Skip to main content

Energy Vault Holdings, Inc.

For the period ended Mar 31, 2025. Filed May 13, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 13, 2025

NRGV$3.53-2.5%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Item 1. Financial Statements

Condensed Consolidated Balance Sheets

(In thousands except par value)

March 31,2025December 31,2024
Assets
Current Assets
Cash and cash equivalents$17,822$27,091
Restricted cash, current portion27,308990
Accounts receivable, net of allowance for credit losses of $1,179 and $1,211 as of March 31, 2025 and December 31, 2024, respectively4,00014,565
Contract assets, net of allowance for credit losses of $25,029 and $25,030 as of March 31, 2025 and December 31, 2024, respectively6,9276,798
Inventory107107
Customer financing receivable, current portion, net of allowance for credit losses of $2,352 and $2,352 as of March 31, 2025 and December 31, 2024, respectively2,1482,148
Advances to suppliers7,40310,678
Investments, current portion3,3332,933
Prepaid expenses and other current assets5,3093,595
Total current assets74,35768,905
Property and equipment, net125,60499,493
Intangible assets, net5,1314,538
Operating lease right-of-use assets2,4021,206
Customer financing receivable, long-term portion, net of allowance for credit losses of $3,645 and $3,645 as of March 31, 2025 and December 31, 2024, respectively3,3293,329
Investments, long-term portion3,4833,270
Restricted cash, long-term portion2,0251,992
Other assets1,1101,156
Total Assets$217,441$183,889
Liabilities and Stockholders’ Equity
Current Liabilities
Accounts payable$24,934$20,250
Accrued expenses21,90624,968
Long-term debt, current portion13,303—
Contract liabilities10,5858,938
Other current liabilities15,519499
Total current liabilities86,24754,655
Long-term debt12,888—
Deferred pension obligation1,6082,044
Other long-term liabilities1,785934
Total liabilities102,52857,633
Commitments and contingencies
Stockholders’ Equity
Preferred stock, $0.0001 par value; 5,000 shares authorized, none issued——
Common stock, $0.0001 par value; 500,000 shares authorized, 154,243 and 153,206 issued and outstanding at March 31, 2025 and December 31, 2024, respectively1515
Additional paid-in capital521,322512,022
Accumulated deficit(404,958)(383,822)
Accumulated other comprehensive loss(1,365)(1,896)
Non-controlling interest(101)(63)
Total stockholders’ equity114,913126,256
Total Liabilities and Stockholders’ Equity$217,441$183,889

Condensed Consolidated Statements of Operations and Comprehensive Loss

(In thousands except per share data)

Three Months Ended March 31,
20252024
Revenue$8,534$7,759
Cost of revenue3,6585,691
Gross profit4,8762,068
Operating expenses:
Sales and marketing4,1454,170
Research and development3,8246,966
General and administrative17,50615,353
Benefit for credit losses(11)(89)
Depreciation and amortization305295
Total operating expenses25,76926,695
Loss from operations(20,893)(24,627)
Other income (expense):
Interest expense(95)(8)
Interest income3151,826
Other income (expense), net(118)1,670
Loss before income taxes(20,791)(21,139)
Provision for income taxes383—
Net loss(21,174)(21,139)
Net loss attributable to non-controlling interest(38)—
Net loss attributable to Energy Vault Holdings, Inc.$(21,136)$(21,139)
Net loss per share attributable to Energy Vault Holdings, Inc. — basic and diluted$(0.14)$(0.14)
Weighted average shares outstanding — basic and diluted153,723147,019
Other comprehensive income (loss) — net of tax
Actuarial gain (loss) on pension$511$(231)
Foreign currency translation gain20152
Total other comprehensive income (loss) attributable to Energy Vault Holdings, Inc.531(79)
Total comprehensive loss attributable to Energy Vault Holdings, Inc.$(20,605)$(21,218)

Condensed Consolidated Statements of Stockholders’ Equity

(In thousands)

Three Months Ended March 31, 2025
Common Stock · Additional Paid-In Capital · Accumulated Deficit · Accumulated Other Comprehensive Income (Loss) · Non-Controlling Interest · Total Stockholders’ Equity
Shares · Amount
Balance at December 31, 2024153,206$15$512,022$(383,822)$(1,896)$(63)$126,256
Stock-based compensation——9,276———9,276
Vesting of restricted stock units (“RSUs”)1,037——————
Net loss———(21,136)—(38)(21,174)
Short-swing profit recovery——24———24
Actuarial gain on pension————511—511
Foreign currency translation gain————20—20
Balance at March 31, 2025154,243$15$521,322$(404,958)$(1,365)$(101)$114,913
Three Months Ended March 31, 2024
Common Stock · Additional Paid-In Capital · Accumulated Deficit · Accumulated Other Comprehensive Income (Loss) · Non-Controlling Interest · Total Stockholders’ Equity
Shares · Amount
Balance at December 31, 2023146,577$15$473,271$(248,072)$(1,421)$—$223,793
Stock-based compensation——9,684———9,684
Vesting of RSUs1,291——————
Net loss———(21,139)——(21,139)
Actuarial loss on pension————(231)—(231)
Foreign currency translation gain————152—152
Balance at March 31, 2024147,868$15$482,955$(269,211)$(1,500)$—$212,259

Condensed Consolidated Statements of Cash Flows

(In thousands)

