General

Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers.

LNG is natural gas (primarily methane) in liquid form and is a cleaner dispatchable fuel for power generation. The LNG we produce is shipped all over the world, converted back into natural gas (called “regasification”) and then transported via pipeline to homes and businesses and used as an energy source that is essential for heating, cooking and other industrial uses.

As of December 31, 2025, we were the largest producer of LNG in the U.S. and the second largest LNG operator globally, based on the total production capacity of our natural gas liquefaction facilities. Our total production capacity is expected to be over 60 mtpa of LNG, inclusive of estimated debottlenecking opportunities, of which over 9 mtpa was under construction and the remainder was in operation as of December 31, 2025, comprised of the following:

over 30 mtpa of total production capacity in operation from natural gas liquefaction facilities located in Cameron Parish, Louisiana at Sabine Pass (the“SPL Project”). We own and operate the SPL Project and export facility (the“Sabine Pass LNG Terminal”), one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with CQP, which is a publicly traded limited partnership. As of December 31, 2025, we owned 100% of the general partner interest, a 48.6% limited partner interest and 100% of the incentive distribution rights of CQP. The Sabine Pass LNG Terminal also has five LNG storage tanks with aggregate capacity of approximately 17 Bcfe and vaporizers with regasification capacity of approximately 4 Bcf/d, as well as three marine berths, two of which can accommodate vessels with nominal capacity of up to 266,000 cubic meters and the third berth, which can accommodate vessels with nominal capacity of up to 200,000 cubic meters. We also own and operate through CQP a 94-mile natural gas supply pipeline that interconnects the Sabine Pass LNG Terminal with several large interstate and intrastate pipelines (the“Creole Trail Pipeline”).

over 30 mtpa of total expected production capacity, inclusive of estimated debottlenecking opportunities, including over 9 mtpa under construction and the remainder in operation as of December 31, 2025, from our natural gas liquefaction and export facility located near Corpus Christi, Texas (the“Corpus Christi LNG Terminal”), of which we have 100% ownership interest. The Corpus Christi LNG Terminal also has three LNG storage tanks with aggregate capacity of approximately 10 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters. We also own and operate through CCP an approximately 21-mile natural gas supply pipeline that interconnects the Corpus Christi LNG Terminal with several large interstate and intrastate natural gas pipelines (the“Corpus Christi Pipeline”). The projects under construction at the Corpus Christi LNG Terminal include:

a project consisting of seven midscale Trains that is expected to add total production capacity of over 10 mtpa of LNG once fully completed (the“Corpus Christi Stage 3 Project”), with over 4 mtpa under construction and the remainder in operation from the first four midscale Trains that have reached substantial completion as of December 31, 2025; and

a project consisting of two additional midscale Trains that is expected to add total production capacity of approximately 5 mtpa of LNG once fully completed, inclusive of estimated debottlenecking opportunities (the“CCL Midscale Trains 8 & 9 Project” and together with the existing assets at the Corpus Christi LNG Terminal, the Corpus Christi Stage 3 Project and the Corpus Christi Pipeline, the“CCL Project”), which was under construction as of December 31, 2025. Our board of directors (our“Board”) made a positive FID with respect to the CCL Midscale Trains 8 & 9 Project on June 17, 2025, and issued a full notice to proceed with construction to Bechtel Energy Inc. (“Bechtel”) effective June 18, 2025. Non-FTA export authorization on the CCL Midscale Trains 8 & 9 Project is pending with the DOE.

Our long-term counterparty arrangements form the foundation of our business and provide us with significant, stable, long-term cash flows, and include SPAs, in which our customers are generally required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, and IPM agreements, in which a gas producer sells natural gas to us on a global LNG or natural gas index price, less a fixed liquefaction fee, shipping and other costs. The SPAs also have a variable fee component, which is primarily indexed to Henry Hub and generally structured to cover the cost of natural gas purchases, transportation and liquefaction fuel consumed to produce LNG. Since we procure most of our feedstock for LNG production from the U.S., the structure of these contracts helps limit our exposure to fluctuations in U.S. natural gas prices. Through our SPAs and IPM agreements currently in effect, with approximately 15 years of weighted average remaining life as of December 31, 2025, we have contracted approximately 90% of the total anticipated production from the SPL Project and the CCL Project (collectively, the“Liquefaction Projects”) through the mid-2030s, excluding volumes from contracts with terms less than 10 years and volumes from SPAs that are conditional on additional liquefaction capacity beyond what is currently in construction or operation, subject to unilateral waiver by us. LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements.

We remain focused on safety, operational excellence and customer satisfaction. Increasing demand for LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. Our capital allocation plan is designed, in part, to invest in financially disciplined growth accretive to our common stock. Capital investment parameters are the foundation of our disciplined, accretive growth, and include consideration to:

Achieve value accretive returns through long-term commercial contracts: We aim to contract approximately 90% of our current and planned liquefaction capacity under long-term SPAs and IPM agreements with creditworthy counterparties under the pricing structures described above, with financial parameters that consider, among other things, targeted unlevered returns that exceed our cost of equity and return on stock at prevailing stock prices and project leverage. Our success in securing long-term commercial contracts at desired returns is influenced by global LNG and natural gas market conditions and other uncertainties described in Item 1A. Risk Factors.

Achieve credit accretive returns: We aim to conservatively fund our projects through financing structures that sustain our long-term, run-rate leverage and credit metrics. Our ability to secure the required financing is influenced by market interest rates and other factors described in Item 1A. Risk Factors.

