Skip to main content

NextDecade Corp

For the period ended Jun 30, 2026. Filed Jul 30, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2026 · Filed Jul 30, 2026

NEXT$6.30+8.6%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Notes to Consolidated Financial Statements

(unaudited)

Note 1 — Background and Basis of Presentation

NextDecade Corporation, a Delaware corporation, is a Houston-based energy company primarily engaged in construction and development activities related to the liquefaction of natural gas and sale of LNG. We are constructing and developing a natural gas liquefaction and export facility located in the Rio Grande Valley near Brownsville, Texas (the “Rio Grande LNG Facility”). Construction of Trains 1–3 (“Phase 1”) by Phase 1 LLC, Train 4 by Train 4 LLC, and Train 5 by Train 5 LLC commenced in July 2023, September 2025, and October 2025, respectively. We are also developing and advancing the permitting process for expansion Trains 6 through 8 at the Rio Grande LNG Facility.

Basis of Presentation

The accompanying unaudited consolidated financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”) for interim financial information and with Rule 10-01 of Regulation S-X. Accordingly, they do not include all the information and disclosures required by GAAP for complete financial statements and should be read in conjunction with the consolidated financial statements and accompanying notes included in our Annual Report on Form 10-K for the year ended December 31, 2025. In our opinion, all adjustments which are necessary to a fair presentation of the unaudited consolidated financial statements have been included, and all such adjustments are of a normal recurring nature. The results of operations for the three and six months ended June 30, 2026 are not necessarily indicative of the operating results for the full year.

Certain reclassifications have been made to prior period amounts to conform to the current presentation. The Company began presenting operating and maintenance expense, which primarily consists of costs associated with the Rio Grande LNG Facility and pre-operational readiness activities, as a separate line item on its Consolidated Statements of Operations. These reclassifications did not have a material effect on the Company’s financial position, results of operations, or cash flows.

Note 2 — Property, Plant and Equipment

Property, plant and equipment consisted of the following (in thousands):

June 30, 2026December 31, 2025
Fixed assets and other assets:
Rio Grande LNG Facility under construction$13,075,552$10,563,032
Corporate and other8,2368,163
Accumulated depreciation(3,641)(2,884)
Total fixed assets and other assets, net13,080,14710,568,311
Finance lease right-of-use assets434,079—
Total property, plant and equipment, net$13,514,226$10,568,311

Note 3 — Leases

The Company leases various assets, including the site for the Rio Grande LNG Facility, office space, and LNG vessels under time charter agreements. The Rio Grande LNG Facility site lease includes renewal options that are reasonably certain of exercise and are included in the lease term and recognized as part of our right of use assets and lease liabilities. The Company also subleases certain of our vessels under charter to third-parties from time to time. For LNG vessels, the Company has elected to combine the lease component and its associated non-lease component and account for them as a single lease component.

Additional vessel charters are expected to commence in the second half of 2026 upon delivery of the related vessels.

The following table shows the classification and location of our right-of-use assets and lease liabilities on our Consolidated Balance Sheets (in thousands):

Consolidated Balance Sheets LocationJune 30, 2026December 31, 2025
Right-of-use assets - operatingOperating lease right-of-use assets$136,793$162,493
Right-of-use assets - financingProperty, plant and equipment, net434,079—
Total right-of-use assets$570,872$162,493
Current operating lease liabilitiesOperating leases - current liabilities$1,633$3,883
Current finance lease liabilitiesAccrued and other current liabilities33,409—
Non-current operating lease liabilitiesOperating leases - non-current liabilities118,932142,266
Non-current finance lease liabilitiesDebt, net396,707—
Total lease liabilities$550,681$146,149

Total lease costs consisted of the following (in thousands):

Three Months Ended June 30,Six Months Ended June 30,
2026202520262025
Operating lease cost$2,720$2,579$5,317$5,114
Finance lease cost:
Amortization of right-of-use assets7,352—7,352—
Interest on lease liabilities5,073—5,073—
Total finance lease cost12,425—12,425—
Sublease income(4,069)—(4,069)—
Total lease cost$11,076$2,579$13,673$5,114

