Liquidity and Capital Resources
The following information describes our ability to generate and obtain adequate amounts of cash to meet our requirements in the short term and the long term. In the short term, we expect to meet our cash requirements using operating cash flows and available liquidity, consisting of cash and cash equivalents, restricted cash and cash equivalents and available commitments under our credit facilities. Additionally, we expect to meet our long term cash requirements by using operating cash flows and other future potential sources of liquidity, which may include debt and equity offerings by us or our subsidiaries. The table below provides a summary of our available liquidity (in millions). Future material sources of liquidity are discussed below.
| December 31, 2024 | |
|---|---|
| Cash and cash equivalents (1) | $2,638 |
| Restricted cash and cash equivalents (1) | 552 |
| Available commitments under our credit facilities (2): | |
| SPL Revolving Credit Facility | 776 |
| CQP Revolving Credit Facility | 1,000 |
| CCH Credit Facility | 3,260 |
| CCH Working Capital Facility | 1,390 |
| Cheniere Revolving Credit Facility | 1,250 |
| Total available commitments under our credit facilities | 7,676 |
| Total available liquidity | $10,866 |
(1)Amounts presented include balances held by our consolidated variable interest entities (“VIEs”), as discussed in Note 8—Non-controlling Interests and Variable Interest Entities of our Notes to Consolidated Financial Statements. As of December 31, 2024, assets of our VIEs, which are included in our Consolidated Balance Sheets, included $270 million of cash and cash equivalents and $125 million of restricted cash and cash equivalents.
(2)Available commitments represent total commitments less loans outstanding and letters of credit issued under each of our credit facilities as of December 31, 2024. See Note 10—Debt of our Notes to Consolidated Financial Statements for additional information on our credit facilities and other debt instruments.
Our liquidity position subsequent to December 31, 2024 will be driven by future sources of liquidity and future cash requirements, as further discussed under the caption Future Sources and Uses of Liquidity.
Although our sources and uses of cash are presented below from a consolidated standpoint, SPL, CQP, CCH and Cheniere operate with independent capital structures. Certain restrictions or requirements under debt and equity instruments executed by our subsidiaries limit the entity’s use of cash, including the following:
SPL and CCH are required to deposit all cash received into restricted cash and cash equivalents accounts under certain of their debt agreements. The usage or withdrawal of such cash is restricted to the payment of liabilities related to the Liquefaction Projects and other restricted payments. In addition, SPL and CCH’s operating costs are managed by our subsidiaries under affiliate agreements, which may require SPL and CCH to advance cash to the respective affiliates, however the cash remains restricted for operation and construction of the Liquefaction Projects;
CQP is required under its partnership agreement to distribute to unitholders all available cash on hand at the end of a quarter less the amount of any reserves established by its general partner. Beginning with the distribution paid in the second quarter of 2022, quarterly distributions by CQP are currently comprised of a base amount plus a variable amount equal to the remaining available cash per unit, which takes into consideration, among other things, amounts reserved for annual debt repayment and capital allocation goals, anticipated capital expenditures to be funded with cash, and cash reserves to provide for the proper conduct of CQP’s business;
Our 48.6% limited partner interest, 100% general partner interest and incentive distribution rights in CQP limit our right to receive cash held by CQP to the amounts specified by the provisions of CQP’s partnership agreement; and
SPL and CCH are restricted by affirmative and negative covenants included in certain of their debt agreements in their ability to make certain payments, including distributions, unless specific requirements are satisfied.
Despite the restrictions noted above, we believe that sufficient flexibility exists within the Cheniere complex to enable each independent capital structure to meet its currently anticipated cash requirements. The sources of liquidity at SPL, CQP and CCH primarily fund the cash requirements of the respective entity, and any remaining liquidity not subject to restriction, as supplemented by liquidity provided by Cheniere Marketing, is available to enable Cheniere to meet its cash requirements.
Future Sources and Uses of Liquidity
The following discussion of our future sources and uses of liquidity includes estimates that reflect management’s assumptions and currently known market conditions and other factors as of December 31, 2024. Estimates are not guarantees of future performance and actual results may differ materially as a result of a variety of factors described in this annual report on Form 10-K.
