A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2025 · Filed Jul 31, 2025

RIOT$17.66+5.7%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Notes to Condensed Consolidated Financial Statements

Note 1. Organization and****Basis of Presentation

Organization

Riot Platforms is a vertically integrated bitcoin mining company principally engaged in enhancing its power infrastructure to support efficient and large-scale Bitcoin mining operations in support of the Bitcoin blockchain. In addition to its growing mining and engineering businesses, the Company is in the process of developing a scalable data center platform designed to allocate a portion of its power capacity toward supporting AI/HPC workloads.

The Company provides comprehensive and critical infrastructure for institutional-scale bitcoin mining at its large-scale Bitcoin Mining facilities in Rockdale, Texas (the “Rockdale Facility”), Navarro County, Texas (the “Corsicana Facility”), andtwo Bitcoin Mining sites in Kentucky (the “Kentucky Facility” and, together with the Rockdale Facility and the Corsicana Facility, the “Facilities”). The Rockdale Facility is a large-scale Bitcoin Mining facility in Rockdale, Texas that currently provides 700 megawatts (“MW”) of total developed capacity. The Company’s second large-scale Bitcoin Mining facility, the Corsicana Facility, is currently equipped to provide up to 400 MW of capacity for our Bitcoin Mining and, upon completion, is expected to have approximatelyone gigawatt (“GW”) of capacity available.

During 2024, the Company acquired Block Mining, Inc. (“Block Mining”), a Kentucky-based vertically integrated bitcoin miner (the “Block Mining Acquisition”), and E4A Solutions, LLC (“E4A Solutions”), a leading provider of electrical engineering services to a diverse customer base of energy developers and data center operators (the “E4A Solutions Acquisition”). The Block Mining Acquisition added 60 MW of operational capacity for self-mining operations, which the Company is working to expand to 110 MW in 2025, and provided access to a second electrical grid. The E4A Solutions Acquisition added engineering expertise to service the Company’s existing and future electrical infrastructure and allows the Company to provide electrical solutions and services to support the rapidly growing market for electrical infrastructure.

AI/HPC Development

The Company strengthened its execution capacity by recruiting critical talent and launching a scalable data center platform to support the initial phase of development, designated for AI/HPC applications at the Corsicana Facility, representing an initial 600 MW of AI/HPC capacity (“AI/HPC Phase I”). Additionally, the Company is evaluating further expansion opportunities and assessing the feasibility of developing additional power capacity to support AI/HPC applications. The Company is in the process of standardizing design templates and assessing procurement of all long-lead equipment, in alignment with its disciplined capital allocation strategy focused on delivering superior risk-adjusted returns. These foundational investments reflect a proactive, strategic approach that positions the Company for durable, long-term leadership and value creation in the data center sector.

Basis of presentation and principles of consolidation

The accompanying unaudited condensed consolidated financial statements (“Condensed Consolidated Financial Statements”) and these notes (these “Notes”) have been prepared in accordance with the accounting principles generally accepted in the United States of America (“GAAP”). In the opinion of management, the Condensed Consolidated Financial Statements reflect all adjustments, consisting of normal and recurring adjustments, considered necessary for a fair presentation of such interim results. Unless otherwise indicated, amounts are stated in thousands of U.S. dollars except for: share, per share, per megawatt hours (“MWh”) and miner amounts; bitcoin quantities, prices and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.

The results in the Condensed Consolidated Financial Statements and these Notes include required estimates and assumptions of management, and they are not necessarily indicative of results to be expected for the year ending December 31, 2025, or for any future interim period. Further, the Condensed Consolidated Financial Statements and these Notes do not include all the information and notes required by GAAP for a complete presentation of annual financial statements. As such, the Condensed Consolidated Financial Statements and these Notes should be read in conjunction with the consolidated financial statements for the year ended December 31, 2024, and notes thereto, included in the 2024 Annual Report.

As described in Note 19.Segment Information, the Company’stwo reportable segments are: Bitcoin Mining and Engineering.

Note 2. Significant Accounting Policies and Recent Accounting Pronouncements

Use of estimates

The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the balance sheet and the reported amounts of revenue and expenses during the reporting periods. Actual results may differ materially from those estimates. The most significant accounting estimates inherent in the preparation of the Company’s financial statements include revenue recognition; valuation of the derivative asset classified under Level 3 on the fair value hierarchy; determination of the useful lives and recoverability of long-lived assets; impairment analysis of fixed assets and finite-lived intangibles; impairment analysis of goodwill; allocating the fair value of purchase consideration to assets acquired and liabilities assumed in business acquisitions; stock-based compensation; and the valuation allowance associated with the Company’s deferred tax assets.

Reclassifications

Certain prior period amounts have been reclassified to conform to the current period presentation in the Condensed Consolidated Financial Statements and these Notes. The reclassifications did not have a material impact on the Condensed Consolidated Financial Statements and related disclosures. The impact on any prior period disclosures was immaterial.

Significant Accounting Policies

Except for the update noted below, see the Company’s 2024 Annual Report for a detailed discussion of the Company’s significant accounting policies.

Restricted bitcoin

The Company has pledged certain of its bitcoin as collateral for certain of its debt facilities. This restricted bitcoin is owned by the Company and is held in a segregated custody account in the Company’s name. Such bitcoin shall not be used by the lender to secure any other loan or account. Consistent with the Company’s other bitcoin holdings, restricted bitcoin is recorded at fair value, as determined using the period-end closing price of bitcoin on the Company’s principal market, Coinbase, and changes in fair value are recognized inChange in fair value of bitcoin, in Operating income (loss) on the Consolidated Statements of Operations.

Recently Issued Accounting Pronouncements

The Company continually assesses new accounting pronouncements to determine their applicability. When it is determined that a new accounting pronouncement affects the Company’s financial reporting, the Company undertakes a study to determine the consequences of such change to its Condensed Consolidated Financial Statements and ensures that there are proper controls in place to ascertain that the Company’s Condensed Consolidated Financial Statements properly reflect the change.

In December 2023, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) No. 2023-09,Income Taxes (Topic 740): Improvements to Income Tax Disclosures(“ASU 2023-09”). ASU 2023-09 expands existing income tax disclosures for rate reconciliations by requiring disclosure of certain specific categories and additional reconciling items that meet quantitative thresholds and expands disclosures for income taxes paid by requiring disaggregation by certain jurisdictions. ASU 2023-09 is effective for annual periods beginning after December 15, 2024; early adoption is permitted. The Company is evaluating the impact the updated guidance will have on its disclosures for the year ending December 31, 2025.

In November 2024, the FASB issued ASU No. 2024-03,Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40)(“ASU 2024-03”). ASU 2024-03 requires, in the notes to the annual and interim financial statements, disaggregated information about certain income statement expense line items. ASU 2024-03 is effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted. The Company is evaluating the impact the updated guidance will have on its disclosures.

Note 3. Acquisitions

Rhodium Settlement and Acquisition of Assets

On April 28, 2025, the Company’s subsidiary, Whinstone US, Inc. (“Whinstone”) acquired certain assets owned by Rhodium Encore LLC (together with its affiliates, “Rhodium”) that were located at the Rockdale Facility, assumed Rhodium’s 125 MW of power capacity at the Rockdale Facility, terminated the legacy hosting agreements with Rhodium, and settled all existing litigation between the parties for total consideration of $185.0 million (the “Rhodium Settlement”). The total consideration consisted of approximately $129.9 million in cash, the return of Rhodium’s power security deposit of approximately $6.1 million, and 6,989,800 shares of Company common stock, valued at $49.0 million based on the precedingten trading day volume-weighted average share price immediately prior to the date of execution. The terminated legacy hosting contracts with Rhodium had a remaining term through December 2030 (see Note 4.Revenue from Contracts with Customers for more information). The settled litigation and claims include all existing claims between the parties, and any and all claims, or future claims, arising under the hosting contracts.

The acquired set of assets did not meet the definition of a business as defined in ASC 805,Business Combinations, as no substantive processes or employees were acquired. The assets acquired consisted primarily of bitcoin miners and related equipment, which are included inProperty and equipment, net on the Condensed Consolidated Balance Sheets. The fair value of the tangible assets acquired was estimated to be $7.3 million and was determined using the cost approach, which utilizes replacement cost as an indicator of fair value. The key assumptions included replacement cost new, effective age, and remaining useful life, as well as physical deterioration factors. No identifiable intangible assets were acquired, no goodwill was recognized, andno liabilities were assumed in connection with the transaction.

In connection with the contract termination and the elimination of the Company’s future obligations under it, the Company relieved approximately $14.9 million of previously recognized deferred revenue (see Note 4.Revenue from Contracts with Customers).

The remaining portion of the transaction value is attributable to the combined impact of terminating the Company’s legacy hosting agreement and settling preexisting litigation with Rhodium, both of which stemmed from an ongoing contractual dispute. The legacy hosting agreement contained terms that were significantly unfavorable compared to prevailing market conditions for similar arrangements. As a result of the termination and settlement, the Company recognized a loss of $158.1 million, which is presented asLoss on contract settlement on the Condensed Consolidated Statements of Operations. This loss represents the residual amount after accounting for the total consideration transferred and the tangible assets acquired as part of the transaction.

E4A Solutions Acquisition

On December 16, 2024, the Company acquired 100% of the equity interests of E4A Solutions, a Texas-based electrical engineering solutions company, for total consideration of approximately$54.4 million, which was comprised of$51.8 million paid in cash from the Company’s existing cash and a contingent purchase price payable to the sellers with an estimated fair value at acquisition of$2.6 million. Under the contingent purchase price payable, the sellers are eligible to earn potential earn-out targets based on E4A Solutions’ adjusted EBITDA during the two years ending December 31, 2026, payable in cash or Riot common stock at the Company’s discretion. The potential earn-out is calculated as 2.65 times the amount the average adjusted EBITDA exceeds the prescribed earn-out threshold.

The E4A Solutions Acquisition builds on Riot’s vertically integrated strategy by adding engineering expertise to service its own existing and future electrical infrastructure and allows the Company to provide electrical solutions and services to support the rapidly growing market for electrical infrastructure.

The E4A Solutions Acquisition was accounted for as an acquisition of a business using the acquisition method of accounting, which requires recognition of assets acquired and liabilities assumed at their respective fair values on the date of acquisition. As of June 30, 2025, the Company has completed a preliminary allocation of the purchase consideration. Therefore, the allocation of the purchase price to assets acquired and liabilities assumed is based on provisional estimates and is subject to continuing management analysis, with assistance from third party valuation advisors. The Company expects to finalize the valuation of these assets and liabilities, and consideration transferred, as soon as practicable, but not later than one year from the acquisition date. Any changes to the preliminary estimates of the fair value of the assets acquired and liabilities assumed will be recorded as adjustments to those assets and liabilities and residual amounts will be allocated to goodwill.

