Portfolio Financings

  1. Portfolio Financings

We have developed various financing options that enable customers’ use of the Energy Servers through third-party ownership financing arrangements.

In the past, we and our third-party equity investors (together, the “Equity Investors”) contributed funds into a limited liability investment entity (the “Investment Company”) that owns and is parent to the Operating Company (together, the “PPA Entities”). The contributed funds were restricted for use by the Operating Company to the purchase of our Energy Servers manufactured by us in our normal course of operations. Allsix PPA Entities established in the past utilized their entire available financing capacity and have completed the purchase of their Energy Servers. Any debt incurred by the Operating Companies was non-recourse to us. Under these structures, each Investment Company was treated as a partnership for U.S. federal income tax purposes. Equity Investors received investment tax credits and accelerated tax depreciation benefits.

In June 2022 and November 2022, we sold PPA IIIa and PPA IV, respectively, which were accounted as our consolidated VIEs, as a result of the repowering of the Energy Servers. In August 2023, we paid off the outstanding balance and related accrued interest of the PPA V debt and released related debt service reserve. For details, please see Note 7 —Outstanding Loans and Security Agreements, Non-recourse Debt Facilities section. In August 2023, we sold PPA V, our last consolidated PPA Entity. The other three PPA Entities — PPA II, PPA IIIb and PPA VI — are not considered VIEs.

PPA IIIa Repowering of the Energy Servers

PPA IIIa was established in 2012 and we, through a special purpose subsidiary (the “Project Company”), had previously entered into certain agreements for the purpose of developing, financing, owning, operating, maintaining and managing a portfolio of 9.8 megawatts of the Energy Servers.

On March 31, 2022, we entered into a Membership Interest Purchase Agreement (the “MIPA”) where we bought out the equity interest of the third-party investor, wherein the PPA IIIa became wholly owned by us (the “PPA IIIa Buyout”).

Following the PPA IIIa Buyout and prior to June 14, 2022, we repaid all outstanding debt of the Project Company of $30.6 million, and recognized loss on extinguishment of debt in an amount of $4.2 million, which includes the write-off of the debt discount related to warrants of $1.8 million and a make-whole payment of $2.4 million associated with the debt extinguishment. Refer to Note 7 —Outstanding Loans and Security Agreements, Non-recourse Debt Facilities section.

On June 14, 2022, we sold our 100% interest in the Project Company to the financier through the MIPA. Simultaneously, we entered into an agreement with the Project Company to upgrade the old 9.8 megawatts of the old PPA IIIa Energy Servers by replacing them with the new PPA IIIa Energy Servers and providing related installation services, which was financed by the financier (the “EPC Agreement”). The plan was to remove the old PPA IIIa Energy Servers prior to installing the new PPA IIIa Energy Servers and return the old PPA IIIa Energy Servers to Bloom. We also amended and restated our operations and maintenance agreement with the Project Company to cover all the new PPA IIIa Energy Servers and the old PPA IIIa Energy Servers prior to their upgrade (“the O&M Agreement”). The operations and maintenance fees under the O&M Agreement are paid on a fixed dollar per kilowatt basis.

Certain power purchase agreements within the PPA IIIa portfolio were classified as sales-type leases under ASC 840, while some were classified as operating leases. We elected the practical expedient package with the adoption of ASC 842, which allowed us to carry forward the lease classification upon adoption of ASC 842 on January 1, 2020. The leases were modified prior to the sale of PPA IIIa to the financier. Such modified leases were reassessed and determined to not be leases under ASC 842 because customers have no control over the identified assets. Accordingly, on the date of modification, the customer financing receivables were derecognized and recognized as property, plant, and equipment (the “PPA IIIa PP&E”).

Due to our repurchase option on the old PPA IIIa Energy Servers, we concluded there was no transfer of control of the old PPA IIIa Energy Servers upon sale of the membership interest to the financier. Accordingly, we continued to recognize the old PPA IIIa Energy Servers, despite the legal ownership of such assets under the MIPA. Upon reclassification of the lease assets to property, plant and equipment, net, we assessed the recorded assets for impairment. The carrying amount of the PPA IIIa PP&E was determined to be not recoverable as the net undiscounted cash flows were less than the carrying amounts for PPA IIIa PP&E. Therefore, we recognized the asset impairment charge as electricity cost, consistent with depreciation expense classification for property, plant and equipment under leases.

The PPA IIIa Upgrade was complete in the fourth quarter of fiscal 2022. It resulted in the following summarized impacts on our consolidated statements of operations for the year ended December 31, 2023: (i) service revenue recognized of $3.5 million related to the O&M Agreements, (ii) installation revenue recognized of $0.4 million, and (iii) cost of installation revenue of $0.1 million. The PPA IIIa Upgrade had the following impacts on our consolidated statements of operations for the year ended December 31, 2022: (i) product, installation and service revenue recognized of $49.8 million, $4.6 million, and $0.7 million, respectively, as a result of the sale of the new PPA IIIa Energy Servers; (ii) cost of electricity revenue of $45.0 million, including the impairment of the old PPA IIIa Energy Servers of $44.8 million and accelerated depreciation of $0.2 million prior to the completion of installation; (iii) cost of product and installation revenue of $21.8 million and $3.2 million, respectively, due to the sale of the new PPA IIIa Energy Servers; and (iv) $4.2 million of loss on extinguishment of debt.

Impacts on our consolidated statements of cash flows for the year ended December 31, 2022, are summarized as follows: net cash provided by financing activities decreased by $32.6 million due to the repayment of debt of $30.2 million and cash fee of $2.4 million associated with debt extinguishment. There was no impact on cash flows from financing activities for the year ended December 31, 2023.

PPA IV Repowering of the Energy Servers

PPA IV was established in 2014 and we, through the Project Company, had previously entered into certain agreements for the purpose of developing, financing, owning, operating, maintaining and managing a portfolio of 19.3 megawatts of the Energy Servers.

On November 2, 2022, we entered into the MIPA where we bought out the equity interest of the third-party investor for $4.0 million, wherein the PPA IV became wholly owned by us (the “PPA IV Buyout”).

Following the PPA IV Buyout and prior to November 22, 2022, we repaid all outstanding debt of the Project Company of $70.9 million and recognized a loss on extinguishment of debt in an amount of $4.7 million, which includes the write-off of the debt discount of $0.6 million and a make-whole payment of $4.1 million associated with the debt extinguishment. Refer to Note 7 —Outstanding Loans and Security Agreements, Non-recourse Debt Facilities section.

On November 22, 2022, we sold our 100% interest in the Project Company to the financier through the MIPA. Simultaneously, we entered into an agreement with the Project Company to upgrade the 19.3 megawatts of the old PPA IV Energy Servers by replacing them with the new PPA IV Energy Servers and providing related installation services, which was financed by the financier under the EPC Agreement. The old PPA IV Energy Servers were be removed prior to installing the new PPA IV Energy Servers, whereby upon completion of installation the old PPA IV Energy Servers are returned to Bloom. We also amended and restated our O&M Agreement with the Project Company to cover all the new PPA IV Energy Servers and the old PPA IV Energy Servers prior to their upgrade. The operations and maintenance fees under the O&M Agreement are paid on a fixed dollar per kilowatt basis.

The power purchase agreements within the PPA IV portfolio were classified as operating leases under ASC 840. We elected the practical expedient package with the adoption of ASC 842, which allowed us to carry forward the lease classification upon adoption of ASC 842 on January 1, 2020. The leases were modified prior to the sale of PPA IV to the financier. Such modified leases were reassessed and determined to not be leases under ASC 842 because customers have no control over the identified assets. Accordingly, on the date of modification, the operating leases were recognized as property, plant, and equipment (the “PPA IV PP&E”).

