| Page No |
|---|
| PART I |
|---|
| ITEM 1. | BUSINESS | 10 |
|---|
| ITEM 1A. | RISK FACTORS | 51 |
|---|
| ITEM 1B. | UNRESOLVED STAFF COMMENTS | 75 |
|---|
| ITEM 1C. | CYBERSECURITY | 75 |
|---|
| ITEM 2. | PROPERTIES | 76 |
|---|
| ITEM 3. | LEGAL PROCEEDINGS | 76 |
|---|
| ITEM 4. | MINE SAFETY DISCLOSURES | 76 |
|---|
| PART II |
|---|
| ITEM 5. | MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES | 77 |
|---|
| ITEM 6. | RESERVED | 79 |
|---|
| ITEM 7. | MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS | 79 |
|---|
| ITEM 7A. | QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK | 105 |
|---|
| ITEM 8. | FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA | 106 |
|---|
| ITEM 9. | CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE | 177 |
|---|
| ITEM 9A. | CONTROLS AND PROCEDURES | 177 |
|---|
| ITEM 9B. | OTHER INFORMATION | 177 |
|---|
| ITEM 9C. | DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS | 178 |
|---|
| PART III |
|---|
| ITEM 10. | DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE | 178 |
|---|
| ITEM 11. | EXECUTIVE COMPENSATION | 179 |
|---|
| ITEM 12. | SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS | 179 |
|---|
| ITEM 13. | CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE | 179 |
|---|
| ITEM 14. | PRINCIPAL ACCOUNTANT FEES AND SERVICES | 179 |
|---|
| PART IV |
|---|
| ITEM 15. | EXHIBITS, FINANCIAL STATEMENT SCHEDULES | 180 |
|---|
| SIGNATURES | 186 | |
|---|
Glossary of Terms To be updated close to filing
Unless the context otherwise requires, all references in this Annual Report on Form 10-K (this “Annual Report”) to “Ormat”, “the Company”, “we”, “us”, “our company”, “Ormat Technologies”, or “our” refer to Ormat Technologies, Inc. and its consolidated subsidiaries. A glossary of certain terms and abbreviations used in this annual report appears at the beginning of this Annual Report. When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below:
| Term | Definition |
|---|
| AC | Alternating Current |
|---|
| ACC | Air Cooled Condenser |
|---|
| ACUA | Atlantic County Utilities Authority |
|---|
| Amatitlan Loan | $42,000,000 in initial aggregate principal amount borrowed by our subsidiary Ortitlan Limitada from Banco Industrial S.A. and Westrust Bank (International) Limited. |
|---|
| AMM | Administrador del Mercado Mayorista (administrator of the wholesale market — Guatemala) |
|---|
| ARRA | American Recovery and Reinvestment Act of 2009 |
|---|
| Auxiliary Power | The power needed to operate a geothermal power plant’s auxiliary equipment such as pumps and cooling towers |
|---|
| Availability | The ratio of the time a power plant is ready to be in service, or is in service, to the total time interval under consideration, expressed as a percentage, independent of fuel supply (heat or geothermal) or transmission accessibility |
|---|
| BESS | Battery Energy Storage Systems |
|---|
| BLM | Bureau of Land Management of the U.S. Department of the Interior |
|---|
| BOT | Build, operate and transfer |
|---|
| BPP | PLN's existing average cost of generation |
|---|
| CAISO | California Independent System Operator |
|---|
| CalGEM | California Geologic Energy Management |
|---|
| Capacity | The maximum load that a power plant can carry under existing conditions, less auxiliary power |
|---|
| Capacity Factor | The ratio of the actual MWh generated and the generating capacity times 8760 hours expressed as a percentage |
|---|
| CARES | Coronavirus Aid, Relief, and Economic Security Act |
|---|
| CCA | Community Choice Aggregator |
|---|
| CDC | Caisse des Dépôts et Consignations, a French state-owned financial organization |
|---|
| CEO | Chief Executive Officer |
|---|
| CFO | Chief Financial Officer |
|---|
| C&I | Refers to the Commercial and Industrial sectors, excluding residential |
|---|
| CNEE | National Electric Energy Commission of Guatemala |
|---|
| COD | Commercial Operation Date |
|---|