We have increased available liquefaction capacity at our Liquefaction Projects as a result of debottlenecking and other optimization projects. We believe these factors provide a foundation for additional growth in our portfolio of customer contracts in the future. We hold significant land positions at both the Sabine Pass LNG Terminal and the Corpus Christi LNG Terminal, which provide opportunity for further liquefaction capacity expansion. We are developing a two-phased expansion adjacent to the SPL Project, inclusive of three liquefaction trains and supporting infrastructure, with an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities (the“SPL Expansion Project”). Following our pre-filing in July 2025, in February 2026, we filed an application with the FERC under the NGA for authorization to site, construct and operate afurther expansion of the CCL Project in a phased approach, inclusive of four liquefaction trains and supporting infrastructure, with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities (the“CCL Expansion Project”). These projects and any future expansions at our sites require, among other things, regulatory approvals and acceptable commercial and financing arrangements before we make a positive FID. Risks associated with cost overruns and delays in the completion of our expansion projects are described in Item 1A. Risk Factors.

The following table summarizes pre-FID development efforts and certain key milestones associated with the SPL Expansion Project and the CCL Expansion Project:

SPL Expansion Project · CCL Expansion Project
Expected total peak production capacity of LNG (1)Up to ~ 20 mtpaUp to 24 mtpa
Milestone
Regulatory (2) · FERC authorizations:
Positive environmental assessmentPendingPending
Order under Section 3 of NGAPendingPending
Certification to commence construction · Pending
DOE export authorization:
FTA countries · ü
Non-FTA countries · Pending
FinancingFinancing(3)(3)
Commercialization and Other ContractingDefinitive commercial agreements(4)(4)
Definitive full-scope EPC contract
Target MilestoneFID (5)2026/20272027/2028

üindicates receipt of authorization, subject to ongoing conditionality

(1)Anticipated based on capacity, scale, location and infrastructure. Subject to regulatory review and approval and may change based on design considerations, engagement with contractors and other factors. Subject to adjustment for planned maintenance, production reliability, potential overdesign and debottlenecking opportunities.

(2)Our activities, including our expansion activities, are highly regulated and require regulatory approvals at various stages, including approvals of the FERC and DOE under Sections 3 and 7 of the NGA, as well as several other material governmental and regulatory approvals and permits. The progression of our expansion projects is dependent on receiving all regulatory approvals required within the respective stages. See Item 1A. Risk Factors for further discussion of the regulations under federal, state and local statutes, rules, regulations and laws to which we are subject and associated risk factors relating to regulations.

(3)We anticipate drawing on current committed facilities and/or incurring additional debt to finance the construction of this expansion project if we reach a positive FID.

(4)Liquefaction capacity partially contracted by Cheniere Marketing, through SPAs that are conditioned on additional liquefaction capacity beyond what is currently in construction or operation and may be available to be novated to SPL or CCL, and by SPL Stage V, through an IPM agreement.

(5)Expected to be subject to phased FID. Any positive FID is subject to achievement of or consideration to relevant milestones and capital investment parameters described herein.

Our Business Strategy

Our primary business strategy is to be a full-service LNG provider to worldwide end-use customers. We accomplish this objective by owning, constructing and operating LNG and natural gas infrastructure facilities to meet our long-term customers’ energy demands and:

safely, efficiently and reliably operating and maintaining our assets;

procuring natural gas and pipeline transport capacity to our facilities;

commencing commercial delivery for, and continuing to fulfill all commercial commitments to, our long-term SPA customers;

providing value to our customers through destination flexibility, options not to lift cargoes and diversity of price and geography;

continuing to secure long-term customer contracts to support our planned expansion, including the FID of potential expansion projects beyond the Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project;

completing our construction projects safely, on-time and on-budget;

maximizing the production of LNG to serve our customers and generating steady and stable revenues and operating cash flows;

maintaining a flexible capital structure to finance the acquisition, development, construction and operation of the energy assets needed to supply our customers;

executing our “all of the above” capital allocation strategy, focused on strengthening our balance sheet, funding financially disciplined growth and returning capital to our stockholders; and

strategically identifying actionable and economic environmental solutions.

Our Business

We shipped our first LNG cargo in February 2016 and as of February 20, 2026, over 4,610 cumulative LNG cargoes totaling over 315 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Projects. Our LNG has been shipped to over 40 countries and regions around the world.

Below is a discussion of our operations. For further discussion of our contractual obligations and cash requirements related to these operations, refer to Liquidity and Capital Resources in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Sabine Pass LNG Terminal

Liquefaction Facilities and Expansion Project

The Sabine Pass LNG Terminal, as described above under the caption General, is one of the largest LNG production facilities in the world with over 30 mtpa of total production capacity, five storage tanks and three marine berths.

The following summarizes the volumes of natural gas for which we have received approvals from the FERC to site, construct and operate the Trains at the SPL Project and the orders we have received from the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG Terminal through December 31, 2050:

FERC Approved VolumeDOE Approved Volume
(in Bcf/yr)(in mtpa)(in Bcf/yr)(in mtpa)
FTA countries (1)1,661.94331,661.9433
Non-FTA countries1,661.94331,661.9433

(1)Excludes 950 Bcf/yr to FTA countries authorized in November 2025 for the SPL Expansion Project that is effective for 25 years from the date of first commercial export from the SPL Expansion Project.

In addition, we are developing the SPL Expansion Project, as also described above under the caption General. In June 2025, certain subsidiaries of CQP updated the SPL Expansion Project’s FERC application, originally filed in February 2024, to reflect a two-phased project, inclusive of three liquefaction trains and supporting infrastructure, maintaining an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities.

