Discussion of Operational Results

The Company owns and operates four past producing gold properties in Nevada, one of the largest gold producing regions in the world. The Company continued to advance its gold properties which are currently at various stages of redevelopment following successful exploration programs at each of the four properties.

Granite Creek Property

The Granite Creek property includes the Granite Creek underground project, a fully permitted, constructed and operating mine and the Granite Creek open pit oxide deposit adjacent to the underground project, currently in early-stage permitting. The Granite Creek underground is the Company's first brownfield project to be redeveloped and is currently ramping up towards steady-state gold output.

Gold was initially discovered at Granite Creek in the mid to late 1930’s and includes the former Pinson mine. Approximately one million ounces have been produced from the property since that time. The Granite Creek property is comprised of several land parcels which now encompass approximately 4,480 acres, located in the Potosi mining district, approximately 27 miles northeast of Winnemucca, within Humboldt County, Nevada. The seven-square miles of land contain all areas of past gold production and the area of mineral resources (underground and open pit).

Granite Creek Property · Three months endedJune 30, · Six months endedJune 30,
Operational Statistics · 2025 · 2024 · 2025 · 2024
Oxide mineralized material minedtonnes24,07416,31439,39725,778
Sulfide mineralized material minedtonnes11,2013,19625,8446,434
Total oxide and sulfide mineralized material minedtonnes35,27519,51065,24132,212
Oxide mineralized material mined gradeg/t11.3811.4911.7412.23
Sulfide mineralized material mined gradeg/t7.4310.087.939.23
Low-grade mineralized material mined1tonnes16,17314,03339,01925,748
Low-grade mineralized material grade1g/t3.033.182.883.35
Waste minedtonnes31,94742,84959,40975,802
Total material minedtonnes83,39576,392163,669133,762
Processed mineralized material - sulphidetonnes7,0144,7027,0144,702
Processed mineralized material - leachtonnes18,750—52,587—
Total processed mineralized materialtonnes25,7644,70259,6014,702
Gold ounces sold2oz5,9811,8099,0863,384
Underground mine development (pre-development)ft6921,5151,1962,264
Drillingft2,97834,4142,97818,479
Financial Statistics2025202420252024
Mining cost (total mineralized material and waste)$/t175113173125
Processing cost (processed mineralized material)$/t1338874147
Site general and administrative (“G&A”) (total mineralized material mined3)$/t34313238
Royalties$000s1,1483211,6541,555
Capital expenditure4$000s1,1142781,491739
Pre-development, evaluation and exploration expenses$000s5,9497,6349,71912,115

1 Low-grade mineralized material extracted as part of the mining process that is below cut-off grade but incrementally economic.

2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 57% in 2025 (2024 - 58%).

3 Total mineralized material mined consists of sulfide, oxide, and low-grade mineralized material.

4 Capital expenditure based on accrual basis.

Granite Creek Underground

Mineralized material mined at Granite Creek underground is processed as follows: (i) sulfide mineralized material processed at third-party autoclave and subject to a tolling agreement entered into in March 2025, (ii) high-grade oxide mineralized material processed at third-party plant and subject to an ore sales agreement, and (iii) low-grade oxide material placed on the Company’s Lone Tree heap leach facility.

Mining activities during the current quarter exceeded levels reported in the comparative prior-year period, primarily driven by additional faces available to mine due to stope development and changes in sequencing of mining. Management expects groundwater inflows to remain at or nearthe current ingress flow rates for the foreseeable future. Improvements to the existing infrastructure are ongoing, including the installation of at least two additional dewatering wells, an expanded water treatment facility, and an in-line piping and pumping system for the removal of mine contact water from underground workings, which are expected to positively impact development rates.

The Company continues to encounter elevated levels of oxide mineralized material compared to levels anticipated in the March 2025 PEA at Granite Creek. The lower-grade oxide mineralized material continues to be suitable for processing via heap leach at the Company's Lone Tree heap leach facility. During the quarter, 1,554 ounces of low-grade oxide material from Granite Creek was leached and sold from the Lone Tree heap leach facility.

As at June 30, 2025, the Company has delivered approximately 28,000 tonnes of sulfide mineralized material, waiting to be processed under a new toll milling agreement with a third party. Under the new toll milling agreement, the material is expected to be processed within 120 days of delivery to the process facilities.

