Item 2. Properties

SUMMARY DISCLOSURE

The following maps show the locations of our principal mines, smelting facilities, refineries and projects. We operate open-pit copper mines in the southern part of Peru—at Toquepala and Cuajone—and in Mexico, at La Caridad and Buenavista. We also own five underground mines, three out of which currently produce zinc, copper, silver and gold.

The below description of the Company’s mining operations is qualified in its entirety by reference to the Technical Report Summaries included as exhibits to this report and incorporated by reference into this Item 2.

EXTRACTION, SMELTING AND REFINING PROCESSES

Our operations include open-pit and underground mining, concentrating, copper smelting, copper refining, copper rod production, solvent extraction/electrowinning (“SX-EW”), zinc refining, sulfuric acid production, molybdenum concentrate production and silver and gold refining. The extraction and production process are summarized below.

OPEN-PIT MINING

In an open-pit mine, the production process begins at the mine pit, where waste rock, leaching ore and copper ore are drilled and blasted and then loaded onto diesel-electric trucks by electric shovels. Waste is hauled to dump areas and leaching ore is hauled to leaching dumps. The ore to be milled is transported to the primary crushers.

UNDERGROUND MINING

In an underground mine, the production process begins at the stopes, where copper, zinc and lead veins are drilled and blasted and the ore is hauled to the underground crusher station. The crushed ore is then hoisted to the surface for processing.

CONCENTRATING

The copper ore above an established cut-off from the primary crusher or the copper, zinc and lead-bearing ore from the underground mines is transported to a concentrator plant where gyratory crushers break the ore into sizes no larger than three-quarter of an inch. The ore is then sent to a mill section where it is ground to the consistency of fine powder. The finely ground ore is mixed with water and chemical reagents and pumped as a slurry to the flotation separator, where it is mixed with certain chemicals. In the flotation separator, reagent solutions and air pumped into the flotation cells cause the minerals to separate from the waste rock and bubble to the surface where they are collected and dried.

If the bulk concentrated copper contains molybdenum, it is first processed in a molybdenum plant as described below under “Molybdenum Production.” In addition, some of the concentrates contain economic amounts of gold and silver that are recovered in the smelters and refineries.

COPPER SMELTING

Copper concentrates are transported to a smelter, where they are smelted using a furnace, converter and anode furnace to produce either blister copper (which is in the form of cakes with air pockets) or copper anodes (which are cleaned of air pockets). At the smelter, the concentrates are mixed with flux (a chemical substance intentionally included for high temperature processing) and then sent to reverberatory furnaces producing copper matte and slag (a mixture of iron and other impurities). Copper matte contains approximately 65% copper. Copper matte is then sent to the converters, where the material is oxidized in two steps: (i) the iron sulfides in the matte are oxidized with silica, producing slag that is returned to the reverberatory furnaces, and (ii) the copper contained in the matte sulfides is then oxidized to produce copper that, after casting, is called blister copper, containing approximately 98% to 99% copper, or anodes, containing approximately 99.7% copper. Most of the blister and anode production is sent to the refinery and the remainder is sold to customers.

COPPER REFINING

Anodes are suspended in tanks with a solution containing water, sulfuric acid and copper sulfate. A weak electrical current is passed through the anodes and chemical solution and the dissolved copper is deposited on very thin starting sheets to produce copper cathodes containing approximately 99.99% copper. During this process, silver, gold and other metals (for example, palladium, platinum and selenium), along with other impurities, settle on the bottom of the tank (anodic muds). This anodic mud is processed at a precious metal plant where selenium, silver and gold are recovered.

COPPER ROD PLANT

To produce copper rod, copper cathodes are first smelted in a furnace and then dosed in a casting machine. The dosed copper is then extruded and passed through a cooling system that begins solidification of copper into a 60×50 millimeter copper bar. The resulting copper bar is gradually stretched in a rolling mill to achieve the desired diameter. The rolled bar is then cooled and sprayed with wax as a preservation agent and collected into a rod coil that is compacted and sent to market.

SOLVENT EXTRACTION/ELECTROWINNING (“SX-EW”)

A complementary processing method is the leaching and SX-EW process. During the SX-EW process, low-grade sulfides ore and copper oxides are leached with sulfuric acid to allow copper content recovery. The acid and copper solution is then agitated with a solvent that contains chemical additives that attract copper ions. As the solvent is lighter than water, it floats to the surface carrying with it the copper content. The solvent is then separated using an acid solution, freeing the copper. The acid solution containing the copper is then moved to electrolytic extraction tanks to produce copper cathodes.

MOLYBDENUM PRODUCTION

Molybdenum is recovered from copper-molybdenum concentrates produced at the concentrator. The copper-molybdenum concentrate is first treated with a thickener until it becomes slurry. The slurry is then agitated in a chemical and water solution and pumped to the flotation separator. The separator creates a froth that carries molybdenum to the surface but not the copper mineral (which is later filtered to produce copper concentrates. The molybdenum froth is skimmed off, filtered and dried to produce molybdenum concentrates.

ZINC REFINING

Metallic zinc is produced through electrolysis using zinc concentrates and zinc oxides. Sulfur is eliminated from the concentrates by roasting and the zinc oxide is dissolved in sulfuric acid solution to eliminate solid impurities. The

purified zinc sulfide solution is treated by electrolysis to produce refined zinc and to separate silver and gold, which are recovered as concentrates.

SULFURIC ACID PRODUCTION

Sulfur dioxide gases are produced in the copper smelting and zinc roasting processes. As a part of our environmental preservation program, we treat the sulfur dioxide emissions at two of our Mexican plants and at our Peruvian processing facilities to produce sulfuric acid, some of which is, in turn, used for the copper leaching process; the balance is sold to mining and fertilizer companies located mainly in Mexico, Peru, United States and Chile.

SILVER AND GOLD REFINING

Silver and gold are recovered from copper, zinc and lead concentrates in the smelters and refineries and from slimes through electrolytic refining.

PRODUCTION OVERVIEW

The table below provides an overview of Southern Copper’s aggregate annual production for all of its properties during each of the three most recently completed fiscal years:

​​​​​​​​​​​​​​​​
​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance · ​
​Year Ended December 31,2023 -20222022 -2021​
​202320222021Volume%Volume%​
COPPER (thousand pounds):​
Mined2,008,4381,972,4802,112,46535,9581.8%(139,985)(6.6)%
Smelted1,383,5971,405,4211,319,619(21,824)​(1.6)%85,8026.5%
Refined1,419,8171,495,7671,401,719(75,950)​(5.1)%94,0486.7%
Rod340,182344,893330,961(4,711)​(1.4)%13,9324.2%
SILVER (thousand ounces)​​​​​​​​​
Mined18,40818,56218,962(154)​(0.8)%(400)(2.1)%
Refined10,92714,27213,691(3,345)​(23.4)%5814.2%
MOLYBDENUM (thousand pounds)​​​​​​​​​
Mined59,16457,84966,7161,3152.3%(8,867)(13.3)%
ZINC (thousand pounds)​​​
Mined144,422132,300147,61712,1229.2%(15,317)(10.4)%
Refined222,695220,225204,3062,4701.1%15,9197.8%
GOLD (ounces)​​​​​​​​​​​​​​​
Mined​65,373​65,134​60,631​2390.4%4,5037.4%
Refined​37,666​43,306​42,628​(5,640)(13.0)%6781.6%

KEY PRODUCTION CAPACITY DATA

We own and operate all production facilities. The table below provides details on the locations of production facilities as of December 31, 2023 by reportable segment, the processes used, and the key production and capacity data for each location:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · 2023 · ​ · 2023 Capacity
Facility Name · ​ · Location · ​ · Stage · ​ · Process · ​ · Nominal Capacity(1) · ​ · Production · ​ · Use(3)
PERUVIAN OPEN‑PIT SEGMENT · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Mining Operations · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Cuajone open‑pit mineCuajone (Peru)​ProductionCopper ore milling and recovery, copper and molybdenum concentrate production90.0 ktpd—ore milled76.1​84.6%
Toquepala open‑pit mine (Concentrator I+II)Toquepala (Peru)​ProductionCopper ore milling and recovery, copper and molybdenum concentrate production120.0 ktpd—ore milled114.8​95.6%
Toquepala SX‑EW plantToquepala (Peru)​ProductionLeaching, solvent extraction and cathode electrowinning56.3 ktpy—refined25.3​44.8%
Processing Operations​​​​​​
Ilo copper smelterIlo (Peru)​ProductionCopper smelting, blister, anodes production1,376.1 ktpy—concentrate feed1,292.9​94.0%
Ilo copper refineryIlo (Peru)​ProductionCopper refining294.8 ktpy—refined cathodes289.7​98.3%
Ilo acid plantsIlo (Peru)​ProductionSulfuric acid1,354.93 ktpy—sulfuric acid1,286.8​95.0%
Ilo precious metals refineryIlo (Peru)​ProductionSlime recovery & processing, gold & silver refining460 tpy355.0​77.1%
MEXICAN OPEN‑PIT SEGMENT​​​​​​
Mining Operations​​​​​​
Buenavista open‑pit mine; Concentrator ISonora (Mexico)​ProductionCopper ore milling & recovery, copper concentrate production84.0 ktpd—milling83.2​99.1%
Concentrator II​​​​​115.0 ktpd—milling​115.7​100.6%
Buenavista: SX‑EW plant ISonora (Mexico)​ProductionLeaching, solvent extraction & refined cathode electrowinning11.0 ktpy—refined—​—%
SX‑EW plant IISonora (Mexico)​ProductionLeaching, solvent extraction & refined cathode electrowinning​43.8 ktpy—refined​20.8​47.5%
SX‑EW plant IIISonora (Mexico)​ProductionLeaching, solvent extraction & refined cathode electrowinning​120.0 ktpy—refined​66.8​55.6%
La Caridad open‑pit mineSonora (Mexico)​ProductionCopper ore milling & recovery, copper & molybdenum concentrate production94.5 ktpd—milling96.2​101.8%
La Caridad SX‑EW plantSonora (Mexico)​ProductionLeaching, solvent extraction & cathode electrowinning21.9 ktpy—refined23.0​105.0%
Processing Operations​​​​​​
La Caridad copper smelterSonora (Mexico)​ProductionConcentrate smelting, anode production1,000 ktpy—concentrate feed966.6​96.7%
La Caridad copper refinerySonora (Mexico)​ProductionCopper refining300 ktpy copper cathode218.6​72.9%
La Caridad copper rod plantSonora (Mexico)​ProductionCopper rod production150 ktpy copper rod154.3​102.9%
La Caridad precious metals refinerySonora (Mexico)​ProductionSlime recovery & processing, gold & silver refining1.8 ktpy—slime0.9​51.5%
La Caridad sulfuric acid plantSonora (Mexico)​ProductionSulfuric acid1,565.5 ktpy—sulfuric acid948.5​60.6%
IMMSA SEGMENT​​​​​​
Underground mines​​​​​​
CharcasSan Luis Potosi (Mexico)​ProductionCopper, zinc, lead milling, recovery & concentrate production1,460 ktpy—ore milled1,270.1​87.0%
San MartinZacatecas (Mexico)​ProductionLead, zinc, copper & silver mining, milling recovery & concentrate production1,606 ktpy—ore milled1,423.5​88.6%
Santa BarbaraChihuahua (Mexico)​ProductionLead, copper and zinc mining & concentrates production2,190 ktpy—ore milled1,652.1​75.4%
Santa EulaliaChihuahua (Mexico)​SuspendedLead & zinc mining and milling recovery & concentrate production547.5 ktpy—ore milled—​—%
Taxco(2)Guerrero (Mexico)​SuspendedLead, zinc silver & gold mining recovery & concentrate production730 ktpy—ore milled—​—%
Processing Operations​​​​​​
San Luis Potosi zinc refinerySan Luis Potosi (Mexico)​ProductionZinc concentrates refining105.0 ktpy zinc cathode101.0​96.2%
San Luis Potosi sulfuric acid plantSan Luis Potosi (Mexico)​ProductionSulfuric acid180.0 ktpy sulfuric acid180.0​100.0%

ktpd = thousands of tonnes per day

ktpy = thousands of tonnes per year

Tpy = tonnes per year

(1)Our estimates of actual capacity under normal operating conditions contemplating an allowance for normal downtime for repairs and maintenance and are based on the average metal content for the relevant period.
(2)The Taxco mine has been on strike since July 2007.
(3)In some cases, real production exceeds nominal capacity due to higher grades and recovery rates.

OTHER PROPERTIES

The table below provides details on the locations and other information as of December 31, 2023 for our properties under development or exploration. These properties are also owned and operated by SCC.

​​​​​​​​​
Property Name​Location​Stage​Mineralization​Mineral rights and acreage
Other properties in Peru​​​​​
Tia MariaArequipa (Peru)​DevelopmentPorphyry copper deposit; economic mineralization is oxide copper.​Consists of 57 concessions covering approximately 34,933 hectares.
Los ChancasApurimac (Peru)​ExplorationPorphyry copper–molybdenum deposit; copper sulfides are dominant.​Consists of 35 concessions, covering approximately 24,237 hectares.
MichiquillayCajamarca (Peru)​ExplorationPorphyry copper–molybdenum–gold deposit; copper sulfides are dominant.​Consists of 18 concessions covering approximately 4,051 hectares.
Other properties in Mexico​​​​​
El PilarSonora (Mexico)​DevelopmentPredominantly consists of the copper oxide mineral chrysocolla.​Consists of 19 concessions covering approximately 9,571 hectares.
El ArcoBaja California (Mexico)​DevelopmentPorphyry copper deposit; mineralization occurs in three sub-horizontal zones.​Consists of 20 concessiones covering approximately 72,131 hectares.

PROPERTY BOOK VALUE

As of December 31, 2023, net book values of property and mine development were as follows (in millions):

​​​​
Peruvian operations: · ​
Cuajone​$597.7
Toquepala​1,925.4
Tia Maria project​282.8
Ilo and other support facilities​548.2
Construction in progress​740.3
Total Peru​$4,094.4
Mexican open‑pit operations:​​
Buenavista mine and concentrator plants​$2,451.6
Buenavista SX‑EW and Quebalix​776.6
La Caridad mine and concentrator plant​652.9
La Caridad support facilities​261.2
Construction in progress​464.4
Total Mexico Open Pit​$4,606.7
Mexican IMMSA unit:​
San Luis Potosi​$85.2
Zinc electrolytic refinery​80.1
Charcas​103.6
San Martin​132.5
Santa Barbara​140.0
Santa Eulalia​34.7
Other facilities​​6.0
Construction in progress​​
- Zinc electrolytic refinery​​11.0
- Charcas​​46.0
- San Martin​​18.7
- Santa Barbara​​78.0
- Santa Eulalia​​15.3
- Other Facilities​​3.4
Total IMMSA Unit​$754.5
Other property:​
El Pilar​$116.0
Mexicana del Arco​103.1
Total​$219.1
Mexican administrative offices​$108.2
Total Mexico​$5,688.5
Total Southern Copper Corporation​$9,782.9

SUMMARY OPERATING DATA

The following table contains certain operating data underlying our financial and operating information for each of the periods indicated.

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance · ​
​Year Ended December 31,2023 -20222022 -2021​
​202320222021Volume%Volume%​
COPPER (thousand pounds):​
Mined​
Peru open‑pit​
Toquepala440,165385,931448,91354,23414.1%(62,982)(14.0)%
Cuajone328,990309,338372,55919,6526.4%(63,221)(17.0)%
SX‑EW Toquepala55,67258,31556,777(2,643)(4.5)%1,5382.7%
Mexico open‑pit​​​​
La Caridad193,596195,091226,390(1,495)(0.8)%(31,299)(13.8)%
Buenavista725,216746,557752,225(21,341)(2.9)%(5,668)(0.8)%
SX‑EW La Caridad50,69151,44955,942(758)(1.5)%(4,493)(8.0)%
SX‑EW Buenavista193,024205,662180,437(12,638)(6.1)%25,22514.0%
IMMSA unit21,08420,13719,2229474.7%9154.8%
Total Mined2,008,4381,972,4802,112,46535,9581.8%(139,985)(6.6)%
Smelted​
Peru open‑pit​
Blister Ilo4,0884,5085,735(420)100.0%(1,227)(21.4)%
Anodes Ilo798,342771,630680,26326,7123.5%91,36713.4%
Mexico open‑pit​​​​
Anodes La Caridad581,167629,283633,621(48,116)(7.6)%(4,338)(0.7)%
Total Smelted1,383,5971,405,4211,319,619(21,824)(1.6)%85,8026.5%
Refined​
Peru Open‑pit​
Cathodes Ilo638,589638,741573,583(152)(0.0)%65,15811.4%
SX‑EW Toquepala55,67258,31556,777(2,643)(4.5)%1,5382.7%
Mexico Open‑pit​​​​
Cathodes La Caridad481,841541,600534,980(59,759)(11.0)%6,6201.2%
SX‑EW La Caridad50,69151,44955,942(758)(1.5)%(4,493)(8.0)%
SX‑EW Buenavista193,024205,662180,437(12,638)(6.1)%25,22514.0%
Total Refined1,419,8171,495,7671,401,719(75,950)(5.1)%94,0486.7%
Rod Mexico Open‑pit—La Caridad340,182344,893330,961(4,711)(1.4)%13,9324.2%
SILVER (thousand ounces)​
Mined​
Peru Open‑pit​
Toquepala2,6152,2202,68139517.7%(461)(17.2)%
Cuajone2,3952,2982,692974.3%(394)(14.6)%
Mexico Open‑pit​​​​
La Caridad2,0652,0862,227(21)(1.0)%(141)(6.3)%
Buenavista4,6695,2084,774(539)(10.3)%4349.1%
IMMSA unit6,6646,7506,588(86)(1.3)%1622.5%
Total Mined18,40818,56218,962(154)(0.8)%(400)(2.1)%
Refined​
Peru—Ilo3,5263,7413,985(215)(5.6)%(244)(6.1)%
Mexico—La Caridad7,3988,5697,612(1,171)(13.7)%95712.6%
IMMSA unit31,9622,094(1,959)(99.8)%(132)(6.3)%
Total Refined10,92714,27213,691(3,345)(23.4)%5814.2%
MOLYBDENUM (thousand pounds)​
Mined​
Toquepala13,91616,93423,462(3,018)(17.8)%(6,528)(27.8)%
Cuajone8,2527,9929,2372603.3%(1,245)(13.5)%
Buenavista11,93711,84811,524890.8%3242.8%
La Caridad25,05921,07522,4933,98418.9%(1,418)(6.3)%
Total Mined59,16457,84966,7161,3152.3%(8,867)(13.3)%
ZINC (thousand pounds)​
Mined IMMSA144,422132,300147,61712,1229.2%(15,317)(10.4)%
Refined IMMSA222,695220,225204,3062,4701.1%15,9197.8%
(1)Copper production reported under “smelted” and “refined” is a subset of the mined copper and it is not additive to the mined copper.

SUMMARY DISCLOSURE OF MINERAL RESOURCES

The following table contains the summary of our mineral resources exclusive of mineral reserves as of December 31, 2023, based on long-term price assumptions of $3.80 per pound of copper, $11.50 per pound of molybdenum ($10.35 per pound of molybdenum in the case of our El Arco mine), $23.00 per ounce of silver, $1.32 per pound of zinc, $1.04 per pound of lead and $1,725 per ounce of gold.

