The Roca Honda Project
The following technical and scientific description of the Roca Honda Project is based in part on the report titled “Technical Report on the Roca Honda Project, McKinley County, State of New Mexico, USA” dated February 22, 2022, prepared by Grant A. Malensek, M.Eng, P.Eng., Mark B. Mathisen, C.P.G., and David M. Robson, P.Eng., MBA, each a Qualified Person employed by SLR, Jeffrey L. Woods, MMSA QP, a Qualified Person Employed by Woods Process Services, Phillip E. Brown, C.P.G., R.P.G., a Qualified Person employed by Consultants in Hydrogeology, and Daniel D. Kapostasy, P.G., SME R.M., a non-independent Qualified Person employed with the Company (the “Roca Honda Technical Report Summary”). The Roca Honda Technical Report Summary was prepared in accordance with S-K 1300 and also constitutes a PEA pursuant to NI 43-101. The Roca Honda Project does not have known “Mineral Reserves” and is therefore considered under S-K 1300 definitions to be an exploration stage property, despite current ongoing permitting activities.
The Company acquired a majority of the Roca Honda Project on August 29, 2013 as a result of its acquisition of Strathmore. Certain adjacent properties (which now form part of the Roca Honda Project) were later acquired by the Company from URI in June 2015.
The Roca Honda project is a proposed underground uranium mine located in McKinley County, in Central New Mexico, USA in the Ambrosia Lake subdistrict, immediately northeast of the city of Grants, New Mexico. The Mine is located at latitude 35°21’34.36” N and longitude 107°42’20.39” W.
The Roca Honda Project does not have known “Mineral Reserves” and is therefore considered under S-K 1300 definitions to be exploratory in nature.
Since May 27, 2016, the Roca Honda Project has been held solely by Strathmore Resources (US) Ltd (Strathmore), which is a wholly owned subsidiary of Energy Fuels Inc. Strathmore acquired the initial portion of the property on March 12, 2004, from Rio Algom Mining LLC (Rio Algom), a successor to Kerr-McGee Corporation (Kerr-McGee), which had staked the claims in 1965 and had continuously maintained them. Roca Honda Resources LLC. (RHR) was established on July 26, 2007, when Strathmore formed a limited liability company with Sumitomo Corporation of Japan and transferred the property to RHR. Energy Fuels Inc. acquired a 100% interest in Strathmore in August 2013 and assumed Strathmore’s 60% ownership interest in RHR. Energy Fuels Inc. acquired the remaining 40% ownership interest in RHR in May 2016 and is now 100% owner of the Roca Honda Project. Total holding costs for 2024 were $41,020.
The Roca Honda Project covers an area of 4,440 acres and includes 63 unpatented lode-mining claims in Sections 9, 10 and 11; 64 unpatented claims in Sections 5 and 6; 36 unpatented claims in Section 8; one adjoining New Mexico State General Mining Lease in Section 16; and the fee mineral interest in all of Section 17. The mining claims also extend onto a 9.4-acre narrow strip of Section 11. The New Mexico State Lease was acquired by David Miller (former Strathmore CEO) on November 30, 2004, and subsequently transferred to Strathmore. Strathmore subsequently relinquished the lease and acquired it again in December 2015 (HG-0133) for a new 15-year term expiring on December 14, 2030. The “Rocca Honda” Claims in Sections 5 and 6 were staked by Miller and Associates in September 2004 and assigned to RHR on August 28, 2013. Strathmore acquired the “Roca Honda” claims in Section 8 and the fee mineral interest in Section 17 on June 26, 2015, from Uranium Resource Incorporated (URI).
Mining claim numbers RH 252, RH 279, RH 306, and RH 333, located in the southern part of Section 10, overlap into the northern part of Section 15, which is privately owned land, therefore, the overlapping portion of these claims are not valid. The Roca Honda property extends only to the Section 15 boundary.
Mining claim numbers RH 325 to RH 333 are located along the eastern boundary of Section 10, extending west across the Section 11 line by approximately 150 ft.
The initial 63 unpatented, contiguous mining claims (the Roca Honda group), covering an area of approximately 1,248.5 acres, are located on Sections 9, 10, and 11, which are federally owned lands within the Cibola National Forest administered by the USFS. Section 5 is also administered by the USFS while claims in Section 6 are located on BLM land. Section 8 is split estate, the private surface belonging to Fernandez Ranch. Sections 5, 6, 9, 10, and 11 are open to the public, with the land used for a variety of purposes including grazing, mineral extraction, hunting, hiking, and other outdoor recreation activities. All claims are listed in the U.S. BLM Mining Claim Geographic Index Report Mineral and Land Record System (MLRS). The claims covering Section 9, 10, and part of 11 have a location date of June 29 and 30, 1965. The claims in Section 8 have location dates of September 10, 1997. The Roca Honda claims in Sections 5 and 6 were located on September 6, 2004.
