Skip to main content

WESTWATER RESOURCES INC

For the period ended Dec 31, 2023. Filed Mar 19, 2024.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2023 · Filed Mar 19, 2024

WWR$0.41+5.3%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

WESTWATER’S GRAPHITE BUSINESS

Kellyton Graphite Plant

The Kellyton Graphite Plant has been under construction for over two years. Under a lease with the Lake Martin Area Industrial Development Authority, AGP holds rights to approximately 70 acres to construct and operate the Kellyton Graphite Plant. The lease has a term of 10 years, a nominal lease payment, and transfer of title to the land to AGP at the end of the lease term. Further, the lease provides AGP the option to purchase the land for a nominal amount during the term of the lease.

AGP has also entered into incentive agreements with the State of Alabama and local municipalities for locating the Kellyton Graphite Plant near Kellyton, Alabama. The incentive agreements provide certain tax credits and incentives under the Alabama Jobs Act in connection with the construction of the Kellyton Graphite Plant.

AGP owns two buildings, adjacent to the Kellyton Graphite Plant, that total approximately 90,000 sq. ft. The build-out of the administrative building was completed in April of 2022 and includes the R&D Lab constructed in 2023. The other building is being used for the maintenance shop, shipping and receiving and as warehousing space.

Westwater plans to develop the Kellyton Graphite Plant in two phases (Phases I and II).

Phase I: Based upon the Company’s optimization plan, after testing and commissioning is completed, the Kellyton Graphite Plant is now anticipated to have capacity to produce approximately 26,500 mt per year of two products in the following quantities:

●ULTRA-CSPG™: 12,500 mt per year
●SG Fines:14,000 mt per year

Phase II: Upon completion of the Phase II expansion, the Kellyton Graphite Plant is now anticipated to have capacity to produce approximately 106,000 mt per year of two products in the following quantities:

●ULTRA-CSPG™: 50,000 mt per year
●SG Fines: 56,000 mt per year

Construction activities for Phase I of the Kellyton Graphite Plant began in the fourth quarter of 2021 and will continue in 2024. While the Company continued construction activities in 2023, Westwater has reduced the level of construction activity from anticipated levels, including adjusting the timing of future work, until receipt of the additional funding needed to complete construction of Phase I of the Kellyton Graphite Plant. Reducing the level of construction activity until financing is secured is expected to extend the overall schedule to complete Phase I of the Kellyton Graphite Plant. The Company expects to provide an update on construction timing once, and if, the additional funding is secured.

Spheroidization, Purification and Post-Processing Activities

The Company will process natural graphite concentrate at the Kellyton Graphite Plant through a combination of sizing, shaping, spheroidization, and classification. Once completed, the purification is expected to be performed using a proprietary purification process that was developed and tested during our pilot program by Dorfner Anzaplan,and other engineering consultants, and internally in our R&D Lab. The process uses a combination of technologies including a caustic bake, acid leach and thermal treatment, a process that allows for a smaller and more sustainable environmental footprint than that of a hydrofluoric acid leaching system, which is widely used by other graphite processing companies. Once the graphite is purified to a minimum graphite carbon content of 99.95%, we then coat the SPG to manufacture the

advanced graphite products we intend to sell. This unique application process developed by Westwater is the subject of a patent application that has been filed in the U.S. Patent and Trademark Office.

Westwater currently purchases graphite flake concentrate for the Kellyton Graphite Plant under a supply contract with Syrah Resources Limited. Westwater expects to continue to purchase graphite concentrate from Syrah Resources Limited and/or other sources for the Kellyton Graphite Plant until the Coosa Graphite Deposit is developed and in operation. Westwater believes its current contract with Syrah Resources Limited provides adequate feedstock supply until then. Currently, the Coosa Graphite Deposit is being evaluated and developed for future mining operations, which will require permitting as well. Development of a mine at the Coosa Graphite Deposit, is expected to serve as an in-house source of graphite feedstock and will provide in-house QA/QC for raw-material inputs.

Westwater acquired Alabama Graphite in 2018 as part of a strategic decision to refocus the Company to supply battery manufacturers with low-cost, high-quality, and high-margin battery-grade natural graphite products. As part of that transaction, Westwater became the owner of mineral lease rights over the Coosa Graphite Deposit, located near Rockford, Alabama, 50 miles southeast of Birmingham. For further detail on the Coosa Graphite Deposit refer toItem 2, Properties, below.

Mining Method

The Coosa Graphite Deposit is expected to be mined by conventional small-scale open-pit mining methods.