Maturities of operating and finance lease liabilities as of June 30, 2026 are as follows (in thousands, except lease term and discount rate):

Operating Leases · Finance Leases
2026 (remaining)$4,928$31,576
202710,35962,638
202810,40342,308
202910,14635,624
203010,19135,624
Thereafter319,587578,475
Total undiscounted lease payments365,614786,245
Discount to present value(245,049)(356,129)
Present value of lease liabilities$120,565$430,116
Weighted average remaining lease term — years41.218.9
Weighted average discount rate — percent7.07.1

Other information related to our leases is as follows (in thousands):

Six Months Ended June 30,
20262025
Cash paid for amounts included in the measurement of lease liabilities:
Operating cash flows from operating leases$5,365$3,824
Operating cash flows from finance leases5,073—
Financing cash flows from finance leases5,397—
Noncash right-of-use assets and lease liabilities recorded for new and modified operating leases(23,927)—
Noncash right-of-use assets and lease liabilities recorded for new finance leases435,513—

Note 4 — Accrued and Other Current Liabilities

Accrued and other current liabilities consisted of the following (in thousands):

June 30, 2026December 31, 2025
Rio Grande LNG Facility$1,205,412$769,137
Accrued interest84,60473,945
Employee compensation10,59919,740
Other accrued liabilities63,09025,378
Total accrued and other current liabilities$1,363,705$888,200

Note 5 — Debt

Debt, net consisted of the following (in thousands):

June 30, 2026December 31, 2025
Phase 1 LLC Debt:
6.67% Senior Secured Notes due 2033$700,000$700,000
6.85% Senior Secured Notes due 2047190,000190,000
6.58% Senior Secured Notes due 20471,115,0001,115,000
6.72% Senior Secured Loans due 2033356,000356,000
7.11% Senior Secured Loans due 2047251,000251,000
CD Credit Agreement3,819,0003,708,000
TCF Credit Agreement496,000485,000
Total Phase 1 LLC Debt6,927,0006,805,000
Phase 1 HoldCo Borrower Debt:
7.05% Phase 1 HoldCo Borrower Term Loan due 20331,000,000—
Train 4 LLC Debt:
Train 4 LLC Credit Agreement549,000357,000
Train 5 LLC Debt:
6.56% Senior Secured Notes due 2050250,000150,000
13.00% Super FinCo Term Loan due 20311,295,1961,214,517
8.00% A&R Corporate Credit Agreement due 2030 - Series A100,000100,000
13.50% A&R Corporate Credit Agreement due 2030 - Series B214,715200,851
Total debt10,335,9118,827,368
Unamortized debt issuance costs(316,011)(316,443)
Finance leases396,707—
Debt, net$10,416,607$8,510,925

Phase 1 LLC Debt

Senior Secured Notes and Senior Secured Loans

The 6.67% Senior Secured Notes,6.85% Senior Secured Notes, and 6.58% Senior Secured Notes (collectively, the “Phase 1 Senior Secured Notes”) and the 6.72% Senior Secured Loans and 7.11% Senior Secured Loans (collectively, the “Phase 1 Senior Secured Loans”) are senior secured obligations of Phase 1 LLC. Principal on the 6.85% Senior Secured Notes,6.58% Senior Secured Notes, and the 7.11% Senior Secured Loans amortizes beginning in 2029 with final maturities in 2047.

The Phase 1 Senior Secured Notes and Phase 1 Senior Secured Loans rank pari passu with the CD Credit Agreement and the TCF Credit Agreement and are secured on a first-priority basis by a security interest in all of the membership interests in Phase 1 LLC and substantially all of Phase 1 LLC’s assets.

Phase 1 LLC’s Credit Agreements

The total commitments under the CD Credit Agreement and TCF Credit Agreement (together, the “Phase 1 LLC Committed Credit Facilities”) are $7.5 billion and $0.7 billion, respectively.

The CD Credit Agreement includes an additional $250.0 million commitment (the “CD Senior Working Capital Facility”) that can be used to draw revolving loans or issue letters of credit. As of June 30, 2026, no amounts have been drawn and approximately $141.1 million of letters of credit have been issued.

