Contents

Items 1 and 2. Business and Properties

Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.

Planned Debt Restructuring

The Company did not make certain interest and principal payments that were due during the fiscal quarters ended December 31, 2025 and March 31, 2026 on (i) the 12.000% Senior Secured Notes due 2029 (the “New 2029 Notes”) issued by NFE Financing LLC, an indirect subsidiary of the Company (“NFE Financing”), (ii) the Company’s Credit Agreement, dated as of July 19, 2024 (the “Term Loan A Credit Agreement”), (iii) the Company’s Credit Agreement, dated as of October 30, 2023 (the “Term Loan B Credit Agreement”), (iv) the Company’s Credit Agreement, dated as of April 15, 2021 (the “Revolving Credit Agreement”), and (iv) the EB-5 Loan Agreement (as defined herein), and events of default arose under these debt agreements upon the expiration of contractual grace periods. Additionally, the Company did not make interest and principal payments that were due on March 15 and March 31, 2026, respectively, on (a) the 6.500% Senior Secured Notes due 2026 issued by the Company (the “2026 Notes”) and (b) the 8.750% Senior Secured Notes due 2029 issued by the Company (the “2029 Notes”), which will result in events of default under each series of notes on April 15 and April 30, 2026, respectively. The indentures and credit agreements underlying substantially all of our outstanding debt includes cross-acceleration and/or cross-default provisions that upon such acceleration of the outstanding principal of any of the debt in default, all of the Company’s other outstanding debt would be payable on demand.

On March 17, 2026, the Company entered into a restructuring support agreement (together with all exhibits, annexes and schedules thereto, the “RSA”) with certain of its lenders and noteholders, including:

certain members of an ad hoc group of holders of the New 2029 Notes;

certain members of an ad hoc group of term lenders under the Term Loan B Credit Agreement;

certain holders of debt under the Revolving Credit Agreement, being lenders under a facility currently drawn at approximately $100 million (the “R-1 Revolving Credit Facility”) and under a facility currently drawn at approximately $560 million (the “R-2 Revolving Credit Facility”);

certain members of an ad hoc group of term lenders under the Term Loan A Credit Agreement; and

a majority of the members of a group of creditors with recourse to the collateral assets in the Company’s core business, but not to the Company’s Fast LNG (or “FLNG”) assets or Brazil business, including (1) holders of the 2026 Notes and holders of the 2029 Notes and (2) creditors of the debt under that certain Credit Agreement, dated as of November 22, 2024, by and among the Company, as the borrower, the guarantors from time to time party thereto, NFE Brazil Investments LLC, as the lender, and Wilmington Savings Fund Society, FSB, as the administrative agent and as collateral agent (the “Series I Credit Agreement”), and under that certain Credit Agreement, dated as of December 6, 2024, by and among the Company, as the borrower, the guarantors from time to time party thereto, NFE Financing, as the lender, and Wilmington Savings Funds Society, FSB, as the administrative agent and as collateral agent (the “Series II Credit Agreement”) (collectively, the “Supporting Creditors”).

Holders of or lenders under the debt instruments described above that are not already party to the RSA may become Additional Supporting Creditors (as defined in the RSA) by executing and delivering a joinder in accordance with the terms of the RSA.

The RSA sets forth principal terms for a comprehensive restructuring of the Company’s principal funded debt obligations (the “Restructuring Transaction”). The RSA contemplates, among other things, the following material terms:

The Company will separate into two independent companies: one generally comprising the Company’s businesses and assets in Brazil and land in Wyalusing, Pennsylvania (“BrazilCo”), and the other generally comprising the Company’s other businesses and assets, which will be retained by the Company (“CoreCo”);

Obligations under the 2026 Notes, the 2029 Notes, the Term Loan A Credit Agreement, the Term Loan B Credit Agreement, the Revolving Credit Agreement, the New 2029 Notes, and certain intercompany credit agreements will be exchanged (in each case on a ratable basis) for one or a combination of the following debt obligations and equity securities:

100% of the common equity interests in BrazilCo;

approximately$571.3 million in senior secured term loans incurred by the Company, as borrower, and guaranteed by each subsidiary of the Company that will be part of CoreCo (subject to customary exclusions and other exclusions to be agreed) (“New CoreCo Term Loans”);

convertible preferred stock of the Company with an aggregate liquidation preference of approximately$2.46 billion (“CoreCo Convertible Preferred Stock”);

shares representing 65% of the Company’s Class A common stock as of the closing date of the Restructuring Transaction, before giving effect to shares authorized under an incentive plan for directors, officers, and other employees of the Company or any conversion of the CoreCo Convertible Preferred Stock into NFE Class A common stock;

$400.0 millionin non-recourse term loans incurred or issued by the subsidiary that owns the Company’s Fast LNG 2 assets (“FLNG 2 Co”), payable in full on the third anniversary of the closing date of the Restructuring Transaction, guaranteed by certain subsidiaries of FLNG 2 Co and secured by substantially all assets of FLNG 2 Co and such subsidiaries; and/or

$200.0 millionin non-convertible, preferred equity (the “FLNG 2 Preferred Equity”) issued by FLNG 2 Co.

Corporate governance matters regarding CoreCo;

Letters of credit issued under the Company’s existing Letter of Credit Facility (as defined herein) or Revolving Facility (as defined herein) will be backstopped or replaced by letters of credit issued under new fully committed letter of credit facilities for each of CoreCo and BrazilCo;

Certain other existing debt facilities and other liabilities will be refinanced, renegotiated, or compromised, or will remain outstanding in accordance with their existing terms;

All shares of the Company’s Class A common stock outstanding immediately prior to the consummation of the Restructuring Transaction will remain outstanding and will represent 35% of the Company’s Class A common stock issued and outstanding following the consummation of the Restructuring Transaction (but before giving effect to shares authorized under the incentive plan for directors, officers and other employees of the Company or any conversion of the CoreCo Convertible Preferred Stock into NFE Class A common stock); and

If required in order to meet a consolidated minimum liquidity threshold ($100 million) on the closing date of the Restructuring Transaction, the Company will offer to all eligible creditors the opportunity to participate in a capital raise, pursuant to which the Company would raise up to $35 million in aggregate principal amount of additional New CoreCo Term Loans and, to the extent the consolidated minimum liquidity threshold would not be met after giving effect to the additional New CoreCo Term Loans, junior term loans secured by a second-priority lien in an amount so that the consolidated minimum liquidity threshold would be met.