Natural Gas Supply, Transportation and Storage

SPL has secured a portion of its expected natural gas feedstock for the SPL Project through long-term natural gas supply agreements, including an IPM agreement. SPL Stage V also has an IPM agreement to supply the SPL Expansion Project. Additionally, to ensure that SPL is able to transport and manage the natural gas feedstock to the Sabine Pass LNG Terminal, it has transportation precedent and other agreements to secure firm pipeline transportation and storage capacity from third parties and CTPL.

Regasification Facilities

The Sabine Pass LNG Terminal, as described above under the caption General, has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. SPLNG has a long-term, third party TUA for 1 Bcf/d with TotalEnergies Gas & Power North America, Inc. (“TotalEnergies”), under which TotalEnergies is required to pay fixed monthly fees, whether or not it uses the regasification capacity it has reserved. Approximately 2 Bcf/d of the remaining capacity has been reserved under a TUA by SPL, which also has a partial TUA assignment agreement with TotalEnergies, as further described in Note 12—Revenues of our Notes to Consolidated Financial Statements.

Corpus Christi LNG Terminal

Liquefaction Facilities and Expansion Projects

The Corpus Christi LNG Terminal, as described above under the caption General, has over 30 mtpa of total expected production capacity, inclusive of estimated debottlenecking opportunities, including over 4 mtpa under construction from the Corpus Christi Stage 3 Project, approximately 5 mtpa under construction from the CCL Midscale Trains 8 & 9 Project and the remainder in operation as of December 31, 2025. The Corpus Christi LNG Terminal also includes three storage tanks and two marine berths.

The following table summarizes the project completion and construction status of the Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project as of December 31, 2025:

Corpus Christi Stage 3 ProjectCCL Midscale Trains 8 & 9 Project
Overall project completion percentage94.1%31.8%
Completion percentage of:
Engineering99.6%75.5%
Procurement100.0%47.3%
Subcontract work95.1%29.0%
Construction84.7%0.2%
Date of expected substantial completion1H 2026 - 2H 20262H 2028

The following summarizes the volumes of natural gas for which we have received approvals from the FERC to site, construct and operate the Trains at the CCL Project and the orders we have received from the DOE authorizing the export of domestically produced LNG by vessel from the Corpus Christi LNG Terminal through December 31, 2050:

FERC Approved Volume (1)DOE Approved Volume (1)
(in Bcf/yr)(in mtpa)(in Bcf/yr)(in mtpa)
Trains 1 through 3 of the CCL Project:
FTA countries875.1617875.1617
Non-FTA countries875.1617875.1617
Corpus Christi Stage 3 Project:
FTA countries582.1411.45582.1411.45
Non-FTA countries582.1411.45582.1411.45

(1)Excludes 170 Bcf/yr to FTA countries authorized in July 2023 for the CCL Midscale Trains 8 & 9 Project that is not effective until the date of first commercial export from the CCL Midscale Trains 8 & 9 Project, which was approved by the FERC in March 2025.

In addition, we are developing the CCL Expansion Project, as also described above under the caption General, inclusive of four liquefaction trains and supporting infrastructure, with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities.

Natural Gas Supply, Transportation and Storage

CCL has secured a portion of its expected natural gas feedstock for the Corpus Christi LNG Terminal through long-term natural gas supply agreements, including IPM agreements. Additionally, to ensure that CCL is able to transport and manage the natural gas feedstock to the Corpus Christi LNG Terminal, it has transportation precedent and other agreements to secure firm pipeline transportation and storage capacity from third parties and CCP.

Marketing

LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements. These volumes may be supplemented by volumes procured from third parties at other locations worldwide to support operational requirements or take advantage of market opportunities.

Additional information regarding our marketing activities can be found in Liquidity and Capital Resources in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Major Customers

We did not have any customers accounting for 10% or more of total consolidated revenues from contracts with external customers for the year ended December 31, 2025.

Additional information regarding our customer contracts can be found in Liquidity and Capital Resources in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations and Note 20—Segment Information and Customer Concentration of our Notes to Consolidated Financial Statements.

Business Seasonality

Our results are affected by production levels, timing of our maintenance activities and the resulting availability of volumes. Therefore, operating profit may not be generated evenly throughout the year. Weather variations, including temperature, have an impact on LNG output at our Liquefaction Projects. Our Liquefaction Projects are capable of relatively higher production volumes during the cooler months as compared to the summer months. We typically perform our scheduled major maintenance activities at our sites during shoulder months in the second and third quarters in order to mitigate the impact to our annual operating results.

Governmental Regulation

Our LNG terminals and pipelines are subject to extensive regulation under federal, state and local statutes, rules, regulations and laws. These laws require that we engage in consultations with appropriate federal and state agencies and that we obtain and maintain applicable permits and other authorizations. As further described in Risks Relating to Regulations within Item 1A. Risk Factors, these rigorous regulatory requirements are built into the cost of construction and operation, and failure to comply with such laws could result in substantial penalties and/or loss of necessary authorizations.

Federal Energy Regulatory Commission

The design, construction, operation, maintenance and expansion of our liquefaction facilities and the transportation of natural gas in interstate commerce through our pipelines are highly regulated activities subject to the jurisdiction of the FERC pursuant to the NGA. Under the NGA, the FERC’s jurisdiction generally extends to the transportation of natural gas in interstate commerce, to the sale for resale of natural gas in interstate commerce, to natural gas companies engaged in such transportation or sale and to the construction, operation, maintenance and expansion of LNG terminals and interstate natural gas pipelines.

