Skip to main content

Cheniere Energy Inc

For the period ended Dec 31, 2024. Filed Feb 20, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 20, 2025

LNG$277.95-0.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

Items 1 and 2. BUSINESS AND PROPERTIES

General

Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers.

LNG is natural gas (methane) in liquid form. The LNG we produce is shipped all over the world, converted back into natural gas (called “regasification”) and then transported via pipeline to homes and businesses and used as an energy source that is essential for heating, cooking, other industrial uses and back up for intermittent energy sources. Natural gas is a cleaner-burning, abundant and affordable source of energy. When LNG is converted back to natural gas, it can be used instead of coal, which reduces the amount of pollution traditionally produced from burning fossil fuels, like sulfur dioxide and particulate matter that enters the air we breathe. Additionally, compared to coal, it produces significantly fewer carbon emissions. By liquefying natural gas, we are able to reduce its volume by 600 times so that we can load it onto special LNG carriers designed to keep the LNG cold and in liquid form for efficient transport overseas.

We are the largest producer of LNG in the United States and we are the second largest LNG operator globally, based on the total production capacity of our liquefaction facilities, which totaled approximately 45 mtpa as of December 31, 2024.

We own and operate a natural gas liquefaction and export facility located in Cameron Parish, Louisiana at Sabine Pass (the“Sabine Pass LNG Terminal”), one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with CQP, which is a publicly traded limited partnership that we formed in 2007. As of December 31, 2024, we owned 100% of the general partner interest, a 48.6% limited partner interest and 100% of the incentive distribution rights of CQP. The Sabine Pass LNG Terminal has six operational Trains, for a total production capacity of approximately 30 mtpa of LNG (the“SPL Project”). The Sabine Pass LNG Terminal also has operational regasification facilities that include five LNG storage tanks with aggregate capacity of approximately 17 Bcfe and vaporizers with regasification capacity of approximately 4 Bcf/d, as well as three marine berths, two of which can accommodate vessels with nominal capacity of up to 266,000 cubic meters and the third berth which can accommodate vessels with nominal capacity of up to 200,000 cubic meters. We also own and operate through CQP a 94-mile natural gas supply pipeline that interconnects the Sabine Pass LNG Terminal with several large interstate and intrastate pipelines (the“Creole Trail Pipeline”).

Additionally, we own and operate a natural gas liquefaction and export facility located near Corpus Christi, Texas (the“Corpus Christi LNG Terminal”) through CCL, which has natural gas liquefaction facilities consisting of three operational Trains for a total production capacity of approximately 15 mtpa of LNG, three LNG storage tanks with aggregate capacity of approximately 10 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters. We are constructing an expansion of the Corpus Christi LNG Terminal (the“Corpus Christi Stage 3 Project”) consisting of seven midscale Trains with an expected total production capacity of over 10 mtpa of LNG. We also own and operate through CCP an approximately 21-mile natural gas supply pipeline that interconnects the Corpus Christi LNG Terminal with several large interstate and intrastate natural gas pipelines (the“Corpus Christi Pipeline” and together with the existing assets at the Corpus Christi LNG Terminal and the Corpus Christi Stage 3 Project, the“CCL Project”).

Our long-term counterparty arrangements form the foundation of our business and provide us with significant, stable, long-term cash flows, and include SPAs, in which our customers are generally required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, and IPM agreements, in which a gas producer sells natural gas to us on a global LNG or natural gas index price, less a fixed liquefaction fee, shipping and other costs. The SPAs also have a variable fee component, which is primarily indexed to Henry Hub and generally structured to cover the cost of natural gas purchases, transportation and liquefaction fuel consumed to produce LNG. Since we procure most of our feedstock for LNG production from the U.S., the structure of these contracts helps limit our exposure to fluctuations in U.S. natural gas prices. Through our SPAs and IPM agreements currently in effect, with approximately 15 years of weighted average remaining life as of December 31, 2024, we have contracted approximately 95% of the total anticipated production from the SPL Project and the CCL Project (collectively, the“Liquefaction Projects”) through the mid-2030s, excluding volumes from contracts with terms less than 10 years and volumes that are contractually subject to additional liquefaction capacity beyond what is currently in construction or operation. LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements.

We remain focused on safety, operational excellence and customer satisfaction. Increasing demand for LNG has allowed us to expand our liquefaction infrastructure in a financially disciplined manner. We have increased available liquefaction capacity at our Liquefaction Projects as a result of debottlenecking and other optimization projects. We believe these factors provide a foundation for additional growth in our portfolio of customer contracts in the future. We hold significant land positions at both the Sabine Pass LNG Terminal and the Corpus Christi LNG Terminal, which provide opportunity for further liquefaction capacity expansion. In March 2023, certain of our subsidiaries submitted an application with the FERC under the Natural Gas Act of 1938, as amended (the“NGA”), for an expansion adjacent to the CCL Project consisting of two midscale Trains with an expected total production capacity of approximately 3 mtpa of LNG (the“CCL Midscale Trains 8 & 9 Project”), for which a positive Environmental Assessment from the FERC was received in June 2024. Additionally, we are developing an expansion adjacent to the SPL Project with a total production capacity of up to approximately 20 mtpa of LNG, inclusive of estimated debottlenecking opportunities (the“SPL Expansion Project”). In February 2024, certain subsidiaries of CQP submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project, as well as an application to the DOE requesting authorization to export LNG to FTA countries and non-FTA countries, both of which applications exclude debottlenecking. In October 2024, the authorization from the DOE to export LNG to FTA countries was received. The development of the CCL Midscale Trains 8 & 9 Project, the SPL Expansion Project or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make a positive FID.