Due to our repurchase option on the old PPA IV Energy Servers, we concluded there was no transfer of control of the old PPA IV Energy Servers upon sale of the membership interest to the financier. Accordingly, we continued to recognize the old PPA IV Energy Servers, despite the legal ownership of such assets under the MIPA. We assessed the recorded assets for impairment. The carrying amount of the PPA IV PP&E was determined to be not recoverable as the net undiscounted cash flows are less than the carrying amounts for the PPA IV PP&E. Therefore, we recognized the asset impairment charge as electricity cost, consistent with depreciation expense classification for property, plant and equipment under leases.

The PPA IV Upgrade was substantially complete as of December 31, 2023. The Upgrade resulted in the following summarized impacts on our consolidated statements of operations for the year ended December 31, 2023: (i) installation revenue recognized of $10.0 million, (ii) service revenue recognized of $1.8 million related to the O&M Agreements, (iii) electricity revenue recognized of $6.1 million (iv) product revenue decreased by $3.4 million due to the revenue adjustment, (v) cost of installation revenue of $6.6 million, and (vi) cost of product revenue of $0.1 million. The PPA IV Upgrade had the following impacts on our consolidated statements of operations for the year ended December 31, 2022: (i) product and electricity revenue recognized of $102.3 million and $1.4 million, respectively, as a result of the sale of new Energy Servers; (ii) cost of electricity revenue of $64.3 million, including the impairment of old Energy Servers of $64.0 million and accelerated depreciation of $0.3 million prior to the completion of installation; (iii) cost of product revenue of $37.4 million, due to the sale of the new PPA IV Energy Servers; (iv) general and administrative expenses of $4.7 million primarily due to the impairment of prepaid insurance, and; (v) $4.7 million of loss on extinguishment of debt.

As a result of the equity interest buyout from the third-party investor, noncontrolling interest related to PPA IV of $23.7 million was eliminated and recorded as part of additional paid-in capital in our consolidated statements of stockholders’ equity (deficit).

Impacts on our consolidated statements of cash flows for the year ended December 31, 2022, are summarized as follows: net cash provided by financing activities decreased by $74.6 million due to the repayment of debt of $70.5 million and cash fee of $4.1 million associated with debt extinguishment. There wasno impact on cash flows from financing activities for the year ended December 31, 2023.

PPA V Interest Buyout

On November 2, 2022, we acquired all of Constellation Energy Generation, LLC’s (“Constellation”) interest in PPA V (the “2022 PPA V Buyout”), as set forth in the Purchase and Sale Agreement. The aggregate purchase price of the transaction amounted to $8.0 million. After the acquisition our interest in PPA V increased from 10% to 70%.

On August 10, 2023, we acquired all of Solar TC Corp’s (“Intel”) interest in PPA V, as set forth in the Purchase and Sale Agreement (the “2023 PPA V Buyout”). The aggregate purchase price of the transaction amounted to $6.9 million. After the acquisition, PPA V became wholly owned by us.

The changes in our ownership interest in PPA V were accounted for as equity transactions in accordance with ASC 810, Consolidations (“ASC 810”). The carrying amounts of the noncontrolling interest were eliminated to reflect the changes in our ownership interest in PPA V, and the differences between the fair values of the considerations paid and the carrying amounts of the noncontrolling interest immediately prior to the 2022 PPA V Buyout on November 2, 2022 and immediately prior to the 2023 PPA V Buyout on August 10, 2023 of $48.1 million and $11.5 million, respectively, were recognized as additional paid-in capital in our consolidated statements of stockholders’ equity (deficit).

PPA V Repowering of the Energy Servers

PPA V was established in 2015 and we, through the Project Company, had previously entered into certain agreements for the purpose of developing, financing, owning, operating, maintaining and managing a portfolio of 37.1 megawatts of the Energy Servers.

On August 24, 2023, we entered into the MIPA with the financier. Following the 2023 PPA V Buyout and prior to signing the MIPA, we repaid all of the outstanding debt of the Project Company of $119.0 million, including accrued interest of $0.5 million, and recognized a loss on extinguishment of debt in an amount of $1.4 million, represented in its entirety by the derecognition of the related debt issuance costs. Refer to Note 7 —Outstanding Loans and Security Agreements, Non-recourse Debt Facilities section.

On August 25, 2023, we sold our 100% interest in the Project Company to the financier through the MIPA. Simultaneously, we entered into an agreement with the Project Company to upgrade the 37.1 megawatts of the old PPA V Energy Servers by replacing them with the new PPA V Energy Servers and to provide related installation services, which was financed by the financier (i.e., EPC Agreement). We also amended and restated our O&M Agreement with the Project Company to cover all the new PPA V Energy Servers and the old PPA V Energy Servers prior to their upgrade. The operations and maintenance fees under the O&M Agreement are paid on a fixed dollar per kilowatt basis.

Due to our repurchase option on the old PPA V Energy Servers, we concluded there was no transfer of control of the old PPA V Energy Servers upon sale of the membership interest to the financier. Accordingly, we continued to recognize the old PPA Energy Servers, despite the legal ownership of such assets having been transferred under the MIPA. We assessed the recorded assets for impairment. The carrying amount of the PPA V property, plant and equipment was determined to be not recoverable as the net undiscounted cash flows were less than the carrying amounts for PPA V property. plant and equipment. Therefore, we recognized the asset impairment charge as electricity cost, consistent with our depreciation expense classification for property, plant and equipment under leases.

The PPA V Upgrade was complete in the first quarter of fiscal 2024, and resulted in the following summarized impacts on our consolidated statements of operations for the year ended December 31, 2023: (i) product revenue and installation revenue recognized of $176.2 million and $14.8 million, respectively, as a result of the sale of the new PPA V Energy Servers; (ii) electricity revenue recognized of $6.1 million related to the old PPA V Energy Servers and the release of deferred incentive revenue of $5.0 million, (iii) service revenue recognized of $2.6 million related to the O&M Agreements (iv) cost of electricity revenue of $125.6 million, primarily including the impairment of the old PPA V Energy Servers of $123.7 million and accelerated depreciation of $0.4 million prior to the completion of installation; (v) cost of product revenue and cost of installation revenue of $75.3 million and $13.2 million, respectively, due to the sale of the new PPA V Energy Servers; (vi) general and administrative expenses of $6.4 million due to the impairment of non-recoverable production insurance; (vii) loss on extinguishment of debt of $1.4 million, (viii) interest expense of $0.3 million, and (ix) net loss attributable to noncontrolling interest of $1.0 million.

Impacts on our consolidated statements of cash flows for the year ended December 31, 2023, are summarized as follows: net cash provided by financing activities decreased by $118.5 million due to the repayment of debt related to PPA V, and acquisition of all of interest in PPA V from Intel for $6.9 million net of distributions to Intel’s noncontrolling interest of $2.3 million.

PPA Entity’s Activities Summary

The table below shows the details of theone Investment Company VIEs that was active during the year ended December 31, 2023 and its cumulative activities from inception to the years indicated (dollars in thousands):

PPA V
Overview:
Maximum size of installation (in megawatts)40
Installed size (in megawatts)37
Term of power purchase agreements (in years)15
First system installedJun-15
Last system installedDec-16
Initial income (loss) and tax benefits allocation to Equity Investor99%
Initial cash allocation to Equity Investor90%
Income (loss), tax and cash allocations to Equity Investor after the flip dateNo flip
Equity Investors1Constellation2 and Intel
Company cash contributions$27,932
Equity Investor cash contributions227,344
Debt financing131,237
Activity as of December 31, 2023:
Distributions to Equity Investor227,344
Debt repayment—principal267,226
Activity as of December 31, 2022:
Distributions to Equity Investor30,786
Debt repayment—principal139,795
Activity as of December 31, 2021:
Distributions to Equity Investor26,601
Debt repayment—principal132,587
1 Investor names represent ultimate parents of subsidiary financing the project. Bloom purchased the equity interest in PPA V from Equity Investors in fiscal 2022 and 2023. Refer to the sections entitled PPA V Interest Buyout and PPA V Repowering of the Energy Servers for further details.
2 Formerly known as Exelon Corporation.

