The La Sal Project

The following technical and scientific description of the La Sal Project is based in part on the report titled “Technical Report on the La Sal Project, San Juan County, Utah, USA” dated February 22, 2022, prepared by Mark B. Mathisen, C.P.G., a Qualified Person employed by SLR (the “La Sal Technical Report Summary”). The La Sal Technical Report Summary was prepared in accordance with S-K 1300 and NI 43-101. The La Sal Project does not have known “Mineral Reserves” and is therefore considered under SEC S-K 1300 definitions to be an exploration stage property, notwithstanding that the Company commenced production from the property starting in January 2024.

The La Sal Project is an existing complex comprised of seven individual underground uranium mines and properties. From east to west, these are Pine Ridge (reclaimed mine), Pandora Mine, Snowball Mine, La Sal Decline, Beaver Shaft, Redd Block IV (property), and the Energy Queen Mine. All the properties that make up the La Sal Project is 100% controlled by the Company’s wholly owned subsidiary EFR Colorado.

The area encompassed by the La Sal Project is located on two U.S. Geological Survey 7½ minute quadrangle topographic maps, La Sal West and La Sal East. The geographic coordinates for the approximate center of the La Sal Project are latitude 38°18’48.20” N and longitude 109°15’56.28” W.

The Project consists of approximately 9,750 acres of mineral rights in a combination of unpatented mining claims owned by EFR Colorado, unpatented mining claims leased by EFR Colorado, State of Utah mineral leases, a San Juan County surface use, access, and mineral lease, and mining leases on private mineral rights, all located in the La Sal Mining District. The land surface overlying some mineral rights is also of varying ownership. Where the federal government controls the surface and minerals, EFR Colorado has the right to access, explore, develop, and mine on unpatented mining claims located on land managed by the BLM or USFS, as long as NEPA regulations are met. All other property, regardless of ownership, is covered by access or surface lease agreements with landowners, including ranchers, San Juan County, and the State of Utah. Total holding costs including fee leases, surface use agreements and claims in 2024 were $242,775.

The Company holds 90 unpatented mining claims on various sections of both USFS and BLM land across the Project. A mining lease between Robert H. Sayre, Jr. and UMETCO, dated July 11, 1973, applies to the 10 unpatented Martha claims at the east end of the Pandora claims. EFR Colorado is successor to this lease. Production from these claims is subject to a royalty to Sayre’s successors of 10% of the contained value of uranium and vanadium, less certain allowable deductions. The Martha claims lie in Section 31, Township 28 South, Range 25 East and Section 5, Township 29 South, Range 25 East. The mining lease does not include any requirement for annual advance royalties or other lease payments.

All claims, which are renewed annually in September of each year, arein good standing until September 1, 2025(at which time they will be renewed for the following year as a matter of course). All unpatented mining claims are subject to an annual federal mining claim maintenance fee of $200 per claim plus approximately $10 per claim for county filing fees to the BLM.

The Company leases the mineral rights on 119 claims located across the Project. These claims are held through four separate mineral leases (“MLs”) described in detail below.

Six Crested and two T&A claims are covered by a Mining Lease dated February 1, 2009, between eight individual owners and Denison, which was acquired by the Company in June 2012. These claims are located in Sections 33 and 34, Township 28 South, Range 24 East and Section 3, Township 29 South, Range 24 East. EFR Colorado pays an annual advance royalty determined by the long-term uranium price in the preceding twelve months. Production royalties are on a sliding scale for both uranium and vanadium depending on the respective commodity’s market price. The uranium royalty varies from 3% to 8% and the vanadium royalty from 2% to 6%, less allowable deductions. The annual $200/claim annual BLM fees are the responsibility of the Company. No other lease costs apply to these claims.

Six Mike claims are covered by a Mining Lease dated August 1, 2001, between various stakeholders of the Mike claims and Denison, which was acquired by the Company in June 2012. This lease supersedes the original 1970 lease between UMETCO and the owners. The claims lie in Section 1, Township 29 South, Range 24 East. Production royalties are on a sliding scale for both uranium and vanadium depending on the respective commodity’s market price. The uranium royalty varies from 3% to 8% and the vanadium royalty from 2% to 6%, less allowable deductions. The annual $200/claim annual BLM fees are the responsibility of the Company. No other lease costs apply to these claims.