There is a 1% gross revenue, no deduction royalty payable to the original claim holders for the claims on Section 9. There are no royalties associated with the claims on Sections 5, 6, 8, 10, or 11.
Holding costs for the 163 claims include a claim maintenance fee of $200.00 per claim payable to the BLM before September 1 of each calendar year and recording an affidavit and Notice of Intent to hold with the McKinley County Clerk, New Mexico. County recording fees for the claims are approximately $500 per year
New Mexico General Mining Lease number HG-0133, located on Section 16, covers an area of 638 acres. The mining lease has a primary, secondary, tertiary, and quaternary term, each with annual rentals to be paid in advance. Strathmore first acquired a lease on Section 16 in November 2004 (Lease number HG-0036-002). As there was no provision to extend the lease past 2019 other than by production, Strathmore dropped the lease as its payment came due in December 2015. The New Mexico Land Office held an auction of the lease parcel that same month. Strathmore was the successful bidder, paying a $100,000 bonus. The new lease has a primary term of three years, and the annual rental is $1.00/acre ($640). The secondary term for years 4 and 5 will require a payment of $10/acre each year, and the tertiary term, years 6 through 10, will cost $3.00/acre each year. The lease will have a quaternary term for years 11 through 15 requiring an annual rental of $10.00 per acre plus an escalating advanced royalty of $10.00 per acre per year. By acquiring the new lease, Strathmore may now hold the land until production can begin up to December 14, 2030. At the end of the quaternary term, the lease may be automatically extended if production has begun. The lease stipulates a 5% of gross returns royalty to the State of New Mexico “less actual and reasonable transportation and smelting or reduction costs, up to 50% of the gross returns” for production of uranium, which is designated a “special mineral” in the lease.
The Roca Honda Project is located approximately three miles northwest of the community of San Mateo, New Mexico, in McKinley County, and approximately 22 miles by road northeast of Grants, New Mexico, via State Highway NM 605.
Climate in the project area may be classified as arid to semi-arid continental, characterized by cool, dry winters, and warm, dry summers. Grants has an annual average temperature of 50°F, with an average summer high of 87°F and low of 52°F, and average winter high of 47°F and low of 18°F.
The Roca Honda Project would employ 257 personnel who would be based around the town of Grants, Cibola County, New Mexico, which is the largest community near the Mine area. As of the 2020 census, Cibola County has a population of 27,172 people of which 8,866 people reside in Grants. Additionally, the city of Albuquerque, New Mexico is located approximately 100 miles east of the Roca Honda Project area and could be a source of most materials and technical support needed for the Roca Honda Project. To process mill feed from the Roca Honda Project for the 11-year mine life.
The Roca Honda Project is located in an historically important uranium-producing region of central New Mexico. All the infrastructure necessary to mine and process significant commercial quantities of U 3 O 8 currently exists. Infrastructure items include high voltage electrical supplies, water sources, paved roads and highways for transporting ROM mill feed crude ore and finished products, and accommodations for employees. Local and State infrastructure also includes hospitals, schools, airports, equipment suppliers, fuel suppliers, and communication systems.
The Roca Honda Project is located at elevations ranging from 7,100 ft above sea level (ft ASL) to 7,680 ft ASL with easterly and southerly dipping slopes. The area is sparsely populated, rural, and largely undeveloped. The predominant land uses include low-density livestock grazing, hay cultivation, and recreational activities such as hiking, sightseeing, picnicking, and seasonal hunting. Vegetation in the area consists mainly of grasses, pinyon pine, and juniper trees.
Material mined at Roca Honda will be trucked 272 mi to the Mill in Blanding, Utah for processing.