Our Business Strategy

Our primary business strategy is to be a full-service LNG provider to worldwide end-use customers. We accomplish this objective by owning, constructing and operating LNG and natural gas infrastructure facilities to meet our long-term customers’ energy demands and:

safely, efficiently and reliably operating and maintaining our assets;

procuring natural gas and pipeline transport capacity to our facilities;

providing value to our customers through destination flexibility, options not to lift cargoes and diversity of price and geography;

continuing to secure long-term customer contracts to support our planned expansion, including the FID of potential expansion projects beyond the Corpus Christi Stage 3 Project;

completing our construction projects safely, on-time and on-budget;

maximizing the production of LNG to serve our customers and generating steady and stable revenues and operating cash flows;

maintaining a flexible capital structure to finance the acquisition, development, construction and operation of the energy assets needed to supply our customers;

executing our “all of the above” capital allocation strategy, focused on strengthening our balance sheet, funding financially disciplined growth and returning capital to our stockholders; and

strategically identifying actionable and economic environmental solutions.

Our Business

We shipped our first LNG cargo in February 2016 and as of February 14, 2025, approximately 3,930 cumulative LNG cargoes totaling approximately 270 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Projects. Our LNG has been shipped to 41 countries and regions around the world.

Below is a discussion of our operations. For further discussion of our contractual obligations and cash requirements related to these operations, refer to Liquidity and Capital Resources in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Sabine Pass LNG Terminal

Liquefaction Facilities and Expansion Project

The Sabine Pass LNG Terminal, as described above under the caption General, is one of the largest LNG production facilities in the world with six Trains, five storage tanks and three marine berths. In February 2024, certain subsidiaries of CQP submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project, as well as an application to the DOE requesting authorization to export LNG to FTA countries and non-FTA countries, both of which applications exclude debottlenecking. In October 2024, the authorization from the DOE to export LNG to FTA countries was received for the SPL Expansion Project.

The following summarizes the volumes of natural gas for which we have received approvals from the FERC to site, construct and operate the Trains at the SPL Project and the orders we have received from the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG Terminal through December 31, 2050:

FERC Approved VolumeDOE Approved Volume
(in Bcf/yr)(in mtpa)(in Bcf/yr)(in mtpa)
FTA countries (1)1,661.94331,661.9433
Non-FTA countries1,661.94331,661.9433

(1)Excludes 899 Bcf/yr to FTA countries authorized in October 2024 for the SPL Expansion Project that is not effective until the date of first commercial export from the SPL Expansion Project.

Natural Gas Supply, Transportation and Storage

SPL has secured natural gas feedstock for the SPL Project through long-term natural gas supply agreements, including an IPM agreement. SPL Stage V also has an IPM agreement to supply the SPL Expansion Project, subject to Cheniere making a positive FID on the first train of the SPL Expansion Project. Additionally, to ensure that SPL is able to transport and manage the natural gas feedstock to the Sabine Pass LNG Terminal, it has transportation precedent and other agreements to secure firm pipeline transportation and storage capacity from third parties and CTPL.

Regasification Facilities

The Sabine Pass LNG Terminal, as described above under the caption General, has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. SPLNG has a long-term, third party TUA for 1 Bcf/d with TotalEnergies Gas & Power North America, Inc. (“TotalEnergies”), under which TotalEnergies is required to pay fixed monthly fees, whether or not it uses the regasification capacity it has reserved. Prior to its cancellation effective December 31, 2022, SPLNG also had a TUA for 1 Bcf/d with Chevron U.S.A. Inc. (“Chevron”). Approximately 2 Bcf/d of the remaining capacity has been reserved under a TUA by SPL, which also has a partial TUA assignment agreement with TotalEnergies, as further described in Note 12—Revenues of our Notes to Consolidated Financial Statements.

Corpus Christi LNG Terminal

Liquefaction Facilities and Expansion Projects

The Corpus Christi LNG Terminal, as described above under the caption General, includes three Trains, three storage tanks, two marine berths and the construction of the Corpus Christi Stage 3 Project with seven midscale Trains. Additionally, in March 2023, certain of our subsidiaries submitted an application with the FERC under the NGA for the CCL Midscale Trains 8 & 9 Project, for which a positive Environmental Assessment from the FERC was received in June 2024. We expect to receive all remaining necessary regulatory approvals for the project in 2025.