Provided certain conditions are met (as set out in the RSA), the Company will pay to holders of or lenders under the debt instruments described above that become Supporting Creditors on or before 5:00 p.m. New York City time on April 8, 2026, an early consent fee (the “Early Consent Fee”) in an amount equal to 0.75% of the principal amount of such Supporting Creditors’pro rata claim in:

a. the principal outstanding under the 2026 Notes for each supporting holder of 2026 Notes;

b. the principal outstanding under the 2029 Notes for each supporting holder of 2029 Notes;

c. the principal outstanding under the Term Loan B Credit Agreement for each supporting lender under the Term Loan B Credit Agreement;

d. the principal outstanding under the R-1 Revolving Credit Facility for each supporting lender under the R-1 Revolving Credit Facility;

e. for each supporting lender under the R-2 Revolving Credit Facility, (i) the principal outstanding under the R-2 Revolving Credit Facility, plus (ii) a share of principal outstanding under the Series I Credit Agreement and the Series II Credit Agreement in proportion to the share of recoveries for lenders under the R-2 Revolving Credit Facility in respect of certain assets of NFE Financing together with a guarantee from Bradford County Real Estate Partners LLC (the “Brazil Collateral”) governed by an intercreditor agreement dated December 6, 2024 (the “Brazil Parent ICA”);

f. for each supporting lender under the Term Loan A Credit Agreement, (i) the principal outstanding under the Term Loan A Credit Agreement, plus (ii) a share of principal outstanding under the Series I Credit Agreement and the Series II Credit Agreement in proportion to the share of recoveries for lenders under the Term Loan A Credit Agreement in respect of the Brazil Collateral under the Brazil Parent ICA; and

g. for each supporting holder of the New 2029 Notes, a share of principal outstanding under the Series I Credit Agreement and the Series II Credit Agreement in proportion to the share of recoveries for holders of the New 2029 Notes in respect of the Brazil Collateral under the Brazil Parent ICA.

The Company has received strong indications of support for the Restructuring Transaction from holders and lenders representing over 95% of its approximately $5.8 billion principal amount of aggregate indebtedness, including approximately 93% of holders of the 2026 Notes, 87% of holders of the 2029 Notes, 98% of holders of the New 2029 Notes, 100% of lenders under the Term Loan A Credit Agreement, 88% of lenders under the Term Loan B Credit Agreement, and 100% of lenders of the Revolving Credit Facility as of April 1, 2026.

A Supporting Creditor’s entitlement to the Early Consent Fee will be determined by reference to the aggregate principal amount of notes and loans held by that Supporting Creditor as of the record date specified to creditors for voting under the Restructuring Plans (as defined below). Such early consent fee will be payable in kind in the form of the consideration to be afforded to such Supporting Creditors under the Restructuring Plans. Separately, the Company has agreed to pay each lender under the Revolving Credit Agreement that agrees to forbear from taking any enforcement action under the Revolving Credit Agreement a standstill fee in an amount equal to 2.00% of the outstanding loans made by such forbearing lender, provided that a simple majority of lenders under the Revolving Credit Agreement agree to forbear.

Summary of the CoreCo Convertible Preferred Stock and FLNG 2 Preferred Equity

Pursuant to the terms of the RSA, the CoreCo Convertible Preferred Stock will mandatorily convert on the third anniversary of the closing date of the Restructuring Transaction into shares of NFE Class A common stock representing 87% of the fully diluted Class A common stock of NFE as of the closing date of the Restructuring Transaction (after giving effect to the shares of NFE Class A common stock to be issued on the closing date of the Restructuring Transaction and the incentive plan for directors, officers and other employees of the Company). The conversion rate of the CoreCo Convertible Preferred Stock will be subject to customary adjustments for stock splits, distributions, reorganizations and reclassifications, as well as to certain price-based anti-dilution adjustments for subsequent issuances of NFE Class A common stock (or securities convertible into NFE Class A common stock) made by the Company while the CoreCo Convertible Preferred Stock remains outstanding (subject to certain exempt issuances). CoreCo will have the right to redeem or repurchase the CoreCo Convertible Preferred Stock from time to time with certain sources of proceeds enumerated in the RSA. Holders of the CoreCo Convertible Preferred Stock will be entitled, in arrears, to a cumulative quarterly compounding dividend, which will accrue automatically via an increase to liquidation preference, with a cumulative per annum preferred return of 3.0%, 5.0% and 7.0% in each of the three years, respectively, prior to conversion. The CoreCo Convertible Preferred Stock will participate on an as-converted basis in any dividends and distributions on, and vote together with holders of, NFE Class A common stock. The CoreCo Convertible Preferred Stock will be subordinated in right of payment to all existing and future indebtedness of CoreCo and senior in right of payment to all existing and future equity securities of CoreCo.

The FLNG 2 Preferred Equity will be issued by FLNG 2 Co at the closing date of the Restructuring Transaction pursuant to the RSA and will reflect economic and structural features substantially similar to those of the CoreCo Convertible

Preferred Stock, except as otherwise provided herein. CoreCo will have the right to redeem the FLNG 2 Preferred Equity from time to time with certain sources of proceeds enumerated in the RSA. The Company will not pay any dividends on the FLNG 2 Preferred Equity. The FLNG 2 Preferred Equity will be subordinated in right of payment to all existing and future indebtedness of FLNG 2 Co and senior in right of payment to all existing and future equity securities of FLNG 2 Co.

Summary of the New CoreCo Term Loans

The Company expects to use the proceeds of the New CoreCo Term Loans to refinance, on a cashless basis, certain of the loans and other obligations outstanding under the Revolving Credit Agreement and Term Loan B Credit Agreement. If necessary, the cash proceeds of up to $35 million of additional New CoreCo Term Loans will be used to satisfy the consolidated minimum liquidity threshold required by the RSA. The New CoreCo Term Loans will mature five years after the closing date of the Restructuring Transaction and will amortize at a rate of 1% per annum, paid quarterly. The New CoreCo Term Loans will be guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the Letter of Credit Facility on the closing date of the Restructuring Transaction, and will be secured by substantially the same collateral as the collateral that currently secures the Letter of Credit Facility, subject to certain exceptions, including the Company’s FLNG 2 assets. To the extent the minimum liquidity threshold is not satisfied after giving effect to the funding of the New CoreCo Term Loans, the Company is permitted to incur additional indebtedness that will be guaranteed by the same guarantors guaranteeing the New CoreCo Term Loans and secured by a second-priority lien on all of the collateral securing the New CoreCore Term Loans.

The New CoreCo Term Loans may be voluntarily prepaid by the Company, in whole or in part, subject to prepayment premiums for optional prepayments equal to 102% of the aggregate principal amount of such term loan prepaid plus accrued and unpaid interest during the first year after the closing of the New CoreCo Credit Agreement, and at par plus accrued and unpaid interest thereafter. The Company will be required to prepay the New CoreCo Term Loans at par with the net proceeds of non-ordinary course asset sales, condemnations and certain other events enumerated in the RSA.