The Phase 1 LLC Committed Credit Facilities are senior secured facilities that amortize quarterly beginning on or after 90 days following the completion of certain conditions including commencement of our long-term LNG Sale and Purchase Agreements (“SPAs”) for Train 3. The facilities have a final maturity in July 2030, bear interest at SOFR plus 2.25%, and accrue commitment fees of 0.68% on undrawn amounts.

Phase 1 LLC’s obligations under the Phase 1 LLC committed facilities rank pari passu with each of the Phase 1 LLC committed credit facilities, the Phase 1 Senior Secured Notes, and the Phase 1 Senior Secured Loans, and are secured by the same collateral package as the Phase 1 Senior Secured Notes and Phase 1 Senior Secured Loans.

In June 2026, Phase 1 LLC repaid approximately $904.0 million and $86.0 million of the amounts outstanding under the CD Credit Agreement and TCF Credit Agreement, respectively, resulting in a loss on debt extinguishment of approximately $32.5 million recorded during the three and six months ended June 30, 2026.

Phase 1 HoldCo Borrower Term Loan

In June 2026, Phase 1 HoldCo Borrower entered into a credit agreement (the “Phase 1 HoldCo Borrower Term Loan”) providing for a term loan in an amount of $1.0 billion to (i) make an equity contribution to Phase 1 LLC, which Phase 1 LLC used to reduce outstanding borrowings under its credit facilities, (ii) pay certain fees and expenses associated with the Phase 1 HoldCo Borrower Term Loan and (iii) pay general and administrative expenses of Phase 1 HoldCo Borrower.

The Phase 1 HoldCo Borrower Term Loan matures on June 17, 2033. Interest is payable semi-annually in cash or paid-in-kind (“PIK”) at Phase 1 HoldCo Borrower’s election until the first interest payment date after June 2029 and in cash thereafter. The Phase 1 HoldCo Borrower Term Loan is secured by pledges of the equity interests in the Phase 1 HoldCo Borrower by its holding company and by a first-priority security interest in substantially all personal property of Phase 1 HoldCo Borrower, including its membership interests in Phase 1 LLC.

Train 4 LLC and Train 5 LLC Credit Agreements

In September 2025 and October 2025, Train 4 LLC and Train 5 LLC, respectively, entered into separate credit facilities of up to approximately $3.8 billion and $3.6 billion, respectively, to fund a portion of their respective project costs, related fees and expenses. Obligations under the credit agreements are secured on a first-priority basis by substantially all of the assets of Train 4 LLC and Train 5 LLC, respectively, as well as a pledge of the membership interest in the respective entities.

Borrowings on both credit facilities bear interest at SOFR plus 2.00% (or base rate plus 1.00%), with rating-based step-downs to SOFR +1.875% / base +0.875% upon “Baa2/BBB” and to SOFR +1.75% / base +0.75% upon “Baa1/BBB+.” Undrawn amounts accrue commitment fees at 30% of the applicable margin for SOFR loans. The Train 4 LLC and Train 5 LLC facilities amortize quarterly beginning on or after 90 days following the completion of certain conditions, including commencement of the SPAs for the respective trains, and mature in September 2032 and October 2032, respectively.

As of June 30, 2026, $549.0 million had been drawn under the Train 4 LLC Credit Agreement andno amounts had been drawn under the Train 5 LLC Credit Agreement.

Train 5 LLC Senior Secured Notes

In October 2025, Train 5 LLC entered into a Note Purchase Agreement to issue $500.0 million of 6.56% Senior Secured Notes (the “Train 5 Senior Secured Notes”) due in 2050. In December 2025, the Company issued the first installment of $150.0 million of the Train 5 Senior Secured Notes at par, with the second installment of $100.0 million issued in April 2026. The remaining Train 5 Senior Secured Notes will be issued at par in installments through October 2026. Principal amortizes beginning in September 2031 with a final maturity in September 2050.