The following table presents the preliminary allocation of the purchase consideration:

​​​​
Cash and cash equivalents​$915
Accounts receivable​​3,958
Prepaid expenses and other current assets​​169
Contract assets​​1,152
Property and equipment​​136
Operating lease right-of-use asset​​612
Finite-lived intangible assets:​​​
Customer contracts​​23,100
Trademark​​1,100
Accounts payable​​(1,446)
Deferred revenue, current portion​​352
Accrued expenses​​(254)
Operating lease liability, current portion​​(323)
Operating lease liability, less current portion​​(289)
Other long-term liabilities​​(53)
Total identifiable assets and liabilities acquired​​29,129
Goodwill​​25,287
Total purchase consideration​$54,416

The fair values of cash and cash equivalents, accounts receivable, prepaid expenses and other current assets, other long-term assets, accounts payable, contract liabilities, accrued expenses, and other long-term liabilities were determined to be their carrying values due to the immaterial and/or short-term nature of the assets and liabilities.

The finite-lived intangible assets consist of a trademark and customer relationships. The fair value of the trademark was estimated using the relief-from-royalty rate method, which estimated future royalty charges attributable to the trademark. The fair value of the customer relationships was estimated using the income approach, which estimated future revenues and costs associated with the existing customer relationships. The estimated fair values of the trademark and customer relationships utilized adiscount rate of 13.4%.

The right-of-use asset and operating lease liabilities consisted of an operating lease of office and commercial space in Houston, Texas. The lease has annual payments of approximately $0.4 million and a remaining lease term of approximatelytwo years as of acquisition.

Goodwill was attributable to the assembled workforce of experienced personnel at E4A Solutions and synergies expected to be achieved from the combined operations of Riot and E4A Solutions. The goodwill recognized is expected to be deductible for tax purposes. We assigned the goodwill to our Engineering reportable segment.

The operating results of E4A Solutions have been included in the Company’s Condensed Consolidated Statements of Operations since the acquisition date. Through June 30, 2025, approximately $2.8 million of acquisition-related costs were expensed as incurred.

Block Mining Acquisition

On July 23, 2024, the Company acquired 100% of the equity interests of Block Mining, a vertically integrated Bitcoin mining company based in Kentucky, for total consideration of approximately$113.6 million. The purchase price consisted of$13.5 million in cash (adjusted for net working capital acquired and other items, excluding the payoff of debt of$5.0 million, which was accounted for as a transaction separate from the acquisition) from the Company’s existing cash,7.2 million shares of Riot common stock valued at approximately$74.0 million, and a contingent purchase price payable to the sellers with an estimated fair value at acquisition of$26.1 million. Under the terms of the contingent purchase price payable, the sellers may earn up to an additional$32.5 million if certain milestones are reached by December 31, 2025.

The Block Mining Acquisition immediately enhanced the Company’s operational capabilities by increasing its total hash rate,

expanding Riot’s geographic footprint, and providing access to additional energy markets beyond the Electric Reliability Council of Texas (“ERCOT”). These markets include the Paducah Power Systems, Tennessee Valley Authority, and Big Rivers Electric Corporation, all located within the Midcontinent Independent System Operator (“MISO”) region. Block Mining consists oftwo operational sites, both in Kentucky, which consist of existing operational Bitcoin Mining capacity, with the potential to expand. In addition, Block Mining owns a greenfield development site adjacent to an existing substation, representing a strategic opportunity for scalable growth. Known for its capital-efficient development model and experienced management team, Block Mining strengthens Riot’s ability to execute on its vertically integrated strategy and enhances its long-term positioning in the Bitcoin mining sector.

The acquisition was accounted for as an acquisition of a business using the acquisition method of accounting, which requires recognition of assets acquired and liabilities assumed at their respective fair values on the date of acquisition. As of June 30, 2025, the Company completed a preliminary allocation of the purchase consideration. Therefore, the allocation of the purchase price to assets acquired and liabilities assumed is based on provisional estimates and is subject to continuing management analysis, with assistance from third-party valuation advisors. The Company finalized the valuation of these assets and liabilities, and consideration transferred, as of June 30, 2025. The finalization of the valuation did not result in any adjustments to any of the amounts presented below.

The following table presents the allocation of the purchase consideration:

​​​​
Cash and cash equivalents​$6,295
Accounts receivable​​362
Prepaid expenses and other current assets​​2,877
Property and equipment​​20,165
Operating lease right-of-use asset​​3,733
Accounts payable​​(1,471)
Accrued expenses​​(1,180)
Operating lease liability, current portion​​(2,410)
Operating lease liability, less current portion​​(1,323)
Long-term debt​​(10,678)
Total identifiable assets and liabilities acquired​​16,370
Goodwill​​97,212
Total purchase consideration​$113,582

The fair values of cash and cash equivalents, accounts receivable, prepaid expenses and other current assets, accounts payable, and accrued expenses were determined to be their carrying values due to the short-term nature of the assets and liabilities. The fair value of the acquired trade receivables was determined to be the net realizable amount of the closing date book value of$0.4 million.

The fair value of property and equipment was estimated by applying the cost approach, which uses the replacement cost as an indicator of fair value. The assumptions of the cost approach include replacement cost new and physical deterioration factors, including remaining life and effective age. The replacement cost new was based on a price per terahash consistent with prices the Company pays for new bitcoin miners and an effective age of three years, consistent with the Company’s current estimated useful life of bitcoin miners.

The right-of-use asset and operating lease liabilities consisted of an operating lease of a data center in Calvert City, Kentucky. The lease has annual payments of approximately$1.4 million and a remaining lease term of approximately 3.0 years as of the acquisition.

The assumed debt consisted of a$5.0 million secured loan and a$5.7 million note payable. The secured loan was paid off on the date of acquisition. The note payable carries a fixed rate of 8.81%, and matures in December 2035, with annual principal and accrued interest payments beginning on December 31, 2024. The fair value of the debt at acquisition of$5.7 million was determined to equal its carrying value due at acquisition as the interest rate is reasonably consistent with rates the Company would expect to incur for similar debt instruments.

Goodwill was attributable to the assembled workforce of experienced personnel at Block Mining and synergies expected to be achieved from the combined operations of Riot and Block Mining. The goodwill recognized is not expected to be deductible for tax purposes. We assigned the goodwill to our Bitcoin Mining reportable segment.

The operating results of Block Mining have been included in the Company’s Condensed Consolidated Statements of Operations since the acquisition date. Through June 30, 2025, approximately$2.9 million of acquisition-related costs were expensed as incurred.

Pro-forma financial information

The following unaudited pro forma financial information summarizes the combined results of operations for Riot, Block Mining, and E4A Solutions, as if the companies were combined as of January 1, 2023. The unaudited pro forma information does not reflect the effect of costs or synergies that may result from the acquisition and excludes acquisition-related costs of$5.7 million incurred for all periods through June 30, 2025. This unaudited pro forma information is presented for informational purposes only and is not necessarily indicative of future operating results of the combined company. This information should not be used as a predictive measure of the Company’s future financial position, results of operations, or liquidity.

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​​Three Months Ended​​Six Months Ended
​​June 30,​​June 30,
​ · 2024 · 2024
Revenue​$85,859​​$182,041
Net income (loss)​$(77,326)​​$138,149

Note 4. Revenue from Contracts with Customers

Disaggregated revenue

Revenue disaggregated by reportable segment is presented in Note 19.Segment Information.

Contract balances

Contract assets relate to uncompleted Engineering contracts. As of June 30, 2025 and December 31, 2024, contract assets were $6.5 million and $6.5 million, respectively.

Contract liabilities primarily relate to uncompleted Engineering contracts. As of June 30, 2025 and December 31, 2024, contract liabilities and deferred revenue were $22.7 million and $26.1 million, respectively. In connection with the Rhodium Settlement described in Note 3.Acquisitions, the legacy hosting contract with Rhodium was terminated, thereby eliminating the Company’s future obligations under the contract. As a result, approximately $14.9 million of previously recognized deferred revenue was relieved and is included inLoss on contract settlement on the Condensed Consolidated Statements of Operations.

During the three months ended June 30, 2025 and 2024, $2.4 million and $2.2 million, respectively, and during the six months ended June 30, 2025 and 2024, $6.9 million and $3.8 million, respectively, of the beginning balance of contract liabilities and deferred revenue, in aggregate, was recognized as revenue.

During the three months ended June 30, 2025 and 2024, $0.1 million and $0.8 million, respectively, and during the six months ended June 30, 2025 and 2024, ($0.4) million and $0.9 million, respectively, were recognized as revenue as a result of satisfying performance obligations in previous periods.

As of June 30, 2025 and December 31, 2024, retainage of $0.9 million and $1.0 million, respectively, were included inAccounts receivable, net on the Condensed Consolidated Balance Sheets.

Remaining performance obligation

The following table presents the estimated future recognition of the Company’s remaining performance obligations, which represent the transaction price of current contracts for work to be performed.