The Pandora Mining Lease, dated June 16, 1967, was originally between Robert H. Sayre, Jr. and American Metal Climax, Inc. (American Metal). Successors to American Metal include Atlas Minerals in 1973 and UMETCO in 1988. The Company is the current successor to the Pandora Mining Lease and its amendments. The Pandora Mining Lease and amendments apply to 105 unpatented Pandora claims. The claims lie in Sections 1 and 12, Township 29 South, Range 24 East, Section 31, Township 28 South, Range 25 East, and Sections 5, 6, and 7, Township 29 South, Range 25 East. Production from these claims is subject to a royalty to Sayre’s successors of 10% of the contained value of uranium and vanadium, less certain allowable deductions. The annual $165/claim annual BLM fees are the responsibility of the Company. No other lease costs apply to these claims.

EFR Colorado holds approximately 2,182 acres under mineral lease from the State of Utah School and Institutional Trust Lands Administration (“SITLA”) in seven separate leases. Three of the leases (ML-18301, -49313, and –51440), covering 900 acres of the surface area, are owned by the State of Utah and thereby grant access to EFR Colorado for exploration and mining related work. The other 1,282 acres of surface are under private ownership. The private parcels are all subject to valid access and surface use agreements with the landowners. The production royalty for all SITLA leases is 8% on uranium and 4% on vanadium. It is based on the gross value received under contract for the processed products less the actual processing and refining costs. Mining costs are not allowable deductions.

The Utah State mineral lease ML-18301, covering all of the 640 acres in Section 36, T28S, R24E, was originally issued to an individual, Robert Manly, on April 25, 1960. Through a series of assignments and amendments, the lease is now held by EFR Colorado. The current term of thelease runs through December 31, 2024 and was renewed for another 10-year term (through

December 31, 2034); it isrenewable annually by making an annual rental payment as well as advance royalty payments. The annual rental is $3.00/acre ($1,920 total) and the advance royalty payment is based on the previous January through November’s average uranium and vanadium market prices. Rentals and annual minimum royalties are credited against actual production royalties for the year in which they accrue. Mining costs are not allowable deductions. The surface of approximately 384 acres of the western part of the lease parcel is owned by Charles Hardison Redd and EFR Colorado has a surface access agreement with Redd. The surface of the eastern part of the lease, a total of 256 acres, is owned by the State of Utah State. Rights to necessary surface use are granted by the mineral lease. The eastern part of the Beaver/La Sal mine lies within this lease.

Mineral lease ML-27247 covers 40 acres in the SW¼, SW¼, Section 35, T28S, R24E. The lease was originally issued on December 4, 1970, to an individual, Gregory Hoskin. Through a series of assignments and amendments, the lease is now held by the Company. The current term of thelease runs through December 31, 2024 and was renewed for another 10-year term (through December 31, 2034); it is renewable annually by making advance royalty payments. The surface of the western 20 acres of the lease parcel is owned by Redd Agri LLC (Redd Agri) and the eastern 20 acres is owned by La Sal Livestock. The Company has a surface access agreement with both Redd Agri and La Sal Livestock. Portions of the western part of the Beaver mine lie on this lease parcel. The lease is held by paying an annual rental payment and an annual minimum royalty based on the previous January through November’s average uranium and vanadium market prices. Rentals and annual minimum royalties are credited against actual production royalties for the year in which they accrue.

As with ML-27247, the Mineral Lease ML-27248 was originally issued to Gregory Hoskin in December 1970 and is now held by the Company following several assignments and amendments. It covers 80 acres in the W½, NW¼, Section 2, Township 29 South, Range 24 East. With the exception of small parcels owned by the San Juan School District and the La Sal Recreation District, the surface is owned by Redd Agri. The Company has a surface use agreement with Redd Agri for those portions held by Redd Agri. Portions of the western part of the Beaver mine are located on this lease. The Company’s operations of the Beaver mine and any expected exploration drilling are not affected by access restrictions to the School and Recreation District’s acreage. The lease is held by paying in advance an annual rental and an annual minimum royalty based on the previous January through November average uranium and vanadium market prices. Rentals and annual minimum royalties are credited against actual production royalties for the year in which they accrue.