History
The Roca Honda Project has a long history of exploration and development with a number of owners. Kerr-McGee Oil Industries (Kerr-McGee), its subsidiaries, and successor (Rio Algom) completed significant work in from the mid-1960s until 1982 succeeded by Western Nuclear Corporation (Western Nuclear), Conoco, and Strathmore Resources (Strathmore). Roca Honda Resources (RHR) was established on July 26, 2007, when Strathmore (60%) formed a limited liability company with Sumitomo Corporation (40%) and transferred the property to RHR. In August 2013, EFR acquired a 100% interest in Strathmore, and assumed Strathmore’s 60% ownership interest in RHR. In June 2015, EFR acquired a 100% interest in the mineral properties controlled by Uranium Resource Incorporated (URI). In May 2016, EFR completed the purchase of Sumitomo Corporation’s 40% interest in RHR and, since then, has a 100% interest in the Property.
No additional work has been completed on the property since its acquisition by the Company in 2013.
The Roca Honda Project is at an advanced stage of permitting. A Draft EIS was completed by the USFS in February 2013. In March 2015 the USFS initiated the scoping process for a new mine dewatering alternative to be addressed in a Supplement to the Draft EIS. In September 2016, an additional scoping process to incorporate Section 17 (the “Adjacent Properties”) and development drilling into the mine plan was initiated by the USFS. The Supplement to the Draft EIS is expected to be completed during late 2025 or early 2026 with a Final EIS and RoD scheduled to be completed in 2026.
Other major permits required for the Roca Honda Project include a Permit to Mine to be issued by the New Mexico Mining and Minerals Division, a Discharge Permit issued by the New Mexico Environment Department, and a Mine Dewatering Permit issued by the New Mexico State Engineer’s Office. The Mine Dewatering Permit was approved in December 2013 but appealed by the Acoma Pueblo in January 2014. RHR subsequently proposed a new alternative for discharging treated mine water that would benefit a number of downstream users including the Acoma Pueblo. The Acoma Pueblo agreed to withdraw the dewatering permit appeal in March 2015. The dewatering permit will need to be revised to reflect a higher dewatering rate with the addition of Section 17 to the mine plan.
The two other major permits that are in the agency review stage are the Discharge Permit, which is expected to be issued in 2026, and the Permit to Mine, which is expected to be issued in 2026 following approval of the Final EIS by the USFS. Permit approvals from the USACE and the EPA are also required for discharge of treated mine water associated with mine activities. An application for the USACE permit has been submitted and the permit is expected prior to issuance of the Permit to Mine in 2026. An application for the EPA permit has also been submitted, however; the previous application is expected to be withdrawn and a new application is expected to be submitted during 2025. The EPA permit for discharge of treated mine water is expected prior to issuance of the Permit to Mine in 2026. EPA approval under the Clean Air Act National Emissions Standard for Hazardous Air Pollutants will also be required prior to mining.
As the project has not yet been developed or operated, we are not aware of any environmental liabilities of any significance.
No permitting is required to start milling the Roca Honda Project material at the White Mesa Mill. The White Mesa Mill is fully permitted with the State of Utah and has all the necessary operating licenses for a conventional uranium mill. As additional tailings storage capacity may eventually be required at the Mill over the life of the mine, an Amendment to the White Mesa Mill’s Radioactive Materials License issued by the Utah DWMRC will be required in due course to construct additional tailing cells, if and when required.
More than 340 Mlb of U 3 O 8 have been produced from the Grants uranium deposits in New Mexico between 1948 and 2002, and at least 403 Mlb of U 3 O 8 remain as unmined resources. The Grants uranium district is one of the largest uranium provinces in the world. The Grants uranium district extends from east of Laguna to west of Gallup in the San Juan Basin of New Mexico. Three types of sandstone uranium deposits are recognized: tabular, redistributed (roll-front, fault-related), and remnant-primary.
Rocks exposed in the Ambrosia Lake subdistrict of the Grants uranium district, which includes the Roca Honda Project area, include marine and non-marine sediments of Late Cretaceous age, unconformably overlying the uranium-bearing Upper Jurassic Morrison Formation. The uppermost sequence of conformable strata consists of the Mesaverde Group, Mancos Shale, and Dakota Sandstone. All rocks that outcrop at the Roca Honda Project area are of Late Cretaceous age; these rocks and the Quaternary Period deposits that cover them in some places.
The uranium mineralization found in the Roca Honda Project area is contained within five sandstone units of the Westwater Canyon Member. Zones of mineralization vary from approximately one foot to 30 ft thick, 100 ft to 600 ft wide, and 200 ft to 3,000 ft in length in elongated pods. Uranium mineralization in the Roca Honda Project area west to east, and northwest to southeast depending on general area within the Roca Honda Project area, consistent with trends of the fluvial sedimentary structures of the Westwater Canyon Member, and the general trend of mineralization across the Ambrosia Lake subdistrict.