Three Months Ended March 31,
20252024
Cash Flows From Operating Activities
Net loss$(21,174)$(21,139)
Adjustments to reconcile net loss to net cash (used in) provided by operating activities:
Depreciation and amortization305295
Non-cash debt and financing costs74—
Non-cash interest income(178)(375)
Stock-based compensation9,2769,684
Benefit for credit losses(11)(89)
Foreign exchange losses13360
Change in operating assets2,61559,725
Change in operating liabilities6,230(47,214)
Net cash (used in) provided by operating activities(2,730)947
Cash Flows From Investing Activities
Purchase of property and equipment(6,783)(8,768)
Investment in note receivable(530)—
Net cash used in investing activities(7,313)(8,768)
Cash Flows From Financing Activities
Proceeds from debt financing26,826—
Proceeds from insurance premium financings1,473—
Repayment of insurance premium financings(545)(358)
Payment of debt issuance costs(709)—
Short-swing profit recovery24—
Payment of taxes related to net settlement of equity awards—(297)
Payment of finance lease obligations(9)(23)
Net cash provided by (used in) financing activities27,060(678)
Effect of exchange rate changes on cash, cash equivalents, and restricted cash65(272)
Net increase (decrease) in cash, cash equivalents, and restricted cash17,082(8,771)
Cash, cash equivalents, and restricted cash – beginning of the period30,073145,555
Cash, cash equivalents, and restricted cash – end of the period47,155136,784
Less: restricted cash at end of period29,3331,011
Cash and cash equivalents - end of period$17,822$135,773
Supplemental Disclosures of Cash Flow Information:
Cash paid for income taxes$—$—
Cash paid for interest138
Supplemental Disclosures of Non-Cash Investing and Financing Information:
Actuarial gain (loss) on pension511(231)
Property and equipment financed through accounts payable and accrued expenses10,5304,798
Assets acquired on finance lease—60

NOTE 1. ORGANIZATION AND DESCRIPTION OF BUSINESS

Energy Vault Holdings, Inc., which together with its subsidiaries is referred to herein as “Energy Vault” or the “Company,” provides a diverse technology portfolio of turnkey energy storage platforms, including proprietary gravity, battery, and green hydrogen energy storage hardware technologies, supported by our technology-agnostic energy management system software and integration platform. In 2024, we began a multi-year transition from providing this technology portfolio solely to third parties through a build-and-transfer model or licensing model, to also taking an ownership interest in energy storage assets in select attractive markets.

We incorporate a customer-centric, solutions-based approach toward helping utilities, independent power producers (“IPP”), and large industrial energy users reduce their energy costs while maintaining power reliability. As the global demand for electricity increases and the world transitions to an economy powered by increasingly intermittent renewable energy such as solar and wind, the ability to provide clean, reliable, and affordable electricity to a growing global population will depend heavily on the ability to store and distribute energy at appropriate times. We are striving to create a world powered by renewable resources so that everyone will have access to clean, reliable, sustainable, and affordable energy. The Company’s mission is to provide energy storage solutions to accelerate the global transition to renewable energy.

NOTE 2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

Basis of Presentation

The accompanying unaudited interim condensed consolidated financial statements have been prepared on an accrual basis of accounting in accordance with United States Generally Accepted Accounting Principles (“GAAP”) and applicable rules and regulations of the Securities and Exchange Commission (“SEC”) regarding interim financial reporting. Certain information and disclosures normally included in consolidated financial statements prepared in accordance with GAAP have been condensed or omitted pursuant to such rules and regulations. Accordingly, these unaudited interim condensed consolidated financial statements should be read in conjunction with the audited consolidated financial statements and accompanying notes for the year ended December 31, 2024. The condensed consolidated balance sheet as of December 31, 2024, included herein, was derived from the consolidated financial statements of the Company as of that date.

These unaudited interim condensed consolidated financial statements, in the opinion of management, reflect all adjustments necessary to present fairly the Company’s financial position as of March 31, 2025, results of operations and comprehensive loss, stockholders’ equity activities, and cash flows for the three months ended March 31, 2025 and 2024. The results for the three months ended March 31, 2025 are not necessarily indicative of the results to be expected for the year ending December 31, 2025 or for any interim period or for any other future year.

Principles of Consolidation

These unaudited interim condensed consolidated financial statements include Energy Vault Holdings, Inc., its wholly owned subsidiaries, and a majority owned subsidiary. All intercompany balances and transactions have been eliminated in consolidation.

Non-controlling interest

In May 2024, the Company’s consolidated subsidiary, Cetus Energy, Inc. (“Cetus”), issued a share-based payment award to an employee of Cetus, representing a non-controlling interest. A non-controlling interest in a subsidiary is considered an ownership interest in a majority-owned subsidiary that is not attributable to the parent. The Company includes non-controlling interest as a component of stockholders’ equity on the Company’s condensed consolidated balance sheets.

Emerging Growth Company

Section 102(b)(1) of the Jumpstart Our Business Startups Act of 2012 (the “JOBS Act”) exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies (that is, those that have not had a Securities Act registration statement declared effective or do not have a class of securities registered under the Exchange Act) are required to comply with the new or revised financial accounting standards. The JOBS Act provides that an emerging growth company can elect to opt out of the extended transition period and comply with the requirements that apply to non-emerging growth companies but any such election to opt out is irrevocable. The Company has elected not to opt out of such extended transition period, which means that when a standard is issued or revised, and it has different application dates for public or private companies, the Company, as an emerging growth company, can adopt the new or revised standard at the time private companies adopt the new or revised standard.

This may make comparison of the Company’s consolidated financial statement with another public company that is neither an emerging growth company nor an emerging growth company that has opted out of using the extended transition period difficult or impossible because of the potential differences in accounting standards used.

Use of Estimates

The preparation of the condensed consolidated financial statements, in conformity with GAAP requires management to make estimates and assumptions that affect the amounts reported in the unaudited interim condensed consolidated financial statements and accompanying notes. The Company evaluates its assumptions on an ongoing basis. The Company’s management believes that the estimates, judgment, and assumptions used are reasonable based upon information available at the time they are made. Significant estimates made by management include, among others, revenue recognition, warranty accruals, and stock-based compensation. Due to the inherent uncertainty involved in making assumptions and estimates, changes in circumstances could result in actual results differing from those estimates, and such differences could be material to the Company’s consolidated financial condition and results of operations.

Liquidity

The accompanying financial statements have been prepared assuming the Company will continue as a going concern, which contemplates continuity of operations, realization of assets, and the satisfaction of liabilities and commitments in the normal course of business.