For the three months ended June 30, 2025, $4.9 million was spent on pre-development expenses. Pre-development, evaluation, and exploration expenses for the six months ended June 30, 2025 were primarily related to underground development of $7.8 million and infill drilling.

Infill drilling of the South Pacific Zone began in June 2025 with two active drill rigs – one operating from underground and one from surface. Three additional rigs are expected to be mobilized in the third quarter, with one additional rig underground and two at surface. These activities are expected to further support mineral resource definition and expansion. The exploration drift was completed at the end of June to a shorter extent than initially planned. The initial underground drill plan was modified to include additional surface drilling as part of the program. The infill drill program aims to upgrade the mineral resource and form the basis for the upcoming feasibility study, which is targeted for completion in the first quarter of 2026.

Granite Creek Open Pit

Following the release of the Granite Creek open pit PEA, technical work is underway to advance the project toward either a pre-feasibility or a feasibility-level study. Simultaneously, technical trade off analyses are being conducted to optimize the project economics.

Permitting work is in the initial stages and advancing as expected. Granite Creek open pit has the potential to contribute to company-wide production by the end of the decade.

Ruby Hill Property

During the 1990’s, an ore body was discovered, which became the Archimedes open pit. Later discoveries included the Ruby Deeps Carlin-style sulfide mineralized deposit with the most recent discovery of the Hilltop zone. The Ruby Hill property is located within the Battle Mountain-Eureka trend, a northwest-trending geological belt located in north-central Nevada. The property contains gold, silver and base metal mineralization and exploration targets within the Archimedes underground project and Mineral Point open pit project. The Archimedes underground project is expected to be the Company's second underground mine, while Mineral Point is a large oxide gold and silver deposit with the potential to become the Company’s largest gold producing asset. Processing infrastructure at Ruby Hill includes a primary crushing plant, grinding mill, leach pad, and carbon-in-column circuit, as well as associated mining infrastructure. Some of the existing facilities are expected to be utilized for Mineral Point, however new crushing, a Merrill Crowe plant and heap leach facilities will be required.

During the first quarter of 2025, the Company finalized a PEA on both the Archimedes underground and Mineral Point open pit.

At Archimedes underground surface infrastructure has been completed, and the initial development of the underground exploration drift is anticipated to commence in the third quarter of 2025.

Permitting for mining above the 5100-foot level at Archimedes underground is nearing completion, with approval for advancement expected shortly. This phase of permitting covers mining activities above the 5100-foot elevation, a threshold consistent with previously approved permits for open pit mining at Ruby Hill. Permitting below the 5100-foot elevation is expected to begin immediately upon receipt of the first phase of permits. This sequential approach to permitting expedites mining while simultaneously pursuing remaining permits for the lower section.

Infill drilling will be initiated in the fourth quarter of 2025 in the Archimedes upper zone and in the first quarter of 2026 for the Archimedes lower zone.

The timeframe for first gold is approximately 14 months in duration from the commencement of portal construction which is expected to commence in the third quarter. In the meantime, the Company continues leaching the historic leach pads, which provides minor amounts of gold extraction.

A drill program for the Mineral Point open pit project commenced in June 2025 with two surface core drill rigs, completing approximately 5,800 feet of surface core drilling in the quarter to support geotechnical, metallurgical and hydrogeology studies for baseline data to advance permitting and technical reports. Following the release of a PEA in the first quarter of 2025, strategic evaluations are underway to determine optimal timing of a pre-feasibility or a feasibility-level study.

Ruby Hill Property · Three months endedJune 30, · Six months endedJune 30,
Operational Statistics · 2025 · 2024 · 2025 · 2024
Gold ounces soldoz6655101,117954
Drillingft5,739—5,7394,032
Financial Statistics2025202420252024
Processing cost (processed oz)$/oz1,6391,2271,6441,189
Site G&A (processed oz)$/oz1,1747601,191877
Royalties$000s663510363
Capital expenditure1$000s71968911118
Pre-development, evaluation and exploration expenses$000s1,8982965,089713

1 Capital expenditure based on accrual basis.

In addition to permitting activities, the Company continued to recover ounces from the heap leach pads at Ruby Hill.

Capital expenditures for the three and six months ended June 30, 2025 were primarily from the construction of a maintenance shop related to the underground access portal.