The following table summarizes the project completion and construction status of the Corpus Christi Stage 3 Project as of December 31, 2024:

Overall project completion percentage77.2%
Completion percentage of:
Engineering97.2%
Procurement97.2%
Subcontract work88.2%
Construction42.6%
Date of expected substantial completion1H 2025 - 2H 2026

The following summarizes the volumes of natural gas for which we have received approvals from the FERC to site, construct and operate the Trains at the CCL Project and the orders we have received from the DOE authorizing the export of domestically produced LNG by vessel from the Corpus Christi LNG Terminal through December 31, 2050:

FERC Approved VolumeDOE Approved Volume (1)
(in Bcf/yr)(in mtpa)(in Bcf/yr)(in mtpa)
Trains 1 through 3 of the CCL Project:
FTA countries875.1617875.1617
Non-FTA countries875.1617875.1617
Corpus Christi Stage 3 Project:
FTA countries582.1411.45582.1411.45
Non-FTA countries582.1411.45582.1411.45

(1)Excludes 170 Bcf/yr to FTA countries authorized in July 2023 for the CCL Midscale Trains 8 & 9 Project that is not effective until the date of first commercial export from the CCL Midscale Trains 8 & 9 Project.

Natural Gas Supply, Transportation and Storage

CCL has secured natural gas feedstock for the Corpus Christi LNG Terminal through long-term natural gas supply agreements, including IPM agreements. Additionally, to ensure that CCL is able to transport and manage the natural gas feedstock to the Corpus Christi LNG Terminal, it has transportation precedent and other agreements to secure firm pipeline transportation and storage capacity from third parties and CCP.

Marketing

LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements.

Major Customers

We did not have any customers accounting for 10% or more of total consolidated revenues for the year ended December 31, 2024.

Additional information regarding our customer contracts can be found in Liquidity and Capital Resources in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations and Note 20—Customer Concentration of our Notes to Consolidated Financial Statements.

Governmental Regulation

Our LNG terminals and pipelines are subject to extensive regulation under federal, state and local statutes, rules, regulations and laws. These laws require that we engage in consultations with appropriate federal and state agencies and that we obtain and maintain applicable permits and other authorizations. These rigorous regulatory requirements increase the cost of construction and operation, and failure to comply with such laws could result in substantial penalties and/or loss of necessary authorizations.

Federal Energy Regulatory Commission

The design, construction, operation, maintenance and expansion of our liquefaction facilities, the import or export of LNG and the purchase and transportation of natural gas in interstate commerce through our pipelines are highly regulated activities subject to the jurisdiction of the FERC pursuant to the NGA. Under the NGA, the FERC’s jurisdiction generally extends to the transportation of natural gas in interstate commerce, to the sale for resale of natural gas in interstate commerce, to natural gas companies engaged in such transportation or sale and to the construction, operation, maintenance and expansion of LNG terminals and interstate natural gas pipelines.

The FERC’s authority to regulate interstate natural gas pipelines and the services that they provide generally includes regulation of:

rates and charges, and terms and conditions for natural gas transportation, storage and related services;

the certification and construction of new facilities and modification of existing facilities;

the extension and abandonment of services and facilities;

the administration of accounting and financial reporting regulations, including the maintenance of accounts and records;

the acquisition and disposition of facilities;

the initiation and discontinuation of services; and

various other matters.

Under the NGA, our pipelines are not permitted to unduly discriminate or grant undue preference as to rates or the terms and conditions of service to any shipper, including our own marketing affiliates. Those rates, terms and conditions must be public, and on file with the FERC. In contrast to pipeline regulation, the FERC does not require LNG terminal owners to provide open-access services at cost-based or regulated rates. Although the provisions that codified the FERC’s policy in this area expired on January 1, 2015, we see no indication that the FERC intends to change its policy in this area. On February 18, 2022, the FERC updated its 1999 Policy Statement on certification of new interstate natural gas facilities and the framework for the FERC’s decision-making process, modifying the standards that the FERC uses to evaluate applications to include, among other things, reasonably foreseeable greenhouse gas (“GHG”) emissions that may be attributable to the project and the project’s impact on environmental justice communities. On March 24, 2022, the FERC rescinded the Policy Statement, re-issued it as a draft and it remains pending. At this time, we do not expect it to have a material adverse effect on our operations.

We are permitted to make sales of natural gas for resale in interstate commerce pursuant to a blanket marketing certificate granted by the FERC with the issuance of our Certificate of Public Convenience and Necessity to our marketing affiliates. Our sales of natural gas will be affected by the availability, terms and cost of pipeline transportation. As noted above, the price and terms of access to pipeline transportation are subject to extensive federal and state regulation.

In order to site, construct and operate our LNG terminals, we received and are required to maintain authorizations from the FERC under Section 3 of the NGA as well as other material governmental and regulatory approvals and permits. The Energy Policy Act of 2005 (the“EPAct”) amended Section 3 of the NGA to establish or clarify the FERC’s exclusive authority to approve or deny an application for the siting, construction, expansion or operation of LNG terminals, unless specifically provided otherwise in the EPAct amendments to the NGA. For example, nothing in the EPAct amendments to the NGA were intended to affect otherwise applicable law related to any other federal agency’s authorities or responsibilities related to LNG terminals or those of a state acting under federal law.