​​​​​​​​​​​​​​​​​​​​​​​​​
​ · ​ · Measured mineral resources · ​ · Indicated mineral resources · ​ · Measured + Indicated mineral resources · ​ · Inferred mineral resources
​ · Amount · ​ · ​ · Metal · ​ · Amount · ​ · ​ · Metal · ​ · Amount · ​ · ​ · Metal · ​ · Amount · ​ · ​ · Metal
​​(million tonnes)​Grades​Content (million lb)​(million tonnes)​Grades​Content (million lb)​(million tonnes)​Grades​Content (million lb)​(million tonnes)​Grades​Content (million lb)
Copper: · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Peru: · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Cuajone Sulfides—​—%—​329.5​0.38%2,746.6​329.5​0.38%2,746.6​836.0​0.32%5,831.2
Cuajone Leach​—​—%—​0.2​0.54%2.6​0.2​0.54%2.6​0.3​0.51%3.4
Toquepala Sulfides—​—%—​1,196.7​0.42%11,182.3​1,196.7​0.42%11,182.3​2,405.1​0.39%20,920.9
Toquepala Leach​—​—%—​1,050.6​0.08%1,943.3​1,050.6​0.08%1,943.3​2,303.7​0.08%4,154.8
La Tapada deposit​—​—%—​90.4​0.21%420.3​90.4​0.21%420.3​1.6​0.18%6.4
Tia Maria deposit—​—%—​35.5​0.17%135.2​35.5​0.17%135.2​21.8​0.22%107.8
Los Chancas Oxide—​—%—​98.0​0.45%975.2​98.0​0.45%975.2​33.0​0.38%277.4
Los Chancas Sulfide​—​—%—​52.0​0.59%672.8​52.0​0.59%672.8​1,400.0​0.45%13,887.6
Michiquillay—​—%—​—​—%—​—​—%—​2,288.0​0.43%21,554.8
Mexico:​​​​​​​​​​​​​​​​​​​​​​​
Buenavista Mill—​—%—​763.8​0.34%5,663.6​763.8​0.34%5,663.6​13,015.0​0.21%56,583.5
Buenavista Leach​—​—%—​76.9​0.13%196.0​76.9​0.13%196.0​2,830.5​0.14%8,517.1
Buenavista zinc plant​—​—%—​148.2​0.46%1,561.6​148.2​0.46%1,561.6​142.8​0.43%1,394.4
La Caridad Mill—​—%—​3,927.5​0.16%13,680.6​3,927.5​0.16%13,680.6​2,972.8​0.14%8,913.2
La Caridad Leach​—​—%—​683.0​0.08%1,129.0​683.0​0.08%1,129.0​526.0​0.08%904.5
Charcas—​—%—​6.4​0.52%73.8​6.4​0.52%73.8​15.2​0.55%182.5
Santa Barbara​—​—%—​25.5​0.52%291.8​25.5​0.52%291.8​18.2​0.55%222.2
San Martin​—​—%—​13.0​0.65%187.0​13.0​0.65%187.0​52.3​0.48%554.0
El Arco Mill—​—%—​826.6​0.41%7,544.9​826.6​0.41%7,544.9​2,344.9​0.37%19,352.3
El Arco Leach​—​—​—​51.3​0.30%335.3​51.3​0.30%335.3​63.8​0.25%350.9
El Pilar2.2​0.20%9.0​81.3​0.18%317.0​83.4​0.18%326.0​88.6​0.12%234.4
Pilares Mill—​—%—​—​—%—​—​—%—​67.3​0.55%817.3
Pilares Leach​—​—%—​—​—%—​—​—%—​0.9​0.34%6.8
Total2.2​​​9.0​9,456.4​​​49,058.8​9,458.5​​​49,067.8​31,427.9​​​164,777.5
Molybdenum:​​​​​​​​​​​​​​​​​​​​​​​
Peru:​​​​​​​​​​​​​​​​​​​​​​​
Cuajone—​—%—​329.5​0.014%103.4​329.5​0.014%103.4​836.0​0.011%200.5
Toquepala—​—%—​1,196.7​0.023%606.7​1,196.7​0.023%606.7​2,405.1​0.019%1,009.3
Mexico:​​​​​​​​​​​​​​​​​​​​​​​
Buenavista Mill—​—%—​763.8​0.005%88.7​763.8​0.005%88.7​13,015.0​0.004%1,081.2
Buenavista zinc plant​—​—%—​148.2​0.002%5.4​148.2​0.002%5.4​142.8​0.003%6.8
La Caridad Mill—​—%—​3,927.5​0.028%2,424.4​3,927.5​0.028%2,424.4​2,972.8​0.025%1,638.5
El Arco Mill—​—%—​826.6​0.008%146.5​826.6​0.008%146.5​2,344.9​0.006%298.2
Pilares Mill—​—%—​—​—%—​—​—%—​67.3​0.005%7.5
Total—​​​—​7,192.3​​​3,375.1​7,192.3​​​3,375.1​21,783.9​​​4,241.9
Silver: (2)​​​​​​​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​​​​​​​
Charcas—​—%—​6.4​84.0​17,297.0​6.4​84.0​17,297.0​15.2​98.0​48,005.0
Santa Barbara—​—%—​25.5​103.0​84,495.0​25.5​103.0​84,495.0​18.2​95.0​55,444.0
San Martin—​—%—​13.0​77.0​32,236.0​13.0​77.0​32,236.0​52.3​72.0​121,500.0
El Arco Mill—​—%—​826.6​1.6​41,875.3​826.6​1.6​41,875.3​2,344.9​1.5​110,887.3
Total—​​​—​871.5​​​175,903.3​871.5​​​175,903.3​2,430.6​​​335,836.3
Zinc:​​​​​​​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​​​​​​​
Buenavista zinc plant​—​—%—​148.2​0.78%2,416.3​148.2​0.78%2,416.3​142.8​0.49%1,638.0
Buenavista Cu plant​—​—%—​763.8​0.07%1,182.1​763.8​0.07%1,182.1​13,015.0​0.03%8,088.8
Charcas​—​—%—​6.4​3.06%431.8​6.4​3.06%431.8​15.2​2.78%928.0
Santa Barbara​—​—%—​25.5​3.15%1,772.7​25.5​3.15%1,772.7​18.2​3.86%1,553.5
San Martin​—​—%—​13.0​1.97%565.0​13.0​1.97%565.0​52.3​2.66%3,072.7
Total​—​​​—​956.9​​​6,367.9​956.9​​​6,367.9​13,243.5​​​15,281.0
Lead:​​​​​​​​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​​​​​​​​
Charcas​—​—%—​6.4​0.39%55.0​6.4​0.39%55.0​15.2​0.39%129.5
Santa Barbara​—​—%—​25.5​1.99%1,121.0​25.5​1.99%1,121.0​18.2​2.25%906.0
San Martin​—​—%—​13.0​0.34%96.8​13.0​0.34%96.8​52.3​0.32%369.3
Total​—​​​—​44.9​​​1,272.8​44.9​​​1,272.8​85.7​​​1,404.8
Gold: (2)​​​​​​​​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​​​​​​​​
Santa Barbara​—​—%—​25.5​0.27​221.0​25.5​0.27​221.0​18.2​0.17​98.0
El Arco Mill​—​—%—​826.6​0.12​3,226.1​826.6​0.12​3,226.1​2,344.9​0.11​8,053.5
Total​—​​​—​852.1​​​3,447​852.1​​​3,447​2,363.1​​​8,152
(1)Mineral resources are reported in situ and are current at December 31, 2023. Mineral resources are reported exclusive of mineral reserves. Figures have been rounded.
(2)Gold and silver grades are denominated in grams per tonne. Gold and silver contents are expressed in thousand ounces.
(3)For further information on assumptions used in preparing the mineral resource estimates, for the following operations: Cuajone, Toquepala, Buenavista and La Caridad; please refer to their individual property disclosure in this Form 10-K and the technical report summaries prepared by qualified persons, under Exhibits 96.1, 96.2, 96.6 and 96.7 respectively of 2022 Form 10-K/A filed on February 28, 2023.
(4)For further information on assumptions used in preparing the mineral resource estimates, for the following operations: Charcas, Santa Barbara and San Martin; please refer to their individual property disclosure in this Form 10-K and the technical report summaries prepared by qualified persons, under Exhibits 96.11, 96.12 and 96.13 respectively in this Form 10-K.
(5)For further information on assumptions used in preparing the estimates for the following operations: El Arco, Tia Maria, Los Chancas, Michiquillay, Pilares and El Pilar, please refer to their individual property disclosure in this Form 10-K and Chapter 11 of the project technical report summaries prepared by qualified persons, under Exhibit 96.10, 96.3, 96.4, 96.5, 96.8 and 96.9, respectively of 2021 Form 10-K/A filed on March 7, 2022.

SUMMARY DISCLOSURE OF MINERAL RESERVES

The following table contains the summary of our mineral reserves as of December 31, 2023, based on long-term price assumptions of $3.30 per pound of copper, $10.00 per pound of molybdenum ($9.00 per pound of molybdenum in the case of our El Arco mine), $20.00 per ounce of silver, $1,500 per ounce of gold and $1.15 per pound of zinc.

​​​​​​​​​​​​​​​​​​​
​ · ​ · Proven mineral reserves · ​ · Probable mineral reserves · ​ · Total mineral reserves
​ · Amount · ​ · ​ · Metal · ​ · Amount · ​ · ​ · Metal · ​ · Amount · ​ · ​ · Metal
​​(million tonnes)​Grades​Content (million lb)​(million tonnes)​Grades​Content (million lb)​(million tonnes)​Grades​Content (million lb)
Copper: · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Peru: · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Cuajone Mill—​—%—​1,294.7​0.48%13,749.7​1,294.7​0.48%13,749.7
Cuajone Leach​—​—%—​20.6​0.51%232.0​20.6​0.51%232.0
Toquepala Mill—​—%—​2,105.0​0.47%21,708.4​2,105.0​0.47%21,708.4
Toquepala Leach​—​—%—​2,545.4​0.15%8,691.7​2,545.4​0.15%8,691.7
La Tapada deposit—​—%—​487.6​0.41%4,449.2​487.6​0.41%4,449.2
Tia Maria deposit​—​—%—​223.8​0.29%1,412.5​223.8​0.29%1,412.5
Mexico:​​​​​​​​​​​​​​​​​
Buenavista Sulfides—​—%—​2,052.4​0.41%18,670.0​2,052.4​0.41%18,670.0
Buenavista Leach​—​—%—​1,033.1​0.22%4,948.0​1,033.1​0.22%4,948.0
La Caridad Mill—​—%—​2,038.7​0.21%9,415.0​2,038.7​0.21%9,415.0
La Caridad Leach​—​—%—​196.8​0.09%393.0​196.8​0.09%393.0
El Arco Mill—​—%—​1,229.5​0.40%10,822.1​1,229.5​0.40%10,822.1
El Arco Leach​—​—%—​140.5​0.27%846.3​140.5​0.27%846.3
El Pilar63.0​0.27%370.4​254.0​0.25%1,373.5​317.0​0.25%1,743.9
Total63.0​​​370.4​13,622.2​​​96,711.4​13,685.2​​​97,081.8
Molybdenum:​​​​​​​​​​​​​​​​​
Peru:​​​​​​​​​​​​​​​​​
Cuajone—​—%—​1,294.7​0.017%493.0​1,294.7​0.017%493.0
Toquepala—​—%—​2,105.0​0.021%996.7​2,105.0​0.021%996.7
Mexico:​​​​​​​​​​​​​​​​​
Buenavista—​—%—​1,961.0​0.007%319.0​1,961.0​0.007%319.0
La Caridad—​—%—​2,038.7​0.028%1,244.0​2,038.7​0.028%1,244.0
El Arco Mill—​—%—​1,229.5​0.006%166.7​1,229.5​0.006%166.7
Total—​​​—​8,628.9​​​3,219.4​8,628.9​​​3,219.4
Silver: (2)​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​
El Arco—​—%—​1,229.5​1.8​70,464.9​1,229.5​1.8​70,464.9
Total—​​​—​1,229.5​​​70,464.9​1,229.5​​​70,464.9
Zinc:​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​
Buenavista zinc plant (3)​—​—%—​91.4​1.42%2,852.0​91.4​1.42%2,852.0
Gold: (2)​​​​​​​​​​​​​​​​​​
Mexico:​​​​​​​​​​​​​​​​​​
El Arco​—​—%—​1,229.5​0.14​5,584.8​1,229.5​0.14​5,584.8
(1)Mineral reserves are current at December 31, 2023. The reference point for the estimate is delivery to the process plant. Figures have been rounded.
(2)Gold and silver grades are denominated in grams per tonne. Gold and silver contents are expressed in thousand ounces.
(3)For further information on assumptions used in preparing the mineral reserve estimates, for the following mineral properties: Cuajone, Toquepala, Buenavista and La Caridad, please refer to the individual property disclosure in this Form 10-K and to the technical report summaries prepared by qualified persons, under Exhibits 96.1, 96.2, 96.6 and 96.7 respectively of 2022 Form 10-K/A filed on February 28, 2023.
(6)For further information on assumptions used in preparing the estimates for the following mineral properties: El Arco, Tia Maria and El Pilar, please refer to the individual property disclosure in this Form 10-K and to the project technical report summaries prepared by qualified persons, under Exhibit 96.10, 96.3 and 96.9 respectively of Form 10-K/A, filed on March 7, 2022.

Tailings Dams

Tailings are comprised of solid particles originating at the concentrator plants during the grinding process that, combined with water, are sent to specially built structures where they are impounded. The water is recovered to be reused in the process.

Tailings dams are basically built in two manners: by using the coarse fraction from the same tailings or by using external material, often known as “borrowed material” such as rock, clay etc. We believe SCC’s tailings dams are built according to international standards and national accepted engineering practices. We comply with the country’s current regulations and adhere to the recommendations of the International Commission on Large Dams (ICOLD). In addition, we have a committee, comprised of both internal and external specialists, which periodically reviews the safety and operation of each dam. In 2020, we implemented the project*“Automation and Real Time Monitoring of geotechnical instrumentation in the Pit and Quebrada Honda Tailings Dam”* and conditioned a location to install three radars to conduct geotechnical monitoring of the Quebrada Honda Tailings Dam. We do not expect that these activities will generate any adverse material effects in our operations.

We have six tailings dams in operation in Mexico and one in Peru as follows:

​​​​​​​​​​​
CountryOperationNameCurrent HeightMaterialMethod
MexicoBuenavistaTailings dam # 3103 metersBorrowedDownstream
MexicoBuenavistaNew tailings dam99 metersBorrowedDownstream
MexicoLa CaridadTailings dam # 7189 metersBorrowedDownstream
MexicoCharcasTailings dam55 metersCoarse tailingsUpstream
MexicoSanta BarbaraNoriega dam52 metersCoarse tailingsUpstream
MexicoSan MartinTailings dam 5 & 750 metersCoarse tailingsUpstream
PeruCuajone and ToquepalaQuebrada Honda143 metersCoarse tailingsDownstream

INDIVIDUAL PROPERTY DISCLOSURE

In 2021, we adopted the disclosure requirements of S-K 1300. The definitions and allowed assumptions for mineral reserves under previous guidance (Industry Guide 7) are significantly different from the defined terms and allowed assumptions for mineral reserves under S-K 1300. Additionally, Industry Guide 7 did not permit mineral resource reporting.

PERUVIAN OPERATIONS

Operations in our Peruvian segment include the Cuajone and Toquepala mine complexes and the smelting and refining plants, the industrial railroad that links Ilo, Toquepala and Cuajone and the port facilities. Other properties include our Tia Maria, Los Chancas and Michiquillay projects. We conduct ongoing maintenance and improvement programs to ensure the satisfactory performance of our equipment. We believe all of the equipment at our Peruvian plants is in good physical condition and is suitable for our operations.

The map below indicates the approximate location of, and access to, our Cuajone and Toquepala mine complexes and our Ilo processing facilities:

Cuajone

The Cuajone operations consist of an open-pit copper mine and a concentrator and are located in the Torata District, Mariscal Nieto Region, of Moquegua, approximately 878 km from the city of Lima and 27 km from the city of Moquegua. The Project centroid is at about 17° 3.130’S latitude and 70° 44.499’W longitude, while the open pit is centered at approximately 17° 2.601’S latitude and 70° 42.481’W longitude.

The Cuajone mine is accessible by paved road from Lima or Tacna by the Pan-American Highway. The Quebrada Honda tailings storage facility (“TSF”) is about 120 km via local roads, south of the Cuajone operations. Access within the project area is via developed roads that are routinely maintained. Tacna, Moquegua, and Ilo have regularly scheduled air services from Lima. Additionally, a spur railway runs from the Toquepala operations to the Cuajone operations.

The Cuajone operations are owned and operated by SPCC Peru Branch and contain a single mining concession, “Acumulacion Cuajone”, which covers an area of 15,024.5 hectares. Power is transmitted for process needs from the Peruvian grid using two Southern Copper-owned transmission lines of 138 kV and 220 kV. Additionally, the Cuajone operations use surface and underground water from a variety of sources as fresh make up water.

The property is currently in the production stage. Southern Copper has had an interest in the Cuajone area since 1954. Predecessor companies included Cerro de Pasco Corporation, Newmont and Asarco. Overburden removal commenced in 1970 and ore production commenced in 1976. Our Cuajone operations utilize a conventional open-pit mining method to drill/blast/haul copper ore for further processing at the concentrator, which has a milling capacity of 90,000 tonnes per day. Book value of the property and its associated plant and equipment is available under “Property Book Value” on page 37 of this report.

The table below shows production information for 2023, 2022 and 2021 for our Cuajone operations:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance 2023 - · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · 2022 · ​
​​202320222021Amount%​
Mine annual operating days365365365​
Mine​​​​
Total ore mined(kt)27,46925,04929,5482,4209.7%
Copper grade(%)0.6400.6580.674(0.018)(2.7)%
Leach material mined(kt)9131,8171,983(904)(49.8)%
Leach material grade(%)0.5900.7130.668(0.123)(17.3)%
Stripping ratio(x)4.154.213.70(0.06)(1.4)%
Total material mined(kt)146,261139,916148,3026,3454.5%
Concentrator​​​​
Total material milled(kt)27,39824,98529,6172,4139.7%
Copper recovery(%)85.3085.3084.70——%
Copper concentrate(kt)601.4562.8670.138.66.9%
Copper in concentrate(kt)149.2140.3169.08.96.3%
Copper concentrates average grade(%)24.8124.9325.22(0.12)(0.5)%
Molybdenum​​​​
Molybdenum grade(%)0.0200.0230.022(0.003)(13.0)%
Molybdenum recovery(%)63.3063.2263.270.080.1%
Molybdenum concentrate(kt)7.06.77.80.34.2%
Molybdenum concentrate average grade(%)53.4353.8653.76(0.43)(0.8)%
Molybdenum in concentrate(kt)3.73.64.20.13.0%

x = Stripping ratio obtained dividing waste by leachable material plus ore mined.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

The Cuajone deposit is considered to be an example of a porphyry copper–molybdenum deposit. The basal regional geology consists of Precambrian metamorphic rocks that are cut by Paleozoic granite, unconformably overlain by Upper Triassic to Jurassic marine volcanic and sedimentary lithologies. Overlying these rocks are late Cretaceous to early Tertiary rhyolite, andesite and agglomerate of the Toquepala Group. These lithologies are intruded by the composite, polyphase Cretaceous to Paleogene Coastal (Andean) Batholith.

Mineralization and alteration at the Cuajone deposit is directly related to a multi-stage latite porphyry that intrudes basaltic andesites and the overlying 370 m of rhyolite porphyries of the Toquepala Group. The Cuajone porphyry deposit exhibits a zoned alteration pattern that includes potassic, propylitic, sericitic and intermediate argillic hydrothermal alteration styles. The Cuajone mineralogy is typically simple and consists of pyrite, chalcopyrite, and bornite, with sparse sphalerite, galena, and enargite.

Our Cuajone operations use state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit to coordinate inflows and optimize operations. The process designs were based on existing technologies and proven equipment, and the plants constructed using those designs have been operating for 47 years. Material with a copper grade over 0.25% is loaded to the in-pit crushing and conveying (IPCC) system and sent to the milling circuit, where giant rotating crushers reduce the size of the rocks to approximately one-half of an inch. The ore is then sent to the ball mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells to produce foam for floating the copper and molybdenum minerals while waste materials called tailings are separated. This copper-molybdenum bulk concentrate is then treated by inverse flotation, where molybdenum is floated and copper is depressed. The copper

concentrate is shipped by rail to the smelter at Ilo and the molybdenum concentrate is packaged for shipment to customers.

Tailings are sent to thickeners to recover water. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

A major mill expansion was completed in 1999 and the eleventh primary mill began operations in January 2008. In December 2013, the high-pressure grinding roll was put in operation. At the end of 2016, the Larox filter press for molybdenum concentrate began operations. The overland primary crusher began operations in May 2018. The new tailings thickener began operations in September 2019.

In November 2023, the "HPGR optimization as a quaternary crushing circuit" project began operational testing and ramping-up. In the first quarter of 2024, the quaternary crushing circuit is expected to be working at full capacity.

The Cuajone pit is approximately 930 meters deep. Under the present mine plan configuration, the Cuajone pit will reach a depth of 1,320 meters. The increases in the depth of the pit present us with a number of geotechnical challenges. Perhaps the foremost concern is the possibility of slope failure, which all open pit mines face. To meet the geotechnical challenges relating to slope stability of the open pit mines, we have taken the following steps:

At the Cuajone mine, the Company maintains many monitoring systems with radars in order to prevent the risk of slope instability. The equipment acquired through these years have helped to control the walls of the pit and anticipate possible damages. In addition, in 2015 a geotechnical study was conducted to increase the inter ramp angle by an average of three degrees and include 40 meters wide geotechnical berms for inter ramp heights above 150 meters.

In 2020, equipment to extract rock samples was implemented in the rock mechanics laboratory. This equipment allows us to obtain cylindrical rock specimens and perform rock mechanics tests under current technical standards and norms. A drone was also incorporated in the slope reconciliation activities to obtain detailed topographic information on the slopes and identify good practices or opportunities to build stable walls. In 2021, as part of the equipment update and the requirement to improve the slope monitoring coverage due to the growth of the pit, two slope monitoring radars were acquired. Three pieces of monitoring equipment have also been added to monitor slopes in the leaching pads. Likewise, the first study of the physical stability of waste rock deposits was carried out by a consulting firm.

In 2022, seismic refraction equipment was used to record information on fracturing frequency, determine the dynamic parameters of the rock mass, and modify designs in the buffer and pre-split blasting rows, as a complement in minimizing the impact on the final slopes of the pit. A digital inclinometer has been replaced to monitor slopes in the pit and identify potential deformation zones.

In 2023, an evaluation of the physical stability of the waste rock deposits and leach heaps was carried out, in compliance with article 400 of the Supreme Decree 024-2016 and its amendments contained in the Supreme Decree 023-2017 E.M. Eight digital extensometers were also acquired to monitor and control waste rock deposits.

The following table contains the summary of copper and molybdenum mineral resources for Cuajone as of December 31, 2023, based on long-term price assumptions of $3.80 and $11.50 per pound respectively; theses prices were fixed over the remaining 47 year of mine life:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Variation
Measured mineral resources​—​—%—%—​—​—%—%—​​
Indicated mineral resources​​​​​​​​​​​​​​​​​
- Sulfides​329.5​0.38%84.8%2,746.6​331.6​0.46%84.8%3,381.5​(18.8)%
- Leach (oxides)​0.2​0.54%42.4%2.6​0.2​0.62%42.4%3.2​​
Measured + Indicated mineral resources​329.7​0.38%​​2,749.2​331.8​0.46%​​3,384.7​(18.8)%
Inferred mineral resources​​​​​​​​​​​​​​​​​​
- Sulfides​836.0​0.32%84.8%5,831.2​850.9​0.31%84.8%5,901.7​(1.2)%
- Leach (oxides)​0.3​0.51%42.4%3.4​0.3​0.51%42.4%3.4​0.0%
Total inferred mineral resources​836.3​0.32%​​5,834.6​851.2​0.31%​​5,905.1​(1.2)%
​​​​​​​​​​​​​​​​​​​
MolybdenumAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Amount (thousand tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Variation
Measured mineral resources​—​—%—%—​—​—%—%—​​
Indicated mineral resources329.5​0.014%62.9%103.4​331.6​0.017%62.9%121.7​(15.0)%
Measured + Indicated mineral resources​329.5​0.014%62.9%103.4​331.6​0.017%62.9%121.7​(15.0)%
Inferred mineral resources​836.0​0.011%62.9%200.5​850.9​0.011%62.9%201.8​(0.6)%
(1)The Variation column refers to metal content variation.
(2)The point of reference for mineral resources is in place and are current as at December 31, 2023; based on 2022 year-end mineral resource tonnages, grades and contents adjusted only considering the 2023 mine depletion. Mineral resources are reported exclusive of mineral reserves. Wood is the third-party firm comprising mining experts responsible for the estimate.
(3)Mineral resources are constrained within an optimized pit shell based on copper and molybdenum revenue only. Mineral resources are reported within a conceptual pit shell that use the following input parameters: metal prices of $3.80/lb Cu and $11.50/lb Mo; average metallurgical recovery assumptions of 84.8% for copper and 62.9% for molybdenum from a process plant and 42.4% copper recovery from a heap leach; based on mining cost of $1.76/t, mill process operating costs of $7.05/t processed, leach costs of $5.26/t processed; copper concentrate payable price of $3.36/lb Cu, molybdenum concentrate payable price of $9.72/lb Mo, and leach copper payable price of $3.77/lb Cu. These parameters are based on the 2022 year-end figures.
(4)No estimates for molybdenum are reported for leachable material as this element cannot currently be recovered using the leach process envisaged.
(5)The cut-off grade for mineral resources was determined to be 0.112% Cu for sulfide mineralization. The cut-off grade for mineral resources sent to the leach pad was 0.149 %Cu.
(6)Numbers in the table have been rounded. Totals may not sum due to rounding.
(7)For further information on the assumptions used to prepare the estimates and a detailed description of the cut-off determination, please refer to Chapter 11 of the Cuajone operations technical report summary prepared by qualified persons, under Exhibit 96.1 to the 2022 Form 10-K.

