Transmission Revenues6.4
Other Revenues9.1
Total Change in Revenues105.3
Changes in Expenses and Other:
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation(57.1)
Other Operation and Maintenance(27.7)
Depreciation and Amortization(6.8)
Taxes Other Than Income Taxes(4.2)
Interest Income0.2
Allowance for Equity Funds Used During Construction0.5
Non-Service Cost Components of Net Periodic Benefit Cost(1.0)
Interest Expense(2.8)
Total Change in Expenses and Other(98.9)
Income Tax Expense17.6
First Quarter of 2024$136.5

Retail Revenues increased $90 million primarily due to the following:

A $46 million increase in rider revenues.

A $28 million increase in fuel revenue primarily due to authorized fuel rate increases in West Virginia.

A $17 million increase in weather-related usage driven by a 14% increase in heating degree days.

Transmission Revenues increased $6 million primarily due to lower PJM rates in 2023 for certain point-to-point transmission services resulting from a December 2022 FERC approved settlement agreement.

Other Revenues increased $9 million primarily due to pole attachment revenue.

Purchased Electricity, Fuel and Other Consumables Used for Electric Generation expenses increased $57 million primarily due to a $37 million increase in West Virginia fuel over-recovery and a $21 million increase in load.

Other Operation and Maintenance expenses increased $28 million primarily due to the following:

A $23 million increase in transmission expenses primarily due to an increase in recoverable PJM expenses.

A $10 million increase in distribution expenses primarily due to vegetation management expenses.

A $5 million decrease due to the January 2024 completion of regulatory asset amortization related to under-earnings during the 2017-2019 Triennial Review.

Depreciation and Amortization expenses increased $7 million primarily due to a higher depreciable base.

Income Tax Expense decreased $18 million primarily due a $14 million increase in amortization of Excess ADIT.

Three Months Ended March 31,
20242023
REVENUES
Electric Generation, Transmission and Distribution$1,024.3$914.5
Sales to AEP Affiliates63.169.6
Other Revenues5.63.6
TOTAL REVENUES1,093.0987.7
EXPENSES
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation396.8339.7
Other Operation212.6191.8
Maintenance80.073.1
Depreciation and Amortization149.8143.0
Taxes Other Than Income Taxes46.041.8
TOTAL EXPENSES885.2789.4
OPERATING INCOME207.8198.3
Other Income (Expense):
Interest Income0.80.6
Allowance for Equity Funds Used During Construction2.92.4
Non-Service Cost Components of Net Periodic Benefit Cost7.18.1
Interest Expense(68.1)(65.3)
INCOME BEFORE INCOME TAX EXPENSE150.5144.1
Income Tax Expense14.031.6
NET INCOME$136.5$112.5
The common stock of APCo is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
Net Income$136.5$112.5
OTHER COMPREHENSIVE LOSS, NET OF TAXES
Cash Flow Hedges, Net of Tax of $(0.1) and $(0.1) in 2024 and 2023, Respectively(0.2)(0.2)
Amortization of Pension and OPEB Deferred Costs, Net of Tax of $(0.1) and $(0.2) in 2024 and 2023, Respectively(0.3)(0.8)
TOTAL OTHER COMPREHENSIVE LOSS(0.5)(1.0)
TOTAL COMPREHENSIVE INCOME$136.0$111.5
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Common Stock · Paid-in Capital · Retained Earnings · Accumulated Other Comprehensive Income (Loss) · Total
TOTAL COMMON SHAREHOLDER'S EQUITY - DECEMBER 31, 2022$260.4$1,828.7$2,891.1$(4.8)$4,975.4
Net Income112.5112.5
Other Comprehensive Loss(1.0)(1.0)
TOTAL COMMON SHAREHOLDER'S EQUITY - MARCH 31, 2023$260.4$1,828.7$3,003.6$(5.8)$5,086.9
TOTAL COMMON SHAREHOLDER'S EQUITY - DECEMBER 31, 2023$260.4$1,834.5$3,185.5$(3.7)$5,276.7
Capital Contribution from Parent100.0100.0
Net Income136.5136.5
Other Comprehensive Loss(0.5)(0.5)
TOTAL COMMON SHAREHOLDER'S EQUITY - MARCH 31, 2024$260.4$1,934.5$3,322.0$(4.2)$5,512.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$7.6$5.0
Restricted Cash for Securitized Funding8.414.9
Advances to Affiliates37.418.9
Accounts Receivable:
Customers191.1170.3
Affiliated Companies100.998.8
Accrued Unbilled Revenues59.870.8
Miscellaneous0.50.6
Allowance for Uncollectible Accounts(2.3)(2.0)
Total Accounts Receivable350.0338.5
Fuel293.6315.0
Materials and Supplies139.8148.4
Risk Management Assets8.722.4
Regulatory Asset for Under-Recovered Fuel Costs148.4155.4
Prepayments and Other Current Assets25.940.5
TOTAL CURRENT ASSETS1,019.81,059.0
PROPERTY, PLANT AND EQUIPMENT
Electric:
Generation7,065.37,041.3
Transmission4,747.54,711.8
Distribution5,238.55,176.6
Other Property, Plant and Equipment1,023.1981.3
Construction Work in Progress754.5709.2
Total Property, Plant and Equipment18,828.918,620.2
Accumulated Depreciation and Amortization5,776.05,688.7
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET13,052.912,931.5
OTHER NONCURRENT ASSETS
Regulatory Assets1,107.41,155.1
Securitized Assets126.7133.4
Employee Benefits and Pension Assets176.3171.7
Operating Lease Assets72.073.7
Deferred Charges and Other Noncurrent Assets197.3187.5
TOTAL OTHER NONCURRENT ASSETS1,679.71,721.4
TOTAL ASSETS$15,752.4$15,711.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
March 31,December 31,
20242023
(in millions)
CURRENT LIABILITIES
Advances from Affiliates$—$339.6
Accounts Payable:
General286.7280.4
Affiliated Companies107.0121.3
Long-term Debt Due Within One Year – Nonaffiliated153.3538.8
Risk Management Liabilities18.415.9
Customer Deposits81.480.0
Accrued Taxes146.9117.6
Accrued Interest83.058.9
Obligations Under Operating Leases14.314.6
Other Current Liabilities132.3118.8
TOTAL CURRENT LIABILITIES1,023.31,685.9
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated5,517.65,049.5
Deferred Income Taxes2,019.82,011.9
Regulatory Liabilities and Deferred Investment Tax Credits1,082.51,081.9
Asset Retirement Obligations441.5442.5
Employee Benefits and Pension Obligations31.632.8
Obligations Under Operating Leases58.359.8
Deferred Credits and Other Noncurrent Liabilities65.170.9
TOTAL NONCURRENT LIABILITIES9,216.48,749.3
TOTAL LIABILITIES10,239.710,435.2
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
COMMON SHAREHOLDER’S EQUITY
Common Stock – No Par Value:
Authorized – 30,000,000 Shares
Outstanding – 13,499,500 Shares260.4260.4
Paid-in Capital1,934.51,834.5
Retained Earnings3,322.03,185.5
Accumulated Other Comprehensive Income (Loss)(4.2)(3.7)
TOTAL COMMON SHAREHOLDER’S EQUITY5,512.75,276.7
TOTAL LIABILITIES AND COMMON SHAREHOLDER’S EQUITY$15,752.4$15,711.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$136.5$112.5
Adjustments to Reconcile Net Income to Net Cash Flows from Operating Activities:
Depreciation and Amortization149.8143.0
Deferred Income Taxes(12.8)10.3
Allowance for Equity Funds Used During Construction(2.9)(2.4)
Mark-to-Market of Risk Management Contracts11.860.1
Deferred Fuel Over/Under-Recovery, Net62.426.0
Change in Other Noncurrent Assets3.9(5.5)
Change in Other Noncurrent Liabilities6.5(33.0)
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(10.6)54.5
Fuel, Materials and Supplies30.0(59.3)
Margin Deposits11.0(11.1)
Accounts Payable(24.7)(156.1)
Accrued Taxes, Net33.023.6
Other Current Assets—2.9
Other Current Liabilities12.4(1.2)
Net Cash Flows from Operating Activities406.3164.3
INVESTING ACTIVITIES
Construction Expenditures(236.0)(287.4)
Change in Advances to Affiliates, Net(18.5)1.1
Other Investing Activities3.61.5
Net Cash Flows Used for Investing Activities(250.9)(284.8)
FINANCING ACTIVITIES
Capital Contribution from Parent100.0—
Issuance of Long-term Debt – Nonaffiliated395.8—
Change in Advances from Affiliates, Net(339.6)128.0
Retirement of Long-term Debt – Nonaffiliated(313.4)(13.0)
Principal Payments for Finance Lease Obligations(2.2)(2.0)
Other Financing Activities0.10.2
Net Cash Flows from (Used for) Financing Activities(159.3)113.2
Net Decrease in Cash, Cash Equivalents and Restricted Cash for Securitized Funding(3.9)(7.3)
Cash, Cash Equivalents and Restricted Cash for Securitized Funding at Beginning of Period19.921.9
Cash, Cash Equivalents and Restricted Cash for Securitized Funding at End of Period$16.0$14.6
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$41.5$37.9
Noncash Acquisitions Under Finance Leases0.30.6
Construction Expenditures Included in Current Liabilities as of March 31,107.3122.6
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential1,4381,463
Commercial1,2751,189
Industrial1,8081,804
Miscellaneous1416
Total Retail4,5354,472
Wholesale1,6201,417
Total KWhs6,1555,889
Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)1,6851,687
Normal – Heating (b)2,1812,182
Actual – Cooling (c)——
Normal – Cooling (b)11
Indiana Michigan Power Company and Subsidiaries
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$102.8
Changes in Revenues:
Retail Revenues(1.9)
Off-system Sales1.2
Transmission Revenues4.5
Other Revenues0.6
Total Change in Revenues4.4
Changes in Expenses and Other:
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation(23.4)
Purchased Electricity from AEP Affiliates(16.4)
Other Operation and Maintenance(2.3)
Depreciation and Amortization16.9
Taxes Other Than Income Taxes(3.8)
Other Income2.6
Non-Service Cost Components of Net Periodic Benefit Cost(1.3)
Interest Expense7.0
Total Change in Expenses and Other(20.7)
Income Tax Expense58.5
First Quarter of 2024$145.0

Retail Revenues decreased $2 million primarily due to the following:

A $13 million decrease due to a regulatory provision for refund.

An $11 million decrease in weather-normalized retail margins primarily in the residential and industrial classes.

A $15 million increase in fuel revenues primarily due to an increase in generation at Rockport Plant.

A $5 million increase in rider revenues.

Purchased Electricity, Fuel and Other Consumables Used for Electric Generation expenses increased $23 million primarily due to an increase in generation at Rockport Plant and a purchased power disallowance in the April 2024 MPSC order on I&M’s 2021 PSCR reconciliation.

Purchased Electricity from AEP Affiliates increased $16 million primarily due to an increase in purchased electricity from Rockport Plant.

Other Operation and Maintenance expenses increased $2 million primarily due to the following:

An $11 million increase in transmission expenses primarily due to an increase in recoverable PJM expenses.

This increase was partially offset by:

A $4 million decrease in nuclear expenses at Cook Plant primarily due to lower refueling outage expenses.

A $3 million decrease due to an increased Nuclear Electric Insurance Limited distribution in 2024.

A $3 million decrease in vegetation management expenses.

Depreciation and Amortization expenses decreased $17 million primarily due to the deferral of Excess ADIT as a result of the PLR received regarding the treatment of stand alone NOLCs and the timing of refunds to customers under rate rider mechanisms.

Interest Expense decreased $7 million primarily due to the recognition of debt carrying charges as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

Income Tax Expense decreased $59 million primarilydue to a reduction in Excess ADIT regulatory liabilities as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

Three Months Ended March 31,
20242023
REVENUES
Electric Generation, Transmission and Distribution$647.8$642.8
Sales to AEP Affiliates1.81.2
Other Revenues – Affiliated15.015.9
Other Revenues – Nonaffiliated2.83.1
TOTAL REVENUES667.4663.0
EXPENSES
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation122.699.2
Purchased Electricity from AEP Affiliates61.545.1
Other Operation178.2169.7
Maintenance52.458.6
Depreciation and Amortization108.3125.2
Taxes Other Than Income Taxes23.319.5
TOTAL EXPENSES546.3517.3
OPERATING INCOME121.1145.7
Other Income (Expense):
Other Income3.20.6
Non-Service Cost Components of Net Periodic Benefit Cost6.78.0
Interest Expense(26.2)(33.2)
INCOME BEFORE INCOME TAX EXPENSE (BENEFIT)104.8121.1
Income Tax Expense (Benefit)(40.2)18.3
NET INCOME$145.0$102.8
The common stock of I&M is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
Net Income$145.0$102.8
OTHER COMPREHENSIVE INCOME (LOSS), NET OF TAXES
Cash Flow Hedges, Net of Tax of $0 and $(0.2) for 2024 and 2023, Respectively0.1(0.7)
Amortization of Pension and OPEB Deferred Costs, Net of Tax of $0 and $(0.5) for 2024 and 2023, Respectively—(1.9)
TOTAL OTHER COMPREHENSIVE INCOME (LOSS)0.1(2.6)
TOTAL COMPREHENSIVE INCOME$145.1$100.2
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Common Stock · Paid-in Capital · Retained Earnings · Accumulated Other Comprehensive Income (Loss) · Total
TOTAL COMMON SHAREHOLDER’S EQUITY - DECEMBER 31, 2022$56.6$988.8$1,963.2$(0.3)$3,008.3
Common Stock Dividends(31.2)(31.2)
Net Income102.8102.8
Other Comprehensive Loss(2.6)(2.6)
TOTAL COMMON SHAREHOLDER'S EQUITY -MARCH 31, 2023$56.6$988.8$2,034.8$(2.9)$3,077.3
TOTAL COMMON SHAREHOLDER’S EQUITY - DECEMBER 31, 2023$56.6$997.6$2,086.6$(0.6)$3,140.2
Common Stock Dividends(37.5)(37.5)
Net Income145.0145.0
Other Comprehensive Income0.10.1
TOTAL COMMON SHAREHOLDER'S EQUITY - MARCH 31, 2024$56.6$997.6$2,194.1$(0.5)$3,247.8
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$5.5$2.1
Accounts Receivable:
Customers51.166.9
Affiliated Companies87.465.0
Accrued Unbilled Revenues0.20.2
Miscellaneous4.28.2
Total Accounts Receivable142.9140.3
Fuel72.888.1
Materials and Supplies202.2208.2
Risk Management Assets11.227.8
Regulatory Asset for Under-Recovered Fuel Costs3.814.8
Prepayments and Other Current Assets41.646.7
TOTAL CURRENT ASSETS480.0528.0
PROPERTY, PLANT AND EQUIPMENT
Electric:
Generation5,664.85,646.8
Transmission1,917.01,906.4
Distribution3,322.73,254.0
Other Property, Plant and Equipment (Including Coal Mining and Nuclear Fuel)891.3898.5
Construction Work in Progress314.4301.7
Total Property, Plant and Equipment12,110.212,007.4
Accumulated Depreciation, Depletion and Amortization4,459.04,378.4
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET7,651.27,629.0
OTHER NONCURRENT ASSETS
Regulatory Assets498.2406.3
Spent Nuclear Fuel and Decommissioning Trusts4,112.63,860.2
Operating Lease Assets51.253.8
Deferred Charges and Other Noncurrent Assets318.3330.7
TOTAL OTHER NONCURRENT ASSETS4,980.34,651.0
TOTAL ASSETS$13,111.5$12,808.0
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

(dollars in millions)

March 31,December 31,
20242023
CURRENT LIABILITIES
Advances from Affiliates$73.2$63.3
Accounts Payable:
General182.1225.8
Affiliated Companies115.9107.3
Long-term Debt Due Within One Year – Nonaffiliated (March 31, 2024 and December 31, 2023 Amounts Include $74.8 and $81.4, Respectively, Related to DCC Fuel)76.983.7
Customer Deposits52.172.2
Accrued Taxes133.5104.7
Accrued Interest38.141.3
Obligations Under Operating Leases14.916.8
Regulatory Liability for Over-Recovered Fuel Costs22.323.2
Other Current Liabilities74.391.9
TOTAL CURRENT LIABILITIES783.3830.2
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated3,401.63,415.7
Deferred Income Taxes1,190.61,169.9
Regulatory Liabilities and Deferred Investment Tax Credits2,262.32,052.3
Asset Retirement Obligations2,123.02,104.3
Obligations Under Operating Leases37.137.7
Deferred Credits and Other Noncurrent Liabilities65.857.7
TOTAL NONCURRENT LIABILITIES9,080.48,837.6
TOTAL LIABILITIES9,863.79,667.8
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
COMMON SHAREHOLDER’S EQUITY
Common Stock – No Par Value:
Authorized – 2,500,000 Shares
Outstanding – 1,400,000 Shares56.656.6
Paid-in Capital997.6997.6
Retained Earnings2,194.12,086.6
Accumulated Other Comprehensive Income (Loss)(0.5)(0.6)
TOTAL COMMON SHAREHOLDER’S EQUITY3,247.83,140.2
TOTAL LIABILITIES AND COMMON SHAREHOLDER’S EQUITY$13,111.5$12,808.0
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$145.0$102.8
Adjustments to Reconcile Net Income to Net Cash Flows from Operating Activities:
Depreciation and Amortization108.3125.2
Deferred Income Taxes(60.3)(3.3)
Amortization (Deferral) of Incremental Nuclear Refueling Outage Expenses, Net(11.8)18.1
Allowance for Equity Funds Used During Construction(3.3)(0.5)
Mark-to-Market of Risk Management Contracts27.18.8
Amortization of Nuclear Fuel24.425.0
Deferred Fuel Over/Under-Recovery, Net10.13.8
Change in Other Noncurrent Assets(34.0)(4.3)
Change in Other Noncurrent Liabilities35.33.7
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(2.1)52.7
Fuel, Materials and Supplies21.3(24.1)
Accounts Payable(13.5)(27.8)
Accrued Taxes, Net28.821.1
Other Current Assets11.9(1.9)
Other Current Liabilities(37.3)(41.8)
Net Cash Flows from Operating Activities249.9257.5
INVESTING ACTIVITIES
Construction Expenditures(142.3)(141.7)
Change in Advances to Affiliates, Net—(37.0)
Purchases of Investment Securities(588.5)(536.3)
Sales of Investment Securities569.5517.6
Acquisitions of Nuclear Fuel(33.7)(1.7)
Other Investing Activities2.73.3
Net Cash Flows Used for Investing Activities(192.3)(195.8)
FINANCING ACTIVITIES
Issuance of Long-term Debt – Nonaffiliated—499.8
Change in Advances from Affiliates, Net9.9(249.9)
Retirement of Long-term Debt – Nonaffiliated(25.4)(274.3)
Principal Payments for Finance Lease Obligations(1.6)(1.9)
Dividends Paid on Common Stock(37.5)(31.2)
Other Financing Activities0.40.1
Net Cash Flows Used for Financing Activities(54.2)(57.4)
Net Increase in Cash and Cash Equivalents3.44.3
Cash and Cash Equivalents at Beginning of Period2.14.2
Cash and Cash Equivalents at End of Period$5.5$8.5
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$38.7$44.4
Net Cash Paid for Income Taxes—2.4
Noncash Acquisitions Under Finance Leases0.52.2
Construction Expenditures Included in Current Liabilities as of March 31,63.161.3
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential3,7513,734
Commercial4,6844,000
Industrial3,5393,418
Miscellaneous2930
Total Retail (a)12,00311,182
Wholesale (b)590453
Total KWhs12,59311,635

(a)Represents energy delivered to distribution customers.

(b)Primarily Ohio’s contractually obligated purchases of OVEC power sold to PJM.

Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)1,4631,344
Normal – Heating (b)1,8711,891
Actual – Cooling (c)——
Normal – Cooling (b)33
Ohio Power Company and Subsidiaries
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$78.0
Changes in Revenues:
Retail Revenues(25.5)
Off-system Sales(3.6)
Transmission Revenues3.3
Other Revenues15.0
Total Change in Revenues(10.8)
Changes in Expenses and Other:
Purchased Electricity for Resale133.9
Purchased Electricity from AEP Affiliates(46.6)
Other Operation and Maintenance(36.4)
Depreciation and Amortization(30.6)
Taxes Other Than Income Taxes(15.5)
Other Income(0.1)
Allowance for Equity Funds Used During Construction2.7
Non-Service Cost Components of Net Periodic Benefit Cost(1.0)
Interest Expense(3.5)
Total Change in Expenses and Other2.9
Income Tax Expense0.5
First Quarter of 2024$70.6

The major components of the decrease in Revenues were as follows:

Retail Revenues decreased $26 million primarily due to the following:

A $122 million decrease due to lower customer participation in OPCo’s SSO, partially offset by higher prices.

A $9 million decrease in weather-normalized revenues in the residential and industrial classes, partially offset by the commercial class.

An $89 million increase in rider revenues.

A $16 million increase in weather-related usage driven by a 9% increase in heating degree days.

Other Revenues increased $15 million due to the following:

A $10 million increase due to third-party Legacy Generation Resource Rider revenue related to the recovery of OVEC costs.

A $6 million increase in refundable sales of renewable energy credits.

Expenses and Other changed between years as follows:

Purchased Electricity for Resale expenses decreased $134 million primarily due to the following:

A $177 million decrease due to lower auction volumes driven by lower customer participation in OPCo’s SSO, partially offset by higher prices.

A $30 million decrease in deferrals of recoverable OVEC costs.

Purchased Electricity from AEP Affiliates expenses increased $47 million primarily due to increased purchases in OPCo’s SSO auction.

Other Operation and Maintenance expenses increased $36 million primarily due to the following:

A $27 million increase in transmission expenses primarily due to an increase in recoverable PJM expenses.

A $16 million increase in distribution expenses primarily related to recoverable storm restoration costs and recoverable vegetation management expenses.

Depreciation and Amortization expenses increased $31 million primarily due to a higher depreciable base and an increase in recoverable rider depreciable expenses.

Taxes Other Than Income Taxes increased $16 million primarily due to higher property taxes driven by additional investments in transmission and distribution assets and higher tax rates.

Three Months Ended March 31,
20242023
REVENUES
Electricity, Transmission and Distribution$1,015.4$1,021.8
Sales to AEP Affiliates5.77.6
Other Revenues2.75.2
TOTAL REVENUES1,023.81,034.6
EXPENSES
Purchased Electricity for Resale258.7392.6
Purchased Electricity from AEP Affiliates46.6—
Other Operation293.2273.8
Maintenance61.344.3
Depreciation and Amortization105.875.2
Taxes Other Than Income Taxes150.8135.3
TOTAL EXPENSES916.4921.2
OPERATING INCOME107.4113.4
Other Income (Expense):
Other Income—0.1
Allowance for Equity Funds Used During Construction5.52.8
Non-Service Cost Components of Net Periodic Benefit Cost5.56.5
Interest Expense(34.6)(31.1)
INCOME BEFORE INCOME TAX EXPENSE83.891.7
Income Tax Expense13.213.7
NET INCOME$70.6$78.0
The common stock of OPCo is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Common Stock · Paid-in Capital · Retained Earnings · Total
TOTAL COMMON SHAREHOLDER’S EQUITY – DECEMBER 31, 2022$321.2$837.8$1,929.1$3,088.1
Capital Contribution from Parent50.050.0
Net Income78.078.0
TOTAL COMMON SHAREHOLDER’S EQUITY – MARCH 31, 2023$321.2$887.8$2,007.1$3,216.1
TOTAL COMMON SHAREHOLDER’S EQUITY – DECEMBER 31, 2023$321.2$1,012.8$2,237.3$3,571.3
Net Income70.670.6
TOTAL COMMON SHAREHOLDER’S EQUITY – MARCH 31, 2024$321.2$1,012.8$2,307.9$3,641.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$12.5$6.4
Accounts Receivable:
Customers70.839.2
Affiliated Companies131.5129.2
Miscellaneous9.92.3
Total Accounts Receivable212.2170.7
Materials and Supplies171.6175.0
Renewable Energy Credits13.48.9
Prepayments and Other Current Assets18.916.8
TOTAL CURRENT ASSETS428.6377.8
PROPERTY, PLANT AND EQUIPMENT
Electric:
Transmission3,438.63,395.1
Distribution6,948.06,839.4
Other Property, Plant and Equipment1,136.11,125.0
Construction Work in Progress710.4654.0
Total Property, Plant and Equipment12,233.112,013.5
Accumulated Depreciation and Amortization2,765.72,713.6
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET9,467.49,299.9
OTHER NONCURRENT ASSETS
Regulatory Assets416.6455.0
Operating Lease Assets67.469.9
Deferred Charges and Other Noncurrent Assets547.8641.1
TOTAL OTHER NONCURRENT ASSETS1,031.81,166.0
TOTAL ASSETS$10,927.8$10,843.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
March 31,December 31,
20242023
(in millions)
CURRENT LIABILITIES
Advances from Affiliates$295.2$110.5
Accounts Payable:
General305.2320.7
Affiliated Companies154.5154.2
Risk Management Liabilities6.06.8
Customer Deposits76.162.0
Accrued Taxes605.5763.3
Obligations Under Operating Leases13.113.5
Other Current Liabilities176.3183.3
TOTAL CURRENT LIABILITIES1,631.91,614.3
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated3,367.43,366.8
Long-term Risk Management Liabilities35.043.9
Deferred Income Taxes1,158.91,152.7
Regulatory Liabilities and Deferred Investment Tax Credits1,004.51,003.6
Obligations Under Operating Leases54.556.7
Deferred Credits and Other Noncurrent Liabilities33.734.4
TOTAL NONCURRENT LIABILITIES5,654.05,658.1
TOTAL LIABILITIES7,285.97,272.4
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
COMMON SHAREHOLDER’S EQUITY
Common Stock –No Par Value:
Authorized – 40,000,000 Shares
Outstanding – 27,952,473 Shares321.2321.2
Paid-in Capital1,012.81,012.8
Retained Earnings2,307.92,237.3
TOTAL COMMON SHAREHOLDER’S EQUITY3,641.93,571.3
TOTAL LIABILITIES AND COMMON SHAREHOLDER’S EQUITY$10,927.8$10,843.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$70.6$78.0
Adjustments to Reconcile Net Income to Net Cash Flows from (Used for) Operating Activities:
Depreciation and Amortization105.875.2
Deferred Income Taxes(0.6)2.1
Allowance for Equity Funds Used During Construction(5.5)(2.8)
Mark-to-Market of Risk Management Contracts(9.7)7.2
Property Taxes95.092.0
Change in Other Noncurrent Assets10.1(43.2)
Change in Other Noncurrent Liabilities11.4(21.7)
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(40.2)(20.3)
Materials and Supplies(1.1)(4.8)
Accounts Payable(32.4)(5.5)
Customer Deposits14.2(22.7)
Accrued Taxes, Net(157.5)(157.9)
Other Current Assets(3.4)(2.2)
Other Current Liabilities1.5(7.7)
Net Cash Flows from (Used for) Operating Activities58.2(34.3)
INVESTING ACTIVITIES
Construction Expenditures(241.1)(262.0)
Other Investing Activities5.24.9
Net Cash Flows Used for Investing Activities(235.9)(257.1)
FINANCING ACTIVITIES
Capital Contribution from Parent—50.0
Change in Advances from Affiliates, Net184.7241.7
Principal Payments for Finance Lease Obligations(1.3)(1.2)
Other Financing Activities0.40.4
Net Cash Flows from Financing Activities183.8290.9
Net Increase (Decrease) in Cash and Cash Equivalents6.1(0.5)
Cash and Cash Equivalents at Beginning of Period6.49.6
Cash and Cash Equivalents at End of Period$12.5$9.1
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$19.1$20.9
Noncash Acquisitions Under Finance Leases0.50.6
Construction Expenditures Included in Current Liabilities as of March 31,104.8109.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential1,4511,388
Commercial1,2321,104
Industrial1,4111,439
Miscellaneous283275
Total Retail4,3774,206
Wholesale4727
Total KWhs4,4244,233
Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)912871
Normal – Heating (b)1,0461,055
Actual – Cooling (c)2210
Normal – Cooling (b)1717
Public Service Company of Oklahoma
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Net Income
(in millions)
First Quarter of 2023$(2.3)
Changes in Revenues:
Retail Revenues (a)(35.5)
Transmission Revenues(0.3)
Other Revenues6.6
Total Change in Revenues(29.2)
Changes in Expenses and Other:
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation51.2
Other Operation and Maintenance(3.8)
Depreciation and Amortization(6.3)
Taxes Other Than Income Taxes0.3
Interest Income(0.8)
Allowance for Equity Funds Used During Construction0.9
Non-Service Cost Components of Net Periodic Benefit Cost(0.7)
Interest Expense8.4
Total Change in Expenses and Other49.2
Income Tax Benefit54.3
First Quarter of 2024$72.0

(a)Includes firm wholesale sales to municipals and cooperatives.