The Train 5 Senior Secured Notes are senior secured obligations of Train 5 LLC, ranking senior in right of payment to any and all of Train 5 LLC’s future indebtedness that is subordinated to the Train 5 Senior Secured Notes, and equal in right of payment with Train 5 LLC’s other existing and future indebtedness that is senior and secured by the same collateral securing the Train 5 Senior Secured Notes. The Train 5 Senior Secured Notes rank pari passu with the Train 5 LLC Credit Agreement and are secured on a first-priority basis by a security interest in the same collateral package.

FinCo Credit Agreement

In September 2025, FinCo entered into a credit agreement (the “FinCo Credit Agreement”) providing a loan and letter of credit facility of up to approximately $0.7 billion, including an approximate $0.6 billion letter of credit sublimit, to fund a portion of the Company’s equity contributions to Train 4 LLC and to finance interest during Train 4 construction and related fees and expenses. In October 2025, the FinCo Credit Agreement was amended to increase the loan to approximately $1.5 billion and to increase the letter of credit sublimit to approximately $1.2 billion to fund the same costs associated with both Train 4 and Train 5. Availability commenced on October 30, 2025.

Borrowings bear interest at SOFR plus 3.50% or base rate plus 2.50%, and undrawn commitment amounts are subject to commitment fees of 1.05%. The facility matures in October 2030, with aone-year extension option exercisable within the 90-day period preceding such anniversary. The facility is secured by pledges of FinCo equity and first-priority liens on substantially all FinCo assets, including equity interests in Phase 1 LLC, Train 4 LLC, and Train 5 LLC.

As of June 30, 2026, no amounts had been drawn and $1.2 billion of letters of credit were issued under the FinCo Credit Agreement.

Super FinCo Term Loan

In September 2025, Super FinCo entered into a credit agreement (the “Super FinCo Term Loan”) providing a senior term loan of $0.6 billion to fund a portion of the Company’s equity contributions to Train 4 LLC and to finance interest during Train 4 construction, pay fees and expenses associated with the Super FinCo and FinCo credit agreements and related facilities, and fund other costs of Super FinCo. In October 2025, the Super FinCo Term Loan was amended to increase the principal amount to $1.2 billion to fund the same costs associated with both Train 4 and Train 5.

The Super FinCo Term Loan matures on the earlier of September 2033 or the 85 th day prior to the maturity of the FinCo Credit Agreement (as extended or refinanced). Interest is payable quarterly with an option to elect PIK interest in full through the first anniversary of Train 4 completion and up to 50% thereafter. The Super FinCo Term Loan is secured by pledges of the equity interests in the Super FinCo borrowers by their holding companies and by a first-priority security interest in substantially all personal property of Super FinCo, including membership interests in FinCo.

Corporate Credit Agreement

In November 2025, Super Holdings, a wholly owned subsidiary of the Company, amended its Corporate Credit Agreement (the “A&R Corporate Credit Agreement”). The A&R Corporate Credit Agreement definestwo distinct tranches of indebtedness:

Series A Loans: Consists of $100.0 million in aggregate principal that matures on November 17, 2030 and bears interest at 8.0% per annum that is payable quarterly, in cash or PIK, at Super Holding’s election. These loans include a make-whole premium if prepaid prior to November 17, 2028.

Exchange Option: The Series A Loans, including any PIK interest, are exchangeable into shares of common stock of the Company at the election of the lenders at an exchange price of $9.50 per share (the “Series A Exchange Option”). This option is available from the 180th day after November 17, 2025 through maturity. The Series A Exchange Option is accounted for as a derivative liability (see Note 6 — Derivatives).

Series B Loans: Consists of the remaining principal that matures on October 16, 2030 and bears interest at 13.5% per annum. Prior to March 31, 2027, Super Holdings may elect to pay up to 100% of interest in cash or in kind and is required to pay 50% of interest in kind and 50% of interest in cash thereafter. These loans include a make-whole premium if prepaid prior to June 30, 2028, and a declining prepayment penalty structure thereafter.

Obligations under the A&R Corporate Credit Agreement are secured on a first-priority basis by all of the equity interest in Super Holdings and its direct subsidiaries.

