10. Commitments and Contingencies
- Commitments and Contingencies
Legal Matters
Talen is involved in certain legal proceedings, claims, and litigation. While we believe that we have meritorious positions and will continue to defend our positions in these matters vigorously, we may not be successful in our efforts. If an unfavorable outcome is probable and can be reasonably estimated, a liability is recognized. In the event of an unfavorable outcome, the liability may be in excess of amounts currently accrued. Because of the inherently unpredictable nature of legal proceedings and the wide range of potential outcomes for any such matter, no estimate of the possible losses in excess of amounts accrued, if any, can be made at this time regarding the matters specifically described below. As a result, additional losses actually incurred in excess of amounts accrued could be substantial.
Pending Legal Matters
ERCOT Weather Event (Winter Storm Uri) Lawsuits. In May 2024, the Company closed on the ERCOT Sale but retained certain potential liabilities in connection with Winter Storm Uri (see Note 17 for information on the ERCOT Sale). In December 2023, five multi-district litigation (“MDL”) bellwether suits against Talen’s former subsidiaries and other power generation facility market participants were dismissed by the MDL court. The plaintiffs allege they suffered losses due to the defendants’ failure to provide sufficient power to the grid and have been seeking unspecified damages. The plaintiffs filed a motion for rehearing on the matter and, if unsuccessful, it’s expected the plaintiffs will petition the Texas Supreme Court to review the decision. The cases dismissed and now on appeal were selected by the MDL court as representative of all 58 cases filed in the Winter Storm Uri litigation. If affirmed by the Texas Supreme Court, Talen expects the MDL court to apply its dismissal ruling broadly to all Winter Storm Uri cases involving Talen defendants. Talen’s maximum potential damages on prepetition Winter Storm Uri claims are expressly limited to payments from the Talen defendants’ insurers pursuant to the Plan of Reorganization. However, claims filed by plaintiffs after the Restructuring commenced who did not receive effective notice of the Restructuring, if any, may not be subject to the Plan of Reorganization. Talen cannot predict the effect of an adverse outcome for any such claims.
Resolved Legal Matters
Pension Litigation. In July 2024, the U.S. District Court for the Eastern District of Pennsylvania approved a $20 million settlement in a class action lawsuit brought by former Talen employees who alleged they were owed enhanced benefits under the TERP. Under the terms of the settlement, Talen agreed to pay: (i) approximately $6 million for administrative costs of the settlement and for plaintiff attorneys fees, which were partially offset by insurance recoveries; and (ii) approximately $14 million to class members from the TERP. Both payment obligations were substantially completed during the three months ended September 30, 2024 (Successor).
PUCT Repricing. In June 2021, Talen intervened in proceedings in which certain market participants challenged the validity oftwo Public Utility Commission of Texas (“PUCT”) orders directing ERCOT to price energy at the maximum of $9,000 per MWh during Winter Storm Uri. Talen opposed this relief. In June 2024, the Texas Supreme Court found the PUCT substantially complied with the Administrative Procedure Act’s procedural rulemaking requirements. Subject to any successful motion for rehearing in the Texas Supreme Court, this matter is effectively concluded in the Company’s favor.
See Note 12 in Notes to the Annual Financial Statements for legal matters resolved previously.
Regulatory Matters
Talen is subject to regulation by federal and state agencies and other bodies that exercise regulatory authority in the various regions where we conduct business, including but not limited to, FERC; the Department of Energy; the Federal Communications Commission; the NRC; NERC; and state public utility commissions. The RTOs and ISOs in the regions in which we conduct business inherently have complex rules that are intended to balance the interests of market stakeholders. Proposed market structure modifications may lead to disputes among stakeholders that might not be resolved for a period of time as a result of regulatory and (or) legal proceedings. Accordingly, Talen is subject to uncertainty with respect to: (i) new or amended regulations issued by regulatory agencies; and (ii) changes in market design, tariff structure, capacity auctions, and (or) pricing rules. Unless otherwise discussed below, we are unable to predict the outcome of any regulatory matters or reasonably estimate the amount of any associated costs and (or) potential liabilities. Additionally, it is possible that any outcome to Talen with respect to such matters, including market modifications, could have a material impact on our capacity revenues, energy revenues, results of operations, liquidity, or financial condition.