Uranium mineralization in the Roca Honda Project area is believed to be predominantly primary (trend) mineralization, with some secondary mineralization due to oxidation and mobilization of uranium near permeable geologic structures. Uranium mineralization consists of dark organic-uranium oxide complexes. The uranium in the Roca Honda Project area is dark grey to black in color and is found between depths of approximately 1,380 ft to 2,600 ft below the surface.
Primary mineralization pre-dates the formation of the Laramide aged structures in the Mine area, with a small amount of vertical offset of mineralization present across the local faults. There is a possibility of some redistribution and stack ore along faults; however, it appears that most of the Roca Honda Project mineralization is primary. Paleochannels that contain quartz-rich, arkosic, fluvial sandstones are the primary mineralization control associated with this trend.
The assay data used to calculate the Mineral Resource estimate for the Project is natural gamma radiometric log data. Core was collected by Strathmore Resources during a 2007 drill program to verify historical natural gamma data but was not used for Mineral Resource estimation. Calibration data for natural gamma logs are available for both historical and recent drilling. The majority of the data used in the Mineral Resource estimate is historical and collected by Kerr-McGee. Kerr-McGee regularly calibrated their logging tools at the DOE calibration test pits in Grants, NM. The calibration data associated with the Kerr-McGee drilling is contained in a series of calibration notebooks and tables.
Drill core collected by Strathmore Resources was analyzed at Energy Labs in Casper, Wyoming.
Utilizing only natural gamma logs as assay data could lead to an over or under estimation of Mineral Resources due to disequilibrium. Positive disequilibrium occurs when the uranium present has not had enough time to decay and produce daughter isotopes, which are what are actually measured during a natural gamma assay. Under positive disequilibrium a natural gamma assay would indicate lower amounts of uranium than what is present. Negative disequilibrium occurs when uranium has had enough time to decay to produce the daughter radioisotopes but was remobilized and removed from the deposit. This would lead to measuring more uranium than is present. The use of core to verify natural gamma logs is standard practice and allows for the calculation of a disequilibrium factor. In addition, the Project is located in a large uranium district that never reported issues with disequilibrium. The disequilibrium factor applied to the Project Mineral Resource is 1.0.
Grades were estimated for the Roca Honda project using a combination of nearest neighbor, inverse distance and ordinary kriging methods. Grades were estimated from historic surface drilling completed by Kerr-McGee, Western Nuclear, Conoco, and Strathmore Minerals. Information regarding the Mineral Resource calculation are given below, and specific details regarding the estimation procedure can be found in Section 14.0, Mineral Resource Estimate of the Roca Honda Technical Report Summary.
In Sections 9. 10 and 16, block grades were estimated using the Inverse Distance Cubed (ID 3) method. Domain models were used as hard boundaries to limit the extent of influence of composite grades within the domains.
Suitable variograms could not be generated for individual or combined domain models due to the small number of contained composite samples. Search ranges were determined visually based on continuity of mineralization and drillhole spacing.
Search directions were determined visually for each domain. Isotropic search ranges in the major and semi-major directions following the trend of individual domain models were applied. Minor search ranges were also determined visually and were shorter.
Two grade estimation passes were run with the major, semi-major, and minor search ranges increased by a factor of 1.5 in the second estimation run. Estimation flags were stored for each estimation run based on increasing search distances. The number of samples and holes were stored in separate block variables for use in determining resource classification.
Octant restrictions were not enforced to preserve local grades. Only the closest composites to block centroids (adhering to defined trends) were used.
In Section 17, block grades were estimated using the Inverse Distance Squared (ID 2), Ordinary Kriging (OK), or Nearest Neighbor (NN) methods. Domain models were used as hard boundaries to limit the extent of influence of composite grades within the domains.
Where wireframes contained only a single drillhole, the NN method was used; in cases where there was enough data to generate variograms, OK was used; and in all other cases, ID 2 was used. ID 2 was used in Section 17 instead of ID 3 because the drill spacing is much tighter than in Sections 9, 10, and 16 and nearby drillholes were determined to have better grade continuity, and therefore more holes should have a greater influence on a block estimate than the nearest drillhole.
Search directions were determined visually for each domain. Anisotropic search ranges were used oriented along the major trend of the mineralized zones. As the mineralization tends to be tabular in nature, tops and bottoms of the mineralization were modeled as part of the wireframe process. Those top and bottom surfaces were used to generate unfolding models that were used in place of dip and plunge (Y rotation and X rotation).