PPA Entity’s Aggregate Assets and Liabilities

Generally, the assets of an operating company owned by an Investment Company can be used to settle only the operating company obligations, and the operating company creditors do not have recourse to us. The following were the aggregate carrying values of our VIE’s assets and liabilities in our consolidated balance sheets, after eliminations of intercompany transactions and balances, including PPA V in the PPA V transaction as of December 31, 2022 (in thousands):

December 31,
2022
Assets
Current assets:
Cash and cash equivalents$5,008
Restricted cash550
Accounts receivable2,072
Prepaid expenses and other current assets1,927
Total current assets9,557
Property and equipment, net133,285
Restricted cash8,000
Other long-term assets1,869
Total assets$152,711
Liabilities
Current liabilities:
Accrued expenses and other current liabilities$1,037
Deferred revenue and customer deposits662
Non-recourse debt13,307
Total current liabilities15,006
Deferred revenue and customer deposits4,748
Non-recourse debt112,480
Total liabilities$132,234

Before the sale on August 24, 2023, we consolidated PPA V as a VIE in the PPA V transaction, as we had determined that we were the primary beneficiary of this VIE. PPA V contained debt that was non-recourse to us and owned the Energy Server assets for which we did not have title.

  1. Related Party Transactions

On September 23, 2023, all 13,491,701 shares of the Series B RCPS (i.e., the Second Tranche Shares) were automatically converted into shares of our Class A common stock. For more information on the Second Tranche Closing, see Note 17 —SK ecoplant Strategic Investment. Consequently, SK ecoplant became a principal owner of an aggregate of 23,491,701 shares of our Class A common stock, including (i)10,000,000 shares held with sole voting and investment power (as a result of the conversion of 10,000,000 shares of our Series A RCPS into 10,000,000 shares of our Class A common stock on November 8, 2022) and (ii)13,491,701 shares held with shared voting and investing power with Econovation LLC,51.67% and 48.33% of which is owned by SK ecoplant and Blooming Green Energy, respectively, as the assignee of the Second Tranche Shares. SK ecoplant is considered to be a related party as of September 23, 2023, and became entitled to nominate a member to the Board of Directors of Bloom. As of December 31, 2023, SK ecoplant’s beneficial ownership of our Class A common stock represents 10.5% of our outstanding Class A common stock.

Our operations included the following related party transactions (in thousands):

Years EndedDecember 31,
202320222021
Total revenue from related parties1$487,240$36,281$16,038
Cost of product revenue2133——
General and administrative expenses3812——
Interest expense484——

1 Includes revenue from SK ecoplant for the year ended December 31, 2023, which became a related party on September 23, 2023, however we had transactions with SK ecoplant in prior periods (see Note 17 —SK ecoplant Strategic Investment). Revenue from related parties for the years ended December 31, 2022 and 2021 relate to Korean JV in its entirety.

2 Includes expenses billed by SK ecoplant to Korean JV for headcount support, maintenance and other services.

3 $0.6 million relate to rent expenses per operating lease agreements entered between Korean JV and SK ecoplant, $0.2 million relate to miscellaneous expenses billed by SK ecoplant to Korean JV.

4 Interest expense pertwo term loans entered between Korean JV and SK ecoplant in fiscal 2023 (see Note 7 —Outstanding Loans and Security Agreements).

Below is the summary of outstanding related party balances as of December 31, 2023 and December 31, 2022 (in thousands):

December 31,
20232022
Accounts receivable$262,031$4,257
Contract assets6,872—
Deferred cost of revenue, current875—
Prepaid expenses and other current assets (Note 17)2,257—
Operating lease right-of-use assets12,031—
Other long-term assets (Note 17)9,069—
Accounts payable77—
Accrued expenses and other current liabilities3,427—
Deferred revenue and customer deposits, current1,707—
Operating lease liabilities, current1440—
Deferred revenue and customer deposits, long-term6,709—
Operating lease liabilities, non-current11,617—
Non-recourse debt2 (Note 7)4,627—

1 Balances relate to operating leases entered between Korean JV and SK ecoplant.

2 Represent the total balance oftwo term loans entered between Korean JV and SK ecoplant in fiscal 2023 (see Note 7 —Outstanding Loans and Security Agreements).

Bloom Energy Japan Limited

In May 2013, we entered into a joint venture with Softbank Corp. (“Softbank”), which was accounted for as an equity method investment. Under this arrangement, we sold the Energy Servers and provided maintenance services to the joint venture. On July 1, 2021 (the “BEJ Closing Date”), we acquired Softbank’s 50% interest in the joint venture for a cash payment of $2.0 million and subject to a $3.6 million earn out. As of the BEJ Closing Date, Bloom Energy Japan Limited (“Bloom Energy Japan”) is no longer considered a related party. For the year ended December 31, 2021 we recognized related party revenue of $1.6 million.

SK ecoplant Joint Venture and Strategic Partnership

In September 2019, we entered into a joint venture agreement with SK ecoplant to establish a light-assembly facility in the Republic of Korea for sales of certain portions of our Energy Servers for the stationary utility and commercial and industrial market in the Republic of Korea. Based on the expanded relationship between us and SK ecoplant, the joint venture in 2022 and 2023 was further extended. The joint venture is a VIE of Bloom and we consolidate it in our financial statements as we are the primary beneficiary and therefore have the power to direct activities which are most significant to the joint venture. For the years ended December 31, 2023, 2022 and 2021, we recognized related party revenue of $37.3 million, $36.3 million and $14.5 million, respectively. As of December 31, 2023 and 2022, we had outstanding accounts receivable of $19.6 million and $4.3 million, respectively.

For additional information, see Note 17 —SK ecoplant Strategic Investment.

  1. Restructuring

In September 2023, as a result of a review of current strategic priorities and resource allocation, we approved the Restructuring Plan intended to realign our operational focus to support our multi-year growth, scale the business, and improve our cost structure and operating margins. The Restructuring Plan included (i) an optimization of our workforce across multiple functions, (ii) a relocation of our Repair & Overhaul (“R&O”) department from our manufacturing and warehousing facility in Newark, Delaware, to Mexico, and (iii) a closure of a manufacturing, warehousing, research and development (“R&D”) facility in Sunnyvale, California (i.e., facility closure). We began executing the Restructuring Plan in September 2023 and expect these efforts to continue in subsequent quarters. The restructuring activities are expected to be completed in the first half of fiscal 2024, subject to local law and consultation requirements, as well as our business needs.

The determination of when we accrue for involuntary termination benefits under restructuring plans depends on whether the termination benefits are provided under an ongoing benefit arrangement or under a one-time benefit arrangement. We account for one-time benefit arrangements in accordance with ASC 420, Exit or Disposal Cost Obligations(“ASC 420”) and account for ongoing benefit arrangements in accordance with ASC 712, Nonretirement Postemployment Benefits. For involuntary termination benefits that are not provided under the terms of an ongoing benefit arrangement, the liability for the current fair value of expected future costs associated with a management-approved restructuring plan is recognized in the period in which the plan is communicated to the employees and the plan is not expected to change significantly. For ongoing benefit arrangements, inclusive of statutory requirements, employee termination costs are accrued when the existing situation or set of circumstances indicates that an obligation has been incurred, it is probable the benefits will be paid, and the amount can be reasonably estimated. The restructuring charges that have been incurred but not yet paid are recorded in accrued expenses and other current liabilities in our consolidated balance sheets, as they are expected to be settled within the next twelve months. Other costs associated with restructuring or exit activities may include contract termination costs, relocation costs and impairments of long-lived assets, which are expensed in accordance with ASC 420 and ASC 360, Property, Plant and Equipment.

According to the Restructuring Plan,74 full-time employees and 48 contractors were separated from the Company in September 2023. An additional 71 full-time employees and 8 contractors separated from the Company in October 2023. Both full-time employees and contractors who were impacted by the restructuring were eligible to receive severance benefits.