| Company | Ormat Technologies, Inc., a Delaware corporation, and its consolidated subsidiaries |
|---|
| CPA | Clean Power Alliance |
|---|
| CPI | Consumer Price Index |
|---|
| CPUC | California Public Utilities Commission |
|---|
| DEG | Deutsche Investitions-und Entwicklungsgesellschaft mbH |
|---|
| CREE | The Regulatory Commission of Electric Power in Honduras |
|---|
| DFC | U.S. International Development Finance Corporation (formerly OPIC) |
|---|
| DOE | U.S. Department of Energy |
|---|
| DSCR | Debt Service Coverage Ratio |
|---|
| EBITDA | Earnings before interest, taxes, depreciation, amortization and accretion |
|---|
| EDF | Electricite de France S.A. |
|---|
| EGS | Enhanced Geothermal Systems |
|---|
| EIB | European Investment Bank |
|---|
| Eligible Green Projects | Allocations made by the Company or any of its subsidiaries to any of the projects defined below in the 24 months prior to or 24 months following the issuance date of the bonds. Eligible Green Projects include the following (for illustrative purposes only): (i) renewable energy (new geothermal energy generation facilities with GHG emissions less than 100g CO2d/KWh; upgrades to existing geothermal energy generation facilities to increase efficiency, resiliency and reliability; energy storage systems; or solar PV systems); and (ii) eco-efficient and/or circular economy adapted products. |
|---|
| EMRA | Energy Market Regulatory Authority in Turkey |
|---|
| ENEE | Empresa Nacional de Energía Eléctrica |
|---|
| Enthalpy | The total energy content of a fluid; the heat plus the mechanical energy content of a fluid (such as a geothermal brine), which, for example, can be partially converted to mechanical energy in an Organic Rankine Cycle. |
|---|
| EPA | U.S. Environmental Protection Agency |
|---|
| EPC | Engineering, procurement and construction |
|---|
| ERCOT | Electric Reliability Council of Texas, Inc. |
|---|
| EPRA | Energy and Petroleum Regulatory Authority of Kenya |
|---|
| EU | European Union |
|---|
| EWG | Exempt Wholesale Generators |
|---|
| Exchange Act | U.S. Securities Exchange Act of 1934, as amended |
|---|
| FASB | Financial Accounting Standards Board |
|---|
| FERC | U.S. Federal Energy Regulatory Commission |
|---|
| FIT | Feed-in Tariff |
|---|
| FPA | U.S. Federal Power Act, as amended |
|---|
| GAAP | Generally accepted accounting principles |
|---|
| GCCU | Geothermal Combined Cycle Unit |
|---|
| GDC | Geothermal Development Company |
|---|
| Geothermal Power Plant | The power generation facility and the geothermal field |
|---|
| Geothermal Steam Act | U.S. Geothermal Steam Act of 1970, as amended |
|---|
| GERD | Grand Ethiopian Renaissance Dam |
|---|
| GHG | Greenhouse gas |
|---|
| GIS | Geographic Information Systems |
|---|
| Green bonds or green convertible bonds | Bonds, which the proceeds from, are used to finance and/or refinance, in whole or in part, new or on-going projects in accordance with the Ormat Green Finance Framework. |
|---|
| GW | Gigawatt |
|---|
| GWh | Gigawatt hour |
|---|
| HELCO | Hawaii Electric Light Company |
|---|
| IDWR | Idaho Department of Water |
|---|
| IESO | The Independent Electricity System Operator |
|---|
| IFM | In Front of the Meter |
|---|
| IGA | International Geothermal Association |
|---|
| IID | Imperial Irrigation District |
|---|
| INDE | Instituto Nacional de Electrification |
|---|
| IOUs | Investor-Owned Utilities |
|---|
| IPCC | Intergovernmental Panel on Climate Change |
|---|
| IPPs | Independent Power Producers |
|---|
| IRA | Inflation Reduction Act of 2022 |
|---|
| ISO | Independent System Operator |
|---|
| ISONE | ISO New England |
|---|
| ITC | Investment Tax Credit |
|---|
| JBIC | Japan Bank for International Cooperation |
|---|
| JOGMEC | Japan state-owned resources agency |
|---|
| John Hancock | John Hancock Life Insurance Company (U.S.A.) |
|---|
| JPM | J.P. Morgan Capital Corporation |
|---|
| KenGen | Kenya Electricity Generating Company Ltd. |
|---|