The major components of the decrease in Revenues were as follows:

Retail Revenues decreased $36 million primarily due to the following:

A $57 million decrease in fuel revenue primarily due to lower authorized fuel rates.

A $19 million increase in base rate and rider revenues.

Other Revenues increased $7 million due to the following:

A $4 million increase in associated business development revenues.

A $3 million increase in affiliated rent revenues.

Expenses and Other and Income Tax Benefit changed between years as follows:

Purchased Electricity, Fuel and Other Consumables Used for Electric Generation expenses decreased $51 million primarily due to the lower current year amortization of under-recovered fuel regulatory assets driven by lower authorized fuel rates.

Depreciation and Amortization expenses increased $6 million primarily due to an increase in the amortization of regulatory assets related to NCWF.

Interest Expense decreased $8 million primarilydue tothe recognition of debt carrying charges as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

Income Tax Benefit increased $54 million primarily due to the following:

A $49 million increase due to a reduction in Excess ADIT regulatory liabilities as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

A $10 million increase in PTCs.

CONDENSED STATEMENTS OF OPERATIONS

Three Months Ended March 31,
20242023
REVENUES
Electric Generation, Transmission and Distribution$378.1$414.8
Sales to AEP Affiliates3.50.7
Other Revenues6.21.5
TOTAL REVENUES387.8417.0
EXPENSES
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation148.9200.1
Other Operation96.692.1
Maintenance28.128.8
Depreciation and Amortization67.461.1
Taxes Other Than Income Taxes17.017.3
TOTAL EXPENSES358.0399.4
OPERATING INCOME29.817.6
Other Income (Expense):
Interest Income0.21.0
Allowance for Equity Funds Used During Construction2.41.5
Non-Service Cost Components of Net Periodic Benefit Cost2.93.6
Interest Expense(16.8)(25.2)
INCOME (LOSS) BEFORE INCOME TAX EXPENSE (BENEFIT)18.5(1.5)
Income Tax Expense (Benefit)(53.5)0.8
NET INCOME (LOSS)$72.0$(2.3)
The common stock of PSO is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)

Three Months Ended March 31,
20242023
Net Income (Loss)$72.0$(2.3)
OTHER COMPREHENSIVE LOSS, NET OF TAXES
Cash Flow Hedges, Net of Tax of $0 and $(0.4) in 2024 and 2023, Respectively—(1.5)
TOTAL COMPREHENSIVE INCOME (LOSS)$72.0$(3.8)
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED STATEMENTS OF CHANGES IN

Common Stock · Paid-in Capital · Retained Earnings · Accumulated Other Comprehensive Income (Loss) · Total
TOTAL COMMON SHAREHOLDER'S EQUITY – DECEMBER 31, 2022$157.2$1,042.6$1,218.0$1.3$2,419.1
Common Stock Dividends(17.5)(17.5)
Net Loss(2.3)(2.3)
Other Comprehensive Loss(1.5)(1.5)
TOTAL COMMON SHAREHOLDER'S EQUITY – MARCH 31, 2023$157.2$1,042.6$1,198.2$(0.2)$2,397.8
TOTAL COMMON SHAREHOLDER'S EQUITY – DECEMBER 31, 2023$157.2$1,039.3$1,374.3$(0.2)$2,570.6
Common Stock Dividends(35.0)(35.0)
Net Income72.072.0
TOTAL COMMON SHAREHOLDER'S EQUITY – MARCH 31, 2024$157.2$1,039.3$1,411.3$(0.2)$2,607.6
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED BALANCE SHEETS

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$3.5$2.5
Accounts Receivable:
Customers74.1107.6
Affiliated Companies69.131.0
Miscellaneous1.00.8
Total Accounts Receivable144.2139.4
Fuel32.533.7
Materials and Supplies111.0106.9
Risk Management Assets7.919.0
Accrued Tax Benefits43.731.0
Regulatory Asset for Under-Recovered Fuel Costs155.8118.3
Prepayments and Other Current Assets34.818.7
TOTAL CURRENT ASSETS533.4469.5
PROPERTY, PLANT AND EQUIPMENT
Electric:
Generation2,704.82,695.5
Transmission1,240.01,228.3
Distribution3,513.03,450.8
Other Property, Plant and Equipment514.6505.9
Construction Work in Progress336.9313.7
Total Property, Plant and Equipment8,309.38,194.2
Accumulated Depreciation and Amortization2,119.72,081.9
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET6,189.66,112.3
OTHER NONCURRENT ASSETS
Regulatory Assets533.1522.7
Employee Benefits and Pension Assets69.668.4
Operating Lease Assets111.1112.8
Deferred Charges and Other Noncurrent Assets92.949.2
TOTAL OTHER NONCURRENT ASSETS806.7753.1
TOTAL ASSETS$7,529.7$7,334.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED BALANCE SHEETS

March 31,December 31,
20242023
(in millions)
CURRENT LIABILITIES
Advances from Affiliates$264.6$54.4
Accounts Payable:
General138.5159.3
Affiliated Companies59.856.7
Long-term Debt Due Within One Year – Nonaffiliated125.60.6
Risk Management Liabilities28.528.9
Customer Deposits82.281.4
Accrued Taxes67.330.7
Accrued Interest26.330.7
Obligations Under Operating Leases10.710.1
Other Current Liabilities54.3106.2
TOTAL CURRENT LIABILITIES857.8559.0
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated2,259.32,384.0
Deferred Income Taxes881.6831.2
Regulatory Liabilities and Deferred Investment Tax Credits701.6765.6
Asset Retirement Obligations85.083.9
Obligations Under Operating Leases104.7106.8
Deferred Credits and Other Noncurrent Liabilities32.133.8
TOTAL NONCURRENT LIABILITIES4,064.34,205.3
TOTAL LIABILITIES4,922.14,764.3
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
COMMON SHAREHOLDER’S EQUITY
Common Stock – Par Value – $15 Per Share:
Authorized – 11,000,000 Shares
Issued – 10,482,000 Shares
Outstanding – 9,013,000 Shares157.2157.2
Paid-in Capital1,039.31,039.3
Retained Earnings1,411.31,374.3
Accumulated Other Comprehensive Income (Loss)(0.2)(0.2)
TOTAL COMMON SHAREHOLDER’S EQUITY2,607.62,570.6
TOTAL LIABILITIES AND COMMON SHAREHOLDER’S EQUITY$7,529.7$7,334.9
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED STATEMENTS OF CASH FLOWS

Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income (Loss)$72.0$(2.3)
Adjustments to Reconcile Net Income (Loss) to Net Cash Flows from (Used for) Operating Activities:
Depreciation and Amortization67.461.1
Deferred Income Taxes(15.5)12.2
Allowance for Equity Funds Used During Construction(2.4)(1.5)
Mark-to-Market of Risk Management Contracts12.513.9
Property Taxes(45.9)(45.6)
Deferred Fuel Over/Under-Recovery, Net(37.6)49.4
Change in Other Noncurrent Assets(18.4)(9.7)
Change in Other Noncurrent Liabilities1.71.4
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(4.8)27.2
Fuel, Materials and Supplies(2.9)12.9
Accounts Payable(4.5)(62.8)
Accrued Taxes, Net23.924.9
Other Current Assets(16.1)0.4
Other Current Liabilities(46.9)(7.5)
Net Cash Flows from (Used for) Operating Activities(17.5)74.0
INVESTING ACTIVITIES
Construction Expenditures(156.9)(146.8)
Acquisitions of Renewable Energy Facilities—(145.7)
Other Investing Activities1.00.4
Net Cash Flows Used for Investing Activities(155.9)(292.1)
FINANCING ACTIVITIES
Issuance of Long-term Debt – Nonaffiliated—469.9
Change in Advances from Affiliates, Net210.2(233.5)
Retirement of Long-term Debt – Nonaffiliated(0.1)(0.1)
Principal Payments for Finance Lease Obligations(0.8)(0.8)
Dividends Paid on Common Stock(35.0)(17.5)
Other Financing Activities0.1(0.1)
Net Cash Flows from Financing Activities174.4217.9
Net Increase (Decrease) in Cash and Cash Equivalents1.0(0.2)
Cash and Cash Equivalents at Beginning of Period2.54.0
Cash and Cash Equivalents at End of Period$3.5$3.8
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$30.3$22.3
Cash Received from Sale of Transferable Tax Credits(24.9)—
Noncash Acquisitions Under Finance Leases0.40.2
Construction Expenditures Included in Current Liabilities as of March 31,47.963.4
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
(in millions of KWhs)
Retail:
Residential1,5091,351
Commercial1,2401,168
Industrial1,2271,203
Miscellaneous1717
Total Retail3,9933,739
Wholesale1,3741,270
Total KWhs5,3675,009
Three Months Ended March 31,
20242023
(in degree days)
Actual – Heating (a)555401
Normal – Heating (b)697705
Actual – Cooling (c)88107
Normal – Cooling (b)4440
Southwestern Electric Power Company
Reconciliation of First Quarter of 2023 to First Quarter of 2024
Earnings Attributable to SWEPCo Common Shareholder
(in millions)
First Quarter of 2023$40.6
Changes in Revenues:
Retail Revenues (a)(0.6)
Off-system Sales2.5
Transmission Revenues(2.9)
Other Revenues1.3
Total Change in Revenues0.3
Changes in Expenses and Other:
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation24.7
Other Operation and Maintenance(13.2)
Depreciation and Amortization1.7
Taxes Other Than Income Taxes1.9
Interest Income(1.4)
Allowance for Equity Funds Used During Construction2.9
Non-Service Cost Components of Net Periodic Benefit Cost(0.8)
Interest Expense11.5
Total Change in Expenses and Other27.3
Income Tax Benefit140.1
Equity Earnings of Unconsolidated Subsidiary0.1
Net Income Attributable to Noncontrolling Interest(0.3)
First Quarter of 2024$208.1

(a)Includes firm wholesale sales to municipals and cooperatives.

Retail Revenues decreased $1 million primarily due to the following:

A $39 million decrease in fuel revenue primarily due to authorized fuel rate decreases in Arkansas and Louisiana, which were primarily driven by lower natural gas and spot market energy prices.

A $32 million increase in weather-normalized margins primarily in the residential and commercial classes.

A $5 million increase in weather-related usage primarily due to a 38% increase in heating degree days.

Expenses and Other and Income Tax Benefit changed between years as follows:

Purchased Electricity, Fuel and Other Consumables Used for Electric Generation expenses decreased $25 million primarily due to a current year decrease in amortization of under-recovered fuel regulatory assets.

Other Operation and Maintenance expenses increased $13 million primarily due to a disallowance recorded on the remaining net book value of the Dolet Hills Power Station as a result of an LPSC approved settlement agreement in April 2024.

Interest Expense decreased $12 million primarily due to the following:

A $28 million decrease due to the recognition of debt carrying charges as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

A $12 million increase due to a decrease in carrying charges on storm-related regulatory assets due to a prior year settlement agreement in Louisiana.

Income Tax Benefit increased $140 million primarily due to the following:

A $109 million increase due to a reduction in Excess ADIT regulatory liabilities as a result of the IRS PLR received regarding the treatment of stand alone NOLCs in retail rate making.

A $32 million increase due to the reversal of a regulatory liability related to the merchant portion of Turk Plant Excess ADIT as a result of the APSC's March 2024 denial of SWEPCo's request to allow the merchant portion of the Turk Plant to serve Arkansas customers.

Three Months Ended March 31,
20242023
REVENUES
Electric Generation, Transmission and Distribution$500.2$503.7
Sales to AEP Affiliates12.111.7
Other Revenues3.90.5
TOTAL REVENUES516.2515.9
EXPENSES
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation184.6209.3
Other Operation112.999.2
Maintenance37.237.7
Depreciation and Amortization78.780.4
Taxes Other Than Income Taxes34.236.1
TOTAL EXPENSES447.6462.7
OPERATING INCOME68.653.2
Other Income (Expense):
Interest Income4.05.4
Allowance for Equity Funds Used During Construction3.40.5
Non-Service Cost Components of Net Periodic Benefit Cost2.63.4
Interest Expense(13.5)(25.0)
INCOME BEFORE INCOME TAX BENEFIT AND EQUITY EARNINGS65.137.5
Income Tax Benefit(144.1)(4.0)
Equity Earnings of Unconsolidated Subsidiary0.40.3
NET INCOME209.641.8
Net Income Attributable to Noncontrolling Interest1.51.2
EARNINGS ATTRIBUTABLE TO SWEPCo COMMON SHAREHOLDER$208.1$40.6
The common stock of SWEPCo is wholly-owned by Parent.
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
Net Income$209.6$41.8
OTHER COMPREHENSIVE INCOME (LOSS), NET OF TAXES
Cash Flow Hedges, Net of Tax of $0 and $0.1 in 2024 and 2023, Respectively(0.1)0.4
Amortization of Pension and OPEB Deferred Costs, Net of Tax of $0 and $(0.1) in 2024 and 2023, Respectively(0.1)(0.3)
TOTAL OTHER COMPREHENSIVE INCOME (LOSS)(0.2)0.1
TOTAL COMPREHENSIVE INCOME209.441.9
Total Comprehensive Income Attributable to Noncontrolling Interest1.51.2
TOTAL COMPREHENSIVE INCOME ATTRIBUTABLE TO SWEPCo COMMON SHAREHOLDER$207.9$40.7
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

SWEPCo Common Shareholder
Common Stock · Paid-in Capital · Retained Earnings · Accumulated Other Comprehensive Income (Loss) · Noncontrolling Interest · Total
TOTAL EQUITY – DECEMBER 31, 2022$0.1$1,442.2$2,236.0$(4.2)$0.7$3,674.8
Capital Contribution from Parent50.050.0
Common Stock Dividends – Nonaffiliated(1.5)(1.5)
Net Income40.61.241.8
Other Comprehensive Income0.10.1
TOTAL EQUITY – MARCH 31, 2023$0.1$1,492.2$2,276.6$(4.1)$0.4$3,765.2
TOTAL EQUITY – DECEMBER 31, 2023$0.1$1,492.2$2,281.3$(3.4)$0.2$3,770.4
Common Stock Dividends(50.0)(50.0)
Common Stock Dividends – Nonaffiliated(1.4)(1.4)
Net Income208.11.5209.6
Other Comprehensive Loss(0.2)(0.2)
TOTAL EQUITY – MARCH 31, 2024$0.1$1,492.2$2,439.4$(3.6)$0.3$3,928.4

See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

ASSETS

March 31,December 31,
20242023
CURRENT ASSETS
Cash and Cash Equivalents$3.8$2.4
Advances to Affiliates2.32.2
Accounts Receivable:
Customers32.739.0
Affiliated Companies61.247.2
Miscellaneous10.38.3
Total Accounts Receivable104.294.5
Fuel103.4113.8
Materials and Supplies (March 31, 2024 and December 31, 2023 Amounts Include $3.2 and $3.9, Respectively, Related to Sabine)84.588.4
Accrued Tax Benefits31.228.4
Regulatory Asset for Under-Recovered Fuel Costs166.3170.8
Prepayments and Other Current Assets52.440.8
TOTAL CURRENT ASSETS548.1541.3
PROPERTY, PLANT AND EQUIPMENT
Electric:
Generation4,790.04,790.7
Transmission2,681.12,660.6
Distribution2,881.82,824.1
Other Property, Plant and Equipment (March 31, 2024 and December 31, 2023 Amounts Include $179.9 and $182.7, Respectively, Related to Sabine)819.2814.4
Construction Work in Progress644.4555.8
Total Property, Plant and Equipment11,816.511,645.6
Accumulated Depreciation and Amortization (March 31, 2024 and December 31, 2023 Amounts Include $179.9 and $182.7, Respectively, Related to Sabine)3,149.83,087.2
TOTAL PROPERTY, PLANT AND EQUIPMENT – NET8,666.78,558.4
OTHER NONCURRENT ASSETS
Regulatory Assets1,138.21,131.8
Deferred Charges and Other Noncurrent Assets395.0326.1
TOTAL OTHER NONCURRENT ASSETS1,533.21,457.9
TOTAL ASSETS$10,748.0$10,557.6
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

LIABILITIES AND EQUITY

March 31,December 31,
20242023
(in millions)
CURRENT LIABILITIES
Advances from Affiliates$254.5$88.7
Accounts Payable:
General185.3198.9
Affiliated Companies49.345.9
Short-term Debt – Nonaffiliated5.44.3
Customer Deposits74.172.5
Accrued Taxes128.558.7
Accrued Interest37.439.9
Obligations Under Operating Leases8.89.0
Other Current Liabilities108.0169.0
TOTAL CURRENT LIABILITIES851.3686.9
NONCURRENT LIABILITIES
Long-term Debt – Nonaffiliated3,647.63,646.9
Deferred Income Taxes1,254.21,179.3
Regulatory Liabilities and Deferred Investment Tax Credits566.9756.1
Asset Retirement Obligations240.3258.6
Employee Benefits and Pension Obligations43.843.1
Obligations Under Operating Leases120.8122.5
Deferred Credits and Other Noncurrent Liabilities94.793.8
TOTAL NONCURRENT LIABILITIES5,968.36,100.3
TOTAL LIABILITIES6,819.66,787.2
Rate Matters (Note 4)
Commitments and Contingencies (Note 5)
EQUITY
Common Stock – Par Value – $18 Per Share:
Authorized – 3,680 Shares
Outstanding – 3,680 Shares0.10.1
Paid-in Capital1,492.21,492.2
Retained Earnings2,439.42,281.3
Accumulated Other Comprehensive Income (Loss)(3.6)(3.4)
TOTAL COMMON SHAREHOLDER’S EQUITY3,928.13,770.2
Noncontrolling Interest0.30.2
TOTAL EQUITY3,928.43,770.4
TOTAL LIABILITIES AND EQUITY$10,748.0$10,557.6
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.
Three Months Ended March 31,
20242023
OPERATING ACTIVITIES
Net Income$209.6$41.8
Adjustments to Reconcile Net Income to Net Cash Flows from Operating Activities:
Depreciation and Amortization78.780.4
Deferred Income Taxes(118.5)10.8
Allowance for Equity Funds Used During Construction(3.4)(0.5)
Mark-to-Market of Risk Management Contracts1.79.9
Property Taxes(74.3)(77.5)
Deferred Fuel Over/Under-Recovery, Net22.842.9
Change in Other Noncurrent Assets(10.2)7.2
Change in Other Noncurrent Liabilities(0.3)(3.3)
Changes in Certain Components of Working Capital:
Accounts Receivable, Net(9.7)29.9
Fuel, Materials and Supplies9.4(4.3)
Accounts Payable(29.6)(47.8)
Accrued Taxes, Net67.062.3
Other Current Assets(17.7)7.3
Other Current Liabilities(55.7)(48.9)
Net Cash Flows from Operating Activities69.8110.2
INVESTING ACTIVITIES
Construction Expenditures(182.6)(201.9)
Change in Advances to Affiliates, Net(0.1)—
Other Investing Activities3.00.4
Net Cash Flows Used for Investing Activities(179.7)(201.5)
FINANCING ACTIVITIES
Capital Contribution from Parent—50.0
Issuance of Long-term Debt – Nonaffiliated—347.3
Change in Short-term Debt – Nonaffiliated1.116.0
Change in Advances from Affiliates, Net165.8(291.9)
Retirement of Long-term Debt – Nonaffiliated—(94.1)
Principal Payments for Finance Lease Obligations(4.4)(14.8)
Dividends Paid on Common Stock(50.0)—
Dividends Paid on Common Stock – Nonaffiliated(1.4)(1.5)
Other Financing Activities0.20.1
Net Cash Flows from Financing Activities111.311.1
Net Increase (Decrease) in Cash and Cash Equivalents1.4(80.2)
Cash and Cash Equivalents at Beginning of Period2.488.4
Cash and Cash Equivalents at End of Period$3.8$8.2
SUPPLEMENTARY INFORMATION
Cash Paid for Interest, Net of Capitalized Amounts$41.2$45.3
Cash Received from the Sale of Transferable Tax Credits(19.9)—
Noncash Acquisitions Under Finance Leases0.40.9
Construction Expenditures Included in Current Liabilities as of March 31,79.4113.3
See Condensed Notes to Condensed Financial Statements of Registrants beginning on page 99.

INDEX OF CONDENSED NOTES TO CONDENSED FINANCIAL STATEMENTS OF REGISTRANTS

The condensed notes to condensed financial statements are a combined presentation for the Registrants. The following list indicates Registrants to which the notes apply. Specific disclosures within each note apply to all Registrants unless indicated otherwise:

NoteRegistrantPageNumber
Significant Accounting MattersAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo100
New Accounting StandardsAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo101
Comprehensive IncomeAEP103
Rate MattersAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo104
Commitments, Guarantees and ContingenciesAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo117
Acquisitions and DispositionsAEP, PSO121
Benefit PlansAEP, AEP Texas, APCo, I&M, OPCo, PSO, SWEPCo122
Business SegmentsAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo123
Derivatives and HedgingAEP, AEP Texas, APCo, I&M, OPCo, PSO, SWEPCo126
Fair Value MeasurementsAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo135
Income TaxesAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo148
Financing ActivitiesAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo150
Variable Interest EntitiesAEP156
Revenue from Contracts with CustomersAEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO, SWEPCo158
  1. SIGNIFICANT ACCOUNTING MATTERS

General

The unaudited condensed financial statements and footnotes were prepared in accordance with GAAP for interim financial information and with the instructions to Form 10-Q and Article 10 of Regulation S-X of the SEC. Accordingly, they do not include all of the information and footnotes required by GAAP for complete annual financial statements.

In the opinion of management, the unaudited condensed interim financial statements reflect all normal and recurring accruals and adjustments necessary for a fair statement of the net income, financial position and cash flows for the interim periods for each Registrant. Net income for the three months ended March 31, 2024 is not necessarily indicative of results that may be expected for the year ending December 31, 2024. The condensed financial statements are unaudited and should be read in conjunction with the audited 2023 financial statements and notes thereto, which are included in the Registrants’ Annual Reports on Form 10-K as filed with the SEC on February 26, 2024.

Earnings Per Share (EPS) (Applies to AEP)

Basic EPS is calculated by dividing net earnings available to common shareholders by the weighted-average number of common shares outstanding during the period. Diluted EPS is calculated by adjusting the weighted-average outstanding common shares, assuming conversion of all potentially dilutive stock awards.

The following table presents AEP’s basic and diluted EPS calculations included on the statements of income:

Three Months Ended March 31,
2024 · 2023
(in millions, except per share data)
$/share · $/share
Earnings Attributable to AEP Common Shareholders$1,003.1$397.0
Weighted-Average Number of Basic AEP Common Shares Outstanding526.6$1.91514.2$0.77
Weighted-Average Dilutive Effect of Stock-Based Awards1.0(0.01)1.4—
Weighted-Average Number of Diluted AEP Common Shares Outstanding527.6$1.90515.6$0.77

There were no antidilutive shares outstanding as of March 31, 2024 and 2023.

Restricted Cash (Applies to AEP, AEP Texas and APCo)

Restricted Cash primarily includes funds held by trustees for the payment of securitization bonds.

Reconciliation of Cash, Cash Equivalents and Restricted Cash

The following tables provide a reconciliation of Cash, Cash Equivalents and Restricted Cash reported within the balance sheets that sum to the total of the same amounts shown on the statements of cash flows:

AEPAEP TexasAPCo
(in millions)
Cash and Cash Equivalents$230.7$0.1$7.6
Restricted Cash51.142.78.4
Total Cash, Cash Equivalents and Restricted Cash$281.8$42.8$16.0
AEPAEP TexasAPCo
(in millions)
Cash and Cash Equivalents$330.1$0.1$5.0
Restricted Cash48.934.014.9
Total Cash, Cash Equivalents and Restricted Cash$379.0$34.1$19.9
  1. NEW ACCOUNTING STANDARDS

Management reviews the FASB’s standard-setting process and the SEC’s rulemaking activity to determine the relevance, if any, to the Registrants’ business. The following standards/rules will impact the Registrants’ financial statements.

SEC Climate Disclosure Rule

On March 6, 2024, the SEC adopted final rules that require Registrants to disclose certain climate-related information in registration statements and annual reports. The final rules require Registrants to disclose, among other things, material climate-related risks, activities to mitigate such risks and information about Registrant’s board of directors oversight and management’s role in managing material climate-related risks. The final rules also require the Registrants to provide information related to any climate-related targets or goals that are material to Registrant’s business, results of operations, or financial condition. A majority of the reporting requirements are applicable to the fiscal year beginning in 2025, with the addition of assurance reporting for greenhouse gas emissions starting in 2029 for large accelerated filers. Litigation challenging the new rules was filed by multiple parties in multiple jurisdictions, which have been consolidated and assigned to the U.S. Court of Appeals for the Eighth Circuit. On April 4, 2024, the SEC issued an order staying the final climate disclosure rules pending the completion of judicial review at the Court of Appeals. The Registrants are currently evaluating the impact of the final rules on their respective consolidated financial statements and related disclosures.