In February 2024, certain subsidiaries of CQP submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project. In March 2023, certain of our subsidiaries submitted an application with the FERC under the NGA for the CCL Midscale Trains 8 & 9 Project, for which a positive Environmental Assessment from the FERC was received in June 2024.

The FERC’s Standards of Conduct apply to interstate pipelines that conduct transmission transactions with an affiliate that engages in natural gas marketing functions. The general principles of the FERC Standards of Conduct are: (1) independent functioning, which requires transmission function employees to function independently of marketing function employees; (2)

no-conduit rule, which prohibits passing transmission function information to marketing function employees; and (3) transparency, which imposes posting requirements to detect undue preference due to the improper disclosure of non-public transmission function information. We have established the required policies, procedures and training to comply with the FERC’s Standards of Conduct.

All of our FERC construction, operation, reporting, accounting and other regulated activities are subject to audit by the FERC, which may conduct routine or special inspections and issue data requests designed to ensure compliance with FERC rules, regulations, policies and procedures. The FERC’s jurisdiction under the NGA allows it to impose civil and criminal penalties for any violations of the NGA and any rules, regulations or orders of the FERC up to approximately $1.5 million per day per violation, including any conduct that violates the NGA’s prohibition against market manipulation.

Several other governmental and regulatory approvals and permits are required throughout the life of our LNG terminals and our pipelines. In addition, our FERC orders require us to comply with certain ongoing conditions and reporting obligations and maintain other regulatory agency approvals throughout the life of our facilities. For example, throughout the life of our LNG terminals and our pipelines, we are subject to regular reporting requirements to the FERC, the Department of Transportation’s (“DOT”) Pipeline and Hazardous Materials Safety Administration (“PHMSA”) and applicable federal and state regulatory agencies regarding the operation and maintenance of our facilities. To date, we have been able to obtain and maintain required approvals as needed, and the need for these approvals and reporting obligations has not materially affected our construction or operations.

DOE Export Licenses

The DOE has authorized the export of domestically produced LNG by vessel from the Sabine Pass LNG Terminal, as discussed in Sabine Pass LNG Terminal—Liquefaction Facilities, and the Corpus Christi LNG Terminal, as discussed in Corpus Christi LNG Terminal—Liquefaction Facilities. Although it is not expected to occur, the loss of an export authorization could be a force majeure event under our SPAs.

Under Section 3 of the NGA, applications for exports of natural gas (including LNG) to FTA countries, which allow for national treatment for trade in natural gas, are “deemed to be consistent with the public interest” and shall be granted by the DOE without “modification or delay.” FTA countries currently recognized by the DOE for exports of LNG include Australia, Bahrain, Canada, Chile, Colombia, Dominican Republic, El Salvador, Guatemala, Honduras, Jordan, Mexico, Morocco, Nicaragua, Oman, Panama, Peru, Republic of Korea and Singapore. FTAs with Israel and Costa Rica do not require national treatment for trade in natural gas. Applications for export of LNG to non-FTA countries are considered by the DOE in a notice and comment proceeding whereby the public and other interveners are provided the opportunity to comment and may assert that such authorization would not be consistent with the public interest. In January 2024, the Biden Administration announced a temporary pause on pending decisions on exports of LNG to non-FTA countries until the DOE can update the underlying analyses for authorizations, which did not have a material adverse effect on our business, contracts, financial condition, operating results, cash flow, or liquidity for the year ended December 31, 2024. The DOE publicly released the updated analyses on December 17, 2024, and has solicited public comments on the analyses. On January 20, 2025, President Trump signed an Executive Order revoking the Biden Administration pause and extending the time for public comment. We do not expect the publication of the analyses to have a material effect on future DOE non-FTA export authorizations. We currently have the SPL Expansion Project and the CCL Midscale Trains 8 & 9 Project pending non-FTA export approval with the DOE. However, the outstanding DOE approvals for these projects are first subject to the receipt of regulatory permit approval from the FERC, responsive to our formal applications. See Sabine Pass LNG Terminal and Corpus Christi LNG Terminal sections above for FERC and DOE approved volumes on our existing Liquefaction Projects.

Pipeline and Hazardous Materials Safety Administration

Our LNG terminals as well as the Creole Trail Pipeline and the Corpus Christi Pipeline are subject to regulation by PHMSA. PHMSA is authorized by the applicable pipeline safety laws to establish minimum safety standards for certain pipelines and LNG facilities. The regulatory standards PHMSA has established are applicable to the design, installation, testing, construction, operation, maintenance and management of natural gas and hazardous liquid pipeline facilities and LNG facilities that affect interstate or foreign commerce. PHMSA has also established training, worker qualification and reporting requirements.

PHMSA performs inspections of pipeline and LNG facilities and has authority to undertake enforcement actions, including issuance of civil penalties up to approximately $273,000 per day per violation, with a maximum administrative civil penalty of approximately $2.7 million for any related series of violations.