Future Sources of Liquidity under Executed Contracts
We expect future material sources of liquidity to be derived from our long-term customer arrangements and structured cash flows under our SPAs and IPM agreements. As described in Items 1. and 2. Business and Properties, these contracts with creditworthy counterparties form the foundation of our business and provide us with significant, stable, long-term cash flows. Under our long-term SPAs and IPM agreements, we have contracted substantially all of our total anticipated production through the mid-2030s from our liquefaction capacity that is currently under construction or in operation.
LNG Revenues from Executed SPAs
We are contractually entitled to significant future consideration contracted under our long-term SPAs that has not yet been recognized as revenue. The timing of revenue recognition under GAAP may not align with cash receipts, although we do not consider the timing difference to be significant to our future liquidity. In addition, a significant portion of this future consideration is subject to variability as discussed more specifically below. We have estimated revenues under agreements with terms dependent on project milestone dates based on the estimated dates as of December 31, 2024. The following table summarizes our estimate of revenues to be received from executed long-term SPAs as of December 31, 2024 (in billions):
| Estimated Revenues Under Executed SPAs by Period (1) (2) | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2026 - 2029 | Thereafter | Total | |||
| LNG revenues (fixed fees) | $6.3 | $27.9 | $70.5 | $104.7 | ||
| LNG revenues (variable fees) (3) | 9.2 | 42.0 | 124.2 | 175.4 | ||
| Total | $15.5 | $69.9 | $194.7 | $280.1 | ||
(1)LNG revenues exclude estimated revenues from contracts with unsatisfied contractual conditions precedent. We may enter into contracts to sell LNG that are conditioned upon one or both of the parties achieving certain milestones, such as reaching FID on a certain liquefaction Train.
(2)LNG revenues exclude revenues from contracts with original expected durations of one year or less. LNG revenues also exclude volumes produced from the commissioning of certain Corpus Christi Stage 3 Project Trains, as volumes related to commissioning are not recognized as revenues. We recognize proceeds from commissioning activities prior to the start of commercial operations as offsets to LNG terminal costs as a component of the testing phase of a Train’s construction.
(3)LNG revenues (variable fees) reflect the assumption of delivery of all contractual volumes, irrespective of any contractual right of non-delivery. LNG revenues (variable fees) are based on estimated forward prices and basis spreads as of December 31, 2024.
Under our SPAs, customers purchase LNG on either an FOB basis (delivered to the customer at the Sabine Pass LNG Terminal or the Corpus Christi LNG Terminal, as applicable) or a DAT basis (delivered to the customer at their specified LNG receiving terminal) generally for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG generally equal to 115% of Henry Hub. The variable fees under our SPAs were generally sized with the intention to cover the supply and transportation of natural gas and the liquefaction fuel consumed to produce the LNG to be sold under each such SPA, thus limiting our exposure to future U.S. natural gas price increases. Certain customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension.
LNG produced by the Liquefaction Projects that is not contracted under long-term contracts is available for Cheniere Marketing, our integrated marketing function, to sell in the global market under spot sales or other short-term agreements. This LNG includes LNG produced from (1) the Liquefaction Projects prior to the date of first commercial delivery under long-term SPAs, (2) LNG production efficiencies and (3) natural gas procured under IPM agreements, as described below. These volumes may be supplemented by volumes procured from other locations worldwide to support operational requirements or take advantage of market opportunities.
Liquidity from Executed IPM Agreements
The table in the LNG Revenues from Executed SPAs section above excludes fees expected to be generated through sales of LNG produced from natural gas procured under our IPM agreements, under which we pay for natural gas feedstock based on global gas market prices less fixed liquefaction fees and certain costs incurred by us. While IPM agreements are not revenue contracts for accounting purposes, the payment structure under the IPM agreements generates a take-or-pay style fixed liquefaction fee. Although the IPM agreements secure natural gas purchases over long-term periods, the LNG produced from that natural gas is generally sold under short-term SPAs. Over a remaining fixed term of 18 years, we expect to generate liquidity from the approximately 3,825 TBtu of LNG to be produced from natural gas not yet received under IPM agreements as of December 31, 2024, excluding approximately 665 TBtu related to an IPM agreement that is subject to unsatisfied contractual conditions precedent.