ASU 2023-09 “Improvements to Income Tax Disclosures” (ASU 2023-09)

In December 2023, the FASB issued ASU 2023-09, to address investors’ suggested enhancements to (a) better understand an entity’s exposure to potential changes in jurisdictional tax legislation and the ensuing risks and opportunities, (b) assess income tax information that affects cash flow forecasts and capital allocation decisions and (c) identify potential opportunities to increase future cash flows.

The new standard requires an annual rate reconciliation disclosure of the following categories regardless of materiality: state and local income tax net of federal income tax effect, foreign tax effects, effect of changes in tax laws or rates enacted in the current period, effect of cross-border tax laws, tax credits, changes in valuation allowances, nontaxable or nondeductible items and changes in unrecognized tax benefits.

The new standard also requires an annual disclosure of the amount of income taxes paid (net of refunds received) disaggregated by federal, state and foreign taxes and by individual jurisdictions that are equal to or greater than 5 percent of total income taxes paid. Disclosure of income (loss) from continuing operations before income tax expense (benefit) disaggregated between domestic and foreign jurisdictions and income tax expense (benefit) from continuing operations disaggregated by federal, state and foreign jurisdictions is required.

The new standard removes the requirement to disclose the cumulative amount of each type of temporary difference when a deferred tax liability is not recognized because of the exceptions to comprehensive recognition of deferred taxes related to subsidiaries and corporate joint ventures.

The amendments in the new standard may be applied on either a prospective or retrospective basis for public business entities for fiscal years beginning after December 15, 2024 with early adoption permitted. Management has not yet made a decision to early adopt the amendments to this standard or how to apply them.

ASU 2023-07 “Improvements to Reportable Segment Disclosures” (ASU 2023-07)

In November 2023, the FASB issued ASU 2023-07, to address investors’ observations that there is limited information disclosed about segment expenses and to better understand expense categories and amounts included in segment profit or loss. The new standard requires annual and interim disclosure of (a) the categories and amounts of significant segment expenses (determined by management using both qualitative and quantitative factors) that are regularly provided to the CODM and included within each reported measure of segment profit or loss, (b) the amounts and a qualitative description of “other segment items”, defined as the difference between reported segment revenues less the significant segment expenses and each reported measure of segment profit or loss disclosed, (c) reportable segment profit or loss and assets that are currently only required annually, (d) the CODM’s title and position, and an explanation of how the CODM uses the reported measure(s) of segment profit or loss in assessing segment performance and deciding how to allocate resources and (e) a requirement that entities with a single reportable segment provide all disclosures required by ASU 2023-07 and all existing segment disclosures in Topic 280. Additionally, this new standard allows disclosure of one or more of additional profit or loss measures if the CODM uses more than one measure provided that at least one of the disclosed measures is determined in a manner “most consistent with the measurement principles under GAAP”. If multiple measures are presented, additional disclosure is required about how the CODM uses each measure to assess performance and decide how to allocate resources.

The amendments in the new standard are effective on a retrospective basis for all entities for fiscal years beginning after December 15, 2023 and interim periods within fiscal periods beginning after December 15, 2024 with early adoption permitted. Management plans to adopt ASU 2023-07 effective for the 2024 10-K.

  1. COMPREHENSIVE INCOME

The disclosures in this note apply to AEP only. The impact of AOCI is not material to the financial statements of the Registrant Subsidiaries.

Presentation of Comprehensive Income

The following tables provide AEP’s components of changes in AOCI and details of reclassifications from AOCI. The amortization of pension and OPEB AOCI components are included in the computation of net periodic pension and OPEB costs. See Note 7 - Benefit Plans for additional information.

Cash Flow Hedges · Pension
Three Months Ended March 31, 2024CommodityInterest Rateand OPEBTotal
(in millions)
Balance in AOCI as of December 31, 2023$104.9$(8.1)$(152.3)$(55.5)
Change in Fair Value Recognized in AOCI, Net of Tax5.512.4—17.9
Amount of (Gain) Loss Reclassified from AOCI
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation (a)(29.3)——(29.3)
Interest Expense (a)—(1.2)—(1.2)
Amortization of Prior Service Cost (Credit)——(1.3)(1.3)
Amortization of Actuarial (Gains) Losses——0.50.5
Reclassifications from AOCI, before Income Tax Benefit(29.3)(1.2)(0.8)(31.3)
Income Tax Benefit(6.1)(0.3)(0.2)(6.6)
Reclassifications from AOCI, Net of Income Tax Benefit(23.2)(0.9)(0.6)(24.7)
Net Current Period Other Comprehensive Income (Loss)(17.7)11.5(0.6)(6.8)
Balance in AOCI as of March 31, 2024$87.2$3.4$(152.9)$(62.3)
Cash Flow Hedges · Pension
Three Months Ended March 31, 2023CommodityInterest Rateand OPEBTotal
(in millions)
Balance in AOCI as of December 31, 2022$223.5$0.3$(140.1)$83.7
Change in Fair Value Recognized in AOCI, Net of Tax(195.3)5.2(12.9)(203.0)
Amount of (Gain) Loss Reclassified from AOCI
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation (a)47.0——47.0
Interest Expense (a)—0.7—0.7
Amortization of Prior Service Cost (Credit)——(5.3)(5.3)
Amortization of Actuarial (Gains) Losses——1.21.2
Reclassifications from AOCI, before Income Tax (Expense) Benefit47.00.7(4.1)43.6
Income Tax (Expense) Benefit9.90.1(0.9)9.1
Reclassifications from AOCI, Net of Income Tax (Expense) Benefit37.10.6(3.2)34.5
Reclassifications of KPCo Pension and OPEB Regulatory Assets from AOCI, Before Income Tax (Expense) Benefit——21.121.1
Income Tax (Expense) Benefit——4.44.4
Reclassifications of KPCo Pension and OPEB Regulatory Assets from AOCI, Net of Income Tax (Expense) Benefit——16.716.7
Net Current Period Other Comprehensive Income (Loss)(158.2)5.80.6(151.8)
Balance in AOCI as of March 31, 2023$65.3$6.1$(139.5)$(68.1)

(a)Amounts reclassified to the referenced line item on the statements of income.

  1. RATE MATTERS

As discussed in the 2023 Annual Report, the Registrants are involved in rate and regulatory proceedings at the FERC and their state commissions. The Rate Matters note within the 2023 Annual Report should be read in conjunction with this report to gain a complete understanding of material rate matters still pending that could impact net income, cash flows and possibly financial condition. The following discusses ratemaking developments in 2024 and updates the 2023 Annual Report.

Regulated Generating Units (Applies to AEP, PSO and SWEPCo)

Compliance with extensive environmental regulations requires significant capital investment in environmental monitoring, installation of pollution control equipment, emission fees, disposal costs and permits. Management continuously evaluates cost estimates of complying with these regulations in balance with reliability and other factors, which has resulted in, and in the future may result in, a proposal to retire generating facilities earlier than their currently estimated useful lives.

Management is seeking or will seek regulatory recovery, as necessary, for any net book value remaining when the plants are retired. To the extent the net book value of these generation assets is not deemed recoverable, it could reduce future net income and cash flows and impact financial condition.

Regulated Generating Units that have been Retired

SWEPCo

In December 2021, the Dolet Hills Power Station was retired. As part of the 2020 Texas Base Rate Case, the PUCT authorized recovery of SWEPCo’s Texas jurisdictional share of the Dolet Hills Power Station through 2046, but denied SWEPCo the ability to earn a return on this investment resulting in a disallowance of $12 million in 2021. See the “2020 Texas Base Rate Case” section below for additional information. As part of the 2021 Arkansas Base Rate Case, the APSC authorized recovery of SWEPCo’s Arkansas jurisdictional share of the Dolet Hills Power Station through 2027, but denied SWEPCo the ability to earn a return on this investment resulting in a disallowance of $2 million in the second quarter of 2022. Also, the APSC did not rule on the prudency of the early retirement of the Dolet Hills Power Station, which will be addressed in a future proceeding. As part of the 2020 Louisiana Base Rate Case, the LPSC authorized the recovery of SWEPCo’s Louisiana share of the Dolet Hills Power Station, through a separate rider, through 2032, but did not rule on the prudency of the early retirement of the plant, which is being addressed in a separate proceeding. In April 2024, the LPSC approved a unanimous settlement agreement filed by SWEPCo, LPSC staff and certain intervenors that resolved the prudency of the retirement of the Dolet Hills Power Station and resulted in a disallowance of $14 million in the first quarter of 2024.

In March 2023, the Pirkey Plant was retired. As part of the 2020 Louisiana Base Rate Case, the LPSC authorized the recovery of SWEPCo’s Louisiana jurisdictional share of the Pirkey Plant, through a separate rider, through 2032. As part of the 2021 Arkansas Base Rate Case, the APSC granted SWEPCo regulatory asset treatment. SWEPCo will request recovery including a weighted average cost of capital carrying charge through a future proceeding. In July 2023, Texas ALJs issued a proposal for decision that concluded the decision to retire the Pirkey Plant was prudent. In September 2023, the PUCT rejected the ALJs proposal for decision concluding the retirement of the Pirkey Plant was prudent. In the open meeting, the commissioners expressed their concerns that the analysis in support of SWEPCo’s decision to retire the Pirkey Plant was not robust enough and that SWEPCo should have re-evaluated the decision following Winter Storm Uri. The treatment of the cost of recovery of the Pirkey Plant is expected to be addressed in a future rate case. As of March 31, 2024, the Texas jurisdictional share of the net book value of the Pirkey Plant was $68 million. To the extent any portion of the Texas jurisdictional share of the net book value of the Pirkey Plant is not recoverable, it could reduce future net income and cash flows and impact financial condition.

Regulated Generating Units to be Retired

PSO

In 2014, PSO received final approval from the Federal EPA to close Northeastern Plant, Unit 3, in 2026. The plant was originally scheduled to close in 2040. As a result of the early retirement date, PSO revised the useful life of Northeastern Plant, Unit 3, to the projected retirement date of 2026 and the incremental depreciation is being deferred as a regulatory asset. As part of the 2022 Oklahoma Base Rate Case, PSO will continue to recover Northeastern Plant, Unit 3 through 2040.

SWEPCo

In November 2020, management announced that it will cease using coal at the Welsh Plant in 2028. As a result of the announcement, SWEPCo began recording a regulatory asset for accelerated depreciation.

The table below summarizes the net book value including CWIP, before cost of removal and materials and supplies, as of March 31, 2024, of generating facilities planned for early retirement:

PlantNet Book ValueAccelerated Depreciation Regulatory AssetCost of RemovalRegulatory LiabilityProjectedRetirement DateCurrent AuthorizedRecovery PeriodAnnual Depreciation (a)
(dollars in millions)
Northeastern Plant, Unit 3$96.7$168.9$20.7(b)2026(c)$15.1
Welsh Plant, Units 1 and 3335.6135.758.1(d)2028(e)(f)39.2

(a)Represents the amount of annual depreciation that has been collected from customers over the prior 12-month period.

(b)Includes Northeastern Plant, Unit 4, which was retired in 2016. Removal of Northeastern Plant, Unit 4, will be performed with the removal of Northeastern Plant, Unit 3, after retirement.

(c)Northeastern Plant, Unit 3 is currently being recovered through 2040.

(d)Includes Welsh Plant, Unit 2, which was retired in 2016. Removal of Welsh Plant, Unit 2, will be performed with the removal of Welsh Plant, Units 1 and 3, after retirement.

(e)Represents projected retirement date of coal assets, units are being evaluated for conversion to natural gas after 2028.

(f)Unit 1 is being recovered through 2027 in the Louisiana jurisdiction and through 2037 in the Arkansas and Texas jurisdictions. Unit 3 is being recovered through 2032 in the Louisiana jurisdiction and through 2042 in the Arkansas and Texas jurisdictions.

Dolet Hills Power Station and Related Fuel Operations (Applies to AEP and SWEPCo)

In December 2021, the Dolet Hills Power Station was retired. While in operation, DHLC provided 100% of the fuel supply to Dolet Hills Power Station. The remaining book value of Dolet Hills Power Station non-fuel related assets are recoverable by SWEPCo through rate riders. As of March 31, 2024, SWEPCo’s share of the net investment in the Dolet Hills Power Station was $86 million, including materials and supplies, net of cost of removal collected in rates. Fuel costs incurred by the Dolet Hills Power Station are recoverable by SWEPCo through active fuel clauses and are subject to prudency determinations by the various commissions. After closure of the DHLC mining operations and the Dolet Hills Power Station, additional reclamation and other land-related costs incurred by DHLC and Oxbow will continue to be billed to SWEPCo and included in existing fuel clauses. As of March 31, 2024, SWEPCo had a net under-recovered fuel balance of $72 million, inclusive of costs related to the Dolet Hills Power Station billed by DHLC, but excluding impacts of the February 2021 severe winter weather event.

In March 2021, the LPSC issued an order allowing SWEPCo to recover up to $20 million of fuel costs in 2021 and defer approximately $35 million of additional costs with a recovery period to be determined at a later date. In August 2022, the LPSC staff filed testimony recommending fuel disallowances of up to $55 million, including denial of recovery of the $35 million deferral, with refunds to customers over five years. In February 2024, an ALJ issued a final recommendation which included a proposed $55 million refund to customers and the denial of recovery of the $35 million deferral. SWEPCo filed a motion to present oral arguments with the LPSC to dispute the ALJ’s recommendations. In April 2024, the LPSC approved a unanimous settlement agreement filed by SWEPCo, LPSC staff and certain intervenors that resolved the fuel recovery dispute and resulted in a fuel disallowance of $11 million. The remaining $24 million regulatory asset balance will be recovered over three years with interest.

In March 2021, the APSC approved fuel rates that provide recovery of $20 million for the Arkansas share of the 2021 Dolet Hills Power Station fuel costs over five years through the existing fuel clause.

In September 2023, the PUCT approved an unopposed settlement agreement that provides recovery of $48 million of Oxbow mine related costs through 2035.

If any of these costs are not recoverable or customer refunds are required, it could reduce future net income and cash flows and impact financial condition.

Pirkey Plant and Related Fuel Operations (Applies to AEP and SWEPCo)

In March 2023, the Pirkey Plant was retired. SWEPCo is recovering, or will seek recovery of, the remaining net book value of Pirkey Plant non-fuel costs. As of March 31, 2024, SWEPCo’s share of the net investment in the Pirkey Plant was $185 million, including materials and supplies, net of cost of removal. See the “Regulated Generating Units that have been Retired” section above for additional information. Fuel costs are recovered through active fuel clauses and are subject to prudency determinations by the various commissions. As of March 31, 2023, SWEPCo fuel deliveries, including billings of all fixed costs, from Sabine ceased. Additionally, as of March 31, 2024, SWEPCo had a net under-recovered fuel balance of $72 million, inclusive of costs related to the Pirkey Plant billed by Sabine, but excluding impacts of the February 2021 severe winter weather event. Remaining operational, reclamation and other land-related costs incurred by Sabine will be billed to SWEPCo and included in existing fuel clauses.

In July 2023, the LPSC ordered that a separate proceeding be established to review the prudence of the decision to retire the Pirkey Plant, including the costs included in fuel for years starting in 2019 and after. The LPSC established a procedural schedule stating staff and intervenor testimony is due in November 2024 and a hearing is scheduled for March 2025.

In September 2023, the PUCT approved an unopposed settlement agreement that provides recovery of $33 million of Sabine related fuel costs through 2035.

If any of these costs are not recoverable or customer refunds are required, it could reduce future net income and cash flows and impact financial condition.

Regulatory Assets Pending Final Regulatory Approval (Applies to all Registrants except AEPTCo)

AEP
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Earning a Return
Welsh Plant, Units 1 and 3 Accelerated Depreciation$135.7$125.6
Pirkey Plant Accelerated Depreciation121.0114.4
Unrecovered Winter Storm Fuel Costs (a)90.897.2
Other Regulatory Assets Pending Final Regulatory Approval14.349.8
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs404.9408.9
NOLC Costs67.7—
Other Regulatory Assets Pending Final Regulatory Approval89.478.5
Total Regulatory Assets Pending Final Regulatory Approval$923.8$874.4

(a)Includes $37 million and $37 million of unrecovered winter storm fuel costs recorded as a current regulatory asset as of March 31, 2024 and December 31, 2023, respectively. See the “February 2021 Severe Winter Weather Impacts in SPP” section below for additional information.

AEP Texas
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs$38.4$37.7
Line Inspection Costs7.45.7
Vegetation Management Program5.25.2
Texas Retail Electric Provider Bad Debt Expense4.14.0
Other Regulatory Assets Pending Final Regulatory Approval12.111.7
Total Regulatory Assets Pending Final Regulatory Approval$67.2$64.3
APCo
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Earning a Return
Other Regulatory Assets Pending Final Regulatory Approval$0.7$0.6
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs - West Virginia91.291.5
Plant Retirement Costs – Asset Retirement Obligation Costs25.925.9
Other Regulatory Assets Pending Final Regulatory Approval11.17.5
Total Regulatory Assets Pending Final Regulatory Approval$128.9$125.5
I&M
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Earning a Return
Other Regulatory Assets Pending Final Regulatory Approval$0.2$0.2
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs - Indiana29.729.7
NOLC Costs - Indiana20.2—
Other Regulatory Assets Pending Final Regulatory Approval4.63.3
Total Regulatory Assets Pending Final Regulatory Approval$54.7$33.2
OPCo
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs$23.6$23.6
Total Regulatory Assets Pending Final Regulatory Approval$23.6$23.6
PSO
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs$88.8$88.5
NOLC Costs12.1—
Other Regulatory Assets Pending Final Regulatory Approval2.90.2
Total Regulatory Assets Pending Final Regulatory Approval$103.8$88.7
SWEPCo
March 31,December 31,
20242023
Noncurrent Regulatory Assets · (in millions)
Regulatory Assets Currently Earning a Return
Welsh Plant, Units 1 and 3 Accelerated Depreciation$135.7$125.6
Pirkey Plant Accelerated Depreciation121.0114.4
Unrecovered Winter Storm Fuel Costs (a)90.897.2
Dolet Hills Power Station Accelerated Depreciation (b)12.012.0
Other Regulatory Assets Pending Final Regulatory Approval1.426.0
Regulatory Assets Currently Not Earning a Return
Storm-Related Costs - Louisiana, Texas51.456.0
NOLC Costs35.4—
Other Regulatory Assets Pending Final Regulatory Approval13.913.7
Total Regulatory Assets Pending Final Regulatory Approval$461.6$444.9

(a)Includes $37 million and $37 million of unrecovered winter storm fuel costs recorded as a current regulatory asset as of March 31, 2024 and December 31, 2023, respectively. See the “February 2021 Severe Winter Weather Impacts in SPP” section below for additional information.

(b)Amounts include the FERC jurisdiction.

If these costs are ultimately determined not to be recoverable, it could reduce future net income and cash flows and impact financial condition.

AEP Texas Rate Matters (Applies to AEP and AEP Texas)

AEP Texas Interim Transmission and Distribution Rates

Through March 31, 2024, AEP Texas’ cumulative revenues from interim base rate increases that are subject to a prudency review is approximately $1.1 billion. The 2024 AEP Texas base rate case described below could result in a refund to customers if AEP Texas incurs a disallowance of the transmission or distribution investment on which an interim increase was based. Management is unable to determine a range of potential losses, if any, that are reasonably possible of occurring. A revenue decrease, including a refund of interim transmission and distribution rates, could reduce future net income and cash flows and impact financial condition.

2024 AEP Texas Base Rate Case

In February 2024, AEP Texas filed a request with the PUCT for a $164 million annual base rate increase over its adjusted test year revenues which include interim transmission and distribution rate updates. AEP Texas’s request is based upon a proposed 10.6% ROE with a capital structure of 55% debt and 45% common equity. The rate case seeks a prudence determination on all capital additions included in interim rates since 2018. The procedural schedule for this case states intervenor testimony is due May 2024 and a hearing is scheduled for June 2024. If any of these costs are not recoverable or refunds of revenues collected under interim transmission and distribution rates are ordered to be returned, it could reduce future net income and cash flows and impact financial condition.

APCo and WPCo Rate Matters (Applies to AEP and APCo)

ENEC (Expanded Net Energy Cost) Filings

In January 2024, the WVPSC issued an order resolving the Companies’ 2021-2023 ENEC cases. In the order, the WVPSC: (a) disallowed $232 million in ENEC under-recovered costs as of February 28, 2023 ($136 million related to APCo) and (b) approved the recovery of $321 million of ENEC under-recovered costs as of February 28, 2023 ($174 million related to APCo) plus a 4% carrying charge rate over a ten-year recovery period starting September 1, 2024. In February 2024, the Companies filed briefs with the West Virginia Supreme Court to initiate an appeal of this order. The West Virginia Supreme Court will hear oral arguments in September 2024, after which it will issue a decision on the appeal. The Companies will submit their annual ENEC update filing with the WVPSC in the second quarter of 2024 proposing that updated ENEC rates become effective September 1, 2024.

2023 Virginia Base Rate Case

In March 2024, APCo filed a request with the Virginia SCC for a $95 million annual increase in base rates based upon a proposed 10.8% ROE and a proposed capital structure of 51% debt and 49% common equity. The requested increase in base rates is primarily due to incremental rate base, proposed capital structure changes including an increase in ROE and proposed increases in distribution and generation operation and maintenance expenses. Staff testimony is due in August 2024 and a hearing is scheduled for September 2024. An order is expected in the second half of 2024. If any costs included in this filing are not approved for recovery, it could reduce future net income and cash flows and impact financial condition.

ETT Rate Matters (Applies to AEP)

ETT Interim Transmission Rates

AEP has a 50% equity ownership interest in ETT. Predominantly all of ETT’s revenues are based on interim rate changes that can be filed twice annually and are subject to review and possible true-up in the next base rate proceeding. Through March 31, 2024, AEP’s share of ETT’s cumulative revenues that are subject to a prudency review is approximately $1.7 billion. A base rate review could produce a refund to customers if ETT incurs a disallowance of the transmission investment on which an interim increase was based. A revenue decrease, including a refund of interim transmission rates, could reduce future net income and cash flows and impact financial condition. Management is unable to determine a range of potential losses, if any, that are reasonably possible of occurring. ETT is required to file for a comprehensive rate review no later than February 1, 2025, during which the $1.7 billion of cumulative revenues above will be subject to review.

I&M Rate Matters (Applies to AEP and I&M)

Michigan Power Supply Cost Recovery (PSCR)

In April 2023, I&M received intervenor testimony in I&M’s 2021 PSCR Reconciliation for the 12-month period ending December 31, 2021 recommending disallowances of purchased power costs of $18 million associated with the OVEC Inter-Company Power Agreement (ICPA) and the Rockport Plant UPA with AEGCo that were alleged to be above market in applying the MPSC’s Code of Conduct rules. Michigan staff submitted testimony in I&M’s 2021 PSCR Reconciliation with no recommended disallowances for PSCR costs incurred, including those associated with the OVEC ICPA and the Rockport Plant UPA with AEGCo. Michigan staff also recommended several options to address I&M’s shortfall in achieving Michigan’s annual one percent energy waste reduction savings level, resulting in potential future disallowed costs of up to approximately $14 million. In June 2023, Michigan staff submitted rebuttal testimony to update their calculation of the 2021 market proxy price resulting in a recommended disallowance of approximately $1 million related to the OVEC ICPA.

In January 2024, I&M received staff testimony in I&M’s 2022 PSCR Reconciliation for the 12-month period ending December 31, 2022 recommending disallowances of purchased power costs of $2 million associated with the OVEC ICPA that were alleged to be above market in applying the MPSC’s Code of Conduct rules. Similar to the 2021 PSCR Reconciliation, Michigan staff also recommended several options to address I&M’s shortfall in achieving Michigan’s annual one percent energy waste reduction savings level, resulting in potential future disallowed costs of up to approximately $6 million. In April 2024, the MPSC issued an order on I&M’s 2021 PSCR Reconciliation that: (a) disallowed $1 million of purchased power costs associated with the OVEC ICPA that the MPSC concluded were above market, (b) disallowed $10 million of purchased power costs under the Rockport Plant UPA with AEGCo that the MPSC concluded were “energy only” and above market and (c) disallowed $497 thousand of PSCR costs due to I&M’s shortfall in achieving Michigan’s one percent energy waste reduction savings level in 2020. As of March 31, 2024, I&M’s financial statements reflect the impacts of this disallowance. I&M expects to appeal the MPSC’s order.

In March 2024, I&M submitted its 2023 PSCR Reconciliation to the MPSC. An MPSC order on I&M’s 2022 PSCR Reconciliation is expected in the second half of 2024. The MPSC has yet to issue a procedural schedule for I&M’s 2023 PSCR Reconciliation. If any PSCR costs are not recoverable, it could reduce future net income and cash flows and impact financial condition.

2023 Indiana Base Rate Case

In August 2023, I&M filed a request with the IURC for a $116 million annual increase in Indiana base rates based upon a 2024 forecasted test year, a proposed 10.5% ROE and a proposed capital structure of 48.8% debt and 51.2% common equity. I&M proposed that the annual increase in base rates be implemented in two steps, with the first increase effective in mid-2024, following an IURC order, and the second increase effective in January 2025. The proposed annual increase includes a $41 million increase related to depreciation expense, driven by increased depreciation rates and increased capital investments, and a $15 million increase related to storm expenses. I&M’s Indiana base case filing requests recovery of certain historical period regulatory asset balances and proposes deferral accounting for certain future investments and tax related issues, including corporate alternative minimum tax expense and PTCs related to the Cook Plant.

In December 2023, I&M and intervenors reached a settlement agreement that was submitted to the IURC recommending a two-step increase in Indiana rates with a $28 million annual increase effective upon an IURC order and the remaining $34 million annual increase effective in January 2025. The recommended revenue increase includes: (a) a 9.85% ROE, (b) a two-step update of I&M’s capital structure with a capital structure of 50% for both debt and common equity effective upon an IURC order and I&M will submit an updated capital structure in January 2025 with the common equity component adjusted to no more than 51.2%, (c) a $25 million increase related to depreciation expense and (d) an $11 million increase related to storm expenses.

A hearing was held in January 2024 and an order is expected in the second quarter of 2024. If any costs included in this filing are not approved for recovery, it could reduce future net income and cash flows and impact financial condition.

2023 Michigan Base Rate Case

In September 2023, I&M filed a request with the MPSC for a $34 million annual increase in Michigan base rates based upon a 2024 forecasted test year, a proposed 10.5% ROE and a capital structure of 49.4% debt and 50.6% common equity. The proposed annual increase includes an $11 million annual increase in depreciation expense driven by increased capital investment. I&M’s Michigan base case filing requests recovery of certain historical period regulatory asset balances and proposes deferral accounting for certain future investments and tax related issues, including corporate alternative minimum tax (CAMT) expense and PTCs related to the Cook Plant.