| Kenyan Energy Act | Kenyan Energy Act, 2006 |
|---|
| KETRACO | Kenya Electricity Transmission Company Limited |
|---|
| KGRA | Known Geothermal Resource Area |
|---|
| KLP | Kapoho Land Partnership |
|---|
| KPLC | Kenya Power and Lighting Co. Ltd. |
|---|
| KRA | Kenya Revenue Authority |
|---|
| kW | Kilowatt - A unit of electrical power that is equal to 1,000 watts |
|---|
| kWh | Kilowatt hour(s), a measure of power produced |
|---|
| LCOE | Levelized Costs of Energy |
|---|
| Mammoth Pacific | Mammoth-Pacific, L.P. |
|---|
| MEMR | The Indonesian Minister of Energy and Mineral Resources |
|---|
| MW | Megawatt - One MW is equal to 1,000 kW or one million watts |
|---|
| MWh | Megawatt hour(s), a measure of energy produced |
|---|
| NIS | New Israeli Shekel |
|---|
| NOA | Notice of Assessments |
|---|
| Notes | Convertible notes from 2022 |
|---|
| NV Energy | NV Energy, Inc. |
|---|
| NYSE | New York Stock Exchange |
|---|
| NYISO | New York Independent System Operator, Inc. |
|---|
| OEC | Ormat Energy Converter |
|---|
| OFC | Ormat Funding Corp., a wholly owned subsidiary of the Company |
|---|
| OFC 2 | OFC 2 LLC, a wholly owned subsidiary of the Company |
|---|
| OFC 2 Senior Secured Notes | Up to $350,000,000 Senior Secured Notes, due 2034 issued by OFC 2 |
|---|
| Opal Geo | Opal Geo LLC |
|---|
| OPC | OPC LLC, a consolidated subsidiary of the Company |
|---|
| OrCal | OrCal Geothermal Inc., a wholly owned subsidiary of the Company |
|---|
| ORC | Organic Rankine Cycle - A process in which an organic fluid such as a hydrocarbon or fluorocarbon (but not water) is boiled in an evaporator to generate high pressure vapor. The vapor powers a turbine to generate mechanical power. After the expansion in the turbine, the low-pressure vapor is cooled and condensed back to liquid in a condenser. A cycle pump is then used to pump the liquid back to the vaporizer to complete the cycle. The cycle is illustrated in the figure below: |
|---|
| Ormat International | Ormat International Inc., a wholly owned subsidiary of the Company |
|---|
| Ormat Nevada | Ormat Nevada Inc., a wholly owned subsidiary of the Company |
|---|
| Ormat Systems | Ormat Systems Ltd., a wholly owned subsidiary of the Company |
|---|
| Ormat Green Finance Framework | A framework developed in alignment with the Green Bond Principles (2021), as published by the International Capital Markets Association, by which the proceeds of green bonds are used to finance and/or refinance, in whole or in part, one or more Eligible Green Projects. |
|---|
| ORIX | ORIX Corporation |
|---|
| ORPD | ORPD LLC, a holding company subsidiary of the Company in which Northleaf Geothermal Holdings, LLC holds a 36.75% equity interest |
|---|
| OrPower 4 | OrPower 4 Inc., a wholly owned subsidiary of the Company |
|---|
| Ortitlan | Ortitlan Limitada, a wholly owned subsidiary of the Company |
|---|
| ORTP | ORTP, LLC, a consolidated subsidiary of the Company |
|---|
| Orzunil | Orzunil I de Electricidad, Limitada, a wholly owned subsidiary of the Company |
|---|
| PEC | Portfolio Energy Credits |
|---|
| PG&E | Pacific Gas and Electric Company |
|---|
| PGV | Puna Geothermal Venture, a wholly owned subsidiary of the Company |
|---|
| PJM | PJM Interconnection, LLC |
|---|
| PLN | PT Perusahaan Listrik Negara |
|---|
| Power plant equipment | Interconnection equipment, cooling towers for water cooled power plant, etc., including the generating units |
|---|
| PPA | Power purchase agreement |
|---|
| PTC | Production Tax Credit |
|---|
| PUC | Public Utilities Commission |
|---|
| PUCH | Public Utilities Commission of Hawaii |
|---|
| PUCN | Public Utilities Commission of Nevada |
|---|
| PUHCA | U.S. Public Utility Holding Company Act of 1935 |
|---|
| PUHCA 2005 | U.S. Public Utility Holding Company Act of 2005 |
|---|
| PURPA | U.S. Public Utility Regulatory Policies Act of 1978 |
|---|