Debt Covenants and Compliance

Each of the Company’s debt instruments contain customary negative covenants that, among other things, limit the ability of the borrower and its subsidiaries to incur additional indebtedness, create liens, make restricted payments (including dividends), make certain investments, and sell all or substantially all assets.

Certain of the Company’s credit agreements also include covenants that, among other things, require the borrower and its subsidiaries to maintain a specified minimum historical debt service coverage ratio as of a specified date in the respective agreement, and covenants that restrict the net assets of the respective subsidiaries from being distributed to NextDecade, unless certain conditions are met.

As of June 30, 2026, the Company was in compliance with all covenants related to its respective debt agreements.

Interest Expense

Interest expense consisted of the following (in thousands):

Three Months Ended June 30,Six Months Ended June 30,
2026202520262025
Interest on debt obligations$180,121$84,404$346,773$157,509
Amortization of debt issuance costs30,37916,99559,92133,911
Interest on finance lease liabilities5,073—5,073—
Other interest and financing costs11,40741022,4771,195
Total interest cost incurred226,980101,809434,244192,615
Capitalized interest(136,203)(70,175)(264,220)(133,776)
Interest expense$90,777$31,634$170,024$58,839

Fair Value Disclosures

The following table shows the carrying amount and estimated fair value of our debt (in thousands):

June 30, 2026December 31, 2025
Carrying AmountEstimated Fair ValueCarrying AmountEstimated Fair Value
Phase 1 Senior Secured Notes$2,005,000$2,044,786$2,005,000$2,077,080
Phase 1 Senior Secured Loans607,000632,581607,000643,504
Train 5 Senior Secured Notes250,000243,177150,000148,470
Super FinCo Term Loan1,295,1961,206,3661,214,5171,144,196
A&R Corporate Credit Agreement - Series A100,00091,954100,00077,416
A&R Corporate Credit Agreement - Series B214,715178,693200,851165,518

The fair value of the debt included in the table above was calculated using a lattice model and is classified as Level 2 in the fair value hierarchy.

The fair values of the CD Credit Agreement, TCF Credit Agreement, and Train 4 LLC Credit Agreement approximate their respective carrying amounts because their variable interest rates align to market interest rates. The fair value of the Phase 1 HoldCo Borrower Term Loan approximates its carrying amount because of the close proximity of the issuance of the debt to June 30, 2026.

Note 6 — Derivatives

To manage interest rate volatility, the Company has entered into interest rate swap agreements (the “Swaps”) to hedge a portion of the floating-rate interest payments associated with the credit agreements described in Note 5 — Debt. These include Swaps entered into by Phase 1 LLC in July 2023 and by Train 4 LLC, Train 5 LLC, and FinCo in the second half of 2025 for their respective debt obligations.

In June 2026, the Company reduced the notional amount of certain of the Phase 1 Swaps, resulting in an approximate $109.2 million receivable due to us based on the fair value of the notional reduction as of the transaction date less transaction costs of approximately $2.6 million. This receivable is classified within Prepaid expenses and other current assets within our Consolidated Balance Sheet. See Note 11 — Subsequent Events for additional information about the receivable.

As of June 30, 2026, the Company had the following Swaps outstanding (in thousands):

Initial Notional AmountMaximum Notional AmountMaturity (1)Weighted Average Fixed Interest Rate PaidVariable Interest Rate Received
Phase 1 Swaps$123,000$6,194,21320483.4%USD - SOFR
Train 4 Swaps186,9003,230,00020504.3%USD - SOFR
Train 5 Swaps17,7093,050,65020514.2%USD - SOFR
FinCo Swaps7,8521,389,85420354.0%USD - SOFR

(1) Phase 1, Train 4, Train 5, and FinCo Swaps, have early mandatory termination dates in July 2030, September 2032, October 2032, and October 2031, respectively.

The Swaps are measured at fair value each reporting period using an income approach (Level 2) based on observable market inputs, including SOFR forward curves. Changes in fair value are recorded within our Consolidated Statement of Operations.

Series A Exchange Option

The Series A Exchange Option (see Note 5 — Debt) is measured at fair value each reporting period using a lattice model (Level 2), and changes in fair value are recorded within our Consolidated Statement of Operations.