​​​​​​​​​​​​​​​​
​ · ​ · Remainder of · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · 2025 · 2026 · 2027 · 2028 · ​ · Total
Engineering$68,446$44,173$6,766$—​$119,385
Other​​49​​97​​97​​97​​340
Total remaining performance obligations​$68,495​$44,270​$6,863​$97​$119,725

Note 5. Bitcoin

The following table presents information about the Company’s bitcoin holdings:

​​​​​​​
​ · ​ · Quantity · Amounts
Balance as of January 1, 2025​​17,722​$1,654,468
Revenue recognized from bitcoin mined​​2,956​​283,748
Change in bitcoin receivable​​—​​(272)
Proceeds from sale of bitcoin​​(1,371)​​(131,802)
Exchange of bitcoin for employee compensation​​(34)​​(3,334)
Change in fair value of bitcoin​​—​​262,772
Balance as of June 30, 2025​​19,273​$2,065,580
​​​​​​​
The following reconciles Bitcoin and Restricted bitcoin to the amounts above:​​​​​​
Bitcoin​​15,973​$1,711,908
Restricted bitcoin (a)​​3,300​$353,672
Total​​19,273​$2,065,580
​​​​​​​
Carrying value of bitcoin as of June 30, 2025 (b)​​​​$1,246,192
Realized gains on the sale or exchange of bitcoin for the three months ended June 30, 2025 (c)​​​​$3,934
Realized gains on the sale or exchange of bitcoin for the six months ended June 30, 2025 (c)​​​​$3,787
Revenue recognized from bitcoin mined for the three months ended June 30, 2025​​​​$140,889
Change in fair value of bitcoin for the three months ended June 30, 2025​​​​$470,812
​​​​​​​
Balance as of January 1, 2024​​7,362​$311,178
Revenue recognized from bitcoin mined​​2,208​​127,160
Change in bitcoin receivable​​10​​249
Proceeds from sale of bitcoin​​(212)​​(9,518)
Exchange of bitcoin for employee compensation​​(34)​​(1,692)
Change in fair value of bitcoin​​—​​157,677
Balance as of June 30, 2024​​9,334​$585,054
​​​​​​​
Carrying value of bitcoin as of June 30, 2024 (b)​​​​$323,484
Realized gains on the sale or exchange of bitcoin for the three months ended June 30, 2024 (c)​​​​$175
Realized gains on the sale or exchange of bitcoin for the six months ended June 30, 2024 (c)​​​​$7,357
Revenue recognized from bitcoin mined for the three months ended June 30, 2024​​​​$55,764
Change in fair value of bitcoin for the three months ended June 30, 2024​​​​$(76,403)
(a)Restricted bitcoin is the Company’s bitcoin pledged as collateral for the Company’s $200 million credit facility. See Note 12. Debt for more information.
(b)The carrying value of bitcoin is equal to the post-impairment value of all bitcoin held as of the adoption of ASU No. 2023-08, Intangibles-Goodwill and Other-Crypto Assets (Subtopic 350-60): Accounting for and Disclosure of Crypto Assets

(“ASU 2023-08”) on January 1, 2023, and, for bitcoin produced subsequent to the adoption of ASU 2023-08, the initial value of the bitcoin as determined for revenue recognition purposes.

(c)Bitcoin is sold on a first-in, first-out (FIFO) basis. For all periods presented, gains were recognized on all sales of bitcoin and exchanges of bitcoin for employee compensation and are included in Change in fair value of bitcoin on the Condensed Consolidated Statements of Operations.

All additions of bitcoin during the periods presented were the result of bitcoin generated by the Company’s Bitcoin Mining operations. All dispositions of bitcoin were the result of sales on the open market to fund Company operations and for compensation for certain employees.

Note 6. Investments

Equity method investment - marketable securities

During the year ended December 31, 2024, the Company acquired approximately 90.1 million common shares of Bitfarms Ltd. (“Bitfarms”) on the open market for approximately $203.8 million. During the three months ended June 30, 2025, the Company sold approximately 16.1 million common shares of Bitfarms on the open market for net proceeds of approximately $14.7 million.

As of June 30, 2025, the Company’s investment in Bitfarms was equal to approximately 13.3% of all outstanding Bitfarms common stock.

The following table presents information about the equity method investment - marketable securities (“marketable securities”):

​​​​
Fair value as of January 1, 2025​$134,265
Net losses on marketable securities​​(57,095)
Sales of marketable securities​​(14,662)
Fair value as of June 30, 2025​$62,508

The following table presents information regarding the net gains and losses associated with the sales of marketable securities:

​ · ​ · ​ · ​ · ​ · ​ · ​
​​Three Months Ended​Six Months Ended
​​June 30, 2025​June 30, 2025
Net gain/(loss) on marketable securities​$6,143​$(57,095)
Less: Net gain/(loss) recognized on marketable securities sold during the period​$(9,119)​$2,129
Net gain/(loss) recognized on marketable securities held as of June 30, 2025​$15,262​$(59,224)

In July 2025, the Company sold approximately 30.6 million common shares of Bitfarms on the open market for net proceeds of approximately $32.6 million. As a result, as of July 29, 2025, the Company’s investment in Bitfarms was equal to approximately 7.8% of all outstanding Bitfarms common stock.

Convertible note

During the year ended December 31, 2023, the Company invested in a $4.5 million convertible note at face value. The convertible note has athree-year term and earns interest at a rate of 12.0% per annum, which may be paid in cash or in-kind, and converts into equity of the issuer of the convertible note at the end of thethree-year term.

The fair value measurement of the convertible note is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. The significant assumptions used to estimate fair value of the convertible note as of June 30, 2025, primarily consisted of a discount rate of 13.0%, which reflected the issuance date spread premium over the selected yield for the remaining time to maturity.

The following table presents information about the convertible note:

​​​​
Fair value as of January 1, 2025$5,345
Accrued interest305
Amortized costs basis5,650
Unrealized holding gains (losses) in accumulated other comprehensive income​​(27)
Fair value as of June 30, 2025$5,623

For the three months ended June 30, 2025, unrealized holding losses in accumulated other comprehensive income were$0.1 million.

Note 7. Property and Equipment

The following table presents the Company’s property and equipment:

​​​​​​​
​ · June 30, · ​ · December 31,
​ · 2025 · 2024
Buildings and building improvements​$768,609​$715,862
Land rights and land improvements​17,779​10,904
Miners and mining equipment​914,120​927,866
Machinery and facility equipment​​48,137​​44,377
Office and computer equipment​3,428​3,081
Construction in progress​115,666​82,965
Total cost of property and equipment​1,867,739​1,785,055
Less accumulated depreciation​(566,007)​(446,268)
Property and equipment, net​$1,301,732​$1,338,787

The Company didnot incur any impairment charges for its property and equipment during the three and six months ended June 30, 2025 and 2024.

For the three months ended June 30, 2025 and 2024, depreciation expense related to property and equipment totaled $82.2 million and $35.9 million, respectively, and $159.1 million and $66.8 million, respectively, for the six months ended June 30, 2025 and 2024.

Miners and mining equipment

As of June 30, 2025, the Company had deployed miners in its Bitcoin Mining operations at each of the Facilities.

During the year ended December 31, 2023, the Company entered into a long-term master purchase and sales agreement, dated as of June 23, 2023, as amended (the “Master Agreement”), to acquire miners from MicroBT Electronics Technology Co., Ltd., through its manufacturing affiliate, SuperAcme Technology (Hong Kong) Limited (collectively “MicroBT”). In 2023, 2024, and 2025, the Company executed purchase orders with MicroBT to acquire U.S.-manufactured miners with a total hash rate of 44.7 exahash per second (“EH/s”), for a total purchase price of approximately $709.0 million, subject to downward adjustment, as provided under the Master Agreement. Delivery of these miners began in 2023, and all miners under these purchase orders are expected to be received by the end of 2025, with deployment following on an ongoing basis.

Note 8. Goodwill and Intangible Assets

Goodwill

The goodwill balance of $122.5 million and $121.9 million as of June 30, 2025 and December 31, 2024, respectively, was attributable to the assembled workforces of experienced personnel at Block Mining and E4A Solutions and synergies expected to be achieved as a result of the Company’s acquisitions. See Note 3.Acquisitions.

Finite-lived intangible assets

The following table presents the Company’s finite-lived intangible assets as of June 30, 2025:

​​​​​​​​​​​​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Weighted-
​ · ​ · Gross · ​ · Accumulated · ​ · Net book · ​ · average life
​ · book value · amortization · value · (years)
Customer contracts​$29,400​$(3,473)​$25,92710
Trademark​6,100​(1,851)​4,24910
UL Listings​2,700​(806)​1,89412
Patents​​10,060​​(10,060)​​—​Various
Finite-lived intangible assets​$48,260​$(16,190)​$32,070​​

The following table presents the Company’s finite-lived intangible assets as of December 31, 2024:

​​​​​​​​​​​​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Weighted-
​ · ​ · Gross · Accumulated · Net book · ​ · average life
​ · book value · amortization · value · (years)
Customer contracts​$29,400​$(1,911)​$27,48910
Trademark​6,100​(1,542)​4,55810
UL Listings​2,700​(694)​2,00612
Patents​​10,060​​(10,060)​​—​Various
Finite-lived intangible assets​$48,260​$(14,207)​$34,053​​

For the three months ended June 30, 2025 and 2024, amortization expense related to finite-lived intangible assets was $1.0 million and $1.4 million, respectively, and $2.0 million and $2.9 million, respectively, for the six months ended June 30, 2025 and 2024.

The following table presents the estimated future amortization of the Company’s finite-lived intangible assets as of June 30, 2025:

​ · ​ · ​ · ​
Remainder of 2025​$1,888
2026​3,775
2027​3,775
2028​3,775
2029​3,775
Thereafter​15,082
Total​$32,070

The Company did not identify any impairment of its finite-lived intangible assets during the three and six months ended June 30, 2025 and 2024.

Note 9. Power Supply Agreements

Rockdale Facility

Power Purchase Agreement

In May 2020, Whinstone entered into a long-term power purchase agreement (the “Rockdale PPA”) to provide power at fixed prices to the Rockdale Facility, via the nearby Sandow Switch. Pursuant to the Rockdale PPA, the Company agreed to acquire a total of 345 MW of long-term, fixed-price power, in multiple blocks, as follows:130 MW contracted in May 2020, through April 30, 2030;65 MW contracted in March 2022, through April 30, 2030; and 150 MW contracted in November 2022, through October 31, 2027. Additionally, the Rockdale PPA allows the purchase of additional power at market prices, as needed.

Under the Rockdale PPA, the Company may also elect not to utilize its long-term, fixed-price power for its operations, and instead elect to sell that power in exchange for credits against future power costs when there is a benefit to the Company, depending on the spot market price of electricity. The Company’s power strategy combines participation in Demand Response Services Programs, as

described below, participation in ERCOT’s Four Coincident Peak (“4CP”) program, and sales of power, to attempt to manage operating costs most efficiently.

During the three months ended June 30, 2025 and 2024, the Company earned credits against future power costs in exchange for power resold of approximately $8.3 million and $13.9 million, respectively, and approximately $16.1 million and $19.0 million, respectively, during the six months ended June 30, 2025 and 2024. These amounts are recorded inPower curtailment credits on the Condensed Consolidated Statements of Operations.

The Company determined the Rockdale PPA meets the definition of a derivative because it allows for net settlement. However, because the Company has the ability to offer the power back for sale outside of the Rockdale PPA, rather than taking physical delivery, the Company determined that physical delivery is not probable through the entirety of the contract and therefore, the Company does not believe the normal purchases and normal sales scope exception applies to the Rockdale PPA. Accordingly, the Rockdale PPA (a non-hedging derivative contract) is accounted for as a derivative and recorded at its estimated fair value each reporting period inDerivative asset on the Condensed Consolidated Balance Sheets with the change in the fair value recorded inChange in fair value of derivative asset on the Condensed Consolidated Statements of Operations. The Rockdale PPA is not designated as a hedging instrument. The Facilities Agreement, Demand Response Service Programs, and the 4CP program are not part of the Rockdale PPA and are therefore not subject to treatment and valuation as a derivative along with Rockdale PPA.