In January 2024, Michigan staff and various intervenors submitted testimony recommending changes in base rates ranging from a $6 million annual decrease to a $19 million annual increase. These changes are based on ROEs ranging from 9.7% to 9.9% and capital structures ranging from 49.4% debt and 50.6% equity to 52% debt and 48% equity. Staff and intervenors also proposed in testimony certain disallowances related to regulatory assets and capital investments, the exclusion of CAMT from any future deferrals and the prospective inclusion of PTCs related to the Cook Plant in I&M’s PSCR.

A hearing was held in February 2024. If any costs included in this filing are not approved for recovery, it could reduce future net income and cash flows and impact financial condition.

KPCo Rate Matters (Applies to AEP)

Investigation of the Service, Rates and Facilities of KPCo

In June 2023, the KPSC issued an order directing KPCo to show cause why it should not be subject to Kentucky statutory remedies, including fines and penalties, for failure to provide adequate service in its service territory. The KPSC’s show cause order did not make any determination regarding the adequacy of KPCo’s service. In July 2023, KPCo filed a response to the show cause order demonstrating that it has provided adequate service. In December 2023 and February 2024, KPCo and certain intervenors filed testimony with the KPSC. In February 2024, KPCo filed a motion to strike and exclude intervenor testimony. In March 2024, the KPSC denied KPCo’s February 2024 motion. A hearing is expected in 2024. If any fines or penalties are levied against KPCo relating to the show cause order, it could reduce net income and cash flows and impact financial condition.

2023 Kentucky Base Rate and Securitization Case

In June 2023, KPCo filed a request with the KPSC for a $94 million net annual increase in base rates based upon a proposed 9.9% ROE with the increase to be implemented no earlier than January 2024. In conjunction with its June 2023 filing, KPCo further requested to finance through the issuance of securitization bonds, approximately $471 million of regulatory assets. KPCo’s proposal did not address the disposition of its 50% interest in Mitchell Plant, which will be addressed in the future. As of March 31, 2024, the net book value of KPCo’s share of the Mitchell Plant, before cost of removal including CWIP and inventory, was $543 million. If any of these costs are not recoverable, it could reduce future net income and cash flows and impact financial condition.

In November 2023, KPCo filed an uncontested settlement agreement with the KPSC, that included an annual base rate increase of $75 million, based upon a 9.75% ROE. Settlement parties agreed that the KPSC should approve KPCo’s securitization request, and that the approximately $471 million regulatory assets requested for securitization are comprised of prudently incurred costs.

In January 2024, the KPSC issued an order modifying the November 2023 uncontested settlement agreement and approving an annual base rate increase of $60 million based upon a 9.75% ROE effective with billing cycles mid-January 2024. The order reduced KPCo’s base rate revenue requirement by $14 million to allow recovery of actual test year PJM transmission costs instead of KPCo’s requested annual level of costs based on PJM 2023 projected transmission revenue requirements. In February 2024, KPCo filed an appeal with the Commonwealth of Kentucky Franklin Circuit Court, challenging among other aspects of the order the $14 million base rate revenue requirement reduction.

In January 2024, consistent with the November 2023 uncontested settlement agreement, the KPSC issued a financing order approving KPCo’s request to securitize certain regulatory assets balances as of the time securitization bonds are issued and concluding that costs requested for recovery through securitization were prudently incurred. The KPSC’s financing order includes certain additional requirements related to securitization bond structuring, marketing, placement and issuance that were not reflected in KPCo’s proposal. As a result, in January 2024, KPCo filed a request for rehearing with the KPSC to clarify certain aspects of these additional requirements. In February 2024, the KPSC denied KPCo’s rehearing requests. In accordance with Kentucky statutory requirements and the financing order, the issuance of the securitized bonds is subject to final review by the KPSC after bond pricing. KPCo expects to proceed with the securitized bond issuance process and to complete the securitization process in the second half of 2024, subject to market conditions. As of March 31, 2024, regulatory asset balances expected to be recovered through securitization total $476 million and include: (a) $288 million of plant retirement costs, (b) $79 million of deferred storm costs related to 2020, 2021, 2022 and 2023 major storms, (c) $46 million of deferred purchased power expenses, (d) $62 million of under-recovered purchased power rider costs and (e) $1 million of deferred issuance-related expenses including KPSC advisor expenses. If any of these costs are not recoverable, it could reduce future net income and cash flows and impact financial condition.

Fuel Adjustment Clause (FAC) Review

In December 2023, KPCo received intervenor testimony in its FAC review for the two-year period ending October 31, 2022, recommending a disallowance ranging from $44 million to $60 million of its total $432 million purchased power cost recoveries as a result of proposed modifications to the ratemaking methodology that limits purchased power costs recoverable through the FAC. A hearing was held in February 2024 and an order is expected in the second quarter of 2024. If any fuel costs are not recoverable or refunds are ordered, it could reduce future net income and cash flows and impact financial condition.

Rockport Offset Recovery

In January 2024, KPCo filed an application with the KPSC seeking to recover an allowed cost (Rockport Offset) of $41 million in accordance with the terms of the settlement agreement in the 2017 Kentucky Base Rate Case permitting KPCo to use the level of non-fuel, non-environmental Rockport Plant UPA expense included in base rates to earn its authorized ROE in 2023 since the Rockport UPA ended in December 2022. An estimated Rockport Offset of $23 million was recovered through a rider, subject to true-up, during the 12-months ended December 2023. In February 2024, the KPSC issued an order allowing KPCo to collect the remaining $18 million through interim rates, subject to refund, over twelve months starting in March 2024. In April 2024, KPCo submitted to the KPSC a request for decision on the record. An order is expected in 2024. Through the first quarter of 2024, the Rockport Offset true-up is reflected in revenues to the extent amounts have been billed to customers, as KPCo has not met the requirements of alternative revenue recognition in accordance with the accounting guidance for “Regulated Operations”. If the Rockport Offset is not recoverable or refunds are ordered, it could reduce future net income and cash flows and impact financial condition.

OPCo Rate Matters (Applies to AEP and OPCo)

OVEC Cost Recovery Audits

In December 2021, as part of OVEC cost recovery audits pending before the PUCO, intervenors filed positions claiming that costs incurred by OPCo during the 2018-2019 audit period were imprudent and should be disallowed. In May 2022, intervenors filed for rehearing on the 2016-2017 OVEC cost recovery audit period claiming the PUCO’s April 2022 order to adopt the findings of the audit report were unjust, unlawful and unreasonable for multiple reasons, including the position that OPCo recovered imprudently incurred costs. In June 2022, the PUCO granted rehearing on the 2016-2017 audit period for purposes of further consideration.

In May 2023, as part of the OVEC cost recovery audits pending before the PUCO, intervenors filed positions claiming that costs incurred by OPCo during the 2020 audit period were imprudent and should be disallowed. A hearing was held in November 2023. In the first quarter of 2024, post-hearing briefs were filed by the parties and the case currently awaits a decision on the merits.

Management disagrees with these claims and is unable to predict the impact of these disputes. If any costs are disallowed or refunds are ordered, it could reduce future net income and cash flows and impact financial condition.

Ohio ESP Filings

In January 2023, OPCo filed an application with the PUCO to approve an ESP that included proposed rate adjustments, proposed new riders and the continuation and modification of certain existing riders, including the DIR, effective June 2024 through May 2030. The proposal includes a return on common equity of 10.65% on capital costs for certain riders. In June 2023, intervenors filed testimony opposing OPCo’s plan for various new riders and modifications to existing riders, including the DIR. In September 2023, OPCo and certain intervenors filed a settlement agreement with the PUCO addressing the ESP application. The settlement included a four year term from June 2024 through May 2028, an ROE of 9.7% and continuation of a number of riders including the DIR subject to revenue caps. In April 2024, the PUCO issued an order approving the settlement agreement.

PSO Rate Matters (Applies to AEP and PSO)

2024 Oklahoma Base Rate Case

In January 2024, PSO filed a request with the OCC for a $218 million annual base rate increase based upon a 10.8% ROE with a capital structure of 48.9% debt and 51.1% common equity. PSO requested an expanded transmission cost recovery rider and a mechanism to recover generation costs necessary to comply with SPP’s 2023 increased capacity planning reserve margin requirements. PSO’s request includes the 155 MW Rock Falls Wind Facility and reflects recovery of Northeastern Plant, Unit 3 through 2040. The procedural schedule for this case states intervenor testimony is due in May 2024 and a hearing is scheduled for July 2024. If any costs included in this filing are not approved for recovery, it could reduce future net income and cash flows and impact financial condition.

SWEPCo Rate Matters (Applies to AEP and SWEPCo)

2012 Texas Base Rate Case

In 2012, SWEPCo filed a request with the PUCT to increase annual base rates primarily due to the completion of the Turk Plant. In 2013, the PUCT issued an order affirming the prudence of the Turk Plant but determined that the Turk Plant’s Texas jurisdictional capital cost cap established in a previous Certificate of Convenience and Necessity case also limited SWEPCo’s recovery of AFUDC in addition to limits on its recovery of cash construction costs.

Upon rehearing in 2014, the PUCT reversed its initial ruling and determined that AFUDC was excluded from the Turk Plant’s Texas jurisdictional capital cost cap. As a result, SWEPCo reversed $114 million of a previously recorded regulatory disallowance in 2013. In 2017, the Texas District Court upheld the PUCT’s 2014 order and intervenors filed appeals with the Texas Third Court of Appeals.

In August 2021, the Texas Third Court of Appeals reversed the Texas District Court judgment affirming the PUCT’s order on AFUDC, concluding that the language of the PUCT’s original 2008 order intended to include AFUDC in the Texas jurisdictional capital cost cap and remanded the case to the PUCT for future proceedings. In November 2021, SWEPCo and the PUCT submitted Petitions for Review with the Texas Supreme Court. In October 2022, the Texas Supreme Court denied the Petitions for Review submitted by SWEPCo and the PUCT. In December 2022, SWEPCo and the PUCT filed requests for rehearing with the Texas Supreme Court. In June 2023, the Texas Supreme Court denied SWEPCo’s request for rehearing and the case was remanded to the PUCT for future proceedings. In October 2023, SWEPCo filed testimony with the PUCT in the remanded proceeding recommending no refund or disallowance.

On December 14, 2023, the PUCT approved a preliminary order stating the PUCT will not address SWEPCo’s request that would allow the PUCT to find cause to allow SWEPCo to exceed the Texas jurisdictional capital cost cap in the current remand proceeding. As a result of the PUCT’s approval of the preliminary order, SWEPCo believes it is probable the PUCT will disallow capitalized AFUDC in excess of the Texas jurisdictional capital cost cap and recorded a pretax, non-cash disallowance of $86 million. Such determination may reduce SWEPCo’s future revenues by approximately $15 million on an annual basis. On December 21, 2023, SWEPCo filed a motion with the PUCT for reconsideration of the preliminary order. In January 2024, the PUCT denied the motion for reconsideration of the preliminary order.

The PUCT’s December 2023 approval of the preliminary order determined that it will address, in the ongoing PUCT remand proceeding, any potential revenue refunds to customers that may be required by future PUCT orders. In January 2024, the PUCT established a procedural schedule for the remand proceeding. On March 1, 2024, SWEPCo filed supplemental direct testimony with the PUCT in response to the December 2023 preliminary order. On March 8, 2024, intervenors and the PUCT staff filed a motion with the PUCT to strike portions of SWEPCo’s October 2023 direct testimony and March 2024 supplemental direct testimony. On March 19, 2024, The ALJ granted portions of the motion which included removal of testimony supporting SWEPCo’s position that refunds are not appropriate. On March 28, 2024, SWEPCo filed an appeal of the ALJ decision with the PUCT. A decision by the PUCT on the appeal is expected in the second quarter of 2024. In April 2024, intervenors and PUCT staff submitted testimony recommending customer refunds through December 2023 ranging from $149 million to $197 million, including carrying charges, with refund periods ranging from 18 months to 48 months. A hearing is scheduled for May 2024. Although SWEPCo does not currently believe any refunds are probable of occurring, SWEPCo estimates it could be required to make customer refunds, including interest, ranging from $0 to $200 million related to revenues collected from February 2013 through March 2024.

2016 Texas Base Rate Case

In 2016, SWEPCo filed a request with the PUCT for a net increase in Texas annual revenues of $69 million based upon a 10% ROE. In January 2018, the PUCT issued a final order approving a net increase in Texas annual revenues of $50 million based upon a ROE of 9.6%, effective May 2017. The final order also included: (a) approval to recover the Texas jurisdictional share of environmental investments placed in-service, as of June 30, 2016, at various plants, including Welsh Plant, Units 1 and 3, (b)

approval of recovery of, but no return on, the Texas jurisdictional share of the net book value of Welsh Plant, Unit 2, (c) approval of $2 million in additional vegetation management expenses and (d) the rejection of SWEPCo’s proposed transmission cost recovery mechanism.

As a result of the final order, in 2017 SWEPCo: (a) recorded an impairment charge of $19 million, which included $7 million associated with the lack of return on Welsh Plant, Unit 2 and $12 million related to other disallowed plant investments, (b) recognized $32 million of additional revenues, for the period of May 2017 through December 2017, that was surcharged to customers in 2018 and (c) recognized an additional $7 million of expenses consisting primarily of depreciation expense and vegetation management expense, offset by the deferral of rate case expense. SWEPCo implemented new rates in February 2018 billings. The $32 million of additional 2017 revenues was collected during 2018. In March 2018, the PUCT clarified and corrected portions of the final order, without changing the overall decision or amounts of the rate change. The order has been appealed by various intervenors related to limiting SWEPCo’s recovery of AFUDC on Turk Plant and recovery of Welsh Plant, Unit 2. If certain parts of the PUCT order are overturned, it could reduce future net income and cash flows and impact financial condition.

2020 Texas Base Rate Case

In October 2020, SWEPCo filed a request with the PUCT for a $105 million annual increase in Texas base rates based upon a proposed 10.35% ROE. The request would move transmission and distribution interim revenues recovered through riders into base rates. Eliminating these riders would result in a net annual requested base rate increase of $90 million primarily due to increased investments. SWEPCo subsequently filed a request with the PUCT lowering the requested annual increase in Texas base rates to $100 million, which would result in an $85 million net annual base rate increase after moving the proposed riders to rate base.

In January 2022, the PUCT issued a final order approving an annual revenue increase of $39 million based upon a 9.25% ROE. The order also includes: (a) rates implemented retroactively back to March 18, 2021, (b) $5 million of the proposed increase related to vegetation management, (c) $2 million annually to establish a storm catastrophe reserve and (d) the creation of a rider to recover the Dolet Hills Power Station as if it were in rate base until its retirement at the end of 2021 and starting in 2022 the remaining net book value to be recovered as a regulatory asset through 2046. As a result of the final order, SWEPCo recorded a disallowance of $12 million in 2021 associated with the lack of return on the Dolet Hills Power Station. In February 2022, SWEPCo filed a motion for rehearing with the PUCT challenging several errors in the order, which include challenges of the approved ROE, the denial of a reasonable return or carrying costs on the Dolet Hills Power Station and the calculation of the Texas jurisdictional share of the storm catastrophe reserve. In April 2022, the PUCT denied the motion for rehearing. In May 2022, SWEPCo filed a petition for review with the Texas District Court seeking a judicial review of the several errors challenged in the PUCT’s final order.

2021 Louisiana Storm Cost Filing

In 2020, Hurricanes Laura and Delta caused power outages and extensive damage to the SWEPCo service territories, primarily impacting the Louisiana jurisdiction. Following both hurricanes, the LPSC issued orders allowing Louisiana utilities, including SWEPCo, to establish regulatory assets to track and defer expenses associated with these storms. In February 2021, severe winter weather impacted the Louisiana jurisdiction and in March 2021, the LPSC approved the deferral of incremental storm restoration expenses related to the winter storm. In March 2023, SWEPCo and the LPSC staff filed a joint stipulation and settlement agreement with the LPSC which confirmed the prudency of $150 million of deferred incremental storm restoration expenses. The agreement also authorized an interim carrying charge at a rate of 3.125% through March 2024. In April 2023, the LPSC issued an order approving the stipulation and settlement agreement. In July 2023, SWEPCo submitted additional information in phase two of this proceeding to obtain a financing order and prudency review of capital investment. In April 2024, SWEPCo and the LPSC staff filed a joint uncontested stipulation and settlement agreement with the LPSC requesting securitization of storm costs, including a storm reserve. A hearing is scheduled for May 2024. If SWEPCo is unable to recover he regulatory assets associated with these storms, it could reduce future net income and cash flows and impact financial condition.

February 2021 Severe Winter Weather Impacts in SPP

In February 2021, severe winter weather had a significant impact in SPP, resulting in significantly increased market prices for natural gas power plants to meet reliability needs for the SPP electric system. For the time period of February 9, 2021 to February 20, 2021, SWEPCo’s natural gas expenses and purchases of electricity still to be recovered from customers are shown in the table below:

JurisdictionMarch 31, 2024December 31, 2023Approved Recovery PeriodApproved Carrying Charge
(in millions)
Arkansas$48.6$54.26 years(a)
Louisiana90.897.2(b)(b)
Texas94.5101.95 years1.65%
Total$233.9$253.3

(a)SWEPCo is permitted to record carrying costs on the unrecovered balance of fuel costs at a weighted-cost of capital approved by the APSC. The APSC will conclude an audit of these costs in 2024. A hearing is scheduled for June 2024.

(b)In March 2021, the LPSC approved a special order granting a temporary modification to the FAC and shortly after SWEPCo began recovery of its Louisiana jurisdictional share of these fuel costs based on a five-year recovery period inclusive of an interim carrying charge equal to the prime rate. The special order states the fuel and purchased power costs incurred will be subject to a future LPSC audit.

If SWEPCo is unable to recover any of the costs relating to the extraordinary fuel and purchases of electricity, or obtain authorization of a reasonable carrying charge on these costs, it could reduce future net income and cash flows and impact financial condition.

PSO and SWEPCo Rate Matters (Applies to AEP, PSO and SWEPCo)

North Central Wind Energy Facilities

The NCWF are subject to various regulatory performance requirements, including a Net Capacity Factor (NCF) guarantee. The NCF guarantee will be measured in MWhs across all facilities on a combined basis for each five year period for the first thirty full years of operation. The first NCF guarantee five year period began in April 2022. Certain wind turbines have experienced performance issues that have prompted PSO and SWEPCo to work with a manufacturer to find a resolution. If regulatory performance requirements, such as the NCF guarantee, are not met, PSO and SWEPCo may recognize a regulatory liability to refund retail customers. Management is unable to determine a range of potential losses that is reasonably possible of occurring.

FERC Rate Matters

Independence Energy Connection Project (Applies to AEP)

In 2016, PJM approved the Independence Energy Connection Project (IEC) and included it in its Regional Transmission Expansion Plan to alleviate congestion. Transource Energy has an ownership interest in the IEC, which is located in Maryland and Pennsylvania. In June 2020, the Maryland Public Service Commission approved a Certificate of Public Convenience and Necessity to construct the portion of the IEC in Maryland. In May 2021, the Pennsylvania Public Utility Commission (PAPUC) denied the IEC certificate for siting and construction of the portion in Pennsylvania. Transource Energy appealed the PAPUC ruling in Pennsylvania state court and challenged the ruling before the United States District Court for the Middle District of Pennsylvania. In May 2022, the Pennsylvania state court issued an order affirming the PAPUC decision as to state law claims. In December 2023, the United States District Court for the Middle District of Pennsylvania granted summary judgment in favor of Transource Energy, finding that the PAPUC decision violated federal law and the United States Constitution. In January 2024, the PAPUC filed an appeal with the United States Court of Appeals for the Third Circuit. Additional regulatory proceedings before the PAPUC are expected to resume in 2024.

In September 2021, PJM notified Transource Energy that the IEC was suspended to allow for the regulatory and related appeals process to proceed in an orderly manner without breaching milestone dates in the project agreement. At that time, PJM stated that the IEC has not been cancelled and remains necessary to alleviate congestion. PJM continues to evaluate reliability and market efficiency in the area. As of March 31, 2024, AEP’s share of IEC capital expenditures was approximately $94 million, located in Total Property, Plant and Equipment - Net on AEP’s balance sheets. The FERC has previously granted abandonment benefits for this project, allowing the full recovery of prudently incurred costs if the project is cancelled for reasons outside the control of Transource Energy. If any of the IEC costs are not recoverable, it could reduce future net income and cash flows and impact financial condition.

Request to Update AEGCo Depreciation Rates (Applies to AEP and I&M)

In October 2022, AEP, on behalf of AEGCo, submitted proposed revisions to AEGCo’s depreciation rates for its 50% ownership interest in Rockport Plant, Unit 1 and Unit 2, reflected in the UPA between AEGCo and I&M. The proposed depreciation rates for these assets reflect an estimated 2028 retirement date for the Rockport Plant. AEGCo’s previous FERC-approved depreciation rates for Rockport Plant, Unit 1 were based upon a December 31, 2028 estimated retirement date while AEGCo’s previous FERC-approved depreciation rates for Rockport Plant, Unit 2 leasehold improvements were based upon a December 31, 2022 estimated retirement date in conjunction with the termination of the Rockport Plant, Unit 2 lease.

In December 2022, the FERC issued an order approving the proposed AEGCo Rockport depreciation rates effective January 1, 2023, subject to further review and a potential refund. In August 2023, AEGCo reached a settlement agreement with the FERC trial staff that resolved all issues set for hearing. In September 2023, the settlement agreement was certified to the FERC as uncontested. In March 2024, the FERC issued an order approving the uncontested settlement agreement. The results of the order did not have a material impact on financial condition, results of operations or cash flows.

FERC 2021 PJM and SPP Transmission Formula Rate Challenge (Applies to AEP, AEPTCo, APCo, I&M, PSO and SWEPCo)

The Registrants transitioned to stand-alone treatment of NOLCs in its PJM and SPP transmission formula rates beginning with the 2022 projected transmission revenue requirements and 2021 true-up to actual transmission revenue requirements, and provided notice of this change in informational filings made with the FERC. Stand-alone treatment of the NOLCs for transmission formula rates increased the annual revenue requirements for years 2024, 2023, 2022 and 2021 by $52 million, $60 million, $69 million and $78 million, respectively.

In January 2024, the FERC issued two orders granting formal challenges by certain unaffiliated customers related to stand-alone treatment of NOLCs in the 2021 Transmission Formula Rates of the AEP transmission owning subsidiaries within PJM and SPP. The FERC directed the AEP transmission owning subsidiaries within PJM and SPP to provide refunds with interest on all amounts collected for the 2021 rate year, and for such refunds to be reflected in the annual update for the next rate year. In February 2024, AEPSC on behalf of the AEP transmission owning subsidiaries within PJM and SPP filed requests for rehearing. In March 2024, the FERC denied AEPSC’s requests for rehearing of the January 2024 orders by operation of law and stated it may address the requests for rehearing in future orders. In March 2024, AEPSC submitted refund compliance reports to the FERC, which preserve the non-finality of the FERC’s January 2024 orders pending further proceedings on rehearing and appeal. In April 2024, AEP made filings with the FERC which request that the FERC: (a) reopen the record so that the FERC may take the IRS PLRs received in April 2024 regarding the treatment of stand-alone NOLCs in ratemaking into evidence and consider them in substantive orders on rehearing and (b) stay its January 2024 orders and related compliance filings and refunds to provide time for consideration of the April 2024 IRS PLRs. The Registrants have not yet been directed to make cash refunds related to the 2024, 2023 or 2022 rate years.

As a result of the January 2024 FERC orders, the Registrants’ balance sheets reflect a liability for the probable refund of all NOLC revenues included in transmission formula rates for years 2024, 2023, 2022 and 2021, with interest. The probable refunds to affiliated and nonaffiliated customers are reflected as Deferred Credits and Other Noncurrent Liabilities on the balance sheets, with the exception of amounts expected to be refunded within one year which are reflected in Other Current Liabilities. Refunds probable to be received by affiliated companies, resulting in a reduction to affiliated transmission expense, were deferred as an increase to Regulatory Liabilities or a reduction to Regulatory Assets on the balance sheets where management expects that refunds would be returned to retail customers through authorized retail jurisdiction rider mechanisms.

Request to Update SWEPCo Generation Depreciation Rates (Applies to AEP and SWEPCo)

In October 2023, SWEPCo filed an application to revise its generation wholesale customer’s contracts to reflect an increase in the annual revenue requirement of approximately $5 million for updated depreciation rates and allow for the return on and of FERC customers jurisdictional share of regulatory assets associated with retired plants. In November 2023, certain intervenors filed a motion with the FERC protesting and recommending the rejection of SWEPCo’s filings. In December 2023, the FERC issued an order approving the proposed rates effective January 1, 2024, subject to further review and refund and established hearing and settlement proceedings. If SWEPCo is unable to recover the remaining regulatory assets associated with retired plants, it could reduce future net income and cash flows and impact financial condition.

  1. COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrants are subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Registrants’ business activities are subject to extensive governmental regulation related to public health and the environment. The ultimate outcome of such pending or potential litigation against the Registrants cannot be predicted. Management accrues contingent liabilities only when management concludes that it is both probable that a liability has been incurred at the date of the financial statements and the amount of loss can be reasonably estimated. When management determines that it is not probable, but rather reasonably possible that a liability has been incurred at the date of the financial statements, management discloses such contingencies and the possible loss or range of loss if such estimate can be made. Any estimated range is based on currently available information and involves elements of judgment and significant uncertainties. Any estimated range of possible loss may not represent the maximum possible loss exposure. Circumstances change over time and actual results may vary significantly from estimates.

For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements. The Commitments, Guarantees and Contingencies note within the 2023 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.” There is no collateral held in relation to any guarantees. In the event any guarantee is drawn, there is no recourse to third-parties unless specified below.

Letters of Credit (Applies to AEP, AEP Texas, APCo and I&M)

Standby letters of credit are entered into with third-parties. These letters of credit are issued in the ordinary course of business and cover items such as natural gas and electricity risk management contracts, construction contracts, insurance programs, security deposits and debt service reserves.

In March 2024, AEP increased its $4 billion revolving credit facility to $5 billion and extended the due date from March 2027 to March 2029. Also, in March 2024, AEP extended the due date of its $1 billion revolving credit facility from March 2025 to March 2027. AEP may issue up to $1.2 billion as letters of credit, under these revolving credit facilities, on behalf of subsidiaries. As of March 31, 2024, no letters of credit were issued under either revolving credit facility.

An uncommitted facility gives the issuer of the facility the right to accept or decline each request made under the facility. AEP issues letters of credit on behalf of subsidiaries under six uncommitted facilities totaling $450 million. The Registrants’ maximum future payments for letters of credit issued under the uncommitted facilities as of March 31, 2024 were as follows:

CompanyAmountMaturity
(in millions)
AEP$247.4April 2024 to March 2025
AEP Texas1.8July 2024
APCo6.3September 2024
I&M2.9September 2024

Indemnifications and Other Guarantees

Contracts

The Registrants enter into certain types of contracts which require indemnifications. Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements. Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters. With respect to sale agreements, exposure generally does not exceed the sale price. As of March 31, 2024, there were no material liabilities recorded for any indemnifications.