Holder Elections

Certain holders of debt under the Revolving Credit Agreement and Term Loan A Credit Agreement may elect to receive their pro rata share of $45 million in lieu of the BrazilCo Common Equity they would receive in exchange for their debt. Holders of debt under the Revolving Credit Agreement may elect to receive additional New CoreCo Term Loans in lieu of the CoreCo Convertible Preferred Stock they would receive in exchange for their claims, at a rate of 50% of the liquidation preference of the CoreCo Convertible Preferred Stock in aggregate principal amount of New CoreCo Term Loans.

In addition, one or more directors and officers of the Company and, potentially, certain Supporting Creditors and/or third-party investors, as determined by such directors and officers, will offer to purchase from holders of debt under the Revolving Credit Agreement and Term Loan A Credit Agreement a limited number of shares of CoreCo Convertible Preferred Stock allocated to such holders (subject to certain terms and conditions, including that the relevant holder timely elects to participate in such arrangements) for a cash purchase price of 25% of the liquidation preference of such shares of CoreCo Convertible Preferred Stock.

The Restructuring Plans

The Company expects to complete the Restructuring Transaction through restructuring plans promoted by each of two indirect subsidiaries of the Company, (i) NFE Global Holdings Limited (“NFE Global”) and (ii) NFE Brazil Newco Limited (“NFE Brazil Newco”) (each, a “PlanCo”) under Part 26A of the UK Companies Act 2006 (for each PlanCo, the “Restructuring Plan” and together, the “Restructuring Plans”) and sanctioned by the High Court of Justice in England (the “UK High Court”). NFE Global will propose a Restructuring Plan (the “CoreCo Plan”) that will compromise the debt under the Series I Credit Agreement, Series II Credit Agreement, 2026 Notes, 2029 Notes, Revolving Credit Agreement, Term Loan A Credit Agreement and Term Loan B Credit Agreement, and NFE Brazil Newco will propose a Restructuring Plan (the “BrazilCo Plan”) that will compromise the debt under the New 2029 Notes. The PlanCos will seek recognition of the Restructuring Plans in the United States pursuant to chapter 15 of the U.S. Bankruptcy Code. The Restructuring Plans will bind all relevant creditors, and release the obligations of the Company and all guarantors, under the debt instruments addressed in the Restructuring Plans; however, neither the Company nor any of its subsidiaries other than the PlanCos anticipate being parties to the Restructuring Plans proceedings in the UK High Court, the chapter 15 recognition proceedings or any other restructuring, bankruptcy or insolvency proceeding in connection with the Restructuring Transaction.

The RSA sets forth the commitments of the Company and the Supporting Creditors to, among other things, cooperate in good faith to negotiate the definitive documents necessary or advisable to effect the Restructuring Transaction, use their commercially reasonable efforts to consummate the Restructuring Transaction in accordance with such definitive documents, and refrain from taking any actions, the substantial purpose of which is to object to, impede, obstruct, or materially delay the implementation of the Restructuring Transaction (including by supporting or consenting to any alternative transaction, subject, in the case of the Company, to a “fiduciary out”). In addition, the Supporting Creditors have agreed to forbear from exercising remedies (or directing or consenting to any such exercise of remedies) with respect to certain specified defaults and events of default under the applicable debt instruments while the RSA is in effect.

The parties’ obligations to consummate the Restructuring Transaction are subject to the satisfaction of certain conditions, including the UK High Court’s entry of an order sanctioning the Restructuring Plans and the recognition of that order in the United States pursuant to chapter 15 of the U.S. Bankruptcy Code, completion of definitive documents acceptable to the parties in accordance with standards set forth in the RSA, approval of certain matters by the Company’s stockholders, receipt of required regulatory and third-party consents and approvals, and satisfaction of certain process “milestones”.

The RSA may be terminated by the Company and/or the Supporting Creditors, as applicable, upon the occurrence of specified events defined in the RSA, including, without limitation, if (1) a material, uncured breach of certain parties’ representations, warranties, covenants, or obligations under the RSA occurs, (2) any of the conditions to the closing of the Restructuring Transaction (including the timely satisfaction of any of the process “milestones” prescribed in the RSA) is not timely satisfied or waived, (3) certain issued letters of credit are drawn or (4) the Restructuring Transaction has not closed by September 15, 2026 (which date may be automatically extended by up to 90 calendar days in certain circumstances and further extended with the consent of certain parties in accordance with the terms of the RSA through December 31, 2026). In addition, the Company may terminate the RSA if the Company’s board of directors determines, upon the advice of counsel, that the Company’s continued performance under the RSA would be inconsistent with the fiduciary duties of the Company’s directors.

The Company intends to submit certain proposals in connection with the Restructuring Transaction to the Company’s stockholders at its 2026 Annual Meeting of Stockholders, including, among other things, an amendment to the Company’s Certificate of Incorporation (the “Certificate of Incorporation”) to increase the number of authorized shares of the Company’s Class A common stock; approval for the potential issuance of common stock exceeding 20% of the current outstanding shares to comply with Nasdaq rules; an amendment to the Company’s 2019 Omnibus Incentive Plan (the “Incentive Plan”) to increase the number of shares available for grants; and an amendment to the Certificate of Incorporation to authorize a reverse stock split at a ratio to be determined by the Company’s board of directors (collectively, the “Stockholder Proposals”). The Restructuring Transaction is conditioned upon approval of all of the Stockholder Proposals.

Although we intend to pursue the Restructuring Transaction in accordance with the terms set forth in the RSA, there can be no assurance that we will satisfy all of the conditions under the RSA and complete the Restructuring Transaction as contemplated or at all. If we are unable to complete the Restructuring Transaction or any other alternative transactions, we will be required or compelled to pursue additional restructuring initiatives to preserve value and optionality, including possible out of court restructurings, or in-court relief, in the UK or the U.S., which could have a material and adverse impact on stockholders.

As part of our ongoing discussions with creditors, we have determined that it was not probable that we would pursue the development of certain Fast LNG projects, the ZeroParks hydrogen project and our Klondike power and data center development business. In addition, as we expect to divest our Brazil business upon effectuation of the Restructuring Transaction, our discussion of our business below is focused on our business after the Restructuring Transaction. Subsequent to the Restructuring Transaction, we plan to focus on operational efficiency of our facilities and cost effective completion of in-process development projects, with the objective of returning to profitability and generating shareholder value.

Business Overview

We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas (“LNG”) infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets. Collectively, our assets and operations reinforce global energy security, enable economic growth, enhance environmental stewardship and transform local industries and communities around the world.

We deliver targeted energy solutions by employing an integrated LNG supply and delivery model:

LNG and Natural Gas Supply and Liquefaction– We supply LNG and natural gas regasified from LNG to our own power plants and to our customers. Our first floating liquefaction unit, which we refer to as “FLNG 1”, began producing LNG in July 2024, and we source a significant portion of our LNG needs from this facility. Currently, demand for LNG above FLNG 1’s capacity is acquired from third party suppliers in open market purchases. Starting in 2027, we expect to meet this demand under long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component.