Pre-development, evaluation and exploration expenditures during the current three and six month period were related to preparatory work related to portal development and other surface work ($4.0 million) as well as costs associated with the infill drill program for Mineral Point open pit.

Cove Project

Modern exploration for copper and gold in the McCoy Mining District started in the 1960s. Cove is a high-grade underground development project and is expected to be the Company's third underground mine. It covers 30,923 acres and is located 32 miles south of the town of Battle Mountain, in the Fish Creek Mountains of Lander County, Nevada, and lies within the McCoy Mining District. Cove is, for the most part, on land controlled by the U.S. Department of Interior, Bureau of Land Management ("BLM") and patented mining claims and consists of 100%-owned unpatented claims and twelve leased patented claims.

National Environmental Policy Act ("NEPA") permitting activities are underway with the BLM in anticipation of an Environmental Impact Statement ("EIS"). i-80 Gold is actively advancing major permit applications with the goal of aligning regulatory approvals with planned development timelines. Cove is expected to be the Company's third underground mine and begin contributing to company-wide production in mid-2029.

Cove Project · Three months endedJune 30, · Six months endedJune 30,
Operational Statistics · 2025 · 2024 · 2025 · 2024
Drillingft—14,38214,76217,976
Financial Statistics2025202420252024
Pre-development, evaluation and exploration expenses$000s1,1742,3433,7214,615

In addition to the permitting process, an infill drill program was completed during the first quarter of 2025 to increase confidence in the mineral resource and collect data for engineering work to complete a feasibility study expected in the first quarter of 2026 while also incorporating additional metallurgical work. Underground delineation drilling was completed during the first quarter on the Helen and Gap deposits with two core rigs, completing approximately 15,000 feet of core drilled, bringing total drilling over the course of the infill campaign to approximately 145,000 feet. All assay results have been received since the inception of the infill drilling campaign in 2023 and expected to provide an updated mineral resource estimate in the third quarter of 2025. The geological model has been updated with these new drill results, and an updated resource estimate is in progress to be included in the feasibility study.

Lone Tree Processing Facility

The Lone Tree property is a historic producing mine that completed mining operations in 2006 and is located within the Battle Mountain-Eureka Trend, midway between the Company's Granite Creek property and Cove underground project. The property consists of the past-producing Lone Tree open pit mine as well as a processing facility. Processing infrastructure at Lone Tree includes an autoclave, carbon-in-leach mill, flotation mill, heap leach facility, assay lab and gold refinery, tailings dam, waste dumps and several buildings, including a warehouse, maintenance shop and administration building.

The Lone Tree processing facility has one of three autoclave facilities in Nevada and is a strategic asset in unlocking value from i-80 Gold’s three underground deposits by providing an owner-operated processing facility for the Company’s high-grade underground refractory material.

Currently, the Lone Tree autoclave refurbishment feasibility-level Class 3 engineering study is underway in collaboration with Hatch Ltd., an industry leader in autoclave technology, building on an internal feasibility study completed in 2023. The autoclave is envisioned to process refractory mineralized material from the Company’s three underground mines, Granite Creek, Archimedes and Cove, creating a regional hub-and-spoke mining and processing strategy. Concurrently, i-80 Gold is recruiting the owner’s team to oversee the engineering and execution of Lone Tree’s refurbishment, along with risk mitigation planning and opportunities to accelerate the development timeline.

The updated technical study for the facility’s refurbishment will incorporate value engineering initiatives and updated cost estimates to support an improved execution strategy. Completion of the revised feasibility study is targeted for the fourth quarter of 2025.

Lone Tree’s processing facility is currently permitted for the operational components in use; however, new and revised applications will need to be approved for air quality and mercury operating programs, in addition to, Water Pollution Control and Reclamation Permit modifications for the processing and environmental controls included in the refurbishment plan.

The Lone Tree open pit project is not currently included in the new development plan.

The leaching of the historic leach pad at Lone Tree continues to produce gold at profitable quantities. The Company plans to continue to recover ounces from the Lone Tree leach pads as long as it is economical to do so.

Lone Tree · Three months endedJune 30, · Six months endedJune 30,
Operational Statistics · 2025 · 2024 · 2025 · 2024
Gold ounces soldoz1,7541,1263,1493,168
Financial Statistics2025202420252024
Processing cost (processed oz)$/oz732690628681
Site G&A (processed oz)$/oz219502181223
Capital expenditure1$000s59793661507

1 Capital expenditure based on accrual basis.

Capital expenditures during the three and six months ended June 30, 2025 and in the comparative period were related to the technical work on the refurbishment of the autoclave processing plant.