AEPSC conducts power purchase-and-sale activity on behalf of APCo, I&M, KPCo and WPCo, who are jointly and severally liable for activity conducted on their behalf. AEPSC also conducts power purchase-and-sale activity on behalf of PSO and SWEPCo, who are jointly and severally liable for activity conducted on their behalf.

Master Lease Agreements (Applies to all Registrants except AEPTCo)

The Registrants lease certain equipment under master lease agreements. Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of the equipment cost at the end of the lease term. If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrants are committed to pay the difference between the actual fair value and the residual value guarantee. Historically, at the end of the lease term the fair value has been in excess of the amount guaranteed. As of March 31, 2024, the maximum potential loss by the Registrants for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:

CompanyMaximumPotential Loss
(in millions)
AEP$44.6
AEP Texas10.7
APCo5.8
I&M4.1
OPCo7.1
PSO4.5
SWEPCo5.1

ENVIRONMENTAL CONTINGENCIES (Applies to all Registrants except AEPTCo)

Proposed Revisions to CCR Rule

In April 2024, the Federal EPA finalized revisions to the CCR Rule to expand the scope of the rule to include inactive impoundments at inactive facilities (“legacy CCR surface impoundments”) as well as to establish requirements for currently exempt solid waste management units that involve the direct placement of CCR on the land (“CCR management units”). The Federal EPA is requiring that owners and operators of legacy surface impoundments comply with all of the existing CCR Rule requirements applicable to inactive CCR surface impoundments at active facilities, except for the location restrictions and liner design criteria. The rule establishes compliance deadlines for legacy surface impoundments to meet regulatory requirements, including a requirement to initiate closure within five years after the effective date of the final rule. The rule requires evaluations to be completed at both active facilities and inactive facilities with one or more legacy surface impoundments. AEP is evaluating the applicability of the rule to current and former plant sites and is working to develop estimates of compliance costs, which are expected to be material, including costs to upgrade or close and replace legacy CCR surface impoundments and to conduct any required remedial actions including removal of coal ash.

Closure and post-closure estimated costs for facilities subject to the original CCR Rule have been included in ARO in accordance with the requirements in the Federal EPA’s original CCR rule. Material ARO revisions will be necessary to address the expanded scope of facilities subject to the revised rule. Additional material ARO revisions may occur on a site-by-site basis if groundwater monitoring activities conclude that corrective actions are required to mitigate groundwater impacts. AEP may incur significant additional costs complying with the Federal EPA’s CCR Rule, including costs to upgrade or close and replace surface impoundments and landfills used to manage CCR and to conduct any required remedial actions including removal of coal ash.

AEP would need to seek cost recovery through regulated rates, including proposing new regulatory mechanisms for cost recovery where existing mechanisms are not applicable, for which regulatory approval cannot be assured. The rule could have a material adverse impact on net income, cash flows and financial condition if AEP cannot ultimately recover any additional costs of compliance. Management is also evaluating potential legal challenges to the revised rule.

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation

By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF. Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized. In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and non-hazardous materials. The Registrants currently incur costs to dispose of these substances safely. For remediation processes not specifically discussed, management does not anticipate that the liabilities, if any, arising from such remediation processes would have a material effect on the financial statements.

NUCLEAR CONTINGENCIES (Applies to AEP and I&M)

I&M owns and operates the Cook Plant under licenses granted by the Nuclear Regulatory Commission. I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant. The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037. Management is currently evaluating applying for license extensions for both units. The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements. By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S. Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Litigation Related to Ohio House Bill 6 (HB 6)

In 2019, Ohio adopted and implemented HB 6 which benefits OPCo by authorizing rate recovery for certain costs including renewable energy contracts and OVEC’s coal-fired generating units. OPCo engaged in lobbying efforts and provided testimony during the legislative process in connection with HB 6. In July 2020, an investigation led by the U.S. Attorney’s Office resulted in a federal grand jury indictment of an Ohio legislator and associates in connection with an alleged racketeering conspiracy involving the adoption of HB 6. After AEP learned of the criminal allegations against the Ohio legislator and others relating to HB 6, AEP, with assistance from outside advisors, conducted a review of the circumstances surrounding the passage of the bill. Management does not believe that AEP was involved in any wrongful conduct in connection with the passage of HB 6.

In August 2020, an AEP shareholder filed a putative class action lawsuit in the U. S. District Court for the Southern District of Ohio against AEP and certain of its officers for alleged violations of securities laws. In December 2021, the district court issued an opinion and order dismissing the securities litigation complaint with prejudice, determining that the complaint failed to plead any actionable misrepresentations or omissions. The plaintiffs did not appeal the ruling.

In January 2021, an AEP shareholder filed a derivative action in the U.S. District Court for the Southern District of Ohio purporting to assert claims on behalf of AEP against certain AEP officers and directors. In February 2021, a second AEP shareholder filed a similar derivative action in the Court of Common Pleas of Franklin County, Ohio. In April 2021, a third AEP shareholder filed a similar derivative action in the U.S. District Court for the Southern District of Ohio and a fourth AEP shareholder filed a similar derivative action in the Supreme Court for the State of New York, Nassau County. These derivative complaints allege the officers and directors made misrepresentations and omissions similar to those alleged in the putative securities class action lawsuit filed against AEP. The derivative complaints together assert claims for: (a) breach of fiduciary duty, (b) waste of corporate assets, (c) unjust enrichment, (d) breach of duty for insider trading and (e) contribution for violations of sections 10(b) and 21D of the Securities Exchange Act of 1934; and seek monetary damages and changes to AEP’s corporate governance and internal policies among other forms of relief. The court entered a scheduling order in the New York state court derivative action staying the case other than with respect to briefing the motion to dismiss. AEP filed substantive and forum-based motions to dismiss in April 2022. In June 2022, the Ohio state court entered an order continuing the stays of that case until the final resolution of the consolidated derivative actions pending in Ohio federal district court. In September 2022, the New York state court granted the forum-based motion to dismiss with prejudice and the plaintiff subsequently filed a notice of appeal with the New York appellate court. In January 2023, the New York plaintiff filed a motion to intervene in the pending Ohio federal court action and withdrew his appeal in New York. The two derivative actions pending in federal district court in Ohio have been consolidated and the plaintiffs in the consolidated action filed an amended complaint. AEP filed a motion to dismiss the amended complaint and subsequently filed a brief in opposition to the New York plaintiffs’ motion to intervene in the consolidated action in Ohio. In March 2023, the federal district court issued an order granting the motion to dismiss with prejudice and denying the New York plaintiffs’ motion to intervene. In April 2023, one of the plaintiffs filed a notice of appeal to the U.S. Court of Appeals for the Sixth Circuit of the Ohio federal district court order dismissing the consolidated action and denying the intervention. The defendants will continue to defend against the claims. Management does not believe the range of potential losses that is reasonably possible of occurring will have a material impact on results of operations, cash flows or financial condition.

In March 2021, AEP received a litigation demand letter from counsel representing a purported AEP shareholder. The litigation demand letter was directed to the Board of Directors of AEP (AEP Board) and contained factual allegations involving HB 6 that were generally consistent with those in the derivative litigation filed in state and federal court. The shareholder that sent the letter has since withdrawn the litigation demand, which is now terminated and of no further effect. In April 2023, AEP received a litigation demand from counsel representing the purported AEP shareholder who filed the dismissed derivative action in New York state court and unsuccessfully tried to intervene in the consolidated derivative actions in Ohio federal court. The litigation demand letter is directed to the AEP Board and contains factual allegations involving HB 6 that are generally consistent with those in the derivative litigation filed in state and federal court. The letter demands, among other things, that the AEP Board undertake an independent investigation into alleged legal violations by certain current and former directors and officers, and that AEP commence a civil action for breaches of fiduciary duty and related claims against any individuals who allegedly harmed AEP. The AEP Board considered the 2023 litigation demand letter and formed a committee of the Board (the “Demand Review Committee”) to investigate, review, monitor and analyze the allegations in the letter and make a recommendation to the AEP Board regarding a reasonable and appropriate response to the same. The AEP Board will act in response to the letter as appropriate. Management does not believe the range of potential losses that is reasonably possible of occurring will have a material impact on results of operations, cash flows or financial condition.

In May 2021, AEP received a subpoena from the SEC’s Division of Enforcement seeking various documents, including documents relating to the passage of HB 6 and documents relating to AEP’s policies and financial processes and controls. In August 2022, AEP received a second subpoena from the SEC seeking various additional documents relating to its ongoing investigation. AEP is cooperating fully with the SEC’s investigation, which has included taking testimony from certain individuals and inquiries regarding Empowering Ohio’s Economy, Inc., which is a 501(c)(4) social welfare organization, and related disclosures. The SEC staff has advanced its discussions with certain parties involved in the investigation, including AEP, concerning the staff’s intentions regarding potential claims under the securities laws. AEP and the SEC are engaged in discussions about a possible resolution of the SEC’s investigation and potential claims under the securities laws. Any resolution or filed claims, the outcome of which cannot be predicted, may subject AEP to civil penalties and other remedial measures. Discussions are continuing and management does not believe the range of potential losses that is reasonably possible of occurring as a result of this investigation, or possible resolution thereof, will have a material impact on results of operations, cash flows or financial condition.

Claims for Indemnification Made by Owners of the Gavin Power Station

In November 2022, the Federal EPA issued a final decision denying Gavin Power LLC’s requested extension to allow a CCR surface impoundment at the Gavin Power Station to continue to receive CCR and non-CCR waste streams after April 11, 2021 until May 4, 2023 (the Gavin Denial). As part of the Gavin Denial, the Federal EPA made several assertions related to the CCR Rule (see “Environmental Issues - CCR Rule” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information), including an assertion that the closure of the 300 acre unlined fly ash reservoir (FAR) is noncompliant with the CCR Rule in multiple respects. The Gavin Power Station was formerly owned and operated by AEP and was sold to Gavin Power LLC and Lightstone Generation LLC in 2017. Pursuant to the PSA, AEP maintained responsibility to complete closure of the FAR in accordance with the closure plan approved by the Ohio EPA which was completed in July 2021. The PSA contains indemnification provisions, pursuant to which the owners of the Gavin Power Station have notified AEP they believe they are entitled to indemnification for any damages that may result from these claims, including any future enforcement or litigation resulting from any determinations of noncompliance by the Federal EPA with various aspects of the CCR Rule consistent with the Gavin Denial. The owners of the Gavin Power Station have also sought indemnification for landowner claims for property damage allegedly caused by modifications to the FAR. Management does not believe that the owners of the Gavin Power Station have any valid claim for indemnity or otherwise against AEP under the PSA. In addition, Gavin Power LLC, several AEP subsidiaries, and other parties have filed Petitions for Review of the Gavin Denial with the U.S. Court of Appeals for the District of Columbia Circuit. Management is unable to determine a range of potential losses that is reasonably possible of occurring. In January 2024, Gavin Power LLC also filed a complaint with the United States District Court for the Southern District of Ohio, alleging various violations of the Administrative Procedure Act and asserting that the Federal EPA, through its prior inaction, has waived and is estopped from raising certain objections raised in the Gavin Denial. Management cannot predict the outcome of that litigation.

Litigation Regarding Justice Thermal Coal Contract

In December 2023, APCo filed a suit in the Franklin County Ohio Court of Common Pleas seeking a declaratory judgment confirming APCo’s right to terminate a long-term coal contract with Justice Thermal LLC (“Justice Thermal”) based on Justice Thermal’s failure to perform under the contract. APCo terminated that contract in January 2024, and in April 2024 APCo filed an amended complaint seeking a declaration that the termination was proper and also seeking damages for Justice Thermal’s breach of contract. Justice Thermal filed an answer and counterclaim in April 2024, contesting the validity of the contract termination and asserting counterclaims. Justice Thermal’s counterclaims allege that APCo breached the contract, assert a claim for fraud relating to APCo’s alleged fabrication of coal sample analyses, and seek damages. APCo will continue to pursue its claims and defend against the counterclaims. Management is unable to determine a range of potential losses that is reasonably possible of occurring.

  1. ACQUISITIONS AND DISPOSITIONS

The disclosures in this note apply to AEP unless indicated otherwise.

ACQUISITIONS

Rock Falls Wind Facility (Vertically Integrated Utilities Segment) (Applies to AEP and PSO)

In November 2022, PSO entered into an agreement to acquire the Rock Falls Wind Facility. In February 2023, the FERC approved PSO’s acquisition of the Rock Falls Wind Facility under Section 203 of the Federal Power Act. In March 2023, PSO acquired an ownership interest in the entity that owned Rock Falls during its development and construction for $146 million. In accordance with the guidance for “Business Combinations,” AEP management determined that the acquisition of the Rock Falls Wind Facility represents an asset acquisition. The lease obligations related to Rock Falls were not material as at the time of acquisition.

DISPOSITIONS

Disposition of the Competitive Contracted Renewables Portfolio (Generation & Marketing Segment) (Applies to AEP)

In February 2022, AEP management announced the initiation of a process to sell all or a portion of AEP Renewables’ competitive contracted renewables portfolio (the portfolio) within the Generation & Marketing segment. In late January 2023, AEP received final bids from interested parties. In February 2023, AEP’s Board of Directors approved management’s plan to sell the portfolio and AEP signed an agreement with a nonaffiliated party. AEP recorded a pretax loss of $112 million ($88 million after-tax) in the first quarter of 2023 as a result of reaching Held for Sale status and determining the carrying value of the portfolio exceeded the estimated fair value.

In August 2023, AEP completed the sale of the entire portfolio to the nonaffiliated party and received cash proceeds of approximately $1.2 billion, net of taxes and transaction costs.

Disposition of NMRD (Generation & Marketing Segment) (Applies to AEP)

In December 2023, AEP and the joint owner signed an agreement to sell NMRD to a nonaffiliated third party and the sale was completed in February 2024. AEP received cash proceeds of approximately $107 million, net of taxes and transaction costs. The transaction did not have a material impact on net income or financial condition.

  1. BENEFIT PLANS

The disclosures in this note apply to all Registrants except AEPTCo.

AEPSC sponsors a qualified pension plan and two unfunded non-qualified pension plans. Substantially all AEPsubsidiary employees are covered by the qualified plan or both the qualified and a non-qualified pension plan. AEPSC also sponsors OPEB plans to provide health and life insurance benefits for retired employees.

Components of Net Periodic Benefit Cost (Credit)

Pension Plans

Three Months Ended March 31, 2024AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Service Cost$25.6$2.2$2.4$3.3$2.4$1.5$1.9
Interest Cost51.94.36.26.04.72.53.1
Expected Return on Plan Assets(80.2)(6.4)(10.7)(10.8)(8.2)(4.3)(4.4)
Amortization of Net Actuarial Loss1.10.10.10.10.1—0.1
Net Periodic Benefit Cost (Credit)$(1.6)$0.2$(2.0)$(1.4)$(1.0)$(0.3)$0.7
Three Months Ended March 31, 2023AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Service Cost$23.6$2.0$2.3$3.0$2.1$1.4$1.9
Interest Cost54.84.66.66.24.92.73.5
Expected Return on Plan Assets(84.8)(7.0)(11.2)(11.0)(8.5)(4.6)(4.8)
Amortization of Net Actuarial Loss0.3——————
Net Periodic Benefit Cost (Credit)$(6.1)$(0.4)$(2.3)$(1.8)$(1.5)$(0.5)$0.6

OPEB

Three Months Ended March 31, 2024AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Service Cost$1.1$0.1$0.1$0.1$0.1$0.1$0.1
Interest Cost10.50.81.71.21.10.50.7
Expected Return on Plan Assets(27.8)(2.3)(4.0)(3.4)(3.0)(1.4)(1.9)
Amortization of Prior Service Credit(3.2)(0.3)(0.5)(0.4)(0.3)(0.2)(0.3)
Amortization of Net Actuarial Loss0.80.10.10.10.1—0.1
Net Periodic Benefit Credit$(18.6)$(1.6)$(2.6)$(2.4)$(2.0)$(1.0)$(1.3)
Three Months Ended March 31, 2023AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Service Cost$1.1$0.1$0.1$0.2$0.1$0.1$0.1
Interest Cost11.60.91.81.31.20.60.7
Expected Return on Plan Assets(27.4)(2.3)(4.0)(3.4)(2.9)(1.5)(1.8)
Amortization of Prior Service Credit(15.8)(1.3)(2.3)(2.2)(1.6)(1.0)(1.2)
Amortization of Net Actuarial Loss3.70.30.60.50.40.20.2
Net Periodic Benefit Credit$(26.8)$(2.3)$(3.8)$(3.6)$(2.8)$(1.6)$(2.0)
  1. BUSINESS SEGMENTS

AEP’s Reportable Segments

AEP’s primary business is the generation, transmission and distribution of electricity. Within its Vertically Integrated Utilities segment, AEP centrally dispatches generation assets and manages its overall utility operations on an integrated basis because of the substantial impact of cost-based rates and regulatory oversight. Intersegment sales and transfers are generally based on underlying contractual arrangements and agreements.

AEP’s reportable segments and their related business activities are outlined below:

Vertically Integrated Utilities

Generation, transmission and distribution of electricity for sale to retail and wholesale customers through assets owned and operated by AEGCo, APCo, I&M, KGPCo, KPCo, PSO, SWEPCo and WPCo.

Transmission and Distribution Utilities

Transmission and distribution of electricity for sale to retail and wholesale customers through assets owned and operated by AEP Texas and OPCo.

OPCo purchases energy and capacity to serve standard service offer customers and provides transmission and distribution services for all connected load.

AEP Transmission Holdco

Development, construction and operation of transmission facilities through investments in AEPTCo. These investments have FERC-approved ROEs.

Development, construction and operation of transmission facilities through investments in AEP’s transmission-only joint ventures. These investments have PUCT-approved or FERC-approved ROEs.

Generation & Marketing

Contracted energy management services.

Marketing, risk management and retail activities in ERCOT, MISO, PJM and SPP.

Competitive generation in PJM.

The remainder of AEP’s activities are presented as Corporate and Other. While not considered a reportable segment, Corporate and Other primarily includes the purchasing of receivables from certain AEP utility subsidiaries, Parent’s guarantee revenue received from affiliates, investment income, interest income and interest expense, income tax expense and other nonallocated costs.

AEP’s CODM makes operating decisions, allocates resources to and assesses performance based on these operating segments. AEP measures segment profit or loss based on net income (loss). Net income (loss) includes intercompany revenues and expenses that are eliminated on the Consolidated Financial Statements. In addition, direct interest expense and income taxes are included in net income (loss).

The tables below represent AEP’s reportable segment income statement information for the three months ended March 31, 2024 and 2023 and reportable segment balance sheet information as of March 31, 2024 and December 31, 2023.

Three Months Ended March 31, 2024
Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration &MarketingCorporate and Other (a)Reconciling AdjustmentsConsolidated
(in millions)
Revenues from:
External Customers$2,901.2$1,483.2$110.5$515.9$14.9$—$5,025.7
Other Operating Segments46.77.0386.847.637.9(526.0)(b)—
Total Revenues$2,947.9$1,490.2$497.3$563.5$52.8$(526.0)$5,025.7
Net Income (Loss)$562.3$150.3$209.8$137.6$(54.3)$—$1,005.7
Three Months Ended March 31, 2023
Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration &MarketingCorporate and Other (a)Reconciling AdjustmentsConsolidated
(in millions)
Revenues from:
External Customers$2,816.3$1,455.3$90.1$326.9$2.3$—$4,690.9
Other Operating Segments41.58.9365.40.127.8(443.7)(b)—
Total Revenues$2,857.8$1,464.2$455.5$327.0$30.1$(443.7)$4,690.9
Net Income (Loss)$262.2$125.7$182.4$(156.4)$(13.5)$—$400.4
March 31, 2024
Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration &MarketingCorporate and Other (a)ReconcilingAdjustmentsConsolidated
(in millions)
Total Assets$52,379.2$25,283.4$17,067.4$2,257.5$5,164.3(c)$(4,407.2)(d)$97,744.6
Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration &MarketingCorporate and Other (a)ReconcilingAdjustmentsConsolidated
(in millions)
Total Assets$51,802.1$24,838.4$16,575.6$2,598.5$5,194.0(c)$(4,324.6)(d)$96,684.0

(a)Corporate and Other primarily includes the purchasing of receivables from certain AEP utility subsidiaries. This segment also includes Parent’s guarantee revenue received from affiliates, investment income, interest income, interest expense and other nonallocated costs.

(b)Represents inter-segment revenues.

(c)Includes elimination of AEP Parent’s investments in wholly-owned subsidiary companies.

(d)Reconciling Adjustments for Total Assets primarily include elimination of intercompany advances to affiliates and intercompany accounts receivable.

Registrant Subsidiaries’ Reportable Segments (Applies to all Registrant Subsidiaries except AEPTCo)

The Registrant Subsidiaries each have one reportable segment, an integrated electricity generation, transmission and distribution business for APCo, I&M, PSO and SWEPCo, and an integrated electricity transmission and distribution business for AEP Texas and OPCo. Other activities are insignificant. The Registrant Subsidiaries’ operations are managed on an integrated basis because of the substantial impact of cost-based rates and regulatory oversight on the business process, cost structures and operating results.

AEPTCo’s Reportable Segments

AEPTCo Parent is the holding company of seven FERC-regulated transmission-only electric utilities. The seven State Transcos have been identified as operating segments of AEPTCo under the accounting guidance for “Segment Reporting.” The State Transcos business consists of developing, constructing and operating transmission facilities at the request of the RTOs in which they operate and in replacing and upgrading facilities, assets and components of the existing AEP transmission system as needed to maintain reliability standards and provide service to AEP’s wholesale and retail customers. The State Transcos are regulated for rate-making purposes exclusively by the FERC and earn revenues through tariff rates charged for the use of their electric transmission systems.

AEPTCo’s CODM makes operating decisions, allocates resources to and assesses performance based on these operating segments. The State Transcos operating segments all have similar economic characteristics and meet all of the criteria under the accounting guidance for “Segment Reporting” to be aggregated into one operating segment. As a result, AEPTCo has one reportable segment. The remainder of AEPTCo’s activity is presented in AEPTCo Parent. While not considered a reportable segment, AEPTCo Parent represents the activity of the holding company which primarily relates to debt financing activity and general corporate activities.

The tables below present AEPTCo’s reportable segment income statement information for the three months ended March 31, 2024 and 2023 and reportable segment balance sheet information as of March 31, 2024 and December 31, 2023.

Three Months Ended March 31, 2024
State TranscosAEPTCo ParentReconciling AdjustmentsAEPTCo Consolidated
(in millions)
Revenues from:
External Customers$97.0$—$—$97.0
Sales to AEP Affiliates383.4——383.4
Other Revenues2.4——2.4
Total Revenues$482.8$—$—$482.8
Net Income (Loss)$181.7$(0.5)(a)$—$181.2
Three Months Ended March 31, 2023
State TranscosAEPTCo ParentReconciling AdjustmentsAEPTCo Consolidated
(in millions)
Revenues from:
External Customers$89.0$—$—$89.0
Sales to AEP Affiliates352.6——352.6
Total Revenues$441.6$—$—$441.6
Net Income$161.6$1.1(a)$—$162.7
March 31, 2024
State TranscosAEPTCo ParentReconciling AdjustmentsAEPTCoConsolidated
(in millions)
Total Assets$15,609.4$5,949.9(b)$(6,000.3)(c)$15,559.0
December 31, 2023
State TranscosAEPTCo ParentReconciling AdjustmentsAEPTCoConsolidated
(in millions)
Total Assets$15,120.6$5,486.6(b)$(5,534.7)(c)$15,072.5

(a)Includes the elimination of AEPTCo Parent’s equity earnings in the State Transcos.

(b)Primarily relates to Notes Receivable from the State Transcos.

(c)Primarily relates to the elimination of Notes Receivable from the State Transcos.

  1. DERIVATIVES AND HEDGING

The disclosures in this note apply to all Registrants unless indicated otherwise. For the periods presented, AEPTCo did not have any derivative and hedging activity.

OBJECTIVES FOR UTILIZATION OF DERIVATIVE INSTRUMENTS

AEPSC is agent for and transacts on behalf of certain AEP subsidiaries, including the Registrant Subsidiaries. AEPEP is agent for and transacts on behalf of other AEP subsidiaries.

The Registrants are exposed to certain market risks as major power producers and participants in the electricity, capacity, natural gas, coal and emission allowance markets. These risks include commodity price risks which may be subject to capacity risk, interest rate risk and credit risk. These risks represent the risk of loss that may impact the Registrants due to changes in the underlying market prices or rates. Management utilizes derivative instruments to manage these risks.

STRATEGIES FOR UTILIZATION OF DERIVATIVE INSTRUMENTS TO ACHIEVE OBJECTIVES

Risk Management Strategies

The strategy surrounding the use of derivative instruments primarily focuses on managing risk exposures, future cash flows and creating value utilizing both economic and formal hedging strategies. The risk management strategies also include the use of derivative instruments for trading purposes which focus on seizing market opportunities to create value driven by expected changes in the market prices of the commodities. To accomplish these objectives, the Registrants primarily employ risk management contracts including physical and financial forward purchase-and-sale contracts and, to a lesser extent, OTC swaps and options. Not all risk management contracts meet the definition of a derivative under the accounting guidance for “Derivatives and Hedging.” Derivative risk management contracts elected normal under the normal purchases and normal sales scope exception are not subject to the requirements of this accounting guidance.

The Registrants utilize power, capacity, coal, natural gas, interest rate and, to a lesser extent, heating oil, gasoline and other commodity contracts to manage the risk associated with the energy business. The Registrants utilize interest rate derivative contracts in order to manage the interest rate exposure associated with the commodity portfolio. For disclosure purposes, such risks are grouped as “Commodity,” as these risks are related to energy risk management activities. The Registrants also utilize derivative contracts to manage interest rate risk associated with debt financing. For disclosure purposes, these risks are grouped as “Interest Rate.” The amount of risk taken is determined by the Commercial Operations, Energy Supply and Finance groups in accordance with established risk management policies as approved by the Finance Committee of the Board of Directors.