In December 2010, the Company purchased Utah State mineral lease ML-49313 from Uranium One with the seller retaining a 1% overriding royalty. Uranium One acquired the lease from the original assignee, William Sheriff. The lease was renewed by the Company on May 1, 2014, for a second 10-year term. This lease covers about 484 acres in the S½, S½ of NW¼, and E½ of NE¼, Section 36, Township 28 South, Range 23 East. The southeast corner of this section is about one mile west of the Energy Queen shaft. It is connected to the Energy Queen lease property by BLM land (W½, Section 31, Township 28 South, Range 24 East and part of NW¼, Section 6, Township 29 South, Range 24 East) currently covered by unpatented mining claims (Daisy and DOD claims) held by EFR Colorado. ML-49313 is contiguous to the north border of the RM and Judas claims. No mining has taken place on this lease. The surface is owned by SITLA. Rights to necessary surface use are granted by the lease. This lease is held by an annual payment. No annual minimum royalties apply.

This lease was issued on April 30, 2004, to William Sheriff. Mr. Sheriff assigned it to Energy Metals Corporation in 2006, which then became Uranium One in 2009. In February 2011, Denison (acquired by the Company in June 2012) purchased it from Uranium One. The lease was renewed by the Company on May 1, 2014, for a second 10-year term. The lease covers 640 acres, all of Section 32, Township 28 South, Range 25 East. This lease lies north of the eastern part of the Pandora Mine, but no mining has occurred on this lease. The surface is owned by Paul Redd. EFR Colorado has a surface access agreement with Mr. Redd to access a Pandora Mine ventilation hole. The lease is held by paying in advance an annual rental. No annual minimum royalties apply.

This lease was issued on April 30, 2004, to William Sheriff. Mr. Sheriff assigned it to Energy Metals Corporation in 2006, which then became Uranium One in 2009. In February 2011, Denison (acquired by the Company in June 2012) purchased it from Uranium One. The lease was renewed by the Company on May 1, 2014, for a second 10-year term. The lease covers almost 138 acres, mostly in the NE¼ and parts of the NW¼, Section 5, Township 29 South, Range 24 East. A portion of the Redd Block Mineral Resource is located on this lease. The surface is owned by SITLA. Rights to necessary surface use are granted by the lease. No mining has yet occurred. This lease is held by paying in advance an annual rental. No annual minimum royalties apply.

In September 2008, the Company was the highest bidder on a State of Utah mineral lease, ML-51440, which covers 160 acres in the N½ S½, Section 32, Township 28 South, Range 24 East. This lease was renewed by the Company on October 31, 2018, for a second 10-year term. This lease borders the Redd Block Mineral Resource on the north side. The surface is owned by

SITLA. Rights to necessary surface use are granted by the lease. An annual payment is required to hold this lease. No annual minimum royalties apply.

The Company has leased the mineral rights on numerous parcels from various private landowners. The Redd family, as individuals or in legal entities, namely La Sal Livestock and Redd Agri, LLC, has owned much of the subject land for many decades, both mineral rights and surface. A few small parcels have joint ownership of minerals with parties other than the Redd family. The surface estate has been split from the minerals on numerous parcels. The Company has surface use and access agreements in place with all the private landowners that allow for any activities pertaining to exploration, development, and mining. The expiration dates for these leases range from 2026 to 2031 but can be held indefinitely through production. All fee leases are subject to annual payment, which may require adjustments based on the long-term spot price of uranium and vanadium.

Most of the mineral ownership east and north of the Energy Queen Mine is vested in Redd Royalties, Ltd. The Energy Queen lease at the west end of the district is not owned by Redd Ranches (a partnership of 11 members of the Redd family) or its affiliates.

The Company entered into a 30-day option with Markle Ranch Holdings, LLC on November 15, 2006, to lease the Energy Queen surface rights. A lease was signed on December 15, 2006, for a term of twenty years, which is extendable if mineral production occurs on a continuing basis. The lease gives EFR the right to use any of the 702 acres for exploration, development, or mining purposes. Markle will be paid a small percentage of market value for any material mined on adjoining properties, if such minerals are removed by use of the mineshaft located on the Markle property.

The Company also entered into a 30-day option to lease the Energy Queen mineral rights from Superior Uranium (Superior) on November 15, 2006. A Mining Lease Agreement was signed on December 13, 2006, for a term of twenty years, which is extendable if mineral production occurs on a continuing basis.