On October 28, 2023, we communicated to additional 61 full-time employees about their forthcoming separation from the Company on January 2, 2024. These employees are sent on paid leave from the communication date through January 2, 2024, and are eligible for one-time employee termination benefits represented by the base salary they earn through the term of the leave.

In fiscal 2023, we incurred $9.3 million in restructuring costs recorded as severance expenses of $5.3 million, facility closure costs of $2.6 million, and other restructuring costs of $1.4 million. We expect to incur another $7.6 million in restructuring costs in subsequent quarters, out of which we expect $3.5 million will relate to relocation costs, $3.3 million will relate to the facility closure costs, and $0.8 million will relate to other one-time employee termination benefits. However, the actual timing and amount of costs associated with these restructuring actions may differ from our current expectations and estimates and such differences may be material.

The following table presents our current liability as accrued for restructuring charges on our consolidated balance sheets. The table sets forth an analysis of the components of the restructuring charges and payments made against the accrual for the year ended December 31, 2023 (in thousands):

Year Ended December 31, 2023
Facility ClosureSeveranceOtherTotal
Balance at December 31, 2022$—$—$—$—
Restructuring accruals2,6115,3061,2499,166
Payments(34)(4,842)(497)(5,373)
Balance at December 31, 2023$2,577$464$752$3,793

Facility closure costs recorded in fiscal 2023 in accordance with ASC 420 related to the closure of a manufacturing, warehousing, R&D facility in Sunnyvale, California, which is planned to be consolidated with our manufacturing facility in Fremont, California. At December 31, 2023, $2.6 million of accrued facility closure costs were included in accrued expenses and other current liabilities in our consolidated balance sheets.

Severance expense recorded in fiscal 2023 in accordance with ASC 420 was a result of the separation of 145 full-time employees and 56 contractors associated with the Restructuring Plan. At December 31, 2023, $0.5 million of accrued severance-related costs were included in accrued expenses and other current liabilities in our consolidated balance sheets.

Other costs are represented by (1) $0.2 million of performance bonuses, (2) $0.2 million of stock-based compensation expense, and (3) $1.0 million of other one-time employee termination benefits. On December 31, 2023, $0.8 million of accrued other costs were included in accrued expenses and other current liabilities in our consolidated balance sheets, respectively.

The following table summarizes restructuring costs included in the accompanying consolidated statements of operations (in thousands):

Year Ended December 31, 2023
Cost of product revenue$2,976
Cost of installation revenue71
Cost of service revenue521
Operating expenses:
Research and development1,609
Sales and marketing1,679
General and administrative2,467
Total$9,323
  1. Commitments and Contingencies

Commitments

Purchase Commitments with Suppliers and Contract Manufacturers —In order to reduce manufacturing lead-times for an adequate supply of inventories, we have agreements with our component suppliers and contract manufacturers to allow long lead-time component inventory procurement based on a rolling production forecast. We are contractually obligated to purchase long lead-time component inventory procured by certain manufacturers in accordance with our forecasts. We can generally give notice of order cancellation at least 90 days prior to the delivery date. However, we occasionally issue purchase orders to our component suppliers and third-party manufacturers that may not be cancellable. As of December 31, 2023 and December 31,

2022, we had no material open purchase orders with our component suppliers and third-party manufacturers that are not cancellable.

Performance Guarantees —We guarantee the performance of the Energy Servers at certain levels of output and efficiency to our customers over the contractual term. We monitor the need for any accruals arising from such guaranties, which are calculated as the difference between committed and actual power output or between natural gas consumption at warranted efficiency levels and actual consumption, multiplied by the contractual rates with the customer. Amounts payable under these guaranties are accrued in periods when the guaranties are not met and are recorded as service revenue in the consolidated statements of operations. We paid $25.9 million and $12.1 million for the years ended December 31, 2023 and 2022, respectively, for such performance guarantees.

Letters of Credit — In 2019, pursuant to the PPA II upgrade of the Energy Servers, we agreed to indemnify our financing partner for losses that may be incurred in the event of certain regulatory, legal or legislative developments and established a cash-collateralized letter of credit facility for this purpose. As of December 31, 2023 and December 31, 2022, the balance of this cash-collateralized letter of credit was $40.4 million and $69.1 million, respectively.

In August 2023, as part of the PPA V Upgrade, the debt service reserve of $8.6 million was reclassified from restricted cash to cash and cash equivalents at the time of repayment of the 3.04% Senior Secured Notes due June 2031. For additional information, please see Note 7 –Outstanding Loans and Security Agreements and Note 10 –Portfolio Financings. The restricted cash held in PPA V as of December 31, 2022, was $8.6 million.

In addition, we have other outstanding letters of credit issued to our customers and other counterparties in the U.S. and international locations under different performance and financial obligations. These letters of credit are collateralized through cash deposited in the controlled bank accounts with the issuing banks and are classified as restricted cash in our consolidated balance sheets. In September 2023, we canceled certain existing cash-collateralized letters of credit with an approximate value of $60.4 million issued to our customers in the Republic of Korea under long-term service agreements and replaced them with surety bonds on a non-collateralized basis. As of December 31, 2023 and December 31, 2022, the balances of the cash-collateralized letters of credit issued to our customers and other counterparties in the U.S. and international locations were $32.6 million and $84.3 million, respectively.

Pledged Funds — In 2019, pursuant to the PPA IIIb upgrade of the Energy Servers, we established a restricted cash fund of $20.0 million, which had been pledged for aseven-year period to secure our operations and maintenance obligations with respect to the totality of our obligations to the financier. All or a portion of such funds would be released if we meet certain credit rating and/or market capitalization milestones prior to the end of the pledge period. If we do not meet the required criteria within the first five-year period, the funds would still be released to us over the followingtwo years as long as the Energy Servers continue to perform in compliance with our warranty obligations. As of December 31, 2023 and December 31, 2022, the balance of the restricted cash fund was $7.6 million and $7.9 million, respectively.

Contingencies

Indemnification Agreements —We enter into standard indemnification agreements with our customers and certain other business partners in the ordinary course of business. Our exposure under these agreements is unknown because it involves future claims that may be made against us but have not yet been made. To date, we have not paid any claims or been required to defend any action related to our indemnification obligations. However, we may record charges in the future as a result of these indemnification obligations.

Delaware Economic Development Authority —In March 2012, we entered into an agreement with the Delaware Economic Development Authority to provide a grant of $16.5 million to us as an incentive to establish a new manufacturing facility in Delaware and to provide employment for full time workers at the facility over a certain period of time. The approved grant consisted of two components — a performance grant of $12.0 million that was received in 2012-2013 and was tied to total compensation paid to full time workers, and a supplier incentive grant of $4.5 million that we would have received if we had employed 900 full time employees by pre-established dates. We forfeited the entire $4.5 million supplier incentive component of the grant. We forfeited and repaid two portions of the performance grant based on our achievement of one out of three milestones for the total compensation paid to full time workers, as follows:

■$108 million in total compensation over thefour-year period ended September 30, 2017, which we did not meet, requiring us to repay $1.5 million of the grant,

■$144 million in total compensation over thefour-year period ended September 30, 2021, which we did not meet, requiring us to repay $1.0 million of the grant, and

■$72 million in total compensation over thetwo-year period ended September 30, 2023, which we met, so no repayment was required.

We account for grants by analogizing to the grant accounting model under IAS 20, Accounting for Government Grants and Disclosure of Government Assistance. We recognize grant funding with conditions as a reduction of expenses the related costs for which the grant is intended to compensate in the period during which the related qualifying expenses are incurred and as the grant conditions are fulfilled. Any amount received in advance of fulfilling such conditions is recorded in accrued expenses and other current liabilities in our consolidated balance sheets, if the conditions are expected to be met within the next twelve months, and in other long-term liabilities in our consolidated balance sheets, if the conditions are expected to be met in more than twelve-month period.