Other Governmental Permits, Approvals and Authorizations

Construction and operation of our facilities require additional permits, orders, approvals and consultations to be issued by various federal and state agencies, including the DOT, U.S. Army Corps of Engineers (“USACE”), U.S. Department of Commerce, National Marine Fisheries Service, U.S. Department of the Interior, U.S. Fish and Wildlife Service, the U.S. Environmental Protection Agency (the“EPA”), U.S. Department of Homeland Security, the Louisiana Department of Environmental Quality (the“LDEQ”), the Texas Commission on Environmental Quality (“TCEQ”) and the Railroad Commission of Texas.

The USACE issues its permits under the authority of the Clean Water Act (“CWA”) (Section 404) and the Rivers and Harbors Act (Section 10). The EPA administers the Clean Air Act (“CAA”), and has delegated authority to the TCEQ and LDEQ to issue the Title V Operating Permit and the Prevention of Significant Deterioration Permit. These two permits are issued by the LDEQ for the Sabine Pass LNG Terminal and CTPL and by the TCEQ for the CCL Project.

Commodity Futures Trading Commission (“CFTC”)

The Dodd-Frank Wall Street Reform and Consumer Protection Act (the“Dodd-Frank Act”) amended the Commodity Exchange Act to provide for federal regulation of the over-the-counter derivatives market and entities, such as us, that participate in those markets. The CFTC has enacted a number of regulations pursuant to the Dodd-Frank Act.

As required by the Dodd-Frank Act, the CFTC and federal banking regulators also adopted rules requiring swap dealers (as defined in the Dodd-Frank Act), including those that are regulated financial institutions, to collect initial and/or variation margin with respect to uncleared swaps from their counterparties that are financial end users, registered swap dealers or major swap participants. These rules do not require collection of margin from non-financial-entity end users who qualify for the end user exception from the mandatory clearing requirement or from non-financial end users or certain other counterparties in certain instances. We qualify as a non-financial-entity end user with respect to the swaps that we enter into to hedge our commercial risks.

Pursuant to the Dodd-Frank Act, the CFTC adopted additional anti-manipulation and anti-disruptive trading practices regulations that prohibit, among other things, manipulative, deceptive or fraudulent schemes or material misrepresentation in the futures, options, swaps and cash markets. In addition, separate from the Dodd-Frank Act, our use of futures and options on commodities is subject to the Commodity Exchange Act and CFTC regulations, as well as the rules of futures exchanges on which any of these instruments are executed. Should we violate any of these laws and regulations, we could be subject to a CFTC or an exchange enforcement action and material penalties, possibly resulting in changes in the rates we can charge.

United Kingdom / European Regulations

Our European trading activities, which are primarily established in and operated out of the United Kingdom (“U.K.”), are subject to a number of European Union (“EU”) and U.K. laws and regulations, including but not limited to:

the European Market Infrastructure Regulation, which was designed to increase the transparency and stability of the European Economic Area (“EEA”) derivatives markets;

the Regulation on Wholesale Energy Market Integrity and Transparency (“REMIT”), which prohibits market manipulation and insider trading in EEA wholesale energy markets and imposes various transparency and other obligations on participants active in these markets;

the Markets in Financial Instruments Directive and Regulation (“MiFID II”), which sets forth a financial services framework across the EEA, including rules for firms engaging in investment services and activities in connection with certain financial instruments, including a range of commodity derivatives; and

the Market Abuse Regulation, which was implemented to create an enhanced market abuse framework, and which applies generally to all financial instruments listed or traded on EEA trading venues (“Traded Instruments”) as well as other over-the-counter financial instruments priced on, or impacting, the price or value of the Traded Instrument.

Following the U.K.'s departure from the EU (“Brexit”), the EU-wide rules that applied to the U.K. while it was a member of the EU (and during the transition period) have been replicated, subject to certain amendments, to create a parallel set of rules applicable only in the U.K. As a result, we are subject to two separate sets of rules based on the same underlying legislation: (i) one set of rules that apply in the EEA (i.e. not including the U.K.) (the“EEA Rules”); and (ii) one set of rules that apply only in the U.K. (the“U.K. Onshored Rules”). We increasingly are seeing divergence between the EEA Rules and the U.K. Onshored Rules albeit not in a way which is expected to materially impact our business at this time.

To the extent our trading activities have a nexus with the EEA, we comply with the EEA Rules. However, as our trading activities are primarily operated out of the U.K., the main rules that impact and apply to us on a day-to-day basis are the U.K. Onshored Rules.

In particular, under the U.K. Onshored Rules, firms engaging in investment services and activities under U.K. MiFID II must be authorized unless an exemption applies. We meet the criteria for an exemption and therefore do not need to be authorized under U.K. MiFID II.