The following tables represent the gross notional volume of the Registrants’ outstanding derivative contracts:

Notional Volume of Derivative Instruments
March 31, 2024December 31, 2023
Primary RiskExposureAEPAEP TexasAPCoI&MOPCoPSOSWEPCoAEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Commodity:
Power (MWhs)233.5—7.03.42.22.21.6246.8—16.85.92.24.12.9
Natural Gas (MMBtus)176.8—43.0——49.019.7151.6—37.3——34.917.9
Heating Oil and Gasoline (Gallons)7.72.01.11.21.30.81.06.51.81.00.61.20.70.9
Interest Rate (USD)$69.6$—$—$—$—$—$—$80.1$—$—$—$—$—$—
Interest Rate on Long-term Debt (USD)$1,500.0$150.0$—$—$—$—$—$1,300.0$150.0$—$—$—$—$—

Fair Value Hedging Strategies (Applies to AEP)

Parent enters into interest rate derivative transactions as part of an overall strategy to manage the mix of fixed-rate and floating-rate debt. Certain interest rate derivative transactions effectively modify exposure to interest rate risk by converting a portion of fixed-rate debt to a floating-rate. Provided specific criteria are met, these interest rate derivatives may be designated as fair value hedges.

Cash Flow Hedging Strategies

The Registrants utilize cash flow hedges on certain derivative transactions for the purchase and sale of power (“Commodity”) in order to manage the variable price risk related to forecasted purchases and sales. Management monitors the potential impacts of commodity price changes and, where appropriate, enters into derivative transactions to protect profit margins for a portion of future electricity sales and purchases. The Registrants do not hedge all commodity price risk.

The Registrants utilize a variety of interest rate derivative transactions in order to manage interest rate risk exposure. The Registrants also utilize interest rate derivative contracts to manage interest rate exposure related to future borrowings of fixed-rate debt. The Registrants do not hedge all interest rate exposure.

ACCOUNTING FOR DERIVATIVE INSTRUMENTS AND THE IMPACT ON THE FINANCIAL STATEMENTS

The accounting guidance for “Derivatives and Hedging” requires recognition of all qualifying derivative instruments as either assets or liabilities on the balance sheets at fair value. The fair values of derivative instruments accounted for using MTM accounting or hedge accounting are based on exchange prices and broker quotes. If a quoted market price is not available, the estimate of fair value is based on the best information available including valuation models that estimate future energy prices based on existing market and broker quotes and other assumptions. In order to determine the relevant fair values of the derivative instruments, the Registrants apply valuation adjustments for discounting, liquidity and credit quality.

Credit risk is the risk that a counterparty will fail to perform on the contract or fail to pay amounts due. Liquidity risk represents the risk that imperfections in the market will cause the price to vary from estimated fair value based upon prevailing market supply and demand conditions. Since energy markets are imperfect and volatile, there are inherent risks related to the underlying assumptions in models used to fair value risk management contracts. Unforeseen events may cause reasonable price curves to differ from actual price curves throughout a contract’s term and at the time a contract settles. Consequently, there could be significant adverse or favorable effects on future net income and cash flows if market prices are not consistent with management’s estimates of current market consensus for forward prices in the current period. This is particularly true for longer term contracts. Cash flows may vary based on market conditions, margin requirements and the timing of settlement of risk management contracts.

According to the accounting guidance for “Derivatives and Hedging,” the Registrants reflect the fair values of derivative instruments subject to netting agreements with the same counterparty net of related cash collateral. For certain risk management contracts, the Registrants are required to post or receive cash collateral based on third-party contractual agreements and risk profiles. AEP netted cash collateral received from third-parties against short-term and long-term risk management assets in the amounts of $86 million and $46 million as of March 31, 2024 and December 31, 2023, respectively. There was no cash collateral received from third-parties netted against short-term and long-term risk management assets for the Registrant Subsidiaries as of March 31, 2024 and December 31, 2023. The amount of cash collateral paid to third-parties netted against short-term and long-term risk management liabilities was immaterial for the Registrants as of March 31, 2024 and December 31, 2023.

Location and Fair Value of Derivative Assets and Liabilities Recognized In the Balance Sheet

The following tables represent the gross fair value of the Registrants’ derivative activity on the balance sheets. The derivative instruments are disclosed as gross. They are subject to master netting agreements and are presented on the balance sheets on a net basis in accordance with the accounting guidance for “Derivatives and Hedging.” Unless shown as a separate line on the balance sheets due to materiality, Current Risk Management Assets are included in Prepayments and Other Current Assets, Long-term Risk Management Assets are included in Deferred Charges and Other Noncurrent Assets, Current Risk Management Liabilities are included in Other Current Liabilities and Long-term Risk Management Liabilities are included in Deferred Credits and Other Noncurrent Liabilities on the balance sheets.

AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
Assets: · (in millions)
Current Risk Management Assets
Risk Management Contracts - Commodity$436.2$0.2$9.9$15.5$0.1$8.5$5.5
Hedging Contracts - Commodity35.4——————
Hedging Contracts - Interest Rate8.32.3—————
Total Current Risk Management Assets479.92.59.915.50.18.55.5
Long-term Risk Management Assets
Risk Management Contracts - Commodity525.0—1.2————
Hedging Contracts - Commodity81.0——————
Hedging Contracts - Interest Rate———————
Total Long-term Risk Management Assets606.0—1.2————
Total Assets$1,085.9$2.5$11.1$15.5$0.1$8.5$5.5
Liabilities:
Current Risk Management Liabilities
Risk Management Contracts - Commodity$456.9$—$21.0$9.0$6.0$29.1$9.5
Hedging Contracts - Commodity5.1——————
Hedging Contracts - Interest Rate46.10.1—————
Total Current Risk Management Liabilities508.10.121.09.06.029.19.5
Long-term Risk Management Liabilities
Risk Management Contracts - Commodity430.0—3.3—35.02.81.8
Hedging Contracts - Commodity0.6——————
Hedging Contracts - Interest Rate70.4——————
Total Long-term Risk Management Liabilities501.0—3.3—35.02.81.8
Total Liabilities$1,009.1$0.1$24.3$9.0$41.0$31.9$11.3
Total MTM Derivative Contract Net Assets (Liabilities) Recognized$76.8$2.4$(13.2)$6.5$(40.9)$(23.4)$(5.8)
AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
Assets: · (in millions)
Current Risk Management Assets
Risk Management Contracts - Commodity$555.1$—$24.6$30.1$—$19.7$12.0
Hedging Contracts - Commodity56.7——————
Hedging Contracts - Interest Rate———————
Total Current Risk Management Assets611.8—24.630.1—19.712.0
Long-term Risk Management Assets
Risk Management Contracts - Commodity468.8—0.312.0——0.5
Hedging Contracts - Commodity86.8——————
Hedging Contracts - Interest Rate———————
Total Long-term Risk Management Assets555.6—0.312.0——0.5
Total Assets$1,167.4$—$24.9$42.1$—$19.7$12.5
Liabilities:
Current Risk Management Liabilities
Risk Management Contracts - Commodity$588.0$0.2$18.5$5.4$6.9$29.7$14.9
Hedging Contracts - Commodity8.2——————
Hedging Contracts - Interest Rate50.52.7—————
Total Current Risk Management Liabilities646.72.918.55.46.929.714.9
Long-term Risk Management Liabilities
Risk Management Contracts - Commodity377.6—6.90.243.91.01.7
Hedging Contracts - Commodity2.2——————
Hedging Contracts - Interest Rate56.9——————
Total Long-term Risk Management Liabilities436.7—6.90.243.91.01.7
Total Liabilities$1,083.4$2.9$25.4$5.6$50.8$30.7$16.6
Total MTM Derivative Contract Net Assets (Liabilities) Recognized$84.0$(2.9)$(0.5)$36.5$(50.8)$(11.0)$(4.1)

Offsetting Assets and Liabilities

The following tables show the net amounts of assets and liabilities presented on the balance sheets. The gross amounts offset include counterparty netting of risk management and hedging contracts and associated cash collateral in accordance with accounting guidance for “Derivatives and Hedging.” All derivative contracts subject to a master netting arrangement or similar agreement are offset on the balance sheets.

AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
Assets: · (in millions)
Current Risk Management Assets
Gross Amounts Recognized$479.9$2.5$9.9$15.5$0.1$8.5$5.5
Gross Amounts Offset(327.2)—(1.2)(4.3)—(0.6)(0.2)
Net Amounts Presented152.72.58.711.20.17.95.3
Long-term Risk Management Assets
Gross Amounts Recognized606.0—1.2————
Gross Amounts Offset(291.6)—(1.2)————
Net Amounts Presented314.4——————
Total Assets$467.1$2.5$8.7$11.2$0.1$7.9$5.3
Liabilities:
Current Risk Management Liabilities
Gross Amounts Recognized$508.1$0.1$21.0$9.0$6.0$29.1$9.5
Gross Amounts Offset(323.7)—(2.6)(8.3)—(0.6)(0.2)
Net Amounts Presented184.40.118.40.76.028.59.3
Long-term Risk Management Liabilities
Gross Amounts Recognized501.0—3.3—35.02.81.8
Gross Amounts Offset(221.5)—(1.2)————
Net Amounts Presented279.5—2.1—35.02.81.8
Total Liabilities$463.9$0.1$20.5$0.7$41.0$31.3$11.1
Total MTM Derivative Contract Net Assets (Liabilities)$3.2$2.4$(11.8)$10.5$(40.9)$(23.4)$(5.8)
AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
Assets: · (in millions)
Current Risk Management Assets
Gross Amounts Recognized$611.8$—$24.6$30.1$—$19.7$12.0
Gross Amounts Offset(394.3)—(2.2)(2.3)—(0.7)(0.4)
Net Amounts Presented217.5—22.427.8—19.011.6
Long-term Risk Management Assets
Gross Amounts Recognized555.6—0.312.0——0.5
Gross Amounts Offset(234.4)—(0.3)(0.2)——(0.5)
Net Amounts Presented321.2——11.8———
Total Assets$538.7$—$22.4$39.6$—$19.0$11.6
Liabilities:
Current Risk Management Liabilities
Gross Amounts Recognized$646.7$2.9$18.5$5.4$6.9$29.7$14.9
Gross Amounts Offset(417.1)(0.2)(2.6)(3.4)(0.1)(0.8)(0.5)
Net Amounts Presented229.62.715.92.06.828.914.4
Long-term Risk Management Liabilities
Gross Amounts Recognized436.7—6.90.243.91.01.7
Gross Amounts Offset(194.9)—(0.3)(0.2)——(0.5)
Net Amounts Presented241.8—6.6—43.91.01.2
Total Liabilities$471.4$2.7$22.5$2.0$50.7$29.9$15.6
Total MTM Derivative Contract Net Assets (Liabilities)$67.3$(2.7)$(0.1)$37.6$(50.7)$(10.9)$(4.0)

The tables below present the Registrants’ amount of gain (loss) recognized on risk management contracts:

Amount of Gain (Loss) Recognized on Risk Management Contracts

Location of Gain (Loss)AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Vertically Integrated Utilities Revenues$(25.7)$—$—$—$—$—$—
Generation & Marketing Revenues(44.7)——————
Electric Generation, Transmission and Distribution Revenues——0.1(25.8)———
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation1.0—0.9————
Maintenance0.1——————
Regulatory Assets (a)13.50.2(0.1)(1.6)8.6(1.2)4.9
Regulatory Liabilities (a)52.70.213.12.2—18.315.0
Total Gain (Loss) on Risk Management Contracts$(3.1)$0.4$14.0$(25.2)$8.6$17.1$19.9
Location of Gain (Loss)AEPAEP TexasAPCoI&MOPCoPSOSWEPCo
(in millions)
Vertically Integrated Utilities Revenues$(5.3)$—$—$—$—$—$—
Generation & Marketing Revenues(147.4)——————
Electric Generation, Transmission and Distribution Revenues———(5.3)———
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation0.7—0.6————
Maintenance0.1——————
Regulatory Assets (a)(24.8)(0.4)(7.1)(0.5)(12.3)(1.2)(1.5)
Regulatory Liabilities (a)(1.5)—(26.2)1.2—18.011.9
Total Gain (Loss) on Risk Management Contracts$(178.2)$(0.4)$(32.7)$(4.6)$(12.3)$16.8$10.4

(a)Represents realized and unrealized gains and losses subject to regulatory accounting treatment recorded as either current or noncurrent on the balance sheets.

Certain qualifying derivative instruments have been designated as normal purchase or normal sale contracts, as provided in the accounting guidance for “Derivatives and Hedging.” Derivative contracts that have been designated as normal purchases or normal sales under that accounting guidance are not subject to MTM accounting treatment and are recognized on the statements of income on an accrual basis.

The accounting for the changes in the fair value of a derivative instrument depends on whether it qualifies for and has been designated as part of a hedging relationship and further, on the type of hedging relationship. Depending on the exposure, management designates a hedging instrument as a fair value hedge or a cash flow hedge.

For contracts that have not been designated as part of a hedging relationship, the accounting for changes in fair value depends on whether the derivative instrument is held for trading purposes. Unrealized and realized gains and losses on derivative instruments held for trading purposes are included in revenues on a net basis on the statements of income. Unrealized and realized gains and losses on derivative instruments not held for trading purposes are included in revenues or expenses on the statements of income depending on the relevant facts and circumstances. Certain derivatives that economically hedge future commodity risk are recorded in the same line item on the statements of income as that of the associated risk being hedged. However, unrealized and some realized gains and losses in regulated jurisdictions for both trading and non-trading derivative instruments are recorded as regulatory assets (for losses) or regulatory liabilities (for gains) in accordance with the accounting guidance for “Regulated Operations.”

Accounting for Fair Value Hedging Strategies (Applies to AEP)

For fair value hedges (i.e. hedging the exposure to changes in the fair value of an asset, liability or an identified portion thereof attributable to a particular risk), the gain or loss on the derivative instrument as well as the offsetting gain or loss on the hedged item associated with the hedged risk impacts net income during the period of change.

AEP records realized and unrealized gains or losses on interest rate swaps that are designated and qualify for fair value hedge accounting treatment and any offsetting changes in the fair value of the debt being hedged in Interest Expense on the statements of income.

The following table shows the impacts recognized on the balance sheets related to the hedged items in fair value hedging relationships:

Carrying Amount of the Hedged LiabilitiesCumulative Amount of Fair Value Hedging Adjustment Included in the Carrying Amount of the Hedged Liabilities
March 31, 2024December 31, 2023March 31, 2024December 31, 2023
(in millions)
Long-term Debt (a) (b)$(860.2)$(878.2)$86.7$68.4

(a)Amounts included within Noncurrent Liabilities line item Long-term Debt on the Balance Sheet.

(b)Amounts include $(28) million and $(30) million as of March 31, 2024 and December 31, 2023, respectively, for the fair value hedge adjustment of hedged debt obligations for which hedge accounting has been discontinued.

The pretax effects of fair value hedge accounting on income were as follows:

Three Months Ended March 31,
20242023
(in millions)
Gain (Loss) on Interest Rate Contracts:
Fair Value Hedging Instruments (a)$(16.4)$6.9
Fair Value Portion of Long-term Debt (a)16.4(6.9)

(a)Gain (Loss) is included in Interest Expense on the statements of income.

Accounting for Cash Flow Hedging Strategies (Applies to AEP, AEP Texas, APCo, I&M, PSO and SWEPCo)

For cash flow hedges (i.e. hedging the exposure to variability in expected future cash flows that is attributable to a particular risk), the Registrants initially report the gain or loss on the derivative instrument as a component of Accumulated Other Comprehensive Income (Loss) on the balance sheets until the period the hedged item affects net income.

Realized gains and losses on derivative contracts for the purchase and sale of power designated as cash flow hedges are included in Total Revenues or Purchased Electricity, Fuel and Other Consumables Used for Electric Generation on the statements of income or in Regulatory Assets or Regulatory Liabilities on the balance sheets, depending on the specific nature of the risk being hedged. During the three months ended March 31, 2024 and 2023, AEP applied cash flow hedging to outstanding power derivatives and the Registrant Subsidiaries did not.

The Registrants reclassify gains and losses on interest rate derivative hedges related to debt financings from Accumulated Other Comprehensive Income (Loss) on the balance sheets into Interest Expense on the statements of income in those periods in which hedged interest payments occur. During the three months ended March 31, 2024, AEP and AEP Texas applied cash flow hedging to outstanding interest rate derivatives and the other Registrant Subsidiaries did not. During the three months ended March 31, 2023, AEP, AEP Texas, I&M, PSO and SWEPCo applied cash flow hedging to outstanding interest rate derivatives and the other Registrant Subsidiaries did not.

For details on effective cash flow hedges included in Accumulated Other Comprehensive Income (Loss) on the balance sheets and the reasons for changes in cash flow hedges, see Note 3 - Comprehensive Income.

Cash flow hedges included in Accumulated Other Comprehensive Income (Loss) on the balance sheets were:

Impact of Cash Flow Hedges on the Registrants’ Balance Sheets
March 31, 2024 · December 31, 2023
Portion Expected to · Portion Expected to
AOCI · be Reclassed to · AOCI · be Reclassed to
Gain (Loss) · Net Income During · Gain (Loss) · Net Income During
Net of Taxthe Next Twelve MonthsNet of Taxthe Next Twelve Months
CommodityInterest RateCommodityInterest RateCommodityInterest RateCommodityInterest Rate
(in millions)
AEP$87.2$3.4$24.0$3.6$104.9$(8.1)$38.3$3.2
AEP Texas—4.4—0.5—0.5—0.2
APCo—5.7—0.8—5.9—0.8
I&M—(5.4)—(0.4)—(5.5)—(0.4)
PSO—(0.2)———(0.2)——
SWEPCo—1.2—0.3—1.3—0.3

As of March 31, 2024 the maximum length of time that AEP is hedging its exposure to variability in future cash flows related to forecasted transactions is 84 months.

The actual amounts reclassified from Accumulated Other Comprehensive Income (Loss) to Net Income can differ from the estimate above due to market price changes.

Credit Risk

Management mitigates credit risk in wholesale marketing and trading activities by assessing the creditworthiness of potential counterparties before entering into transactions with them and continuing to evaluate their creditworthiness on an ongoing basis. Management uses credit agency ratings and current market-based qualitative and quantitative data as well as financial statements to assess the financial health of counterparties on an ongoing basis.

Master agreements are typically used to facilitate the netting of cash flows associated with a single counterparty and may include collateral requirements. Collateral requirements in the form of cash, letters of credit and parental/affiliate guarantees may be obtained as security from counterparties in order to mitigate credit risk. Some master agreements include margining, which requires a counterparty to post cash or letters of credit in the event exposure exceeds the established threshold. The threshold represents an unsecured credit limit which may be supported by a parental/affiliate guaranty, as determined in accordance with AEP’s credit policy. In addition, master agreements allow for termination and liquidation of all positions in the event of a default including a failure or inability to post collateral when required.

Credit-Risk-Related Contingent Features

Credit Downgrade Triggers (Applies to AEP, APCo, I&M, PSO and SWEPCo)

A limited number of derivative contracts include collateral triggering events, which include a requirement to maintain certain credit ratings. On an ongoing basis, AEP’s risk management organization assesses the appropriateness of these collateral triggering events in contracts. The Registrants have not experienced a downgrade below a specified credit rating threshold that would require the posting of additional collateral. The Registrants had no derivative contracts with collateral triggering events in a net liability position as of March 31, 2024 and December 31, 2023.

Cross-Acceleration Triggers

Certain interest rate derivative contracts contain cross-acceleration provisions that, if triggered, would permit the counterparty to declare a default and require settlement of the outstanding payable. These cross-acceleration provisions could be triggered if there was a non-performance event by the Registrants under any of their outstanding debt of at least $50 million and the lender on that debt has accelerated the entire repayment obligation. On an ongoing basis, AEP’s risk management organization assesses the appropriateness of these cross-acceleration provisions in contracts. AEP had derivative contracts with cross-acceleration provisions in a net liability position of $116 million and $107 million and no cash collateral posted as of March 31, 2024 and December 31, 2023, respectively. If a cross-acceleration provision would have been triggered, settlement at fair value would have been required. The Registrant Subsidiaries’ derivative contracts with cross-acceleration provisions outstanding as of March 31, 2024 and December 31, 2023 were not material.

Cross-Default Triggers (Applies to AEP, APCo, I&M, PSO and SWEPCo)

In addition, a majority of non-exchange traded commodity contracts contain cross-default provisions that, if triggered, would permit the counterparty to declare a default and require settlement of the outstanding payable. These cross-default provisions could be triggered if there was a non-performance event by Parent or the obligor under outstanding debt or a third-party obligation that is $50 million or greater. On an ongoing basis, AEP’s risk management organization assesses the appropriateness of these cross-default provisions in the contracts. AEP had derivative contracts with cross-default provisions in a net liability position of $235 million and $242 million and no cash collateral posted as of March 31, 2024 and December 31, 2023, respectively, after considering contractual netting arrangements. If a cross-default provision would have been triggered, settlement at fair value would have been required. APCo, PSO and SWEPCo had derivative contracts with cross-default provisions in a net liability position of $16 million, $31 million and $10 million, respectively, and no cash collateral posted as of March 31, 2024. APCo, PSO and SWEPCo had derivative contracts with cross-default provisions in a net liability position of $22 million, $29 million and $15 million, respectively, and no cash collateral posted as of December 31, 2023. The other Registrant Subsidiaries had no derivative contracts with cross-default provisions outstanding as of March 31, 2024 and December 31, 2023.

  1. FAIR VALUE MEASUREMENTS

The disclosures in this note apply to all Registrants except AEPTCo unless indicated otherwise.

Fair Value Hierarchy and Valuation Techniques

The accounting guidance for “Fair Value Measurements and Disclosures” establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurement) and the lowest priority to unobservable inputs (Level 3 measurement). Where observable inputs are available for substantially the full term of the asset or liability, the instrument is categorized in Level 2. When quoted market prices are not available, pricing may be completed using comparable securities, dealer values, operating data and general market conditions to determine fair value. Valuation models utilize various inputs such as commodity, interest rate and, to a lesser degree, volatility and credit that include quoted prices for similar assets or liabilities in active markets, quoted prices for identical or similar assets or liabilities in inactive markets, market corroborated inputs (i.e. inputs derived principally from, or correlated to, observable market data) and other observable inputs for the asset or liability.

For commercial activities, exchange-traded derivatives, namely futures contracts, are generally fair valued based on unadjusted quoted prices in active markets and are classified as Level 1. Level 2 inputs primarily consist of OTC broker quotes in moderately active or less active markets, as well as exchange-traded derivatives where there is insufficient market liquidity to warrant inclusion in Level 1. Management verifies price curves using these broker quotes and classifies these fair values within Level 2 when substantially all of the fair value can be corroborated. Management typically obtains multiple broker quotes, which are nonbinding in nature but are based on recent trades in the marketplace. When multiple broker quotes are obtained, the quoted bid and ask prices are averaged. In certain circumstances, a broker quote may be discarded if it is a clear outlier. Management uses a historical correlation analysis between the broker quoted location and the illiquid locations. If the points are highly correlated, these locations are included within Level 2 as well. Certain OTC and bilaterally executed derivative instruments are executed in less active markets with a lower availability of pricing information. Illiquid transactions, complex structured transactions, FTRs and counterparty credit risk may require nonmarket-based inputs. Some of these inputs may be internally developed or extrapolated and utilized to estimate fair value. When such inputs have a significant impact on the measurement of fair value, the instrument is categorized as Level 3. The main driver of contracts being classified as Level 3 is the inability to substantiate energy price curves in the market. A portion of the Level 3 instruments have been economically hedged which limits potential earnings volatility.

AEP utilizes its trustee’s external pricing service to estimate the fair value of the underlying investments held in the nuclear trusts. AEP’s investment managers review and validate the prices utilized by the trustee to determine fair value. AEP’s management performs its own valuation testing to verify the fair values of the securities. AEP receives audit reports of the trustee’s operating controls and valuation processes.

Assets in the nuclear trusts, cash and cash equivalents, other temporary investments restricted cash for securitized funding are classified using the following methods. Equities are classified as Level 1 holdings if they are actively traded on exchanges. Items classified as Level 1 are investments in money market funds, fixed income and equity mutual funds and equity securities. They are valued based on observable inputs, primarily unadjusted quoted prices in active markets for identical assets. Items classified as Level 2 are primarily investments in individual fixed income securities. Fixed income securities generally do not trade on exchanges and do not have an official closing price but their valuation inputs are based on observable market data. Pricing vendors calculate bond valuations using financial models and matrices. The models use observable inputs including yields on benchmark securities, quotes by securities brokers, rating agency actions, discounts or premiums on securities compared to par prices, changes in yields for U.S. Treasury securities, corporate actions by bond issuers, prepayment schedules and histories, economic events and, for certain securities, adjustments to yields to reflect changes in the rate of inflation. Other securities with model-derived valuation inputs that are observable are also classified as Level 2 investments. Investments with unobservable valuation inputs are classified as Level 3 investments.

Fair Value Measurements of Long-term Debt (Applies to all Registrants)

The fair values of Long-term Debt are based on quoted market prices, without credit enhancements, for the same or similar issues and the current interest rates offered for instruments with similar maturities classified as Level 2 measurement inputs. These instruments are not marked-to-market. The estimates presented are not necessarily indicative of the amounts that could be realized in a current market exchange. The fair value of AEP’s Equity Units (Level 1) are valued based on publicly traded securities issued by AEP.

The book values and fair values of Long-term Debt are summarized in the following table:

March 31, 2024December 31, 2023
CompanyBook ValueFair ValueBook ValueFair Value
(in millions)
AEP$39,835.9$36,392.2$40,143.2$37,325.7
AEP Texas5,878.75,289.75,889.85,400.7
AEPTCo5,860.75,066.35,414.44,796.9
APCo5,670.95,370.85,588.35,390.1
I&M3,478.53,182.33,499.43,291.6
OPCo3,367.42,912.13,366.82,992.1
PSO2,384.92,130.22,384.62,154.3
SWEPCo3,647.63,170.63,646.93,209.7

Fair Value Measurements of Other Temporary Investments and Restricted Cash (Applies to AEP)

Other Temporary Investments include marketable securities that management intends to hold for less than one year and investments by AEP’s protected cell of EIS.

The following is a summary of Other Temporary Investments and Restricted Cash:

Gross · Gross
Unrealized · Unrealized · Fair
Other Temporary Investments and Restricted CashCostGainsLossesValue
(in millions)
Restricted Cash (a)$51.1$—$—$51.1
Other Cash Deposits15.4——15.4
Fixed Income Securities – Mutual Funds (b)164.7—(6.8)157.9
Equity Securities – Mutual Funds14.729.0—43.7
Total Other Temporary Investments and Restricted Cash$245.9$29.0$(6.8)$268.1
Gross · Gross
Unrealized · Unrealized · Fair
Other Temporary Investments and Restricted CashCostGainsLossesValue
(in millions)
Restricted Cash (a)$48.9$—$—$48.9
Other Cash Deposits13.9——13.9
Fixed Income Securities – Mutual Funds (b)165.9—(6.2)159.7
Equity Securities – Mutual Funds14.825.9—40.7
Total Other Temporary Investments and Restricted Cash$243.5$25.9$(6.2)$263.2

(a)Primarily represents amounts held for the repayment of debt.

(b)Primarily short and intermediate maturities which may be sold and do not contain maturity dates.