The FERC’s authority to regulate interstate natural gas pipelines and the services that they provide generally includes regulation of:

rates and charges, and terms and conditions for natural gas transportation, storage and related services;

the certification and construction of new facilities and modification of existing facilities;

the extension and abandonment of services and facilities;

the administration of accounting and financial reporting regulations, including the maintenance of accounts and records;

the acquisition and abandonment of facilities; and

various other matters.

Under the NGA, interstate pipelines are not permitted to unduly discriminate or grant undue preference as to rates or the terms and conditions of service to any shipper, including the company’s own affiliates. Those rates, terms and conditions must be public, and on file with the FERC. In contrast to pipeline regulation, the FERC does not require NGA Section 3 LNG terminal owners to provide open-access services at cost-based or regulated rates. Although the provisions that codified the FERC’s policy in this area expired on January 1, 2015, we see no indication that the FERC intends to change its policy in this area. On February 18, 2022, the FERC updated its 1999 Policy Statement on certification of new interstate natural gas facilities and the framework for the FERC’s decision-making process. On March 24, 2022, the FERC rescinded the Policy Statement and re-issued it as a draft. On September 12, 2025, the FERC issued an order terminating the proceeding to consider updates to the 1999 Policy Statement.

We are permitted to make sales of natural gas for resale in interstate commerce pursuant to a blanket marketing certificate granted by the FERC. Our sales of natural gas will be affected by the availability, terms and cost of pipeline transportation.

In order to site, construct and operate our LNG terminals, we received and are required to maintain authorizations from the FERC under Section 3 of the NGA as well as other material governmental and regulatory approvals and permits. The Energy Policy Act of 2005 (the“EPAct”) amended Section 3 of the NGA to establish or clarify the FERC’s exclusive authority to approve or deny an application for the siting, construction, expansion or operation of LNG terminals, unless specifically provided otherwise in the EPAct amendments to the NGA. For example, nothing in the EPAct amendments to the NGA were intended to affect otherwise applicable law related to any other federal agency’s authorities or responsibilities related to LNG terminals or those of a state acting under federal law.

In March 2025, we received authorization from the FERC under the NGA to site, construct and operate the CCL Midscale Trains 8 & 9 Project. In June 2025, certain subsidiaries of CQP updated the SPL Expansion Project’s FERC application, originally filed in February 2024, to reflect a two-phased project, inclusive of three liquefaction trains and supporting infrastructure, maintaining an expected total peak production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities. In December 2025, we filed an application with the FERC to increase the LNG production capacity of the previously-authorized Corpus Christi Stage 3 Project and CCL Midscale Trains 8 & 9 Project by approximately 5 mtpa, which remains pending at the FERC. Following our pre-filing in July 2025, in February 2026, we filed an application with the FERC under the NGA for authorization to site, construct and operate the CCL Expansion Project in a phased approach, inclusive of four liquefaction trains and supporting infrastructure, with an expected total peak production capacity of up to 24 mtpa of LNG, inclusive of estimated debottlenecking opportunities.

The FERC’s Standards of Conduct apply to interstate pipelines that conduct transmission transactions with an affiliate that engages in natural gas marketing functions. The general principles of the FERC Standards of Conduct are: (1) non-discrimination, which requires transmission providers to treat all transmission customers, affiliated and non-affiliated, on a not unduly discriminatory basis, and to not make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage; (2) independent functioning, which requires transmission function employees to function independently of marketing function employees; (3) no-conduit rule, which prohibits passing transmission function information to marketing function employees; and (4) transparency, which imposes posting requirements to detect undue preference due to the improper disclosure of non-public transmission function information. We have established the required policies, procedures and training to comply with the FERC’s Standards of Conduct.

All of our FERC construction, operation, reporting, accounting and other regulated activities are subject to audit by the FERC, which may conduct routine or special inspections and issue data requests designed to ensure compliance with FERC rules, regulations, policies and procedures. The FERC’s jurisdiction under the NGA allows the imposition of civil and criminal penalties for any violations of the NGA and any rules, regulations or orders of the FERC thereunder up to approximately $1.6 million per day per violation, including any conduct that violates the NGA’s prohibition against market manipulation.

Several other governmental and regulatory approvals and permits are required throughout the life of our LNG terminals and our pipelines. In addition, our FERC orders require us to comply with certain ongoing conditions and reporting obligations and maintain other regulatory agency approvals throughout the life of our facilities. For example, throughout the life of our LNG terminals and our pipelines, we are subject to regular reporting requirements to the FERC, the Department of Transportation’s (“DOT”) Pipeline and Hazardous Materials Safety Administration (“PHMSA”) and applicable federal and state regulatory agencies regarding the operation and maintenance of our facilities. To date, we have been able to obtain and maintain required approvals as needed, and the need for these approvals and reporting obligations has not materially affected our construction or operations.

DOE Export Licenses

The DOE has authorized the export of domestically produced LNG by vessel from the Sabine Pass LNG Terminal, as discussed in Sabine Pass LNG Terminal—Liquefaction Facilities, and the Corpus Christi LNG Terminal, as discussed in Corpus Christi LNG Terminal—Liquefaction Facilities. Although it is not expected to occur, the loss of an export authorization could be a force majeure event under our SPAs.