| Qualifying Facility(ies) | Certain small power production facilities are eligible to be “Qualifying Facilities” under PURPA, provided that they meet certain power and thermal energy production requirements and efficiency standards. Qualifying Facility status provides an exemption from PUHCA 2005 and grants certain other benefits to the Qualifying Facility |
|---|
| RCEA | Redwood Coast Energy Authority |
|---|
| REC | Renewable Energy Credit |
|---|
| REG | Recovered Energy Generation |
|---|
| RER | Renewable Energy Resource certificate |
|---|
| RPS | Renewable Portfolio Standards |
|---|
| RTO | Regional Transmission Organization |
|---|
| SCE | Southern California Edison |
|---|
| SCPPA | Southern California Public Power Authority |
|---|
| SDG&E | San Diego Gas and Electric |
|---|
| SEC | U.S. Securities and Exchange Commission |
|---|
| Securities Act | U.S. Securities Act of 1933, as amended |
|---|
| SOL | Sarulla Operations Ltd. |
|---|
| Solar PV | solar photovoltaic |
|---|
| SOX Act | Sarbanes-Oxley Act of 2002 |
|---|
| SRAC | Short Run Avoided Costs |
|---|
| TASE | Tel Aviv Stock Exchange |
|---|
| Tax Act | Tax Cuts and Jobs Act |
|---|
| UIC | Underground Injection Control |
|---|
| UN | United Nation |
|---|
| Union Bank | Union Bank, N.A. |
|---|
| U.S. | United States of America |
|---|
| U.S. Treasury | U.S. Department of the Treasury |
|---|
| USG | U.S. Geothermal Inc. |
|---|
| VAT | Value Added Tax |
|---|
| VCE | Valley Clean Energy |
|---|
| Viridity | Viridity Energy Solutions Inc., a wholly owned subsidiary of the Company |
|---|
| YTL | Turkish Lira |
|---|
Cautionary Note Regarding Forward-Looking Statements and Risk Factor Summary
This Annual Report includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, included in this report that address activities, events or developments that we expect or anticipate will or may occur in the future, including such matters as our projections of annual revenues, expenses and debt service coverage with respect to our debt securities, future capital expenditures, business strategy, competitive strengths, goals, development or operation of generation assets, market and industry developments and the growth of our business and operations, are forward-looking statements. When used in this Annual Report, the words “may”, “will”, “could”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “projects”, “potential”, “target”, “goal”, or “contemplate” or the negative of these terms or other comparable terminology are intended to identify forward-looking statements, although not all forward-looking statements contain such words or expressions. The forward-looking statements in this Annual Report are primarily located in the material set forth under the headings Item 1 — “Business” contained in Part I of this Annual Report, Item 1A — “Risk Factors” contained in Part I of this Annual Report, Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” contained in Part II of this Annual Report, and “Notes to Financial Statements” contained in Item 8 — “Financial Statements and Supplementary Data” contained in Part II of this Annual Report, but are found in other locations as well. These forward-looking statements generally relate to our plans, objectives and expectations for future operations and are based upon management’s current estimates and projections of future results or trends. Although we believe that our plans and objectives reflected in or suggested by these forward-looking statements are reasonable, we may not achieve these plans or objectives. You should read this Annual Report completely and with the understanding that actual future results and developments may be materially different from what we expect attributable to a number of risks and uncertainties, many of which are beyond our control.
These forward-looking statements are made only as of the date hereof, and, except as legally required, we undertake no obligation to update or revise the forward-looking statements, whether as a result of new information, future events or otherwise.
