Chord Energy Corp
For the period ended Sep 30, 2024. Filed Nov 7, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Nov 7, 2024
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Glossary of Terms
The terms defined in this section are used throughout this Quarterly Report on Form 10-Q:
“ABR.” Alternate base rate.
“ARO.” Asset retirement obligations.
“ASC.” Accounting Standards Codification.
“ASU.” Accounting Standards Update.
“Basin.” A large natural depression on the earth’s surface in which sediments generally brought by water accumulate.
“Bbl.” One stock tank barrel, of 42 U.S. gallons liquid volume, used herein in reference to crude oil, condensate, natural gas liquids or fresh water.
“Boe.” Barrels of oil equivalent, with 6,000 cubic feet of natural gas being equivalent to one barrel of crude oil.
“Boepd.” Barrels of oil equivalent per day.
“Bopd.” Barrels of oil per day.
“British thermal unit.” The heat required to raise the temperature of a one-pound mass of water from 58.5 to 59.5 degrees Fahrenheit.
“Completion.” The process of treating a drilled well followed by the installation of permanent equipment for the production of natural gas or oil, or in the case of a dry hole, the reporting of abandonment to the appropriate agency.
“DD&A.” Depreciation, depletion and amortization.
“Dry hole.” A well found to be incapable of producing hydrocarbons in sufficient quantities such that proceeds from the sale of such production exceed production expenses and taxes.
“Economically producible.” A resource that generates revenue that exceeds, or is reasonably expected to exceed, the costs of the operation.
“ESG.” Environmental, social and governance.
“FASB.” Financial Accounting Standards Board.
“Field.” An area consisting of a single reservoir or multiple reservoirs all grouped on, or related to, the same individual geological structural feature or stratigraphic condition. The field name refers to the surface area, although it may refer to both the surface and the underground productive formations.
“Formation.” A layer of rock which has distinct characteristics that differ from nearby rock.
“G&A.” General and administrative.
“GAAP.” Generally accepted accounting principles in the United States.
“GPT.” Gathering, processing and transportation.
“MBbl.” One thousand barrels of crude oil, condensate, natural gas liquids or fresh water.
“MBoe.” One thousand barrels of oil equivalent.
“Mcf.” One thousand cubic feet of natural gas.
“MMBtu.” One million British thermal units.
“MMcf.” One million cubic feet of natural gas.
“Net acres.” The percentage of total acres an owner has out of a particular number of acres, or a specified tract. An owner who has 50% interest in 100 acres owns 50 net acres.
“NGL.”Natural gas liquids.
“NYMEX.” The New York Mercantile Exchange.
“NYMEX WTI.” The New York Mercantile Exchange West Texas Intermediate crude oil price index.
“OPEC+.” The Organization of Petroleum Exporting Countries and other oil exporting nations.
“Plug.”A down-hole packer assembly used in a well to seal off or isolate a particular formation for testing, acidizing, cementing, etc.; also a type of plug used to seal off a well temporarily while the wellhead is removed.
“Productive well.” A well that is found to be capable of producing hydrocarbons in sufficient quantities such that proceeds from the sale of the production exceed production expenses and taxes.
“Proved reserves.” Those quantities of oil and gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible — from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations — prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. The project to extract the hydrocarbons must have commenced or the operator must be reasonably certain that it will commence the project within a reasonable time. The area of the reservoir considered as proved includes (i) the area identified by drilling and limited by fluid contacts, if any, and (ii) adjacent undrilled portions of the reservoir that can, with reasonable certainty, be judged to be continuous with it and to contain economically producible crude oil or gas on the basis of available geoscience and engineering data. In the absence of data on fluid contacts, proved quantities in a reservoir are limited by the lowest known hydrocarbons, as seen in a well penetration unless geoscience, engineering, or performance data and reliable technology establishes a lower contact with reasonable certainty. Where direct observation from well penetrations has defined a highest known oil, elevation and the potential exists for an associated gas cap, proved oil reserves may be assigned in the structurally higher portions of the reservoir only if geoscience, engineering, or performance data and reliable technology establish the higher contact with reasonable certainty. Reserves which can be produced economically through application of improved recovery techniques (including, but not limited to, fluid injection) are included in the proved classification when (i) successful testing by a pilot project in an area of the reservoir with properties no more favorable than in the reservoir as a whole, the operation of an installed program in the reservoir or an analogous reservoir, or other evidence using reliable technology establishes the reasonable certainty of the engineering analysis on which the project or program was based; and (ii) the project has been approved for development by all necessary parties and entities, including governmental entities. Existing economic conditions include prices and costs at which economic producibility from a reservoir is to be determined. The price shall be the average price during the 12-month period prior to the ending date of the period covered by the report, determined as an unweighted arithmetic average of the first-day-of-the-month price for each month within such period, unless prices are defined by contractual arrangements, excluding escalations based upon future conditions.
“Reasonable certainty.” If deterministic methods are used, reasonable certainty means a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90 percent probability that the quantities actually recovered will equal or exceed the estimate. A high degree of confidence exists if the quantity is much more likely to be achieved than not, and, as changes due to increased availability of geoscience (geological, geophysical and geochemical) engineering, and economic data are made to estimated ultimate recovery with time, reasonably certain estimated ultimate recovery is much more likely to increase or remain constant than to decrease.
“Reserves.” Estimated remaining quantities of crude oil and natural gas and related substances anticipated to be economically producible as of a given date by application of development prospects to known accumulations.
“Reservoir.” A porous and permeable underground formation containing a natural accumulation of producible natural gas and/or crude oil that is confined by impermeable rock or water barriers and is separate from other reservoirs.
“SEC.” The U.S. Securities and Exchange Commission.
“SOFR.” Secured overnight financing rate as administered by the Federal Reserve Bank of New York.
“Unit.” The joining of all or substantially all interests in a reservoir or field, rather than a single tract, to provide for development and operation without regard to separate property interests. Also, the area covered by a unitization agreement.
“Wellbore.” The hole drilled by the bit that is equipped for crude oil or gas production on a completed well. Also called well or borehole.
“Workover.” The repair or stimulation of an existing productive well for the purpose of restoring, prolonging or enhancing the production of hydrocarbons.
EXPLANATORY NOTE
On May 31, 2024, Chord Energy Corporation (“Chord” or the “Company”) completed the previously announced arrangement agreement with Enerplus Corporation, a corporation existing under the laws of the Province of Alberta, Canada (“Enerplus”) and Spark Acquisition ULC, an unlimited liability company organized and existing under the laws of the Province of Alberta, Canada and a wholly-owned subsidiary of the Company, pursuant to which, among other things, the Company acquired Enerplus in a stock-and-cash transaction. The business combination was accounted for as of May 31, 2024 under the acquisition method of accounting in accordance with FASB ASC 805, Business Combinations. Accordingly, unless otherwise specifically noted herein, the periods prior to May 31, 2024 report the financial results of Chord excluding the impacts from the business combination with Enerplus, while the periods as of and subsequent to May 31, 2024 report the financial results including the impacts from the business combination.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.