DISCUSSION OF FINANCIAL RESULTS

Three months endedJune 30,Six months endedJune 30,
(in thousands of USD)2025202420252024
Revenue27,8367,18441,88415,597
Cost of sales(26,491)(19,422)(37,257)(27,753)
Depletion, depreciation and amortization(547)(74)(923)(451)
Gross profit (loss)798(12,312)3,704(12,607)
Expenses
Pre-development, evaluation and exploration9,04510,43618,59017,710
General and administrative7,3385,73312,3289,958
Property maintenance3,1662,7817,3137,103
Loss from operations(18,751)(31,262)(34,527)(47,378)
Other income and expenses, net(2,769)(600)(19,995)4,239
Interest expense(8,695)(8,757)(16,898)(16,793)
Loss before income taxes(30,215)(40,619)(71,420)(59,932)
Deferred tax expense—(386)—(773)
Net loss(30,215)(41,005)(71,420)(60,705)

Financial results for the three months ended June 30, 2025

Revenue

Revenue for the three months ended June 30, 2025 was $27.8 million, an increase from $7.2 million in the comparative prior year period. During the three months ended June 30, 2025, gold ounces sold 1 totaled 8,400 ounces at an average realized gold price 2 of $3,301 per ounce compared to gold ounces sold 1 of 3,445 at an average realized gold price 1 of $2,337 per ounce during the same period of 2024. The increase in revenue was driven by both higher gold ounces sold and higher gold prices.

Three months endedJune 30,
Spot price per ounce of gold ($)20252024% Change
Average3,2882,33641%
Low2,9832,21435%
High3,4332,42741%
Average realized3,3012,33741%

Cost of sales

Cost of sales for the three months ended June 30, 2025 was $26.5 million, which was an increase from $19.4 million in the comparative prior year quarter due to rise in gold ounces sold 1 partially offset by a lower inventory write-down of $3.1 million in the current quarter, compared to $8.8 million in the prior year period. The current quarter write-down was due to higher processing costs associated with sulfide mineralized materials at Granite Creek under the new toll milling agreement.

Depreciation, depletion and amortization

Depreciation, depletion, and amortization expense for the three months ended June 30, 2025 was $0.5 million compared to $0.1 million from the prior year period. The higher expense in 2025 is due to leach pad depreciation associated with Granite Creek material which began leaching in the fourth quarter of 2024.

Pre-development, evaluation and exploration expenses

Three months endedJune 30,
(in thousands of USD)20252024
Granite Creek5,9497,634
Ruby Hill1,898296
Cove1,1742,343
Other24163
Total pre-development, evaluation and exploration9,04510,436

For the three months ended June 30, 2025, the Company incurred $9.0 million of pre-development, evaluation and exploration expenses, 13% lower compared to the three month period ended June 30, 2024. Granite Creek expenses were lower due primarily to lower drilling expenses. Ruby Hill expenses were higher due to drilling at Mineral Point for hydrogeologic, geotechnical, and metallurgical purposes. Cove pre-development, evaluation and exploration expenditures were lower in the current quarter compared to the prior year quarter as drilling was largely completed in the first quarter of 2025.

Other expense

Three months endedJune 30,
(in thousands of USD)20252024
Gain on fair value measurement on Convertible Loans7653,030
Gain on fair value measurement of warrant liabilities7091,645
Loss on Gold Prepay Agreement(2,412)(2,478)
Loss on Silver Purchase Agreement(1,986)(4,445)
Interest income on restricted cash346429
Other (expense) income(486)770
Gain on foreign exchange295449
Total other expense(2,769)(600)

Gains and losses on revaluation of the fair value of warrants and Convertible Loans derivatives were driven by changes in the Company’s share price during the period.

Loss on Gold Prepay Agreement and Silver Purchase Agreement are comprised of realized losses due to higher metal prices compared to agreement inception prices on settlement as well as unrealized fair value measurement gains and losses which are driven by changes in the gold and silver forward prices during the period.