Under Section 3 of the NGA, applications for exports of natural gas (including LNG) to FTA countries, which allow for national treatment for trade in natural gas, are “deemed to be consistent with the public interest” and shall be granted by the DOE without “modification or delay.” FTA countries currently recognized by the DOE for exports of LNG include Australia, Bahrain, Canada, Chile, Colombia, Dominican Republic, El Salvador, Guatemala, Honduras, Jordan, Mexico, Morocco, Nicaragua, Oman, Panama, Peru, Republic of Korea and Singapore. FTAs with Israel and Costa Rica do not require national treatment for trade in natural gas. As part of its review of applications for export of LNG to non-FTA countries, the DOE publishes a Notice of Application in the Federal Register whereby the public and other interveners are provided the opportunity to comment and may assert that such authorization would not be consistent with the public interest. We currently have the SPL Expansion Project and the CCL Midscale Trains 8 & 9 Project pending non-FTA export approval with the DOE. However, the outstanding DOE approval for the SPL Expansion Project is first subject to the receipt of regulatory permit approval from the FERC, responsive to our formal application. In June 2025, certain subsidiaries of CQP updated the SPL Expansion Project’s application to the DOE for authorization to export LNG to FTA countries and non-FTA countries. In November 2025, the updated authorization to export LNG to FTA countries was received. See Sabine Pass LNG Terminal and Corpus Christi LNG Terminal sections above for FERC and DOE approved volumes on our existing Liquefaction Projects.

Pipeline and Hazardous Materials Safety Administration

Our LNG terminals as well as the Creole Trail Pipeline and the Corpus Christi Pipeline are subject to regulation by PHMSA. PHMSA is authorized by the applicable pipeline safety laws to establish minimum safety standards for certain pipelines and LNG facilities. The regulatory standards PHMSA has established are applicable to the design, installation, testing, construction, operation, maintenance and management of natural gas and hazardous liquid pipeline facilities and LNG facilities that affect interstate or foreign commerce. PHMSA has also established training, worker qualification and reporting requirements.

PHMSA performs inspections of pipeline and LNG facilities and has authority to undertake enforcement actions, including issuance of civil penalties up to approximately $273,000 per day per violation, with a maximum administrative civil penalty of approximately $2.7 million for any related series of violations.

Other Governmental Permits, Approvals and Authorizations

Construction and operation of our facilities require additional permits, orders, approvals and consultations to be issued by various federal and state agencies, including the DOT, U.S. Army Corps of Engineers (“USACE”), U.S. Department of Commerce, National Marine Fisheries Service, U.S. Department of the Interior, U.S. Fish and Wildlife Service, the U.S. Environmental Protection Agency (the“EPA”), U.S. Department of Homeland Security, the Louisiana Department of Environmental Quality (the“LDEQ”), the Texas Commission on Environmental Quality (“TCEQ”) and the Railroad Commission of Texas.

The USACE issues its permits under the authority of the Clean Water Act (“CWA”) (Section 404) and the Rivers and Harbors Act (Section 10). The EPA administers the Clean Air Act (“CAA”), and has delegated authority to the TCEQ and LDEQ to issue the Title V Operating Permit and the Prevention of Significant Deterioration Permit. These two permits are issued by the LDEQ for the Sabine Pass LNG Terminal and CTPL and by the TCEQ for the CCL Project.

Commodity Futures Trading Commission (“CFTC”)

The Dodd-Frank Wall Street Reform and Consumer Protection Act (the“Dodd-Frank Act”) amended the Commodity Exchange Act to provide for federal regulation of the over-the-counter derivatives market and entities, such as us, that participate in those markets. The CFTC has enacted a number of regulations pursuant to the Dodd-Frank Act.

As required by the Dodd-Frank Act, the CFTC and federal banking regulators also adopted rules requiring swap dealers (as defined in the Dodd-Frank Act), including those that are regulated financial institutions, to collect initial and/or variation margin with respect to uncleared swaps from their counterparties that are financial end users, registered swap dealers or major swap participants. These rules do not require collection of margin from non-financial-entity end users who qualify for the end user exception from the mandatory clearing requirement or from non-financial end users or certain other counterparties in certain instances. We qualify as a non-financial-entity end user with respect to the swaps that we enter into to hedge our commercial risks.

Pursuant to the Dodd-Frank Act, the CFTC adopted additional anti-manipulation and anti-disruptive trading practices regulations that prohibit, among other things, manipulative, deceptive or fraudulent schemes or material misrepresentation in the futures, options, swaps and cash markets. In addition, separate from the Dodd-Frank Act, our use of futures and options on commodities is subject to the Commodity Exchange Act and CFTC regulations, as well as the rules of futures exchanges on which any of these instruments are executed. Should we violate any of these laws and regulations, we could be subject to a CFTC or an exchange enforcement action and material penalties, possibly resulting in changes in the rates we can charge.

United Kingdom / European Regulations

Our European trading activities, which are primarily established in and operated out of the United Kingdom (“U.K.”), are subject to a number of European Union (“EU”) and U.K. laws and regulations, including but not limited to:

the European Market Infrastructure Regulation, which was designed to increase the transparency and stability of the European Economic Area (“EEA”) derivatives markets;

the Regulation on Wholesale Energy Market Integrity and Transparency (“REMIT”), which prohibits market manipulation and insider trading in EEA wholesale energy markets and imposes various transparency and other obligations on participants active in these markets;

the Markets in Financial Instruments Directive and Regulation (“MiFID II”), which sets forth a financial services framework across the EEA, including rules for firms engaging in investment services and activities in connection with certain financial instruments, including a range of commodity derivatives; and

the Market Abuse Regulation, which was implemented to create an enhanced market abuse framework, and which applies generally to all financial instruments listed or traded on EEA trading venues (“Traded Instruments”) as well as other over-the-counter financial instruments priced on, or impacting, the price or value of the Traded Instrument.