Since our inception in October 2017, we have incurred significant net losses and have used significant cash in our business. As of March 31, 2025 and December 31, 2024, we had accumulated deficits of $405.0 million and $383.8 million, respectively, and net losses of $21.1 million and $21.1 million, respectively, for the three months ended March 31, 2025 and 2024. We anticipate that we will incur net losses for the foreseeable future and there is no guarantee that we will achieve or maintain profitability.

The assessment of liquidity requires management to make estimates of future activity and judgments about whether the Company can meet its obligations and have adequate liquidity to operate. Significant inputs to the Company’s liquidity analysis include:

$10.0 million in Cross Trails Bridge Loan proceeds. The Cross Trails Bridge Loan was executed on May 12, 2025. Refer to Note 17, Subsequent Events, for further details on this transaction.

$39.9 million in estimated proceeds from the sale of investment tax credits (“ITCs”) pursuant to a Tax Credit Transfer Commitment. Refer to Note 16, Commitments and Contingencies, for further details on the Tax Credit Transfer Commitment.

$25.0 million in proceeds from the sale of common stock pursuant to an equity purchase agreement (the “Equity Purchase Agreement”) with an investor (the “Equity Investor”). Pursuant to the Equity Purchase Agreement, the Company has the right at its sole discretion, but not the obligation, to sell to the Equity Investor, and the Equity Investor is obligated to purchase, up to $25.0 million of newly issued shares of the Company’s common stock, from time to time during the term of the Equity Purchase Agreement, subject to certain limitations and conditions. The Company expects to issue the Equity Investor shares of our common stock equivalent to 0.3% of our outstanding common stock as of March 31, 2025 to maintain the right to sell shares to the Equity Investor at a market discount (the “Commitment Shares”). The Equity Purchase Agreement contains customary representations, warranties and agreements by us, as well as customary indemnification obligations of the Company. Pursuant to the terms of the Equity Purchase Agreement, we have agreed to enter into a Registration Rights Agreement with the Equity Investor, pursuant to which, among other things, the Company will provide the Equity Investor with customary registration rights with respect to the Commitment Shares and the shares issuable pursuant to the Equity Purchase Agreement.

The securities to be offered pursuant to the Equity Purchase Agreement will be offered pursuant to our effective S-3/A shelf registration statement (File No. 333-273089), which was filed with the SEC on July 14, 2023 and declared effective on July 20, 2023, or a registration statement that will be filed with the SEC promptly after the execution of the Registration Rights Agreement.

Management believes that its cash, cash equivalents, and restricted cash on hand as of the filing date of this Quarterly Report, along with the actions which can be taken subsequent to March 31, 2025 as discussed above, will be sufficient to fund our operating activities for at least the next twelve months.

Segment Reporting

The Company reports its operating results and financial information inone operating and reportable segment. Our chief operating decision maker (“CODM”), which is our chief executive officer, reviews our operating results on a consolidated basis and uses that consolidated financial information to make operating decisions, assess financial performance, and allocate resources.

Concentration of Credit and Other Risks

Financial instruments that subject the Company to concentrations of credit risk consist primarily of cash and cash equivalents, restricted cash, accounts receivable, and customer financings receivable.

Risks associated with cash and cash equivalents and restricted cash are mitigated by banking with creditworthy institutions. Such balances with any one institution may, at times, be in excess of federally insured amounts.

As of March 31, 2025 and December 31, 2024, one customer accounted for 100% of accounts receivable.

As of March 31, 2025 and December 31, 2024, one customer accounted for 100% of the customer financing receivable.

Revenue from two customers accounted for 55% and 38% of total revenue for the three months ended March 31, 2025 and revenue from two customers accounted for 80% and 14% of total revenue for the three months ended March 31, 2024.

Summary of Significant Accounting Policies

The Company’s significant accounting policies are discussed in Note 2 of the notes to the consolidated financial statements included in the Company’s 2024 Annual Report on Form 10-K filed with the SEC on April 1, 2025. There have not been any significant changes to these policies during thethree months ended March 31, 2025.

NOTE 3. REVENUE RECOGNITION

The Company recognized revenue for the product and service categories as follows for three months ended March 31, 2025 and 2024 (amounts in thousands):

Three Months Ended March 31,
20252024
Sale of energy storage products$4,891$7,725
Operation and maintenance services276—
Software licensing112—
Intellectual property (“IP”) licensing3,255—
Other—34
Total revenue$8,534$7,759

Remaining Performance Obligations

Remaining performance obligations represent the amount of unearned transaction prices under contracts for which work is wholly or partially unperformed. As of March 31, 2025, the amount of the Company’s remaining performance obligations was $127.6 million. The Company generally expects to recognize approximately 97% of the remaining performance obligations as revenue over the next 12 months and the remainder more than 12 months from March 31, 2025.

Contract Balances

The following table provides information about contract assets and contract liabilities from contracts with customers (amounts in thousands):

March 31,2025December 31,2024
Refundable contribution$25,000$25,000
Unbilled receivables6,9566,828
Less allowance for credit losses(25,029)(25,030)
Contract assets, net of allowance for credit losses$6,927$6,798
Contract liabilities$10,585$8,938

Contract assets consist of a refundable contribution and unbilled receivables. The refundable contribution was initially payable to the Company upon the customer’s first gravity energy storage system achieving substantial completion, subject to potential downward adjustment for liquidated damages if specified performance metrics were not met. In 2024, the customer agreed to remove the substantial completion condition and committed to repay the refundable contribution in the second half of 2024. However, the customer did not remit payment, and during 2024 the Company increased its allowance for credit losses to fully reserve this receivable. The Company is continuing to engage with the customer and is actively pursuing collection efforts.

Unbilled receivables represent the estimated value of unbilled work for projects with performance obligations recognized over time.

Contract liabilities consist of deferred revenue. Under certain contracts, the Company may be entitled to invoice the customer and receive payments in advance of performing the related contract work. In those instances, the Company recognizes a liability for advance billings in excess of revenue recognized, which is referred to as deferred revenue. Deferred revenue is not considered to be a significant financing component because it is generally used to meet working capital demands that can be higher in the early stages of a contract. For the three months ended March 31, 2025 and 2024, the Company recognized revenue of $5.2 million and $0.5 million, respectively, related to amounts that were included in the deferred revenue balance as of the beginning of each period.