Interest Expense

Three months endedJune 30,
(in thousands of USD)20252024
Interest accretion on Convertible Loans1,6393,026
Interest accretion on Gold Prepay Agreement2,7052,722
Interest accretion on Silver Purchase Agreement1,5641,415
Interest accretion on long-term debt727—
Interest accretion on Convertible Debentures864792
Amortization of finance costs344357
Finance expense521—
Other interest expense331445
Total interest expense8,6958,757

Interest expense for the three months ended June 30, 2025 was $8.7 million, $0.1 million higher compared to the prior year quarter. The increased interest expenses were related to the New Gold Prepay and Silver Purchase Agreement with National Bank, partially offset by lower interest accretion on the Gold Prepay Agreement as a result of gold deliveries during 2025.

Financial results for the six months ended June 30, 2025

Revenue

Revenue for the six months ended June 30, 2025 was $41.9 million, an increase of 169% from $15.6 million in the comparative prior year period. During the six months ended June 30, 2025, gold ounces sold 1 totaled 13,352 ounces at an average realized gold price 2 of $3,124 per ounce, compared to 7,506 at an average realized gold price 2 of $2,188 per ounce during the same period of 2024. The higher revenue was equally driven by higher ounces sold at Granite Creek and higher average realized gold prices 2.

Six months endedJune 30,
Spot price per ounce of gold ($)20252024% Change
Average3,0772,20440%
Low2,6351,98533%
High3,4332,42741%
Average realized3,1242,18843%

Cost of sales

Cost of sales for the six months ended June 30, 2025 was $37.3 million, which was an increase from $27.8 million in the comparative prior year period, largely driven by an increase in gold ounces sold 1, partially offset by lower inventory write-downs of $4.0 million compared to $8.8 million in the comparative period of 2024. The current period write-down is mainly due to higher processing fees related to sulfide mineralized material and heap leach material at Granite Creek.

Depreciation, depletion and amortization

Total depreciation, depletion, and amortization expense for the six months ended June 30, 2025 was higher than the prior year period mainly due to higher leach pad depreciation related to Granite Creek material which began in the fourth quarter of 2024.

Pre-development, evaluation and exploration expenses

Six months endedJune 30,
(in thousands of USD)20252024
Granite Creek9,71912,115
Ruby Hill5,089713
Cove3,7214,615
Other61267
Total pre-development, evaluation and exploration expenses18,59017,710

For the six months ended June 30, 2025, the Company incurred $18.6 million of pre-development, evaluation and exploration expenses compared to $17.7 million of expenses for six months ended June 30, 2024. The higher pre-development, evaluation and exploration expenses for the six months ended June 30, 2025 were related to the infill drilling and underground development at Granite Creek, the Cove drilling program, and Ruby Hill preparatory surface work related to the portal development.

Other (expense) income

Six months endedJune 30,
(in thousands of USD)20252024
(Loss) gain on fair value measurement of Convertible Loans(673)9,145
Gain on fair value measurement of warrant liabilities2754,275
Loss on sales from Gold Prepay Agreement(10,674)(5,976)
Loss on Silver Purchase Agreement(9,461)(5,302)
Interest income on restricted cash686915
Other (expense) income(316)802
Gain on foreign exchange168380
Total other (expense) income(19,995)4,239

The loss on the valuation of the fair value of warrants and the Convertible Loans conversion option derivatives were driven by changes in the Company’s share price at each reporting period.

The loss on the Gold Prepay Agreement and Silver Purchase Agreement were driven by increasing gold and silver forward price. The lower loss on the fair value measurement of the Gold Prepay Agreement derivative is due to gold delivery settlements. The realized loss from Gold Prepay Agreement is as a result of increases to the realized gold price compared to the price at inception of the agreement.

Interest Expense

Six months endedJune 30,
(in thousands of USD)20252024
Interest accretion on Convertible Loans5,3445,324
Interest accretion on Gold Prepay Agreement4,1095,842
Interest accretion on Silver Purchase Agreement2,1091,703
Interest accretion on Convertible Debentures3,0682,802
Interest accretion on long-term debt727—
Amortization of finance costs691671
Finance expense521—
Other interest expense329451
Total interest expense16,89816,793

Interest expense for the six months ended June 30, 2025 was higher compared to the prior year comparative period due to higher interest accretion related to the National Bank New Gold Prepay and Silver Purchase Agreement of $0.7 million and finance fees related to debt modification of $0.5 million, partially offset by lower interest accretion on Gold Prepay Agreement as a result of deliveries.