As of December 31, 2022, we recorded $9.5 million of grant related liability in accrued expenses and other current liabilities for future repayment of the grant. As of September 30, 2023, we concluded there was reasonable assurance that we had met the grant requirements, and $9.5 million was recognized in the consolidated statements of operations as a reduction in (i) cost of product revenue of $5.3 million, (ii) cost of service revenue of $2.9 million, (iii) general and administrative expenses of $0.6 million, (iv) research and development expenses of $0.5 million, and (v) sales and marketing expenses of $0.2 million for the year ended December 31, 2023.

Investment Tax Credits — Our Energy Servers are eligible for federal ITCs that accrued to qualified property under Internal Revenue Code Section 48 when placed into service. However, the ITC program has operational criteria that extend for five years. If the energy property is disposed of or otherwise ceases to be qualified investment credit property before the close of the five-year recapture period is fulfilled, it could result in a partial reduction of the incentives.

Legal Matters —We are involved in various legal proceedings that arise in the ordinary course of business. We review all legal matters at least quarterly and assess whether an accrual for loss contingencies needs to be recorded. We record an accrual for loss contingencies when management believes that it is both probable that a liability has been incurred and the amount of the loss can be reasonably estimated. Legal matters are subject to uncertainties and are inherently unpredictable, so the actual liability in any such matter may be materially different from our estimates. If an unfavorable resolution were to occur, there exists the possibility of a material adverse impact on our consolidated financial condition, results of operations or cash flows for the period in which the resolution occurs or in future periods.

In March 2019, the Lincolnshire Police Pension Fund filed a class action complaint in the Superior Court of the State of California, County of Santa Clara, against us, certain members of our senior management, certain of our directors and the underwriters in our July 25, 2018 IPO alleging violations under Sections 11 and 15 of the Securities Act for alleged misleading statements or omissions in our Registration Statement on Form S-1 filed with the SEC in connection with the IPO. Two related class action cases were subsequently filed in the Santa Clara County Superior Court against the same defendants containing the same allegations; Rodriquez vs Bloom Energy et al. was filed on April 22, 2019 and Evans vs Bloom Energy et al. was filed on May 7, 2019. These cases have been consolidated. Plaintiffs’ consolidated amended complaint was filed with the court on September 12, 2019. On October 4, 2019, defendants moved to stay the lawsuit pending the federal district court action discussed below. On December 7, 2019, the Superior Court issued an order staying the action through resolution of the parallel federal litigation mentioned below. We believe the complaint to be without merit and in contravention of our forum selection clause in our Restated Certificate of Incorporation and we intend to defend this action vigorously. We are unable to estimate any range of reasonably possible losses.

In May 2019, Elissa Roberts filed a class action complaint in the federal district court for the Northern District of California against us, certain members of our senior management team, and certain of our directors’ alleging violations under Sections 11 and 15 of the Securities Act for alleged misleading statements or omissions in our Registration Statement on Form S-1 filed with the SEC in connection with the IPO. On September 3, 2019, the court appointed a lead plaintiff and lead plaintiffs’ counsel. On November 4, 2019, plaintiffs filed an amended complaint adding the underwriters in the IPO and our auditor as defendants for the Section 11 claim, as well as adding claims under Sections 10(b) and 20(a) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), against us, and certain members of our senior management team. The amended complaint alleged a class period for all claims from the time of our IPO until September 16, 2019. On April 21, 2020, plaintiffs filed a second amended complaint, which continued to make the same claims and added allegations pertaining to the restatement and, as to claims under the Exchange Act, extended the putative class period through February 12, 2020. On July 1, 2020, we and the other defendants filed motions to dismiss the second amended complaint. On September 29, 2021, the court entered an order dismissing with leave to amend (1) five of seven statements or groups of statements alleged to violate Sections

11 and 15 of the Securities Act and (2) all allegations under the Exchange Act. All allegations against our auditors were also dismissed. Plaintiffs elected not to amend the complaint and instead on October 22, 2021 filed a motion for entry of final judgment in favor of our auditors so that plaintiffs could appeal the dismissal of those claims. The court denied that motion on December 1, 2021 and in response plaintiffs filed a motion asking the court to certify an interlocutory appeal as to the accounting claims. The court denied plaintiffs’ motion on April 14, 2022. The claims for violation of Sections 11 and 15 of the Securities Act that were not dismissed by the court entered the discovery phase.

On January 6, 2023, Bloom and the plaintiffs’ entered into an agreement in principle to settle the claims against Bloom, its executives and directors, and the IPO underwriters for a payment of $3 million, which we expect to be funded entirely by our insurers. If the settlement becomes effective, we expect it to result in a dismissal with prejudice of all claims against us, our executives and directors, and the underwriters. The settlement does not constitute an acknowledgement of liability or wrongdoing. On June 30, 2023, Bloom and the plaintiff’s executed a definitive settlement agreement containing the foregoing terms and customary terms for class action settlements, and on the same date, filed the settlement agreement with the court to seek its approval. The judge issued a preliminary approval of the settlement on October 31, 2023. Notice of the settlement together with requested Plaintiff attorney fees has been sent to the defined class of Bloom stockholders and a final fairness hearing on May 2, 2024 will occur before the settlement is final.

In June 2021, we filed a petition for writ of mandate and a complaint for declaratory and injunctive relief in the Santa Clara Superior Court against the City of Santa Clara for failure to issue building permits for two of our customer installations and asking the court to require the City of Santa Clara to process and issue the building permits. In October 2021, we filed an amended petition and complaint that asserts additional constitutional and tort claims based on the City’s failure to timely issue the Energy Server permits. Discovery has commenced and we are aggressively pursuing all claims. On February 4, 2022, the City of Santa Clara filed a demurrer seeking to dismiss all of the Company’s claims. The trial judge rejected the demurrer on all claims except one, and allowed Bloom to leave to amend that claim. The second amended petition was filed on July 5, 2022. The City of Santa Clara demurred only to the amended cause of action seeking damages for tortious conduct. The trial judge granted that demurrer and struck the tort claim on October 27, 2022; the writ of mandate and constitutional claims were allowed to proceed. The parties are currently briefing the writ of mandate claims which seek immediate issuance of the building permits. On April 21, 2023, the parties executed a settlement agreement which allows our two pending customer installations to proceed under building permits and requires the City of Santa Clara to amend its zoning code so that future installations of Bloom Energy Servers in Santa Clara require only building permits.

In February 2022, Plansee SE/Global Tungsten & Powders Corp. (“Plansee/GTP”), a former supplier, filed a request for expedited arbitration with the World Intellectual Property Organization Arbitration and Mediation Center in Geneva Switzerland (“WIPO”), for various claims allegedly in relation to an Intellectual Property and Confidential Disclosure Agreement between Plansee/GTP and Bloom Energy Corporation. Plansee/GTP’s statement of claims includes allegations of infringement of U.S. Patent Nos. 8,802,328, 8,753,785 and 9,434,003. On April 3, 2022, we filed a complaint against Plansee/GTP in the Eastern District of Texas to address the dispute between Plansee/GTP and Bloom Energy Corporation in a proper forum before a U.S. Federal District Court. Our complaint seeks the correction of inventorship of U.S. Patent Nos. 8,802,328, 8,753,785 and 9,434,003 (the “Patents-in-Suit”); declaratory judgment of invalidity, unenforceability, and non-infringement of the Patents-in-Suit; and declaratory judgment of no misappropriation. Further, our complaint seeks to recover damages we have suffered in relation to Plansee/GTP’s business dealings that, as alleged, constitute acts of unfair competition, tortious interference contract, breach of contract, violations of the Racketeer Influenced and Corrupt Organizations (RICO) Act and violations of the Clayton Antitrust Act. On June 9, 2022, Plansee/GTP filed a motion to dismiss the complaint filed in the Eastern District of Texas and compel arbitration (or alternatively to stay). We filed our opposition on June 30, 2022, Plansee/GTP filed its reply on July 14, 2022 and we filed our sur-reply on July 22, 2022. On February 9, 2023, Magistrate Judge Payne issued a report and recommendation to stay the district court action pending an arbitrability determination by the arbitrator for each claim.