In addition to the U.K. Onshored Rules, we are also subject to a separate, U.K.-specific regime that is not based on prior EU/EEA legislation. This is primarily set out in the U.K.’s Financial Services and Markets Act 2000 (“FSMA”) and Financial Services and Markets Act 2000 (Regulated Activities) Order 2001 (“RAO”), which, among other things, governs the regulation of financial services and markets in the U.K., and contains a definitive list of the specified kinds of activities and products that are regulated. Under these U.K.-specific rules, a firm engaging in regulated activities must be authorized unless an exclusion applies. We qualify under applicable exclusions and therefore are not required to be authorized under the U.K. FSMA/RAO regime.

In December 2022, the EU enacted regulations, which among other things established a market correction mechanism against excessively high LNG prices, volatility and movements, and provided for the collection of information though new reporting obligations that would be utilized to provide for a new LNG pricing assessment/benchmark. The applicable regulations are set forth in Council Regulation (EU) 2022/2576-2581. However, these were temporary rules which have subsequently expired and been replaced by new, yet substantively identical, permanent rules that are within the scope of the recast REMIT regulation which came into effect in May 2024. The impact of such regulations on our business remains uncertain, but is not expected to be material.

Violation of the foregoing laws and regulations could result in investigations, possible fines and penalties, and in some scenarios, criminal offenses, as well as reputational damage.

Brexit and Equivalence

As referenced above, the U.K. ceased to be a member of the EU on January 31, 2020. On December 24, 2020, the EU and the U.K. reached an agreement in principle on the terms of certain agreements and declarations governing the ongoing relationship between the EU and the U.K., including the EU-U.K. Trade and Cooperation Agreement (the“TCA”). The TCA provisionally applied from January 1, 2021, and entered into force on May 1, 2021. The TCA is limited in its scope; in particular the TCA does not make any meaningful provision for the financial services sector. For example, the TCA does not meaningfully address equivalence. Uncertainties remain relating to certain aspects of the U.K.’s future economic, trading and legal relationships with the EU and with other countries. As a result, we separately monitor and ensure compliance with all applicable U.K. and EU rules.

The Financial Services and Markets Act 2023 (“FSMA 2023”) came into U.K. law in June 2023. FSMA 2023 is the framework for the U.K.’s post-Brexit financial legislative and regulatory landscape. It is intended to provide the foundations for a significant overhaul and re-structuring of the U.K. financial services and markets regimes, with many of its measures being intended to address issues and points arising from Brexit. The changes include the revocation of retained EU laws, the introduction of new powers and objectives for the regulators of such markets, as well as a number of measures relevant to financial market infrastructure operators and market participants. Changes will be implemented pursuant to subsidiary legislation or directly by regulators. However, at this time it is not possible to determine whether any such actions would have a material impact on our business.

Environmental Regulation

Our LNG terminals are subject to various federal, state and local laws and regulations relating to the protection of the environment and natural resources. These environmental laws and regulations can affect the cost and output of operations and may impose substantial penalties for non-compliance and substantial liabilities for pollution, as further described in the risk factor Existing and future safety, environmental and similar laws and governmental regulations could result in increased compliance costs or additional operating costs or construction costs and restrictions in Risks Relating to Regulations within Item 1A. Risk Factors. Many of these laws and regulations, such as those noted below, restrict or prohibit impacts to the environment or the types, quantities and concentration of substances that can be released into the environment and can lead to substantial administrative, civil and criminal fines and penalties for non-compliance.

Clean Air Act

Our LNG terminals are subject to the federal CAA and comparable state and local laws. We may be required to incur certain capital expenditures over the next several years for air pollution control equipment in connection with maintaining or obtaining permits and approvals addressing air emission-related issues. However, we do not believe any such requirements will have a material adverse effect on our operations, or the construction and operations of our Liquefaction Projects.

On February 28, 2022, the EPA removed a stay of formaldehyde standards in the National Emission Standards for Hazardous Air Pollutants (“NESHAP”) Subpart YYYY for stationary combustion turbines located at major sources of hazardous air pollutant (“HAP”) emissions. Owners and operators of lean remix gas-fired turbines and diffusion flame gas-fired turbines at major sources of HAP that were installed after January 14, 2003 were required to comply with NESHAP Subpart YYYY by March 9, 2022 and demonstrate initial compliance with those requirements by September 5, 2022. We do not believe that the construction and operations of our Liquefaction Projects will be materially and adversely affected by such regulatory actions.

We are supportive of regulations reducing GHG emissions over time. Since 2009, the EPA has promulgated and finalized multiple GHG emissions regulations related to reporting and reductions of GHG emissions from our facilities. On December 2, 2023, the EPA issued final rules to reduce methane and volatile organic compounds (“VOC”) emissions from new, existing and modified emission sources in the oil and gas sector. These regulations require monitoring of methane and VOC emissions at our compressor stations. We do not believe such regulations will have a material adverse effect on our operations, financial condition or results of operations.

From time to time, Congress has considered proposed legislation directed at reducing GHG emissions. On August 16, 2022, President Biden signed H.R. 5376 (P.L. 117-169), the Inflation Reduction Act of 2022 (“IRA”) which includes a charge on methane emissions above a certain methane intensity threshold for facilities that report their GHG emissions under the EPA’s Greenhouse Gas Emissions Reporting Program Part 98 regulations. The charge started at $900 per metric ton of methane in 2024, increased to $1,200 per metric ton in 2025, and is increasing to $1,500 per metric ton in 2026 and beyond. On November 12, 2024, the EPA finalized a rule to impose and collect the methane emissions charge authorized under the IRA. We do not believe the methane charge will have a material adverse effect on our operations, financial condition or results of operations.