The terms of the Rockdale PPA require margin-based collateral, calculated as exposure resulting from fluctuations in the market cost rate of electricity versus the fixed price stated in the contract. As of June 30, 2025, the margin-based collateral requirement of the Company waszero.

While the Company manages operating costs at the Rockdale Facility in part by periodically selling back unused or uneconomical power, the Company does not consider such actions to be trading activities.

Demand Response Services Programs

Concurrently with the Rockdale PPA, Whinstone entered into an interconnection agreement for the extension of delivery system transmission/substation facilities to facilitate delivery of electricity to the Rockdale Facility (the “Facilities Agreement”). Power costs incurred under the Facilities Agreement are determined every 15 minutes using settlement information provided by ERCOT and are recorded inCost of revenueon the Condensed Consolidated Statements of Operations. During the year ended December 31, 2024, the construction of the interconnection was completed and power costs under the Facilities Agreement are no longer being incurred.

ERCOT has implemented demand response services programs for customers like the Company that have the ability to reduce or modify electricity use in response to ERCOT instructions or signals (“Demand Response Services Programs”). These Demand Response Services Programs provide the ERCOT market with valuable grid stability and economic services by helping to preserve system reliability, enhancing competition and load predictability, mitigating price spikes, and stabilizing the grid by encouraging the demand side of the market to give more visibility and control of their power consumption to grid operators. Market participants with flexible electrical loads, like the Company, may participate in these Demand Response Service Programs directly by offering their electrical loads into the ERCOT markets, or indirectly by voluntarily reducing their energy usage in response to increasing power demand in the ERCOT marketplace. The Demand Response Services Programs run concurrent with the Rockdale PPA.

Under these Demand Response Services Programs, the Company can participate in various ancillary services by designating a portion of its available electrical load for forward market bidding. Participation in the Demand Response Services Programs is compensated based on hourly power rates and the volume of load bid into each program. Through ancillary services, the Company competitively bids among other market participants to sell ERCOT the ability to control the Company’s electrical load on demand. This requires the Company to remain powered on during the times in which its power is bid into ancillary services, allowing ERCOT the ability to direct the Company to power down the amount of power bid into the program. The Company receives compensation for its participation in ancillary services whether or not the Company is actually called to power down.

The Company also participates in the 4CP program, which refers to the highest-load settlement intervals in each of the four summer months (June, July, August, and September), during which time, demand for power is typically at its highest across the ERCOT grid. The 4CP program participants may voluntarily power down operations during these times and in doing so, reduce the electrical load demand on the ERCOT grid. Participants that reduce their load in these peak periods receive credits toward transmission costs on

future power bills for the subsequent year, reducing overall power costs for the year. As a result of participation in the 4CP program in 2024, the Company’s ongoing 2025 monthly power bills reflect substantially reduced transmission charges. The 4CP program has an indefinite duration.

Corsicana Facility

During the year ended December 31, 2024, the Company’s subsidiary, Riot Corsicana, LLC, entered into an agreement with ICE Futures U.S., Inc., a subsidiary of the InterContinental Exchange to access the exchange for the execution of electricity futures contracts. The Company intends to enter into electricity futures contracts up to the amount of power used at the Corsicana Facility. These financial instruments meet the definition of derivatives, but are not designated as hedging instruments, and will be recognized at fair value, with any gains or losses recognized inNet income (loss) on the Condensed Consolidated Statements of Operations.

The Company enters into electricity futures contracts to manage electricity price risk and reduce the variability of cash flows associated with purchases of electricity used for the Company’s Bitcoin Mining operations at its Corsicana Facility.

As of June 30, 2025, the Company held outstanding electricity futures contracts for 46,928 MWh with a combined fair value of $0.6 million included inPrepaid expenses and other current assets on the Condensed Consolidated Balance Sheets. During the three and six months ended June 30, 2025, realized and unrealized losses of $0.2 million and $0.3 million were recognized inOther income (expense) on the Condensed Consolidated Statements of Operations.

During the year ended December 31, 2024, the Company’s subsidiary, Riot Corsicana, LLC, also entered into a requirements contract with MEMS Industrial Supply (“MEMSIS”) under which it will purchase retail power to meet the consumption requirements of the Corsicana Facility. Electric power will be invoiced by MEMSIS based upon the market price for electric power at the ERCOT North Load Zone, plus a retail adder corresponding to the peak consumption threshold of the Corsicana Facility, and pass-through charges (including ancillary charges, taxes, congestion, and line loss), based on the actual variable consumption of the Corsicana Facility. The contract, dated November 12, 2024, has a 3-year term ending November 25, 2027. Although this contract does not require the supply of power at a fixed price, it allows the parties to enter into fixed-price contracts.

Under the requirements contract with MEMSIS, during the year ended December 31, 2024, Riot and MEMSIS entered into a power purchase agreement (the “Corsicana PPA”), a three-year contract (January 1, 2025 through December 31, 2027, but excluding July and August contracts during the period) for a fixed quantity of 25 MW at a fixed price of $43.95 per MWh.

The Company determined the Corsicana PPA meets the definition of a derivative and, accordingly, the Corsicana PPA (a non-hedging derivative contract) is recorded at its estimated fair value each reporting period inDerivative asset on the Condensed Consolidated Balance Sheets with the change in the fair value recorded inChange in fair value of derivative asset on the Condensed Consolidated Statements of Operations. The requirements contract is not designated as a hedging instrument.

Kentucky Facility

In April 2021, the Company’s subsidiary, Block Mining, entered into a long-term power purchase agreement (the “Kentucky PPA”) to provide power to one of its locations in Kentucky. Pursuant to the Kentucky PPA, the Company has the ability, but not the obligation, to acquire up to a total of 60 MW of power at one of its facilities through mid-April 2041. The all-in power rate includes a portion of the total fee that is at a fixed rate and another portion that adjusts annually. The Company determined the Kentucky PPA does not meet the definition of a derivative because it does not contain any net settlement provisions.

Under the Kentucky PPA, the Company may also elect not to utilize its long-term, fixed-price power for its operations, and instead elect to sell that power back into the MISO grid in exchange for credits against future power costs when there is a benefit to the Company, depending on the spot market price of electricity. The Company’s power strategy combines participation in Demand Response Services Programs and sales of power, to attempt to manage operating costs most efficiently.

Derivative Asset

The following table presents the unobservable inputs used in the valuation of theDerivative asset:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Valuation Date · ​ · ​ · Significant Unobservable Input · ​ · Range · ​ · Average
June 30, 2025​​Forward prices (per MWh)​$36.44-$97.03​$53.31
December 31, 2024​​Forward prices (per MWh)​$26.35-$95.58​$52.05

The following table presents changes in the estimated fair value of theDerivative asset:

​​​​
Balance as of January 1, 2025​$149,495
Change in fair value of derivative asset:​​
Change due to future price curve​​(3,245)
Change due to passage of time and settlements​​2,392
Total change in fair value of derivative assets​​(853)
Balance as of June 30, 2025​$148,642

For the three months ended June 30, 2025, the total change in fair value of the derivative assets was $(42.7) million, which consisted of $(39.3) million for the change due to the future price curve and $(3.4) million for the change due to the passage of time and settlements.

The estimated fair values of the Rockdale PPA and Corsicana PPA are classified under Level 3 of the fair value hierarchy due to the significant unobservable inputs utilized in the valuation. These inputs include the fixed price of each block for all 345 MW of power to be delivered under the Rockdale PPA and 25 MW of power to be delivered under the Corsicana PPA. The valuation relies on discounted cash flow estimation models incorporating quoted commodity exchange spot and forward prices in MWh adjusted for basis spreads for load zone-to-hub differentials through the term of the Rockdale PPA, which is scheduled to end as of April 30, 2030, and the term of the Corsicana PPA, which is scheduled to end as of December 31, 2027, and a discount rate of 23.6%. Actual power usage is not a variable input in the determination of the fair value as the price and quantity of power to be delivered per the Rockdale PPA and the Corsicana PPA are fixed despite the existence of multiple blocks with separate power amounts.

The discount rate reflects the nature of the contract as it relates to the risk and uncertainty of the estimated future mark-to-market adjustments, forward price curves of the power supply, broker/dealer quotes, and other similar data obtained from quoted market prices or independent pricing vendors, risk-free rate of return, which is determined from United States Treasury Bond yields, estimated cost of debt, which includes a Moody’s rating, and an equity risk premium based upon market data provided by a global cost of capital service provider. The discount rate includes observable market inputs, but also includes unobservable inputs based on qualitative judgment related to Company credit risk.

Note 10. Deposits

The following table presents the activity of the Company’s deposits paid:

​​​​
Deposits on equipment: · ​
Balance as of January 1, 2025​$4,495
Additions​86,403
Reclassifications to property and equipment​​(27,573)
Balance as of June 30, 2025​$63,325
Security deposits:​​​
Balance as of January 1, 2025​$25,620
Additions​​143
Deposits returned​​(429)
Balance as of June 30, 2025​​25,334
Total long-term deposits​$88,659

Deposits on Equipment

During the six months ended June 30, 2025, the Company made deposits and advance payments of $80.7 million to MicroBT for the purchase of miners and made deposits of $5.7 million for the purchase of other property and equipment, primarily consisting of electrical components used in the development of the Corsicana Facility. During the six months ended June 30, 2025, the Company reclassified $20.4 million of deposits made to MicroBT and $7.2 million of other deposits to property and equipment in connection with the receipt of the equipment. See Note 7.Property and Equipment.

Security Deposits

During the year ended December 31, 2023, the Company paid $23.0 million, all of which remains held as a deposit as of June 30, 2025, as a security deposit in connection with its 215 MW increase to the long-term, fixed-price power secured under the Rockdale PPA, resulting in a total of 345 MW under contract at fixed prices. See Note 9.Power Supply Agreements.

The Company has other security deposits totaling approximately $2.3 million for its offices and facilities, including $1.8 million associated with its ground lease.

Note 11. Accrued Expenses

Accrued expenses consist of the following:

​​​​​​​
​ · June 30, · ​ · December 31,
​ · ​ · 2025 · ​ · 2024
Property and equipment​$415​$5,790
Power related costs​27,855​19,636
Compensation​​11,480​​21,218
Insurance​4,930​11,672
Sales and property tax payable​​16,859​​9,356
Other​8,467​8,000
Total accrued expenses​$70,006​$75,672

Note 12. Debt

2030 Notes

The Company’s 0.75% Convertible Senior Notes (the “2030 Notes”) are recognized as long-term debt on the Condensed Consolidated Balance Sheets, net of unamortized debt issuance costs. As of June 30, 2025, the amount recognized was $580.8 million ($594.4 million principal less $13.6 million of unamortized debt issuance costs).