On February 23, 2023, we filed an amended complaint adding additional causes of action and filed objections to the Magistrate’s report and recommendation. On April 26, 2023, Judge Gilstrap overruled our objections to the Magistrate’s report and recommendation and stayed the district court action pending arbitrability determinations by the arbitrator in the WIPO proceeding. The arbitration had been held in abeyance awaiting the decision of the Eastern District of Texas. A hearing by the arbitrator in WIPO on arbitrability took place on June 27, 2023. On October 2, 2023, the arbitrator in the WIPO proceeding issued a ruling concluding that all the parties’ claims were arbitrable. On November 18, 2023, the arbitrator bifurcated the arbitration into a first phase that will focus on Bloom’s claims directed to improper inventorship of the Patents-in-Suit and Bloom’s defective product claims. Briefing on the first phase will take place throughout 2024 with a potential evidentiary hearing to be scheduled in 2025. We are unable to predict the ultimate outcome of the arbitration at this time.

  1. Segment Information

Our chief operating decision makers (“CODM”), the Chief Executive Officer and the Chief Financial Officer, review financial information presented on a consolidated basis for the purposes of allocating resources and evaluating financial performance. The CODM allocates resources and make operational decisions based on direct involvement with our operations and product development efforts. We are managed under a functionally based organizational structure with the head of each function reporting to the Chief Executive Officer. The CODM assesses performance, including incentive compensation, based upon consolidated operations performance and financial results on a consolidated basis. As such, we have a single operating unit structure and are a single reporting segment.

  1. Income Taxes

The components of loss before the provision for income taxes are as follows (in thousands):

Years EndedDecember 31,
202320222021
United States$(310,243)$(320,107)$(195,208)
Foreign4,2006,1182,885
Total$(306,043)$(313,989)$(192,323)

The provision for income taxes is comprised of the following (in thousands):

Years EndedDecember 31,
202320222021
Current:
Federal$—$—$—
State246374107
Foreign1,6401,1581,012
Total current1,8861,5321,119
Deferred:
Federal———
State———
Foreign8(435)(73)
Total deferred8(435)(73)
Total provision for income taxes$1,894$1,097$1,046

A reconciliation of the U.S. federal statutory income tax rate to our effective tax rate is as follows (in thousands):

Years EndedDecember 31,
202320222021
Tax at federal statutory rate$(64,270)$(65,922)$(40,387)
State taxes, net of federal effect246374107
Impact of noncontrolling interest1,2222,8726,074
Elimination of acquiree deferred taxes——2,149
Non-U.S. tax effect1,067(387)412
Nondeductible expenses and losses5,2392,2581,311
Stock-based compensation3,2227,0195,307
Loss on debt extinguishment———
U.S. tax on foreign earnings (GILTI)862,52559
(Gain) loss on SK Equity Transaction11,811(3,932)2,292
Acquisition contingent liability——(762)
Change in valuation allowance43,27156,29024,484
Provision for income taxes$1,894$1,097$1,046

For the year ended December 31, 2023, the Company recognized a provision for income taxes of $1.9 million on a pre-tax loss of $306.0 million, for an effective tax rate of (0.6)%. For the year ended December 31, 2022, we recognized a provision for income taxes of $1.1 million on a pre-tax loss of $314.0 million, for an effective tax rate of (0.3)%. For the year ended December 31, 2021, we recognized a provision for income taxes of $1.0 million on a pre-tax loss of $192.3 million, for an effective tax rate of (0.5)%. The effective tax rate for 2023, 2022 and 2021 is lower than the statutory federal tax rate primarily due to a full valuation allowance against U.S. deferred tax assets.

Significant components of our deferred tax assets and liabilities consist of the following (in thousands):

December 31,
20232022
Tax credits and net operating loss carryforwards$574,679$558,779
Lease liabilities151,470157,890
Depreciation and amortization59,79027,681
Deferred revenue13,58018,992
Accruals and reserves36,09621,084
Research and development expenditures capitalization53,99128,965
Stock-based compensation19,69822,675
Disallowed Interest expenses29,58129,159
Investment in PPA entities—4,354
Other items — deferred tax assets1,6951,519
Gross deferred tax assets940,580871,098
Valuation allowance(831,597)(758,242)
Net deferred tax assets108,983112,856
Managed services — deferred costs(16,826)(18,974)
Right-of-use assets and leased assets(88,391)(90,682)
Other items — deferred tax liability(2,381)(2,049)
Gross deferred tax liabilities(107,598)(111,705)
Net deferred tax asset$1,385$1,151

Income taxes are recorded using the asset and liability method. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss and tax credit carryforwards. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income (or loss) in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the enactment date.

A valuation allowance is provided for the amount of deferred tax assets that, based on available evidence, is not more-likely-than-not to be realized. Management believes that, based on available evidence, both positive and negative, it is not more likely than not that the net U.S. deferred tax assets will be utilized. As a result, a full valuation allowance has been recorded.

The valuation allowance for deferred tax assets was $831.6 million and $758.2 million as of December 31, 2023 and 2022, respectively. The net change in the total valuation allowance for the years ended December 31, 2023 and 2022 was an increase of $73.4 million and an increase of $69.0 million, respectively.

At December 31, 2023, we had federal and California net operating loss carryforwards of $2.1 billion and $1.5 billion, respectively, to reduce future taxable income. The expiration of federal and California net operating loss carryforwards is summarized as follows (in billions):

FederalCalifornia
Expire in 2024 — 2028$0.2$0.1
Expire in 2029 — 20330.70.6
Expire beginning in 20340.80.8
Carryforward indefinitely0.4—
Total$2.1$1.5

At December 31, 2023, we also had other state net operating loss carryforwards of $369.5 million, that began to expire in fiscal 2024. In addition, at December 31, 2023, we had approximately $39.1 million of federal research credit, $6.6 million of federal investment tax credit, and $19.1 million of state research credit carryforwards.

The expiration of the federal and California credit carryforwards is summarized as follows (in millions):

FederalCalifornia
Expire in 2024 — 2028$4.3$—
Expire in 2029 — 20337.9—
Expire beginning in 203433.5—
Carryforward indefinitely—19.1
Total$45.7$19.1

We have not reflected deferred tax assets for the federal and state research credit carryforwards as the entire amount of the carryforwards represent unrecognized tax benefits.

Internal Revenue Code Section 382 (“Section 382”) limits the use of net operating loss and tax credit carryforwards in certain situations in which changes occur in our capital stock ownership. Any annual limitation may result in the expiration of net operating losses and credits before utilization. If we should have an ownership change, as defined by the tax law, utilization of the net operating loss and credit carryforwards could be significantly reduced. We completed a Section 382 analysis through December 31, 2023. Based on this analysis, Section 382 limitations will not have a material impact on our net operating loss and credit carryforwards related to any ownership changes.

During the year ended December 31, 2023, the amount of uncertain tax positions increased by $9.8 million. We have not recorded any uncertain tax liabilities associated with our tax positions.

A reconciliation of the beginning and ending amounts of unrecognized tax benefits were as follows (in thousands):

Years EndedDecember 31,
202320222021
Unrecognized tax benefits beginning balance$48,389$42,010$37,753
Gross decrease for tax positions of prior year(152)(55)—
Gross increase for tax positions of prior year1,307—95
Gross increase for tax positions of current year8,6136,4344,162
Unrecognized tax benefits end balance$58,157$48,389$42,010

If fully recognized in the future, there would be no impact to the effective tax rate, and $54.1 million would result in adjustments to the valuation allowance. We do not have any tax positions that are expected to significantly increase or decrease within the next 12 months.

Interest and penalties, to the extent there are any, would be included in income tax expense. There wereno material interest or penalties accrued during or for the years ended December 31, 2023 and 2022.