The mineral lease and surface lease cover the same 702 acres located in most of Section 6 and the N½ NE¼ and NE¼ NW¼ Section 7, Township 29 South, Range 24 East. A production royalty will be paid on a sliding scale for both uranium and vanadium depending on the market prices of uranium.

The surface and minerals of this parcel were leased previously to Hecla Mining with the surrounding properties controlled by UMETCO. These two companies operated the mine, then known as the Hecla Shaft, in a joint venture. The shaft and other surface facilities for the Energy Queen Mine are located in the northeast corner of Section 6.

The leased parcel referred to as Redd 1-A covers 160 acres in the SE¼ Section 31, Township 28 South, Range 24 East, immediately north of the Energy Queen Mine. This lease was once part of a much larger mining lease dated June 1, 1971, between Union Carbide Corporation (Union Carbide) and Redd Ranches, a partnership of 11 members of the Redd family. The other parcels were released in November 1999. Through a succession of assignments, the Company became the owner of the Mining Lease with the acquisition of Denison’s U.S. Mining Division in June 2012. It is the intent of the Company to continue to hold the lease. No mining has occurred on this parcel. The production royalty is a percentage of “gross value.” The gross value is the combination of the Uranium Base plus the Vanadium Base. The Uranium Base is determined by a table that has specified dollar amounts based on the U 3 O 8 grade of the ore produced. The Uranium Base is adjusted from the table value by the actual price received for sale of concentrates in the preceding six months. The Vanadium Base is determined by the V 2 O 5 component of an ore purchase price offered by the Mill or other price of V 2 O 5 contained in ore prevailing in the area at the time the ore is fed to the initial process. Surface access is granted to this land in an agreement with La Sal Livestock.

The leased parcel referred to as Redd 1-B was entered at the same time and in the same form as the Redd 1-A lease described above, but covering different parcels of land. The Redd 1-B Mining Lease applies to 1,720 acres in the following sections: S½ SW¼ and SW¼ SE¼, Section 25, NE¼ NE¼, Section 35, N½ NW¼ and W½ SW¼ Section 36, Township 28 South, Range 23 East; E½ SE¼ and SE¼ NE¼ Section 34 and W½ NW¼ Section 35, Township 28 South, Range 24 East; all of Section 2, Township 29 South, Range 24 East, except the W½ NW¼; the SE¼, E½ SW¼ and E¼ NE¼, Section 3, Township 29 South, Range 24 East; and the N½ Section 11, Township 29 South, Range 24 East. An annual advance royalty is paid to hold this lease. It is the intent of EFR Colorado to continue to hold the lease. The production royalty is a percentage of the “gross value”; gross value is defined the same here as under the Redd Royalties Block 1-A mining lease. EFR Colorado is granted access to the surface of this Mining Lease under agreements with both La Sal Livestock and Redd Agri.

This lease was entered into on February 5, 2008, between Denison (acquired by the Company in June 2012) and Redd Royalties for a 20-year term to cover some of the land previously part of the Redd 1-A that had been released from the 1-A lease in 1999. The leased land lies in the following parcels: NE¼ Section 31, Township 28 South, Range 24 East; S½ NE¼ and SE¼ Section

4, Township 29 South, Range 24 East; and SE½ Section 5, Township 29 South, Range 24 East. It totals approximately 683 acres. An annual advance royalty is paid to hold this lease. No mining has occurred on the subject land. If mining occurs on the lease. a “market value” production royalty will be due on a sliding scale. The “market value” is determined to be the published prices for the two products, uranium and vanadium, in the month the ore is fed to process multiplied by the contained pounds less allowable deductions. The allowable deductions include sales brokerage fees, costs of transporting processed concentrates to point of sale, and applicable production and sales taxes. Payments for surface access agreements are made to Lowry Redd and Charles Redd for specific surface parcel ownership.