NOTE 4. ALLOWANCE FOR CREDIT LOSSES

Activity in the allowance for credit losses was as follows for the three months ended March 31, 2025 and 2024 (amounts in thousands):

Accounts ReceivableContract AssetsCustomer Financing ReceivableOther Notes ReceivableTotal
Allowance for credit losses, beginning of period$1,211$25,030$5,997$—$32,238
Provision (benefit) for credit losses(32)(1)—22(11)
Allowance for credit losses, end of period$1,179$25,029$5,997$22$32,227
Accounts ReceivableContract AssetsCustomer Financing ReceivableOther Notes ReceivableTotal
Allowance for credit losses, beginning of period$69$1,113$1,332$—$2,514
Provision (benefit) for credit losses(46)(72)29—(89)
Allowance for credit losses, end of period$23$1,041$1,361$—$2,425

The Company estimates expected uncollectible amounts related to its accounts receivable, customer financing receivable, contract asset balances, and other notes receivable as of the end of each reporting period, and presents those financial asset balances net of an allowance for expected credit losses in the consolidated balance sheets. Due to the Company’s limited operating history, the Company generally utilizes a probability-of-default (“PD”) and loss-given-default (“LGD”) methodology to calculate the allowance for credit losses for each customer by type of financial asset. The Company derives its PD and LGD rates using historical rates for corporate bonds as published by Moody’s. The Company uses PD and LGD rates that correspond to the customer’s credit rating and period of time in which the financial asset is expected to remain outstanding. For significantly past due receivables, such as the customer financing receivable and refundable contribution, the Company determines specific allowances for each receivable.

The amortized cost basis for the Company’s customer financing receivable was $11.5 million as of March 31, 2025 and December 31, 2024. Effective December 31, 2024, the Company placed the customer financing receivable on non-accrual status and discontinued the accrual of interest income due to the customer’s firsttwo installment payments being past-due.

NOTE 5. FAIR VALUE MEASUREMENTS

Carrying amounts of certain financial instruments, including cash, accounts payable, and accrued expenses approximate their fair value due to their relatively short maturities and market interest rates, if applicable.

The Company categorizes assets and liabilities recorded or disclosed at fair value on the consolidated balance sheet based upon the level of judgment associated with inputs used to measure their fair value. The categories are as follows:

Level 1—Inputs which included quoted prices in active markets for identical assets and liabilities.

Level 2—Inputs other than Level 1 that are observable, either directly or indirectly, such as quoted prices for similar assets or liabilities; quoted prices in markets that are not active; or other inputs that are observable or can be corroborated by observable market data for substantially the full term of the assets or liabilities.

Level 3—Unobservable inputs in which there is little or no market data, which require the reporting entity to develop its own assumptions.

The Company’s financial assets and liabilities measured at fair value on a recurring basis are as follows (amounts in thousands):

Fair Value at
Fair Value HierarchyMarch 31, 2025December 31, 2024
Assets (Liabilities):
Warrant liabilities (1)Level 3$(2)$(2)

(1) The warrants are not publicly traded and the Company uses a Black-Scholes model to determine the fair value of the warrants.

NOTE 6. RELATED PARTY TRANSACTIONS

During the three months ended March 31, 2025 and 2024, the Company paid $0.3 million and $0.4 million, respectively, in marketing and sales costs to a company owned by an immediate family member of an officer of the Company. As of March 31, 2025 and December 31, 2024, the Company had payables of $0.1 million due to this related party.

NOTE 7. INVESTMENTS

The following table provides a reconciliation of investments to the Company’s condensed consolidated balance sheets (amounts in thousands):

March 31, 2025December 31, 2024
CurrentLong-TermCurrentLong-Term
Investment in equity securities$—$3,270$—$3,270
Convertible note receivable2,725—2,622—
Other note receivable (1)608213311—
$3,333$3,483$2,933$3,270

(1) The balance is shown net allowance for credit losses. Refer to Note 4, Allowance for credit losses, for further information.

Investment in Equity Securities

In 2022 and 2023, the Company purchased equity securities in KORE Power, Inc. (“KORE”), a U.S. manufacturer of battery cells and modules. These equity securities do not have a readily determinable fair value and are recorded at cost, less any impairment, plus or minus adjustments for observable price changes in orderly transactions for the same or similar securities, with unrealized gains and losses recognized in earnings. The cost basis of the KORE equity securities is $15.0 million, and cumulative impairment recorded as of March 31, 2025 and December 31, 2024 was $11.7 million.

Convertible Note Receivable

In October 2021, the Company entered into a convertible promissory note purchase agreement with DG Fuels, LLC (“DG Fuels”) and purchased a promissory note with a principal balance of $1.0 million (“DG Fuels Tranche 1 Note”). In April 2022, the Company purchased an additional promissory note from DG Fuels with a principal balance of $2.0 million. (“DG Fuels Tranche 2 Note”) (collectively, the “DG Fuels Note”).

The maturity date of the DG Fuels Note is the earlier of (i)30 days after a demand for payment is made by the Company at any time after thetwo year anniversary of the date of issuance of the note; (ii) thefour year anniversary of the date of issuance of the note; (iii)five days following a Financial Close (“Financial Close” means a project finance style closing by DG Fuels or its subsidiary of debt and equity capital to finance the construction of that certain biofuel facility currently under development by DG Fuels), or (iv) upon an event of default determined at the discretion of the Company. The DG Fuels Note has an annual interest rate of 10.0%. Per the conversion terms, the Company can convert the principal balance and unpaid accrued interest into equity securities of DG Fuels at a 20% discount. The Company does not expect to exercise its conversion option when the DG Fuels Note matures in October 2025.