Additional Future Sources of Liquidity
Available Commitments under Credit Facilities
As of December 31, 2024, we had $7.7 billion in available commitments under our credit facilities, as detailed earlier in the table summarizing our available liquidity, subject to compliance with the applicable covenants, to potentially meet liquidity needs. Our credit facilities mature between 2026 and 2029, based on estimated project milestone dates as of December 31, 2024.
Disciplined Accretive Growth
Our significant land positions at the Corpus Christi LNG Terminal and the Sabine Pass LNG Terminal provide potential development and investment opportunities for further liquefaction capacity expansion at strategically advantaged locations with proximity to pipeline infrastructure and resources. In February 2024, certain subsidiaries of CQP submitted an application to the FERC under the NGA for authorization to site, construct and operate the SPL Expansion Project, as well as an application to the DOE requesting authorization to export LNG to FTA countries and non-FTA countries, both of which applications exclude debottlenecking. In October 2024, the authorization from the DOE to export LNG to FTA countries was received. In June 2024, we received a positive Environmental Assessment from the FERC relating to the CCL Midscale Trains 8 & 9 Project, and we expect to receive all remaining necessary regulatory approvals for the project in 2025. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, will require, among other things, acceptable commercial and financing arrangements before we make a positive FID.
Future Cash Requirements for Operations and Capital Expenditures under Executed Contracts
We are committed to make future cash payments for operations and capital expenditures pursuant to certain of our contracts. The following table summarizes our estimate of material cash requirements for operations and capital expenditures related to our core operations under executed contracts as of December 31, 2024 (in billions):
| Estimated Payments Due Under Executed Contracts by Period (1) | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2026 - 2029 | Thereafter | Total | |||
| Purchase obligations (2): | ||||||
| Natural gas supply agreements excluding IPM agreements (3) (4) | $6.6 | $16.4 | $6.6 | $29.6 | ||
| Natural gas transportation and storage service agreements (5) | 0.5 | 2.0 | 4.4 | 6.9 | ||
| Capital expenditures | 1.6 | 0.6 | — | 2.2 | ||
| Other Purchase Obligations | — | 0.2 | 0.5 | 0.7 | ||
| Leases (6) | 0.7 | 2.9 | 3.4 | 7.0 | ||
| Total | $9.4 | $22.1 | $14.9 | $46.4 | ||
(1)Agreements in force as of December 31, 2024 that have terms dependent on project milestone dates are based on the estimated dates as of December 31, 2024.
(2)Purchase obligations consist of agreements to purchase goods or services that are enforceable and legally binding that specify fixed or minimum quantities to be purchased. We include contracts for which we have an early termination option if the option is not currently expected to be exercised. We include contracts with unsatisfied contractual conditions if the conditions are currently expected to be met.
(3)Natural gas supply agreements exclude IPM agreements, which are structured to generate a fixed margin when viewed in conjunction with the sale of LNG produced from the natural gas procured under the IPM agreements, as described under Liquidity from Executed IPM Agreements.
(4)Pricing of natural gas supply agreements is based on estimated forward prices and basis spreads as of December 31, 2024. Natural gas supply agreements are presented net of $0.3 billion in contracted sales of natural gas as of December 31, 2024.
(5)Natural gas transportation and storage services agreements include $1.2 billion in obligations to related parties.
(6)Leases include payments under (1) operating leases, (2) finance leases, (3) short-term leases and (4) vessel time charters that were executed as of December 31, 2024 but will commence in the future. Payments during future renewal option periods that are exercisable at our sole discretion are included only to the extent that the option is believed to be reasonably certain to be exercised. Leases are presented net of $1.2 billion in future income associated with vessel time charters that were subchartered to third parties.