On January 31, 1968, Union Carbide entered a mining lease with Redd Ranches, a partnership of 11 members of the Redd family, for the rights to more than 3,680 acres north and east of La Sal, Utah. Since then, various parcels have been dropped from the lease. The current lease held by the Company is applicable to only 60 acres described as SE¼ SW¼ and E½ SW¼ SW¼ Section 31, Township 28 South, Range 25 East. It is the intent of the Company to continue to hold the lease. A production royalty is based upon the “gross value”; gross value is defined the same here as under the Redd Royalties Block 1-A mining lease. Mining in portions of the Snowball Mine took place on the subject land up to the cessation of mining in the Pandora/Snowball Mines in December 2012.

Denison (acquired by the Company in June 2012) entered into a mining lease with Redd Royalties on February 5, 2008, to cover an area previously in the Pine Lodge Unit (described above) that had been dropped from the older lease. The current lease held by the Company applies to 100.4 acres described as W½ NE¼ SW¼; NW¼ SW¼; and Lots 2 and 3, Section 31, Township 28 South, Range 25 East. An annual advance royalty is paid to hold this lease. It is the intent of the Company to continue to hold this lease. No mining has occurred on the subject land. When ore production commences, a “market value” production royalty will be due on a sliding scale. The “market value” is determined to be the published prices for the two products, uranium and vanadium, in the month the ore is fed to process multiplied by the contained pounds, less allowable deductions. The allowable deductions include sales brokerage fees, costs of transporting processed concentrates to point of sale, and applicable production and sales taxes.

Union Carbide entered into a lease with Katheryn Anne Redd Mullins and 10 other members of the Redd family on April 16, 1973. It covered 50% of the mineral ownership of 280 acres located in S½ SW¼ and S½ SE¼, Section 33, Township 28 South, Range 24 East and SE¼ SW¼ and W½ SE¼, Section 34, Township 28 South, Range 24 East. The remaining 50% mineral ownership of these parcels is discussed in the subsections Crawford-Kelly portion of Redd-Mullins Land and Barton Norton Estate portion of Redd-Mullins Land.

The lease has undergone various assignments and amendments. The lease is held by an annual advance royalty payment. It is the Company’s intent to continue to hold this lease. The production royalty on the 50% mineral ownership on this leased land is due at a percentage of “gross value”; gross value is defined the same here as under the Redd Royalties Block 1-A mining lease. Production from the western end of the Beaver Shaft has occurred on the Section 34 portion of this lease. Surface access is secured through agreements with both La Sal Livestock and Redd Agri for various portions of the leased land.

A 20-year mining lease was entered into between Denison (acquired by the Company in June 2012) and the Erma Crawford Family Trust on April 1, 2008. It applies to the Crawford’s 25% mineral ownership of 240 acres of land situated in S½ SW¼ and SW¼ SE¼, Section 33, Township 28 South, Range 24 East and SE¼ SW¼ and W½ SE¼, Section 34, Township 28 South, Range 24 East. An annual advance royalty payment is made to hold this lease. The production royalty is based on a sliding scale. The “market value” is determined to be the published prices for the two products, uranium and vanadium, in the month the ore is fed to process multiplied by the contained pounds, less allowable deductions. The allowable deductions include sales brokerage fees, costs of transporting processed concentrates to point of sale, and applicable production and sales taxes.

Two additional, identical mining leases were made effective May 1, 2008, and May 12, 2008, between Denison (acquired by the Company in June 2012) and Robert and Pamela Fergusson, and between Denison (acquired by the Company in June 2012) and Carole and Fay Giles, respectively, to lease equally the remaining 25% of mineral rights in the same land parcels. These two leases combined are referred to as the Keller Estate portion of the Redd-Mullins Mining Lease. The annual advance royalty, determined in the same manner as the Crawford portion, is paid in four equal parts to the heirs of the Keller Estate. The Keller Estate lease carries the same production royalty as the Crawford portion.

Denison (acquired by the Company in June 2012) entered into a mining lease with Joel Norton, representative of the Thora Barton Norton Estate on April 25, 2008. The lease covers a 50% mineral ownership on 40 acres located in the SE¼ SE¼, Section 33, Township 28 South, Range 24 East. The other 50% mineral right resides with Redd Royalties, as described in the Redd-Mullins Mining Lease subsection. An annual advance royalty payment is made to hold the Barton Norton mineral lease. The vanadium “market value” royalty is variable. The “market value” is determined to be the published prices for the two products, uranium and vanadium, in the month the ore is fed to process multiplied by the contained pounds, less allowable deductions. The allowable deductions include sales brokerage fees, costs of transporting processed concentrates to point of sale, and applicable production and sales taxes. A portion of the Redd Block Mineral Resource is located on this parcel. No mining has taken place on this mineral lease. Surface access is covered by the La Sal Livestock Agreement.