A summary of the risks that may cause actual results to differ from our expectations include, but are not limited to the following:
Risks Related to the Company’s Business and Operation
| • | Our financial performance depends on the successful operation of our geothermal, REG, Solar PV power plants under the Electricity segment as well as, our energy storage facilities, which are subject to various operational risks. |
| • | Our exploration, development, and operation of geothermal energy resources are subject to geological risks and uncertainties, which may result in insufficient prospects to support our growth, decreased performance or increased costs for our power plants. |
| • | We may decide not to implement, or may not be successful in implementing, one or more elements of our multi-year strategic plan, and the plan may not achieve its goal of enhancing shareholder value. |
| • | Our investments in BESS technology involves new technologies and expected advanced technologies with relatively limited history with respect to reliability and performance and may not perform as expected. In addition, our investments and profitability may be negatively affected by a number of factors, including increases in storage costs, risk of fire and volatility in merchant prices. |
| • | Concentration of customers, specific projects and regions may expose us to heightened financial exposure. |
| • | Our international operations expose us to risks related to the application of foreign laws and regulations. |
| • | Political, economic and other conditions in the emerging economies where we operate, including Israel, may subject us to greater risk than in the developed U.S. economy. |
| • | Conditions in and around Israel, where the majority of our senior management and our main production and manufacturing facilities are located, including the ongoing military conflicts on the borders of Israel, may adversely affect our operations and may limit our ability to produce and sell our products, and support our Electricity segment. |
| • | Responses in various countries where we have business operations to Israel’s ongoing military conflicts on some of its borders or future similar conflicts may adversely affect our operations and may limit our ability to produce and sell our products. |
| • | Reduction in our Products segment backlog may affect our ability to fully utilize our main production and manufacturing facilities. |
| • | Some of our leases will terminate if we do not extract geothermal resources in “commercial quantities”, or if we fail to comply with the terms or stipulations of such leases or any of the provisions of the Geothermal Steam Act or if the lessor under any such lease defaults on any debt secured by the relevant property, thus requiring us to enter into new leases or secure rights to alternate geothermal resources, none of which may be available on terms as favorable to us as any such terminated lease, if at all. |
| • | Our business development activities may not be successful and our projects under construction or facilities undergoing enhancement and repowering may encounter delays. |
| • | Our future growth depends, in part, on the successful enhancement of a number of our existing facilities. |
| • | We rely on power transmission facilities that we do not own or control. |
| • | Our use of joint ventures may limit our flexibility with jointly owned investments. |
| • | Our operations could be adversely impacted by climate change. |
| • | We could be negatively impacted by regulatory and other responses to climate change. |
| • | We may not be able to successfully complete acquisitions, and we may not be able to successfully integrate, or realize anticipated synergies from, companies that we have acquired and may acquire in the future. |
| • | We encounter intense competition from electric utilities, other power producers, power marketers, developers and third-party investors. |
| • | Changes in costs and technology may significantly impact our business by making our power plants and products less competitive, resulting in our inability to sign new or recontracted PPAs for our Electricity segment and new supply and EPC contracts for our Products segment. |
| • | Our intellectual property rights may not be adequate to protect our business. |
| • | We may experience difficulties implementing and maintaining our new enterprise resource planning system. |
| • | We may experience a cyber-incident, cyber security breach, severe natural event or physical attack on our operational networks and information technology systems. |
Risks Related to Governmental Regulations, Laws and Taxation
| • | Our financial performance could be adversely affected by changes in the legal and regulatory environment affecting our operations. |
| • | Pursuant to the terms of some of our PPAs with investor-owned electric utilities and publicly-owned electric utilities in states that have renewable portfolio standards, the failure to supply the contracted capacity and energy thereunder may result in the imposition of penalties. |
| • | If any of our domestic power plants lose their current Qualifying Facility status under PURPA, or if amendments to PURPA are enacted that substantially reduce the benefits currently afforded to Qualifying Facilities, our domestic operations could be adversely affected. |
| • | The reduction, elimination or inability to monetize government incentives could adversely affect our business, financial condition, future results and cash flows. |
| • | We are a holding company and our cash depends substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions. |