Other Note Receivable

In October 2024, the Company loaned AUD 0.5 million (or $0.3 million) to Stoney Creek BESS Pty Ltd (“Stoney Creek”) to assist the company with purchasing a bond for a battery energy storage system (“BESS”) project (“Tranche 1”). Tranche 1 has a stated interest rate of 8.0% and principal and accrued interest for are due in October 2025.

On March 7, 2025, the Company agreed to provide Stoney Creek with a bank guarantee of AUD 2.5 million (or $1.6 million) as security for a performance bond (“Tranche 2”). This bank guarantee has not been issued as of March 31, 2025.

Also on March 7, 2025, the Company loaned an additional AUD 0.5 million (or $0.3 million) to Stoney Creek to fund BESS project costs (“Tranche 3”). Tranche 3 has a stated interest rate of 8.0% and principal and accrued interest are due in March 2026.

On March 17, 2025, the Company agreed to loan Stoney Creek, pending final governmental approval of the BESS project, up to an additional AUD 7.8 million (or $4.9 million) to fund development payments due to Stoney Creek’s owner and developer, Enervest Utility Pty Ltd (“Enervest”) (“Tranche 4”). The Company has loaned AUD 0.4 million (or $0.2 million) under Tranche 4 as of March 31, 2025.

If Stoney Creek’s BESS project is cancelled or does not obtain final governmental approval, any outstanding principal and interest owed to Energy Vault would immediately become due. In February 2025, Stoney Creek received preliminary approval by the Australian regulator and Stoney Creek was awarded a long-term energy service agreement by the Australian Energy Market Operator Services.

Also on March 17, 2025, the Company entered into a share purchase agreement to acquire Stoney Creek from Enervest for a nominal purchase price ofone hundred Australian dollars. The closing of the acquisition is subject to regulatory review and approval in Australia. Upon closing of the acquisition, the carrying value of the note receivable is expected to be incorporated as part of the total consideration.

NOTE 8. PROPERTY AND EQUIPMENT, NET

As of March 31, 2025 and December 31, 2024, property and equipment, net consisted of the following (amounts in thousands):

March 31,2025December 31,2024
Land$302$302
Buildings774774
Machinery and equipment11,91211,584
Finance lease right-of-use assets – vehicles190185
Furniture and IT equipment1,4421,259
Leasehold improvements12171
Construction in progress114,81588,669
Total property and equipment129,556102,844
Less: accumulated depreciation and amortization(3,952)(3,351)
Property and equipment, net$125,604$99,493

The increase in construction in progress primarily relates to construction of the Calistoga Resiliency Center hybrid energy storage system, the BESS in Snyder, Texas (“Cross Trails BESS”), and the microgrid and customer demonstration unit in Snyder, Texas (“Snyder CDU”).

For the three months ended March 31, 2025, depreciation and amortization related to property and equipment was $0.1 million and for the three months ended March 31, 2024, depreciation and amortization related to property and equipment was$0.2 million.

NOTE 9. INTANGIBLE ASSETS, NET

Intangible assets are stated at amortized cost and consist of the following (amounts in thousands):

March 31, 2025December 31, 2024
Gross Carrying AmountAccumulated AmortizationNet Carrying AmountGross Carrying AmountAccumulated AmortizationNet Carrying Amount
Capitalized software to be sold$5,657$(526)$5,131$4,901$(363)$4,538

Once a software application is available for general release and is placed in service, the Company amortizes the capitalized costs on a product basis by the greater of the straight-line method over the estimated economic life of the product, or the ratio that current gross revenues for a product bear to the total current and anticipated future gross revenues for that product. The useful life for our external-use software development costs isfive years. Amortization expense for the three months ended March 31, 2025 and 2024 was $0.2 million and $0.1 million, respectively.

Future amortization expense for intangible assets is estimated as follows (amounts in thousands):

Amount
Remainder of 2025$588
2026784
2027784
2028784
2029421
Thereafter32
Subtotal3,393
Software projects in process1,738
Total$5,131

NOTE 10. DEBT

CRC Bridge Loan

On March 31, 2025, Calistoga Resiliency Center, LLC (“CRC” or the “Borrower”), a wholly-owned subsidiary of the Company, entered into a $27.8 million credit agreement (“CRC Bridge Loan”) with Jefferies Finance LLC (“Jefferies”), as administrative agent, collateral agent, and lender. The CRC Bridge Loan was intended to provide interim financing until long-term debt could be arranged. The CRC Bridge Loan carried a 9.5% annual interest rate and had a scheduled maturity date of April 23, 2025. After deducting closing fees, net proceeds totaled $26.8 million. The loan proceeds were included in the line item, restricted cash, current portion in the condensed consolidated balance sheet as of March 31, 2025.

On April 4, 2025, the Company refinanced the full outstanding balance of the CRC Bridge Loan through the issuance of $27.8 million in CRC Senior Notes (as described below). In accordance with Accounting Standard Codification (“ASC”) 470-10-45-14, because the refinancing was completed prior to the issuance of the financial statements, the Company reclassified the CRC Bridge Loan in the March 31, 2025 condensed consolidated balance sheet to reflect the long-term nature of the refinancing. The current portion of the CRC Bridge Loan is presented in an amount equal to the principal payments due within 12 months of March 31, 2025 under the terms of the CRC Senior Notes, which totals $13.3 million. The remaining $12.9 million carrying value of the CRC Bridge Loan, which is net of $1.6 million in debt discounts and issuance costs, is classified as long-term debt in the condensed consolidated balance sheet as of March 31, 2025. Due to the short-term nature of the CRC Bridge Loan, fair value approximates carrying value as of March 31, 2025.

CRC Senior Notes

On April 4, 2025, CRC issued $27.8 million of senior notes (“CRC Senior Notes”), with Eagle Point Credit as lender and Jefferies serving as agent for the transaction. The CRC Senior Notes were priced at 99.25% of par, resulting in net proceeds of $27.6 million.