The following table contains the summary of copper and molybdenum mineral reserves for Cuajone as of December 31, 2023, based on long-term price assumptions of $3.30 and $10.00 per pound respectively; these prices were fixed over the remaining 47 year of mine life:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Variation
Proven mineral reserves​—​—%—%—​—​—%—%—​​
Probable mineral reserves (mill)1,294.7​0.48%84.4%13,749.7​1,336.1​0.48%84.4%14,216.7​(3.3)%
Probable mineral reserves (leach)​20.6​0.51%48.2%232.0​21.5​0.51%48.2%244.5​(5.1)%
Total mineral reserves​1,315.3​0.48%​​13,981.6​1,357.6​0.48%​​14,461.2​(3.3)%
​​​​​​​​​​​​​​​​​​​
MolybdenumAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Amount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Variation
Proven mineral reserves​—​—%—%—​—​—%—%—​​
Probable mineral reserves1,294.7​0.017%62.5%493.0​1,336.1​0.017%62.5%508.3​(3.0)%
Total mineral reserves​1,294.7​0.017%62.5%493.0​1,336.1​0.017%62.5%508.3​(3.0)%
(1)Mineral reserves are current as of December 31, 2023; based on 2022 year-end tonnages, grades and metal contents adjusted for 2023 mine depletion only. Wood is the third-party firm comprising mining experts that is responsible for the estimates.
(2)The point of reference is the point at which the mineral reserves are delivered to the processing facility.
(3)Numbers in the table have been rounded. Totals may not sum due to rounding.
(4)Mill and leach ore include existing stockpiled material.
(5)Mineral reserves are constrained within an engineered pit based on copper and molybdenum revenues only. The following parameters were used in estimation: assumed open-pit mining methods; assumed concentration and dump leaching processes; copper price of $3.30/lb, molybdenum price of $10.00/lb; variable NSR cut-off values of $7.791–$8.079/t-processed for concentration material, and a NSR cut-off value of $9.061/t-processed for leaching material; mining recovery of 100%; variable metallurgical recoveries (average LOM recoveries of 84.4% for copper by concentration, 62.5 % for molybdenum by concentration, and 48.2% for copper by leaching, including concentration and leach ore existing in stockpiles); average copper recoveries of 97.4% for smelting and 99.9% for refining; variable mining costs that range from $2.337–$3.417/t-mined; average process costs of $7.971/t-processed for concentration material, and $9.061/t for leaching material; average smelting and refining cost of $0.382/lb Cu; selling costs of $-0.0024/lb Cu for concentration process, $1.679/lb Mo for concentration process, and $-0.009/lb Cu for leaching process; and 1% NSR royalty applied to the for Cu and Mo. These parameters are based on and are unchanged from the 2022 year-end figures.
(6)For further information on assumptions used in preparing the estimates and a detailed description of the cut-off determination, please refer to Chapter 12 of the Cuajone operations technical report summary prepared by qualified persons, under Exhibit 96.1 to the 2022 Form 10-K.

Toquepala

The Toquepala operations are situated in Southern Peru, approximately 150 km by road from the city of Tacna and 30 kilometers from Cuajone. The Project centroid is at about 17° 3.130’S latitude and 70° 44.499’W longitude while the open pit is centered at approximately 17° 2.601’S latitude and 70° 42.481’W longitude. Road access from Tacna is via the Pan-American highway and other local roads. Alternative access is from Lima, using the Pan-American highway to Alto Camiara, and then driving for 70 km on a paved road to the Toquepala camp. The Quebrada Honda tailings storage facility (TSF) is 40 km south of the mine and is located at approximately 17° 27.724’S latitude: 70° 47.810’W longitude. The Quebrada Honda tailings can be accessed via the MO-107 route that connects Alto Camiara with Toquepala. Within the operations area, access is by unpaved mine and exploration roads. The city of Tacna has a regional airstrip, with regular service within Peru. Additionally, railways extend from Ilo to Toquepala, and a spur railway runs from the Toquepala operations to the Cuajone operations.

The Toquepala operations are owned and operated by SPCC Peru Branch and contain a single mining concession, “Acumulacion Toquepala 1”, which covers an area of 17,552.4 hectares. Power is transmitted for process needs from the Peruvian grid using two Southern Copper-owned transmission lines of 138 kV and 220 kV. Additionally, the Toquepala operations use surface and underground water from a variety of sources as fresh make up water.

The property is currently under the production stage. Our Toquepala operations consist of an open-pit copper mine and two concentrators; each with a milling capacity of 60,000 tonnes per day. We also refine copper at the SX-EW facility through a leaching process. The SX-EW facility has a production capacity of 56,336 tonnes per year of LME grade A copper cathodes. Southern Copper has had an interest in the Project area since 1945. Prior to Southern Copper’s Project interests, the area had been subject to artisanal mining activities. Overburden removal commenced in 1957 and ore production commenced in 1960. Our Toquepala operations utilize a conventional open-pit mining method to collect copper ore for further processing in our concentrators. The second concentrator began operations in the fourth quarter of 2018. Book value of the property and its associated plant and equipment is available under “Property Book Value” on page 37 of this report.

The table below contains production information for 2023, 2022 and 2021 for our Toquepala operations:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance 2023 - · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · 2022 · ​
​ · 2023 · 2022 · 2021 · Amount · % · ​
Mine annual operating days365365365​
Mine​​​​
Total ore mined(kt)41,65741,55840,827990.2%
Copper grade(%)0.5290.4760.5390.05311.1%
Leach material mined(kt)51,87041,49953,22610,37125.0%
Leach material grade(%)0.0960.2140.225(0.118)(55.1)%
Stripping ratio(x)1.491.531.16(0.04)(2.6)%
Total material mined(kt)232,795209,745203,15023,05011.0%
Concentrator​​​​
Total material milled(kt)41,54740,31941,6991,2283.0%
Copper recovery(%)90.8091.2190.60(0.41)(0.4)%
Copper concentrate(kt)787.0689.8791.697.214.1%
Copper in concentrate(kt)199.7175.1203.624.614.0%
Copper concentrate average grade(%)25.3725.3825.72(0.01)(0.0)%
SX‑EW plant​​​​
Estimated leach recovery(%)23.8723.6023.540.271.1%
SX‑EW cathode production(kt)25.326.525.8(1.2)(4.5)%
Molybdenum​​​​
Molybdenum grade(%)0.0200.0260.035(0.006)(23.1)%
Molybdenum recovery(%)72.3573.2772.91(0.92)(1.3)%
Molybdenum concentrate(kt)11.213.719.0(2.5)(18.2)%
Molybdenum concentrate average grade(%)56.5756.2756.020.300.5%
Molybdenum in concentrate(kt)6.37.710.6(1.4)(17.8)%

x = Stripping ratio obtained by dividing waste tonnes by leachable material plus ore mined.

Copper and molybdenum grades are referred to as total copper grade and total molybdenum grade, respectively.

The Toquepala deposit is an example of a copper–molybdenum porphyry deposit. The basal regional geology consists of Precambrian metamorphic rocks that are cut by Paleozoic granite, unconformably overlain by Upper Triassic to Jurassic marine volcanic and sedimentary lithologies. Overlying these rocks are late Cretaceous to early Tertiary rhyolite, andesite and agglomerate of the Toquepala Group. These lithologies are intruded by the composite, polyphase Cretaceous to Paleogene Coastal (Andean) Batholith.

Mineralization consists of leached capping, oxide, enriched, transitional and primary mineralization. Leached capping, oxide, enriched and transition mineralization is mostly mined out. Primary mineralization occurs as hypogene sulfides mainly restricted to the dacite porphyry and breccias. Chalcopyrite is the dominant economic mineral with lesser bornite, molybdenite, and enargite as disseminations, fracture fillings, and breccia matrix. Economic molybdenite mineralization is associated with quartz veinlets and locally, with disseminated chalcopyrite.

Concentrators

Our Toquepala concentrators use state-of-the-art computer monitoring systems to coordinate inflows and optimize operations. Material with a copper grade over 0.25% is loaded onto an overland conveyor belt and sent to the crushing circuit, where rotating crushers reduce the size of the rocks by approximately 85% to less than one-half of an inch. The ore is then sent to the rod and ball mills, which grind it in a mix with water to the consistency of fine powder. The finely ground powder mixed with water is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. The bulk concentrate with sufficient molybdenum content is processed to recover molybdenum by inverse flotation. This final copper concentrate with a content of approximately 26.5% of copper is filtered to reduce moisture to 8.5% or less. Concentrates are then shipped by rail to the Ilo smelter.

Tailings are sent to thickeners where water is recovered. The remaining tailings are sent to the Quebrada Honda dam, our principal tailings storage facility.

The SX-EW facility at Toquepala produces grade A LME electrowon copper cathodes of 99.999% purity from solutions obtained by leaching low-grade ore stored at the Toquepala mine and copper oxides ore at the Cuajone mine. The leach plant commenced operations in 1995 with a design capacity of 35,629 tonnes per year of copper cathodes. In 1999, the capacity was expanded to 56,336 tonnes per year.

This facility processes copper oxides from Cuajone and copper sulfides from Toquepala. Copper oxides from Cuajone with a copper grade higher than 0.268% and acid solubility index higher than 20% are leached. At Toquepala, the copper sulfides cutoff grade is 0.070% and therefore, material with a total copper grade between 0.070% and 0.15% is leached. Copper in solution produced at Cuajone is sent to Toquepala through an eight-inch pipe laid alongside the Cuajone-Toquepala railroad track.

Plant and equipment are supported by a maintenance plan and a quality management system to assure good physical condition and high availability. The SX-EW plant management quality system (including leaching operations) has been audited periodically since 2002 by an external audit company and found to be in compliance with the requirements of ISO 9001-2015, ISO 14001-2015 and ISO 45000-2018 standard.

Overview of Toquepala Pit Depth: The Toquepala pit is approximately 1,005 meters deep, with plans to reach 1,665 meters. This depth increase presents geotechnical challenges, primarily the risk of slope failure.

**Geotechnical Measures from 2007 to 2018:**Preventive actions were taken during 2007-2018 to enhance Toquepala pit slope stability, including installing berms, updating monitoring software, and initiating the "Slope Stability Analysis in Deposits of Waste and Leachable Material" study in 2013.

**Developments in 2019:**External consultants performed an update on slope stability analysis, incorporating the IBIS ArcSAR radar for enhanced monitoring and implementing sub-horizontal drains for pit slope depressurization.

**Studies and Implementations in 2020 and 2021:**In 2020, external consultants conducted stability studies for the Toquepala Pit and various waste deposits, incorporating an IBIS ArcSAR radar with a five-kilometer range into the pit slope monitoring system. Simultaneously, initiatives included establishing a geotechnical drillhole database and implementing the project "Automation and Real-Time Monitoring of geotechnical instrumentation in the Pit and Quebrada Honda Tailings Dam." The installation of three radars for geotechnical monitoring of the Quebrada Honda Tailings Dam was also planned. In 2021, the focus shifted to the "Stability Study of the Quebrada Honda Tailings Dam – Toquepala Mine," accompanied by the installation of the Quebrada Honda Radar System, comprising two IBIS M units and one IBIS FM unit for geotechnical monitoring.

Tierra Group International's Contribution: In 2022, Tierra Group International supported various studies related to seismic hazard, including the "Update of Seismic Hazard Study of Toquepala Mine", "Update of the Material Resistance Parameters of Waste and Leachable Deposits," (geotechnical field investigation), "Update of the Hydrogeological Model of the Leachable Deposits," "Study of Physical Stability of Waste and Leachable Deposits in Current Condition," "Update of the Numerical Hydrogeological Model of Toquepala Mine," and "Study of Anisotropic Physical Stability of Toquepala Mine."

The Inersia company began conducting satellite monitoring and developing moisture maps for the pit, waste and leachable deposits as well as tailings deposits at Quebrada Honda.

In 2023, Geotechnical – Structural logging, geological logging, in situ tests and hydrogeological laboratory and instrumentation for the Geotechnical Drilling and Update of the Peak Particle Velocity Study of Toquepala mine were rolled out. Software 3D modeling was used to implement the Preliminary Blasting Project and Inersia company began conducting satellite monitoring humidity at Suches, Santallana and kilometer 16. In the Quebrada Honda Tailings Dam, Geotechnical Drilling, including SPT tests and installation of geotechnical instrumentation, CPTu and pit testing, and updates on resistance were conducted.

The following table contains the summary of copper and molybdenum mineral resources for Toquepala as of December 31, 2023, based on long-term price assumptions of $3.80 and $11.50 per pound respectively; these prices were fixed over the remaining 49 years of mine life:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Variation
Measured mineral resources​—​—%—%—​—​—%—%—​​
Indicated mineral resources​​​​​​​​​​​​​​​​​
- Sulfides​1,196.7​0.42%88.2%11,182.3​1,584.2​0.43%88.2%15,060.6​(25.8)%
- Leach (low grade sulfides)​1,050.6​0.08%16.1%1,943.3​521.2​0.09%16.1%1,024.8​89.6%
Measured + Indicated mineral resources​2,247.3​0.26%​​13,125.6​2,105.4​0.35%​​16,085.4​(18.4)%
Inferred mineral resources​​​​​​​​​​​​​​​​​​
- Sulfides​2,405.1​0.39%88.2%20,920.9​2,406.7​0.39%88.2%20,939.9​(0.1)%
- Leach (low grade sulfides)​2,303.7​0.08%16.1%4,154.8​2,306.0​0.08%16.1%4,158.9​(0.1)%
Total inferred mineral resources​4,708.9​0.24%​​25,075.7​4,712.7​0.24%​​25,098.8​(0.1)%
​​​​​​​​​​​​​​​​​​​
MolybdenumAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Amount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Variation
Measured mineral resources​—​—%—%—​—​—%—%—​​
Indicated mineral resources1,196.7​0.023%68.1%606.7​1,584.2​0.024%68.1%829.2​(26.8)%
Measured + Indicated mineral resources​1,196.7​0.023%68.1%606.7​1,584.2​0.024%68.1%829.2​(26.8)%
Inferred mineral resources​2,405.1​0.019%68.1%1,009.3​2,406.7​0.019%68.1%1,010.2​(0.1)%
(1)The Variation column refers to metal content variation.
(2)The point of reference for the mineral resources is in place and are current as at December 31, 2023; based on 2022 year-end tonnages, grades and contents adjusted only considering the 2023 depletion. Mineral resources are reported exclusive of mineral reserves. Wood is the third-party firm comprising mining experts responsible for the estimate.
(3)Mineral resources are reported within a conceptual pit shell that uses the following input parameters: metal prices of $3.80/lb Cu and $11.50/lb Mo; average metallurgical recovery of 88.2% for copper and 68.1% for molybdenum from a process plant and 16.1% copper recovery from a heap leach; base mining costs of $1.87/t; mill process operating costs of $7.68/t, leach operating costs of $0.70/t; copper concentrate payable price of $3.37/lb Cu, molybdenum concentrate payable price of $9.72/lb Mo, and leach copper payable price of $3.77/lb Cu. These parameters are based on the 2022 year-end figures.
(4)No estimates for molybdenum are reported for leachable material as this element cannot currently be recovered using the leach process envisaged.
(5)The cut-off grade used for mineral resource estimation for sulfide material was 0.146% Cu. Low-grade sulfide material to be sent to the leach dumps was reported at a cut-off of 0.052 %Cu.
(6)Numbers in the table have been rounded. Totals may not sum due to rounding.
(7)For further information on assumptions used in preparing the estimates and a detailed description of the cut-off grade determination, please refer to Chapter 11 of the Toquepala operations technical report summary prepared by qualified persons, under Exhibit 96.2 to the 2022 Form 10-K.

The following table contains the summary of copper and molybdenum mineral reserves for Toquepala as of December 31, 2023, based on long-term price assumptions of $3.30 and $10.00 per pound, respectively. The metal prices were fixed over the remaining 49 years of mine life:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds) · ​ · Variation
Proven mineral reserves​—​—%—%—​—​—%—%—​​
Probable mineral reserves (mill)2,105.0​0.47%88.2%21,708.4​2,144.6​0.47%88.2%22,157.2​(2.0)%
Probable mineral reserves (dump leach)​2,545.4​0.15%8.0%8,691.7​2,503.3​0.15%8.0%8,668.2​0.3%
Total mineral reserves​4,650.4​0.30%​​30,400.1​4,647.9​0.30%​​30,825.4​(1.4)%
​​​​​​​​​​​​​​​​​​​
MolybdenumAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Amount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)​Variation
Proven mineral reserves​—​—%—%—​—​—%—%—​​
Probable mineral reserves2,105.0​0.021%68.1%996.7​2,144.6​0.021%68.1%1,014.0​(1.7)%
Total mineral reserves​2,105.0​0.021%68.1%996.7​2,144.6​0.021%68.1%1,014.0​(1.7)%
(1)Mineral reserves are current as at December 31, 2023, based on 2022 year-end tonnages, grades and contents adjusted for 2023 mine depletion only. Wood is the third-party firm comprising mining experts responsible for the estimates.
(2)The point of reference for the mineral reserves is the point of delivery to the processing facility.
(3)Numbers in the table have been rounded. Totals may not sum due to rounding.
(4)Only 60% of leachable material will be exposed to irrigation on the leach dumps.
(5)The dump leach material includes leachable ore located in the leach dumps. The copper grade in the dump leach represents the estimated grade of material that has been loaded on the leach dumps and material that has been under leach for a period of time.
(6)Mineral reserves are constrained within a smoothed designed pit based on copper and molybdenum only. The following parameters were used in estimation: assumption of open pit mining methods; assumption of concentration and leaching processes; copper price of $3.30/lb, molybdenum price of $10.00/lb; variable NSR cut-off values of $10.84–$12.64/t-processed for concentration material; a NSR cut-off value of $0.819/t-processed for leaching material; mining recovery of 100%; 6% mining dilution; 22% reduction factor applied to molybdenum grade; variable metallurgical recoveries (average LOM recoveries of 88.2% for copper by concentration, 68.1% for molybdenum by concentration, and 16.1% for copper by leaching excluding leach ore existing in leach dumps, and 8.0% for copper by leaching including leach ore existing in leach dumps); average copper recoveries of 97.4% for smelting and 99.9% for refining; variable mining costs that range from $2.46–$4.26/t-mined; average process costs of $8.384/t-processed for concentration material, and $0.819/t-processed for leaching material; average smelting and refining cost of $0.382/lb Cu; selling costs of $-0.0024/lb Cu for concentration process, $1.679/lb Mo for concentration process, and $-0.009/lb Cu for leaching process; 1% NSR royalty applied to Cu and Mo; and 60% of the leachable material will be leached and processed by the SX/EW plant. These parameters are based on and unchanged from the 2022 year-end figures.
(7)For further information on assumptions used in preparing the estimates and a detailed description of the cut-off grade determinination, please refer to Chapter 12 of the Toquepala operations technical report summary prepared by qualified persons, under Exhibit 96.2 to the 2022 Form 10-K.

Processing Facilities—Ilo

Our Ilo smelter and refinery complex is located in the southern part of Peru, 17 kilometers north of the city of Ilo, 121 kilometers from Toquepala, 147 kilometers from Cuajone and 871 kilometers from the city of Lima. The smelter and refinery are located at about 17° 29.924’S latitude; 71° 21.608’W longitude and 17° 34.728’S latitude; 71° 21.188’W longitude respectively. Access is by plane from Lima to Tacna (1:40 hours) and then by highway to the city of Ilo (2:00 hours). Additionally, we operate a port facility in Ilo, from where we ship our products and receive supplies. Products shipped and supplies received are moved between Toquepala, Cuajone and Ilo on our industrial railroad.

Smelter

Our Ilo smelter produces copper anodes for the refinery we operate as part of the same facility. When the copper produced by the smelter exceeds the refinery’s capacity, the excess is sold to other refineries around the world. In 2007, we completed a major modernization of the smelter. The nominal installed capacity of the smelter is 1,200,000 tonnes of copper concentrate per year. Copper concentrates from Toquepala and Cuajone are transported by railroad to the smelter,

where they are smelted using an ISASMELT furnace, converters and anode furnaces to produce copper anodes with 99.7% copper.

At the smelter, the concentrates are mixed with flux and other material and sent to the ISASMELT furnace producing a mixture of copper matte and slag, which is tapped through a taphole to either of two rotary holding furnaces, where these smelted phases will be separated.

Copper matte contains approximately 63% copper. Copper matte is then sent to the four Pierce Smith converters, where the material is oxidized in two steps: (1) the iron sulfides in the matte are oxidized with oxygen enriched air and silica is added producing slag that is sent to the slag cleaning furnaces, and (2) the copper contained in the matte sulfides is then oxidized to produce blister copper, containing approximately 99.3% copper.

The blister copper is refined in two anode furnaces by oxidation and sulfur is removed with compressed air injected into the bath. Finally, the oxygen content of the molten copper is adjusted by reduction by injecting liquefied petroleum gas with steam into the bath. Anodes, containing approximately 99.7% copper, are cast in two casting wheels. The smelter also can produce blister copper bars, especially when an anode furnace is undergoing general repairs.