In July 2024, the EU enacted Regulation (EU) 2024/1787 on the reduction of methane emissions in the energy sector, which became effective on August 4, 2024. This regulation requires, among other things, importers of natural gas (including LNG) into the EU to report methane emissions and information on the measurement, reporting and verification (“MRV”) programs that the producer of such natural gas has in place. In addition, in future years, the EU intends to establish a maximum methane intensity for imported energy. The impact of this regulation on our business is uncertain, but is not expected to be material.

The timing, extent and impact of these rules and other Biden Administration initiatives remain uncertain as the Trump Administration has undertaken steps to delay their implementation, and to review, repeal and potentially replace them.

Coastal Zone Management Act (“CZMA”)

The siting and construction of our LNG terminals within the coastal zone is subject to the requirements of the CZMA. The CZMA is administered by the states (in Louisiana, by the Department of Natural Resources, and in Texas, by the General Land Office). This program is implemented to ensure that impacts to coastal areas are consistent with the intent of the CZMA to manage the coastal areas.

Clean Water Act

Our LNG terminals are subject to the federal CWA and analogous state and local laws. The CWA imposes strict controls on the discharge of pollutants into the navigable waters of the United States, including discharges of wastewater and storm water runoff and fill/discharges into waters of the United States. Permits must be obtained prior to discharging pollutants into state and federal waters. The CWA is administered by the EPA, the USACE and by the states (in Louisiana, by the LDEQ, and in Texas, by the TCEQ). The CWA regulatory programs, including the Section 404 dredge and fill permitting program and Section 401 water quality certification program carried out by the states, are frequently the subject of shifting agency interpretations and legal challenges, which at times can result in permitting delays.

Resource Conservation and Recovery Act (“RCRA”)

The federal RCRA and comparable state statutes govern the generation, handling and disposal of solid and hazardous wastes and require corrective action for releases into the environment. When such wastes are generated in connection with the operations of our facilities, we are subject to regulatory requirements affecting the handling, transportation, treatment, storage and disposal of such wastes.

Protection of Species, Habitats and Wetlands

Various federal and state statutes, such as the Endangered Species Act, the Migratory Bird Treaty Act, the CWA and the Oil Pollution Act, prohibit certain activities that may adversely affect endangered or threatened animal, fish and plant species and/or their designated habitats, wetlands, or other natural resources. If one of our LNG terminals or pipelines adversely affects a protected species or its habitat, we may be required to develop and follow a plan to remediate those impacts. In that case, siting, construction or operations may be delayed or restricted and cause us to incur increased costs.

It is not possible at this time to predict how future regulations or legislation may address protection of species, habitats and wetlands and impact our business. However, we do not believe such regulatory actions will have a material adverse effect on our operations, or the construction and operations of our Liquefaction Projects.

Market Factors and Competition

Market Factors

Our ability to enter into additional long-term SPAs to underpin the development of additional Trains, sell LNG through Cheniere Marketing or develop new projects is subject to market factors. These factors include changes in worldwide supply and demand for natural gas, LNG and substitute products, the relative prices for natural gas, crude oil and substitute products in North America and international markets, the extent of energy security needs in the EU and elsewhere, the rate of fuel switching from coal, nuclear or oil to natural gas and other overarching factors such as global economic growth and the pace of any transition from fossil-based systems of energy production and consumption to alternative energy sources. In addition, our ability to obtain additional funding to execute our business strategy is subject to the investment community’s appetite for investment in LNG and natural gas infrastructure and our ability to access capital markets.

We expect that global demand for natural gas and LNG will continue to increase as nations seek more abundant, reliable and environmentally cleaner fuel alternatives to oil and coal. Market participants around the globe have shown commitments to environmental goals consistent with many policy initiatives that we believe are constructive for LNG demand and infrastructure growth. Currently, significant amounts of money are being invested across Europe and Asia in natural gas projects under construction, and more continues to be earmarked to planned projects globally. In Europe, there are various plans to install more than 75 mtpa of import capacity over the near-term to secure access to LNG and displace Russian gas imports. In India, there are more than 5,600 kilometers of gas pipelines under construction to expand the gas distribution network and increase access to natural gas. And in China, billions of U.S. dollars have already been invested and hundreds of billions of U.S. dollars are expected to be further invested all along the natural gas value chain to enable growth and decrease harmful emissions. Furthermore, some of the existing integrated liquefaction facilities outside of the U.S. have been experiencing issues related to reduced feed gas as a result of depleting upstream resources. Global supply contributions from these plants have been decreasing and LNG supply growth is expected to help support these shortages.