During the three and six months ended June 30, 2025, the Company recognized $0.7 million and $1.5 million, respectively, of amortization of the deferred issuance costs.

As of June 30, 2025, the 2030 Notes had an estimated fair value of approximately $620.0 million. The estimated fair value is based on quoted prices in an active market and valued at the closing price reported at the end of the period and thus represents a Level 1 measurement on the fair value hierarchy.

Revolving Credit Facilities

$50 Million Credit Facility

In July 2024, the Company entered into aone-year $50.0 million Revolving Credit Facility (“$50 Million Credit Facility”). In May 2025, the Company extended the term of the facility through July 15, 2026. Revolving Loans borrowed by the Company under the $50 Million Credit Facility may be used for general corporate purposes and carry a per annum interest rate of 1.25% plus the Secured Overnight Financing Rate. Letters of Credit issued under the $50 Million Credit Facility have aone-year term and incur fees of

1.25% per annum on the amount of Letters of Credit outstanding. Letters of Credit require the pledge of cash collateral by the Company equal to 105% of the Letter of Credit exposure.

Concurrent with entry into the $50 Million Credit Facility, as required by the agreement, the Company pledged as security $50.0 million in cash collateral, depositing the funds into a control account maintained by the lender. The balance maintained in the control account is included inRestricted cash on the Condensed Consolidated Balance Sheets. Variable interest, equal to approximately 4.13% per annum as of June 30, 2025, is earned by the Company on the amount held in the control account.

During the six months ended June 30, 2025, the Company borrowed $34.3 million in revolving loans under the $50 Million Credit Facility and recognized interest expense of $0.3 million for the three and six months ended June 30, 2025.

The following is a summary of the revolving line of credit under the $50 Million Credit Facility as of June 30, 2025:

​​​​​
​ · ​ · June 30,
​ · ​ · 2025
Total revolving credit facility​$50,000​
Borrowings outstanding at end of period (a)​34,272​
Weighted average daily borrowings during the period ended​​17,780​
Maximum daily borrowings during the period ended​41,000​
Weighted average interest rate during the period ended​​5.6%
Interest rate at end of the period​5.6%
(a)As of June 30, 2025, the Company had $15.2 million in letters of credit issued under the $50 Million Credit Facility, which results in total available capacity under this facility of approximately $0.6 million.

$20 Million Credit Facility

In August 2024, the Company entered into atwo-year $20.0 million Revolving Credit Facility (“$20 Million Credit Facility”). Revolving Loans borrowed by the Company under the $20 Million Credit Facility may be used for general corporate purposes and carry a per annum interest rate of 1.60% plus the Secured Overnight Financing Rate. Letters of Credit issued under the $20 Million Credit Facility have aone-year term and incur fees of 1.5% per annum on the amount of Letters of Credit outstanding. Letters of Credit require the pledge of cash collateral by the Company equal to 105% of the Letter of Credit exposure.

Concurrent with entry into the $20 Million Credit Facility, as required by the agreement, the Company pledged as security $20.0 million in cash collateral, depositing the funds into a control account maintained by the lender. The balance maintained in the control account is included inRestricted cash on the Condensed Consolidated Balance Sheets. Variable interest, equal to approximately 3.81% per annum as of June 30, 2025, is earned by the Company on the amount held in the control account.

As of June 30, 2025, the Company hadno letters of credit issued under the $20 Million Credit Facility.

During the six months ended June 30, 2025, the Company borrowed $20.0 million in revolving loans under the $20 Million Credit Facility and recognized interest expense of $0.3 million for the three and six months ended June 30, 2025.

The following is a summary of borrowings under the $20 Million Credit Facility as of June 30, 2025:

​​​​​
​ · ​ · June 30,
​ · ​ · 2025
Total revolving credit facility​$20,000​
Borrowings outstanding at end of period​20,000​
Weighted average daily borrowings during the period ended​​9,724​
Maximum daily borrowings during the period ended​20,000​
Weighted average interest rate during the period ended​​5.9%
Interest rate at end of the period​5.9%

$200 Million Credit Facility

On April 22, 2025, the Company entered into a$100 million credit facility with Coinbase Credit, Inc. (“Coinbase”). On May 20, 2025, this credit facility was upsized to a total commitment of $200 million (“$200 Million Credit Facility”). Under the $200 Million Credit Facility, a multiple drawdown term loan facility in an aggregate principal amount of up to$200 million was made available to the Company. The Company has fully drawn against the $200 Million Credit Facility and intends to use the proceeds to pursue key strategic initiatives and for general corporate purposes.

All amounts borrowed under the $200 Million Credit Facility will bear interest at an annual rate equal to (a) the greater of (i) the federal funds rate on the date of the applicable borrowing, and (ii)3.25%, plus (b)4.50%. The $200 Million Credit Facility has a term ofone year following commencement, but the Company may request that the maturity date be extended by an additionalone-year term, subject to consent by Coinbase. Amounts borrowed under the $200 Million Credit Facility are secured by a portion of the Company’s total bitcoin holdings. Such pledged collateral shall not be used by the lender to secure any other loan account.

As of June 30, 2025,3,300 of the Company’s bitcoin were pledged as collateral to secure the $200 Million Credit Facility. These bitcoin are recorded inRestricted bitcoin on the Condensed Consolidated Balance Sheets.

During the three and six months ended June 30, 2025, the Company recognized interest expense on the $200 Million Credit Facility of$3.1 million. The interest rate as of June 30, 2025 was 9.0%.

Note Payable

As part of the Block Mining Acquisition, the Company assumed a$5.7 million note payable with a fixed rate of 8.81%. The note matures in December 2035, with annual principal and accrued interest payments due beginning on December 31, 2024.

The following table presents the Company’s future note payable principal payments due as of June 30, 2025:

​ · ​ · ​ · ​
Remainder of 2025​$314
2026​343
2027​373
2028​405
2029​443
Thereafter​3,445
Total​$5,323

As of June 30, 2025, the note payable had an estimated fair value of approximately $5.3 million. The fair value measurement is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. The significant assumptions used to estimate fair value of the note as of June 30, 2025, primarily consisted of an interest rate range of 8.9% to 10.2%, which reflected the issuance date spread premium over the selected yield for the remaining time to maturity.

Note 13. Leases

As of June 30, 2025, the Company had operating leases primarily for its various offices, the manufacturing facilities of ESS Metron and E4A Solutions, a ground lease for the Rockdale Facility, and the Kentucky Facility data center, all of which expire on various dates through January 2032.

As of June 30, 2025 and December 31, 2024, operating lease right-of-use assets were $30.8 million and $27.5 million, respectively, and operating lease liabilities were $31.1 million and $28.5 million, respectively.

The following table presents the components of the Company’s lease expense. Ground and facilities lease expenses are included inCost of revenue and office lease expenses are included inSelling, general, and administrative on the Condensed Consolidated Statements of Operations:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · Three Months Ended · Six Months Ended
​ · June 30, · June 30,
​ · ​ · 2025 · 2024 · ​ · 2025 · 2024
Operating lease cost​$1,917​$1,231​$3,499​$2,429
Variable lease cost​102​150​199​260
Total lease expense​$2,019​$1,381​$3,698​$2,689

The following table presents supplemental lease information:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · Three Months Ended · ​ · ​ · Six Months Ended
​ · ​ · June 30, · ​ · ​ · June 30,
​ · ​ · 2025 · ​ · 2024 · ​ · ​ · 2025 · ​ · 2024
Operating leases net operating cash outflows​$2,779​$1,007​​$4,038​​$1,216​
Right-of-use assets exchanged for new operating lease liabilities​$—​$—​​$5,962​​$2,118​
Weighted-average remaining lease term – operating leases​5.5​6.8​​5.5​​6.8​
Weighted-average discount rate – operating leases​7.3%6.8%​7.3%​6.8%

The following table presents the Company’s future minimum operating lease payments as of June 30, 2025:

​​​​​​​​​​
​ · Ground lease · Office and other leases · Total
Remainder of 2025​$1,028​$1,449​$2,477
2026​2,119​4,028​6,147
2027​​2,183​​3,433​​5,616
2028​2,249​2,989​5,238
2029​2,316​2,275​4,591
Thereafter​5,053​2,106​7,159
Total undiscounted lease payments​14,948​16,280​31,228
Less present value discount​(3,273)​3,193​(80)
Present value of lease liabilities​$11,675​$19,473​$31,148

Note 14. Stockholders’ Equity

The Company is authorized to issue up to 680,000,000 shares of common stock, without any par value per share.

Each holder of common stock is entitled to one vote for each share held of record on all matters to be voted on by such holders. Holders of common stock are entitled to receive dividends, if declared. Upon liquidation, dissolution or winding-up, holders of common stock are entitled to share ratably in the net assets legally available for distribution after payment of all debts and other liabilities, subject to any preferential rights of the holders of preferred stock, if any.

During the six months ended June 30, 2025, approximately 0.2 million shares of common stock vested or were issued to the Company’s board of directors, officers, employees, and advisors in settlement of an equal number of fully vested restricted stock awards (“RSAs”) or restricted stock units (“RSUs”) awarded to such individuals by the Company under the Company’s 2019 Equity Incentive Plan, as amended (the “2019 Equity Incentive Plan”). The Company withheld approximately less than 0.1 million of these shares, with a fair value of approximately $0.6 million, to cover the withholding taxes related to the settlement of these vested RSAs and RSUs, as permitted by the 2019 Equity Incentive Plan.

At-the-Market Equity (“ATM”) Program

August 2024 ATM Program

In August 2024, the Company established the August 2024 ATM Program, under which it could offer and sell up to $750.0 million in shares of the Company’s common stock.

During the six months ended June 30, 2025, the Company received net proceeds of approximately $121.1 million ($123.9 million of gross proceeds, net of $2.8 million in commissions and expenses) from the sale of 10,775,462 shares of its common stock at a weighted average fair value of $11.50 per share under its August 2024 ATM Program. As of June 30, 2025, approximately $238.3 million in shares of the Company’s common stock were available for sale under the August 2024 ATM Program.

Note 15. Stock-Based Compensation

The 2019 Equity Incentive Plan authorizes the granting of stock-based compensation awards to directors, officers, employees, and advisors of the Company in the form of RSAs, RSUs, or stock options, all of which settle in shares of the Company’s common stock upon vesting.