Natural Gas Supply, Transportation and Storage Service Agreements
Excluding IPM agreements and unexercised extension options, we have secured approximately 7,980 TBtu of natural gas feedstock for our Liquefaction Projects through long-term natural gas supply agreements with remaining fixed terms of up to 15 years. As of December 31, 2024, we have secured approximately 74% of the natural gas supply required to support the total forecasted production capacity of the Liquefaction Projects during 2025, excluding the 6% of which has been secured under IPM agreements. Natural gas supply secured decreases as a percentage of forecasted production capacity beyond 2025. As further described in the LNG Revenues from Executed SPAs section, the pricing structure of our SPAs often incorporates a variable fee per MMBtu of LNG generally equal to 115% of Henry Hub, which is paid upon delivery, thus limiting our net exposure to future increases in natural gas prices.
To ensure that we are able to transport natural gas feedstock to the Liquefaction Projects, we have transportation precedent and other agreements to secure firm pipeline transportation capacity from interstate and intrastate pipeline companies. We have also entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the Liquefaction Projects.
Capital Expenditures
We enter into lump sum turnkey contracts with third party contractors for the EPC of our Liquefaction Projects. The future capital expenditures included in the table above primarily consist of fixed costs under the lump sum Bechtel EPC contract for the Corpus Christi Stage 3 Project, in which Bechtel charges a lump sum and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel causes us to enter into a change order, or we agree with Bechtel to a change order. In addition to amounts presented in the table above, we expect to incur ongoing capital expenditures to maintain our facilities and other assets, as well as to optimize our existing assets and purchase new assets that are intended to grow our productive capacity.
Corpus Christi Stage 3 Project
The following table summarizes the project completion and construction status of the Corpus Christi Stage 3 Project as of December 31, 2024:
| Overall project completion percentage | 77.2% |
|---|---|
| Completion percentage of: | |
| Engineering | 97.2% |
| Procurement | 97.2% |
| Subcontract work | 88.2% |
| Construction | 42.6% |
| Date of expected substantial completion | 1H 2025 - 2H 2026 |
Leases
Our obligations under our lease arrangements primarily consist of LNG vessel time charters with terms of up to 15 years to ensure delivery of cargoes sold on a DAT basis. We have also entered into leases for the use of tug vessels, office space and facilities, land sites and equipment.
Additional Future Cash Requirements for Operations and Capital Expenditures
Corporate Activities
We are required to maintain corporate and general and administrative functions to serve our business activities. During the year ended December 31, 2024, selling, general and administrative expense was $0.4 billion, a portion of which was related to leases for office space which is included in the table of cash requirements for operations and capital expenditures under executed contracts above.
Taxes
CAMT accelerates our cash tax payments for federal income taxes due to near-term deferral of the realization of our existing NOL carryforwards and may cause volatility in future cash tax payments due to variability in adjusted financial statement income. Additionally, our cash tax payments may be substantially lower in the periods that the Corpus Christi Stage 3 Project is placed into service due to anticipated tax depreciation allowances from the project. Thus, the ongoing interplay between the CAMT, the utilization of our existing NOLs and bonus depreciation eligibility of our Corpus Christi Stage 3 Project is expected to cause volatility in our cash tax payments. See the risk Additions or changes in tax laws and regulations could potentially affect our financial results or liquidity under Risks Relating to Regulationsin Item 1A. Risk Factors.
As part of our ongoing effort to mitigate our emissions from our shipping transport operations, we primarily utilize the LNG that we produce at our terminals as transport fuel in our shipping vessel operations, serving as a substitute for diesel and heavy fuel oils, which have higher emission factors. Our use of LNG as a cleaner burning fuel in our operations has enabled us to claim domestic alternative fuel excise tax credits which we are actively pursuing for the period spanning from 2018 to 2024. Although we believe we qualify and are entitled to claim such credits, we have not recognized any financial benefit of our credit claims in our results of operations to date. Our claims are currently under review by the IRS, and there is ongoing uncertainty regarding the final determination of our eligibility.
Disciplined Accretive Growth
The FID of any expansion projects will result in additional cash requirements to fund the construction and operations of such projects in excess of our current contractual obligations under executed contracts discussed above, although expansion may be designed to leverage shared infrastructure to reduce the incremental costs of any potential expansion.