We are subject to taxation in the U.S. and various states and foreign jurisdictions. Our 2020 tax year that was under audit by the IRS has been closed in 2023 without a material impact on our financial position. All of our tax years will remain open for examination by federal and state authorities for three and four years from the date of utilization of any net operating losses and tax credits.

The Tax Cuts and Jobs Act of 2017 (“Tax Act”) includes a provision referred to as Global Intangible Low-Taxed Income (“GILTI”) which generally imposes a tax on foreign income in excess of a deemed return on tangible assets. Guidance issued by the Financial Accounting Standards Board in January 2018 allows companies to make an accounting policy election to either (i) account for GILTI as a component of tax expense in the period in which the tax is incurred (“period cost method”), or (ii) account for GILTI in the measurement of deferred taxes (“deferred method”). We elected to account for the tax effects of this provision using the period cost method.

On August 16, 2022, the U.S. government enacted the IRA. The IRA establishes a new corporate alternative minimum tax based on financial statement income adjusted for certain items. The new minimum tax is effective for tax years beginning after December 31, 2022. The enactment of the IRA did not have a material impact to our tax expense for the years ended December 31, 2023 and 2022, but we are currently assessing the impact of the production and tax credit-related IRA provisions on our business for future periods.

The accumulated undistributed foreign earnings of the Company as of December 31, 2023 have been subject to either the deemed one-time mandatory repatriation under the Tax Act or the current year income inclusion under GILTI regime for U.S. tax purposes. If we were to make actual distributions of some or all of these earnings, including earnings accumulated after December 31, 2017, we would generally incur no additional U.S. income tax but could incur U.S. state income tax and foreign withholding taxes. We have not accrued for these potential U.S. state income tax and foreign withholding taxes because we intend to permanently reinvest our foreign earnings in our international operations. However, any additional income tax associated with the distribution of these earnings would be immaterial.

  1. Net Loss per Share Available to Common Stockholders

Net loss per share (basic) available to common stockholders is calculated by dividing net loss available to common stockholders by the weighted-average shares of common stock outstanding for the period. Net loss per share is the same for each class of common stock as they are entitled to the same liquidation and dividend rights. As a result, net loss per share (basic) and net loss per share (diluted) available to common stockholders are the same for both Class A and Class B common stock and are combined for presentation. On July 27, 2023, each share of our Class B common stock automatically converted intoone share of our Class A common stock.

Net loss per share (diluted) is computed by using (i) the if-converted method when calculating the potentially dilutive effect, if any, of our convertible notes, and our redeemable convertible preferred stock, and (ii) the treasury stock method when calculating the potentially dilutive effect, if any, of our outstanding stock options and awards, and shares issued in conjunction with the Company’s ESPP. Net loss per share (diluted) available to common stockholders is then calculated by dividing the resulting adjusted net loss available to common stockholders by the combined weighted-average number of fully diluted common shares outstanding. There were no adjustments to net loss available to common stockholders (diluted). Equally, there were no adjustments to the weighted average number of outstanding shares of common stock (basic) in arriving at the weighted average number of outstanding shares (diluted), as such adjustments would have been antidilutive.

The following table sets forth the computation of our net loss per share available to common stockholders, basic and diluted (in thousands, except per share amounts):

Years EndedDecember 31,
202320222021
Numerator:
Net loss available to common stockholders$(302,116)$(301,708)$(164,473)
Denominator:
Weighted average shares of common stock, basic and diluted212,681185,907173,438
Net loss per share available to common stockholders, basic and diluted$(1.42)$(1.62)$(0.95)

The following common stock equivalents (in thousands) were excluded from the computation of our net loss per share available to common stockholders, diluted, for the years presented as their inclusion would have been antidilutive (in thousands):

Years EndedDecember 31,
202320222021
Convertible notes35,32714,18714,187
Redeemable convertible preferred stock9,7958,52182
Stock options and awards4,0115,6837,018
49,13328,39121,287

As of December 31, 2022, pursuant to the notice received from SK ecoplant of its intent to exercise its option to purchase additional shares of our Class A common stock, there were an additional 13,491,701 common stock equivalents that were excluded from the table above.

  1. SK ecoplant Strategic Investment

In October 2021, we expanded our existing relationship with SK ecoplant. As part of this arrangement, we amended the previous Preferred Distribution Agreement (the “Restated PDA”) and the Joint Venture Agreement (the “JVA”) with SK ecoplant. The Restated PDA establishes SK ecoplant’s purchase commitments for our Energy Servers for thethree-year period on a take-or-pay basis as well as the basis for determining the prices at which the Energy Servers and related components will be sold. The restated JVA increases the scope of assembly done by the joint venture facility in the Republic of Korea, which was established in 2019, for the procurement of local parts for our Energy Servers and the assembly of certain portions of the Energy Servers for the South Korean market. The joint venture is a VIE of Bloom and we consolidate it in our financial statements as we are the primary beneficiary and therefore have the power to direct activities which are most significant to the joint venture.

In October 2021, we also entered into a new Commercial Cooperation Agreement (the “CCA”) regarding initiatives pertaining to the hydrogen market and general market expansion for our products.

In September 2023, we entered into the Amended and Restated JVA and the Share Purchase Agreement (together, the “Amended JV Agreements”) with SK ecoplant which changed the share of our voting rights in the Korean JV to 40% and increased the scope of assembly done by the joint venture facility in the Republic of Korea to full assembly. Neither the Amended JV Agreements, nor the fact that SK ecoplant is considered to be our related party after the conversion of Series B RCPS into shares of our Class A common stock (for additional information, please see Note 11 —Related Party Transactions)

changed our status as the primary beneficiary of the Korean JV. Therefore, we continue to consolidate this VIE in our financial statements as of December 31, 2023.

The following are the aggregate carrying values of the Korean JV’s assets and liabilities in our consolidated balance sheets, after eliminations of intercompany transactions and balances, as of December 31, 2023 and 2022 (in thousands):

December 31,
20232022
Assets
Current assets:
Cash and cash equivalents$3,003$2,591
Accounts receivable19,5674,257
Inventories8,15613,412
Prepaid expenses and other current assets6442,645
Total current assets31,37022,905
Property and equipment, net2,5191,141
Operating lease right-of-use assets2,1382,390
Other long-term assets4647
Total assets$36,073$26,483
Liabilities
Current liabilities:
Accounts payable$3,480$5,607
Accrued expenses and other current liabilities2,3471,355
Deferred revenue and customer deposits—2
Operating lease liabilities440393
Total current liabilities6,2677,357
Operating lease liabilities1,6172,000
Non-recourse debt4,627—
Total liabilities$12,511$9,357

In September 2023, and December 2023, we entered into the First and the Second Amendments to the Restated PDA, respectively (the “First Amended Restated PDA” and the “Second Amended Restated PDA”, respectively). The First Amended Restated PDA amends the delivery terms. The Second Amended Restated PDA extends the initial term of the Restated PDA to December 31, 2027 and increases SK ecoplant’s purchase commitments for Bloom Energy products.

The Second Amended Restated PDA adds a new minimum purchase commitment of 250 megawatts and extends the timing of delivery of the remaining take-or- pay commitment under the original agreement. For thefour-year period from January 1, 2024 to December 31, 2027, the total purchase commitment under the Second Amended Restated PDA is 500 megawatts, including a recommitment of 250 megawatts from the Restated PDA and an additional 250 megawatts commitment.

Under the Second Amended Restated PDA SK ecoplant can fulfill its volume commitments with both our Energy Servers and the Electrolyzer and this enables SK ecoplant to pursue opportunities globally outside of the Republic of Korea. The purchase commitments are expressed on a quarterly and annual basis. Should SK ecoplant fail to meet these purchase commitments, this would constitute an event of default and we would be entitled to damages equivalent to the lost profit.