As of June 30, 2025, the Company had 12,887,563 shares of common stock reserved for issuance under the 2019 Equity Incentive Plan.

The following table presents the Company’s stock-based compensation expense by category:

​​​​​​​​​​​​​
​ · ​ · Three Months Ended · ​ · Six Months Ended
​ · ​ · June 30, · ​ · June 30,
​ · 2025 · 2024 · 2025 · 2024
Performance-based stock awards and units​$25,767​$24,520​$51,312​$46,810
Service-based stock awards and units​​4,233​​7,615​​8,263​​17,325
Stock options​​121​​-​​121​​-
Total stock-based compensation​$30,121​$32,135​$59,696​$64,135

Stock-based compensation expense is recognized inSelling, general and administrative on the Condensed Consolidated Statements of Operations.

Performance-Based Awards and Units

Performance-based RSAs and RSUs are eligible to vest over a three-year performance period based on the Company’s total shareholder return (“TSR”) as compared to the performance of the Russell 3000 Index (the “Index”).

The following table presents a summary of the activity of the performance-based RSAs:

​ · ​ · ​ · ​ · ​ · ​
​​​​Weighted Average
​​​​Grant Date
​​​​Per Share
​ · Number of Shares · Fair Value
Balance as of January 1, 2025​19,615,388​$13.03
Granted​—​$—
Vested​—​$—
Forfeited​(96,556)​$7.95
Balance as of June 30, 2025​19,518,832​$13.05

As of June 30, 2025, there was approximately $111.0 million of unrecognized compensation cost related to the performance-based RSAs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.3 years.

The following table presents a summary of the activity of the performance-based RSUs:

​ · ​ · ​ · ​ · ​ · ​
​​​​Weighted Average
​​​​Grant Date
​​​​Per Share
​ · Number of Units · Fair Value
Balance as of January 1, 2025​1,769,038​$12.55
Granted​—​$—
Vested​—​$—
Forfeited​—​$—
Balance as of June 30, 2025​1,769,038​$12.55

As of June 30, 2025, there was approximately $9.8 million of unrecognized compensation cost related to the performance-based RSUs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.4 years.

Service-Based Awards and Units

Service-based RSAs and RSUs vest overone, two, andthree-year service periods.

The following table presents a summary of the activity of the service-based RSAs:

​ · ​ · ​ · ​ · ​ · ​
​​​​Weighted Average
​​​​Grant Date
​​​​Per Share
​ · Number of Shares · Fair Value
Balance as of January 1, 2025​2,712,859​$11.76
Granted​751,209​$8.06
Vested​(177,486)​$6.85
Forfeited​(54,981)​$11.31
Balance as of June 30, 20253,231,601​$11.18

As of June 30, 2025, there was approximately $24.0 million of unrecognized compensation cost related to the service-based RSAs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.8 years.

The following table presents a summary of the activity of the service-based RSUs:

​ · ​ · ​ · ​ · ​ · ​
​​​​Weighted Average
​​​​Grant Date
​​​​Per Share
​ · Number of Units · Fair Value
Balance as of January 1, 2025​362,425​$12.29
Granted​12,000​$10.46
Vested​(28,651)​$10.16
Forfeited​—​$—
Balance as of June 30, 2025345,774​$12.41

As of June 30, 2025, there was approximately $2.6 million of unrecognized compensation cost related to the service-based RSUs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.8 years.

Stock Options

In June 2025, the Company granted approximately 1.2 million performance-based stock option awards under the 2019 Equity Incentive Plan. The stock options awards are eligible to vest inone-third increments upon meeting certain AI/HPC-based EBITDA milestones through December 31, 2029.

The vesting of all options is contingent upon continued service with the Company through each of the applicable milestones. All vested options are exercisable through December 31, 2030.

As of the grant date, the fair value per share underlying each stock option award was$5.99 and the total fair value of all options granted was approximately$7.0 million. The total fair value will be recognized ratably as stock-based compensation expense for each performance milestone over its implied service period, based on the estimated probability of achieving such milestone, through December 31, 2029.

The Company estimated the fair value of the stock option awards on the date of grant using the Black-Scholes option-pricing model, utilizing the following inputs:

●The grant date exercise price/strike price of $8.07, equal to the closing market price of the Company’s common stock on the date of the grant;
●An expected award term of approximately five years determined using the simplified method, which uses the mid-point between the vesting period and the contractual term;
●Contractual term of approximately five years based on the expiration date of vested awards;
●A risk-free rate of 3.93% based on U.S. Treasury yields over the expected life of the options granted; and
●Expected volatility of future equity of 94.7% based on the average of the Company’s own historical volatility over the past five years and the implied volatility over the five-year term.

The following table presents a summary of the activity of the stock options:

​ · ​ · ​ · ​ · ​ · ​
​​​​​
​ · Number of Options · Exercise Price
Balance as of January 1, 2025​—​$—
Granted​1,166,861​$8.07
Vested​—​$—
Forfeited​—​$—
Balance as of June 30, 20251,166,861​$8.07

As of June 30, 2025, there was approximately $6.9 million of unrecognized compensation cost related to stock options, which is expected to be recognized over a remaining weighted-average vesting period of approximately 3.5 years. The weighted average remaining contractual term of the options is approximately 4.5 years.

The intrinsic value of the stock options was approximately $3.8 million. The intrinsic value is calculated as the difference between the Company’s closing stock price of $11.30 on June 30, 2025 and the exercise price, multiplied by the number of in-the-money options that would have been received by the option holder, had the holder been able to, in fact exercise the options on June 30, 2025.

Subsequent Awards

In July 2025, the Company granted approximately 1.8 million performance-based RSAs. The awards are eligible to vest, if at all, over athree-year performance period based on the Company’s TSR as compared to the Index TSR through December 31, 2027. The awards have a vesting range of 0% to 200% of each recipient’s target award of approximately 0.9 million RSAs, which is calculated based on the difference between the Company’s TSR and the Index TSR over thethree-year performance period, subject to each recipient’s continuous employment with the Company through the vesting date. The awards have an aggregate grant date fair value of approximately $15.2 million.

In July 2025, the Company granted approximately 0.9 million service-based RSAs. The awards are eligible to vest in one-third installments over an approximate three-year service period commencing on the award’s grant date, subject to each recipient’s continuous employment with the Company through the applicable vesting dates. The awards have an aggregate grant date fair value of $10.4 million.

Note 16. Fair Value Measurements

Assets and Liabilities Measured at Fair Value on a Recurring Basis:

The following tables present the Company’s assets and liabilities measured at fair value on a recurring basis:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · Fair value measured as of June 30, 2025
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Significant
​ · ​ · ​ · ​ · ​ · Quoted prices in · ​ · Significant other · ​ · unobservable
​​Total carrying​active markets​observable inputs​inputs
​ · Value · (Level 1) · (Level 2) · (Level 3)
Bitcoin(a)​$1,711,908​$1,711,908​$—​$—
Restricted bitcoin(a)​$353,672​$353,672​$—​$—
Equity method investment - marketable securities(b)​$62,508​$62,508​$—​$—
Convertible note(b)​$5,623​$—​$—​$5,623
Derivative asset(c)​$148,642​$—​$—​$148,642
Contingent consideration liabilities(d)​$9,213​$—​$—​$9,213
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · Fair value measured as of December 31, 2024
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Significant
​ · ​ · ​ · ​ · ​ · Quoted prices in · ​ · Significant other · ​ · unobservable
​​Total carrying​active markets​observable inputs​inputs
​ · Value · (Level 1) · (Level 2) · (Level 3)
Bitcoin(a)​$1,654,468​$1,654,468​$—​$—
Equity method investment - marketable securities(b)​$134,265​$134,265​$—​$—
Convertible note(b)​$5,345​$—​$—​$5,345
Derivative asset(c)​$149,495​$—​$—​$149,495
Contingent consideration liabilities(d)​$26,855​$—​$—​$26,855
(a)See Note 5. Bitcoin.
(b)See Note 6. Investments.
(c)See Note 9. Power Supply Agreements.
(d)See Note 17. Commitments and Contingencies.

There wereno transfers of financial instruments between Level 1, Level 2, and Level 3 during the periods presented.

Assets and Liabilities Not Measured at Fair Value on a Recurring Basis:

In addition to assets and liabilities that are measured at fair value on a recurring basis, we also measure certain assets and liabilities at fair value on a non-recurring basis. Our non-financial assets, including goodwill, intangible assets, operating lease right of use assets, and property, plant and equipment, are measured at fair value when there is an indication of impairment and the carrying amount exceeds the asset’s projected undiscounted cash flows. These assets are recorded at fair value only when an impairment charge is recognized.

As of June 30, 2025 and December 31, 2024, the fair values of cash and cash equivalents, restricted cash, accounts receivable, contract assets, prepaid expenses and other current assets, accounts payable, contract liabilities, and accrued expenses approximated their carrying values because of the short-term nature of these instruments.

Note 17. Commitments and Contingencies

Commitments

Miners and mining equipment

Through June 30, 2025, the Company has paid approximately $632.3 million in total deposits and payments to MicroBT for the purchase of miners pursuant to the Master Agreement described in Note 7.Property and Equipment. As of June 30, 2025, the Company has a remaining commitment of $83.5 million for the purchase of miners, all of which is expected to be paid during the remainder of 2025.

Infrastructure

During 2024, the Company entered into agreements related to water supply infrastructure for the Corsicana Facility, resulting in total remaining commitments of approximately $7.5 million. The Company expects to incur these costs through 2026.

Contingent consideration liabilities

Block Mining

As part of the Block Mining Acquisition, the sellers are eligible to earn an additional$32.5 million in potential earn-out targets, payable in cash or stock, if certain milestones are reached by December 31, 2025 (See Note 3.Acquisitions). This contingent consideration is recognized at fair value on the Condensed Consolidated Balance Sheets in*Contingent consideration liabilities, current portion.*The fair value measurement as of June 30, 2025 is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. These inputs include management’s best estimate of both the probability and timing of achieving the milestones, risk-free interest rate of 4.2% based on the U.S. Treasury rate for the corresponding time periods, and a credit spread of 1.5% based on the median of investment grade high yield debt instruments with a Standard & Poor’s BB credit rating. This credit rating was selected based on an independently-produced synthetic credit rating analysis.

As of June 30, 2025, the Block Mining Acquisition contingent consideration had an estimated fair value of $6.1 million.