The following table provides the activity for fixed income and equity securities within Other Temporary Investments:

Three Months Ended March 31,
20242023
(in millions)
Proceeds from Investment Sales$3.0$—
Purchases of Investments1.51.0
Gross Realized Gains on Investment Sales0.3—
Gross Realized Losses on Investment Sales0.2—

Fair Value Measurements of Trust Assets for Decommissioning and SNF Disposal (Applies to AEP and I&M)

Nuclear decommissioning and SNF trust funds represent funds that regulatory commissions allow I&M to collect through rates to fund future decommissioning and SNF disposal liabilities. By rules or orders, the IURC, the MPSC and the FERC established investment limitations and general risk management guidelines. In general, limitations include:

Acceptable investments (rated investment grade or above when purchased).

Maximum percentage invested in a specific type of investment.

Prohibition of investment in obligations of AEP, I&M or their affiliates.

Withdrawals permitted only for payment of decommissioning costs and trust expenses.

I&M maintains trust funds for each regulatory jurisdiction. Regulatory approval is required to withdraw decommissioning funds. These funds are managed by an external investment manager that must comply with the guidelines and rules of the applicable regulatory authorities. The trust assets are invested to optimize the net of tax earnings of the trust giving consideration to liquidity, risk, diversification and other prudent investment objectives.

I&M records securities held in these trust funds in Spent Nuclear Fuel and Decommissioning Trusts on its balance sheets. I&M records these securities at fair value. I&M classifies debt securities in the trust funds as available-for-sale due to their long-term purpose.

Other-than-temporary impairments for investments in debt securities are considered realized losses as a result of securities being managed by an external investment management firm. The external investment management firm makes specific investment decisions regarding the debt and equity investments held in these trusts and generally intends to sell debt securities in an unrealized loss position as part of a tax optimization strategy. Impairments reduce the cost basis of the securities which will affect any future unrealized gain or realized gain or loss due to the adjusted cost of investment. I&M records unrealized gains, unrealized losses and other-than-temporary impairments from securities in these trust funds as adjustments to the regulatory liability account for the nuclear decommissioning trust funds and to regulatory assets or liabilities for the SNF disposal trust funds in accordance with their treatment in rates. Consequently, changes in fair value of trust assets do not affect earnings or AOCI.

The following is a summary of nuclear trust fund investments:

March 31, 2024 · December 31, 2023
Gross · Gross · Other-Than- · Gross · Gross · Other-Than-
FairUnrealizedUnrealizedTemporaryFairUnrealizedUnrealizedTemporary
ValueGainsLossesImpairmentsValueGainsLossesImpairments
(in millions)
Cash and Cash Equivalents$25.2$—$—$—$16.8$—$—$—
Fixed Income Securities:
United States Government1,267.016.5(4.2)(25.7)1,273.028.6(3.9)(33.2)
Corporate Debt123.32.5(6.0)(5.1)132.14.8(5.2)(8.6)
State and Local Government1.7———1.7———
Subtotal Fixed Income Securities1,392.019.0(10.2)(30.8)1,406.833.4(9.1)(41.8)
Equity Securities - Domestic2,695.42,119.1(1.1)—2,436.61,869.5(0.9)—
Spent Nuclear Fuel and Decommissioning Trusts$4,112.6$2,138.1$(11.3)$(30.8)$3,860.2$1,902.9$(10.0)$(41.8)

The following table provides the securities activity within the decommissioning and SNF trusts:

Three Months Ended March 31,
20242023
(in millions)
Proceeds from Investment Sales$569.5$517.6
Purchases of Investments588.5536.3
Gross Realized Gains on Investment Sales5.448.5
Gross Realized Losses on Investment Sales1.28.6

The base cost of fixed income securities was $1.4 billion and $1.4 billion as of March 31, 2024 and December 31, 2023, respectively. The base cost of equity securities was $577 million and $568 million as of March 31, 2024 and December 31, 2023, respectively.

The fair value of fixed income securities held in the nuclear trust funds, summarized by contractual maturities, as of March 31, 2024 was as follows:

Fair Value of Fixed
Income Securities
(in millions)
Within 1 year$338.8
After 1 year through 5 years598.0
After 5 years through 10 years186.6
After 10 years268.6
Total$1,392.0

Fair Value Measurements of Financial Assets and Liabilities

The following tables set forth, by level within the fair value hierarchy, the Registrants’ financial assets and liabilities that were accounted for at fair value on a recurring basis. As required by the accounting guidance for “Fair Value Measurements and Disclosures,” financial assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. Management’s assessment of the significance of a particular input to the fair value measurement requires judgment and may affect the valuation of fair value assets and liabilities and their placement within the fair value hierarchy levels. There have not been any significant changes in management’s valuation techniques.

AEP

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Other Temporary Investments and Restricted Cash
Restricted Cash$51.1$—$—$—$51.1
Other Cash Deposits (a)———15.415.4
Fixed Income Securities – Mutual Funds157.9———157.9
Equity Securities – Mutual Funds (b)43.7———43.7
Total Other Temporary Investments and Restricted Cash252.7——15.4268.1
Risk Management Assets
Risk Management Commodity Contracts (c) (d)3.6679.7257.5(593.9)346.9
Cash Flow Hedges:
Commodity Hedges (c)—94.518.7(1.3)111.9
Interest Rate Hedges—8.3——8.3
Total Risk Management Assets3.6782.5276.2(595.2)467.1
Spent Nuclear Fuel and Decommissioning Trusts
Cash and Cash Equivalents (e)13.3——11.925.2
Fixed Income Securities:
United States Government—1,267.0——1,267.0
Corporate Debt—123.3——123.3
State and Local Government—1.7——1.7
Subtotal Fixed Income Securities—1,392.0——1,392.0
Equity Securities – Domestic (b)2,695.4———2,695.4
Total Spent Nuclear Fuel and Decommissioning Trusts2,708.71,392.0—11.94,112.6
Total Assets$2,965.0$2,174.5$276.2$(567.9)$4,847.8
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c) (d)$21.0$688.4$157.1$(520.3)$346.2
Cash Flow Hedges:
Commodity Hedges (c)—2.5—(1.3)1.2
Interest Rate Hedges—1.7——1.7
Fair Value Hedges—114.8——114.8
Total Risk Management Liabilities$21.0$807.4$157.1$(521.6)$463.9

AEP

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Other Temporary Investments and Restricted Cash
Restricted Cash$48.9$—$—$—$48.9
Other Cash Deposits (a)———13.913.9
Fixed Income Securities – Mutual Funds159.7———159.7
Equity Securities – Mutual Funds (b)40.7———40.7
Total Other Temporary Investments and Restricted Cash249.3——13.9263.2
Risk Management Assets
Risk Management Commodity Contracts (c) (f)9.7736.9274.3(617.0)403.9
Cash Flow Hedges:
Commodity Hedges (c)—123.519.8(8.5)134.8
Total Risk Management Assets9.7860.4294.1(625.5)538.7
Spent Nuclear Fuel and Decommissioning Trusts
Cash and Cash Equivalents (e)7.8——9.016.8
Fixed Income Securities:
United States Government—1,273.0——1,273.0
Corporate Debt—132.1——132.1
State and Local Government—1.7——1.7
Subtotal Fixed Income Securities—1,406.8——1,406.8
Equity Securities – Domestic (b)2,436.6———2,436.6
Total Spent Nuclear Fuel and Decommissioning Trusts2,444.41,406.8—9.03,860.2
Total Assets$2,703.4$2,267.2$294.1$(602.6)$4,662.1
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c) (f)$24.7$783.8$154.1$(600.3)$362.3
Cash Flow Hedges:
Commodity Hedges (c)—9.60.6(8.5)1.7
Interest Rate Hedges—9.0——9.0
Fair Value Hedges—98.4——98.4
Total Risk Management Liabilities$24.7$900.8$154.7$(608.8)$471.4

AEP Texas

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Restricted Cash for Securitized Funding$42.7$—$—$—$42.7
Risk Management Assets
Risk Management Commodity Contracts (c)—0.2—2.32.5
Cash Flow Hedges:
Interest Rate Hedges—2.3—(2.3)—
Total Risk Management Assets—2.5——2.5
Total Assets$42.7$2.5$—$—$45.2
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$—$—$0.1$0.1
Cash Flow Hedges:
Interest Rate Hedges—0.1—(0.1)—
Total Liabilities$—$0.1$—$—$0.1
Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Restricted Cash for Securitized Funding$34.0$—$—$—$34.0
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$0.2$—$(0.2)$—
Cash Flow Hedges:
Interest Rate Hedges—2.7——2.7
Total Risk Management Liabilities$—$2.9$—$(0.2)$2.7

APCo

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Restricted Cash for Securitized Funding$8.4$—$—$—$8.4
Risk Management Assets
Risk Management Commodity Contracts (c)—2.18.6(2.0)8.7
Total Assets$8.4$2.1$8.6$(2.0)$17.1
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$19.3$4.6$(3.4)$20.5
Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Restricted Cash for Securitized Funding$14.9$—$—$—$14.9
Risk Management Assets
Risk Management Commodity Contracts (c)—1.123.5(2.2)22.4
Total Assets$14.9$1.1$23.5$(2.2)$37.3
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$24.0$1.1$(2.6)$22.5

I&M

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$13.1$1.8$(3.7)$11.2
Spent Nuclear Fuel and Decommissioning Trusts
Cash and Cash Equivalents (e)13.3——11.925.2
Fixed Income Securities:
United States Government—1,267.0——1,267.0
Corporate Debt—123.3——123.3
State and Local Government—1.7——1.7
Subtotal Fixed Income Securities—1,392.0——1,392.0
Equity Securities - Domestic (b)2,695.4———2,695.4
Total Spent Nuclear Fuel and Decommissioning Trusts2,708.71,392.0—11.94,112.6
Total Assets$2,708.7$1,405.1$1.8$8.2$4,123.8
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$7.6$0.8$(7.7)$0.7
Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$37.4$4.5$(2.3)$39.6
Spent Nuclear Fuel and Decommissioning Trusts
Cash and Cash Equivalents (e)7.8——9.016.8
Fixed Income Securities:
United States Government—1,273.0——1,273.0
Corporate Debt—132.1——132.1
State and Local Government—1.7——1.7
Subtotal Fixed Income Securities—1,406.8——1,406.8
Equity Securities - Domestic (b)2,436.6———2,436.6
Total Spent Nuclear Fuel and Decommissioning Trusts2,444.41,406.8—9.03,860.2
Total Assets$2,444.4$1,444.2$4.5$6.7$3,899.8
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$3.7$1.7$(3.4)$2.0

OPCo

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$0.1$—$—$0.1
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$—$41.0$—$41.0
Level 1Level 2Level 3OtherTotal
Liabilities: · (in millions)
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$0.2$50.6$(0.1)$50.7

PSO

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$0.1$8.4$(0.6)$7.9
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$31.2$0.7$(0.6)$31.3
Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$—$19.7$(0.7)$19.0
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$29.6$1.1$(0.8)$29.9

SWEPCo

Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$0.1$5.5$(0.3)$5.3
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$11.1$0.2$(0.2)$11.1
Level 1Level 2Level 3OtherTotal
Assets: · (in millions)
Risk Management Assets
Risk Management Commodity Contracts (c)$—$0.5$12.0$(0.9)$11.6
Liabilities:
Risk Management Liabilities
Risk Management Commodity Contracts (c)$—$15.7$0.9$(1.0)$15.6

(a)Amounts in “Other’’ column primarily represent cash deposits in bank accounts with financial institutions or third-parties. Level 1 and Level 2 amounts primarily represent investments in money market funds.

(b)Amounts represent publicly traded equity securities and equity-based mutual funds.

(c)Amounts in “Other’’ column primarily represent counterparty netting of risk management and hedging contracts and associated cash collateral under the accounting guidance for “Derivatives and Hedging.’’

(d)The March 31, 2024 maturities of the net fair value of risk management contracts prior to cash collateral, assets/(liabilities), were as follows: Level 1 matures $(14) million in 2024 and $(3) million in periods 2025-2027; Level 2 matures $(65) million in 2024, $51 million in periods 2025-2027 and $5 million in periods 2028-2029; Level 3 matures $34 million in 2024, $55 million in periods 2025-2027, $23 million in periods 2028-2029 and $(12) million in periods 2030-2032. Risk management commodity contracts are substantially comprised of power contracts.

(e)Amounts in “Other’’ column primarily represent accrued interest receivables from financial institutions. Level 1 amounts primarily represent investments in money market funds.

(f)The December 31, 2023 maturities of the net fair value of risk management contracts prior to cash collateral, assets/(liabilities), were as follows: Level 1 matures $(11) million in 2024 and $(4) million in 2025-2027; Level 2 matures $(99) million in 2024, $(44) million in periods 2025-2027, $7 million in periods 2028-2029 and $2 million in periods 2030-2033; Level 3 matures $74 million in 2024, $43 million in periods 2025-2027, $18 million in periods 2028-2029 and $(16) million in periods 2030-2033. Risk management commodity contracts are substantially comprised of power contracts.

The following tables set forth a reconciliation of changes in the fair value of net trading derivatives classified as Level 3 in the fair value hierarchy:

Three Months Ended March 31, 2024AEPAPCoI&MOPCoPSOSWEPCo
(in millions)
Balance as of December 31, 2023$139.4$22.4$2.8$(50.6)$18.6$11.1
Realized Gain (Loss) Included in Net Income (or Changes in Net Assets) (a) (b)46.99.23.2(0.4)18.514.7
Unrealized Gain (Loss) Included in Net Income (or Changes in Net Assets) Relating to Assets Still Held at the Reporting Date (a)11.3—————
Realized and Unrealized Gains (Losses) Included in Other Comprehensive Income (c)0.6—————
Settlements(96.6)(26.8)(4.8)2.6(31.3)(23.6)
Transfers into Level 3 (d) (e)4.6—————
Transfers out of Level 3 (e)2.1————0.5
Changes in Fair Value Allocated to Regulated Jurisdictions (f)10.8(0.8)(0.2)7.41.92.6
Balance as of March 31, 2024$119.1$4.0$1.0$(41.0)$7.7$5.3
Three Months Ended March 31, 2023AEPAPCoI&MOPCoPSOSWEPCo
(in millions)
Balance as of December 31, 2022$160.4$69.1$4.6$(40.0)$23.7$14.2
Realized Gain (Loss) Included in Net Income (or Changes in Net Assets) (a) (b)(7.1)(31.9)1.2(1.3)16.612.9
Unrealized Gain (Loss) Included in Net Income (or Changes in Net Assets) Relating to Assets Still Held at the Reporting Date (a)14.8—————
Realized and Unrealized Gains (Losses) Included in Other Comprehensive Income (c)(13.9)—————
Settlements(96.6)(27.3)(4.2)1.0(34.3)(23.0)
Transfers into Level 3 (d) (e)(6.1)—————
Transfers out of Level 3 (e)1.0—————
Changes in Fair Value Allocated to Regulated Jurisdictions (f)(7.4)(4.2)(0.5)(6.6)3.31.7
Balance as of March 31, 2023$45.1$5.7$1.1$(46.9)$9.3$5.8

(a)Included in revenues on the statements of income.

(b)Represents the change in fair value between the beginning of the reporting period and the settlement of the risk management commodity contract.

(c)Included in cash flow hedges on the statements of comprehensive income.

(d)Represents existing assets or liabilities that were previously categorized as Level 2.

(e)Transfers are recognized based on their value at the beginning of the reporting period that the transfer occurred.

(f)Relates to the net gains (losses) of those contracts that are not reflected on the statements of income. These changes in fair value are recorded as regulatory liabilities for net gains and as regulatory assets for net losses or accounts payable.

The following tables quantify the significant unobservable inputs used in developing the fair value of Level 3 positions:

Significant Unobservable Inputs

Significant · Input/Range
Type of · Fair Value · Valuation · Unobservable · Weighted
CompanyInputAssetsLiabilitiesTechniqueInputLowHighAverage (a)
(in millions)
AEPEnergy Contracts$246.5$146.1Discounted Cash FlowForward Market Price (b)$10.31$169.47$49.39
AEPFTRs29.711.0Discounted Cash FlowForward Market Price (b)(79.90)23.79(0.35)
APCoFTRs8.64.6Discounted Cash FlowForward Market Price (b)(0.38)5.050.61
I&MFTRs1.80.8Discounted Cash FlowForward Market Price (b)0.036.820.84
OPCoEnergy Contracts—41.0Discounted Cash FlowForward Market Price (b)19.7275.8847.20
PSOFTRs8.40.7Discounted Cash FlowForward Market Price (b)(79.90)3.13(3.48)
SWEPCoFTRs5.50.2Discounted Cash FlowForward Market Price (b)(79.90)3.13(3.48)
Significant · Input/Range
Type of · Fair Value · Valuation · Unobservable · Weighted
CompanyInputAssetsLiabilitiesTechniqueInputLowHighAverage (a)
(in millions)
AEPEnergy Contracts$225.5$144.9Discounted Cash FlowForward Market Price (b)$5.21$153.77$45.05
AEPNatural Gas Contracts—0.5Discounted Cash FlowForward Market Price (c)3.113.113.11
AEPFTRs68.69.3Discounted Cash FlowForward Market Price (b)(25.45)17.07—
APCoFTRs23.51.1Discounted Cash FlowForward Market Price (b)(1.04)6.451.36
I&MFTRs4.51.7Discounted Cash FlowForward Market Price (b)(1.48)8.40(0.85)
OPCoEnergy Contracts—50.6Discounted Cash FlowForward Market Price (b)22.9267.5342.85
PSOFTRs19.71.1Discounted Cash FlowForward Market Price (b)(25.45)4.80(4.33)
SWEPCoNatural Gas Contracts—0.5Discounted Cash FlowForward Market Price (c)3.113.113.11
SWEPCoFTRs12.00.4Discounted Cash FlowForward Market Price (b)(25.45)4.80(4.33)

(a)The weighted average is the product of the forward market price of the underlying commodity and volume weighted by term.

(b)Represents market prices in dollars per MWh.

(c)Represents market prices in dollars per MMBtu.

The following table provides the measurement uncertainty of fair value measurements to increases (decreases) in significant unobservable inputs related to Energy Contracts and FTRs for the Registrants as of March 31, 2024 and December 31, 2023:

Significant Unobservable InputPositionChange in InputImpact on Fair ValueMeasurement
Forward Market PriceBuyIncrease (Decrease)Higher (Lower)
Forward Market PriceSellIncrease (Decrease)Lower (Higher)
  1. INCOME TAXES

Effective Tax Rates (ETR)

The Registrants’ interim ETR reflect the estimated annual ETR for 2024 and 2023, adjusted for tax expense associated with certain discrete items. In the first quarter of 2024, I&M, PSO, and SWEPCo recorded tax benefits of $61 million, $49 million, and $114 million, respectively, related to the reduction of a regulatory liability associated with the IRS PLRs received, driving a reduction to the interim ETR resulting in AEP’s tax rate of (16.5)% as shown below.

The ETR for each of the Registrants are included in the following tables:

AEPAEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
U.S. Federal Statutory Rate21.0%21.0%21.0%21.0%21.0%21.0%21.0%21.0%
Increase (decrease) due to:
State Income Tax, net of Federal Benefit2.1%0.2%2.6%2.4%3.9%1.0%3.7%1.7%
Tax Reform Excess ADIT Reversal(2.3)%(1.3)%0.2%(13.4)%(0.5)%(6.0)%(2.0)%4.6%
Remeasurement of Excess ADIT(29.7)%—%—%—%(58.2)%—%(263.3)%(224.7)%
Production and Investment Tax Credits(6.8)%(0.2)%—%(0.1)%(1.1)%—%(49.6)%(23.8)%
Flow Through—%0.1%0.3%(0.3)%(2.8)%0.6%0.2%0.6%
AFUDC Equity(1.2)%(1.5)%(1.8)%(0.4)%(0.7)%(1.0)%(1.3)%(1.3)%
Discrete Tax Adjustments0.2%—%—%—%—%—%0.9%1.3%
Other0.2%0.5%—%0.1%—%0.2%1.2%(0.8)%
Effective Income Tax Rate(16.5)%18.8%22.3%9.3%(38.4)%15.8%(289.2)%(221.4)%
AEPAEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
U.S. Federal Statutory Rate21.0%21.0%21.0%21.0%21.0%21.0%21.0%21.0%
Increase (decrease) due to:
State Income Tax, net of Federal Benefit1.9%0.3%2.6%2.4%3.6%1.0%3.2%(0.4)%
Tax Reform Excess ADIT Reversal(6.2)%(1.5)%0.3%(4.6)%(7.9)%(6.8)%(18.7)%(3.8)%
Production and Investment Tax Credits(9.7)%(0.2)%—%—%(1.1)%—%(55.7)%(26.4)%
Flow Through0.1%0.2%0.3%0.6%(1.8)%0.5%0.3%0.5%
AFUDC Equity(1.4)%(1.5)%(1.6)%(0.7)%(0.5)%(0.8)%(1.4)%(0.8)%
Discrete Tax Adjustments(3.2)%—%—%3.2%1.8%—%—%—%
Other0.1%0.1%0.1%—%—%—%(2.0)%(0.8)%
Effective Income Tax Rate2.6%18.4%22.7%21.9%15.1%14.9%(53.3)%(10.7)%

Federal and State Income Tax Audit Status

The statute of limitations for the IRS to examine AEP and subsidiaries originally filed federal return has expired for tax years 2016 and earlier. AEP has agreed to extend the statute of limitations on the 2017-2020 tax returns to May 31, 2025, to allow time for the current IRS audit to be completed including a refund claim approval by the Congressional Joint Committee on Taxation.

The current IRS audit and associated refund claim evolved from a net operating loss carryback to 2015 that originated in the 2017 return. AEP has received and agreed to immaterial IRS proposed adjustments on the 2017 tax return. The IRS exam is complete, and AEP is currently waiting on the IRS to submit the refund claim to the Congressional Joint Committee on Taxation for resolution and final approval.

AEP and subsidiaries file income tax returns in various state and local jurisdictions. These taxing authorities routinely examine the tax returns, and AEP and subsidiaries are currently under examination in several state and local jurisdictions. Generally, the statutes of limitations have expired for tax years prior to 2017. In addition, management is monitoring and continues to evaluate the potential impact of federal legislation and corresponding state conformity.

Federal Legislation

In August 2022, President Biden signed H.R. 5376 into law, commonly known as the Inflation Reduction Act of 2022, or IRA. Most notably this budget reconciliation legislation creates a 15% minimum tax on adjusted financial statement income (Corporate Alternative Minimum Tax or CAMT), extends and increases the value of PTCs and ITCs, adds a nuclear and clean hydrogen PTC, an energy storage ITC and allows the sale or transfer of tax credits to third parties for cash. As further significant guidance from Treasury and the IRS is expected on the tax provisions in the IRA, AEP will continue to monitor any issued guidance and evaluate the impact on future net income, cash flows and financial condition.

AEP and subsidiaries are applicable corporations for purposes of the CAMT in 2024. CAMT cash taxes are expected to be partially offset by regulatory recovery, the utilization of tax credits and additionally the cash inflow generated by the sale of tax credits. The sale of tax credits are presented in the operating section of the statements of cash flows consistent with the presentation of cash taxes paid. AEP presents the loss on sale of tax credits through income tax expense.

In June 2023, the IRS issued temporary regulations related to the transfer of tax credits. In 2023, AEP, on behalf of PSO, SWEPCo and AEP Energy Supply, LLC, entered into transferability agreements with nonaffiliated parties to sell 2023 generated PTCs resulting in cash proceeds of approximately $174 million with $102 million received in 2023, $62 million received in the first quarter of 2024 and the remaining $10 million was received in April 2024. AEP expects to continue to explore the ability to efficiently monetize its tax credits through third party transferability agreements.

I&M’s Cook Plant qualifies for the transferable Nuclear PTC, which is available for tax years beginning in 2024 through 2032. The Nuclear PTC is calculated based on electricity generated and sold to third-parties and is subject to a “reduction amount” as the facility’s gross receipts increase above a certain threshold. Due to lack of guidance and uncertainty surrounding the computation of gross receipts, AEP and I&M are unable to estimate the amount of the Nuclear PTCs earned as of March 31, 2024 and have not included any Nuclear PTCs in the annualized effective tax rate for the first quarter of 2024.

  1. FINANCING ACTIVITIES

The disclosures in this note apply to all Registrants, unless indicated otherwise.

Common Stock (Applies to AEP)

At-the-Market (ATM) Program

In 2023, AEP filed a prospectus supplement and executed an Equity Distribution Agreement, pursuant to which AEP may sell, from time to time, up to an aggregate of $1.7 billion of its common stock through an ATM offering program, including an equity forward sales component. The compensation paid to the selling agents by AEP may be up to 2% of the gross offering proceeds of the shares. There were no issuances under the ATM program for the three months ended March 31, 2024.

Long-term Debt Outstanding (Applies to AEP)

The following table details long-term debt outstanding, net of issuance costs and premiums or discounts:

Type of DebtMarch 31, 2024December 31, 2023
(in millions)
Senior Unsecured Notes$34,606.1$33,779.4
Pollution Control Bonds1,771.01,771.6
Notes Payable163.5193.3
Securitization Bonds343.8368.9
Spent Nuclear Fuel Obligation (a)304.4300.4
Junior Subordinated Notes1,588.22,388.1
Other Long-term Debt1,058.91,341.5
Total Long-term Debt Outstanding39,835.940,143.2
Long-term Debt Due Within One Year1,198.62,490.5
Long-term Debt$38,637.3$37,652.7

(a)Pursuant to the Nuclear Waste Policy Act of 1982, I&M, a nuclear licensee, has an obligation to the United States Department of Energy for SNF disposal. The obligation includes a one-time fee for nuclear fuel consumed prior to April 7, 1983. Trust fund assets related to this obligation were $355 million and $348 million as of March 31, 2024 and December 31, 2023, respectively, and are included in Spent Nuclear Fuel and Decommissioning Trusts on the balance sheets.

Long-term Debt Activity

Long-term debt and other securities issued, retired and principal payments made during the first three months of 2024 are shown in the following tables:

Principal · Interest
CompanyType of DebtAmount (a)RateDue Date
Issuances: · (in millions) · (%)
AEPTCoSenior Unsecured Notes$450.05.152034
APCoSenior Unsecured Notes400.05.652034
Non-Registrant:
Transource EnergyOther Long-term Debt18.0Variable2025
Total Issuances$868.0

(a)Amounts indicated on the statements of cash flows are net of issuance costs and premium or discount and will not tie to the issuance amounts.