Future Cash Requirements for Financing under Executed Contracts
We are committed to make future cash payments for financing pursuant to certain of our contracts. The following table summarizes our estimate of material cash requirements for financing under executed contracts as of December 31, 2024 (in billions):
| Estimated Payments Due Under Executed Contracts by Period (1) | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2026 - 2029 | Thereafter | Total | |||
| Debt | $0.4 | $10.5 | $12.2 | $23.1 | ||
| Interest payments | 1.1 | 3.5 | 2.0 | 6.6 | ||
| Total | $1.5 | $14.0 | $14.2 | $29.7 | ||
(1)Debt and interest payments are based on the total debt balance, scheduled contractual maturities and fixed or estimated forward interest rates in effect at December 31, 2024. Debt and interest payments do not contemplate repurchases, repayments and retirements that we may make prior to contractual maturity.
Debt
As of December 31, 2024, our debt complex was comprised of senior notes with an aggregate outstanding principal balance of $23.1 billion and credit facilities with no outstanding loan balances. As of December 31, 2024, each of our issuers was in compliance with all covenants related to their respective debt agreements. Further discussion of our debt obligations, including the restrictions imposed by these arrangements, can be found in Note 10—Debt of our Notes to Consolidated Financial Statements.
Interest
As of December 31, 2024, our senior notes had a weighted average contractual interest rate of 4.69%. Borrowings under our credit facilities are indexed to SOFR. Undrawn commitments under our credit facilities are subject to commitment fees ranging from 0.075% to 0.525%, subject to change based on the applicable entity’s credit rating. Issued letters of credit under our credit facilities are subject to letter of credit fees ranging from 1.0% to 2.20%, subject to change based on the applicable entity’s credit rating. We had $334 million aggregate amount of issued letters of credit under our credit facilities as of December 31, 2024.
Additional Future Cash Requirements for Financing
CQP Distributions
CQP is required by its partnership agreement to, within 45 days after the end of each quarter, distribute to unitholders all available cash at the end of a quarter less the amount of any reserves established by its general partner. We own a 48.6% limited partner interest in CQP in the form of 239.9 million common units, 100% of the general partner interest and 100% of the incentive distribution rights, with the remaining non-controlling limited partner interest held by Blackstone Inc., Brookfield Asset Management Inc. and the public. During the year ended December 31, 2024, $846 million in distributions were paid to our non-controlling interests.
Capital Allocation Plan
In June 2024, our Board approved an updated comprehensive long-term capital allocation plan, which included an increase to our share repurchase authorization by $4.0 billion through 2027. As of December 31, 2024, we had up to $3.9 billion available under the share repurchase program. The timing and amount of any shares of our common stock that are repurchased under the share repurchase program will be determined by management based on market conditions and other factors, with repurchases executed within trading parameters pre-established for each applicable trading period in compliance with SEC Rule 10b5-1. During the year ended December 31, 2024, we repurchased approximately 13.8 million shares of our common stock for $2.3 billion at a weighted average price per share of $163.72. A discussion of our share repurchase program can be found in Item 5. Market for Registrant’s Common Equity, Related Stockholders Matters and Issuer Purchase of Equity Securities.
Another aspect of our capital allocation plan is to lower our long-term leverage target through debt paydown to approximately 4x, which may involve the repayment, redemption or repurchase, on the open market or otherwise, of our indebtedness, including senior notes of SPL, CQP, CCH and Cheniere. The timing and amount of any paydown of our indebtedness will be determined by management based on market conditions and other factors. During the year ended December 31, 2024, we used $800 million of available cash to reduce our outstanding indebtedness, all of which was pursuant to our capital allocation plan.
The updated capital allocation plan also included a plan to increase our quarterly dividend by approximately 15% to $2.00 per common share on an annualized basis, which commenced with the dividend pertaining to the third quarter of 2024. On January 28, 2025, we declared a quarterly dividend of $0.50 per share of common stock that is payable on February 21, 2025 to stockholders of record as of the close of business on February 7, 2025.
Financially Disciplined Growth
To the extent that liquefaction capacity at the Corpus Christi LNG Terminal and the Sabine Pass LNG Terminal is expanded beyond the Liquefaction Projects, such as the CCL Midscale Trains 8 & 9 Project and the SPL Expansion Project, we expect that additional financing would be used to fund construction of the expansion.