E4A Solutions

As part of the E4A Solutions Acquisition, the sellers are eligible to earn potential earn-out targets based on E4A Solutions’ adjusted EBITDA, calculated as 2.65 times the amount the average adjusted EBITDA exceeds the established earn-out threshold during the two years ending December 31, 2026, payable in cash or Riot common stock at the Company’s discretion. This contingent consideration is recognized at fair value on the Condensed Consolidated Balance Sheets in*Contingent consideration liabilities, less current portion.*The fair value measurement as of June 30, 2025 is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. These inputs include management’s best estimate of both the probability and timing of achieving the milestones, risk-free interest rates ranging from 4.0% to 4.3% based on the U.S. Treasury rate for the corresponding time periods and a credit spread of approximately 1.4% based on the median of investment grade and high yield debt instruments with a Standard & Poor’s BB credit rating. This credit rating was selected based on an independently-produced synthetic credit rating analysis.

As of June 30, 2025, the E4A Solutions Acquisition contingent consideration had an estimated fair value of $2.5 million.

The following table presents the changes in the estimated fair value of the Company’s contingent consideration liabilities:

​​​​
Balance as of January 1, 2025​$26,855
Change in fair value of contingent consideration​​(17,642)
Balance as of June 30, 2025​$9,213

For the three months ended June 30, 2025, the change in fair value of the contingent consideration was approximately ($9.4) million.

Contingencies

Legal Proceedings

The Company, and our subsidiaries, are subject at times to various claims, lawsuits and governmental proceedings relating to our business and transactions arising in the ordinary course of business. We cannot predict the final outcome of such proceedings. Where appropriate, we vigorously defend such claims, lawsuits and proceedings. Some of these claims, lawsuits and proceedings seek damages, including direct, consequential, exemplary, and/or punitive damages, in amounts that could, if awarded, be significant. Certain of the claims, lawsuits and proceedings arising in ordinary course of business are covered by our insurance program. We maintain property and various types of liability insurance in an effort to protect ourselves from such claims. In terms of any matters where there is no insurance coverage available to us, or where coverage is available and we maintain a retention or deductible associated with such insurance, we may establish an accrual for such loss, retention or deductible based on current available information. In accordance with accounting guidance, if it is probable that an asset has been impaired or a liability has been incurred as of the date of the financial statements, and the amount of loss is reasonably estimable, then an accrual for the cost to resolve or settle these claims is recorded by us on the Condensed Consolidated Balance Sheets. If it is reasonably possible that an asset may be impaired as of the date of the financial statement, then we disclose the range of possible loss. Costs related to the defense of such claims are recorded by us as they are incurred. Management, with the assistance of outside counsel, may from time to time adjust such accruals according to new developments in the matter, court rulings, or changes in the strategy affecting our defense of such matters. On the basis of current information, we do not believe there is a reasonable possibility that any material loss, if any, will result from any claims, lawsuits and proceedings to which we are subject to either individually, or in the aggregate.

Green Revolution Cooling Patent Dispute

On March 22, 2024, Green Revolution Cooling, Inc. (“GRC”) filed a complaint against the Company in the Western District of Texas (Case No. 6:24-CV-152), for patent infringement. More specifically, GRC has alleged that the immersion cooling systems provided to the Company by third parties infringe GRC’s U.S. Patent Nos. 9,992,914 (“the’914 Patent”) and 10,123,463 (“the ’463 Patent”). In the complaint, GRC seeks unspecified damages and an injunction against all products that allegedly infringe the ’914 Patent and the ’463 Patent (or in lieu of an injunction, an award of a compulsory forward royalty). The Company has engaged counsel and is working with its counsel to evaluate and defend the Company from this infringement claim. While a preliminary investigation of GRC’s claims is underway, the Company cannot reasonably predict the outcome of such ongoing litigation, or the magnitude of such outcome, at this time.

Northern Data Working Capital Disputes

On September 7, 2022, the Company filed a complaint against Northern Data AG (“Northern Data”) in the Delaware Court of Chancery (Case No. C.A. No. 2022-0792-LWW) disputing the purchase price of Whinstone and seeking declaratory relief and specific performance of the stock purchase agreement (the “Northern Data Case”). On March 31, 2023, the parties filed a stipulation agreeing to dismiss all claims without prejudice and to submit the dispute for final determination to an independent accountant. The Company placed approximately $29.5 million in escrow pending the final determination of the independent accountant, and, on June 9, 2023, the independent accountant rendered a written final determination finding in favor of the Company on disputed issues totaling approximately $27.1 million. Accordingly, approximately $27.1 million of the escrowed amount was released from escrow and distributed to the Company on June 13, 2023, with the remaining approximately $2.4 million held in escrow allocated to Northern Data. As a result, the Company recognized a deferred gain on acquisition post-close dispute settlement of $26.0 million on the Condensed Consolidated Balance Sheets.

Following the final determination, Northern Data filed a complaint against the Company in the Delaware Court of Chancery (the “Chancery Court”) on June 23, 2023 (Case No. C.A. No. 2023-0650-LWW) challenging the independent accountant’s written final determination and seeking to re-litigate the purchase price adjustment process. The Company contested the legal and factual bases of Northern Data’s claims and filed a motion to dismiss the complaint on July 17, 2023, which the Chancery Court heard on February 13, 2024. The Chancery Court denied the motion to dismiss on May 17, 2024, at which time the court advised the parties that summary judgment briefing after focused discovery may be a worthwhile endeavor. Both the Company and Northern Data moved for summary judgment on November 6, 2024. On February 17, 2025, the Chancery Court heard the parties’ motions for summary judgment and took the matter under advisement.

On June 2, 2025, the Chancery Court issued a ruling on the parties’ motions for summary judgment which granted the Company’s motion on Count 1 (relating to disputed items totaling approximately $22.5 million) and Northern Data’s motion on Counts 2 and 3 (relating to disputed items totaling approximately $3.8 million). The deadline to appeal the Chancery Court’s ruling was July 18, 2025. Neither the Company nor Northern Data appealed the decision which resolved all claims in the Northern Data Case. As a result of the ruling, the Company recognized a gain of $26.0 million, which is recognized asGain on acquisition post-close settlement dispute on the Condensed Consolidated Statements of Operations.

Legacy Hosting Customer Disputes

Rhodium

On May 2, 2023, Whinstone filed a petition against Rhodium 30MW, LLC (“Rhodium 30MW”), Rhodium JV, LLC (“Rhodium JV”), Air HPC LLC (“Air HPC”), and Jordan HPC, LLC (“Jordan HPC” and, together with Rhodium 30MW, Rhodium JV, and Air HPC, collectively, the “Defendants”) in Case No. CV41873 in the 20th District Court (the “District Court”) of Milam County, Texas. In its amended petition filed May 3, 2023, Whinstone asserted breach of contract claims for Rhodium JV and Air HPC’s failure to pay certain hosting and service fees under the now-terminated Whinstone-Rhodium hosting agreements (the “Hosting Agreements”) and sought a declaration regarding the rights and obligations under certain hosting agreements with the Defendants and that no power credits are owed to any Rhodium entity under any agreement. Whinstone sought recovery of more than $26 million, plus reasonable attorneys’ fees and costs, expenses, and pre- and post-judgment interest. On June 12, 2023, Defendants answered and, along with non-parties Rhodium Encore LLC, Rhodium 2.0 LLC, and Rhodium 10mw LLC (collectively, the “Rhodium Non-Parties” and, together with Defendants, collectively, “Rhodium”), filed contingent counterclaims for breach of contract and moved to compel arbitration for alleged unpaid energy sale credits and lost profits. On August 14, 2023, Whinstone filed a second amended petition to include a declaration regarding the rights and obligations under the now-terminated water agreement between Whinstone and various Rhodium entities.

On April 28, 2025, Whinstone, Riot, and Rhodium entered into a global settlement which included: (1) settlement of all existing (or future) claims between the parties, including any and all claims arising under the Hosting Agreements, and dismissal of all such claims; (2) mutual termination of the Hosting Agreements, and (3) Whinstone’s purchase of specific Rhodium assets (the “Transaction”). In consideration for the settlement and Transaction, Whinstone paid to Rhodium a total sum of $185.0 million, comprised of approximately $129.9 million in cash, the return of Rhodium’s power security deposit of approximately $6.1 million, and 6,989,800 shares of Company common stock, valued at $49.0 million based on the preceding ten trading day volume-weighted average share price immediately prior to the date of execution of the Transaction. As a result of the Transaction, the Company recognized a loss of $158.1 million, which is recognized asLoss on contract settlement on the Condensed Consolidated Statements of Operations.

SBI

On April 5, 2023, SBI Crypto Co., Ltd. (“SBI”) filed a complaint in the United States District Court for the Western District of Texas (Case No. 6:23-cv-252), which it later amended, against Whinstone alleging breach of contract, fraud, and negligent bailment claims related to a colocation services agreement between Whinstone and SBI that was terminated in 2021. On July 21, 2023, Whinstone filed a motion to dismiss the amended complaint, which was denied on October 25, 2023. On November 25, 2024, Whinstone asserted counterclaims for breach of contract and fraudulent inducement. SBI has since updated its alleged damages, now claiming over $350 million in purported lost profits and more than $50 million in equipment replacement cost, plus reasonable attorneys’ fees, costs, expenses, and pre- and post-judgment interest. Whinstone believes many of the claims are barred or waived, and that all of SBI’s claims substantively lack merit, and Whinstone plans to vigorously contest the same, as appropriate. While a preliminary investigation of the merits of SBI’s claims has commenced and because this litigation is still at this early stage, the Company cannot reasonably estimate the outcome of such ongoing litigation, or the magnitude of such an outcome, at this time.

GMO

On June 13, 2022, GMO Gamecenter USA, Inc. and its parent, GMO Internet Group, Inc., (collectively “GMO”) filed a complaint against Whinstone alleging breach of a colocation services agreement between GMO and Whinstone, which has since been terminated, seeking damages in excess of $150.0 million for lost profit and profit sharing payments GMO alleges it was owed from Whinstone. The case is pending in the United States District Court for the Southern District of New York (Case No. 1:22-cv-05974-

JPC). Whinstone has responded to GMO’s claims and raised counterclaims of its own, alleging GMO itself breached the colocation services agreement, seeking a declaratory judgment and damages in excess of $25.0 million. On October 19, 2023, GMO filed its fourth amended complaint claiming an additional $496.0 million in damages, for loss of future profits and future profit sharing payments GMO alleges would have been received through the term of the agreement, based on Whinstone’s allegedly wrongful termination of the colocation services agreement as of June 29, 2023. The Company cannot reasonably estimate the outcome of such ongoing litigation, or the magnitude of such an outcome, at this time.