Shipping– We lease, own or operate a fleet of two floating storage and regasification units (“FSRUs”) and seven liquefied natural gas carriers (“LNGCs”) and floating storage units (“FSUs”). Six vessels are owned by Energos Infrastructure (“Energos”). We also charter vessels to and from third parties as well as from Energos.

Facilities– Through our network of current and planned downstream facilities and logistics assets, we are strategically positioned to deliver gas and power solutions to our customers seeking either to transition from environmentally dirtier distillate fuels such as automotive diesel oil (“ADO”) and heavy fuel oil (“HFO”) or to purchase natural gas to meet their current fuel needs.

Our Business Model

As an integrated gas-to-power energy infrastructure company, our business model spans the entire production and delivery chain from natural gas procurement and liquefaction to shipping, logistics, facilities and conversion or development of natural gas-fired power generation. We currently conduct our downstream terminal operations at the following facilities:

our landed micro-fuel handling facility in San Juan, Puerto Rico (the “San Juan Facility”), and

our LNG receiving facility (the “La Paz Facility”) and gas-fired power plant (the “La Paz Power Plant”) at the Port of Pichilingue in Baja California Sur, Mexico.

In addition, we are currently developing facilities in Nicaragua and Ireland, as described below in more detail. We are in active discussions with additional customers to develop projects in multiple regions around the world who may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target pricing or margins.

On May 14, 2025, we completed the sale of our Jamaica business, including operations at the LNG import terminal in Montego Bay, the offshore floating storage and regasification terminal in Old Harbour and the 150 MW Combined Heat and Power Plant in Clarendon, along with the associated infrastructure (the “Jamaica Business”). We received cash proceeds of approximately$678.5 million, with an additional$98.6 million of proceeds held in escrow to be returned to us based on the terms of the sale agreement. The proceeds were partially used to repay all outstanding South Power Bonds of $227.2 million and certain transaction costs.

On April 1, 2026, we completed the Turbine Sale-Leaseback Transaction (as defined herein) with respect to certain turbines located in Puerto Rico for a purchase price of $265.9 million. The net proceeds from the Turbine Sale-Leaseback Transaction were used to repay certain indebtedness, thereby reducing our leverage profile.

Our Facilities

We build facilities in locations where the need for natural gas is significant. We design and construct natural gas and power facilities to meet the supply and demand specifications of our current and potential future customers in an applicable region. In these markets, we first seek to identify and establish “beachhead” target markets for the sale of LNG, natural gas or natural gas-fired power, and we then seek to supply natural gas or power under long-term downstream contracts. Finally, our goal is to expand within the market and supply natural gas or power to additional industrial and transportation customers.

Our facilities position us to acquire and supply LNG to customers and natural gas-fired power in a number of attractive markets around theworld. Downstream, we have seven facilities that are either operational or under active development. We currently have two operational LNG terminal facilities and two under active development, as well as one operational power plant facility and two power plant facilities under active development, as described below. Our LNG facilities currently operating or under development are expected to be capable of receiving up to approximately 435,000 MMBtu from LNG per day depending upon the needs of our customers and potential demand in the region.

Set forth below is additional detail regarding each of our LNG and power facilities:

San Juan, Puerto Rico– Our San Juan Facility became fully operational in July 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the Puerto Rico Electric Power Authority (“PREPA”) San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and other industrial end-user customers in Puerto Rico.

In 2023, we entered into agreements for the installation and operation of approximately 350 MW of power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas and ADO. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 350 MW of duel-fuel power generation using our gas supply in less than 180 days. In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated, and we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA. In December 2025, we entered into a settlement agreement, pursuant to which the Company will receive a total of $142.0 million as equitable adjustment related to the early termination of our contract to provide emergency power services. We received $52.6 million of payment in February 2026 and expect to receive the remaining balance in the first half of 2026.

In December 2025, we were awarded a new 7-year gas supply agreement with PREPA to deliver up to 75 TBtu of natural gas annually from our San Juan Facility. The new contract establishes security of supply in San Juan for power plants currently running on natural gas and also provides for incremental natural gas volumes to be delivered, allowing for the conversion of additional gas-ready plants currently burning diesel. We do not expect to have to incur significant capital expenditures to be able to supply these additional locations.

In 2023, our wholly-owned subsidiary, Genera PR LLC (“Genera”), was awarded a 10-year contract for theoperation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. The service period under the contract commenced on July 1, 2023, and we receive an annual management fee for the services provided.

La Paz, Baja California Sur, Mexico– Our La Paz Facility commenced operations in the fourth quarter of 2021. It is an LNG receiving facility located at the Port of Pichilingue in Baja California Sur, Mexico, receiving LNG via ISO containers on an offshore supply vehicle from a nearby vessel. Beginning in 2021, we have entered into a gas sales agreement with CFEnergia (“CFE”), a subsidiary of Federal Electricity Commission (Comisión Federal de Electricidad), Mexico’s power utility, for the supply of natural gas to power plants located at Punta Prieta and Coromuel in the State of Baja California Sur (“CFE Plants”). We continue to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur, and in the third quarter of 2024, we executed a 10-year gas sales agreement to supply natural gas to additional CFE facilities on take-or-pay basis.

The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135 MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023. We expect to sell approximately 34,000 MMBtu from LNG per day to CFE and for use in the La Paz Power Plant.

Puerto Sandino, Nicaragua– We are developing an offshore liquefied natural gas receiving, transloading and regasification facility off the coast of Puerto Sandino, Nicaragua (the “Puerto Sandino Facility”). The Puerto Sandino Facility is expected to supply gas via a pipeline to our new approximately 300 MW natural gas-fired power plant in Puerto Sandino, Nicaragua (the “Nicaragua Power Plant”) that we will own and operate. We have entered into a 25-year power purchase agreement with Nicaragua’s electricity distribution companies. We expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. Construction of the power plant is substantially complete, and we expect to complete the construction of the terminal and commission both the terminal and the power plant during 2026. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.

Shannon, Ireland– We intend to develop and operate an LNG facility (the “Ireland Facility” and, together with the San Juan Facility, the La Paz Facility and the Puerto Sandino Facility, our “LNG Facilities”) and a power plant on the Shannon Estuary, near Tarbert, Ireland (the “Ireland Power Plant” and, together with the La Paz Power Plant, Nicaragua Power Plant, the “Power Plants,” and together with the LNG Facilities, the “Facilities”). In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator.