The off gases from the smelter are treated to recover over 92% of the incoming sulfur received in the concentrates to produce 98.5% sulfuric acid. The gas stream from the smelter with 11.34% SO 2 is split between two plants: The No. 1 acid plant (double absorption/double contact) and the No. 2 plant (double absorption/double contact). Approximately, 16% of the acid produced is used at our facilities with the balance sold to third parties.

In 2010, the Ilo smelter marine trestle started operations. This facility allows us to offload directly to offshore ships the sulfuric acid produced, avoiding hauling cargo through the city of Ilo. The 500-meter-long marine trestle is the last part of the Ilo smelter modernization project. Currently all overseas shipments of sulfuric acid are being made using the marine trestle.

The smelter also has two oxygen plants. Plant No. 1, which has a production capacity of 272 tonnes per, and Plant No.2, with a capacity of 1,045 tonnes per day.This facility also has auxiliary plants (sea water intake and two desalinization plants).

The table below contains production information for 2023, 2022 and 2021 for our Ilo smelter plant:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance 2023 - · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · 2022 · ​
Smelter202320222021Volume%​
Concentrate smelted(kt)1,292.91,242.01,089.250.94.1%
Average copper recovery(%)97.196.397.40.80.8%
Anode production(kt)362.9350.8309.212.13.4%
Average anode grade(%)99.7899.7899.78——%
Blister productionkt1.92.12.6(0.2)(9.5)%
Average blister grade(%)99.2899.1899.030.100.10%
Sulfuric acid produced(kt)1,286.81,210.21,066.576.66.3%

Refinery

The Ilo refinery consists of a copper electrolytic plant, a precious metal plant and ancillary facilities. The refinery produces grade A copper cathode of 99.998% purity. The plant was acquired in 1994 and modernized the operation to produce 246,000 t/a of copper cathodes. It was subsequently expanded to the current nominal capacity of 294,763 tonnes per year.

In the electrolytic plant, impure copper anodes are suspended in tanks containing a solution of sulfuric acid and copper sulfate. A low voltage but high amperage electrical current is passed through the anodes, chemical solution and cathodes to dissolve copper which is initially deposited on very thin starting copper sheets until thickness is increased to produce

high grade copper cathodes. During this process, silver, gold and other metals, including palladium, platinum and selenium, along with other impurities, settle to the bottom of the tank in the form of anodic slime. This anodic slime is processed in the precious metal plant to produce refined silver, refined gold and commercial grade selenium.

The table below contains production information for 2023, 2022 and 2021 for our Ilo refinery and precious metals plants:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance 2023 - · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · 2022 · ​
Refinery202320222021Volume%​
Cathodes produced(kt)289.7289.7260.2(0.1)(0.0)%
Average copper grade(%)99.99999.99999.999(0.000)—%
Refined silver produced(000 Kg)109.7116.4124.0(6.7)(5.8)%
Refined gold produced(kg)223.1185.8215.837.320.1%
Commercial grade selenium produced(tons)50.056.948.2(6.9)(12.1)%

In addition to the processing facilities, the refinery has a production control section, a laboratory that provides sample analysis throughout the Company, a maintenance department, a desalinization plant and other support facilities.

The industrial railroad’s main equipment includes locomotives of different types and rolling stock with different types of cars and capacities. The track runs in a single 214 kilometer standard gauge line and supports a 30-ton axle load. The total length of the track system is around 257 kilometers including main yards and sidings. The infrastructure includes 27 kilometers of track under tunnels and one concrete bridge. The industrial railroad includes a car repair shop which is responsible for maintaining and repairing the car fleet. Annual transported tonnage is approximately 5.6 million tonnes.

Tia Maria Project

The Tia Maria Project is in the District of Cocachacra, Mejia and Deán Valdivia, Province of Islay, and Arequipa Region. The Project is located 118 km from Moquegua, 125 km from Arequipa, 120 km from the District of Ilo, and 980 km from Lima. The Project centroid is at approximately 17º 00’ 21.06” S and 71º 49’ 44.94” W. The mine gate will be situated at Pampa Cachendo. Mine access will be from the Pan-American Highway, diverting off the highway to the Project access road at km 1027–1028, between Arequipa and Moquegua, approximately 17 km before the town of El Fiscal.

The Project covers an area of 36,604.3 hectares in 55 concessions. We have easement agreements in place that cover the proposed powerline route and the planned water pipeline that will run from the envisaged desalination plant to the mine. Additionally, the project currently holds no water rights and the mine plan assumes that water for process operations will be sourced from a desalination plant. The project envisions a 120,000 ton annual SX-EW plant and the mine plans assume conventional open pit mining methods from the La Tapada and Tia Maria deposits.

The property is currently under the development stage. From 1994 through 1999, prior to involvement by Southern Copper, the Tia Maria Project area was evaluated by Teck Corporation, Phelps Dodge and Rio Tinto. We acquired the project in 2003, and we were granted the construction permit on July 2019. Additionally, on October 2019, the Mining Council of the Peruvian Ministry of Energy and Mines ratified the construction permit for the Tia Maria project. We expect the Peruvian government to acknowledge the significant progress the project has made on the social front and the important contributions that Tia Maria will generate for Peru´s economy and, consequently, take the necessary steps to provide SCC with adequate support to initiate construction.

The La Tapada and Tía Maria deposits are within the northwest–southeast-trending Tambo–El Toro structural corridor that appears to be a large dextral shear zone. There are a number of vein-hosted copper–gold–hematite deposits also

associated with the corridor, outside our mineral tenure package. Alteration within the project area is associated with the two porphyry systems currently outlined. The only known mineralization is derived from oxidation of low-grade porphyry copper systems.

The following table contains the summary of copper mineral resources for the La Tapada and Tia Maria deposits as of December 31, 2023, based on long-term price assumptions of $3.80 per pound, fixed over the 20 year mine life:

​​​​​​​​​
La Tapada · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds)
Measured mineral resources​—​—%—%—
Indicated mineral resources90.4​0.21%69%420.3
Measured + Indicated mineral resources​90.4​0.21%69%420.3
Inferred mineral resources​1.6​0.18%69%6.4
​​​​​​​​​
Tia MariaAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)
Measured mineral resources​—​—%—%—
Indicated mineral resources35.5​0.17%65%135.2
Measured + Indicated mineral resources​35.5​0.17%65%135.2
Inferred mineral resources​21.8​0.22%65%107.8
(1)Mineral resources are reported in situ and are current as at December 31, 2023. Figures have been rounded.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)The cut-off grade used for mineral resource estimation was 0.08% Cu. Mineral resources are constrained within a wireframe constructed at a 0.1% total copper cut-off grade.
(4)Mineral resources are reported within a conceptual pit shell that uses the following input parameters: metal prices of $3.80/lb Cu; metallurgical recovery assumptions of 69% for La Tapada and 65% for Tia Maria; base mining costs of $1.40/t mined and incremental haul costs of $0.017/t mined; process operating costs of $3.78/t processed for La Tapada and $3.61/t processed for Tia María; general and administrative costs of $0.37/t processed; transport and freight costs of $0.04/lb Cu; an assumed copper cathode premium of $0.03/lb Cu, and a royalty payable of 1%. Average pit slope angles were used for the north and south geotechnical zones in each deposit, and ranged from 35º–39º.
(5)No estimates for gold, silver, or molybdenum are reported for leachable material as these elements cannot currently be recovered using the leach process envisaged.
(6)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determinations, please refer to Chapter 11 of the Tia Maria project technical report summary prepared by qualified persons, under Exhibit 96.3 of Form 10-K/A filed on March 7, 2022.
(7)Wood is the third-party firm; its mining experts were responsible for the estimate.
(8)There were no changes with regard to the figures reported in 2021.

The following table contains the summary of copper mineral reserves for the La Tapada and Tia Maria deposits as of December 31, 2023, based on long-term price assumptions of $3.30 per pound, fixed over the estimated 20-year mine life:

​​​​​​​​​
La Tapada · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds)
Proven mineral reserves​—​—%—%—
Probable mineral reserves487.6​0.41%69%4,449.2
Total mineral reserves​487.6​0.41%69%4,449.2
​​​​​​​​​
Tia MariaAmount (million tonnes)GradesMetallurgical recovery​Metal content (million pounds)
Proven mineral reserves​—​—%—%—
Probable mineral reserves223.8​0.29%65%1,412.5
Total mineral reserves​223.8​0.29%65%1,412.5
(1)Mineral reserves are current as at December 31, 2023.
(2)The reference point for the estimate is delivery to the process facility.
(3)Four oxide stockpiles for material grading less than the run-of-mine cut-off but >0.08% Cu are planned, with two stockpile locations at each open pit.
(4)Mineral reserves are constrained within an optimized pit shell that uses the following parameters: assumption of open pit

mining methods; assumption of heap leach processing; copper price of $3.30/lb; copper cut-off grade of 0.10% Cu; mining

recovery of 100%; metallurgical recovery of 69% at La Tapada and 65% at Tía María; total mining costs (base, incremental

and sustaining) of $1.466/t mined; process costs of $3.779/t processed at La Tapada and $3.614/t processed at Tía

María; process sustaining capital costs of $0.155/t processed, general and administrative costs of $0.373/t processed;

transport costs (rail, port, freight) of $0.034/lb Cu; a copper cathode premium payable of $0.026/lb Cu; and assumption of a 1% royalty payment.

(5)For further information on assumptions used in preparing the estimates, including a detailed description on the cut-off determinations, please refer to Chapter 12 of the Tia Maria project technical report summary prepared by qualified persons, under Exhibit 96.3 of Form 10-K/A report filed on March 7, 2022.
(6)Wood is the third-party; its mining experts were responsible for the estimate.
(7)There were no changes with regard to the mineral reserves figures reported in 2021.

Los Chancas Project

The Los Chancas project is located in the Andes Range in southern Peru. The site is approximately 65 km southwest of the city of Abancay in the Department of Apurimac, Peru at coordinates 14° 9.904’S, 73° 6.608’W or UTM 8433300 S, 703,270 E – WGS84. The project site can be accessed using a Highway 1, a paved road, from Lima to Nazca (460 km), from Nazca to Santa Rosa (250 km), using road 30A, and a gravel road from Santa Rosa to the Project site (32 km). Alternatively, access is available from Cuzco, via paved road, to Santa Rosa (170 km), and uses the same gravel road from Santa Rosa to the Project site (32 km). Access within the project area is via gravel roads.

The closest airport is at Cuzco, which is served by daily flights from Lima (approximately one hour flying time). There are a number of port options that may be available to the project for concentrate shipment. These include San Juan de Marcona (approximately 500 km by road), General San Martin at Pisco (about 640–800 km depending on the road route) and Matarani (about 600–750 km depending on the road route).

The project covers 24,200 hectares in 35 concessions. Surface rights are currently being negotiated. The area where surface rights are required is within the Tiaparo and Tapairíhua rural community boundaries. Additionally, we hold two water rights that cover water from four spring sources.

The property is currently under the exploration stage. We commenced exploration in the Los Chancas area in 1997. The initial Environmental Assessment of the Los Chancas Project was conducted in 2001 and updated in 2008. A semi-detailed environmental impact assessment was completed in 2010. Additionally, we completed baseline studies from 2012 through 2020 and have community initiatives in place in the project area of influence. In 2023 we continued to roll out social and environmental improvement efforts in local communities. In 2024, we expect to restart the environmental impact assessment; conduct a diamond drilling campaign for 40,000 meters; and initiate hydrogeological and geotechnical studies to gather additional information on the characteristics of the Los Chancas deposit. Los Chancas envisions an open-pit mine with a combined operation of concentrator and SX-EW processes.

The Los Chancas deposit is considered to be an example of a porphyry copper–molybdenum deposit. The deposit is about 1,200 m in diameter, extends for at least 1,000 m at depth, and most drill holes bottom in mineralization. The deposit remains open to the southeast and at depth. Sedimentary rocks of the Jurassic–Cretaceous Ferrobamba, Mara, Soraya, and Chuquibambilla Formations form a north-facing anticline that is eroded along the axial plane. The sediments were intruded by three generations of monzonite intrusion.

Mineralization is hosted by quartz monzonite and surrounding quartzite and siltstone country rocks. Sulfide mineralization consists of hypogene chalcopyrite, bornite, molybdenite, and pyrite. Sulfides are hosted in quartz veins, occur as small sulfide streaks/veins, or form disseminations in the intrusive and sedimentary rocks. This primary

mineralization was oxidized and leached, and a zone of supergene enrichment developed. The major area of leaching is to the east, and vertically above, the primary mineralized zone. The oxide zone is sub-parallel to topography. Brochantite and chrysocolla are the dominant copper oxide minerals, with subordinate azurite and malachite. Sulfide minerals within the supergene enrichment zone include chalcocite, covellite, digenite, cuprite, and native copper. Copper oxides are also present as a minor constituent.

The following table contains the summary of copper mineral resources for Los Chancas as of December 31, 2023, based on long-term price assumptions of $3.80 per pound, fixed over the long-term period of time that mineral resources are expected to be produced:

​​​​​​​​​
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds)
Measured mineral resources​—​—%—%—
Oxide​98​0.45​​​975.2
Sulfide​52​0.59​​​672.8
Indicated mineral resources150​0.50%82-84%1,648
Measured + Indicated mineral resources​150​0.50%82-84%1,648
Oxide​33​0.38​​​277.4
Sulfide​1,400​0.45​​​13,887.6
Inferred mineral resources​1,433​0.45%82-84%14,165
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported within a conceptual pit shell that uses the following input parameters: metal prices of $3.80/lb Cu; metallurgical recoveries from copper leaching of 81.8% and from copper milling of 84.3%; base mining costs of $1.70/t; sustaining capital costs of $0.25/t processed; heap leach and electrowinning process operating costs of $4.29/t, mill process operating costs of $5.82/t, general and administrative costs of $1.06/t processed; and closure costs of $0.51/t processed. The marginal net smelter return cut-off values were $6.11/t for material amenable to heap leach methods and $7.64/t for material amenable to milling and flotation concentration.
(3)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Los Chancas project technical report summary prepared by qualified persons, under Exhibit 96.4 of Form 10-K/A filed by the Company on March 7, 2022.
(4)Wood is the third-party; its mining experts were responsible for the estimate.
(5)There were no changes with regard to the mineral resource figures reported in 2021.

Michiquillay Project

The Michiquillay project is located in the Western Cordillera of the Andes in northwest Peru, approximately 45 km from Cajamarca and 900 km northeast of Lima. Project centroid coordinates are approximately 7º 02’ 23.65” S and 78º 19’ 23.59” W. The Michiquillay deposit is located at 7º 02’ 17.53” S and 78º 19’ 29.30” W. The datum used is UTM WGS84. The main access route to the Project is via road from Cajamarca. Initially, the paved Route 8B is used from Cajamarca to the town of La Encañada, a distance of approximately 33 km. A gravel road is then used from La Encañada to the project site, approximately 14 km. The communities of Michiquillay and Encañada are 2 km and 14 km from the project, respectively. Access within the project is via various gravel and two-track roads that link areas where drilling is planned. The closest airport is at Cajamarca, which is serviced by regular flights from Lima.

The Michiquillay Project consists of 18 mining concessions with a total area of 4,051.4 hectares. The Michiquillay deposit is located on lands of the Michiquillay Rural Community and the Encañada Rural Community. We have signed surface land use agreements with both communities which allow us to conduct exploration activities. Permits for the use of water for exploration purposes are currently being processed by the National Water Authority and the Marañon Local Authority.

The property is currently under the exploration stage. Previous work in the project was conducted by Northern Peru Mining Company, American Smelting and Refining Company, later Asarco LLC, Minero Peru S.A., and various Anglo

American subsidiaries. In June 2018, Southern Copper purchased the project from Activos Mineros S.A.C. for a total purchase price of $400 million and made an initial payment of $12.5 million. In June 2021, we paid an additional $12.5 million to acquire the project. The remaining balance of $375 million will be paid if we decide to develop the project. In 2021, we signed Social Agreements with the Michiquillay and La Encañada communities. Additionally, on October 1, 2021 the Peruvian Ministry of Energy and Mines approved the semi-detailed Environmental Impact Study for the project. In the fourth quarter of 2022, the Company informed MINEM that it had begun exploration activities and initiated an assessment of existing mineral resources at depth. In 2022, we drilled 1,585 meters. As of December 31, 2023, we had drilled 63,000 meters and obtained 20,137 core samples for chemichal analysis. Geological modeling, cross section interpretation, and drilling logging are currently underway. For 2024, the Company expects to complete the diamond drilling program; geological modeling; and resource evaluation. We will also begin hydrogeological and geotechnical studies and assess the results of metallurgical testing at the deposit.

The Michiquillay deposit is considered to be an example of a porphyry copper–molybdenum–gold deposit. The project is located within a northwest–southeast-oriented metallogenetic corridor of the Andes, that hosts several porphyry copper deposits in the Cajamarca region. Those deposits are characterized by calc-alkaline magmatic rocks covered by folded and faulted sedimentary formations. Mineralization is zoned vertically due to oxidation and remobilization of copper by supergene processes.

The porphyry mineralization and the porphyritic intrusion at Michiquillay appear to be related to, and controlled by, a regional-scale strike change on a series of pre-mineral west–northwest to northwest striking brittle–ductile fault zones. The porphyry intrusions appear to be controlled by intense, concentrated extension on releasing bends, splays, overlaps in dextral fault segments and on the margins of brittle fault zones with development of multiple extensional phases in stockworks, synthetic/antithetic extensional faults and extensional duplexes.

The following table contains the summary of copper mineral resources for Michiquillay as of December 31, 2023, based on long-term price assumptions of $3.80 per pound, fixed over long-term period that would be expected to be required to produce the mineral resources:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Copper · Amount (million tonnes) · Grades · Metallurgical recovery · ​ · Metal content (million pounds)
Measured mineral resources​—​—%—%—
Indicated mineral resources—​—%—%—
Measured + Indicated mineral resources​—​—%—%—
Inferred mineral resources​2,288.0​0.43%85%21,554.8
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported within a conceptual pit shell that uses the following input parameters: metal prices of $3.80/lb Cu; copper metallurgical recovery assumptions of 85.4%; base mining costs of $1.70/t; mill process operating costs of $5.82/t, general and administrative costs of $1.12/t; variable pit slope angles that vary from 34–38º; 3% NSR royalty payable to Activos Mineros Mineral resources are reported above a cut-off grade of 0.1% Cu.
(3)Wood chose a cut-off grade of 0.1% Cu to report mineral resource estimates as based on the above assumptions it provides reasonable prospects of economic extraction.
(4)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Michiquillay project technical report summary prepared by qualified persons, under Exhibit 96.5 of Form 10-K/A filed by the Company on March 7, 2022.
(5)Wood is the third-party; its mining experts were responsible for the estimate.
(6)There were no changes with regard to the mineral resource figures reported in 2021.

MEXICAN OPERATIONS

The map below indicates the approximate locations of our Mexican mines and processing facilities:

MEXICAN OPEN-PIT SEGMENT

Our Mexican open-pit segment operations combine two units of Minera Mexico, La Caridad and Buenavista, which include La Caridad and Buenavista mine complexes and smelting and refining plants and support facilities, which service both complexes.

The map below indicates the approximate location of, and access to, our Mexican open-pit mine complexes and our processing facilities:

We have ongoing maintenance and improvement programs to ensure the satisfactory performance of our equipment. We believe all our Mexican open-pit segment equipment is in good physical condition and suitable for our operations.

Buenavista

The Buenavista mining unit operates an open-pit porphyry copper mine, two concentrators and three SX-EW plants. It is located within the Cananea mining district in the north-central part of the State of Sonora, Mexico. The property is located about 222 kilometers northeast of the city of Hermosillo, Sonora and 150 kilometers southeast of the city of Tucson, Arizona. The geographical location of the Cananea mining district is between latitudes 30° 42’ and 31° 16’ north, and longitude meridians 109° 51’ and 110° 33’ west. The Cananea mining district is located at an altitude between 1,600 and 2,485 meters (m) above mean sea level. The property covers an area of 89,220.5 hectares of mining concessions. The elevation of the mine is of the order of 1,604 meters above mean sea level.

The Buenavista del Cobre (“BVC”) deposit contains two pit areas, namely BVC and Buenavista Zinc (“BVZ”). The BVZ pit area lies within the largest BVC pit. Buenavista is connected by paved highways to the border city of Agua Prieta to the northeast, to the town of Nacozari in the southeast and to the town of Imuris to the west. Buenavista is also connected by railway to Agua Prieta and Nogales. A municipal airport is located approximately 20 kilometers to the northeast of Buenavista. All required fixed and permanent infrastructure of power, pipelines and primary roadways, and Project access are established. Drainage, water controls and mine access roads are established for current operations and will be expanded and continued as the pit progresses through its planned life of operations.

In 2016 we concluded our $3.5 billion investment program in Mexico. The program included a third SX-EW plant, which was completed in June 2014 with a rated annual capacity of 120,000 tonnes of copper and a new concentrator, completed in 2015, with an annual copper production capacity of 188,000 tonnes. The program also included two molybdenum plants with a combined annual capacity of 4,600 tonnes. The first plant was completed in 2013 and the second in 2016. Additionally, the program included the Crushing, Conveying and Spreading System for Leachable Ore (Quebalix IV), which was completed on time and under budget and is currently operating steadily. This project will reduce mining costs and increase SX-EW copper recovery, allowing the Buenavista unit to reach its copper production capacity of 500,000 tonnes.

The original concentrator currently has a nominal milling capacity of 82,000 tonnes per day. The second concentrator began operations in 2016 and currently has a nominal milling capacity of 115,000 tonnes per day. The SX-EW facilities have a cathode production capacity of 174,470 tonnes per year. The Buenavista ore body is considered one of the world’s largest porphyry copper deposits. Buenavista is the oldest continuously operated copper mine in North America, with operations dating back to 1899. High grade ore deposits in the district were mined exclusively using underground methods. The Anaconda Company acquired the property in 1917. In the early 1940s, Anaconda started developing the first open-pit in Buenavista. In 1990, through a public auction procedure, Minera Mexico acquired 100% of the Buenavista mining assets for $475 million. Buenavista is currently applying conventional open-pit mining methods to extract copper ore for further processing in the concentrator. Additionally, we have built a new zinc concentrator plant, which will increase milling capacity and will allow us to recover zinc, along with copper contents. Ramping up of the plant began in the first quarter of 2024 after technical adjustments to the concentrator.