Note 18. Earnings Per Share (“EPS”)

The following table presents potentially dilutive securities that were included in the computation of diluted net income (loss) per share:

​​​​​​​​​​​​​​
​ · ​ · Three Months Ended · ​ · Six Months Ended · ​
​ · ​ · June 30, · ​ · June 30, · ​
​ · 2025 · 2024 · 2025 · 2024
Numerator:​​​​​​​​​​​​​
Net income (loss)​$219,454​$(84,449)​$(76,913)​$127,328​
Interest incurred on the 2030 Notes, net of income taxes​​2,189​​-​​-​​-​
Numerator for diluted EPS​$221,643​$(84,449)​$(76,913)​$127,328​
​​​​​​​​​​​​​​
Denominator:​​​​​​​​​​​​​
Denominator for basic EPS - weighted average shares outstanding​​336,278,380​​264,625,308​​332,912,120​​249,711,377​
Effect of dilutive securities:​​​​​​​​​​​​​
Unvested RSAs​​5,881,278​​—​​—​​—​
Unvested RSUs​​529,579​​—​​—​​—​
2030 Notes​​39,988,127​​—​​—​​—​
Dilutive potential common shares​​46,398,984​​—​​—​​—​
Denominator for diluted EPS - adjusted weighted average shares outstanding​​382,677,364​​264,625,308​​332,912,120​​249,711,377​
​​​​​​​​​​​​​​
Basic EPS​$0.65​$(0.32)​$(0.23)​$0.51​
Diluted EPS​$0.58​$(0.32)​$(0.23)​$0.51​

The following table presents potentially dilutive securities that were not included in the computation of diluted net income (loss) per share as their inclusion would have been anti-dilutive:

​​​​​​​​​​​​​
​ · ​ · Three Months Ended · ​ · Six Months Ended
​ · ​ · June 30, · ​ · June 30,
​ · 2025 · 2024 · 2025 · 2024
Warrants to purchase common stock​​63,000​​63,000​​63,000​​63,000
Unvested RSAs(a)​​—​​16,803,122​​22,846,989​​16,803,122
Unvested RSUs​​—​​1,385,639​​2,114,812​​1,385,639
Stock options​​1,166,861​​—​​1,166,861​​—
Total​​1,229,861​​18,251,761​​26,191,662​​18,251,761
(a)Unvested restricted stock awards are included in total common shares outstanding but are excluded from the calculation of basic earnings per share.

Note 19. Segment Information

The Company hastwo reportable segments: Bitcoin Mining and Engineering. The reportable segments are identified based on the types of services performed. No operating segments have been aggregated to form the reportable segments.

Gross profit (loss) is the segment performance measure the chief operating decision maker (“CODM”) uses to assess the Company’s reportable segments, and is calculated before the elimination of intersegment profits.

Prior to 2024, the Company had a Data Center Hosting reportable segment but has since terminated all contracts with its Data Center Hosting customers. Commencing with the three months ended March 31, 2024, the CODM ceased analyzing the performance of the Data Center Hosting operations and the Company ceased reporting Data Center Hosting as a separate reportable business segment. The Company has no plans to offer data center hosting services to new customers. All residual revenue and costs of revenue related to Data Center Hosting incurred during the three and six months ended June 30, 2025 and 2024 are included inRevenue: OtherandCost of Revenue: Other on the Condensed Consolidated Statements of Operations.

Other than the $97.2 million of goodwill from the Block Mining Acquisition allocated to the Bitcoin Mining segment, and $25.3 million of goodwill from the E4A Solutions Acquisition allocated to the Engineering segment, the Company does not allocate assets to the reporting segments because its assets are managed on an entity-wide basis and, therefore, does not separately disclose the total assets of its reportable operating segments.

The Bitcoin Mining segment generates revenue from the bitcoin the Company earns through its Bitcoin Mining activities. The Engineering segment generates revenue through customer contracts for custom-engineered electrical products and services. All* Revenue: Other revenue* is from external customers.

All revenue and cost of revenue from intersegment transactions have been eliminated in the Condensed Consolidated Statements of Operations.

The following tables present segment revenue and segment gross profit (loss), including the significant expense items reviewed by the CODM:

Three Months Ended June 30, 2025

​​​​​​​​​​
​ · ​ · Bitcoin Mining · ​ · Engineering · ​ · Total
Revenue from external customers​$140,889​$10,576​$151,465
Intersegment revenue​​—​​5,010​​5,010
Segment revenue​​140,889​​15,586​​156,475
​​​​​​​​​​
Reconciliation of revenue​​​​​​​​​
Other revenue(a)​​​​​​​​1,523
Elimination of intersegment revenue​​​​​​​​(5,010)
Total consolidated revenue​​​​​​​​152,988
​​​​​​​​​​
Segment cost of revenue:​​​​​​​​​
Power​​62,170​​—​​62,170
Compensation​​4,686​​—​​4,686
Insurance on miners​​1,462​​—​​1,462
Ground rent and related water and property tax​​5,719​​—​​5,719
Materials​​—​​2,165​​2,165
Labor​​—​​805​​805
Other segment items(b)​​4,139​​6,888​​11,026
Segment gross profit (loss)​$62,714​$5,728​$68,442

Three Months Ended June 30, 2024

​​​​​​​​​​
​ · ​ · Bitcoin Mining · ​ · Engineering · ​ · Total
Revenue from external customers​$55,764​$9,627​$65,391
Intersegment revenue​​—​​2,755​​2,755
Segment revenue​​55,764​​12,382​​68,146
​​​​​​​​​​
Reconciliation of revenue​​​​​​​​​
Other revenue(a)​​​​​​​​4,627
Elimination of intersegment revenue​​​​​​​​(2,755)
Total consolidated revenue​​​​​​​​70,018
​​​​​​​​​​
Segment cost of revenue:​​​​​​​​​
Power​​26,465​​—​​26,465
Compensation​​2,821​​—​​2,821
Insurance on miners​​1,639​​—​​1,639
Ground rent and related water and property tax​​1,274​​—​​1,274
Materials​​—​​5,233​​5,233
Labor​​—​​1,476​​1,476
Other segment items(b)​​3,076​​1,552​​4,628
Segment gross profit (loss)​$20,489​$4,121​$24,610

Six Months Ended June 30, 2025

​​​​​​​​​​
​ · ​ · Bitcoin Mining · ​ · Engineering · ​ · Total
Revenue from external customers​$283,748​$24,496​$308,244
Intersegment revenue​​—​​11,334​​11,334
Segment revenue​​283,748​​35,830​​319,578
​​​​​​​​​​
Reconciliation of revenue​​​​​​​​​
Other revenue(a)​​​​​​​​6,131
Elimination of intersegment revenue​​​​​​​​(11,334)
Total consolidated revenue​​​​​​​​314,375
​​​​​​​​​​
Less:​​​​​​​​​
Power​​123,999​​—​​123,999
Compensation​​9,131​​—​​9,131
Insurance on miners​​2,924​​—​​2,924
Ground rent and related water and property tax​​7,862​​—​​7,862
Materials​​—​​5,811​​5,811
Labor​​—​​1,967​​1,967
Other segment items(b)​​9,077​​13,886​​22,963
Segment gross profit (loss)​$130,755​$14,166​$144,921

Six Months Ended June 30, 2024

​​​​​​​​​​
​ · ​ · Bitcoin Mining · ​ · Engineering · ​ · Total
Revenue from external customers​$127,160​$14,302​$141,462
Intersegment revenue​​—​​3,440​​3,440
Segment revenue​​127,160​​17,742​​144,902
​​​​​​​​​​
Reconciliation of revenue​​​​​​​​​
Other revenue(a)​​​​​​​​7,852
Elimination of intersegment revenue​​​​​​​​(3,440)
Total consolidated revenue​​​​​​​​149,314
​​​​​​​​​​
Segment cost of revenue:​​​​​​​​​
Power​​54,463​​—​​54,463
Compensation​​5,465​​—​​5,465
Insurance on miners​​3,375​​—​​3,375
Ground rent and related water and property tax​​2,606​​—​​2,606
Materials​​—​​6,557​​6,557
Labor​​—​​2,365​​2,365
Other segment items(b)​​5,916​​5,357​​11,272
Segment gross profit (loss)​$55,336​$3,463​$58,799
(a)Other revenue is primarily attributable to Data Center Hosting revenue and is therefore not included in the total for segment gross profit (loss).
(b)For each reportable segment, the other segment items category primarily consists of:

Bitcoin Mining: Bitcoin miner and network repair and maintenance costs.

Engineering: Manufacturing overhead costs.

The following table presents the reconciliation of segment gross profit (loss) tonet income (loss) before taxes:

​​​​​​​​​​​​​
​ · ​ · Three Months Ended June 30, · ​ · Six Months Ended June 30,
​ · 2025 · 2024 · 2025 · 2024
Segment gross profit (loss)​$68,442​$24,610​$144,921​$58,799
​​​​​​​​​​​​​
Reconciling Items:​​​​
Other profit (loss)(a)​​(1,483)​​(5,478)​​(5,840)​​(6,788)
Elimination of intersegment profits​(5,010)​(2,755)​(11,334)​(3,440)
Acquisition-related costs​(111)​—​(187)​—
Selling, general, and administrative​(75,902)​(61,189)​(147,350)​(118,841)
Depreciation and amortization​(83,197)​(37,326)​(161,123)​(69,669)
Change in fair value of bitcoin​​470,812​​(76,403)​​262,772​​157,677
Change in fair value of derivative asset​(42,747)​27,484​(853)​47,716
Power curtailment credits​​8,313​​13,897​​16,114​​19,028
Change in fair value of contingent consideration​9,390​—​17,642​—
(Loss) gain on sale/exchange of equipment​​(350)​​(68)​​(479)​​(68)
Casualty-related (charges) recoveries, net​119​187​119​2,487
Interest income​3,334​8,466​6,731​16,655
Interest expense​​(6,093)​(314)​​(8,401)​​(698)
Unrealized gain (loss) on equity method investment - marketable securities​6,143​24,462​(57,095)​24,462
Loss on contract settlement​​(158,137)​—​(158,137)​—
Gain on acquisition post-close dispute settlement​​26,007​—​26,007​—
Other income (expense)​244​33​337​41
Net income (loss) before taxes​$219,774​$(84,394)​$(76,156)​$127,361
(a)Other profit (loss) is primarily attributable to Data Center Hosting activity and is therefore not included in the total for segment gross profit (loss).

Concentrations

During the three and six months ended June 30, 2025 and 2024, aside from the Bitcoin Mining revenue generated as a result of the Company’s participation in a mining pool, no single customer or related group of customers contributed 10% or more of the Company’s total consolidated revenue.

During the three and six months ended June 30, 2025 and 2024, Bitcoin Mining power was primarily obtained from ERCOT.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.