The CRC Senior Notes bear interest at 12.5% per annum until the earlier of (i) the Company’s receipt of any tax credit transfer proceeds and (ii) December 31, 2025, and thereafter at a rate of 9.50% per annum. The CRC Senior Notes are senior secured obligations of CRC, backed by a first-priority pledge of all CRC assets and equity interests. The CRC Senior Notes include customary affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio.

Principal and interest are payable semi-annually, with installments due each February 28 and August 31. The first principal payment of $12.9 million is due on August 31, 2025, with subsequent payments as set forth in the financing agreement. A final balloon payment of $7.0 million is due at maturity on April 4, 2032.

The Company may, at its option, redeem all or a portion of the CRC Senior Notes prior to maturity, subject to specified call protection provisions and any prepayment premiums set forth in the agreement. In the event of a change of control, the Company may be required to offer to repurchase the notes at a specified price. The proceeds of the CRC Senior Notes are restricted until the hybrid energy storage system in Calistoga, California is placed into service.

Insurance Premium Financings

In April 2024, the Company entered intotwo financing agreements related to premiums under certain insurance policies. For the first financing, the Company was obligated to repay the lender an aggregate sum of $1.4 million throughten equal monthly payments commencing on April 10, 2024. For the second financing, the Company was obligated to repay the lender an aggregate sum of $0.4 million through nine equal monthly payments commencing on May 10, 2024. Both financings had an annual interest rate of 7.4% and were fully repaid during the first quarter of 2025.

In June 2024, the Company entered into a financing agreement related to premiums under certain insurance policies. The Company is obligated to repay the lender an aggregate sum of AUD 0.3 million (or $0.2 million) through twelve equal monthly payments of AUD 22 thousand (or $15 thousand), at an annual interest rate of 4.4%, commencing on June 25, 2024.

In July 2024, the Company entered into a financing agreement related to premiums under certain insurance policies. The Company is obligated to repay the lender an aggregate sum of $1.1 million through nine equal monthly payments, at an annual interest rate of 7.5%, commencing on August 15, 2024.

In March 2025, the Company entered into a financing agreement related to premiums under certain insurance policies. The Company is obligated to repay the lender an aggregate sum of $1.5 million through nine equal monthly payments, at an annual interest rate of 5.8%, commencing on April 10, 2025.

As of March 31, 2025 and December 31, 2024, the carrying value of the Company’s insurance premium financings was $1.6 million and $0.7 million, respectively, and is included in the line item, accrued expenses, in the condensed consolidated balance sheets.

Interest Expense

The line item, interest expense, on the condensed consolidated statements of operations and comprehensive loss for the three months ended March 31, 2025 and 2024, consists of the following (amounts in thousands):

Three Months Ended March 31,
20252024
Contractual interest expense$18$4
Amortization of debt issuance costs43—
Amortization of debt discount31—
Interest expense on finance leases34
Total$95$8

NOTE 11. SUPPLEMENTAL BALANCE SHEETS DETAIL

(amounts in thousands)March 31,2025December 31,2024
Prepaid and other current assets:
Prepaid expenses$5,132$3,423
Tax refund receivable141117
Other3655
Total$5,309$3,595
Other assets:
Interest receivable$925$850
Other185306
Total$1,110$1,156
Accrued expenses:
Professional fees$10,267$8,373
Accrued purchases6,5758,165
Employee costs1,9924,019
Insurance premium financings1,621724
Taxes payable6902,351
Warranty liabilities7611,336
Total$21,906$24,968
Other current liabilities:
Customer deposits$15,001$—
Operating leases478461
Finance leases4038
Total$15,519$499
Other long-term liabilities:
Operating leases$1,699$785
Finance leases7381
Asset retirement obligation1111
Warrant liabilities22
Warranty liabilities—55
Total$1,785$934

NOTE 12. STOCK-BASED COMPENSATION

2022 Equity Incentive Plan

In 2022, the Company adopted its 2022 Equity Incentive Plan (the “2022 Incentive Plan”). The 2022 Incentive Plan provides for the granting of stock options, stock appreciation rights (“SARs”), restricted stock, and RSUs to employees, non-employee directors, and consultants of the Company. Shares of common stock underlying awards that expire or are forfeited or canceled will again be available for issuance under the 2022 Incentive Plan.

The initial number of shares of the Company’s common stock reserved for issuance under the 2022 Incentive Plan was approximately 15.5 million, plus up to approximately 8.3 million shares subject to awards granted under the 2017 and 2020 Stock Incentive Plans. Beginning on March 1, 2022 and ending on (and including) March 31, 2031, the number of shares of the Company’s common stock that may be issued under the 2022 Incentive Plan increases by a number of shares equal to the lesser of (i)4.0% of the outstanding shares on the last day of the immediately preceding month or (ii) such lesser number of shares (including zero) that the Company’s Board determines for the purposes of the annual increase for that fiscal year.

2022 Inducement Plan

In 2022, the Company adopted its 2022 Inducement Plan, which provides for the granting of stock options, SARs, restricted stock, and RSUs to individuals who were not previously employees of Energy Vault, or following a bona fide period of non-employment, as inducement material to such individuals entering into employment with Energy Vault. Shares of common stock underlying awards that expire or are forfeited or canceled will again be available for issuance under the 2022 Inducement Plan.8.0 million shares of the Company’s common stock are reserved for issuance under the 2022 Inducement Plan.

2025 Inducement Plan

In February 2025, the Board approved the Company’s 2025 Inducement Plan, which provides for the granting of stock options, SARs, restricted stock, and RSUs to individuals who were not previously employees of Energy Vault, or following a bona fide period of non-employment, as inducement material to such individuals entering into employment with Energy Vault. Shares of common stock underlying awards that expire or are forfeited or canceled will again be available for issuance under the 2025 Inducement Plan.8.0 million shares of the Company’s common stock are reserved for issuance under the 2025 Inducement Plan.