Following the U.K.'s departure from the EU (“Brexit”), the EU-wide rules that applied to the U.K. while it was a member of the EU (and during the transition period) have been replicated, subject to certain amendments, to create a parallel set of rules applicable only in the U.K. As a result, we are subject to two separate sets of rules based on the same underlying legislation: (i) one set of rules that apply in the EEA (i.e. not including the U.K.) (the“EEA Rules”); and (ii) one set of rules that apply only in the U.K. (the“U.K. Onshored Rules”). We increasingly are seeing divergence between the EEA Rules and the U.K. Onshored Rules albeit not in a way which is expected to materially impact our business at this time.

To the extent our trading activities have a nexus with the EEA, we comply with the EEA Rules. However, as our trading activities are primarily operated out of the U.K., the main rules that impact and apply to us on a day-to-day basis are the U.K. Onshored Rules.

In particular, under the U.K. Onshored Rules, firms engaging in investment services and activities under U.K. MiFID II must be authorized unless an exemption applies. We meet the criteria for an exemption and therefore do not need to be authorized under U.K. MiFID II.

In addition to the U.K. Onshored Rules, we are also subject to a separate, U.K.-specific regime that is not based on prior EU/EEA legislation. This is primarily set out in the U.K.’s Financial Services and Markets Act 2000 (“FSMA”) and Financial Services and Markets Act 2000 (Regulated Activities) Order 2001 (“RAO”), which, among other things, governs the regulation of financial services and markets in the U.K., and contains a definitive list of the specified kinds of activities and products that are regulated. Under these U.K.-specific rules, a firm engaging in regulated activities must be authorized unless an exclusion applies. We qualify under applicable exclusions and therefore are not required to be authorized under the U.K. FSMA/RAO regime.

In December 2022, the EU enacted regulations, which among other things established a market correction mechanism against excessively high LNG prices, volatility and movements, and provided for the collection of information though new reporting obligations that would be utilized to provide for a new LNG pricing assessment/benchmark. The applicable regulations are set forth in Council Regulation (EU) 2022/2576-2581. However, these temporary rules have subsequently expired and been replaced by new, yet substantively identical, permanent rules that are within the scope of the recast REMIT regulation which came into effect in May 2024. The impact of such regulations on our business remains uncertain, but is not expected to be material.

Violation of the foregoing laws and regulations could result in investigations, possible fines and penalties, and in some scenarios, criminal offenses, as well as reputational damage.

Brexit and Equivalence

As referenced above, the U.K. ceased to be a member of the EU on January 31, 2020. On December 24, 2020, the EU and the U.K. reached an agreement in principle on the terms of certain agreements and declarations governing the ongoing relationship between the EU and the U.K., including the EU-U.K. Trade and Cooperation Agreement (the“TCA”). The TCA provisionally applied from January 1, 2021, and entered into force on May 1, 2021. The TCA is limited in its scope; in particular the TCA does not make any meaningful provision for the financial services sector. For example, the TCA does not meaningfully address equivalence. Uncertainties remain relating to certain aspects of the U.K.’s future economic, trading and legal relationships with the EU and with other countries. As a result, we separately monitor and ensure compliance with all applicable U.K. and EU rules.

The Financial Services and Markets Act 2023 (“FSMA 2023”) came into U.K. law in June 2023. FSMA 2023 is the framework for the U.K.’s post-Brexit financial legislative and regulatory landscape. It is intended to provide the foundations for a significant overhaul and re-structuring of the U.K. financial services and markets regimes, with many of its measures being intended to address issues and points arising from Brexit. The changes include the revocation of retained EU laws, the introduction of new powers and objectives for the regulators of such markets, as well as a number of measures relevant to financial market infrastructure operators and market participants. Changes will be implemented pursuant to subsidiary legislation or directly by regulators. However, at this time it is not possible to determine whether any such actions would have a material impact on our business.

Environmental Regulation

Our LNG terminals are subject to various federal, state and local laws and regulations relating to the protection of the environment and natural resources. These environmental laws and regulations can affect the cost and output of operations and may impose substantial penalties for non-compliance and substantial liabilities for pollution, as further described in the risk factor Existing and future safety, environmental and similar laws and governmental regulations could result in increased compliance costs or additional operating costs or construction costs and restrictions in Risks Relating to Regulations within Item 1A. Risk Factors. Many of these laws and regulations, such as those noted below, restrict or prohibit impacts to the environment or the types, quantities and concentration of substances that can be released into the environment and can lead to substantial administrative, civil and criminal fines and penalties for non-compliance.

In July 2024, the EU published Regulation (EU) 2024/1787 on the reduction of methane emissions in the energy sector, which became effective on August 4, 2024. This regulation requires, among other things, importers of natural gas (including

LNG) into the EU to report methane emissions currently and, when and where applicable, to also report information on the measurement, reporting and verification (“MRV”) programs that the producer of such natural gas has in place. In addition, in future years, the EU intends to establish a maximum methane intensity for imported energy and it will be a requirement to demonstrate compliance with this maximum limit. The impact of this regulation on our business is uncertain, but is not expected to be material.

Clean Air Act

Our LNG terminals are subject to the federal CAA and comparable state and local laws. We may be required to incur certain capital expenditures over the next several years for air pollution control equipment in connection with maintaining or obtaining permits and approvals addressing air emission-related issues. However, we do not believe any such requirements will have a material adverse effect on our operations or the construction of our Liquefaction Projects.

On February 28, 2022, the EPA removed a stay of formaldehyde standards in the National Emission Standards for Hazardous Air Pollutants (“NESHAP”) Subpart YYYY for stationary combustion turbines located at major sources of hazardous air pollutant (“HAP”) emissions. Owners and operators of lean remix gas-fired turbines and diffusion flame gas-fired turbines at major sources of HAP that were installed after January 14, 2003 were required to comply with NESHAP Subpart YYYY by March 9, 2022 and demonstrate initial compliance with those requirements by September 5, 2022. We do not believe that the construction and operations of our Liquefaction Projects will be materially and adversely affected by such regulatory actions.