In the third quarter of 2023, An Bord Pleanála (“ABP”), Ireland’s planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that the ABP did not have appropriate grounds for the denial of our permit. In March 2025, ABP withdrew their appeal to the September 2024 decision of the High Court of Ireland. ABP is now reconsidering our planning application in accordance with Irish Law. Further, in March 2025, An Coimisiún Pleanála (previously ABP) granted our application to construct a 600 MW power plant and a separate application to construct the 220kV electricity interconnect. We are able to fuel this power plant via our LNG marine import terminal, if approved, or using gas provided from our permitted pipeline interconnection. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project; however, management continues to assess all options in respect of future developments for the land held.

Santa Catarina, Brazil- We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day of natural gas. In March 2026, the Company entered into a term sheet to lease its Santa Catarina Facility to a third party that is expected to commence in August 2026.

In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. (“Lins”), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05GW located in the State of São Paulo, within the city limits of Lins. The Santa Catarina Facility will supply natural gas to the Lins power project, and is expected to commence operations in 2031.

Barcarena, Brazil - The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We have substantially completed our Barcarena Facility and are in process of final commissioning.

The Barcarena Facility will also supply our new 630 MW combined cycle natural gas-fired power plant located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to place the Barcarena Power Plant into service in the first half of 2026.

In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. (“PortoCem”), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior (“Ceiba Energy”). PortoCem isthe owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant (“PortoCem Power Plant”) to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.

Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Barcarena Facility, Barcarena Power Plant, Santa Catarina Facility, and PortoCem Power Plant.

LNG Supply

NFE provides reliable, affordable and clean energy supplies to customers around the world, and we currently satisfy customer demand with production from FLNG 1, which we expect to generate up to 70 TBtus annually. We have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2029. Additional LNG needed to supply expansion of our operations in Puerto Rico and/or our Nicaragua Power Plant will be provided by open market purchases until the commencement of these LNG supply contracts.

Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years, including recently due to the war with Iran. Our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Pricing for feed gas purchased for own Fast LNG production is based on Henry Hub, which allows us to mitigate exposure to variability in LNG prices. Our long-term supply contracts also contain pricing based on Henry Hub, however, until the commencement of these long-term supply contracts, a portion of our LNG needs will be purchased on the open market which exposes us to volatility in LNG pricing.

Fast LNG

Our first Fast LNG unit, FLNG 1, has been deployed off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit utilizes CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. FLNG 1 is fully commissioned, and we are in the process of increasing available liquefaction capacity through optimization projects.

The Fast LNG design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored floating storage unit(s) provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. Fast LNG is anchored by key benefits over conventional liquefaction projects. In particular, we believe installing modular equipment in a shipyard will meaningfully expedite timelines. In addition, placing solutions offshore provides greater access to natural gas and optimized marine logistics.

Following the completion of the Restructuring Transaction, we do not plan to incur significant capital expenditures to develop our second 1.4 MTPA Fast LNG unit (“FLNG 2”). We are in active discussions with third parties to co-develop FLNG 2, which is expected to take approximately 24 months to complete from the time our partner is engaged. Estimated cost to complete is uncertain and is dependent upon final design and engineering, but we currently expect the remaining cost to be between $750.0 million and $1,500.0 million.

Our Shipping Assets

Our shipping assets include: FSRUs, FSUs and LNGCs, which are primarily commercially operated by us or opportunistically leased to customers under long-term or spot arrangements when not being used in our operations. FSRUs provide offshore storage and regasification capabilities and are generally less costly and substantially faster to deploy compared to the construction and development of land-based LNG regasification and storage facilities. FSUs are floating storage assets, which often provide storage for LNG but are also capable of transporting LNG when required. LNGCs are vessels that transport LNG and are compatible with many LNG loading and receiving terminals globally.

Our shipping assets are included in our two operating segments, Ships and Terminals and Infrastructure. The Ships operating segment includes vessels that were part of a historical financing transaction. We exclude such vessels from the Ships operating segment and include them in our Terminals and Infrastructure operating segment once we begin to use the vessels in our own operations.

Set forth below are tables containing additional detail regarding each vessel in our operating segments:

Ships Segment:

NameTypeCapacity (cubic meters of LNG)OwnerContract TypeLocation
Nusantara Regas SatuFSRU125,000EnergosLeaseIndonesia

Terminals and Infrastructure Segment:

NameTypeCapacity (cubic meters of LNG)OwnerContract TypeLocation
Orion SeaLNGC/FSU174,000JP MorganLeaseVarious
Energy EnduranceLNGC / FSU174,000Alpha GasLeaseVarious
Energos CelsiusFSRU161,000EnergosLeaseBrazil
NFE PenguinLNGC / FSU161,000EnergosLeaseMexico
Gaslog SingaporeLNGC / FSU155,000GaslogLeaseVarious
Energos MariaLNGC / FSU146,000EnergosLeaseVarious
Energos GrandLNGC / FSU146,000EnergosLeaseMexico
Energos PrincessLNGC / FSU138,000EnergosLeaseVarious

We also lease, own and operate various operating service vessels, tugboats and other vessels to support our global operations.

Our Current Customers

Our downstream customers are, and we expect future customers to be, a mix of power, transportation and industrial users of natural gas and LNG, as well as local power generation, distribution companies, including private and governmental owned or controlled. We seek to substantially reduce our customers’ fuel costs while providing them with a cleaner-burning, more environmentally-friendly fuel source. We also intend to sell power directly to some of our customers.

We seek to enter into long-term take-or-pay contracts to deliver natural gas or LNG. Pricing for any particular customer depends on the size of the customer, purchased volume, the customer’s credit profile, the complexity of the delivery and the infrastructure required to deliver it.

We continue to have significant concentrations in revenue. Revenue from one customer constituted 30% of total revenue in 2025; no other customers comprised more than 10% of our revenue. We expect to have more significant concentrations in revenue in the near term upon divestiture of our Brazil business as a result of the Restructuring Transaction.

We have several contracts with government-affiliated entities in the countries in which we operate. In Puerto Rico, we have gas sales agreements with PREPA, and Genera operates and maintains PREPA’s thermal generation assets. In Mexico, we have entered into a gas sales agreement with CFE. In Nicaragua, we have entered into a 25-year power purchase agreement with Nicaragua’s electricity distribution companies, some of which are wholly or partially owned or controlled by governmental entities.

Competition

In marketing LNG and natural gas, we compete for sales of LNG and natural gas primarily with LNG distribution companies who focus on sales of LNG without our integrated approach which includes terminal services and power. We also compete with a variety of natural gas marketers who may have affiliated distribution partners, including:

major integrated marketers whose advantages include large amounts of capital and the ability to offer a wide range of services and market numerous products other than natural gas;

producer marketers who sell natural gas they produce or which is produced by an affiliated company;

small geographically focused marketers who focus their marketing on the geographic area in which their affiliated distributor operates; and

aggregators who gather small volumes of natural gas from various sources, combine them and sell the larger volumes for more favorable prices and terms than would be possible selling the smaller volumes separately.