PJM Capacity Market Reform. In June 2023, FERC accepted a request by PJM to delay certain PJM BRAs in order for PJM to propose market reforms. PJM filed its market reform proposals with FERC in October 2023. In early 2024, FERC accepted portions of PJM’s proposed market changes. PJM held the PJM BRA for the 2025/2026 PJM Capacity Year in July 2024 which incorporated the FERC accepted changes. The PJM BRAs for the 2026/2027, 2027/2028, and 2028/2029 PJM Capacity Years were previously scheduled for December 2024, June 2025, and December 2025, respectively; however in September 2024, the Sierra Club and other public interest organizations filed a complaint at FERC challenging PJM’s rules establishing must-offer exceptions for PJM BRA participation by PJM RMR resources and seeking to delay the 2026/2027 PJM BRA pending resolution of its complaint. In October 2024, PJM announced it has concerns about FERC considering the Sierra Club’s complaints about PJM RMR resources in isolation and therefore intends to file a Section 205 proceeding under the Federal Power Act seeking FERC’s approval of to-be-determined market reforms not limited to potential revisions to the treatment of PJM RMR resources. As a result, in October 2024 PJM formally requested that FERC approvesix-month delays in the PJM BRAs for the 2026/2027, 2027/2028, 2028/2029, and 2029/2030 PJM Capacity Years and in November 2024, FERC approved the auction delays. Talen can provide no assurance that thefour scheduled auctions will be held as scheduled or at all.
Susquehanna ISA Amendment. Under a prior, FERC-accepted interconnection agreement between PJM, Susquehanna, and a subsidiary of PPL Corporation (“PPL”) (collectively, the “ISA Parties”), Susquehanna is permitted to decrease by up to 300 MW the amount of power supply that it would otherwise provide to the power grid within PPL’s service area. Susquehanna currently provides that power to load via load-owned transmission directly connected to Susquehanna rather than supplying load from the power grid. In June 2024, PJM filed at FERC an Amended Interconnection Service Agreement (“Amended ISA”) executed between the ISA Parties permitting Susquehanna to decrease by up to 480 MW the amount of power supply that it would otherwise provide to the power grid and now intends to sell to AWS instead. PJM previously concluded such increase in the amount of withheld power would have no reliability impacts on the grid. In June 2024, despite the Amended ISA being applicable solely to the PPL service area, Exelon Corporation and AEP filed a protest to the Amended ISA at FERC and raised generic issues involving the direct connection of load service to generators. FERC responded by issuing a deficiency letter in August 2024 seeking more information about the arrangement described in the Amended ISA and separately setting a Technical Conference for November 2024 to discuss broader issues related to (i) co-located load connected directly to generation; and (ii) emerging reliability issues resulting from the dramatic rise in data center demand for power. In September 2024, PJM provided a response to FERC’s August 2024 deficiency letter on the Amended ISA and filed a Construction Service Agreement between the ISA Parties and Mid-Atlantic Interstate Transmission, LLC to facilitate certain network upgrades to ultimately accommodate a 960 MW decrease of power supply to the grid. Talen filed its own comments in September 2024 and written testimony in the Technical Conference proceeding in October 2024. Shortly after the conclusion of the FERC Technical Conference on November 1, 2024, FERC issued a 2-1 decision rejecting the Amended ISA. Talen may seek a rehearing of the FERC order within the 30-day deadline for such motions and, if necessary, file a subsequent appeal in a U.S. Court of Appeals.
The prior FERC-accepted interconnection agreement between the ISA Parties permitting Susquehanna to decrease 300 MW of its current power supply from the power grid remains in place and facilitates the initial sale of power to AWS under the AWS PPA. The Company is evaluating its commercial and legal options to provide the most efficient path to full development of the AWS data center campus. Such options include, but are not limited to, potential submission of a revised form of Amended ISA or alternate contract structures with AWS. If the Company is unable commercially or legally to resolve the Amended ISA approval impediments and realize the full development of the AWS data center campus, there may be a material impact on our future results of operations and (or) financial condition.
Environmental Matters
Extensive federal, state, and local environmental laws and regulations are applicable to our business, including those related to air emissions, water discharges, and hazardous and solid waste management. From time to time, in the ordinary course of our business, Talen may be: (i) subject to environmental remediation work at its facilities; (ii) involved in other environmental matters; or (iii) become subject to other, new or revised environmental statutes, regulations, or requirements. It may be necessary for us to modify, curtail, replace, or cease operation of certain facilities or performance of certain operations to comply with statutes, regulations, and other requirements imposed by regulatory bodies, courts, or environmental groups. We may incur significant costs to comply with these requirements, including increased capital expenditures or operation and maintenance expenses, monetary fines, remediation costs, penalties, or other restrictions. Legal challenges to environmental rules or permits add to the uncertainty of estimating future compliance costs. Additionally, costs may increase significantly if the requirements or scope of environmental laws or regulations, or similar rules, are expanded or changed. Unless otherwise discussed below, we are unable to predict the outcome of any environmental matters or reasonably estimate the amount of any associated costs and (or) potential liabilities. It is possible that any adverse outcome to Talen with respect to such matters could have a material impact on our results of operations, liquidity, and (or) financial condition.