The following table contains production information for 2023, 2022 and 2021 for Buenavista:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​​​​​​​​​​2023 - 2022
​​​​​​​​​​Variance
​​202320222021Volume%
Mine annual operating days365365365​
Mine:​​​​
Total ore mined(kt)72,89674,18074,234(1,284)(1.7)%
Copper grade(%)0.5250.5280.527(0.003)(0.6)%
Leach material mined(kt)121,124122,630139,070(1,506)(1.2)%
Leach material grade(%)0.2230.210.1960.0136.2%
Stripping ratio(x)0.660.720.52(0.06)(8.3)%
Total material mined(kt)322,142337,727324,860(15,585)(4.6)%
Concentrator:​​​​​​
Total material milled(kt)72,60974,12174,302(1,512)(2.0)%
Copper recovery(%)86.3686.5787.18(0.21)(0.2)%
Copper concentrate(kt)1,455.61,482.31,464.9(26.7)(1.8)%
Copper in concentrate(kt)329.0339.0341.0(10.0)(2.9)%
Copper concentrate average grade(%)22.6022.8723.28(0.3)(1.2)%
SX‑EW plant​​​​​​
Estimated leach recovery(%)70.0067.0065.003.004.5%
SX‑EW cathode production(kt)87.693.381.8(5.7)(6.1)%
Molybdenum​​​​​​
Molybdenum grade(%)0.0110.010.010.00110.0%
Molybdenum recovery(%)70.8470.4668.970.380.5%
Molybdenum concentrate(kt)10.4910.4810.210.010.1%
Molybdenum concentrate average grade(%)51.5751.2451.220.330.6%
Molybdenum in concentrate(kt)5.415.375.230.040.7%

x = Stripping ratio obtained dividing waste by leachable material plus ore mined.

The copper and molybdenum grade are total grade.

The Cananea mining district lies within the eastern section of the Sonora Basin and Range Province of northern Mexico. Sustained magmatic activity along the North American Cordillera during the late Mesozoic through Paleogene resulted in the development of numerous porphyry copper deposits. The Precambrian Cananea basement rocks are overlain by several Paleozoic sedimentary units ranging from the Cambrian Capote Quartzite through thick limestone sequence of Upper Paleozoic age. Overlying the Paleozoic sediments and Precambrian granite of Cananea are the Henrietta and Elenita formations which are Triassic to late Jurassic in age and are comprised of volcanic rocks of latite to andesite composition. The youngest volcanic units in the district are andesitic tuffs and rhyolites of the Mesa formation.

The intrusions of diorite, granodiorite and quartz monzonite formed after the emplacement of the Mesa Formation. In the final stage of intrusive activity, diabase dikes intruded faults and fractures with a NW-SE trend. Pipe-like breccias formed as late-stage products of the quartz-monzonite porphyries. During the Cenozoic, alluvian and fluvial sediments were deposited as erosion of the Cananea Mountains occurred. Exhumation of the upper part of the Cananea minig district porphyry system resulted in the formation of a supergene enrichment and an oxidation overburden overlying the porphyry system.

Buenavista uses state-of-the-art computer monitoring systems at the concentrators, the crushing plant and the flotation circuit in order to coordinate inflows and optimize operations. In the original concentrator, material with a copper grade above a cut-off grade of approximately 0.30% is currently loaded onto trucks and sent to the milling circuit, where giant rotating crushers reduce the size of the ore to approximately one-half of an inch. The ore is then sent to the ball mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. Recovered copper, with the consistency of froth, is filtered and dried to produce copper concentrates with an average copper content of approximately 24%. Concentrates are then shipped by rail to the smelter at La Caridad.

In the second concentrator, material with a copper grade above a cut-off grade of aprroximately 0.30% is sent to a three-phase milling circuit, where the ore size is reduced to approximately one-half inch. The ore is then sent to a circuit of six ball mills, which grind it to the consistency of fine powder. The finely ground powder is agitated in a water and reagents solution and is then transported to flotation cells. Air is pumped into the cells producing a froth, which carries the copper mineral to the surface but not the waste rock, or tailings. Recovered copper, with the consistency of froth, is filtered and dried to produce copper concentrates with an average copper content of approximately 24%. Concentrates are then sent by trucks or by railroad to the La Caridad smelter or to the Guaymas port, at Sonora, for export.

The current cut-off grade assumptions used on site for both concentrator 1 and 2 and material assigned for leach is recommended to be reassessed. The mineral reserves reported for Buenavista have been estimated by determining economic value of each block containing mineral resource. This takes into account the potential revenue of the block whether it is processed in a concentrator or on the leach pad along with the downstream selling costs. The approximate cut-off grade for the concentrators is estimated to be 0.11% copper and the approximate cut-off grade for the leachable material is estimated to be 0.05% copper. The approximate cut-off grade for the zinc concentrator (once it has been constructed) was estimated to be 0.22% copper equivalent.

As part of the expansion program for this unit, in 2013 we completed the construction of the first molybdenum plant with an annual production capacity of 2,000 tonnes of molybdenum contained in concentrate. The plant was designed to process 1,500 tonnes of copper-molybdenum concentrates per day with a content recovery of approximately 80% copper and 50% molybdenum. The molybdenum plant consists of thickeners, homogenizer tanks, flotation cells, column cells and a holo-flite dryer. The second molybdenum plant was designed to process 3,040 tonnes of copper-molybdenum concentrates per day for a content recovery between 80% and 87% for copper and 60% for molybdenum. The plant generated its first production lot in July 2016 and fully initiated operations in November 2016.

The Buenavista unit operates a leaching facility and three SX-EW plants. All copper ore with a grade lower than the mill cut-off grade of 0.30%, but higher than 0.15%, is delivered to the leach dumps. A cycle of leaching and resting occurs for approximately five years in the run-of-mine dumps and three years for the crushed leach material. A review of the cut-off grades based on economics is recommended to be reassessed as described above.

There are three irrigation systems for the dumps and eleven dams for the pregnant leach solution (PLS). Plant I has four solvent extraction tanks with a nominal capacity of 18,000 liters per minute of PLS and 54 electrowinning cells and has a daily production capacity of 30 tonnes of copper cathodes with 99.999% purity. Plant II has five trains of solvent extraction with a nominal capacity of 62,000 liters per minute of PLS and 220 cells distributed in two bays and has a daily production capacity of 120 tonnes of copper cathodes with 99.9% purity. Plant III has three trains of solvent extraction with a nominal capacity of 167,100 liters per minute of PLS and 270 cells distributed in two bays and has a daily production capacity of 328 tonnes of copper cathodes with 99.9% purity. The plant produces copper cathodes of LME grade A.

At the Buenavista mine, we are following the recommendations produced by a geotechnical evaluation of the design slope for the 15-year pit plan. This evaluation was prepared by an independent mine consulting firm. The assessment included the determination of optimum pit slope design angles and bench design parameters for the proposed mine plan. The objective of the study was: (1) to determine optimum inter-ramp slope angles and bench design parameters for the 15-year plan and (2) to identify and analyze any potential major instability that could adversely impact mine operation. In 2012, we installed a radar system to monitor the walls of the mine.

The following recommendations were made for the Buenavista mine: inter-ramp slope design angles for the 15-year pit plan for all of the 21 design sectors defined on a rock-fabric-based catch bench analysis, using double bench, can range from 48° and 55°, and the inter-ramp slope angles are based on geometries obtained from the back-break analysis using 80% reliability of achieving the required 7.6 meter catch bench width for a single bench configuration and 10.6 meter catch bench width for a double bench configuration. Preliminary observations suggest the 15-year pit walls may be relatively free-draining; the back-break analysis assumed depressurized conditions of mine benches, and the inter-ramp stability analysis were performed for both saturated and depressurized conditions.

A pit dewatering/depressurization plan for the Buenavista mine was also recommended to address the issues of open-pit drainage, dewatering plan and future slope depressurization. Phase I of the geohydrological study was completed by an independent consultant. The analysis included a preliminary assessment and work plan implementation.

Between 2011 and 2014, we conducted well drilling and dewatering programs to ensure the ability to continue with the mining plan. We also executed a geophysical study to determine the best locations for water extraction wells and continued collecting new geotechnical information from two exploration drilling projects. Following the recommendations of the geotechnical evaluation, we continued monitoring the walls using the radar system.

Various studies are now being conducted by outside specialized consultants to establish long-range mine water management objectives and implement recommendations for the efficient use of this resource. We are also conducting a geotechnical study and a diamond drilling program with an independent consulting firm in order to obtain additional geotechnical information, which will allow us to verify the slope stability for the long-term mine plan. In addition, slope monitoring continues with the SSR 160 radar.

In July 2020, the OMNI 505 radar began operating. As such, we currently have two working radars, which allow us to cover 95% of the slopes in the operating areas of the mine. In 2021, we acquired two pieces of equipment for additional monitoring and began developing a geotechnical study for the mine with the support of a specialized consulting firm. The results of the study concluded in 2022 and included recommendations for updates to the bench design which have not been incorporated in the current estimation of Mineral Reserves. These recommendations should be reviewed for potential updates to the ultimate pit design.

During 2022, we continued with the diamond exploration and reverse circulation programs for the quantification and certification of resources and reserves, considering the limits of the final slope design (LOM). During this period, a total of 24,865 linear meters were developed distributed in a total of 35 diamond exploration holes. 8,105 tested samples for 18 chemical elements were generated and 1,425 samples related to QA/QC analysis (control samples) were included. We also drilled 4,332 meters of exploration with reverse circulation that were distributed into 45 holes for short-term planning. All exploration information contains lithological descriptions, geomechanical data, QA/QC data, orientations, densities and final coordinates.

In 2023, we continued to roll out diamond exploration and reverse circulation programs for the quantification and certification of resources and reserves, considering the limits of the updated final slope design. Over the year, a total of 33,810 linear meters were developed distributed in a total of 47 diamond exploration holes. 11,098 tested samples for 18 chemical elements were generated and a total of 2,090 samples related to QA/QC analysis (control samples) were included. In the short-term exploration segment, we drilled 7,606 meters of exploration with reverse circulation distributed in 64 holes. All the exploration information contains lithological descriptions, geomechanical data, QA/QC data, orientations, densities and final coordinates.

The following table contains the summary of copper, molybdenum and zinc mineral resources exclusive of mineral reserves for Buenavista as of December 31, 2023, based on long-term price assumptions of $3.80, $11.50 and $1.32 per pound, respectively:

​​​​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023
Copper plant · Amount (million tonnes) · Copper grades · ​ · Molybdenum grades · ​ · Zinc grades · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Contained zinc (million pounds) · ​ · Variation Copper · ​ · Variation Molybdenum · ​ · Variation Zinc
Measured mineral resources​—​—%​—%—%—​—​—​—​—​—
Indicated mineral resources764​0.34%​0.005%0.07%5,664​89​1,182​0.0%​1.1%​0.0%
Measured + Indicated mineral resources​764​0.34%​0.005%0.07%5,664​89​1,182​0.0%​1.1%​0.0%
Inferred mineral resources​13,015​0.21%​0.004%0.03%56,584​1,080​8,089​0.0%​0.0%​0.0%
​​​​​​​​​​​​​​​​​​​​​​
Zinc plantAmount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Measured mineral resources​—​—%​—%—%—​—​—​—​—​—
Indicated mineral resources148​0.46%​0.002%0.78%1,562​5​2,416​0.1%​22.7%​0.0%
Measured + Indicated mineral resources​148​0.46%​0.002%0.78%1,562​5​2,416​0.1%​22.7%​0.0%
Inferred mineral resources​143​0.43%​0.003%0.49%1,394​7​1,638​0.1%​0.0%​0.0%
​​​​​​​​​​​​​​​​​​​​​​
Leach plantAmount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Measured mineral resources​—​—​—%—%—​—​—​—​—​—
Indicated mineral resources77​0.13%​—%—%196​—​—​0.0%​—​—
Measured + Indicated mineral resources​77​0.13%​—%—%196​—​—​0.0%​—​—
Inferred mineral resources​2,831​0.14%​—%—%8,518​—​—​(0.2)%​—​—
​​​​​​​​​​​​​​​​​​​​​​
​​2022
Copper plant​Amount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Measured mineral resources​—​—%​—%—%—​—​—​​​​​​
Indicated mineral resources​764​0.34%​0.005%0.07%5,664​88​1,182​​​​​​
Measured + Indicated mineral resources​764​0.34%​0.005%0.07%5,664​88​1,182​​​​​​
Inferred mineral resources​13,015​0.21%​0.004%0.03%56,584​1,080​8,089​​​​​​
​​​​​​​​​​​​​​​​​​​​​​
Zinc plant​Amount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Measured mineral resources​—​—%​—%—%—​—​—​​​​​​
Indicated mineral resources​148​0.46%​0.002%0.78%1,561​4​2,416​​​​​​
Measured + Indicated mineral resources​148​0.46%​0.002%0.78%1,561​4​2,416​​​​​​
Inferred mineral resources​143​0.43%​0.003%0.49%1,393​7​1,638​​​​​​
​​​​​​​​​​​​​​​​​​​​​​
Leach plant​Amount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Measured mineral resources​—​—​—%—%—​—​—​​​​​​
Indicated mineral resources​77​0.13%​—%—%196​—​—​​​​​​
Measured + Indicated mineral resources​77​0.13%​—%—%196​—​—​​​​​​
Inferred mineral resources​2,838​0.14%​—%—%8,538​—​—​​​​​​
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Mineral recovery was based on historical 3-year averages for mill: 86.5% for Cu, 64% for Mo and 68% for Zn and for Leach (combined ROM and crushed leach): Cu 31.5%.
(4)Cut-off grade: mineral resources are reported on break-even plant and leach profit basis. The estimate was constrained to the Resource pit based on a Cu price of $3.795/lb, Mo price of $11.50/lb and Zn price of $1.323/lb.
(5)It was assumed that ore with solubility index greater than 0.8 had been sent to the leach pad. If more than one process was profitable, then the process with the highest value was chosen.
(6)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Buenavista del Cobre technical report summary prepared by qualified persons, under Exhibit 96.6 to the 2022 Form 10-K.

The variations registered for mineral resources from 2022 to 2023 were attributable to:

-Production depletion for 2023.
-Updated end-of-year topography surfaces for 2022 and 2023 and rounding.

The following table contains the summary of copper, molybdenum and zinc mineral reserves for Buenavista as of December 31, 2023, based on long-term price assumptions of $3.30, $10.00 and $1.15 per pound, respectively:

​​​​​​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023
Probable mineral reserves · Amount (million tonnes) · Copper grades · ​ · Molybdenum grades · ​ · Zinc grades · ​ · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Contained zinc (million pounds) · ​ · Variation Copper · ​ · Variation Molybdenum · ​ · Variation Zinc
Sulfide ROM Ore - Copper plant​1,961​0.41%​0.007%​—%​17,861​319​—​(3.6)%​(4.2)%​0.0%
Sulfide ROM Ore - Zinc plant91​0.40%​—%​1.42%​809​—​2,852​(1.8)%​0.0%​(5.5)%
Sulfide ROM Ore - Total​2,052​0.41%​—%​—%​18,670​319​2,852​(3.5)%​(4.2)%​(5.5)%
Leachable Ore​1,033​0.22%​—%​—%​4,948​—​—​(9.3)%​0.0%​0.0%
​​​​​​​​​​​​​​​​​​​​​​​​
​​2022
Probable mineral reserves​Amount (million tonnes)Copper grades​Molybdenum grades​Zinc grades​​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained zinc (million pounds)​​​​​​
Sulfide ROM Ore - Copper plant​2,020​0.42%​0.007%​—%​18,529​333​—​​​​​​
Sulfide ROM Ore - Zinc plant​96​0.39%​—%​1.43%​824​—​3,018​​​​​​
Sulfide ROM Ore - Total​2,116​0.41%​—%​—%​19,353​333​3,018​​​​​​
Leachable Ore​1,132​0.22%​—%​—%​5,456​—​—​​​​​​
(1)Mineral reserves are current as at December 31, 2023.
(2)The reference point for the estimate is delivery to the process plant.
(3)Contained metal in mineral reserves in 2023 decreased slightly compared to 2022 due to mining depletion for the year 2023.
(4)Mineral reserves are reported on an elevated cut of grade for the first three years of the mine schedule and then on a break-even plant and leach profit basis for the remaining LOM schedule. The estimate was based on the long- range schedule, inclusive of processing costs and transport streams and based on a Cu price of $3.30/lb, Mo price of $10.00/lb and Zn price of $1.15/lb.
(5)It was assumed that ore with a solubility index greater than 0.8 had been sent to the leach pad. If more than one process was profitable, then the process with the highest value was chosen.
(6)The Copper mill Cu Cut-off grade was 0.30% (2023 – 2025), 0.25% (2026), 0.20% (2027) and 0.12% (2028+), the leach Cu equivalent Cut-off Grade at 0.06% Cu and the Zinc mill Cu equivalent Cut-off grade at 0.22%.
(7)Mineral recovery is estimated as the last 3-year averages for mill: 86.5% for Cu, 64% for Mo and 68% for Zn and for leach (combined ROM and crushed): 31.5% for Cu.
(8)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 12 of the Buenavista operations technical report summary prepared by qualified persons, under Exhibit 96.6 to the 2022 Form 10-K.

The variations registered for mineral reserves from 2022 to 2023 were attributable to mining depletion as per mine operations during year 2023 and updated end-of-year topography surfaces provided for 2022 and 2023 and rounding.

La Caridad

The La Caridad complex includes an open-pit mine, concentrator, smelter, copper refinery, precious metals refinery, rod plant, SX-EW plant, lime plant and two sulfuric acid plants.

La Caridad mine and mill are located about 23 kilometers southeast of the town of Nacozari in northeastern Sonora at an average altitude of 1,500 meters above mean sea level. Nacozari is about 266 kilometers northeast of the Sonora state capital of Hermosillo and 125 kilometers south of the U.S.—Mexico border. The municipality of Nacozari de Garcia is located between 30°17’ and 30°20’ of north latitude and 109°32’ and 109 35’ of west longitude with regard to the Greenwich meridian. The average elevation is 1,500 meters above mean sea level. Limits of the mining unit using UTM coordinates are listed in the following table:

​ · ​
VERTEX · UTM Zone 12 WGS 84
​ · ​ · Easting · Northing
1​629,600.00​3,361,303.35
2​655,325.58​3,361,303.35
3​655,325.58​3,350,065.74
4​629,600.00​3,350,065.74

Nacozari is connected by paved highway with Hermosillo and Agua Prieta and by rail with the international port of Guaymas, and the Mexican and United States rail systems. An airstrip with a reported runway length of 2,500 meters is located 36 kilometers north of Nacozari, less than one kilometer away from the La Caridad copper smelter and refinery. The smelter and the sulfuric acid plants, as well as the refineries and rod plant, are located approximately 24 kilometers from the mine. Access is by paved highway and by railroad.

The mining claims held by La Caridad unit cover an area of about 103,821 hectares for exploration and exploitation activities. Surface rights are held by a combination of private ownership and agreements with local ejidos. Ejidos are agrarian land grants held by a group of people. The agreements allow for exploration and mining activities. The La Caridad complex imports natural gas from the United States through its pipeline (between Douglas, Arizona and Nacozari, Sonora). The electrical power is supplied to site from the utility grid via 230 kV overhead transmission lines. The bulk of demand is supplied by MGE, a subsidiary of Grupo Mexico. The primary fresh water source is the La Angostura Dam located approximately 29 km to the northeast of the La Caridad mine.

The ore at La Caridad is recovered using open-pit conventional truck and shovel mining methods due to the proximity of the ore to the surface and the physical characteristics of the deposit. The concentrator began operations in 1979; the molybdenum plant was added in 1982 and the smelter in 1986; the first sulfuric acid plant was added in 1988 and the SX-EW plant in 1995; the second sulfuric acid plant was added in 1997 and the copper refinery in 1997; the rod plant was added in 1998 and the precious metals refinery in 1999; and the dust and effluents plant was incorporated in 2012.

In 2020, the final ore reserve estimation report for the Bella Union prospect was integrated into the La Caridad Block Model and in 2021 it was considered in the new life of mine that was delivered in January 2022. The Bella Union prospect is a mineralized copper and molybdenum breccia deposit; the site is located at less than one kilometer from the border of La Caridad pit.

The table below contains production information for 2023, 2022 and 2021 for La Caridad:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance
​​​​​​​​​​2023 - 2022
​​202320222021Volume%
Mine annual operating days365365365​
Mine​​​​
Total ore mined(kt)34,88634,09934,876787.02.3%
Copper grade(%)0.2960.3030.340(0.007)(2.3)%
Leach material mined(kt)15,09930,11335,230(15,014.0)(49.9)%
Leach material grade(%)0.2500.2010.2120.04924.4%
Stripping ratio(x)1.480.650.430.83127.7%
Total material mined(kt)124,090106,251100,41217,839.016.8%
Concentrator​​​​​​
Total material milled(kt)35,12834,11434,9291,014.03.0%
Copper recovery(%)84.4585.7186.44(1.26)(1.5)%
Copper concentrate(kt)387.2385.3456.81.90.5%
Copper in concentrate(kt)87.888.5102.7(0.7)(0.8)%
Copper concentrate average grade(%)22.6822.9722.48(0.29)(1.3)%
SX‑EW plant​​​​​​
Estimated leach recovery(%)34.9734.4638.110.511.5%
SX‑EW cathode production(kt)22.9923.3425.38(0.35)(1.5)%
Molybdenum​​​​​​
Molybdenum grade(%)0.0390.0340.0350.00514.7%
Molybdenum recovery(%)82.7181.6782.441.041.3%
Molybdenum concentrate(kt)2117.818.93.218.0%
Molybdenum concentrate average grade(%)54.1553.5853.920.571.1%
Molybdenum in concentrate(kt)11.49.610.21.818.8%

x = Stripping ratio obtained dividing waste by leachable material plus ore mined

The copper and molybdenum grade are total grade.