Despite these competitors, we do not expect to experience significant competition for our LNG logistics services with respect to the Facilities to the extent we have entered into GSAs or other long-term agreements we serve through the Facilities. If and when we have to replace our agreements with our counterparties, we may compete with other then-existing LNG logistics companies for these customers.

In purchasing LNG, we compete for supplies of LNG with:

large, multinational and national companies with longer operating histories, a stronger credit profile, more development experience, greater name recognition, larger staffs and substantially greater financial, technical and marketing resources;

oil and gas producers who sell or control LNG derived from their international oil and gas properties; and

purchasers located in other countries where prevailing market prices can be substantially different from those in the United States.

Government Regulation

Our infrastructure business and operations are subject to extensive regulation under federal, state and local statutes, rules, regulations and laws, as well as foreign regulations and laws. These laws require, among other things, consultations with appropriate federal, state and other agencies and that we obtain, maintain and comply with applicable permits, approvals and other authorizations for the siting and conduct of our business. These regulatory requirements increase our costs of operations and construction, and failure to comply with such laws could result in consequences such as substantial penalties and/or the issuance of administrative orders to cease or restrict operations until we are in compliance.

DOE Export

The DOE issued an order authorizing us, through our subsidiary, NFEnergía LLC, to import LNG from various international sources by vessel at our San Juan Facility over the two-year period beginning March 26, 2024. NFEnergía LLC must renew its authorization every two years and is in the process of attaining such authorization from the DOE for the two-year period beginning on March 26, 2026. Imports of LNG are deemed to be consistent with the public interest under Section 3 of the Natural Gas Act (“NGA”) and applications for such imports must be granted without modification or delay. In August 2024, we received authorization from the DOE to export up to 1.4 million tonnes per annum of LNG to non-FTA countries from our Altamira Facility for a term of five years.

FERC Authorization

The Federal Energy Regulatory Commission (“FERC”) regulates the siting, construction and operation of “LNG terminals” under NGA Section 3. In consultation with our outside counsel and, where appropriate, FERC staff, we have designed and constructed our U.S. facilities so that they do not meet the statutory definition of an “LNG terminal” as interpreted by FERC pursuant to its case law. On March 19, 2021, as upheld on rehearing on July 15, 2021, FERC determined that our San Juan Facility is subject to its jurisdiction and directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. The FERC orders were affirmed by the United States Court of the Appeals for the District of Columbia Circuit (“D.C. Circuit”) on June 14, 2022. In order to comply with the FERC’s directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.

On July 18, 2023, we filed for an amendment to the March 19, 2021 and July 15, 2021 FERC orders allowing the continued operation of the San Juan Facility during the pendency of the formal application to allow us to construct and interconnect 220 feet of incremental 10-inch pipeline needed to supply natural gas for temporary power generation solicited through the Puerto Rico Power Stabilization Task Force. On July 31, 2023, FERC issued an order stating that it would not take action to prevent the construction and operation of the pipeline and interconnect and on January 30, 2024, FERC reaffirmed the order allowing the construction and operation to continue. On September 19, 2025, the D.C. Circuit denied a petition challenging this FERC order, holding that the order reflected an unreviewable exercise of enforcement discretion rather than a de facto authorization for construction or operation. The deadline to seek a writ of certiorari from that decision has expired.

On September 26, 2024, the United States Coast Guard (“USCG”) filed a Letter of Recommendation (“LOR”) with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025. On January 12, 2026, the Acting Captain of the Port of San Juan for the USCG issued a LOR in response to NFE’s filings. The LOR determined that the Port of San Juan waterway is suitable for the transit and docking of larger LNG Carriers.

On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.

Pipeline and Hazardous Materials Safety Administration

Many LNG facilities are also subject to regulation by the Department of Transportation (“DOT”), through PHMSA; PHMSA has established requirements relating to the design, installation, testing, construction, operation, replacement and management of “pipeline facilities,” which PHMSA has defined to include certain LNG facilities that liquefy, store, transfer or vaporize natural gas transported by pipeline in interstate or foreign commerce. PHMSA has promulgated detailed, comprehensive regulations governing LNG facilities under its jurisdiction at Title 49, Part 193 of the United States Code of Federal Regulations. These regulations address LNG facility siting, design, construction, equipment, operations, maintenance, personnel qualifications and training, fire protection and security. Variances from these regulations may require obtaining a special permit from PHMSA, the issuance of which is subject to public notice and comment and consultation with other federal agencies, which could result in delays, perhaps substantial in length, to the construction of our facilities where such variances are needed; additionally, PHMSA may condition, revoke, suspend or modify the special permits it issues.

Environmental Regulation

Our infrastructure and operations are subject to various international, federal, state and local laws and regulations as well as foreign laws and regulations relating to the protection of the environment, natural resources and human health. These laws and regulations may require the installation of controls on emissions and structures to prevent or mitigate any potential harm to human health and the environment or require certain protocols to be in place for mitigating or responding to accidental or intentional incidents at certain facilities. These laws and regulations may also lead to substantial penalties for noncompliance and substantial liabilities for incidents arising out of the operation of our facilities. Many of these laws and regulations restrict or prohibit the types, quantities and concentration of substances that can be released into the environment and can lead to substantial civil and criminal fines and penalties for non-compliance.

Other local laws and regulations, including local zoning laws, critical infrastructure regulations and fire protection codes, may also affect where and how we operate.

The costs of compliance with these requirements are not expected to have a material adverse effect on our business, financial condition or results of operations.

Environmental Regulation in Mexico

Mexican law comprehensively regulates the energy sector, including all aspects of the receipt, delivery, import, export, storage, marketing, liquefaction, and regasification of LNG; the generation and transmission of electricity; and the environmental impact of all these activities. Various Mexican federal agencies regulate these activities including, the Ministry of Energy, Ministry of the Navy, Ministry of Environment and Natural Resources, Ministry of Infrastructure,

Communication and Transportation, the Energy Regulatory Commission, and the Safety, Energy & Environment Agency. State and local agencies are also involved in regulating these activities, issuing permits and authorizing the use of property for such purposes. To obtain permits and approvals required under Mexican law for the development, construction and operation of energy-related projects in Mexico, such projects must first complete environmental and social impact assessments, which are subject to the evaluation by the authorities. In addition, all hydrocarbon projects must include an environmental risk assessment, which is based on a thorough risk analysis made prior to each stage and aimed at identifying potential design and operational hazards. Mexican law allows the governmental entities and, in certain cases, individuals, to pursue claims against violations of environmental laws or permits issued pursuant to such laws.