EPA Cross-State Air Pollution Rule (“EPA CSAPR”) and Nitrogen Oxides (“NOx”) Requirements. Coal-fired generation facilities, including those in which Talen has ownership, have been the subject of EPA regulations and efforts by certain states and other parties to strengthen applicable NOx emission limits under the Clean Air Act. In 2015, the EPA’s 2015 revision to the 8-hour ozone National Ambient Air Quality Standards for ground-level ozone to 70 parts per billion (the “EPA 2015 Ozone Standard”) was issued, which triggered updates to state-specific compliance requirements as well as provisions that are intended to limit cross-state emissions. In June 2023, the EPA published a rule in connection with the EPA 2015 Ozone Standard updating the EPA CSAPR ozone season NOx allowance trading program for 2023 and beyond (“Good Neighbor Plan FIP”). Talen’s facilities in Maryland, Pennsylvania, and New Jersey are subject to the new rule; however, the entire rule has been challenged by multiple parties. The Good Neighbor Plan FIP was stayed in its entirety by the U.S. Supreme Court in June 2024 pending a complete review of the rule by the D.C. Circuit Court of Appeals. In the meantime, EPA has issued a direct final rule indicating it plans to provide NOx allocations and budgets from the previously applicable and less restrictive revised CSAPR rule until the Good Neighbor Plan FIP matter is resolved.
EPA Mercury and Air Toxics Standards Rule (“EPA MATS Rule”). In May 2024, the EPA published a rule that requires coal-fired generation facilities to reduce particulate matter (“PM”) emissions by the middle of 2027 (or 2028, if an extension is approved). Colstrip is not expected to meet the new PM standard without substantial upgrades to its control equipment. As a result, Talen Montana and the other Colstrip co-owners face the decision either to invest in new cost-prohibitive control equipment or retire the Colstrip facility. Such decision must be evaluated in conjunction with compliance requirements under the May 2024 EPA GHG Rule due to timing and costs. Challenges to the EPA MATS Rule have been filed in the D.C. Circuit Court of Appeals, including by Talen and 23 states. After motions to stay the EPA MATS Rule during the pendency of the litigation were denied by the D.C. Circuit Court of Appeals, Talen and other parties filed emergency stay request applications with the U.S. Supreme Court in September 2024, which were denied in October 2024. The appeal on the merits of the new rule remains pending in the D.C. Circuit Court of Appeals. No assurance can be provided as to when the challenges to the EPA MATS Rule will be resolved or whether such challenges will be resolved in the Company’s favor. As the timeline for compliance with the new standards is accelerated and must be considered in tandem with the new EPA GHG Rule, it is possible the Company will need to make operating decisions about the future of Colstrip before the Company has clarity about the outcome of the litigation.
EPA Greenhouse Gas Rule (“EPA GHG Rule”). In May 2024, the EPA published a rule that establishes carbon dioxide limits for new electric generating units (“EGUs”) and greenhouse gas (“GHG”) emission guidelines for certain existing EGUs. Under the guidelines, if existing coal-fired EGUs operate beyond 2031, GHG reductions, such as those achieved by the addition of carbon capture and sequestration (“CCS”), are required to be implemented by the end of 2031. Colstrip is not expected to meet the new rules without substantial technology upgrades and pipeline infrastructure build-out. As a result, Talen Montana and the other Colstrip co-owners face the decision either to invest in new cost-prohibitive controls (e.g., CCS technology) or retire the Colstrip facility by the end of 2031. Such decision must be evaluated in conjunction with compliance requirements under the May 2024 EPA MATS Rule. Petitions have been filed in the D.C. Circuit Court of Appeals, including by coalitions representing 27 states and an ad hoc coalition of power producers of which Talen is a member, requesting a review of the EPA GHG Rule. Stay motions were denied by the D.C. Circuit Court of Appeals in July 2024 and the U.S. Supreme Court in October 2024. Appeals of the EPA GHG Rule remain pending in the D.C. Circuit Court of Appeals. No assurance can be provided as to when the challenges to the EPA GHG Rule will be resolved or whether such challenges will be resolved in the Company’s favor. The EPA has also stated its intent to develop GHG regulations for existing natural gas combustion turbines; however, no rule has been proposed. As the timeline for compliance with the new standards is accelerated and must be considered in tandem with the new EPA MATS Rule, it is possible the Company will need to make operating decisions about the future of Colstrip before the Company has clarity about the outcome of the litigation.