The Initial Investment

In October 2021, we entered into the SPA pursuant to which we agreed to sell and issue to SK ecoplant 10,000,000 shares of Series A RCPS at a purchase price of $25.50 per share for an aggregate purchase price of $255.0 million. On

December 29, 2021, the closing of the sale of the Series A RCPS was completed, and we issued 10,000,000 shares of the Series A RCPS (the “Initial Investment”).

In addition to the Initial Investment, the SPA provided SK ecoplant with an option to acquire a variable number of shares of Class A common stock (the “Option”). According to the SPA, SK ecoplant was entitled to exercise the Option through August 31, 2023, and the transaction must have been completed by November 30, 2023.

The sale of Series A RCPS was recorded at its fair value of $218.0 million on the date of issuance. Accordingly, we allocated the excess of the cash proceeds received of $255.0 million plus the change in fair value of the Series A RCPS between October 23, 2021, and December 29, 2021, of $9.7 million, over the fair value of the Series A RCPS on December 29, 2021, and the fair value of the Option on October 23, 2021, to the PDA. This excess amounted to $37.0 million and was recorded in deferred revenue and customer deposits. Accordingly, during the years ended December 31, 2022 and 2021, we recognized product revenue of $9.6 million and $2.8 million, respectively, in connection with this arrangement. No product revenue was recognized during the year ended December 31, 2023 in connection with this arrangement. As of December 31, 2022, the unrecognized amount of $24.6 million included $10.0 million in current deferred revenue and customer deposits and $14.6 million in non-current deferred revenue and customer deposits on the consolidated balance sheets. As of December 31, 2023, the unrecognized amount of deferred revenue and customer deposits was reduced tozero as a result of the Second Tranche Closing (see details below in section “The Second Tranche Closing”).

Restated PDA, JVA, CCA and the SPA entered into with SK ecoplant concurrently were evaluated as a combined contract in accordance with ASC 606 and, to the extent applicable for separated components, under the guidance of Topic 815 Derivatives and Hedging and applicable subsections and ASC 480, Distinguishing Liabilities from Equity.

We concluded that the Option was a freestanding financial instrument that should have been separately recorded at fair value on the date the SPA was executed. We determined the fair value of the Option on that date to be $9.6 million.

On August 10, 2022, pursuant to the SPA, SK ecoplant notified us of its intent to exercise its option to purchase additional shares of our Class A common stock, pursuant to a Second Tranche Exercise Notice (as defined in the SPA) electing to purchase 13,491,701 shares at a purchase price of $23.05 per share. The Option was fairly valued as of the notice date at $4.2 million, and gain on revaluation of $9.0 million was recorded under other (expense) income, net in our consolidated statements of operations. Upon the receipt of the notice from SK ecoplant the Option met the criteria of equity award and was classified as a forward contract as part of additional paid-in capital.

On November 8, 2022, each share of the Series A RCPS was converted into 10,000,000 shares of Class A common stock.

On December 6, 2022, SK and Bloom mutually agreed to delay the Second Tranche Closing until March 31, 2023. The mutual agreement to modify the closing date did not change the accounting or valuation of the equity-classified forward recorded.

The Second Tranche Closing

On March 20, 2023, SK ecoplant entered into the Amended SPA with us, pursuant to which on March 23, 2023, we issued and sold to SK ecoplant 13,491,701 shares of non-voting Series B RCPS, par value $0.0001 per share, at a purchase price of $23.05 per share for cash proceeds of $311.0 million, excluding issuance cost of $0.5 million.

The Amended SPA triggered the modification of the equity-classified forward contract on Class A common stock, which resulted in the derecognition of the pre-modified fair value of the forward contract given to SK ecoplant of $76.2 million. We valued the forward contract as the difference between our Class A common stock trading price adjusted by a discount for lack of marketability (“DLOM”) as of the date of Amended SPA (the “Valuation Date”) and the present value of the strike price, with further reduction associated with the expected outcome of the Second Tranche Closing. The derecognition of the pre-modified fair value was recorded in additional paid-in capital in our consolidated balance sheets as of December 31, 2023.

The Series B RCPS was accounted for as a stock award with liability and equity components. The liability component of the Series B RCPS was recognized at the redemption value of $311.0 million, less issuance costs of $0.5 million, and was recorded in current liabilities in our consolidated balance sheets as of December 31, 2023. The equity component of the Series B RCPS (the “Conversion Option”) was valued as a European-type call option under the guidance of ASC 718 by applying the Black-Scholes valuation model using inputs of the strike price, maturity, risk-free rate, and volatility. In addition, DLOM was applied to the Class A common stock price. The Conversion Option was recognized at its fair value of $16.1 million on March 20, 2023 and recorded in additional paid-in capital in our consolidated balance sheets as of December 31, 2023.

On March 20, 2023, in connection with the Amended SPA we also entered into the Loan Agreement, pursuant to which we had the option to draw on a loan from SK ecoplant with a maximum principal amount of $311.0 million, a maturity offive years and an interest rate of 4.6%, should SK ecoplant have sent a redemption notice to us under the Amended SPA (i.e., loan commitment asset). We concluded that the loan commitment was a freestanding financial instrument as of the Valuation Date, as such its fair value was based on the difference between the present value of cash flows associated with a loan with a market-participant based interest rate (i.e., the rate for which the value of the hypothetical loan agreement equals the face value of the Loan Agreement) and the cash flows associated with the loan committed to by SK ecoplant, and applied a redemption probability to the difference. The Series B RCPS redemption probability was obtained from a lattice model used to value the Series B preferred stock. As of December 31, 2023, the loan commitment asset from SK ecoplant was derecognized as a result of automatic conversion of all shares of the Series B RCPS into shares of our Class A common stock.

The Amended SPA and the Loan Agreement provided us with cash proceeds of $311.0 million and a loan commitment asset of $52.8 million from SK ecoplant for total consideration of $363.8 million. In return, SK ecoplant received consideration of $403.3 million, consisting of the release from the obligation to close on the original transaction fair valued at $76.2 million, the obligation from us to issue the Series B RCPS at redemption value of $311.0 million, and the option to convert the Series B RCPS to Class A common stock, which had an estimated fair value of $16.1 million. The excess consideration provided by us amounted to $39.5 million, which resulted in a reduction of our deferred revenue and customer deposits by $24.6 million related to the Initial Investment, as of December 31, 2023. The net excess consideration of $14.9 million was recognized as $8.2 million in prepaid expenses and other current assets and $6.7 million was classified as other long-term assets in our consolidated balance sheets as of March 31, 2023. The deferred expense is recognized as contra-revenue based on the remaining purchase commitments under the Second Amended Restated PDA. During the year ended December 31, 2023, the deferred expense recognized as contra-revenue was $3.5 million. As a result, as of December 31, 2023, we recognized the net excess consideration of $11.4 million, of which $2.3 million was classified as prepaid expenses and other current assets and $9.1 million was classified as other long-term assets, in our consolidated balance sheets.

On September 23, 2023, all 13,491,701 shares of the Series B RCPS were automatically converted into shares of our Class A common stock pursuant to the Certificate of Designation, dated as of March 20, 2023, setting forth the rights, preferences, privileges, and restrictions of the Series B RCPS, as amended by the Certificate of Amendment to the Certificate of Designation, dated as of April 18, 2023. As a result of the conversion: (i) the liability component of the Series B RCPS of $310.5 million was reclassified to additional paid-in capital, less par value of the issued $13,491,701 shares of our Class A common stock, and (ii) the loan commitment asset was recorded at its fair value of $52.8 million, of which $5.3 million was classified as current and $47.5 million was classified as non-current in our consolidated balance sheets, and was expensed immediately and recognized in interest expense in our consolidated statements of operations.

Upon conversion of all Series B RCPS into shares of our Class A common stock, SK ecoplant is considered to be a related party. For additional information, please see Note 11 —Related Party Transactions.

  1. Subsequent Events

There have been no material subsequent events that occurred during the period subsequent to the date of these consolidated financial statements that would require adjustment to our disclosure in the consolidated financial statements as presented.