Consolidated Performance
Driven by a 36% increase in revenue from $38.4 million in Q3/23 up to $52.3 million in Q3/24, and slightly offset by a 12% increase in production costs, we reported a gross profit of $13.8 million in Q3/24, compared to a gross profit of $3.8 million for Q3/23.
Supported by our improvement in gross profit described above, we reported a net loss of $2.1 million (or $0.04 per share) and adjusted EBITDA of $10.5 million (or $0.20 per share) in Q3/24, compared to a net loss of $18.5 million (or $0.39 per share) and adjusted EBITDA of $1.5 million (or $0.03 per share) in Q3/23.
Production from our 100% owned mines of 21,495 GEOs in Q3/24 increased by 814 GEOs, from 20,681 GEOs produced in Q3/23. At the Gold Bar mine, the production increase of 4,133 GEOs in Q3/24 compared to Q3/23 was attributable to a 21% increase in higher gold grades of stacked mineralized material, and higher heap leach recovery rates. At the Fox Complex, the production decrease of 3,319 GEOs in Q3/24 compared to Q3/23 was driven by a 9% decrease in tonnes processed and a 21% decrease in average head grades processed.
Our attributable share of San José mine production was 13,684 GEOs in Q3/24, or 24% lower than the 17,932 GEOs produced in Q3/23. The decrease was primarily driven by temporary lower than expected metal grades mined and processed.