EX-99.1 · SPL Expansion Project
SPL Expansion Project
Through Cheniere Partners, we are developing an expansion adjacent to the SPL Project with an expected total peak production capacity of up to approximately 20 mtpa of LNG (the “SPL Expansion Project”), inclusive of estimated debottlenecking opportunities. We expect to execute the SPL Expansion Project in a phased approach, maximizing brownfield economics, and a positive FID is subject to, among other things, receipt of necessary regulatory approvals and acceptable commercial and financing arrangements.
The first phase includes a single train, Train 7, and a boil-off gas re-liquefaction unit, along with supporting infrastructure and tie-ins to the existing Sabine Pass LNG terminal, and has an expected total production capacity of over 6 mtpa of LNG, inclusive of estimated debottlenecking opportunities. In May 2026, the lump sum, turnkey engineering, procurement and construction (EPC) contract with Bechtel Energy, Inc. (“Bechtel”) for the first phase of the SPL Expansion Project was signed, and Bechtel was released to commence early engineering and procurement under a limited notice to proceed (LNTP).
The FERC application for authorization to site, construct and operate the SPL Expansion Project, as well as the Department of Energy (“DOE”) application authorizing the export of LNG to non-free trade agreement (“FTA”) countries, remain pending. In September 2026, the FERC issued the final EIS relating to the SPL Expansion Project.