Warrants

The Company issued approximately 9.2 million warrants (the “Warrants”) in connection with the A&R Corporate Credit Agreement that consist of approximately 3.6 million warrants with an exercise price of $7.15 per share and approximately 5.6 million warrants with an exercise price of $9.30 per share. Approximately 7.2 million of the Warrants mature in 2031 and the approximately 2.0 million remaining warrants mature in 2032. The Warrants may be exercised by the holder solely on a cashless exercise basis at any time prior to their expiration.

Subject to certain liquidity conditions, the Company may cause the cash exercise of approximately 3.6 million of these warrants if the 30-day volume weighted average price of the Company’s common stock and the closing price of the Company’s common stock immediately prior to the date of exercise equals or exceeds $13.50 per share or $15.00 per share during specified periods in 2026 and 2027, respectively.

The Warrants are accounted for as derivative liabilities and are remeasured each period using either a Black-Scholes model or Monte Carlo, depending on the terms of the instrument (Level 2). Changes in fair value are recorded within our Consolidated Statement of Operations.

Consolidated Balance Sheet and Statement of Operations presentation

The fair value of the Company’s derivative instruments was recorded in the Consolidated Balance Sheets as follows (in thousands):

June 30, 2026
SwapsSeries A Exchange OptionWarrantsTotal
Derivatives - current assets$12,103$—$—$12,103
Derivatives - noncurrent assets479,177——479,177
Accrued and other current liabilities2,451——2,451
Derivatives - noncurrent liabilities88,61928,03743,918160,574
December 31, 2025
SwapsSeries A Exchange OptionWarrantsTotal
Derivatives - noncurrent assets$532,245$—$—$532,245
Accrued and other current liabilities6,422——6,422
Derivatives - noncurrent liabilities85,88815,72033,912135,520

The gains (losses) on the Company’s derivative instruments as presented in the Consolidated Statements of Operations are as follows (in thousands):

Three Months Ended June 30,Six Months Ended June 30,
2026202520262025
Swaps$111,899$25,897$76,288$(141,612)
Series A Exchange Option949—(12,317)—
Warrants3,227—(10,006)—
Other—(740)—(1,931)
Derivative gain (loss), net$116,075$25,157$53,965$(143,543)

Note 7 — Variable Interest Entities

Phase 1 Holdings, Train 4 Holdings, Train 5 Holdings, and their wholly owned subsidiaries were established to construct and operate Phase 1, Train 4, and Train 5 of the Rio Grande LNG Facility, respectively. The Company is not obligated to fund their losses.

The equity investors at risk, as a group, lack the characteristics of a controlling financial interest. Additionally, through agreements with NextDecade LLC, the Company holds decision-making rights over construction and key operational aspects of Phase 1 LLC, Train 4 LLC, and Train 5 LLC, which agreements can only be terminated by equity holders for cause. Based on these factors, the

Company holds a variable interest in Phase 1 Holdings, Train 4 Holdings, and Train 5 Holdings, and is their primary beneficiary, resulting in the consolidation of these entities in these Consolidated Financial Statements.

The following table presents the summarized combined assets and liabilities (in thousands) of Phase 1 Holdings, Train 4 Holdings, and Train 5 Holdings, which are included in the Company’s Consolidated Balance Sheets. The assets in the table below may only be used to settle the obligations of Phase 1 Holdings, Train 4 Holdings, and Train 5 Holdings, respectively. In addition, there is no recourse to NextDecade for the consolidated VIE’s liabilities. The assets and liabilities in the table below include only the assets and liabilities of Phase 1 Holdings, Train 4 Holdings, Train 5 Holdings, and their respective subsidiaries and exclude intercompany balances between Phase 1 Holdings, Train 4 Holdings, and Train 5 Holdings and NextDecade, which are eliminated in the Consolidated Financial Statements of NextDecade.