Principal · Interest
Company · Type of Debt · Amount Paid · Rate · Due Date
Retirements and Principal Payments: · (in millions) · (%)
AEPJunior Subordinated Notes$805.02.032024
AEP TexasSecuritization Bonds11.92.062025
APCoOther Long-term Debt300.0Variable2024
APCoSecuritization Bonds13.43.772028
I&MNotes Payable1.2Variable2024
I&MNotes Payable0.9Variable2025
I&MNotes Payable4.00.932025
I&MNotes Payable5.03.442026
I&MNotes Payable6.85.932027
I&MNotes Payable6.86.012028
I&MOther Long-term Debt0.76.002025
PSOOther Long-term Debt0.13.002027
Non-Registrant:
AEGCoNotes Payable5.02.432028
Transource EnergySenior Unsecured Notes1.42.752050
Total Retirements and Principal Payments$1,162.2

Long-term Debt Subsequent Events

In April 2024, APCo remarketed $86 million of Pollution Control Bonds.

In April 2024, I&M issued $80 million of 6.41% Notes Payable due in 2028.

In April 2024, I&M retired $8 million of Notes Payable related to DCC Fuel.

In April 2024, WPCo issued $450 million of 6.89% Notes Payable due in 2034.

In April 2024, WPCo retired $265 million of Other Long-term Debt.

Debt Covenants (Applies to AEP and AEPTCo)

Covenants in AEPTCo’s note purchase agreements and indenture limit the amount of contractually-defined priority debt (which includes a further sub-limit of $50 million of secured debt) to 10% of consolidated tangible net assets. AEPTCo’s contractually-defined priority debt was 0.2% of consolidated tangible net assets as of March 31, 2024. The method for calculating the consolidated tangible net assets is contractually-defined in the note purchase agreements.

Dividend Restrictions

Utility Subsidiaries’ Restrictions

Parent depends on its utility subsidiaries to pay dividends to shareholders. AEP utility subsidiaries pay dividends to Parent provided funds are legally available. Various financing arrangements and regulatory requirements may impose certain restrictions on the ability of the subsidiaries to transfer funds to Parent in the form of dividends.

All of the dividends declared by AEP’s utility subsidiaries that provide transmission or local distribution services are subject to a Federal Power Act requirement that prohibits the payment of dividends out of capital accounts in certain circumstances; payment of dividends is generally allowed out of retained earnings. The Federal Power Act also creates a reserve on earnings attributable to hydroelectric generation plants. Because of their ownership of such plants, this reserve applies to APCo and I&M.

Certain AEP subsidiaries have credit agreements that contain covenants that limit their debt to capitalization ratio to 67.5%. The method for calculating outstanding debt and capitalization is contractually-defined in the credit agreements.

The Federal Power Act restriction does not limit the ability of the AEP subsidiaries to pay dividends out of retained earnings.

Parent Restrictions (Applies to AEP)

The holders of AEP’s common stock are entitled to receive the dividends declared by the Board of Directors provided funds are legally available for such dividends. Parent’s income primarily derives from common stock equity in the earnings of its utility subsidiaries.

Pursuant to the leverage restrictions in credit agreements, AEP must maintain a percentage of debt to total capitalization at a level that does not exceed 67.5%. The method for calculating outstanding debt and capitalization is contractually-defined in the credit agreements.

Corporate Borrowing Program (Applies to all Registrant Subsidiaries)

AEP subsidiaries use a corporate borrowing program to meet their short-term borrowing needs. The corporate borrowing program includes a Utility Money Pool, which funds AEP’s utility subsidiaries; a Nonutility Money Pool, which funds certain AEP nonutility subsidiaries; and direct borrowing from AEP. The AEP Utility Money Pool operates in accordance with the terms and conditions of its agreement filed with the FERC. The amounts of outstanding loans to (borrowings from) the Utility Money Pool as of March 31, 2024 and December 31, 2023 are included in Advances to Affiliates and Advances from Affiliates, respectively, on the Registrant Subsidiaries’ balance sheets. The Utility Money Pool participants’ money pool activity and corresponding authorized borrowing limits for the three months ended March 31, 2024 are described in the following table:

Maximum · Average · Net Loans to
BorrowingsMaximumBorrowingsAverage(Borrowings from)Authorized
from theLoans to thefrom theLoans to thethe Utility MoneyShort-term
UtilityUtilityUtilityUtilityPool as ofBorrowing
CompanyMoney PoolMoney PoolMoney PoolMoney PoolMarch 31, 2024Limit
(in millions)
AEP Texas$267.9$—$191.2$—$(267.9)$600.0
AEPTCo313.3298.0178.575.3272.9820.0(a)
APCo399.551.1205.520.337.4750.0
I&M125.5—60.2—(73.2)500.0
OPCo295.2—143.4—(295.2)500.0
PSO264.6—128.8—(264.6)750.0
SWEPCo254.5—161.1—(254.5)750.0

(a) Amount represents the combined authorized short-term borrowing limit the State Transcos have from FERC or state regulatory commissions.

The activity in the above table does not include short-term lending activity of certain AEP nonutility subsidiaries. AEP Texas’ wholly-owned subsidiary, AEP Texas North Generation Company, LLC and SWEPCo’s wholly-owned subsidiary, Mutual Energy SWEPCo, LLC participate in the Nonutility Money Pool. The amounts of outstanding loans to the Nonutility Money Pool as of March 31, 2024 and December 31, 2023 are included in Advances to Affiliates on the subsidiaries’ balance sheets. The Nonutility Money Pool participants’ activity for the three months ended March 31, 2024 is described in the following table:

Maximum LoansAverage LoansLoans to the Nonutility
to the Nonutilityto the NonutilityMoney Pool as of
CompanyMoney PoolMoney PoolMarch 31, 2024
(in millions)
AEP Texas$7.1$7.0$7.0
SWEPCo2.32.22.3

AEP has a direct financing relationship with AEPTCo to meet its short-term borrowing needs. The amounts of borrowings from AEP as of March 31, 2024 and December 31, 2023 are included in Advances from Affiliates on AEPTCo’s balance sheets. AEPTCo’s direct financing activities with AEP and corresponding authorized borrowing limit for the three months ended March 31, 2024 are described in the following table:

MaximumMaximumAverageAverageBorrowings fromLoans toAuthorized
BorrowingsLoansBorrowingsLoansAEP as ofAEP as ofShort-term
from AEPto AEPfrom AEPto AEPMarch 31, 2024March 31, 2024Borrowing Limit
(in millions)
$44.4$148.5$4.4$72.9$3.7$—$50.0(a)

(a) Amount represents the authorized short-term borrowing limit from FERC or state regulatory agencies not otherwise included in the utility money pool above.

The maximum and minimum interest rates for funds either borrowed from or loaned to the Utility Money Pool are summarized in the following table:

Three Months Ended March 31,
20242023
Maximum Interest Rate5.79%5.42%
Minimum Interest Rate5.66%4.66%

The average interest rates for funds borrowed from and loaned to the Utility Money Pool are summarized in the following table:

Average Interest Rate for Funds · Average Interest Rate for Funds
Borrowed from the Utility Money Pool · Loaned to the Utility Money Pool
for Three Months Ended March 31,for Three Months Ended March 31,
Company2024202320242023
AEP Texas5.71%5.18%—%—%
AEPTCo5.72%5.09%5.70%5.29%
APCo5.74%5.14%5.72%5.12%
I&M5.73%5.12%—%5.16%
OPCo5.71%5.17%—%—%
PSO5.71%4.84%—%5.11%
SWEPCo5.71%5.12%—%—%

Maximum, minimum and average interest rates for funds loaned to the Nonutility Money Pool are summarized in the following table:

Three Months Ended March 31, 2024Three Months Ended March 31, 2023
MaximumMinimumAverageMaximumMinimumAverage
Interest RateInterest RateInterest RateInterest RateInterest RateInterest Rate
for Fundsfor Fundsfor Fundsfor Fundsfor Fundsfor Funds
Loaned toLoaned toLoaned toLoaned toLoaned toLoaned to
the Nonutilitythe Nonutilitythe Nonutilitythe Nonutilitythe Nonutilitythe Nonutility
CompanyMoney PoolMoney PoolMoney PoolMoney PoolMoney PoolMoney Pool
AEP Texas5.79%5.66%5.72%5.42%4.66%5.12%
SWEPCo5.79%5.66%5.72%5.42%4.66%5.13%

AEPTCo’s maximum, minimum and average interest rates for funds either borrowed from or loaned to AEP are summarized in the following table:

Maximum · Minimum · Maximum · Minimum · Average · Average
Interest Rate · Interest Rate · Interest Rate · Interest Rate · Interest Rate · Interest Rate
Three Monthsfor Fundsfor Fundsfor Fundsfor Fundsfor Fundsfor Funds
EndedBorrowedBorrowedLoanedLoanedBorrowedLoaned
March 31,from AEPfrom AEPto AEPto AEPfrom AEPto AEP
20245.79%5.66%5.79%5.66%5.74%5.71%
20235.38%4.53%5.38%4.53%5.03%5.15%

Short-term Debt (Applies to AEP and SWEPCo)

Outstanding short-term debt was as follows:

March 31, 2024 · December 31, 2023
Outstanding · Interest · Outstanding · Interest
CompanyType of DebtAmountRate (a)AmountRate (a)
(dollars in millions)
AEPSecuritized Debt for Receivables (b)$900.05.54%$888.05.65%
AEPCommercial Paper2,832.25.61%1,937.95.69%
SWEPCoNotes Payable5.47.68%4.37.71%
Total Short-term Debt$3,737.6$2,830.2

(a)Weighted-average rate as of March 31, 2024 and December 31, 2023, respectively.

(b)Amount of securitized debt for receivables as accounted for under the “Transfers and Servicing” accounting guidance.

Credit Facilities

For a discussion of credit facilities, see “Letters of Credit” section of Note 5.

Securitized Accounts Receivables – AEP Credit (Applies to AEP)

AEP Credit has a receivables securitization agreement with bank conduits. Under the securitization agreement, AEP Credit receives financing from the bank conduits for the interest in the receivables AEP Credit acquires from affiliated utility subsidiaries. These securitized transactions allow AEP Credit to repay its outstanding debt obligations, continue to purchase the operating companies’ receivables and accelerate AEP Credit’s cash collections.

AEP Credit’s receivables securitization agreement provides a commitment of $900 million from bank conduits to purchase receivables and expires in September 2025. As of March 31, 2024, the affiliated utility subsidiaries were in compliance with all requirements under the agreement.

Accounts receivable information for AEP Credit was as follows:

Three Months Ended March 31,
20242023
(dollars in millions)
Effective Interest Rates on Securitization of Accounts Receivable5.61%4.86%
Net Uncollectible Accounts Receivable Written-Off$8.1$6.9
March 31, 2024December 31, 2023
(in millions)
Accounts Receivable Retained Interest and Pledged as Collateral Less Uncollectible Accounts$1,164.2$1,207.4
Short-term – Securitized Debt of Receivables900.0888.0
Delinquent Securitized Accounts Receivable58.252.2
Bad Debt Reserves Related to Securitization42.642.0
Unbilled Receivables Related to Securitization336.9409.8

AEP Credit’s delinquent customer accounts receivable represent accounts greater than 30 days past due.

Securitized Accounts Receivables – AEP Credit (Applies to all Registrant Subsidiaries except AEP Texas and AEPTCo)

Under this sale of receivables arrangement, the Registrant Subsidiaries sell, without recourse, certain of their customer accounts receivable and accrued unbilled revenue balances to AEP Credit and are charged a fee based on AEP Credit’s financing costs, administrative costs and uncollectible accounts experience for each Registrant Subsidiary’s receivables. APCo does not have regulatory authority to sell its West Virginia accounts receivable. The costs of customer accounts receivable sold are reported in Other Operation expense on the Registrant Subsidiaries’ statements of income. The Registrant Subsidiaries manage and service their customer accounts receivable, which are sold to AEP Credit. AEP Credit securitizes the eligible receivables for the operating companies and retains the remainder.

The amount of accounts receivable and accrued unbilled revenues under the sale of receivables agreements were:

CompanyMarch 31, 2024December 31, 2023
(in millions)
APCo$196.5$184.6
I&M167.0156.4
OPCo536.0541.7
PSO96.3134.6
SWEPCo144.2168.3

The fees paid to AEP Credit for customer accounts receivable sold were:

Three Months Ended March 31,
Company20242023
(in millions)
APCo$4.2$4.9
I&M4.13.9
OPCo7.47.3
PSO3.43.2
SWEPCo4.84.3

The proceeds on the sale of receivables to AEP Credit were:

Three Months Ended March 31,
Company20242023
(in millions)
APCo$536.0$506.2
I&M529.7525.4
OPCo845.7884.4
PSO361.6416.3
SWEPCo425.4437.6
  1. VARIABLE INTEREST ENTITIES

The disclosures in this note apply to AEP unless indicated otherwise.

The accounting guidance for “Variable Interest Entities” is a consolidation model that considers if a company has a variable interest in a VIE. A VIE is a legal entity that possesses any of the following conditions: the entity’s equity at risk is not sufficient to permit the legal entity to finance its activities without additional subordinated financial support, equity owners are unable to direct the activities that most significantly impact the legal entity’s economic performance (or they possess disproportionate voting rights in relation to the economic interest in the legal entity), or the equity owners lack the obligation to absorb the legal entity’s expected losses or the right to receive the legal entity’s expected residual returns. Entities are required to consolidate a VIE when it is determined that they have a controlling financial interest in a VIE and therefore, are the primary beneficiary of that VIE, as defined by the accounting guidance for “Variable Interest Entities.” In determining whether AEP is the primary beneficiary of a VIE, management considers whether AEP has the power to direct the most significant activities of the VIE and is obligated to absorb losses or receive the expected residual returns that are significant to the VIE. Management believes that significant assumptions and judgments were applied consistently.

AEP holds ownership interests in businesses with varying ownership structures. Partnership interests and other variable interests are evaluated to determine if each entity is a VIE, and if so, whether or not the VIE should be consolidated into AEP’s financial statements. AEP has not provided material financial or other support that was not previously contractually required to any of its consolidated VIEs. If an entity is determined not to be a VIE, or if the entity is determined to be a VIE and AEP is not deemed to be the primary beneficiary, the entity is accounted for under the equity method of accounting.

Consolidated Variable Interests Entities

The Annual Report on Form 10-K for the year ended December 31, 2023 includes a detailed discussion of the Registrants’ consolidated VIEs.

The balances below represent the assets and liabilities of consolidated VIEs. These balances include intercompany transactions that are eliminated upon consolidation.

March 31, 2024
Consolidated VIEs
SWEPCoSabineI&MDCC FuelAEP Texas Transition FundingAEP Texas Restoration FundingAPCo Appalachian Consumer Rate Relief FundingAEP CreditProtectedCellof EISTransource Energy
(in millions)
ASSETS
Current Assets$5.1$75.3$40.1$20.4$6.3$1,165.3$211.6$31.7
Net Property, Plant and Equipment—129.5—————536.9
Other Noncurrent Assets140.163.555.3(a)139.7(b)130.3(c)10.2—9.3
Total Assets$145.2$268.3$95.4$160.1$136.6$1,175.5$211.6$577.9
LIABILITIES AND EQUITY
Current Liabilities$22.8$75.1$76.3$36.4$29.0$1,113.7$52.3$22.5
Noncurrent Liabilities122.1193.214.7122.4105.71.090.8258.8
Equity0.3—4.41.31.960.868.5296.6
Total Liabilities and Equity$145.2$268.3$95.4$160.1$136.6$1,175.5$211.6$577.9

(a)Includes an intercompany item eliminated in consolidation of $6 million.

(b)Includes an intercompany item eliminated in consolidation of $6 million.

(c)Includes an intercompany item eliminated in consolidation of$2 million.

December 31, 2023
Consolidated VIEs
SWEPCoSabineI&MDCC FuelAEP Texas Transition FundingAEP Texas Restoration FundingAPCoAppalachianConsumerRate Relief FundingAEP CreditProtectedCellof EISTransource Energy
(in millions)
ASSETS
Current Assets$4.2$81.9$25.5$27.5$13.3$1,208.8$205.3$36.9
Net Property, Plant and Equipment—153.8—————533.4
Other Noncurrent Assets150.781.771.4(a)145.6(b)138.2(c)9.6—5.1
Total Assets$154.9$317.4$96.9$173.1$151.5$1,218.4$205.3$575.4
LIABILITIES AND EQUITY
Current Liabilities$19.9$81.7$75.5$36.8$29.9$1,155.0$49.2$45.3
Noncurrent Liabilities134.8235.717.0135.1119.70.991.7241.5
Equity0.2—4.41.21.962.564.4288.6
Total Liabilities and Equity$154.9$317.4$96.9$173.1$151.5$1,218.4$205.3$575.4

(a)Includes an intercompany item eliminated in consolidation of$8 million.

(b)Includes an intercompany item eliminated in consolidation of$6 million.

(c)Includes an intercompany item eliminated in consolidation of $2 million.

Significant Variable Interests in Non-Consolidated VIEs and Significant Equity Method Investments

The Annual Report on Form 10-K for the year ended December 31, 2023 includes a detailed discussion of significant variable interests in non-consolidated VIEs and other significant equity method investments. As of December 31, 2023, AEP no longer owns interests in four joint ventures due to the sale of the Competitive Contracted Renewables Portfolio. Previously held by AEP Wind Holdings, LLC, the interests were accounted for under the equity method. See the “Disposition of the Competitive Contracted Renewables Portfolio” section of Note 6 for additional information.

  1. REVENUE FROM CONTRACTS WITH CUSTOMERS

The disclosures in this note apply to all Registrants, unless indicated otherwise.

Disaggregated Revenues from Contracts with Customers

The tables below represent AEP’s reportable segment revenues from contracts with customers, net of respective provisions for refund, by type of revenue:

Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration & MarketingCorporate and OtherReconciling AdjustmentsAEP Consolidated
(in millions)
Retail Revenues:
Residential Revenues$1,212.3$703.8$—$—$—$—$1,916.1
Commercial Revenues645.1397.0————1,042.1
Industrial Revenues (a)647.1136.1———(0.2)783.0
Other Retail Revenues55.313.9————69.2
Total Retail Revenues2,559.81,250.8———(0.2)3,810.4
Wholesale and Competitive Retail Revenues:
Generation Revenues235.9——27.4—0.1263.4
Transmission Revenues (b)118.9179.8488.7——(418.6)368.8
Renewable Generation Revenues (a)———6.3—(1.4)4.9
Retail, Trading and Marketing Revenues (c)———571.40.5(46.2)525.7
Total Wholesale and Competitive Retail Revenues354.8179.8488.7605.10.5(466.1)1,162.8
Other Revenues from Contracts with Customers (d)59.751.08.11.360.4(68.7)111.8
Total Revenues from Contracts with Customers2,974.31,481.6496.8606.460.9(535.0)5,085.0
Other Revenues:
Alternative Revenue Programs (e)(0.7)0.70.5——1.01.5
Other Revenues (a) (f)(25.7)7.9—(42.9)(8.1)8.0(60.8)
Total Other Revenues(26.4)8.60.5(42.9)(8.1)9.0(59.3)
Total Revenues$2,947.9$1,490.2$497.3$563.5$52.8$(526.0)$5,025.7

(a)Amounts include affiliated and nonaffiliated revenues.

(b)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for AEP Transmission Holdco was $387 million. The remaining affiliated amounts were immaterial.

(c)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for Generation & Marketing was $46 million. The remaining affiliated amounts were immaterial.

(d)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for Corporate and Other was $48 million. The remaining affiliated amounts were immaterial.

(e)Alternative revenue programs in certain jurisdictions include regulatory mechanisms that periodically adjust for over/under collection of related revenues.

(f)Generation & Marketing includes economic hedge activity.

Vertically Integrated UtilitiesTransmission and Distribution UtilitiesAEP Transmission HoldcoGeneration & MarketingCorporate and OtherReconciling AdjustmentsAEP Consolidated
(in millions)
Retail Revenues:
Residential Revenues$1,170.4$656.8$—$—$—$—$1,827.2
Commercial Revenues633.4375.9————1,009.3
Industrial Revenues670.3212.9———(0.2)883.0
Other Retail Revenues56.812.1————68.9
Total Retail Revenues2,530.91,257.7———(0.2)3,788.4
Wholesale and Competitive Retail Revenues:
Generation Revenues182.8——32.4——215.2
Transmission Revenues (a)114.7164.2450.1——(401.8)327.2
Renewable Generation Revenues (b)———21.3—(0.1)21.2
Retail, Trading and Marketing Revenues (b)———413.7(0.3)0.1413.5
Total Wholesale and Competitive Retail Revenues297.5164.2450.1467.4(0.3)(401.8)977.1
Other Revenues from Contracts with Customers (c)32.642.83.60.629.4(43.7)65.3
Total Revenues from Contracts with Customers2,861.01,464.7453.7468.029.1(445.7)4,830.8
Other Revenues:
Alternative Revenue Programs (d)(3.1)(11.6)1.8——2.9(10.0)
Other Revenues (b) (e)(0.1)11.1—(141.0)1.0(0.9)(129.9)
Total Other Revenues(3.2)(0.5)1.8(141.0)1.02.0(139.9)
Total Revenues$2,857.8$1,464.2$455.5$327.0$30.1$(443.7)$4,690.9

(a)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for AEP Transmission Holdco was $357 million. The remaining affiliated amounts were immaterial.

(b)Amounts include affiliated and nonaffiliated revenues.

(c)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for Corporate and Other was $29 million. The remaining affiliated amounts were immaterial.

(d)Alternative revenue programs in certain jurisdictions include regulatory mechanisms that periodically adjust for over/under collection of related revenues.

(e)Generation & Marketing includes economic hedge activity.

AEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
(in millions)
Retail Revenues:
Residential Revenues$147.3$—$526.3$224.8$556.5$158.2$182.4
Commercial Revenues110.9—188.3144.8286.1103.0140.0
Industrial Revenues (a)35.6—196.4147.9100.580.395.0
Other Retail Revenues9.7—28.11.34.221.52.6
Total Retail Revenues303.5—939.1518.8947.3363.0420.0
Wholesale Revenues:
Generation Revenues (b)——85.1137.3—2.247.1
Transmission Revenues (c)155.9475.447.110.123.810.839.6
Total Wholesale Revenues155.9475.4132.2147.423.813.086.7
Other Revenues from Contracts with Customers (d)8.88.121.727.642.212.09.6
Total Revenues from Contracts with Customers468.2483.51,093.0693.81,013.3388.0516.3
Other Revenues:
Alternative Revenue Programs (e)(1.8)(0.7)(0.1)(0.5)2.6(0.2)(0.1)
Other Revenues (a)——0.1(25.9)7.9——
Total Other Revenues(1.8)(0.7)—(26.4)10.5(0.2)(0.1)
Total Revenues$466.4$482.8$1,093.0$667.4$1,023.8$387.8$516.2

(a)Amounts include affiliated and nonaffiliated revenues.

(b)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for APCo was $41 million primarily related to the PPA with KGPCo.

(c)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for AEPTCo was $384 million, APCo was $21 million and SWEPCo was $14 million. The remaining affiliated amounts were immaterial.

(d)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for I&M was $18 million primarily related to barging, urea transloading and other transportation services. The remaining affiliated amounts were immaterial.

(e)Alternative revenue programs in certain jurisdictions include regulatory mechanisms that periodically adjust for over/under collection of related revenues.

AEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
(in millions)
Retail Revenues:
Residential Revenues$130.7$—$470.5$239.6$526.0$170.9$175.9
Commercial Revenues97.3—171.3138.9278.5109.1143.5
Industrial Revenues39.3—185.8152.6173.698.3104.2
Other Retail Revenues8.3—26.21.33.824.22.6
Total Retail Revenues275.6—853.8532.4981.9402.5426.2
Wholesale Revenues:
Generation Revenues (a)——80.2104.0—0.939.6
Transmission Revenues (b)146.3438.741.48.117.911.342.9
Total Wholesale Revenues146.3438.7121.6112.117.912.282.5
Other Revenues from Contracts with Customers (c)9.73.713.021.433.22.37.9
Total Revenues from Contracts with Customers431.6442.4988.4665.91,033.0417.0516.6
Other Revenues:
Alternative Revenue Programs (d)(2.1)(0.8)(0.7)(2.9)(9.5)—(0.7)
Other Revenues (e)————11.1——
Total Other Revenues(2.1)(0.8)(0.7)(2.9)1.6—(0.7)
Total Revenues$429.5$441.6$987.7$663.0$1,034.6$417.0$515.9

(a)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for APCo was $47 million primarily related to the PPA with KGPCo.

(b)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for AEPTCo was $349 million. The remaining affiliated amounts were immaterial.

(c)Amounts include affiliated and nonaffiliated revenues. The affiliated revenue for I&M was $18 million primarily related to barging, urea transloading and other transportation services. The remaining affiliated amounts were immaterial.

(d)Alternative revenue programs in certain jurisdictions include regulatory mechanisms that periodically adjust for over/under collection of related revenues.

(e)Amounts include affiliated and nonaffiliated revenues.

Fixed Performance Obligations (Applies to AEP, APCo and I&M)

The following table represents the Registrants’ remaining fixed performance obligations satisfied over time as of March 31, 2024. Fixed performance obligations primarily include electricity sales for fixed amounts of energy and stand ready services into PJM’s RPM market. The Registrants elected to apply the exemption to not disclose the value of unsatisfied performance obligations for contracts with an original expected term of one year or less. Due to the annual establishment of revenue requirements, transmission revenues are excluded from the table below. The Registrant Subsidiaries amounts shown in the table below include affiliated and nonaffiliated revenues.

Company20242025-20262027-2028After 2028Total
(in millions)
AEP$62.3$166.8$84.1$24.7$337.9
APCo12.132.224.311.780.3
I&M3.38.88.84.525.4

Contract Assets and Liabilities

Contract assets are recognized when the Registrants have a right to consideration that is conditional upon the occurrence of an event other than the passage of time, such as future performance under a contract. The Registrants did not have material contract assets as of March 31, 2024 and December 31, 2023.

When the Registrants receive consideration, or such consideration is unconditionally due from a customer prior to transferring goods or services to the customer under the terms of a sales contract, they recognize a contract liability on the balance sheets in the amount of that consideration. Revenue for such consideration is subsequently recognized in the period or periods in which the remaining performance obligations in the contract are satisfied. The Registrants’ contract liabilities typically arise from services provided under joint use agreements for utility poles. The Registrants did not have material contract liabilities as of March 31, 2024 and December 31, 2023.

Accounts Receivable from Contracts with Customers

Accounts receivable from contracts with customers are presented on the Registrant Subsidiaries’ balance sheets within the Accounts Receivable - Customers line item. The Registrant Subsidiaries’ balances for receivables from contracts that are not recognized in accordance with the accounting guidance for “Revenue from Contracts with Customers” included in Accounts Receivable - Customers were not material as of March 31, 2024 and December 31, 2023. See “Securitized Accounts Receivable - AEP Credit” section of Note 12 for additional information.

The following table represents the amount of affiliated accounts receivable from contracts with customers included in Accounts Receivable - Affiliated Companies on the Registrant Subsidiaries’ balance sheets:

AEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
(in millions)
March 31, 2024$—$129.2$77.8$55.8$72.3$10.8$16.1
December 31, 2023—123.271.744.070.112.427.4
ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.