As a result of these dynamics, we expect natural gas and LNG to continue to play an important role in satisfying energy demand going forward. In its forecast published in the third quarter of 2024, Wood Mackenzie Limited (“WoodMac”) forecasted that global demand for LNG would increase by approximately 61%, from approximately 418 mtpa, or 20.1 Tcf, in 2023, to 675 mtpa, or 32.4 Tcf, in 2040 and by approximately 65% to 691 mtpa or 33.1 Tcf in 2050. WoodMac also forecasted LNG production from existing operational facilities and new facilities already under construction would be able to supply the market with approximately 532 mtpa in 2040, declining to 463 mtpa in 2050. This could result in a market need for construction of an additional approximately 142 mtpa of LNG production by 2040 and about 227 mtpa by 2050. As a cleaner burning fuel with lower emissions than coal or liquid fuels in power generation, we expect natural gas and LNG to play a central role in balancing grids, serving as back up for intermittent energy sources and contributing to a low carbon energy system globally. We believe the capital and operating costs of the uncommitted capacity of our Liquefaction Projects, as well as our proposed expansions at Sabine Pass and Corpus Christi, are competitive with new proposed projects globally and we are well-positioned to capture a portion of this incremental market need.

As described above under the caption General, we have limited exposure to oil price movements as we have contracted a significant portion of our LNG production capacity under long-term SPAs and IPM agreements, which are structured to generate fixed fees in addition to variable fees indexed to Henry Hub or international LNG pricing. Refer to General for further discussion of our long-term agreements.

Competition

Despite the long term nature of our SPAs, when SPL, CCL or Cheniere Marketing need to replace or amend any existing SPA or enter into new SPAs, they will compete with each other and other natural gas liquefaction projects throughout the world primarily on the basis of price per contracted volume of LNG at that time, as well as attributes such as commercial innovation, reliable production and customer-focused operations to provide flexible and tailored solutions to LNG buyers. Revenues associated with any incremental volumes sold outside of our long-term SPAs, including those sold by our integrated marketing function, will also be subject to market-based price competition.

Corporate Responsibility

As described in Market Factors and Competition, we expect that global demand for natural gas and LNG will continue to increase as nations seek more abundant, reliable and environmentally cleaner fuel alternatives to oil and coal. Our vision is to provide clean, secure and affordable energy to the world. This vision underpins our focus on responding to the world’s shared energy challenges — expanding the global supply of clean, secure and affordable energy, improving air quality, reducing emissions and supporting the transition to a lower-carbon future. Our approach to corporate responsibility is guided by our Climate and Sustainability Principles: Transparency, Science, Supply Chain and Operational Excellence. In August 2024, we published Energy Secured, Benefits Delivered, our fifth Corporate Responsibility (“CR”) report, which details our approach and progress on ESG matters. Our CR report is available at www.cheniere.com/our-responsibility/reporting-center. Information on our website, including the CR report, is not incorporated by reference into this Annual Report on Form 10-K. For further discussion on social and governance matters, see Human Capital Resources.

Our climate strategy is to measure and mitigate emissions so that we may better position our LNG supplies to remain competitive in a lower carbon future and provide energy, economic and environmental security to our customers across the world. To maximize the environmental benefits of our LNG, we believe it is important to develop our climate goals and strategies based on an accurate and holistic assessment of the emissions profile of our LNG, accounting for all steps in the supply chain.

Consequently, we have collaborated with natural gas midstream companies, technology providers and leading academic institutions on life-cycle assessment (“LCA”) models, quantification, monitoring, reporting and verification (“QMRV”) of GHG emissions and other research and development projects. We also co-founded and sponsored the Energy Emissions Modeling and Data Lab (“EEMDL”), a multidisciplinary research and education initiative led by the University of Texas at

Austin in collaboration with Colorado State University and the Colorado School of Mines. In addition, we commenced providing Cargo Emissions Tags (“CE Tags”) to our long-term customers in June 2022, and in October 2022 joined the Oil and Gas Methane Partnership (“OGMP”) 2.0, the United Nations Environment Programme’s (“UNEP”) flagship oil and gas methane emissions reporting and mitigation initiative. To ensure transparency and rigor, we work with academics and scientists to publish methodologies and results in multiple peer-reviewed journals.

Our total incremental expenditures related to climate initiatives, including capital expenditures, were not material to our Consolidated Financial Statements during the years ended December 31, 2024, 2023 and 2022. However, as governments consider and implement actions to reduce GHG emissions and the transition to a lower-carbon economy continues to evolve, as described in Market Factors and Competition, we expect the scope and extent of our future climate and sustainability initiatives to evolve accordingly. While we have not incurred material direct expenditures related to climate change, we are proactive in our management of climate risks and opportunities, including compliance with existing and future government regulations. We face certain business and operational risks associated with physical impacts from climate change, such as exposure to severe weather events or changes in weather patterns, in addition to transition risks. Please see Item 1A. Risk Factors for additional discussion.

Subsidiaries

Substantially all of our assets are held by our subsidiaries. We conduct most of our business through these subsidiaries, including the development, construction, maintenance and operation of our LNG terminal business and the development and operation of our LNG and natural gas marketing business.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.