June 30, 2026December 31, 2025
Assets
Current assets:
Restricted cash$360,356$486,221
Derivatives12,102—
Prepaid expenses and other current assets115,8517,219
Total current assets488,309493,440
Property, plant and equipment, net13,431,59810,563,022
Operating lease right-of-use assets122,895150,210
Deferred financing fees324,517367,022
Derivatives478,104532,245
Other non-current assets52,87221,496
Total assets$14,898,295$12,127,435
Liabilities
Current liabilities:
Accounts payable$323,047$438,498
Operating leases3052,747
Accrued and other current liabilities1,311,348829,340
Total current liabilities1,634,7001,270,585
Debt, net7,944,9037,135,483
Operating leases102,097126,506
Derivatives85,66484,606
Total liabilities$9,767,364$8,617,180

Related Party Transactions

TotalEnergies SE and its subsidiaries (together, “TotalEnergies”) are related parties under Accounting Standards Codification 850, Related Party Disclosures, due to TotalEnergies’s ownership of more than 10% of the Company’s common stock. The Company entered into commercial and financing arrangements with TotalEnergies as part of the final investment decisions for Phase 1 and Train 4, including long-term LNG sale and purchase agreements for Phase 1 and Train 4 and equity commitments to Phase 1 Holdings and Train 4 Holdings. TotalEnergies also provides contingent credit support for the TCF Credit Agreement.

For the three and six months ended June 30, 2026, TotalEnergies contributed approximately $329.1 million and $377.5 million under its equity commitments to Phase 1 Holdings, respectively.

Note 8 — Loss Per Share

The computation of basic and diluted loss per share is as follows (in thousands, except per share amounts):

Three Months Ended June 30,Six Months Ended June 30,
2026202520262025
Net loss attributable to common stockholders — basic$(65,426)$(60,867)$(201,832)$(149,672)
Warrants — change in fair value(277)———
Net loss attributable to common stockholders — diluted$(65,703)$(60,867)$(201,832)$(149,672)
Weighted average shares outstanding — basic265,043260,877264,976260,646
Warrants — incremental shares344———
Weighted average shares outstanding — diluted265,387260,877264,976260,646
Loss per common share — basic$(0.25)$(0.23)$(0.76)$(0.57)
Loss per common share — diluted$(0.25)$(0.23)$(0.76)$(0.57)

Potentially dilutive shares related to unvested restricted stock and restricted stock units, outstanding stock options, and the Series A Exchange Option were excluded from the calculation of diluted loss per share for all periods presented because their effect would have been antidilutive. Potentially dilutive shares related to the Warrants were included from the calculation of diluted loss per share for the three months ended June 30, 2026, and excluded from the remaining periods presented because their effect would have been antidilutive. See Note 5 — Debt and Note 6 — Derivatives for additional information about the Series A Exchange Option and the Warrants, respectively.

Note 9 — Commitments and Contingencies

Legal Proceedings

From time to time the Company may be subject to various claims and legal actions that arise in the ordinary course of business. As of June 30, 2026, management is not aware of any claims or legal actions against the Company that, separately or in the aggregate, are likely to have a material adverse effect on the Company’s financial position, results of operations, or cash flows, although the Company cannot guarantee that a material adverse effect will not occur.

Note 10 — Supplemental Cash Flows

The following table provides supplemental disclosure of cash flow information (in thousands):

Six Months Ended June 30,
20262025
Interest payments classified as operating activities$47,250$—
Accounts payable for acquisition of property, plant and equipment321,194301,506
Accruals for acquisition of property, plant and equipment1,213,272303,941
Non-cash settlement of warrant liabilities—2,827
Capitalized interest that was paid-in-kind36,502—
Accrued liabilities for debt issuance costs1,1531,718

Note 11 — Subsequent Events

On July 2, 2026, Phase 1 LLC completed an offering of $3.5 billion of aggregate principal amount of senior secured notes. The net proceeds from the offering were used to repay approximately $3.5 billion of outstanding borrowings under its existing Phase 1 LLC Committed Credit Facilities and pay related fees and expenses.

In addition, the Company collected the $109.2 million receivable related to the net settlement of certain of the Phase 1 Swaps, as described in Note 6 — Derivatives. The proceeds were also used to repay outstanding borrowings under its existing Phase 1 LLC Committed Credit Facilities.