La Caridad is a porphyry copper deposit, that is currently the largest copper producer in Mexico and the youngest dated porphyry copper system in the American Southwest region. The La Caridad district lies within the eastern section of the Sonora Basin and Range Province of northern Mexico. Sustained magmatic activity along the North American Cordillera during the late Mesozoic through Paleogene resulted in the development of numerous porphyry copper deposits. The basement rocks of area consist of strongly deformed greenschist-grade volcanic and sedimentary rocks that are intruded by granites emplaced at 1.4 and 1.1 billion years ago. Above the sequence Late Proterozoic and Paelozoic rocks are overlain by volcanic and plutonic rocks of Mesozoic and Cenozoic age. Middle Jurassic rocks characterized by volcanic and volcano-sedimentary sequences, with occasional granite intrusions, outcrop in the northern and northeastern portion of Sonora. In the La Caridad district, these rocks outcrop in the Sierra Cobriza area, west of the town of Nacozari.

The main mineralization at La Caridad occurs in the Quartz-monzonite porphyry and hydrothermal breccias. The host rock at La Caridad are andesites, with the oldest rocks corresponding to the Laramide volcanic rocks, which are regionally correlated with the Tarahumara Formation. Locally, this andesitic volcanic sequence was intruded by a granodiorite which is well exposed to the east-southeast of the La Caridad mine, which are in turn intruded by diorite dikes that range from fine to coarse grain. Discordantly overlying this igneous complex is a sequence of rhyolitic flows.

La Caridad uses state-of-the-art computer monitoring systems at the concentrator, the crushing plant and the flotation circuit to coordinate inflows and optimize operations. The concentrator has a current capacity of 94,500 tonnes of ore per day.

Ore extracted from the mine with a copper grade over 0.30% is currently sent to the concentrator and processed into copper concentrates and molybdenum concentrates. The copper concentrates are sent to the smelter and the molybdenum concentrate is sold to a Mexican customer. The molybdenum recovery plant has a capacity of 2,000 tonnes per day of copper-molybdenum concentrates. The lime plant has a capacity of 340 tonnes of finished product per day.

The mineral reserves estimated for La Caridad were estimated utilizing an economic cut-off to assign material to either the concentrator or leach pad. Each block in the mineral resource model is assigned an economic value based on the total potential revenue whether the block is processed in the concentrator or on a leach pad and takes into account the various recoveries, selling costs, and payability. The resulting cut-off grade for the concentrator is approximately 0.08% copper and the leachable cutoff grade is approximately 0.01% copper.

Approximately 999.0 million tonnes of leaching ore with an average grade of approximately 0.239% copper was extracted from the La Caridad open-pit mine and deposited in leaching dumps to December 31, 2023. All copper ore with a grade lower than the current mill cut-off grade 0.30%, but higher than 0.15% copper, is at present delivered to the leaching dumps. In 1995, we completed the construction of a SX-EW facility at La Caridad that has allowed us to process this ore and certain leach mineral reserves that were not mined; this has led to a subsequent reduction in our copper production costs. The SX-EW facility has an annual design capacity of 21,900 tonnes of copper cathodes. These cut-off grades need to be re-assessed as the mineral reserves stated were estimated utilizing an economic cut-off value.

The plant has three trains of solvent extraction with a nominal capacity of 2,400 cubic meters per hour and has 94 electrowinning cells, which are distributed in a single electrolytic bay. The plant has a daily production capacity of 65 tonnes of copper cathodes with 99.999% purity.

In 2004, our 15-year mine plan study for the La Caridad mine was awarded to an independent consulting firm to conduct a geotechnical evaluation. The purpose of the plan was to develop a program of optimum bench design and inter-ramp slope angles for the open-pit. The results of the evaluation presented by the consultants included a recommendation of a maximum average bench face angle of 72 degrees. Additionally, single benching was recommended for the upper sections of the west, south and east walls of the main pit. Double benching was recommended for the lower levels of the main pit and single benching for the upper slope segments that consist of either alluvial material, mine waste dumps or mineralized stockpile material. Alternatively, slopes in these types of materials, may be designed with an overall 37-degree slope. The geostructural and geotechnical parameters recommended were applied in the pit design for the new life of mine plan for La Caridad mine, which was prepared in 2015. This mine plan replaced the 15-year mine plan prepared in 2010. However, since final pit limits have yet to be established at La Caridad, all current pit walls are effectively working slopes. Geostructural and geotechnical data collected at the open-pit mine from cell-mapping and oriented-core drilling databases provided the basis for the geotechnical evaluation and recommendations. Additional geotechnical drilling is required in the expanded areas of the Mineral Reserve ultimate pit shell which are beyond the design sector limits.

In 2019, we assigned an independent consulting firm to conduct a geotechnical study of La Caridad, which included the Bella Union area, based on a 15-year mining plan. The results of this study included recommendations on geostructural and geotechnical parameters. These were applied to the pit design for the new mine plan for La Caridad, which replaced the 15-year mine plan prepared in 2015. A hydrogeological study was also recommended to determine the distribution of pore pressure. In September 2021, the SSR-OMNI and the SSR-FX radars began operating. These two working radars will allow us to cover up to 80% of the slopes in the operating areas of the mine.

In 2022, a Geotechnical Engineer in charge of the Geotechnical Department, took care of the two radars to create information and to make daily monitoring reports as well as giving recommendations to the Operation Department to have a safer mining process. Geostructural data from cell-mapping is being collected. The inter-ramp slope angles are updated weekly, as the topography changes, to know if we continue within the recommended level.

In 2023, a second Geotechnical Engineer was hired for the Geotechnical Department. The Maptek XR3 scanner is being used to improve structural mapping and make recommendations to the Blasting Department. A “Pit Slope Review” for the 2019 geotechnical study is currently underway along with Hydrogeological Characterization via 15 holes and multi-level piezometers; both studies are expected to be completed in July 2024.

The following table contains the summary of copper and molybdenum mineral resources exclusive of mineral reserves for La Caridad as of December 31, 2023, based on long-term price assumptions of $3.80 and $11.50 per pound, respectively:

​​​​​​​​​​​​​​​
​ · ​ · 2023
Leach process · Amount (million tonnes) · Copper grades · Molybdenum grades · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Variation Copper · ​ · Variation Molybdenum
Measured mineral resources​—​—%—%—​—​—​—
Indicated mineral resources683​0.08%—%1,129.0​—​2.4%​—
Measured + Indicated mineral resources​683​0.08%—%1,129.0​—​2.4%​—
Inferred mineral resources​526​0.08%—%905.0​—​2.6%​—
​​​​​​​​​​​​​​​
Mill processAmount (million tonnes)Copper gradesMolybdenum grades​Contained copper (million pounds)​Contained molybdenum (million pounds)​Variation Copper​Variation Molybdenum
Measured mineral resources​—​—%—%—​—​—​—
Indicated mineral resources3,928​0.16%0.028%13,681.0​2,424​0.1%​(0.04)%
Measured + Indicated mineral resources​3,928​0.16%0.028%13,681.0​2,424​0.1%​(0.04)%
Inferred mineral resources​2,973​0.14%0.025%8,913.0​1,639​1.1%​6.2%
​​​​​​​​​​​​​​​
​​2022
Leach process​Amount (million tonnes)Copper gradesMolybdenum grades​Contained copper (million pounds)Contained molybdenum (million pounds)​​​​
Measured mineral resources​—​—%—%—​—​​​​
Indicated mineral resources​684​0.07%—%1,102.3​—​​​​
Measured + Indicated mineral resources​684​0.07%—%1,102.3​—​​​​
Inferred mineral resources​526​0.08%—%881.8​—​​​​
​​​​​​​​​​​​​​​
Mill process​Amount (million tonnes)Copper gradesMolybdenum grades​Contained copper (million pounds)​Contained molybdenum (million pounds)​​​​
Measured mineral resources​—​—%—%—​—​​​​
Indicated mineral resources​3,934​0.16%0.028%13,668.6​2,425​​​​
Measured + Indicated mineral resources​3,934​0.16%0.028%13,668.6​2,425​​​​
Inferred mineral resources​2,974​0.14%0.025%8,818.5​1,543​​​​
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Copper content in mineral resources in 2023 remained the same level as in 2022.
(4)Cut-off grade: mineral resources are reported on break-even plant and leach profit basis. The estimate was constrained to the Resource pit based on a Cu price of $3.795/lb, Mo price of $11.50/lb.
(5)It was assumed that ore with solubility index greater than 0.8 had been sent to the leach pad.
(6)Recovery assumed based on 3-year averages of La Caridad 84% Cu and 83% Mo for mill and 40% Cu for heap leach.
(7)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the La Caridad operations technical report summary prepared by qualified persons, under Exhibit 96.7 to the 2022 Form 10-K.

The variations registered for mineral resources from 2022 to 2023 were attributable to:

-Production depletion for 2023
-Updated end-of-year topography surfaces for 2022 and 2023 and rounding

The following table contains the summary of copper and molybdenum mineral reserves for La Caridad as of December 31, 2023, based on long-term price assumptions of $3.30 and $10.00 per pound, respectively.

​​​​​​​​​​​​​​​​​
​ · ​ · 2023
Probable mineral reserves · Amount (million tonnes) · Copper grades · ​ · Molybdenum grades · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Variation Copper · ​ · Variation Molybdenum
Leach process​197​0.09%​—%​393​—​(0.5)%​—
Mill process2,039​0.21%​0.028%​9,415​1,244​(3.3)%​(3.3)%
​​​​​​​​​​​​​​​​​
​​2022
Probable mineral reserves​Amount (million tonnes)Copper grades​Molybdenum grades​Contained copper (million pounds)Contained molybdenum (million pounds)​​​​
Leach process​198​0.09%​—%​395​—​​​​
Mill process​2,100​0.21%​0.028%​9,737​1,286​​​​
(1)Mineral reserves are current as at December 31, 2023.
(2)The reference point for the estimate is the leach pad or concentrator.
(3)Cut-off grade: mineral reserves are reported on break-even plant and leach profit basis. The estimate was constrained to an ultimate pit design limited to an elevation of 1,050 ft., or an approximate 60 year life. The design was based on a Cu price of $3.30/lb and a Mo price of $10.00/lb.
(4)It was assumed that ore with solubility index greater than 0.8 was sent to the leach pad.
(5)Copper recovery for the mill process is 83% for Cu and 81% for Mo and recovery for the leach process is 29%.
(6)Contained metal in mineral reserves in 2023 decreased compared with 2022 estimate due to production depletion.
(7)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 12 of the La Caridad operations technical report summary prepared by qualified persons, under Exhibit 96.7 to the 2022 Form 10-K.

The variations registered for mineral reserves from 2022 to 2023 were attributable to:

-Production depletion for 2023
-Updated end-of-year topography surfaces for 2022 and 2023 and rounding

Processing Facilities—La Caridad

Our La Caridad complex includes a smelter, an electrolytic copper refinery, a precious metal refinery, a copper rod plant and an effluent and dust treatment plant. The distance between this complex and the La Caridad mine is approximately 24 kilometers.

Smelter

Copper concentrates from Buenavista, Santa Barbara, Charcas and La Caridad are transported by rail and truck to the La Caridad smelter where they are processed and cast into copper anodes of 99.2% purity. Sulfur dioxide off-gases collected from the flash furnace, the El Teniente converter and conventional converters are processed into sulfuric acid at two sulfuric acid plants. Approximately 2% to 3% of this acid is used by our SX-EW plants and the balance is sold to third parties.

All of the anodes produced in the smelter are sent to the La Caridad copper refinery. The actual installed capacity of the smelter is 1,000,000 tonnes per year, a capacity that is sufficient to treat all the concentrates of La Caridad and almost 40.5% of total production of the OMIMSA I and OMIMSA II concentrators from Buenavista. In 2010, the smelter also began processing concentrates from the IMMSA mines, as we closed the San Luis Potosi smelter.

Other facilities in the smelter include two sulfuric acid plants with capacities of 2,625 and 2,135 tonnes per day, three oxygen plants each with a production capacity of 275 tonnes per day; and one power turbine which generates 11.5 MWh.

Refinery

La Caridad includes an electrolytic copper refinery that uses permanent cathode technology. The installed capacity of the refinery is 300,000 tonnes per year. The refinery consists of an anode plant with a preparation area, an electrolytic plant with an electrolytic cell house with 1,115 cells and 32 liberator cells, two cathode stripping machines, an anode washing machine, a slime treatment plant and a number of ancillary facilities. The refinery is producing grade A (LME) and grade 1 (COMEX) copper cathode of 99.99% purity. Anodic slimes are recovered from the refining process and sent to the slime treatment plant, where additional copper is extracted. The slimes are then filtered, dried, packed and shipped to the La Caridad precious metals refinery to produce silver and gold.

Precious Metals Plant

The operations at the precious metal refinery begin with the reception of anodic slimes, which are dried in a steam dryer. After this, the dried slime is smelted and a gold and silver alloy is obtained, which is known as Dore. The precious metal refinery plant has a hydrometallurgical stage and a pyrometallurgical stage, in addition to a steam dryer, Dore casting system, Kaldo furnace, 20 electrolytic cells in the silver refinery, one induction furnace for fine silver, one silver ingot casting system and two reactors for obtaining fine gold. The process ends with the refining of the gold and silver alloy. We also recover commercial selenium from the gas produced by the Kaldo furnace process.

Copper Rod Plant

A rod plant at the La Caridad complex began operations in 1998 and reached its full annual operating capacity of 150,000 tonnes in 1999. The plant is producing eight-millimeter copper rods with a purity of 99.99%.

Effluent and Dust Treatment Plant

In 2012, we started operating a dust and effluent plant with a treatment capacity of 5,000 tonnes of smelter dusts per year, which will produce 1,500 tonnes of copper by-products and 2,500 tonnes of lead sulfates per year. This plant is designed to reduce dust emissions from La Caridad metallurgical complex.

The table below contains production information for 2023, 2022 and 2021 for the La Caridad processing facilities:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance
​​​​​​​​​​2023 - 2022
​​202320222021Volume%
Smelter​
Total copper concentrate smelted(kt)966.61,052.01,047.3(85.4)(8.1)%
Anode copper production(kt)265.3287.1289.0(21.8)(7.6)%
Average copper content in anode(%)99.3899.4399.46(0.05)(0.1)%
Average smelter recovery(%)96.7096.8096.3(0.10)(0.1)%
Sulfuric acid production(kt)948.51,001.3990.0(52.8)(5.3)%
Refinery​​​​​​
Refined cathode production(kt)218.6245.7242.7(27.1)(11.0)%
Refined silver production(000 kg)230.1266.5236.7(36.4)(13.7)%
Refined gold production(Kg)948.11,096.41,029.1(148.3)(13.5)%
Rod Plant​​​​​​
Copper rod production(kt)154.3156.4150.1(2.1)(1.3)%

Kg = kilograms

Pilares Project

Pilares is considered part of the La Caridad unit and ore from Pilares is routed to the leach pads and processing facilities at the La Caridad operations. The Pilares mineral development project is located in northeastern Sonora, Mexico, about 266 kilometers northeast of the city of Hermosillo and 125 kilometers south of the city of Agua Prieta Sonora, Mexico, which is on the international U.S. – Mexico border. The Pilares project is located between 30°19’ and 30°20’ N, and between 109°38’ and 109°37’47’’ W, at elevations ranging between 1,400 to 1,460 meters above mean sea level. It is about 6 kilometers from the La Caridad mining unit and 22 kilometers from the town of Nacozari.

The mining claims held by Pilares project cover an area of about 143.3 hectares for exploration and exploitation activities. Surface rights are held by a combination of private ownership and agreements with the local ejido “Pilares”, which consists of about 40 members. Ejidos are agrarian land grants held by a group of people. The agreements allow for exploration and mining activities, plus conservation of the historical town of Pilares. Additionally, the Pilares Project was included in the regional environmental permit obtained for the entire La Caridad complex dated September 2018 and valid for 60 years.

The La Caridad mining district, where the Pilares porphyry copper deposit is located, lies within the eastern section of the Sonora Basin and Range Province in Northern Mexico. Sustained magmatic activity along the North American Cordillera during the late Mesozoic through Paleogene resulted in the development of numerous porphyry copper deposits.

The local geology of the Pilares area consists of two main lithological packges, a volcanic sequence and a set of hypabyssal bodies that intrude the volcanic sequence. The volcanic sequence is comprised from the base to the top by the following units: andesitic flows from intercallations of Crystal Tuff, Tobaceous Sandstone, tuff-breccia (ignimbrite), basalt-andesite flows and Lapilli Tuffs. The Lapilli Tuff is composed of lapilli-sized volcanic fragments outcropping in the topographic highs and distributed in the central, southeastern and northeastern portion of the Pilares area. The Lapilli Tuff hosts the mineralized structure of the Pilares Breccia.

The following table contains the summary of copper and molybdenum mineral resources for Pilares as of December 31, 2023, based on long-term price assumptions of $3.80 and $11.50 per pound, respectively:

​​​​​​​​​​​​​​​​​​​
​ · ​ · ​ · 2023
Process · Classification · Amount (million tonnes) · Total copper · Copper oxide · ​ · Molybdenum grade · ​ · Contained copper (million pounds) · ​ · Contained molybdenum (million pounds) · ​ · Variation Copper · ​ · Variation Molybdenum
Leach​Inferred​0.9​0.34%0.09%0.003%6.8​—​(85.0)%​—
MillInferred​67.3​0.55%0.04%0.005%817.3​7.4​(7.1)%​(4.1)%
​​​​​​​​​​​​​​​​​​​
​​​​2022
ProcessClassification​Amount (million tonnes)Total copperCopper oxide​Molybdenum grade​Contained copper (million pounds)​Contained molybdenum (million pounds)​​​​
Leach​Inferred​4.8​0.44%0.22%0.002%45.6​—​​​​
MillInferred​71.8​0.56%0.05%0.005%879.9​7.7​​​​
​​​​​​​​​​​​​​​​​​​
(1)Mineral resources are reported in situ and effective as at December 31, 2023. Mine development continued in 2023. Changes to mineral resources are due to mining depletion and updated end-of-year topography surfaces provided for 2022 and 2023.
(2)Recovery assumed based on 3-year averages of La Caridad 84% Cu and 83% Mo for mill and 40% Cu for heap leach.
(3)Cut-off grade: mineral resources are reported on break-even plant and leach profit basis. The estimate was constrained to the Resource pit based on a Cu price of $3.795/lb, Mo price of $11.50/lb. Three mineral zones were considered: Zone 1 Oxide, Zone 2 Transition and Zone

3 Sulfide. It was assumed that Zone 1 had been sent to the leach pad. Zone 2 with a solubility index greater than 0.8 was assumed to have been sent to the leach pad. Zoned 2 with a solubility index less than 0.8 was assumed to have been sent to the destination that would have generated the highest profit. Zone 3 was assumed to be sent to the mill. The formulas used to calculate Leach and Mill profits were:

Leach Profit/t = ($28.58 * Cu Grade) - $1.91

Mill Profit/t = (($70.28 * Cu Grade) + ($210.43 * Mo Grade)) - (($4.98 * Cu Grade) + ($32.02 * Mo Grade)) – ($6.408 + $0.249)

(4)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Pilares project technical report summary prepared by qualified persons, under Exhibit 96.8 of the Form 10-K/A filed by the Company on March 7, 2022.

El Pilar Project

The El Pilar Property is located in north central Sonora, Mexico, about 15 kilometers south of the international border with United States. The property is situated within lands of Ejido Miguel Hidalgo (also referred to as San Lazaro), in the Santa Cruz Municipality. The property is situated between UTM coordinates 3,446,000N to 3,455,000N and 526,800 E to 534,700 E. The El Pilar property comprises 9,571.4 hectares in 19 concessions. These concessions are wholly owned by Recursos Stingray de Cobre S.A de C.V., our wholly owned Mexican subsidiary. Additionally, a total of 1,926 hectares of surface rights have been successfully negotiated with the Ejido Miguel Hidalgo, which allows for all required land ownership rights needed for project development.

The El Pilar deposit is located at the southwest margin of the Patagonia Mountains near the base of a mountain range.

The topography near the deposit permits sufficient surface space for a mining operation, leaching pads, waste disposal

areas, and other facilities. The property can be reached by road from Hermosillo, Sonora in Mexico and from Tucson, Arizona in the United States. The route from Hermosillo to Miguel Hidalgo takes about 3.5 hours of driving time. The route from Tucson to Miguel Hidalgo is currently a two-hour drive. The site is a green-field mining site with no existing infrastructure. Experienced mining personnel and related contractors are available within driving distance.

The project area climate allows year-round mining and processing operations. A power line is located 3 km to the south, in the village of Miguel Hidalgo where SCC has an office and warehouse facilities, but the project will require the construction of a high voltage power line from the site to connect with the high voltage power lines accessible in Nogales, which is 28 km northwest of the property. A railroad is located 3 km south of the deposit. Construction of a new railway spur approximately 4 km in length is planned for the delivery of molten sulfur or sulfuric acid.

The deposit is located within the Sonora-Arizona Porphyry Copper Province, along the southwest flank of the Patagonia Mountains. The geology of the El Pilar property consists of Precambrian intrusive rocks overlain by Paleozoic sedimentary rocks. These units are overlain by Tertiary sedimentary rocks. Intrusives of granitic to monzonitic composition with some pegmatitic and aplitic facies intrude all the older units. Tertiary and Quaternary alluvial fan and alluvial wash sediments cover the flanks of the ranges and the intervening valleys.

The El Pilar copper deposit occurs within unconsolidated, poorly sorted, poorly bedded, proximal facies alluvial wash

deposits that are overlain by dissected younger alluvial fan deposits. The copper bearing sediments at El Pilar are

comprised solely of alluvial wash gravels deposited into a paleo topographic range-front depression. At the northern

boundary of the deposit, these basin-fill sediments are juxtaposed against unmineralized Precambrian granitic rocks

by an east-west to northwest-trending, south dipping zone of faulting and hydrothermal brecciation. Mineralization predominantly consists of the copper oxide mineral chrysocolla, which occurs as coatings on clasts of highly silicified breccia and as grains in the sedimentary gravel matrix.