Concentrate Plant

Mineralized material from the Coosa Graphite Deposit is projected to have an average grade of approximately 3.04% Cg, and is expected to contain impurities consisting of quartz, muscovite, iron oxides and calcite. Most of the impurities are present on the surfaces of the graphite flakes and can be easily removed during a metallurgical process known as flotation. Flotation processing maximizes the removal of these impurities while avoiding degradation of graphite flakes.

Further development work at the Coosa Graphite Deposit is expected to result in the detailed design and construction of a milling and concentration plant.

Products and Business Development

The Company is working to develop products for potential major battery markets. Based on discussions with potential customers, Westwater will focus on the production of ULTRA-CSPG™ and SG Fines during Phase I of the Kellyton Graphite Plant and expects to evaluate the production of additional products in Phase II, subject to market demand and customer interest.

The Company is in active discussions with potential customers, including battery manufacturers and automobile manufacturers, with the goal of executing multi-year supply agreements. To date, the Company has executed a Procurement Agreement with SK On, which resulted from the ongoing collaboration under the JDA that was executed in the first quarter of 2023. The Company has also signed general terms and conditions for a supply agreement with a North American automobile manufacturer and is negotiating with this manufacturer regarding a possible off-take agreement. In addition, the Company has also executed Non-Disclosure Agreements with potential customers and has executed eight letters of intent across multiple product lines, which are subject to customary conditions and quality and packaging specifications to be included in future definitive agreements.

Regulation

Graphite extraction and processing is regulated by federal and state governments. Compliance with such regulations has a material effect on the economics of our operations and the timing of project development. Our primary

regulatory costs have been, and are expected to relate to, obtaining licenses and operating permits from federal and state agencies before the commencement of production activities, as well as the cost for continuing compliance with licenses and permits once they have been issued. The current environmental and technical regulatory requirements for the graphite extraction and processing industry are well established. However, the regulatory process can make permitting difficult and timing unpredictable.

U.S. regulations pertaining to graphite extraction and processing may evolve in the U.S. However, at this time we do not anticipate any adverse impact from these regulations that would be unique to our operations.

Kellyton Graphite Plant

For construction and operations of the Kellyton Graphite Plant, the Company is required to obtain permits related to air emissions, water discharge, storm water drainage, and possibly other regulated waste. On January 31, 2022, Westwater announced that it had received its National Pollutant Discharge Elimination System (“NPDES”) construction stormwater permit, which was required to commence site grading for the Kellyton Graphite Plant. The NPDES permit has been issued by the State of Alabama under NPDES to ensure Westwater’s construction efforts comply with the Federal Clean Water Act as it relates to regulated disturbances and any stormwater runoff from the Kellyton Graphite Plant site.

In June 2022 and August 2022, the Company received its air permit and its State Indirect Discharge (“SID”) permit for the treatment of wastewater from the Alabama Department of Environmental Management, respectively. Consequently, the Company has all necessary permits to complete the construction of Phase I of the Kellyton Graphite Plant.

Coosa Graphite Deposit

Graphite mining and processing in Alabama requires various permits, including those for any emissions to air, water, or other aspects of the environment. Permits may be required from the State of Alabama, the U.S. Environmental Protection Agency, the Army Corps of Engineers, and other state and federal agencies. Specifically, to mine the Coosa Graphite Deposit, permits may be required in accordance with the Alabama Surface Mining Act of 1969, which is administered by the Alabama Department of Labor (“DoL”). DoL issues mining permits, ensures that mine sites are properly bonded for reclamation purposes, and makes periodic inspections. The Company is currently in the process of determining which permits are needed as well as the requirements for posting surety obligations or negotiable bonds related to the area to be disturbed. Future mining operations at the Coosa Graphite Deposit may be subject to the U.S. National Environmental Policy Act process, with potential review by various federal agencies that may include the U.S. Environmental Protection Agency, the Army Corp of Engineers, the Bureau of Land Management, and others.

In Alabama, any surface or groundwater withdrawals are managed through the Alabama Water Use Reporting Program. The Alabama Water Resources Act and associated regulations establish the requirements for water withdrawals. The process begins with the submission of an application form called a “Declaration of Beneficial Use” and other required information to the Office of Water Resources (“OWR”) within the Alabama Department of Economic and Community Affairs. Once application information is reviewed and determined to be complete, OWR will issue a Certificate of Use (“COU”) that lists the applicant’s name and information concerning all registered surface and/or groundwater withdrawal points and their withdrawal information. Entities with a capacity to withdraw more than 100,000 gallons per day are required to register with OWR and obtain a COU. The COU certifies that proposed water use will not interfere with existing water use and is beneficial. The Company anticipates evaluating the future need for a COU during its development of a detailed mine plan.