Up to three grade estimation passes were run with the major, semi-major, and minor search ranges increased by a factor of 2.0 in the second and third estimation runs. Estimation flags were stored for each estimation run based on increasing search distances. The number of samples and holes were stored in separate block variables for use in determining resource classification.
Octant restrictions were not enforced to preserve local grades. Only the closest composites to block centroids (adhering to defined trends) were used.
The table below sets out the Mineral Resources estimates for the Roca Honda Project as of December 31, 2024. These estimates are derived from the Roca Honda Technical Report Summary, in which Mineral Resources were estimated as of December 31, 2021. Daniel Kapostasy, the Company’s non-independent Qualified Person, reviewed and confirmed that the Mineral Resources estimates set forth in the Roca Honda Technical Report Summary remained accurate as of December 31, 2024.
Roca Honda Project – Summary of Mineral Resources – In Situ Uranium(1)(2)(3)(4)(5)(6)(7)
| Classification | Cut-Off Grade | Area | Tonnage | Grade | Contained Metal | Metallurgical Recovery |
|---|---|---|---|---|---|---|
| (% eU3O8) · (Tons) · (% eU3O8) · (lbs. U3O8) | ||||||
| Measured | 0.19 | Sec. 9, 10, & 16 | 208,000 | 0.48 | 1,984,000 | 95% |
| 0.19 | Sec. 17 | — | — | — | — | |
| Total Measured | 0.19 | Sec. 9, 10, 16, & 17 | 208,000 | 0.48 | 1,984,000 | 95% |
| Indicated | 0.19 | Sec. 9, 10, & 16 | 1,303,000 | 0.48 | 12,580,000 | 95% |
| 0.19 | Sec. 17 | 336,000 | 0.45 | 3,058,000 | 95% | |
| Total Indicated | 0.19 | Sec. 9, 10, 16, & 17 | 1,639,000 | 0.48 | 15,638,000 | 95% |
| Total Measured + Indicated | 0.19 | Sec. 9, 10, 16, & 17 | 1,847,000 | 0.48 | 17,622,000 | 95% |
| Inferred | 0.19 | Sec. 9, 10, & 16 | 1,198,000 | 0.47 | 11,206,000 | 95% |
| 0.19 | Sec. 17 | 315,000 | 0.42 | 2,636,000 | 95% | |
| Total Inferred | 0.19 | Sec. 9, 10, 16, & 17 | 1,513,000 | 0.46 | 13,842,000 | 95% |
Notes:
(1) SEC S-K 1300 and NI 43-101 definitions were followed for all Mineral Resource categories.
(2) Mineral Resources are estimated at a U 3 O 8 cut-off grade of 0.19% eU 3 O 8.
(3) Mineral Resources are estimated using a long-term Uranium price of US$65 per pound. The long-term uranium price is based on supply and demand projections for the period 2021-2035.
(4) Bulk density is 0.067 tons/ft 3 (15.0 ft 3/ton or 2.14 t/m 3).
(5) There are no Mineral Reserves for the property.
(6) Numbers may not add due to rounding.
(7) Mineral Resources are 100% attributable to the Company.
Old drill roads were previously established across the property, and an electrical line transects the northern half of Section 16 in the project area. The line continues along the west side of the project area into Section 17, where it terminates, and on the east side of Section 16 through the northwest quarter of Section 15 and along the southern section boundary of Section 10. Three monitor water wells were drilled by RHR in 2007 and are located on Section 16. More than 900 historic drill exploration holes were completed on the property from the late 1960s to the early 1980s. Except for the existing shaft on Section 17, there are no mine workings, existing tailings ponds, waste deposits or other improvements or facilities at the site.
In 2024, the Company completed an engineering assessment of the Roca Honda Project. Results of the engineering study will be used in future permitting efforts.
The Company has not conducted any exploration activities on the Project since acquiring the properties in August 2013.
The Roca Honda Project was acquired by the Company in August 2013, through the Company’s acquisition of Strathmore. As of December 31, 2024, the total net book value attributable to the Roca Honda Project on the consolidated financial statements of the Company was $22.10 million.
The Company intends to continue its permitting and related activities at the Roca Honda Project during 2025. Permitting efforts in 2025 include the integration of the Adjacent Roca Honda Properties into the permitting efforts underway for the Roca Honda Project properties, including the expected submittal of a revised National Pollutant Discharge Elimination System (“NPDES”) permit application to the EPA and continuation of the Supplement to the Draft EIS through the USFS.