Environmental Regulation in Nicaragua

The regulation of activities with the potential to impact the environment in Nicaragua are largely regulated by the Natural Resource and Environment Ministry. Nicaragua regulates many areas of environmental protection. In order to obtain various permits for operations, a project must complete environmental and social impact analyses according to Nicaraguan law. While Nicaragua does not currently have any legislation specifically addressing the receipt, handling, and distribution of natural gas, such laws may be passed in the future.

Environmental Regulation in Ireland

The operation of the facilities will be regulated via additional licenses and consents including from the Environmental Protection Agency (EPA); the Commission for Regulation of Utilities (CRU); the Health and Safety Authority (HSA); and the Local Planning Authority (Kerry Co. Council (KCC)). Additionally, the Shannon Foynes Port Company (SFPC) has statutory jurisdiction over marine activities. The LNG Terminal and Power Plant will also have to operate within the provisions of a number of codes, such as the EirGrid Transmission Network Grid Code, Single Electricity Market Trading and Settlement Code and GNI Code of Operations. We are in the process of applying for all these necessary permits, licenses and consents to build and complete the Ireland Facility. The issuance of many of these permits may be subject to administrative or judicial challenges, including by non-governmental groups that act on behalf of citizens.

Environmental Regulation in Puerto Rico

Our operations in Puerto Rico are subject to various state and federal laws and regulations relating to the protection of the environment, natural resources and human health. Environmental statutes and regulations are largely implemented by the Puerto Rico Department of Environment and Natural Resources, which also oversees certain EPA delegated programs. As part of its operations, our San Juan Facility is required to comply with Clean Water Act requirements for stormwater and Clean Air Act requirements for facility emission sources. These laws and their related regulations require permits for the operation of the facilities and the implementation of mitigation measures to address environmental impacts of facility operations. Additionally, our operations in Puerto Rico are subject to regulation by the Department of Transportation and Public Works (“DTOP”). DTOP has been delegated authority from DOT to regulate both the distribution of natural gas through road transportation and facilities that operate natural gas pipelines. All deliveries of LNG by truck in Puerto Rico are subject to federal requirements for the ISO containers that hold the LNG and for the transport of the LNG by truck. Any expansion or increased stringency of these requirements may increase compliance costs for our operations in Puerto Rico.

U.S. and International Maritime Regulations of LNG Vessels

The International Maritime Organization (“IMO”) is the United Nations agency that provides international regulations governing shipping and international maritime trade. The requirements contained in the International Safety Management Code for the Safe Operation of Ships and for Pollution Prevention (the “ISM Code”) promulgated by the IMO govern the shipping of our LNG cargos and the operations of any vessels we use in our operations. Among other requirements, the ISM Code requires the party with operational control of a vessel to develop an extensive safety management system that includes, among other things, the adoption of a policy for safety and environmental protection setting forth instructions and procedures for operating its vessels safely and describing procedures for responding to emergencies.

Vessels that transport gas, including LNGCs, are also subject to regulation under various international programs such as the International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (the “IGC Code”) published by the IMO. The IGC Code provides a standard for the safe carriage of LNG and certain other liquid gases by prescribing the design and construction standards of vessels involved in such carriage, and includes specific air emissions limits, including on sulfur oxide and nitrogen oxide emissions from ship exhausts.

We contract with leading vessel providers in the LNG industry and look to them to ensure that each of our chartered vessels is in compliance with applicable international and in-country requirements. Nevertheless, the IMO continues to review and introduce new regulations and we cannot with any certainty predict what additional regulations, if any, may be passed by the IMO and what effect, if any, such regulation may have on our operations.

Import and Export Control Laws and Regulations

We conduct business throughout the world, and our business activities and services are subject to various applicable import and export control laws and regulations of the United States and other countries, particularly countries in the Caribbean, Latin America, Europe and the other countries in which we seek to do business. We must also comply with trade and economic sanctions laws, including the U.S. Commerce Department’s Export Administration Regulations and economic and trade sanctions regulations maintained by the U.S. Treasury Department’s Office of Foreign Assets Control. For example, in 2018, U.S. legislation was approved to restrict U.S. aid to Nicaragua and between 2018 and 2022, U.S. and European governmental authorities imposed a number of sanctions against entities and individuals in or associated with the governments of Nicaragua and Venezuela. Following the invasion of Ukraine by Russia in 2022, U.S., European, U.K. and other governmental authorities imposed a number of sanctions against entities and individuals in Russia or connected to Russia, including sanctions specifically targeting the Russian oil and gas industry. Violations of governmental export control and economic sanctions laws and regulations could result in negative consequences to us, including government investigations, sanctions, criminal or civil fines or penalties, more onerous compliance requirements, loss of authorizations needed to conduct aspects of our international business, reputational harm and other adverse consequences. Moreover, it is possible that we could invest both time and capital into a project involving a counterparty who may become subject to sanctions. If any of our counterparties becomes subject to sanctions as a result of these laws and regulations, changes thereto or otherwise, we may face an array of issues, including, but not limited to, (i) having to suspend our development or operations on a temporary or permanent basis, (ii) being unable to recuperate prior invested time and capital or being subject to lawsuits, or (iii) investigations or regulatory proceedings that could be time-consuming and expensive to respond to and which could lead to criminal or civil fines or penalties.

Anti-corruption Laws and Regulations

We are also subject to anti-corruption laws and regulations, including the U.S. Foreign Corrupt Practices Act (“FCPA”), the U.K. Bribery Act and local anti-bribery laws, which generally prohibit companies and their intermediaries from making improper payments to foreign officials for the purpose of obtaining or keeping business and/or other benefits. Some of the jurisdictions in which we currently operate present heightened risks for FCPA issues, such as Nicaragua, Brazil and Mexico. Furthermore, our strategy has been, and continues to be, dependent in part on our ability to expand our operations in additional emerging markets, including in Latin America, Asia and Africa. Efforts to expand our operations in these markets could expose us to additional risks related to anti-corruption laws and regulations. Although we have adopted policies and procedures that are designed to assist us, our officers, directors, employees and other intermediaries in complying with the FCPA and other anti-corruption laws and regulations, developing and implementing policies and procedures is a complex endeavor, particularly given the high level of complexity of these laws and regulations. There is no assurance that these policies and procedures have or will work effectively all of the time or protect us against liability under anti-corruption laws and regulations, including the FCPA, for actions taken by our officers, directors, employees and other intermediaries with respect to our business or any businesses that we may acquire, particularly in high-risk jurisdictions.

Suppliers

We expect to continue to supply our downstream customers with LNG and natural gas sourced primarily from our own FLNG production, supplemented by purchases on the open market, prior to the commencement of our long-term LNG supply contracts in 2027.

