Item 1. BUSINESS

Premium Resources Ltd. and its wholly-owned subsidiaries’ principal business activity is the exploration and evaluation of PREM’s flagship asset, the Selebi nickel-copper-cobalt sulphide mine in Botswana and, separately, the Company’s Selkirk nickel-copper-cobalt-platinum group elements sulphide mine, also in Botswana. The common shares of PREM (“Common Shares”) are listed and posted for trading on the TSX Venture Exchange (the “TSXV”) under the symbol “PREM”. Prior to November 20, 2024, the Company traded on the TSXV under its previous name and symbol, Premium Nickel Resources Ltd. and PNRL, respectively. In addition, the Common Shares are currently quoted on the OTC Pink Open Market under the symbol “PRMLF”.

-1-

The following corporate structure chart sets out details of the direct and indirect ownership of the principal subsidiaries of the Company:

Notes:

(1)Premium Nickel Group Proprietary Limited (“PNGPL”) owns the Selkirk Assets (as defined below).
(2)Premium Nickel Resources Proprietary Limited (“PNRPL”) owns the Selebi Assets (as defined below).

The Company’s head and registered office is located at One First Canadian Place, 100 King Street West, Suite 3400, Toronto, Ontario, Canada, M5X 1A4.

PREM is a mineral exploration and evaluation company focused on the discovery and advancement of high-quality nickel-copper-cobalt-platinum group elements (“Ni-Cu-Co-PGE”) resources. The principal assets of the Company are the Selebi and Selebi North nickel-copper-cobalt (“Ni-Cu-Co”) mines in Botswana and related infrastructure (together, the “Selebi Mines”), as well as the Ni-Cu-Co-PGE Selkirk mine in Botswana, together with associated infrastructure and four surrounding prospecting licences (collectively, the “Selkirk Mine” and together with the Selebi Mines, the “Mines”).

The Selebi and Selkirk mines are permitted with 10-year mining licences, granted in 2022, and renewable upon the submission of approved mine plans and other customary conditions, and benefit from significant local infrastructure. The Company’s flagship Selebi Mines includes two operational shafts, the Selebi and Selebi North shafts, and related infrastructure such as rail, power and roads.

Summary of Activities

In 2023, PREM commenced its Phase 2 drill program undertaking a combination of resource and continued exploration drilling at the Selebi Mines to demonstrate the size potential of the Selebi Mines mineral system, with the aim of establishing an initial mineral resource estimate on the Selebi Mines (the “Initial Selebi MRE”).

On December 23, 2024, the Company filed the Initial Selebi MRE in conformance with the United States Securities and Exchange Commission’s (“SEC”) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary, entitled “S-K 1300 Technical Report Summary, Selebi Mines, Central District, Republic of Botswana” (the “Selebi TRS”) and dated December 17, 2024 (with an effective date of June 30, 2024) for its Selebi Mines. The Initial Selebi MRE will serve as the basis for future engineering and economic studies.

-2-

The Selebi North underground (“SNUG”) resource and exploration drilling program continued throughout 2024 and into 2025. During 2024 and up to the date of this Report, the Company has drilled approximately 45,827 metres in 87 holes, bringing the SNUG drilling program total to 63,947 metres in 162 holes. Assays for a total of 33,963 metres across 80 completed holes have not been accounted for in the Initial Selebi MRE.

The Company has begun testing the deeper borehole electromagnetic (“BHEM”) plates from N2 Limb and South Limb at SNUG. These assay results will continue to be released as they are received and confirmed by the Company.

During 2024, drill core from 17 historic holes at the Selkirk Mine were resampled to augment the historical database. Prospecting licences were explored through data compilation, differential global positioning system (“DGPS”) of historic collars, surface prospecting, and two surface electromagnetic (“EM”) surveys. Resampling of additional holes is underway with 20 holes transferred from Selkirk to the core processing facility at Selebi.

On January 31, 2025, the Company filed the Selkirk MRE in conformance with the SEC’s Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary, entitled “S-K 1300 Technical Report Summary, Selkirk Nickel Project, North East District, Republic of Botswana” (the “Selkirk TRS”) and dated January 8, 2025 (with an effective date of November 1, 2024) for its Selkirk Mine. The Selkirk MRE serves as a solid foundation for advancing the Selkirk deposit to an economic study*.*

For more information relating to the contemplated activities and milestones on the Mines, please see*“Properties – Mining Properties – Selebi Mines”and“Properties – Mining Properties – Selkirk Mine”*below.