The following table contains the summary of copper mineral resources exclusive of mineral reserves for El Pilar as of December 31, 2023, based on long-term price assumptions of $3.80 per pound:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​2023
Copper · Amount (million tonnes) · Total copper · Soluble copper · ​ · Contained copper (million pounds) · ​
Measured mineral resources​2.2​0.20%0.10%9​
Indicated mineral resources81.3​0.18%0.08%317​
Measured + Indicated mineral resources​83.4​0.18%0.08%326​
Inferred mineral resources​88.6​0.12%0.06%234​
(1)Mineral resources are reported in situ and effective as at December 31, 2021 as reported in the Technical Report Summary dated February 28, 2022. Southern Copper has reported that minor contractor activity conducted at the site since that time has not materially impacted the total Mineral Resource estimates effective as at December 31, 2021. Therefore, the estimates at December 31, 2021 are deemed to be current as at December 31, 2023. The qualified person (“QP”) has not visited the site since August 2021 and cannot independently determine whether the contractor activities have impacted the Mineral Resources.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Metallurgical Recovery: Cu Recovery = 0.3349 x LN (Soluble Cu/Total Cu) + 0.7949
(4)Cut-Off Grade: Calculated on break-even profit basis and constrained within the pit shell outlined using a Cu price of $3.795/lb.
(5)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the El Pilar project technical report summary prepared by qualified persons, under Exhibit 96.9 of Form 10-K/A for the fiscal year ended December 31, 2021, filed on March 7, 2022.
(6)There were no changes in resources with regard to 2021’s figures. Technical Studies are underway.

The following table contains the summary of copper mineral reserves for El Pilar as of December 31, 2023, based on long-term price assumptions of $3.30 per pound:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​2023
Copper · ROM Ore (million tonnes) · Copper grade · Contained copper (thousand tonnes) · Recovered copper (million pounds)
Proven mineral reserves​63​0.27%168​370
Probable mineral reserves254​0.25%623​1,374
Total mineral reserves​317​0.25%790​1,744
(1)Mineral reserves are effective as at December 31, 2021 as reported in the Technical Report Summary dated February 28, 2022. Southern Copper has reported that minor contractor activity conducted at the site since that time has not materially impacted the original Mineral Reserves estimates. Therefore, the estimates at December 31, 2021 are deemed to be current as at December 31, 2023. The QP has not visited the site since August 2021 and cannot independently determine whether the contractor activities have impacted the Mineral Reserves.
(2)The reference point for the estimate is delivery to the leach pad.
(3)The recovered copper estimate utilizes the following recovery formula: (Cu Rec % = 0.3349 x LN(Cu_Ratio) + 0.7949)
(4)Cut-Off Grade: Measured and Indicated Blocks within the ultimate pit design with a value greater than or equal to zero were considered ore. The following “Value Equation” was used to calculate that value using a Cu price of $3.30/lb. Value / tonne = ($0.73 * Cu Recovery * Cu Grade) – ($0.15 * Cu Recovery * Cu Grade) - $0.57
(5)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 12 of the La Caridad operations technical report summary prepared by qualified persons, under Exhibit 96.9 of the Company´s Form 10-K/A for the fiscal year ended December 31, 2021, filed on March 7, 2022.
(7)There were no changes in reserves with regard to 2021’s figures. Technical Studies are underway.

El Arco Project

The El Arco deposit is located near the village of El Arco in Baja California, Mexico, which lies near the center of the Baja California Peninsula in the municipalities of San Quintin, Baja California and Mulegé, Baja California Sur, Mexico. The Project centroid is at approximately 28°03’ 24.08” N; 113° 27’ 35.23” W. The center of the El Arco deposit

is located at approximately 28° 02’ 02.97” N; 113° 23’ 46.75” W. Route 1 is the only paved highway connecting the northern and southern parts of the Baja Peninsula. El Arco located between the towns of Santa Rosalía and Guerrero Negro at kilometer 189. The El Arco site is accessed by taking Highway 1 approximately 30 kilometers south of the town of Guerrero Negro to the intersection with the highway MX 18, and following MX 18 for 42 kilometers east to the project site. Highway 1 is paved and in good condition and Highway 18 was originally paved but currently all pavement is gone, leaving a gravel roadbed.

The nearest port is Santa Rosalía on the Sea of Cortez, 240 km by road southeast of El Arco. We plan to construct a port at El Barril, located 70 km northeast of the proposed mine site. The site is currently a greenfields site with limited infrastructure that is only suitable to support exploration-level activities. Planned on-site infrastructure includes an open pit mine, two waste rock storage facilities, mill complex and oxide fine crushing facilities, temporary ore stockpile, heap leach facility, tailings storage facility, administration building, truck shop and warehouse, main 230 kV electrical substation and a water storage dam and reservoir.

We hold 20 mining concessions, covering 72,131 hectares. Surfaces rights in the deposit area are held by a combination of agrarian cooperatives (ejidos) and private owners. Project water is planned to be sourced from a desalination plant, to be constructed at El Barril. Additionally, we expect to obtain power from a private provider.

The El Arco deposit is considered to be an example of a porphyry copper deposit. The Alisitos arc is an approximately 300 × 30 kilometer oceanic arc terrane that accreted to the western edge of the Peninsular Ranges batholith within the North American Cordillera. A chain of granitic batholithic intrusions intrude the Alisitos Formation, and El Arco, the oldest known porphyry deposit in this chain, is located at the extreme southern end of the chain.

The El Arco area basement consists of serpentinite, with blocks of peridotite, pyroxenite and amphibolite that are tectonically overlain by diorites, gabbros, and rocks interpreted to be pillow lavas. These units are overlain by metavolcanic agglomerates, metagraywackes, meta-andesite flows and breccias, and thinly-bedded marble. Andesite flows in the upper part of this sequence host granodiorite porphyry intrusions that generated the El Arco deposit. Barren diabase dikes cut the andesite and granodiorite porphyry. All lithologies have been subject to greenschist facies metamorphism, characterized by development of chlorite–epidote–calcite–quartz. Mineralization at El Arco occurs in three sub-horizontal zones.

The following table contains the summary of mineral resources for El Arco as of December 31, 2023, based on long-term price assumptions of $3.80 and $10.35 per pound for copper and molybdenum, respectively, and fixed over the 35-year expected mine life.

​​​​​​​​​​​​​​​​​​​
​2023
Mill plant · Amount (million tonnes) · Copper grades · Molybdenum grades · ​ · Gold grade (g/t) · ​ · Silver grade (g/t) · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Contained gold (million ounces) · ​ · Contained silver (million ounces)
Measured mineral resources​—​—%—%—​—​—​—​—​—
Indicated mineral resources826.6​0.41%0.008%0.12​1.6​7,544.9​146.5​3.23​41.88
Measured + Indicated mineral resources​826.6​0.41%0.008%0.12​1.6​7,544.9​146.5​3.23​41.88
Inferred mineral resources​2,344.9​0.37%0.006%0.11​1.5​19,352.3​298.2​8.05​110.89
​​​​​​​​​​​​​​​​​​​
Leach plantAmount (million tonnes)Copper gradesMolybdenum grades​Gold grade (g/t)​Silver grade (g/t)​Contained copper (million pounds)Contained molybdenum (million pounds)​Contained gold (million ounces)​Contained silver (million ounces)
Measured mineral resources​—​—%—%—​—​—​—​—​—
Indicated mineral resources51.3​0.30%—%—​—​335.3​—​—​—
Measured + Indicated mineral resources​51.3​0.30%—%—​—​335.3​—​—​—
Inferred mineral resources​63.8​0.25%—%—​—​350.9​—​—​—
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
(3)Mineral resources are reported within a conceptual pit shell that is based on copper and molybdenum values only. The pit shell uses the following input parameters: metal prices of $3.80/lb Cu and $10.35/lb Mo; variable net smelter return cut-offs; mining recovery of 100%; metallurgical recoveries of 86% Cu, and 55% Mo for material sent to the mill facility, and recovery of 80% Cu (Total copper) for material sent to the heap leach pad; total mining costs (base, incremental and sustaining) of $1.206/t mined; total mill process costs (base, sustaining, tailings, G&A and molybdenum plant) of $7.80/t milled, total leaching costs (operating and SX-EW) of $1.60/t leached; miscellaneous costs (closure, payments) of $0.10/t processed; copper refining cost of $0.09/lb, copper smelting cost of $90/t concentrate, copper transport costs of $107.69/t concentrate, molybdenum transport costs of $73.67/t concentrate, and molybdenum refining/treatment cost of 12.50% (of molybdenum price). Mineral resources are constrained within a wireframe constructed at a 0.1% total copper cut-off grade.
(4)Gold and silver are not used in the pit optimization. The gold and silver metallurgical recoveries for material that will be sent to the mill facility are forecast at 55.7% Au, and 50.2% Ag, respectively. Molybdenum, gold and silver are not expected to be recovered from the leach process.
(5)Mineral resources are constrained within a wireframe constructed at a 0.1% total copper cut-off grade.
(6)For further information on assumptions used in preparing the estimates, please refer to Chapter 11 of the El Arco project technical report summary prepared by qualified persons, under Exhibit 96.10 of the Company´s Form 10-K/A for the fiscal year ended December 31, 2021, filed on March 7, 2022.
(7)There were no changes in mineral resources with regard to the figures reported in 2021.

The following table contains the summary of copper mineral reserves for El Arco as of December 31, 2023, based on long-term price assumptions of $3.30 and $9.00 per pound for copper and molybdenum, respectively, and were fixed over the 35 year expected mine life.

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​2023
Probable mineral reserves · Amount (million tonnes) · Copper grades · Molybdenum grades · Gold grade (g/t) · ​ · Silver grade (g/t) · ​ · Contained copper (million pounds) · Contained molybdenum (million pounds) · ​ · Contained gold (million ounces) · ​ · Contained silver (million ounces)
Sulfide mill​1,229.5​0.40%0.006%0.14​1.8​10,822​166.7​5.6​70.5
Oxide leach140.5​0.27%—%—​—​846​—​—​—
(1)Mineral reserves are current as at December 31, 2023.
(2)The reference point for the estimate is the point of delivery to the processing facility.
(3)Mineral reserves are constrained within an optimized pit shell based on copper and molybdenum only.
(4)The following parameters were used in estimation: assumption of open pit mining methods; assumption of heap leach and concentrate processing; copper price of $3.30/lb, molybdenum price of $9.00/lb; variable net smelter return cut-offs; mining recovery of 100%; metallurgical recoveries of 86% Cu, and 55% Mo for material sent to the mill facility, and recovery of 80% Cu (Total copper) for material sent to the heap leach pad; total mining costs (base, incremental and sustaining) of $1.206/t mined; total mill process costs (base, sustaining, tailings, G&A and molybdenum plant) of $7.80/t milled, total leaching costs (operating and SX-EW) of $1.60/t leached; miscellaneous costs (closure, payments) of $0.10/t processed; copper refining cost of $0.09/lb, copper smelting cost of $90/t concentrate, copper transport costs of $107.69/t concentrate, molybdenum transport costs of $73.67/t concentrate, and molybdenum refining/treatment cost of 12.50% (of molybdenum price).
(5)Gold and silver are not used in the pit optimization. The gold and silver metallurgical recoveries for material that will be sent to the mill facility are forecast at 55.7% Au, and 50.2% Ag, respectively. Molybdenum, gold and silver are not expected to be recovered from the leach process.
(6)For the leaching process, the internal copper cut-off was 0.049% while the breakeven copper cut-off was 0.057%.
(7)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 12 of the El Arco operations technical report summary prepared by qualified persons, under Exhibit 96.10 of the Company´s Form 10-K/A for the fiscal year ended December 31, 2021, filed on March 7, 2022.
(8)There were no changes in mineral reserves with regard to the figures reported in 2021.

MEXICAN IMMSA UNIT

Our IMMSA unit (underground mining poly-metallic division) owns five underground mining complexes situated in central and northern Mexico, three of which are currently operating. It produces zinc, lead, copper, silver and gold. These complexes include industrial processing facilities for zinc, lead, copper and silver. All of IMMSA’s mining facilities employ exploitation systems and conventional equipment. We believe that all the plants and equipment are in satisfactory operating condition. IMMSA’s principal mining facilities are Charcas, Santa Barbara, San Martin, Santa Eulalia and Taxco.

The table below contains production information for 2023, 2022 and 2021 for our Mexican IMMSA unit:

​​​​​​​​​​​​​​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance
​​​​​​​​​​2023 - 2022
​​202320222021Volume%
Average annual operating days(*)​​301307336​​​​​
Total material mined and milled(kt)4,3464,1003,9652466.0%
Zinc:​​​​​​
Average ore grade(%)1.881.792.040.095.0%
Average recovery(%)80.2281.6282.87(1.40)(1.7)%
Concentrate produced(kt)132.0124.0135.18.06.5%
Concentrate average grade(%)49.6448.3849.581.262.6%
Zinc in concentrate(kt)65.560.067.05.59.2%
Lead:​​​​​​
Average ore grade(%)0.630.580.620.058.6%
Average recovery(%)68.7869.4969.20(0.71)(1.0)%
Concentrate produced(kt)33.632.533.81.13.4%
Concentrate average grade(%)55.7151.0050.664.719.2%
Lead in concentrate(kt)18.716.617.12.112.7%
Copper:​​​​​​
Average ore grade(%)0.380.390.41(0.01)(2.6)%
Average recovery(%)57.5256.7153.710.811.4%
Concentrate produced(kt)43.940.338.03.68.9%
Concentrate average grade(%)21.8022.6522.94(0.85)(3.8)%
Copper in concentrate(kt)9.69.18.70.55.5%
Silver:​​​​​​
Average ore grade(ounces)1.972.132.17(0.16)(7.5)%
Average recovery(%)77.8877.2276.590.660.9%
Concentrate average grade(%)31.8​34.331.9(2.5)(7.3)%
Silver in concentrates((000) ounces)6,664.006,749.66,588.5(85.6)(1.3)%

kt = thousand tonnes

(*)Weighted average annual operating days based on total material mined and milled in the three active mines: Charcas, Santa Barbara and San Martin.

Charcas

The Charcas mining complex is located approximately 110 kilometers north of the city of San Luis Potosi in the State of San Luis Potosi, Mexico. The mine uses the Universal Transverse Mercator (UTM) World Geodetic System (WGS84) Zone 14Q coordinate system and is located at 2 560 223 N and 280 042 E at an altitude of 2,150 meters above sea level. Charcas is connected to the state capital by a paved highway of 130 kilometers. It was discovered in 1573 and operations in the 20th century began in 1911. The complex includes three underground mines (San Bartolo, Rey-Reina and La Aurora) and one flotation plant that produces zinc, lead and copper concentrates with significant amounts of silver. The Charcas mine is characterized by low operating costs and good quality ores and is situated near the zinc refinery. Charcas is exploited underground by room and pillar with hydraulic cut and fill. The crushed ore is transported to the surface for processing in the flotation plant.

We currently hold 13 mining concessions over the Charcas property, which covers a total area of 88,643.26 hectares. Additionally, we own surface lands covering an area of 1,744.4 hectares with rights to conduct any work or exploration required to advance or continue of activities within the Charcas project. Water is obtained from three main sources: recovery of process water from the tailings dam, recovery of the working water from the mine and fresh water from concession wells. Additionally, the unit receives a power supply of 115,000 volts in two 7.5-Mega Volt-Amp (MVA) transformers, distributed to electrical substations located in the different areas of mining operation. Fuel comes from a local distribution point in the city of San Luis Potosi and is stored in a series of tanks located on the surface.

The Charcas mining district is in the east-central part of the central mesa of Mexico, which is part of the larger metallogenic province of Sierra Madre. The mineral deposits found within the Charcas mining district are tertiary polymetallic skarn (silver, lead, zinc and copper) deposits hosted in carbonate rocks of the Jurassic-Cretaceous periods and in shales and sandstones of the Late Triassic. In the carbonate rocks, veins and mantos form the predominant mineralization, while less mineralized fractures tend to occur within the shales and sandstones. The varied style of mineralization largely corresponds to the lithological variety of units that serve as host rocks.

The Charcas intrusive complex (“CIC”) was emplaced in Triassic to upper Cretaceous sedimentary rocks. Some dikes from the CIC have developed metamorphic halos with related polymetallic mineralization. There are two recognized stages of mineralization. In the first stage, the mineralization is enriched in silver, lead, and zinc and characterized with calcite and small quantities of quartz and chalcopyrite (CuFeS) present. In the second stage, the mineralization is copper and silver rich with lesser amounts of chalcopyrite. The mineralization also includes lead ore with associated silver, plus pyrite and only minor amounts of sphalerite (ZnS). The mineralization occurs as replacement sulfides in carbonate rocks and as filling fracture veins. The typical sulfides found at the Charcas include chalcopyrite, sphalerite, galena (PbS), and silver minerals.

The following table contains the summary of mineral resources for Charcas as of December 31, 2023, based on long-term metal price assumptions:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Silver · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Variation
Measured mineral resources​—​—​—​—​—​—​—​—​—
Indicated mineral resources​23.00​6,410​84​17,297​23.006,057​88​17,165​0.8%
Measured + Indicated mineral resources​23.00​6,410​84​17,297​23.00​6,057​88​17,165​0.8%
Inferred mineral resources​23.00​15,162​98​48,005​23.00​15,446​97​48,207​(0.4)%
​​​​​​​​​​​​​​​​​​​
ZincMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—%—​—​—​—%—​—
Indicated mineral resources​1.32​6,410​3.06%195.9​1.326,057​3.13%189.7​3.3%
Measured + Indicated mineral resources​1.32​6,410​3.06%195.9​1.32​6,057​3.13%189.7​3.3%
Inferred mineral resources​1.32​15,162​2.78%421.0​1.32​15,446​2.70%416.6​1.1%
​​​​​​​​​​​​​​​​​​​
LeadMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—%—​—​—​—%—​—
Indicated mineral resources​1.09​6,410​0.39%24.9​1.046,057​0.39%23.5​6.0%
Measured + Indicated mineral resources​1.09​6,410​0.39%24.9​1.04​6,057​0.39%23.5​6.0%
Inferred mineral resources​1.09​15,162​0.39%58.7​1.04​15,446​0.39%60.1​(2.3)%
​​​​​​​​​​​​​​​​​​​
CopperMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—%—​—​—​—%—​—
Indicated mineral resources​3.80​6,410​0.52%33.5​3.806,057​0.54%32.6​2.8%
Measured + Indicated mineral resources​3.80​6,410​0.52%33.5​3.80​6,057​0.54%32.6​2.8%
Inferred mineral resources​3.80​15,162​0.55%82.8​3.80​15,446​0.54%84.0​(1.4)%
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Metallurgical recovery assumptions (in payable concentrates) are: 78% for silver, 47% for lead, 69% for copper and 90% for zinc.
(4)Mineral resources are reported at metal-equivalent Cut-Off Grades (COG) based on metal price assumptions, variable metallurgical recovery assumptions, mining costs, processing costs, G&A costs, and variable Net Smelter Recovery (NSR) factors. Mining, processing, and G&A costs total $67.33/t with metal prices of $1,725/tr oz for Au, $23/tr oz for Ag, $1.09/lb for Pb, $1.32 /lb for Zn and $3.80/lb for Cu.
(5)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Charcas operations technical report summary prepared by qualified persons, under Exhibit 96.11 to this Form 10-K.
(6)Variations in mineral resources in 2023 were attributable to additional exploration drilling and production depletion in 2023.

Santa Barbara

The Santa Barbara mining complex is located approximately 26 kilometers southwest of the city of Hidalgo del Parral in southern Chihuahua, Mexico. The mine uses the Universal Transverse Mercator (UTM) World Geodetic System (WGS84) Zone 13R coordinate system and is located at 2 965 880 N and 418 948 E at an altitude of 2,000 m above sea level. The area can be reached via a paved road of from Hidalgo del Parral, a city on a federal highway. The area is also connected to the state capital of Chihuahua 250 km along Highway 24. It was discovered in 1536 and mining activities in the 20th century began in 1913. Santa Barbara includes three main underground mines (San Diego, Segovedad and Tecolotes) as well as a flotation plant and produces lead, copper and zinc concentrates, with significant amounts of silver.

IMMSA currently holds 33 mining concessions over the Santa Barbara property, covering a total area of 27,772.51 hectares (ha), with the titles held 100% by the Company. There are also surface lands that cover an area of 20.92 hectares and are owned by IMMSA, which provide us within sufficient rights to any work or exploration that we require to carry out for the advancement and continuity of activities in the Santa Barbara property. There are an additional 371.07 hectares covered by a contract with the community of Santa Barbara that allows for any further work or exploration required.

Due to the variable characteristics of the ore bodies, four types of mining methods are used: shrinkage stoping, long-hole drilled open stoping, cut-and-fill stoping and horizontal bench stoping. The ore, once crushed, is processed in the flotation plant to produce concentrates. All the water used in industrial operations at Santa Barbara comes from the mine and the concentrator plant, where a large part of this water is recovered from the tailings dam, creating a closed circuit for its proper use. Electricity is supplied by Eolica el Retiro, Energia Chihuahua, S.A. de C.V. and the CFE.

The pre-mineral rock types found at Santa Barbara consist of a thick calcareous shale formation and andesite flows. The post-mineral rock types consist of dikes and sills of rhyolite and diabase, a thin conglomerate formation, basalt flows, and unconsolidated stream sediments. Pre-mineral faulting took place in two stages, forming four fault systems. All faults within each system have similar strike and dip. Movement along these faults, vertical in the first-stage faults and horizontal in the second-stage faults, formed openings and breccia zones.

Hydrothermal solutions, emanating from depth, were introduced into the faults. The walls and breccia fragments within the faults were silicified, and the high-temperature silicates, garnet, pyroxene, and epidote were formed. Accompanying and following the formation of the silicates, the sulfides, such as sphalerite, galena, chalcopyrite, pyrite, and arsenopyrite, with associated gold and a silver mineral, were introduced with quartz, calcite, and fluorite. Most of these minerals replaced the silicates and altered shale. The parts of the faults where wide pre-mineral openings were located filled with quartz and a higher ratio of sulfides than in the narrow portions of the faults. Quartz, calcite, fluorite, and barite were among the last minerals deposited.