We are supportive of reasonable regulations reducing methane emissions over time. Since 2009, the EPA has promulgated and finalized multiple greenhouse gas (“GHG”) emissions regulations related to reporting and reductions of GHG emissions from our facilities. On December 2, 2023, the EPA issued final rules to reduce methane and volatile organic compounds (“VOC”) emissions from new, existing and modified emission sources in the oil and gas sector. These regulations require monitoring of methane and VOC emissions at our compressor stations. We do not believe such regulations will have a material adverse effect on our operations, financial condition or results of operations.

From time to time, Congress has considered proposed legislation directed at reducing GHG emissions. On August 16, 2022, President Biden signed H.R. 5376 (P.L. 117-169), the Inflation Reduction Act of 2022 (“IRA”) which includes a waste emissions charge on methane emissions above a certain methane intensity threshold for facilities that report their GHG emissions under the EPA’s Greenhouse Gas Emissions Reporting Program Part 98 regulations. The One Big Beautiful Bill Act (“OBBBA”), signed by President Trump on July 4, 2025, delays the imposition of the methane emissions charge until calendar year 2034. We do not believe the methane charge will have a material adverse effect on our operations, financial condition or results of operations.

The timing, extent and impact of these rules and other Biden Administration initiatives remain uncertain as the Trump Administration has undertaken steps to delay their implementation, and to review, repeal and potentially replace them.

Coastal Zone Management Act (“CZMA”)

The siting and construction of our LNG terminals within the coastal zone is subject to the requirements of the CZMA. The CZMA is administered by the states (in Louisiana, by the Louisiana Department of Conservation and Energy, and in Texas, by the General Land Office). This program is implemented to ensure that impacts to coastal areas are consistent with the intent of the CZMA to manage the coastal areas.

Clean Water Act

Our LNG terminals are subject to the federal CWA and analogous state and local laws. The CWA imposes strict controls on the discharge of pollutants into the navigable waters of the U.S., including discharges of wastewater and storm water runoff and fill/discharges into waters of the U.S. Permits must be obtained prior to discharging pollutants into state and federal waters. The CWA is administered by the EPA, the USACE and by the states (in Louisiana, by the LDEQ, and in Texas, by the TCEQ). The CWA regulatory programs, including the Section 404 dredge and fill permitting program and Section 401 water quality certification program carried out by the states, are frequently the subject of shifting agency interpretations and legal challenges, which at times can result in permitting delays.

Resource Conservation and Recovery Act (“RCRA”)

The federal RCRA and comparable state statutes govern the generation, handling and disposal of solid and hazardous wastes and require corrective action for releases into the environment. When such wastes are generated in connection with the operations of our facilities, we are subject to regulatory requirements affecting the handling, transportation, treatment, storage and disposal of such wastes.

Protection of Species, Habitats and Wetlands

Various federal and state statutes, such as the Endangered Species Act, the Migratory Bird Treaty Act, the CWA and the Oil Pollution Act, prohibit certain activities that may adversely affect endangered or threatened animal, fish and plant species and/or their designated habitats, wetlands, or other natural resources. If one of our LNG terminals or pipelines adversely affects a protected species or its habitat, we may be required to develop and follow a plan to remediate those impacts. In that case, siting, construction or operations may be delayed or restricted and cause us to incur increased costs.

It is not possible at this time to predict how future regulations or legislation may address protection of species, habitats and wetlands and impact our business. However, we do not believe such regulatory actions will have a material adverse effect on our operations or the construction of our Liquefaction Projects.

Market Factors and Competition

Market Factors

Our ability to enter into additional long-term SPAs to underpin the development of additional Trains, sell LNG through Cheniere Marketing or develop new projects is subject to market factors. These factors include changes in worldwide supply and demand for natural gas, LNG and substitute products, the relative prices for natural gas, crude oil and substitute products in North America and international markets, the extent of energy security needs in the EU and elsewhere, the rate of fuel switching from coal, nuclear or oil to natural gas and other overarching factors such as global economic growth and the pace of any transition from fossil-based systems of energy production and consumption to alternative energy sources. In addition, our ability to obtain additional funding to execute our business strategy is subject to the investment community’s appetite for investment in LNG and natural gas infrastructure and our ability to access capital markets.

We expect that global demand for natural gas and LNG will continue to increase as nations seek more abundant, reliable and environmentally cleaner fuel alternatives to oil and coal. Market participants around the globe have shown commitments to environmental goals consistent with many policy initiatives that we believe are constructive for LNG demand and infrastructure growth. Significant amounts of money have been invested recently and continue to be invested across Europe and Asia in natural gas projects. In Europe alone, over 50 mtpa of regasification capacity has been added since 2022 with more planned over the next few years to secure access to LNG and displace Russian natural gas imports. In India, over 8,000 kilometers of pipelines have started commissioning in the past several years and there are more than 9,000 kilometers of natural gas pipelines under construction to expand the natural gas distribution network and increase access to natural gas. And in China, hundreds of billions of U.S. dollars have been and are expected to be further invested all along the natural gas value chain to enable growth and decrease harmful emissions. Furthermore, some of the existing integrated liquefaction facilities outside of the U.S. have been experiencing issues related to reduced feed gas as a result of depleting upstream resources. Global supply contributions from these plants have been decreasing and LNG supply growth is expected to help support these shortages.