A Metalliferous Mineral Lease between San Juan County, Utah, and Hecla Mining Company was signed April 17, 1967. This gave Hecla the right to explore and mine 262.69 acres located in the S½ S½, Section 32, Township 28 South, Range 24 East and most of the NW¼, Section 5, Township 29 South, Range 24 East. Two small private parcels in the NW¼ of Section 5 are excluded. A very small parcel, 0.18 acres in Section 10, Township 29 South, Range 24 East, is included in the lease. Hecla assigned 50% interest in the lease to Union Carbide in December 1976 as part of the Hecla-Union Carbide joint venture (JV). This JV operated the Hecla Shaft (now Energy Queen) immediately west of Section 5 on the Superior Uranium Lease. The San Juan County Mineral Lease is held by an annual payment. It is the intent of the Company to continue to hold this lease. An amendment to the lease in January 1968 changed the production royalty to match that used by the State of Utah on it metalliferous leases. When the Energy Queen Mine (Hecla Shaft) ceased operation in 1983, a development drift had advanced into the County land by a few tens of feet. Very little if any ore was produced at that time. The drift was developing toward mineral resources that are now part of the Redd Block Mineral Resources. The mineral lease allows for surface use as necessary for exploration and mining.

The Company entered into an Asset Purchase Agreement on December 8, 2024 with Kyle Kimmerle and Kimmerle Mining LLC to acquire 12 unpatented mining claims adjacent to the La Sal Complex. The claims are located in Section 33 & 34, Township 28 South , Range 24 East, Section 32, Township 28 South, Range 25 East and Sections 4 & 5, Township 29 South, Range 24 East. All unpatented mining claims are subject to an annual federal mining claim maintenance fee of $200 per claim plus approximately $10 per claim for county filing fees to the BLM. The claims have a sliding scale uranium and vanadium production royalty associated with them ranging from 1.5% - 4.0% on uranium and 1.0% - 3.0% on vanadium.

The La Sal Project is easily accessed from the all-weather Utah State Highway 46. Utah 46 enters the La Sal Project land about one mile west of the Energy Queen lease. Utah 46 stays within or very near the La Sal Project for the next eight miles to the east. The Energy Queen headframe, visible from the highway, is located approximately 500 ft south of Utah 46 and is accessed by a gravel road.

The area of the La Sal Project is semi-arid. Temperatures range between an average low of 41°F to an average high of 72°F. Less than 10 in. of precipitation falls per year. Winters are not particularly severe, although there are numerous snowstorms. The temperature drops below 0°F at times, and snow can accumulate to over a foot in the lower elevations and more than two feet at higher elevations.

It is anticipated that most personnel will be hired from the local area with other personnel being hired from other mining districts around the country.

La Sal, Utah, is a small town consisting of a Post Office and general store. Most supplies necessary for mining operations can be found locally in the towns of Moab, Utah, or Monticello, Utah, 24 mi northwest or 34 mi south of the La Project, respectively.

The primary infrastructure as well as electricity and water are already in place at the Project. The mines associated with the Project were in commercial production between 2009 and 2012, before being placed on standby. A test-mining program that began in April 2018 and ran through May 2019 included the rehabilitation of both the La Sal and Pandora declines and re-established underground utilities to most of the mine workings. An airport in Moab, Utah provides daily service to Salt Lake City, Utah, and Denver, Colorado, both of which have international airports.

Electric transmission and distribution lines exist throughout the project area, of sufficient size to supply the load the mines demanded in the past. Many portions of the electrical distribution system were replaced or refurbished as part of a test-mining and rehabilitation program that occurred at the Project between April 2018 and May 2019. The electrical supply is also adequate for additional demand should more ventilation fans, compressors, and even another production shaft with hoisting equipment be added when production resumes and expands. Natural gas is also available for any future production needs.