Stock Option Activity

Stock option activity for the three months ended March 31, 2025 was as follows (amounts in thousands, except per share data):

Options Outstanding
Number ofOptionsWeighted AverageExercise PricePer ShareWeighted AverageRemainingContractualTerm (in years)AggregateIntrinsicValue
Balance as of December 31, 20246,429$1.626.0$4,248
Stock options granted————
Stock options exercised————
Stock options forfeited, canceled, or expired————
Balance as of March 31, 20256,4291.625.893
Options exercisable as of March 31, 20252,3421.545.193
Options vested and expected to vest as of March 31, 20256,429$1.625.8$93

As of March 31, 2025, total unrecognized stock-based compensation expense related to unvested option awards that are expected to vest was $3.1 million. The weighted-average period over which such stock-based compensation expense will be recognized is approximately 1.6 years.

The aggregate intrinsic values of options outstanding, exercisable, vested and expected to vest were calculated as the difference between the exercise price of the options and the closing stock price of the Company’s common stock on the NYSE as of March 31, 2025.

Restricted Stock Units

RSU activity for the three months ended March 31, 2025 was as follows (amounts in thousands, except per share data):

Number of RSUsWeighted AverageGrant Date FairValue per Share
Nonvested balance as of December 31, 202422,325$2.83
RSUs granted7,0700.95
RSUs forfeited(116)1.91
RSUs vested(3,617)3.08
Nonvested balance as of March 31, 202525,662$2.28

As of March 31, 2025, unrecognized stock-based compensation expense related to these RSUs was $43.1 million which is expected to be recognized over the remaining weighted-average vesting period of approximately 1.7 years.

Stock-Based Compensation Expense

Total stock-based compensation expense for the three months ended March 31, 2025 and 2024 is as follows (amounts in thousands):

Three Months Ended March 31,
20252024
Sales and marketing$1,045$1,715
Research and development1,3682,227
General and administrative6,8635,742
Total stock-based compensation expense$9,276$9,684

NOTE 13. SEGMENT REPORTING

As a single reportable segment entity, the Company’s CODM uses the profit measure of net loss to allocate resources and assess performance of our business by comparing actual results to historical results and previously forecasted financial information. The measure of segment assets is reported on the condensed consolidated balance sheets as total assets.

See Note 3 for the Company’s revenue disaggregated by product line.

The following table presents revenue, significant segment expenses provided to the CODM, and net loss for our consolidated segment (amounts in thousands):

Three Months Ended March 31,
20252024
Revenue$8,534$7,759
Cost of revenue3,6585,691
Gross profit4,8762,068
Significant segment expenses: (1)
Non-personnel operating costs (2)7,2908,012
Salaries and wages (3)8,9098,792
Stock-based compensation9,2769,684
Depreciation and amortization305295
Other segment items (4)270(3,576)
Net loss$(21,174)$(21,139)

(1) The significant segment expense categories and amounts presented align with the segment-level information that is regularly provided to the CODM.

(2) Represents sales and marketing, research and development, and general and administrative expenses, excluding personnel related costs.

(3) Represents the costs of employees’ salaries, benefits, and payroll taxes that are reported within sales and marketing, research and development, and general and administrative expenses in the condensed consolidated statements of operations and comprehensive loss. This amount excludes stock-based compensation expense.

(4) Represents certain other segment items that are not deemed significant segment expenses and primarily consists of provision (benefit) for credit losses, interest income, interest expense, and other income/expense items.

NOTE 14. INCOME TAXES

The Company recognized a tax provision of $0.4 million for the three months ended March 31, 2025 and didnot recognize any tax provision for the three months ended March 31, 2024. The Company has recorded a valuation allowance against substantially all of the Company’s net deferred tax assets. The Company provides for a valuation allowance when it is more likely than not that some portion of, or all of the Company’s deferred tax assets will not be realized. Due to the Company’s history of losses, the Company determined that it is not more likely than not to realize its deferred tax assets.

NOTE 15. NET LOSS PER SHARE OF COMMON STOCK

Basic and diluted net loss per share attributable to common stockholders are calculated as follows (amounts in thousands, except per share amounts):

Three Months Ended March 31,
20252024
Net loss attributable to Energy Vault Holdings, Inc.$(21,136)$(21,139)
Weighted-average shares outstanding – basic and diluted153,723147,019
Net loss per share – basic and diluted attributable to Energy Vault Holdings, Inc.$(0.14)$(0.14)

There wereno common share equivalents that were dilutive for the three months ended March 31, 2025 and 2024. Due to net losses during those periods, basic and diluted net loss per common share were the same, as the effect of potentially dilutive securities would have been anti-dilutive.

The following outstanding balances of common share equivalent securities have been excluded from the calculation of diluted weighted-average common shares outstanding because the effect is anti-dilutive for the three months ended March 31, 2025 and 2024 (amounts in thousands):

Three Months Ended March 31,
20252024
Private warrants5,1675,167
Stock options6,4295,803
RSUs25,66224,021
Total37,25834,991

In connection with the reverse recapitalization in 2022, eligible Energy Vault stockholders immediately prior to the closing of the transaction obtained a contingent right to receive 9.0 million shares of the Company’s common stock (“Earn-Out Shares”) upon the Company’s common stock quoted on the NYSE equaling or exceeding certain specified prices for any 20 trading days within a 30 consecutive day trading period (“Earn-Out Triggering Event”).9.0 million of common stock equivalents subject to the Earn-Out Shares are excluded from the anti-dilutive table above as of March 31, 2025, as the underlying shares remain contingently issuable as the Earn-Out Triggering Events have not been satisfied.

The contingent right for Earn-Out Shares expired on May 12, 2025.

NOTE 16. COMMITMENTS AND CONTINGENCIES

Our principal commitments as of March 31, 2025 consisted primarily of obligations under operating leases, finance leases, a deferred pension, warranty liabilities, and issued purchase orders. Our non-cancelable purchase obligations as of March 31, 2025 totaled approximately $7.6 million.

Loss Contingencies:

In the ordinary course of business, the Company is regularly subject to various legal proceedings. The Company has identified certain legal matters where the Company believes an unfavorable outcome is not probable and, therefore, no reserve has been established. Although the Company currently believes that resolving claims against the Company, including claims where an unfavorable outcome is reasonably possible, will not have a material impact on the Company’s business, financial position, results of operations, or cash flows, these matters are subject to inherent uncertainties and the Company’s view of these matters may change in the future.