As a result of these dynamics, we expect natural gas and LNG to continue to play an important role in satisfying energy demand going forward. In its forecast published in the third quarter of 2025, Wood Mackenzie Limited (“WoodMac”) forecasted that global demand for LNG would increase by approximately 64%, from approximately 410 mtpa, or 19.7 Tcf, in 2024, to 671 mtpa, or 32.2 Tcf, in 2040 and by approximately 67% to 685 mtpa or 32.9 Tcf in 2050. WoodMac also forecasted LNG production from existing operational facilities and new facilities already under construction would be able to supply the market with approximately 568 mtpa in 2040, declining to about 472 mtpa in 2050. This could result in a market need for construction of an additional approximately 104 mtpa of LNG production by 2040 and about 212 mtpa by 2050. As a cleaner dispatchable fuel for power generation, we expect natural gas and LNG to play a central role in balancing grids and contributing to a low carbon energy system globally. We believe the capital and operating costs of the uncommitted capacity of our Liquefaction Projects, as well as our proposed expansions at Sabine Pass and Corpus Christi, are competitive with new proposed projects globally and we are well-positioned to capture a portion of this incremental market need.

As described above under the caption General, we have limited exposure to oil price movements and other competing fuels as we have contracted a significant portion of our LNG production capacity under long-term SPAs and IPM agreements, which are structured to generate fixed fees in addition to variable fees indexed to Henry Hub or international LNG pricing. Refer to General for further discussion of our long-term agreements.

Competition

Despite the long term nature of our SPAs, when SPL, CCL or Cheniere Marketing need to replace or amend any existing SPA or enter into new SPAs, they will compete with each other and other natural gas liquefaction projects throughout the world primarily on the basis of price per contracted volume of LNG at that time, as well as attributes such as commercial innovation, reliable production and customer-focused operations to provide flexible and tailored solutions to LNG buyers. Revenues associated with any incremental volumes sold outside of our long-term SPAs, including those sold by our integrated marketing function, will also be subject to market-based price competition. Refer to Item 1A. Risk Factors for further discussion of risks relating to market competition.

Corporate Responsibility

As described in Market Factors and Competition, we expect that global demand for natural gas and LNG will continue to increase as nations seek more abundant, reliable and environmentally cleaner fuel alternatives to oil and coal. Our vision is to provide clean, secure and affordable energy to the world. This vision underpins our focus on responding to the world’s shared energy challenges — expanding the global supply of clean, secure and affordable energy, improving air quality, reducing emissions and supporting the transition to a lower-carbon future. Our approach to corporate responsibility is guided by our Climate and Sustainability Principles: Transparency, Science, Supply Chain and Operational Excellence. In August 2025, we published Together, We Deliver, our sixth Corporate Responsibility (“CR”) report, which details our approach and progress on environmental, social and governance (“ESG”) matters. Our CR report is available at www.cheniere.com/our-responsibility/reporting-center. Information on our website, including the CR report, is not incorporated by reference into this Annual Report on Form 10-K. For further discussion on social and governance matters, see Human Capital Resources.

Our climate strategy is to measure and mitigate emissions so that we may better position our LNG supplies to remain competitive in a lower carbon future and provide energy, economic and environmental security to our customers across the world. To maximize the environmental benefits of our LNG, we believe it is important to develop our climate goals and strategies based on an accurate and holistic assessment of the emissions profile of our LNG, accounting for all steps in the supply chain. In 2024, we announced a voluntary, measurement-informed Scope 1 annual methane emissions intensity target across our liquefaction facilities. The Scope 1 methane target builds upon our robust climate strategy and leverages data from our multi-scale quantification, monitoring, reporting and verification (“QMRV”) emissions measurement program. We achieved a methane emissions intensity for 2024, which received third party limited assurance, of less than our methane target of 0.03% across our liquefaction sites, as reported in our latest CR report.

As a key aspect of our strategy, we collaborate with natural gas midstream companies, technology providers and leading academic institutions on life-cycle assessment (“LCA”) models, QMRV of GHG emissions and other research and development projects. We also co-founded and sponsored the Energy Emissions Modeling and Data Lab (“EEMDL”), a multidisciplinary research and education initiative led by the University of Texas at Austin in collaboration with Colorado State University and the Colorado School of Mines. In addition, we commenced providing Cargo Emissions Tags (“CE Tags”) to our long-term customers in June 2022, and in October 2022 joined the Oil and Gas Methane Partnership (“OGMP”) 2.0, the United Nations Environment Programme’s (“UNEP”) flagship oil and gas methane emissions reporting and mitigation initiative. As a result of our efforts described above, in 2025, we achieved OGMP 2.0 Gold Standard reporting by the UNEP for our comprehensive methane emissions measurement and reporting under the OGMP 2.0 program and recognition by the Coalition for LNG Emissions Abatement toward Net-zero led by the Japan Organization for Metals and Energy Security. To ensure transparency and rigor, we work with academics and scientists to publish methodologies and results in multiple peer-reviewed journals.

Our total incremental expenditures related to climate initiatives, including capital expenditures, were not material to our Consolidated Financial Statements during the years ended December 31, 2025, 2024 and 2023. However, as governments consider and implement actions to reduce GHG emissions and the transition to a lower-carbon economy continues to evolve, as described in Market Factors and Competition, we expect the scope and extent of our future climate and sustainability initiatives to evolve accordingly. While we have not incurred material direct expenditures related to climate change, we are proactive in our management of climate risks and opportunities, including compliance with existing and future government regulations. We face certain business and operational risks associated with physical impacts from climate change, such as exposure to severe weather events or changes in weather patterns, in addition to transition risks. Please see Item 1A. Risk Factors for additional discussion.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.