Pennsylvania RGGI. In April 2022, Pennsylvania entered the RGGI program, with compliance set to begin on July 1, 2022. However, in November 2023, the Commonwealth Court of Pennsylvania ruled RGGI was an invalid tax and voided the rulemaking. The Pennsylvania Department of Environmental Protection appealed this decision to the Pennsylvania Supreme Court and filed notice with the court that the RGGI program would not be implemented while the appeal is pending. In July 2024, the Pennsylvania Supreme Court permitted certain non-profit environmental groups to intervene in the litigation.
EPA Effluent Limitation Guidelines Rule (“EPA ELG Rule”). In November 2015, the EPA revised the effluent limitation guidelines for certain power generation facilities, which imposed more stringent standards for wastewater streams as facility discharge permits are renewed. In 2020, the EPA issued changes that would exempt coal generation facility operators from meeting certain wastewater standards if the facility would commit to cease coal-fired generation by the end of 2028, which Talen elected for its wholly owned coal operations. In May 2024, the EPA published revisions to the EPA ELG Rule, which imposed additional requirements for legacy wastewater and combustion residual leachate. Such EPA ELG Rule revisions impact Talen’s active generation facilities that have both CCR units and hold National Pollutant Discharge Elimination System (“NPDES”) discharge permits. These sites include Brandon Shores, Brunner Island, Montour, and potentially Martins Creek. Talen is evaluating what: (i) potential discharge limits may apply; (ii) treatment may be required; and (iii) the implementation timeline may be. Obligations for installing any new wastewater treatment equipment, if necessary, will not be known until each applicable state where the active generation facilities operate makes their own determination with respect to NPDES permit renewals with new limits and associated timing. As a result of the future permit conditions, additional capital expenditures and (or) AROs may be required, which may have a material impact on our results of operations and (or) financial condition.
Multiple challenges, including stay requests, to the EPA ELG Rule have been filed in various U.S. Courts of Appeal by parties that include 15 states, environmental groups, and industry groups, including the Utility Water Act Group (“UWAG”), of which Talen is a member. The appeals have been consolidated in the U.S. Court of Appeals for the Eighth Circuit, and in October 2024, stay requests were denied. No assurance can be provided as to when the challenges to the EPA ELG Rule merits will be resolved or whether such challenges will be resolved in the Company’s favor.
EPA Coal Combustion Residuals Rule (“EPA CCR Rule”). In April 2015, the EPA established regulations under the Resource Conservation and Recovery Act to identify CCRs as nonhazardous solid waste and provided CCR management and siting requirements. The 2015 rule was modified in 2020 after a 2018 D.C. Circuit Court of Appeals ruling found that, among other things, the EPA did not adequately regulate unlined impoundments. In its 2020 rulemaking, the EPA specified procedures for owners to extend the operating timeline of certain unlined impoundments. Talen submitted an extension request under this process for an unlined impoundment at Montour, which the EPA has not yet acted upon. The 2018 D.C. Circuit Court of Appeals ruling also found that the EPA did not properly address legacy surface impoundments in the 2015 CCR rule. As a result of the finding, in May 2024, the EPA finalized additional federal CCR regulations with an effective date in November 2024, which provided new requirements for legacy CCR surface impoundments and new requirements for other CCR disposal and management areas at active power plants (“CCR Management Units” or “CCRMUs”). This rule has been challenged in the D.C. Circuit Court of Appeals by multiple parties, includingtwo industry groups of which Talen is a member. Additionally, the EPA is being challenged by other industry parties on new regulatory interpretations that could be consequential to CCR unit closure practices and costs. No assurance can be provided at this time as to when the legal challenges to the EPA’s CCR Rule and interpretations will be resolved or whether such challenges will be decided in the Company’s favor.
Talen continues to review the 2024 EPA CCR Rule provisions, perform the required applicability assessments, and await additional information and guidance from the EPA concerning the rule’s requirements. Pursuant to the regulations, initial facility evaluation reports to identify CCR areas which may become regulated and subject to the rule’s requirements are due in February 2026. Following that, site investigation may be required to further investigate applicability and a subsequent facility report is due in February 2027. The Company has initiated reviews under the facility evaluation report requirements at locations with ash impoundments that have long since ceased coal operations as well as at locations with current coal operations. No assurance can be provided as to whether any specific ash impoundments owned by the Company may or may not be within scope of the new EPA CCR Rule until the Company completes its assessments within the regulatory timeframe.