The following table contains the summary of mineral resources for Santa Barbara as of December 31, 2023, based on long-term metal price assumptions:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Silver · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Variation
Measured mineral resources​—​—​——​—​—​——​—
Indicated mineral resources​23.00​25,512​103​84,495​23.0023,470​100​75,343​12.1%
Measured + Indicated mineral resources​23.00​25,512​103​84,495​23.00​23,470​100​75,343​12.1%
Inferred mineral resources​23.00​18,238​95​55,444​23.00​19,664​100​63,479​(12.7)%
​​​​​​​​​​​​​​​​​​​
ZincMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​——​—​—​—​—​—
Indicated mineral resources​1.32​25,512​3.15%804.1​1.3223,470​3.17%744.2​8.1%
Measured + Indicated mineral resources​1.32​25,512​3.15%804.1​1.32​23,470​3.17%744.2​8.1%
Inferred mineral resources​1.32​18,238​3.86%704.7​1.32​19,664​4.03%792.3​(11.1)%
​​​​​​​​​​​​​​​​​​​
LeadMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​——​—​—​—​—​—
Indicated mineral resources​1.09​25,512​1.99%508.5​1.0423,470​1.89%442.6​14.9%
Measured + Indicated mineral resources​1.09​25,512​1.99%508.5​1.04​23,470​1.89%442.6​14.9%
Inferred mineral resources​1.09​18,238​2.25%410.9​1.04​19,664​2.36%464.9​(11.6)%
​​​​​​​​​​​​​​​​​​​
CopperMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—​—​—​—​—​—​—
Indicated mineral resources​3.80​25,512​0.52%132.3​3.8023,470​0.52%122.9​7.7%
Measured + Indicated mineral resources​3.80​25,512​0.52%132.3​3.80​23,470​0.52%122.9​7.7%
Inferred mineral resources​3.80​18,238​0.55%100.8​3.80​19,664​0.56%109.8​(8.2)%
​​​​​​​​​​​​​​​​​​​
GoldMetal price (per ounce)Amount (thousand tonnes)Grades (grams per tonne)Metal content (thousand ounces)​Metal price (per ounce)Amount (thousand tonnes)Grades (grams per tonne)Metal content (thousand ounces)​Variation
Measured mineral resources​—​—​——​—​—​——​—
Indicated mineral resources​1,725​25,512​0.27​221​1,72523,470​0.28210​5.2%
Measured + Indicated mineral resources​1,725​25,512​0.27​221​1,725​23,470​0.28210​5.2%
Inferred mineral resources​1,725​18,238​0.17​98​1,725​19,664​0.17​107​(8.4)%
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Metallurgical recovery assumptions (in payable concentrates) are: 33% for Gold, 82% for silver, 79% for lead, 63% for copper and 81% for zinc.
(4)Mineral resources are reported at metal-equivalent Cut-Off Grades (COG) based on metal price assumptions, variable metallurgical recovery assumptions, mining costs, processing costs, G&A costs, and variable Net Smelter Recovery (NSR) factors. Mining, processing, and G&A costs total $83.4/t. with metal prices of $1,725/tr oz for Au, $23/tr oz for Ag, $1.09/lb for Pb, $1.32 /lb for Zn and $3.80/lb for Cu.
(5)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the Santa Barbara operations technical report summary prepared by qualified persons, under Exhibit 96.12 to this Form 10-K.
(6)Variations in mineral resources in 2023 were attributable to additional exploration drilling and production depletion in 2023.

San Martin

The San Martin mining complex is located in the municipality of Sombrerete in the northwestern part of the state of Zacatecas, Mexico. It is located approximately 185 kilometers from the city of Zacatecas. The elevation of the San Martin mining complex is approximately 2,600 meters (m) with geographic coordinates of 629,000 E and 2,614,000 N (WGS84, UTM Zona 13). The nearest major town is the municipality of Sombrerete (17 km away) in the Sierra Madre Occidental geographic province. It was discovered in 1555 and mining operations in the 20th century began in 1949. The complex includes an underground mine and a flotation plant. The ore body contains lead, copper and zinc concentrates, with significant amounts of silver. The state of Zacatecas has an extensive infrastructure of roads and highways that connect the San Martín to the rest of the country. The San Martin mining unit has a paved road to Highway 45, which leads to the town of Sombrerete, 17 kilometers away. Highway 45 then connects Sombrete to Fresnillo, Zacatecas and Durango at distances of 110,171 and 125 kilometers, respectively.

The San Martin property consists of 73 mining concessions with a total surface of 10,360.95 hectares, with the titles held by IMMSA. Water is currently extracted via three deep wells in the Proaño area, storing it in a pool adjacent to the wells. Electric power is provided by the national grid via a 45 kilometer extension. The unit receives a power supply of 115 KV, the main substation has a capacity of 24 MWA.

After eleven years of an illegal stoppage, we resumed control of the San Martin mine in August 2018. The San Martin facilities deteriorated during this period and we undertook a major renovation to restart operations in the second quarter of 2019, with a total expense of approximately $90.5 million. Production at this mine was restored to full capacity at the end of the third quarter of 2019.

San Martín mine is located in the Central Mesa of Mexico, between Sierra Madre Occidental and Sierra Madre Oriental. The Cuesta del Cura (Upper Cretaceous) limestone is the main sedimentary formation in the district. This is a sequence of shallow marine limestone and black chert which is overlain by Indura Formation that consists of alternating shales and fine-grained clayey limestones.

The mineral deposits in this district are associated with replacement veins and bodies formed in the skarn in close proximity to the Cerro de la Gloria granodiorite intrusion. The main mineralized veins are San Marcial, Ibarra and Gallo-Gallina which are oriented parallel to the intrusive contact and have thicknesses varying from 0.4 m to 4 m and horizontal extents of up to 1,000 m to the east/northeast from the granodiorite contact. The mineralization is associated with massive and disseminated sulfides occurring in replacement ore bodies between the main veins and in the skarn and include chalcopyrite (CuFeS), sphalerite (ZnS), galena (PbS), bornite (CuFeS), tetrahedrite (CuFe Sb S), native Silver (Ag), Pyrite (FeS), arsenopyrite (FeAsS) and stibnite (SbS).

The following table contains the summary of mineral resources for San Martin as of December 31, 2023, based on long-term metal price assumptions:

​​​​​​​​​​​​​​​​​​​
​ · ​ · 2023 · ​ · 2022
Silver · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Metal price (per ounce) · Amount (thousand tonnes) · Grades (grams per tonne) · Metal content (thousand ounces) · ​ · Variation
Measured mineral resources​—​—​—​—​—​—​—​—​—
Indicated mineral resources​23.00​12,978​77​32,236​23.0011,542​92​34,311​(6.0)%
Measured + Indicated mineral resources​23.00​12,978​77​32,236​23.00​11,542​92​34,311​(6.0)%
Inferred mineral resources​23.00​52,330​72​121,500​23.00​9,176​112​32,894​269.4%
​​​​​​​​​​​​​​​​​​​
ZincMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—​—​—​—​—%—​—
Indicated mineral resources​1.32​12,978​1.97%256.3​1.3211,542​2.48%285.9​(10.4)%
Measured + Indicated mineral resources​1.32​12,978​1.97%256.3​1.32​11,542​2.48%285.9​(10.4)%
Inferred mineral resources​1.32​52,330​2.66%1,393.8​1.32​9,176​2.05%187.8​642.2%
​​​​​​​​​​​​​​​​​​​
LeadMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—​—​—​—​—%—​—
Indicated mineral resources​1.04​12,978​0.34%43.9​1.0411,542​0.49%56.6​(22.4)%
Measured + Indicated mineral resources​1.04​12,978​0.34%43.9​1.04​11,542​0.49%56.6​(22.4)%
Inferred mineral resources​1.04​52,330​0.32%167.5​1.04​9,176​0.62%56.4​197.0%
​​​​​​​​​​​​​​​​​​​
CopperMetal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Metal price (per pound)Amount (thousand tonnes)GradesMetal content (thousand tonnes)​Variation
Measured mineral resources​—​—​—​—​—​—​—%—​—
Indicated mineral resources​3.80​12,978​0.65%84.8​3.8011,542​0.61%70.2​20.8%
Measured + Indicated mineral resources​3.80​12,978​0.65%84.8​3.80​11,542​0.61%70.2​20.8%
Inferred mineral resources​3.80​52,330​0.48%251.3​3.80​9,176​0.49%45.4​453.5%
(1)Mineral resources are reported in situ and are current as at December 31, 2023.
(2)Mineral resources are reported exclusive of mineral reserves.
(3)Metallurgical recovery assumptions (in payable concentrates) are 71% for silver, 31% for lead, 67% for copper and 75% for zinc.
(4)Mineral resources are reported at metal-equivalent Cut-Off Grades (COG) based on metal price assumptions, variable metallurgical recovery assumptions, mining costs, processing costs, G&A costs, and variable Net Smelter Recovery (NSR) factors. Mining, processing, and G&A costs total $63.1/t. with metal prices of $1,725/tr oz for Au, $23/tr oz for Ag, $1.04/lb for Pb, $1.32 /lb for Zn and $3.80/lb for Cu.
(5)For further information on assumptions used in preparing the estimates, including a detailed description of the cut-off determination, please refer to Chapter 11 of the San Martin operations technical report summary prepared by qualified persons, dated February 05, 2024.
(6)Variations in mineral resources in 2023 were attributable to the implementation of 3D implicit geological modeling, geostatistical analysis, block model construction and mineral resource estimation, involving changes in the method of evaluating capping, use of statistical tools and grade continuity evaluation through variography analysis.
(7)The inferred continuity of the mineralized structures was based on the variography analysis and the geological evidence that resulted in a significant increase in inferred resources.
(8)Additional exploration drilling and production depletion in 2023 resulted in additional variations in mineral resources in 2023 .

Santa Eulalia

The mining district of Santa Eulalia is located in the central part of the state of Chihuahua, Mexico, approximately 26 kilometers east of the city of Chihuahua, and is connected to the city of Chihuahua by a paved road (highway no. 45). It was discovered in 1590 but exploitation began in 1870. The main mines in Santa Eulalia are The Buena Tierra mine and the San Antonio mine.

Regarding its geology, the majority of mineralization corresponds to ore skarns: silicoaluminates of calcium, iron and manganese with variable quantities of lead, zinc, copper and iron sulfides. Economic ore include sphalerite (ZnS), galena (PbS) and small quantities of pyrargyrite (Ag 3 SbS 3).

In the first quarter of 2020, the Santa Eulalia mine temporarily suspended its operations due to flooding. We are currently evaluating different options to supply the Santa Eulalia concentrator. We are also evaluating drainage at the mining facilities and determining if it is possible to sell the water for agricultural or other uses.

Taxco

The Taxco mining complex has been on strike since July 2007. It is located on the outskirts of the city of Taxco in the northern part of the state of Guerrero, Mexico. It was discovered in 1519 and mining activities in the 20th century began in 1918. The complex includes several underground mines (San Antonio, Guerrero and Remedios) and a flotation plant. The ore contains lead and zinc concentrates, with some amounts of gold and silver.

There was no mine exploration drilling at Taxco during the three-year period ended December 31, 2023 due to the strikes. Please see Note 13 “Commitments and Contingencies—Labor matters” to the consolidated financial statements.

Processing Facilities—San Luis Potosi

Our San Luis Potosi electrolytic zinc refinery is located in the city of San Luis Potosi, in the state of San Luis Potosi, Mexico. The city of San Luis Potosi is connected to our refinery by a major highway.

Zinc Refinery

The San Luis Potosi electrolytic zinc refinery was built in 1982 and was designed to produce 105,000 tonnes of refined zinc per year by treating up to 200,000 tonnes of zinc concentrate from our own mines, principally Charcas, which is located 113 kilometers from the refinery. The refinery produces special high-grade zinc (99.995%), high-grade zinc (over 99.9%) and zinc-based alloys with aluminum, lead, copper or magnesium in varying quantities and sizes depending on market demand. Refined silver and gold production is obtained from tolling services provided by a third party mining company.

The electrolytic zinc refinery has an acid plant, a steam recovery boiler and a roaster. There is also a calcine processing area with five leaching stages: neutral, hot acid, intermediate acid, acid, purified fourth and jarosite, as well as two stages for solution purifying.

The table below contains production information for 2023, 2022 and 2021 for our San Luis Potosi zinc refinery:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · Variance
​​​​​​​​​​2023 - 2022
​​202320222021Volume%
Total zinc concentrate treated(kt)215.2215.3203.6(0.1)(0.0)%
Refined zinc produced(kt)101.099.992.71.11.1%
Sulfuric acid produced(kt)179.9182.1172.4(2.2)(1.2)%
Refined silver produced(kt)13.918.919.1(5.0)(26.5)%
Refined gold produced(k)21.721.520.50.20.9%
Refined cadmium produced(kt)0.50.60.5(0.1)(15.0)%
Average refinery recovery(%)92.293.191.9(0.9)(1.0)%

kt = thousand tonnes

MINERAL RESOURCES AND RESERVES

Mineral resources are concentrations or occurrences of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. Such a deposit cannot qualify as recoverable proven and probable mineral reserves until engineering, legal and economic feasibility are confirmed based upon a comprehensive evaluation of development and operating costs, grades, recoveries and other material factors. Mineral resources include measured, indicated and inferred mineral classifications.

Measured mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.

Indicated mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.

Inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred mineral resource may not be considered when assessing the economic viability of a mining project, may not be converted to a mineral reserve and no assurance can be given that the estimated mineral resources not included in mineral reserves will become proven and probable mineral reserves.

Mineral reserves are estimates of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. Mineral reserves, as used in the mineral reserve data presented in this report, means the economically mineable part of a measured or indicated resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. Proven mineral reserve is the economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource. Probable mineral reserve is the economically mineable part of an indicated and, in some cases, a measured mineral resource.

Our estimates of mineral reserves and mineral resources have been prepared in accordance with the disclosure requirements of S-K 1300. Pursuant to SEC guidance, qualified persons used forecast metal prices for mineral resource and mineral reserve estimation and the economic analysis. These projected prices were derived from forecasts from several analysts and banks. The commodity price forecast covered the period 2021–2025 and provided a long-term forecast for 2025 onward. As of December 31, 2023, we considered $3.30 per pound of copper and $10.00 per pound of molybdenum.

Our engineering department reviews reserve computations in detail on an annual basis. In addition, our engineering department reviews the computation when changes in assumptions occur. Changes can occur for price or cost assumptions, results in field drilling or new geotechnical parameters. We also engage third party consultants to review mine planning procedures.

We periodically reevaluate estimates of our mineral reserves, which represent our estimate as to the amount of unmined copper remaining in our existing mine locations that can be produced and sold at a profit. These estimates are based on engineering evaluations derived from samples of drill holes and other openings, combined with assumptions about copper market prices and production costs at each of our mines. See Risk Factors in Item 1A for a discussion of risks associated with our estimates of mineral reserves and resources.

The qualified persons responsible for mineral reserve and resource estimates are as follows:

Peruvian open-pit:

Cuajone mine – Wood Group USA Inc.

Toquepala mine - Wood Group USA Inc.

Tia Maria project:

Chancas project:

Michiquillay project:

Mexican open-pit:

La Caridad - Golder Associates USA Inc.

Buenavista del Cobre - Golder Associates USA Inc.

IMMSA unit:

Santa Barbara - SRK Consulting (U.S.), Inc.

Charcas - SRK Consulting (U.S.), Inc.

San Martin – SRK Consulting (U.S.), Inc.

El Arco project:

El Pilar project:

M3 Engineering & Technology Corp., Ingenieria Geomex, S.A. de C.V., and Golder Associates USA Inc.

Pilares project:

Golder Associates USA Inc.

MINERAL RESERVES AND MINERAL RESOURCES INTERNAL CONTROLS DISCLOSURE

In 2021, we adopted the new requirements of S-K 1300. As part of this process, we developed an implementation plan with a high-level cross functional team, which performed a completeness assessment over the Technical Report Summaries for each material property prepared by a third-party Qualified Person. Additionally, we established new policies, procedures and internal controls related to the new regulation. The review includes, among others, an analysis of the reasonableness of technical information, a thorough review of the mineral resources and reserves estimates, and the economic analysis which supports these estimates.

In addition, as part of the adoption of the requirements of S-K 1300, a significant component of our internal controls and quality assurance procedures on the information from material properties was performed by qualified persons responsible for mineral reserve and resource estimates. These include an intensive review of our procedures, as well as database verification, validation of mineral resource and reserve estimates, and the elaboration of technical report summaries. These controls and methods help to validate the reasonabless of the estimates. The effectiveness of the controls are reviewed periodically to address changes in conditions and the degree of compliance with policies and procedures.

EXPLORATION ACTIVITIES

We are engaged in ongoing extensive exploration to locate additional ore bodies in Peru, Mexico, Argentina, Ecuador and Chile. We also conduct exploration in the areas of our current mining operations. We invested $55.0 million on exploration programs in 2023, $41.7 million in 2022 and $43.4 million in 2021 and we expect to spend approximately $65 million on exploration programs in 2024.

Currently, we directly control 156,818 hectares and 502,688 hectares of concessions in Peru and Mexico, respectively. We also currently hold 168,200 hectares and 28,453 hectares of exploration concessions in Argentina and Chile, respectively.

Peru

In 2023, we finished a diamond drilling program of 4,500 meters at the Chaparra Project and determined the existence of low-grade copper mineralization. We will not continue exploration work on this project. Regarding the exploration programs in southern Peru, we conducted a diamond drilling program of 2,031 meters in the Qori Project and the results are currently under evaluation. We also concluded the geophysical studies of the Atico Project to determine potential levels of copper mineralization.

In 2024, we plan to conduct a diamond drilling program for 5,000 meter to explore prospective areas for copper mineralization, primarily in Southern Peru. Additionally, we will carry out prospecting work in metallogenic zones associated with copper porphyry systems.

Mexico

In addition to exploration and drilling programs at existing mines, we are currently conducting exploration to locate mineral deposits at various other sites in Mexico. The following are some of the more significant exploration projects:

*The Chalchihuites.*This is a skarn type deposit located in the state of Zacatecas, close to the San Martin mining unit. Drilling programs conducted between 1980 and 2014 identified 12.6 million of mineralized material with an average silver content of 110 grams per ton, 2.66% of zinc, 0.37% of lead and 0.67% of copper. Current results indicate that mineralization consists of a complex mixture of oxides and sulfides of silver, lead and zinc that requires additional metallurgical research. In 2017, we started a new drilling program of 21,000 meters to continue metallurgical research and testing. In 2018, this exploration program, which included 48 drill holes was completed. This program has been carried out in compliance with QA/QC protocol, which includes testing the specific density of different rocks and mineralized types and geochemistry sampling. In addition, 5,000 meters of core sample from the drilling program were analyzed with a hyperspectral scanner, and a study of 498 kilometers of hyperspectral imaging was conducted to

recognize the geology of the entire Chalchihuites mineral district. In 2019, with the complete data from the diamond drilling program, we made a geological model of the Cronos deposit using Leapfrog software. In 2020, the sample design for a metallurgical test was completed and three metallurgical samples were delivered to an external consultant. Metallurgical tests for silver recovery will continue with semi-sulfide and oxide ores. In 2022 and 2023, we drilled a total 5,000 meters and included 16 drill holes in the area known as Virgen Morena. Exploration activities at this area did not render positive results and they were suspended. Metallurgical tests were concluded and confirmed that recoveries in sulphide flotation are good for Zn, Cu, Pb and Ag; however it was not possible to separate lead from the copper concentrate. Dynamic acid leaching tests were performed for oxides and mixed oxides. The results were positive. In 2024, Cu-Pb separation tests will be carried out using an extended kinetics simulation in a microbubble cell and then at the laboratory level, to determine flotation of Cu/Pb concentrate. We will evaluate the possibility of building an access ramp to obtain ore and process it in a pilot plant.

*Campo Medio (Santa Eulalia).*This prospect is located close to the west border of the Santa Eulalia mine. Results of geological surveying and drilling programs indicated that its mineralization consists of sulfides with 2.85 meters of width, 219 grams of silver, 6.60% of lead and 7.55% of zinc. Exploration at the Campo Medio area did not render positive results and exploration activities were suspended. We abandoned the project because the mineralized intervals intercepted by core drilling were insufficient to determine drilling targets of economic interest.

San Antonio Sur (Santa Eulalia). It is located in the San Antonio mine, eastern field zone in Santa Eulalia. There is evidence of mineralization at Level 8 inside the mine. The drilling program is in place to verify the continuity of mineralization. The mine is currently flooded. In December 2023, the gauging stage with the new pumping system began, but it is currently not clear if the mine can be dewatered.

Chile

*El Salado (Montonero).*A copper-gold prospect located in the Atacama region, northern Chile has been under exploration for copper and molybdenum porphyry since 2014. In 2016 and 2017, we conducted a diamond drilling program of 22,108 meters and finished the conceptual study. In 2022, we concluded the pre-feasibility study of the project. We are currently evaluating this deposit and expect to complete an economic evaluation in 2024.

In 2023, we conducted diamond drilling programs of 2,397 meters and 3,000 meters at the Chapalele and Taruca prospects respectively, both located in the Atacama Region, Province of Huasco. These prospects have copper porphyry characteristics; the results indicated no occurrence of mineralization of economic interest.

Ecuador

*Chaucha.*The Ruta del Cobre (“Copper Road”) project is located in the west of Cuenca city and south of Guayaquil. The mineralization in this area is characteristic of a copper-molybdenum porphyry system which is being explored since 2014. In 2021, the infill-drilling program was concluded, totaling 121,000 meters of diamond drilling. With this information, we prepared the project’s feasibility study, which concluded in 2022. The results of this study did not meet the Company´s commercial expectations and efforts were suspended in 2023.

Argentina

In 2011, we started exploration activities in Argentina in the Neuquen province. In 2015, we performed geological exploration in the Salta, Rio Negro and Neuquen provinces where we expected to locate copper porphyry with precious metals epithermal systems. Starting 2017, we performed prospection and geological evaluation work in the provinces of San Juan and Rio Negro with the exploration of silver-gold epithermal systems through geological mapping and surface sampling. In 2021, superficial geological and geochemical work was concluded at the Cerro La Mina and Tanque Negro prospects. In 2023, we developed surface geochemical and geological studies at the La Hoyada and La Chilena prospects, both located in the province of Catamarca. With the results of these studies, we expect to perform a diamond drilling program of 2,000 meters in 2024.

*Cañadon del Moro.This is *a low sulfidation epithermal deposit with high longitude seams located in the Rio Negro province. We conducted a diamond drilling program of 1,300 meters through 2021. In 2022, we conducted a diamond

drilling program of 8,864 meters to evaluate the resource. In 2023, we started the Conceptual Study and expect to finish it in 2024. So far, the results are positive.