| • | The costs of compliance with federal, state, local and foreign environmental laws and our ability to obtain and maintain environmental permits and governmental approvals required for development, construction and/or operation may result in liabilities, costs and delays in construction (as well as any fines or penalties that may be imposed upon us in the event of any non-compliance or delays with such laws or regulations). |
| • | We could be exposed to significant liability for violations of hazardous substances laws because of the use or presence of such substances at our power plants. |
| • | U.S. federal, state and foreign country income tax reform could adversely affect us. |
Risks Related to Economic and Financial Conditions
| • | We may be unable to obtain the financing we need on favorable terms to pursue our growth strategy and any future financing we receive may be less favorable to us than our current financing arrangements. |
| • | We have incurred substantial indebtedness that may decrease our business flexibility, access to capital, and/or increase our borrowing costs, and we may still incur substantially more debt, which may adversely affect our operations and financial results. |
| • | Our debt obligations may adversely affect our ability to raise additional capital and will be a burden on our future cash resources, particularly if we elect to settle these obligations in cash upon conversion or upon maturity or required repurchase. |
| • | The capped call transactions, into which we entered in connection with the issuance of June 2022 convertible notes, (the "Notes") may affect the value of the Notes and our common stock and we are subject to counterparty risk with respect to the capped call transactions. |
| • | Our foreign power plants and foreign manufacturing operations expose us to risks related to fluctuations in currency rates, which may reduce our profits from such power plants and operations. |
| • | Our power plants have generally been financed through a combination of our corporate funds and limited or non-recourse project finance debt and lease financing. If our project subsidiaries default on their obligations under such limited or non-recourse debt or lease financing, we may be required to make certain payments to the relevant debt holders, and if the collateral supporting such leveraged financing structures is foreclosed upon, we may lose certain of our power plants. |
| • | We may experience fluctuations in the cost of construction, raw materials, commodities and drilling. |
| • | Our commodity derivative activity may limit potential gains, increase potential losses, result in earnings volatility and involve other risks. |
| • | We are exposed to swap counterparty credit risk |
Risks Related to Force Majeure
| • | The existence of a prolonged force majeure event or a forced outage affecting a power plant, or the transmission systems could reduce our net income. |
| • | Threats of terrorism may impact our operations in unpredictable ways and could adversely affect our business, financial condition, future results and cash flow. |
Risks Related to Ownership of our Common Stock
| • | Future equity issuances, including through our current or any future equity compensation plans, could result in dilution, which could cause the price of our shares of common stock to decline. |
| • | A substantial percentage of our common stock is held by stockholders whose interests may conflict with the interests of our other stockholders. |
| • | The price of our common stock may fluctuate substantially, and your investment may decline in value. |
| • | We may issue additional shares of our common stock in connection with conversions of the Notes, and thereby dilute our existing stockholders and potentially adversely affect the market price of our common stock. |
| • | The fundamental change provisions of the Notes may delay or prevent an otherwise beneficial takeover attempt of us. |
Market and Industry Data
This Annual Report includes market and industry data and forecasts that we have derived from publicly available information, various industry publications, other published industry sources and internal data and estimates. Industry publications and other published industry sources generally indicate that the information contained therein was obtained from sources believed to be reliable. Internal data and estimates are based upon information obtained from trade and business organizations and other contacts in the markets in which we operate and our management’s understanding of industry conditions. Any estimates underlying such market-derived information and other factors could cause actual results to differ materially from those expressed in the independent parties’ estimates and in our estimates.
Company Contact and Sources of Information
Our website is www.ormat.com. Information contained on or accessible via our website, including our Sustainability Reports, is not part of or otherwise incorporated by reference into this Annual Report. Information that we furnish to or file with the U.S. Securities and Exchange Commission (the “SEC”), including our Annual Reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to, or exhibits included in, these reports are made available for download, free of charge, through our website as soon as reasonably practicable. Our SEC filings, including exhibits filed therewith, are also available directly on the SEC’s website at www.sec.gov.
We may use our website as a distribution channel of material company information. Financial and other important information regarding the Company is routinely posted on and accessible through our website at www.ormat.com. Accordingly, investors should monitor this channel, in addition to following our press releases, SEC filings and public conference calls and webcasts.
PART I