Highlights and Key Developments

●On January 1, 2024, James Gowans was appointed as the Chair of the board of directors (the “Board of Directors” or the “Board”).
●Since January 1, 2024, the Company has reported assay results from the Selebi Mines from a total of 88 drill holes and 1 hole extension, pursuant to news releases issued from January 18, 2024 to January 27, 2025, the full text of which are available on the Company’s website (https://premiumresources.com/). The Company’s website is not incorporated in this Report.
●On June 14 and June 21, 2024, the Company closed two tranches of a non-brokered private placement offering of units of the Company (the “Units”), pursuant to which the Company issued a total of 35,256,409 Units at a price of $0.78 per Unit for gross proceeds of approximately $27.5 million (the “June 2024 Financing”). Each Unit is comprised of one Common Share and one Common Share purchase warrant. For a more detailed summary of the June 2024 Financing, see “Liquidity & Capital Resources — Financings”.
●On June 24, 2024, Norman MacDonald was appointed to the Board of Directors.
●On September 19, 2024, the Company announced the appointment of Paul Martin to the Board of Directors of the Company to fill a vacancy resulting from John Hick’s retirement from the Board of Directors.
●On November 11, 2024, the Company announced the extension of the study phase for the Selebi Mines project pursuant to the terms of the Selebi asset purchase agreement (the “Selebi APA”) with the liquidator of BCL Limited (the “BCL Liquidator”). This extension follows successful completion by the Company of the work and investment milestones required by the Selebi APA. It provides the Company with an additional one year, to February 1, 2026, to complete an economic study and make the next milestone payment, in the amount of US$25 million, under the Selebi APA.
●On November 18, 2024, the Company announced that it had changed its name from “Premium Nickel Resources Ltd.” to “Premium Resources Ltd.” Further, on November 20, 2024, the Company’s Common Shares commenced trading under the new name and new stock ticker symbol “PREM”.

-3-

●On December 2, 2024, the Company announced the retirement of Keith Morrison as Chief Executive Officer and a director of PREM, effective December 31, 2024. As of such date, Paul Martin began serving as the Company’s Interim Chief Executive Officer.
●On December 23, 2024, the Company filed the Selebi TRS. For details of the Initial Selebi MRE, see “Properties – Mining Properties – Selebi Mines”.
●On January 31, 2025, the Company filed the Selkirk TRS. For details of the Selkirk MRE, see “Properties – Mining Properties – Selkirk Mine”.
●On March 18, 2025, the Company announced the closing of a significant refinancing, including the introduction of a new strategic investor group and the deleveraging of its balance sheet with the conversion of its three-year term loan (the “Term Loan”) with Cymbria Corporation (“Cymbria”) into equity. See “Liquidity & Capital Resources – Financings”. On closing of the financing, Morgan Lekstrom was appointed Chief Executive Officer effective March 20, 2025. Mr. Lekstrom will also join the Board of Directors of the Company. James K. Gowans will retire as Chair of the Board but continue as a director of PREM, and Paul Martin will transition from his role as Interim Chief Executive Officer to Chairman of the Board.

Corporate Social Responsibility

The Company is committed to conducting its business in a socially responsible and sustainable manner, with a focus on environmental stewardship, health and safety, community engagement and ethical conduct. The Company has established policies and procedures in its Code of Business Conduct and Ethics to ensure compliance with applicable laws and regulations, as well as industry standards for responsible mining. PREM recognizes the importance of stakeholder engagement and works closely with local communities, indigenous groups and other stakeholders to ensure their concerns and perspectives are heard and addressed.

Exploration and Evaluation Activities

The following table outlines the key milestones, estimated timing and costs related to each of the Mines, based on the Company’s reasonable expectations, intended courses of action and current assumptions and judgement, with information based as of December 31, 2024.

Key Milestones for ProjectExpected Timing of CompletionAnticipated Costs
Selebi Mines & Selkirk Mine
Advancement towards economic studies(1)Ongoing, costs to December 31, 2025$13 million to $16 million
Operating costsOngoing, costs to December 31, 2025$13 million to $16 million

Notes:

(1)The key milestones are to complete the metallurgical studies, further drilling and advancement of underground development to support drilling, test the deep BHEM plates beneath the Selebi Main deposit, continue the assaying of historical drill core at Selkirk, and advance engineering studies.

-4-

Readers are cautioned that the above represents the opinions, assumptions and estimates of management considered reasonable at the date the statements are made and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those described above. See*“Cautionary Note Regarding Forward-Looking Statements”*.

Available Information

We file annual, quarterly, current reports and other information with the SEC. You may read and copy any reports, statement or other information that we file with the SEC at the SEC’s public reference room at 100 F Street, N.E., Washington, D.C. 20549. Please call the SEC at (202) 551-8090 for further information on the public reference room. These SEC filings are also available to the public from commercial document retrieval services and at the Internet site maintained by the SEC athttp://www.sec.gov.