Warranty Liabilities:

The Company provides a limited warranty to its BESS customers assuring that the BESSs are free from defects. The Company’s limited warranties are generally for a period oftwo orthree years after the substantial completion date of a project. These warranties are considered assurance-type warranties which provide a guarantee of quality of the products. For assurance-type warranties in engineering, procurement, and construction (“EPC”) contracts, the Company records an estimate of future warranty costs over the period of construction. For assurance-type warranties in engineered equipment (“EEQ”) contracts, the Company records an estimate of future warranty costs upon the transfer of the equipment to the customer. Warranty costs are recorded as a component of cost of revenue in the Company’s condensed consolidated statements of operations and comprehensive loss.

As of March 31, 2025 and 2024, the Company accrued the below estimated warranty liabilities, respectively (amounts in thousands):

Three Months Ended March 31,
20252024
Warranty liabilities, balance at beginning of period$1,391$1,818
Change in estimates—243
Costs paid or settled(630)(56)
Warranty liabilities, balance at end of period$761$2,005

The key inputs and assumptions used in calculating the estimated warranty liability are reviewed by management each reporting period. The Company may make additional adjustments to the estimated warranty liability based on a comparison of actual warranty results to expected results for significant differences or based on performance trends or other qualitative factors. If actual failure rates or replacement costs differ from our estimates in future periods, changes to these estimates may be required, resulting in increases or decreases in the estimated warranty liability, which may be material.

Letters of Credit and Bank Guarantees:

In the ordinary course of business and under certain contracts, the Company is required to post letters of credit or bank guarantees for its customers, for project performance, and for its vendors for payment guarantees. Such letters of credit or bank guarantees are generally issued by a bank or a similar financial institution. The letter of credit or bank guarantee commits the issuer to pay specified amounts to the holder of the letter of credit or bank guarantee under certain conditions. As of March 31, 2025, the Company had $14.5 million in outstanding letters of credit and $2.0 million in bank guarantees issued through the Company’s credit relationships. The Company is not aware of any material claims relating to its outstanding letters of credit or bank guarantees. $3.0 million of the Company’s restricted cash balance as of March 31, 2025 consists of cash held by banks as collateral for the Company’s letters of credit or bank guarantees.

Performance and Payment Bonds:

In the ordinary course of business, Energy Vault is required by certain customers to provide performance and payment bonds for contractual commitments related to its projects. These bonds provide a guarantee that the Company will perform under the terms of a contract and that the Company will pay its subcontractors and vendors. If the Company fails to perform under a contract or to pay its subcontractors and vendors, the customer may demand that the surety make payments or provide services under the bond. The Company must reimburse the surety for expenses or outlays it incurs. As of March 31, 2025, the Company had $110.3 million in outstanding performance and payment bonds. Subsequent to March 31, 2025, an additional $4.0 million in cash was restricted in connection with the issuance of a payment bond.

Other Bonds:

In the ordinary course of business, Energy Vault is required to obtain other bonds, such as for insurance and government payments. These bonds provide a guarantee that the Company will post the necessary reserves as required by banks and tax or licensing authorities. Additionally, bonds are issued to banks as support for letters of credit provided by those banks. As of March 31, 2025, the Company had $20.5 million in outstanding other bonds.

Tax Credit Transfer Commitment

On March 28, 2025, the Company entered into a Tax Credit Transfer Commitment, on behalf of its wholly owned subsidiary companies, with a third-party purchaser pursuant to which the Company agreed to sell certain investment tax credits (“ITCs”) generated by the Calistoga Resiliency Center hybrid energy storage system, the Cross Trails BESS, and the Snyder CDU that are anticipated to be placed in service in 2025. The Tax Credit Transfer commitment is subject to certain conditions set forth therein, and requires the Company to incur the remaining associated capital expenditures to complete the projects (via internal sources or external sources such as project financing). The third-party purchaser has agreed to purchase on or before December 15, 2025, all the eligible ITCs generated by these projects, in an amount to be finalized subject to final cost segregation reports, which management believes will be approximately $39.9 million, net of fees, across all three projects.

NOTE 17. SUBSEQUENT EVENTS

NYSE Notification

On April 16, 2025, the Company was notified by the NYSE that it was not in compliance with Section 802.01C of the NYSE Listed Company Manual because the average closing price of the Company’s common stock was less than $1.00 over a consecutive 30 trading-day period. The notice did not result in the immediate delisting of the Company’s common stock from the NYSE. Under NYSE rules, Energy Vault has a period of six months from receipt of the notice to regain compliance with the NYSE minimum stock price listing requirement. The Company intends to consider available alternatives, subject to stockholder approval, to cure the stock price non-compliance. Under the NYSE’s rules, if Energy Vault determines that it will cure the stock price deficiency by taking an action that will require stockholder approval, the price condition will be deemed cured if the average closing price exceeds $1.00 per share over a 30-day trading period and the Company has a closing share price of at least $1.00 on the last day of the cure period. Energy Vault’s common stock will continue to be listed and trade on the NYSE during this cure period.

Cross Trails Bridge Loan

On May 12, 2025, the Company entered into a credit agreement with Crescent Cove Opportunity Lending, LLC (“Crescent Cove”) as lender and administrative agent, providing for a short-term loan in an aggregate principal amount of $10.0 million (Cross Trails Bridge Loan”). The Cross Trails Bridge loan bears interest at an annual rate of 24% and matures on July 13, 2025. The Cross Trails Bridge Loan includes an original issue discount equal to 5% of the principal amount and a structuring fee of $0.2 million. The loan is secured by substantially all of the Company’s assets in the U.S., primarily the Cross Trails BESS and excludes the Calistoga hybrid energy system, and is guaranteed by all of the Company’s U.S. subsidiaries except for CRC. Proceeds will be used for general corporate purposes and working capital.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.