Seasonality

Our operations can be affected by seasonal weather, which can temporarily affect our revenues, the delivery of LNG and the construction of our Facilities. For example, activity in the Caribbean is often lower during the North Atlantic hurricane season of June through November, and following a hurricane, activity may decrease further as there may be business interruptions as a result of damage or destruction to our Facilities or the countries in which we operate. Due to these seasonal fluctuations, results of operations for individual quarterly periods may not be indicative of the results that may be realized on an annual basis. Severe weather in the countries where our Facilities are located may delay completion of our Facilities under development and related infrastructure, adversely affect our operations of our Facilities and affect the markets in which we operate. We are also particularly exposed to the risks posed by hurricanes, tropical storms and their collateral effects, in particular with respect to fleet operations and floating offshore liquefaction units.

Our Insurance Coverage

We maintain customary insurance coverage for our business and operations. Our domestic insurance related to property, equipment, automobile, general liability and workers’ compensation is provided through policies customary for the business and exposures presented, subject to deductibles typical in the industry. Internationally, we also maintain insurance, including policies related to property, equipment, automobile, marine, pollution liability, general liability and the portion of workers’ compensation not covered under a governmental program.

We maintain property insurance, including named windstorm and flood, related to the operation of the San Juan Facility and the La Paz Facility, and builders risk insurance at our Facilities under development.

Human Capital

We had 596 NFE full-time employees and 699 Genera full-time employees as of December 31, 2025. We depend upon our skilled workforce to manage, operate and plan for our business. Recruitment and retention of talent across our company enables growth and innovation across a multitude of corporate initiatives, and this is one of our top priorities.

Our Human Resources team oversees human capital management, including talent attraction and retention, compensation and bonuses, employee relations, employee engagement and training and development in the various countries in which we operate.

Culture and Inclusivity

Our employees are critical to the success of our business. We value a broad range of perspectives in our workplace and are committed to maintaining culture where our employees feel valued, welcomed and can thrive. We are subject to various federal, state and local laws related to labor and employment, including matters related to workplace discrimination, harassment and unlawful retaliation in the jurisdictions in which we operate. We have developed and published our Code of Business Conduct, which sets out a guideline in connection with these matters and reflects our high expectations for an ethical workplace where employees are treated with dignity and respect. Because labor and employment laws and regulations can differ among the jurisdictions in which we operate, our Code of Business Conduct operates as a guideline for practices, but does not cover every legal aspect in each of our locations.

We are committed to advancing our culture of inclusivity through the following actions, among others:

collecting and analyzing employee workforce data;

conducting harassment trainings; and

expanding employee benefits to include additional health programs such as mental health support and medical concierge services.

Employee Health, Safety and Wellness

We are subject to various health, safety, and environmental laws and regulations in the jurisdictions in which we operate. We have developed and published a Health, Safety, Security and Environment (HSSE) Strategic Framework, which sets out a guideline in connection with risk management, education/training, emergency response, incident management, performance measurement and other key programmatic drivers. Because health, safety, and environmental laws and regulations can differ among the jurisdictions in which we operate, our HSSE Strategic Framework operates as a guideline for practices, but is not binding or required. We also have developed and published a contractor safety management handbook for our contractors.

For the year ended December 31, 2025, we had no fatalities across our operating sites.

Property

We lease space for our offices in New York, New York, Houston, Texas, Rio de Janeiro, Brazil, Mexico City, Mexico and San Juan, Puerto Rico, and in other regions in which we operate. We own land in Pennsylvania and Ireland that can be used for future developments. Additionally, the properties on which our Facilities are located are generally subject to long-term leases and rights-of-way. Our leased properties are subject to various lease terms and expirations.

Sustainability

Since our founding in 2014, sustainability has been at the core of our mission and vision. We believe that a sustainable future built on positive energy is the way forward. To advance both our business model and the interests of our stakeholders— including our people, shareholders and investors, partners, the communities we serve, and the wider public—we have established three key sustainability goals: (i) protect and preserve the environment, (ii) empower people worldwide and (iii) invest in communities. Our sustainability initiatives and investments under each of these goals are highlighted below.

Protect and Preserve the Environment

We are committed to our goal to protect and preserve the environment, and we progress this goal by providing cleaner energy solutions around the world. With our projects, we strive to reduce carbon emissions and increase energy efficiency. By helping our customers convert from traditional fuels such as oil or coal to LNG as their energy source, we seek to reduce air-polluting emissions of nitrogen oxide (NOx), carbon dioxide (CO2), sulfur oxide (SOx), and fine particulate matter, among others. Moreover, we believe that the use of LNG as a complement to renewable power options is helping the transition to a sustainably-sourced energy future.

Empower People Worldwide

We are committed to our goal to provide access to affordable, reliable, cleaner energy. To that end, we help our customers customize and implement LNG energy solutions designed to lower their energy costs, reduce their environmental footprint, and improve their energy efficiency, either by converting their existing power generation to LNG or by building brand-new gas-fired facilities. In addition, we seek to provide a reliable supply of LNG to our customers, wherever located, through our established, integrated LNG logistics chain.

Invest in Communities

We are committed to our goal to improve lives and support people, especially in the communities where we operate. For the year ended December 31, 2025, we:

Hired 142 full-time employees globally, prioritizing local hires in each region;

Donated $0.2 million through our employee charity matching program;

Hosted a technical visit for top-performing Electrical and Mechanical Engineering students from the Federal University of the State of Pará, Brazil, supporting regional technical and scientific development through hands-on exposure to thermal power plant construction and assembly;

Developed a pilot vegetable garden in the Acuí Community of Brazil to support 150 people, promoting environmental education, sustainable land use, and preservation of traditional knowledge;

Supported women in completing a cutting and sewing course, resulting in certifications and professional empowerment; contributed five industrial sewing machines to the São Sebastião de Burajuba quilombola community in Brazil;

Sponsored the Museu das Amazônias in Belém, Brazil, for 7,000 visitors, supporting a landmark cultural initiative celebrating the Amazon’s identities, ecosystems, and heritage;

Provided safe drinking water through rainwater systems, benefiting 1,200 people, including 600 students, across schools, businesses, restaurants, and the Combu Health Center in Brazil;

Raised funding to provide adult diapers for older adults through Lions Club International, and collected and donated toys to support 150 children in La Paz, Mexico;

Sponsored the neighborhood baseball team from Guaynabo, Puerto Rico.

Available Information

We are required to file or furnish any annual, quarterly and current reports, proxy statements and other documents with the SEC under the Securities Exchange Act of 1934, as amended (the “Exchange Act”). The SEC maintains an internet website that contains reports, proxy and information statements and other information regarding issuers, including us, that file electronically with the SEC. The public can obtain any documents that we file with the SEC, including this Annual Report, atwww.sec.gov.

We also make available free of charge through our website, www.newfortressenergy.com, our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8- K, and, if applicable, amendments to those reports filed or furnished pursuant to Section 13(a) of the Exchange Act as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC. Information on our website or any other website is not incorporated by reference into, and does not constitute a part of, this Annual Report.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.