ITEM 2. PROPERTIES

Mining Property

To determine material mining operations in accordance with subpart 1300 of Commission Regulation S-K, management considered both quantitative and qualitative factors, assessed in the context of the Company’s overall business and financial condition. The Company concluded that, as of the date of the filing of this prospectus, its sole material mining operation is the CuMo Project. The Company will update its assessment of individually material mines on an annual basis.

The information relating to such sole material mining operation is contained in the technical report summary (“TRS”) relating to the CuMo Project prepared in compliance with Item 601(b)(96) and subpart 1300 of Regulation S-K. Reference should be made to the full text of the TRS, a copy of which is filed as Exhibit 96.1 to this registration statement and is incorporated herein by reference. A glossary of terms used herein can be found in the TRS.

Pursuant to Item 1302(b)(5) of Regulation S-K (17 C.F.R. §229.1302(b)(5)), the Company states that the TRS was prepared by Shaun M. Dykes, M. Sc. (Eng), P. Geo of Geologic Systems, Ltd. Mr. Dykes served as a director of the Company and Vice President, Exploration. Mr. Dykes met the qualifications specified under the definition of “Qualified Person” under Item 1300 of Regulation S-K. Mr. Dykes resigned from his position as an officer of the Company and a member of the Board on March 27, 2023.

The CuMo Project currently consists of one hundred and twenty-six (126) federal unpatented lode mining claims, and six (6) patented mining claims. In total, the project comprises approximately 2,640 acres. The unpatented lode mining claims and patented claims are situated in an unorganized mining district, in Boise County, Idaho, spanning Sections in Township 7N and 8N, Range 5E and 6E, Boise Meridian.

The names of the unpatented claims, and the place of record of the location notices, thereof in the official records of the Boise County recorder, and the authorized office of the Bureau of Land Management are as follows:

Table 1

The following table lists the unpatented mining claims currently a part of the CuMo Project:

On August 24, 2021, ICUMO and Computershare Trust Company of Canada entered into a 7.5% Secured Note Indenture under which the aggregate principal amount of notes authorized to be issued is $15,000, with a maturity date of May 31, 2028. The 7.5% Secured Note Indenture is secured by all of the mining claims of ICUMO that represent the CuMo Project, other than the patented lode mining claims located in Section 13, Township 8 North, Range 5 East, Boise Meridian, Boise County, Idaho, as depicted on Mineral Survey 1706: (i) Blackbird; (ii) Red Flag; (iii) Enterprise; (iv) Enterprise Fraction; (v) Commonwealth; and (vi) Baby Mine. In connection with this security interest, ICUMO and Computershare Trust Company of Canada, as Mortgagee, signed a Real Property Mortgage under which the Mortgagee has the right upon default by the mortgagor to choose to sell the real property constituting the unpatented claims set out above.

Table 2

The following table lists the patented mining claims currently a part of the CuMo Project:

On October 31, 2014, as subsequently amended March 26, 2015, and January 29, 2016, ICUMO entered into a Loan Agreement with La Familia II, LLC, evidenced by a secured promissory note, in the amount of $500,000. The promissory note accrues annual interest at 8.5%, has a maturity date of December 31, 2025, and is secured by a first priority deed of trust over the patented mining claims listed above.

Location, Access, Climate, Infrastructure and Topography

The CuMo Project is situated in the mountains of south-west Idaho, in the Boise National Forest, in Boise County, Idaho, approximately 15 miles northeast of the town of Idaho City, near the unincorporated community of Centerville, roughly 37 miles on a straight line, and 60 miles by road, from the city of Boise. Good all-weather highways, and US Forest Service roads provide access to the project from Idaho City and Centerville. The trip from Boise takes approximately 1.5 hours. Access can be limited during some winter months when significant snow cover can impede passage via the Forest Service roads.

The property can be accessed by road from Boise by taking State Highway 55 northerly for approximately 40 miles (65 km) to the town of Banks, Idaho, and then east on the Banks Lowman Road towards the town of Garden Valley for approximately 10 miles (16 km). One mile east of Garden Valley is a secondary road heading south across the Payette River. Following this secondary road, the westernmost edge of the CuMo claim block is approximately 10 miles (16 km) from Garden Valley. Alternatively, access can be gained (1) by traveling northeast from Boise along Highway 21 past the towns of Idaho City and Centerville, along Grimes Creek, and then over the Grimes Pass, or (2) from State Highway 55 north to Horseshoe Bend, then east on Harris Creek Road past New Centerville, Centerville, Pioneerville to Forest Service roads which give access to the western portion of the claim block.

The elevation of the CuMo project ranges between 5,100 feet and 7,200 feet. The project site features a mountain top which contains the bulk of the mineral deposit, deep ravines adjacent, and is largely forested, except for sections that have been cleared by several fires which occurred in 2014 and 2016.

The climate is defined by summer temperatures to a maximum of 100° F (38°C) and cold, windy winters with lows to -10° F (-23°C). Precipitation is moderately light with an average rainfall of 30 inches (<1 meter) and an average snowfall of approximately 140 inches (3.6 m). Vegetation in the project area consists of cedar, lodgepole pine, mountain mahogany, and juniper.

The general area is serviced by the Idaho Power Company which supplies electricity to residents of Garden Valley, Lowman and Pioneerville, and electricity from the existing power grid would be available by constructing a line and substations to the project site. The nearest rail line is the Idaho Northern & Pacific line formerly operated by Union Pacific that runs through the town of Banks, approximately 20 road miles (32 km) to the west of the property. There is also a rail loadout, on the same rail line as above, at the town of Horseshoe Bend roughly 25 miles southwest of the property. Equipment, supplies, and services for exploration and mining development projects are available at Boise, and housing for a construction and operational workforce is available in Boise and the smaller communities in the general area. Water is available from holders of Boise Basin certificated water allocation, or from the adjacent Payette River Basin. There is also a trained mining-industrial workforce available in Boise.

Exploration (subject to seasonal limitations provided under the Exploration Plan of Operations (Exploration PoO) issued by the US Forest Service) and mining activities at the property can be conducted year-round, due to the established road system and its proximity to other infrastructure. The property is large enough to accommodate exploration within the current CuMo deposit property footprint.