As of September 30, 2024 (Successor), the Company has recognized required cost estimates in order to comply with the rule’s initial compliance requirements and deadlines. However, the Company does not yet have sufficient information available to estimate costs for the future compliance obligations under the rule. As the Company continues its applicability evaluations and site assessments to determine the scope of work on its properties imposed by the new rule, additional new AROs and (or) revisions could be required. It is expected estimates will be available, under the timeline provided for by the regulations, as described above, at the completion of the initial facility evaluation reports or at the completion of a subsequent site investigation. Such AROs or ARO changes could be material and, as a result, may have a material impact on our results of operations and (or) financial condition.
Guarantees and Other Assurances
In the normal course of business, the Company enters into agreements to provide financial performance assurance to third parties on behalf of certain subsidiaries. These agreements primarily support or enhance the stand-alone creditworthiness attributed to a subsidiary or facilitate the commercial activities in which these subsidiaries engage. Such agreements may include guarantees, stand-by LCs, and (or) surety bonds. Additionally, they may include customary indemnifications to third parties related to asset sales and other transactions. The probability of expected material payment and (or) performance for these assurance agreements is believed to be remote.
Surety Bonds. Surety bonds provide financial performance assurance to third parties on behalf of certain Company subsidiaries for obligations including, but not limited to, environmental obligations and AROs. In the event of nonperformance by the applicable subsidiary, the beneficiary would make a claim to the surety, and the Company would be required to reimburse any payment by the surety. Talen’s liability with respect to any particular surety bond is released once the obligations secured by the surety bond are performed. Surety bond providers generally have the right to request additional collateral or request that such bonds be replaced by alternate surety providers. As of September 30, 2024 (Successor) and December 31, 2023 (Successor), the aggregate amount of surety bonds outstanding was $234 million and $240 million, respectively, including surety bonds posted on behalf of Talen Montana as discussed below.
Talen Montana Financial Assurance. Pursuant to the Colstrip Administrative Order on Consent (the “Colstrip AOC”), Talen Montana, in its capacity as the Colstrip operator, is obligated to close and remediate coal ash disposal impoundments at Colstrip. The Colstrip AOC specifies an evaluation process between Talen Montana and the Montana Department of Environmental Quality (the “MDEQ”) on the scope of remediation and closure activities, requires the MDEQ to approve such scope, and requires financial assurance to be provided to the MDEQ on approved plans. Each of the co-owners of Colstrip has provided its proportionate share of financial assurance to the MDEQ for estimates of coal ash disposal impoundments remediation and closure activities approved by the MDEQ.
The aggregate amount of surety bonds posted to the MDEQ on behalf of Talen Montana’s proportionate share of such activities was $125 million as of September 30, 2024 (Successor) and $115 million as of December 31, 2023 (Successor). Talen Montana’s surety bond requirements may increase due to scope changes, cost revisions, and (or) other factors when the MDEQ conducts annual reviews of approved remediation and closure plans as required under the Colstrip AOC. The surety bond requirements are expected to decrease as Colstrip’s coal ash impoundments remediation and closure activities are completed.
Other Commitments and Contingencies
Talen Montana Fuel Supply. Talen Montana purchases coal from a coal mine owned by Westmoreland Rosebud Mining, LLC (the “Rosebud Mine”) for its interest in Colstrip Units 3 and 4 under a full requirements contract with an unaffiliated coal mine operator. Two lawsuits have been brought against the Rosebud Mine challenging permits issued to it by the State of Montana. Talen Montana is not party to either lawsuit, but is monitoring the progress of each to assess the impact to its operations. In the first lawsuit, the Montana Supreme Court affirmed a lower court’s ruling to vacate a mining permit and require the Montana Board of Environmental Review to perform an additional review of the permit. In the second lawsuit, the Montana Federal District Court ordered a branch of the U.S. Department of the Interior to complete an updated Environmental Impact Statement (“EIS”). In April 2024, the Montana Federal District Court granted an extension to the EIS completion date to January 31, 2025. At this time, Talen cannot predict the effect of that an adverse outcome of these lawsuits to Rosebud Mine would have on: (i) Talen Montana’s ability to source fuel for its share of Colstrip operations; or (ii) Talen Montana’s operations, results of operations, or liquidity.