Water for the mine is purchased from a local rancher who maintains a water well near the Beaver Shaft. Water pumped from the well is either transported by truck to the facilities where it is distributed to the mines or by utility drops located throughout the Project. The eastern end of the Project, including all the current mine workings associated with the Beaver Shaft, La Sal Decline, and Pandora Mines are dry. The Energy Queen Mine workings and shaft are currently flooded and will need to be dewatered prior to mining.

History

In the late 1960s, three mining companies controlled most of the Project. Union Carbide had leases and claims in the central portion of the Project including the La Sal Decline, Snowball Mine, Beaver Shaft, and most of the Redd Block IV property; Union Carbide reorganized in the early 1980s and became UMETCO. American Metal Climax held the lease on the Pandora Mine as the east end of the Project; that lease was assigned to Atlas Minerals in 1973 and Atlas Minerals assigned it to UMETCO in 1988, retaining an overriding royalty. Hecla Mining held the Energy Queen and San Juan County leases on the west end of the Project. Hecla and Union Carbide formed a joint venture on those properties in 1976.

UMETCO and EFN (no relation to the Company) entered into an agreement in 1984 whereby UMETCO owned 70% capacity in, and was the operator of, the Mill. That operating agreement was restructured in 1988 wherein EFN became 20% owner of the UMETCO uranium-vanadium properties in Colorado and Utah, including the La Sal properties. In 1994, UMETCO gave back its interest in the Mill to EFN and assigned all interest in the La Sal properties, among others, to EFN, thereby giving EFN control of all previous UMETCO, Hecla, and Atlas properties in the Project. Many of the UMETCO personnel continued working for EFN. Original data of the previous operators also transferred to EFN ownership. EFN bought-out the Atlas Minerals royalty on the Pandora Mine in the mid-1990s. The Hecla 50% interest was also acquired by EFN.

IUC bought all assets of EFN in 1997 including the Project and the Mill. IUC did not retain the Superior Uranium lease (Energy Queen lease). Again, many personnel and all data on the Project transferred to IUC. In 2006, IUC acquired Denison and changed its name to Denison Mines Corporation (Denison). EFR Colorado entered into a new lease on the Energy Queen property in late 2006. The Company acquired Denison’s U.S. Mining Division in June 2012, thereby becoming owner and operator (through various subsidiaries) of the entire Project and the Mill. Several Company staff have been associated with all or portions of the Project since the 1980s. All historical data on the Project is the property of the Company.

Following the end of commercial mining at the Project in October 2012, the Project was placed on care and maintenance. In 2018 the La Sal, Beaver, and Pandora portions of the Complex were reopened and rehabilitated as part of a test mining program. In May 2019 the Project was placed back into care and maintenance mode.

Mineral extraction facilities on private and public lands in Utah require an approved Notice of Intent (“NOI”) with UDOGM. If the facility generates water, a ground water discharge permit is required for the treatment plant and ponds, and a surface water discharge permit is required for discharge of treated water. Both permits are issued through DWQ. Air permits for air emissions including radon are issued by the Utah Division of Air Quality. Water well permits, water rights, and stream alteration permits are issued through the Division of Water Rights. On federal land, all the state permits listed above are required, as well as a Plan of Operations approved through a NEPA review by the responsible federal land managing agency.

The Company’s mineral facilities at the La Sal Project are all existing facilities in historic mining areas, and approvals by the BLM and USFS have been obtained under EAs and FONSIs under NEPA. The Energy Queen and Redd Block IV Properties are located on private land and were permitted with UDOGM in the early 1980s by Union Carbide. The Energy Queen Property was developed and has conducted mineral extraction, but the Redd Block IV Property was discontinued soon after the start of construction. An NOI amendment for the Energy Queen Property was approved by UDOGM on September 22, 2009. This amendment allows the Company to install water treatment and other new surface facilities to support extraction of up to 250 tons per day of mineralized materials. Water discharge permits to allow initial and ongoing discharge of water from underground workings were also approved by DWQ in 2009 and renewed most recently in 2018. Energy Fuels initiated permitting plans for additional facility expansion in 2012, but then deferred these plans when the Redd Block IV resource was acquired in the Denison acquisition. As market conditions may warrant, the Company intends to perform engineering studies to determine if the Redd Block IV resource can be extracted from the Energy Queen shaft and surface facilities. If this proves to be the case, the Energy Queen UDOGM permit would be updated to include the Redd Block IV area as well as other resources that have been acquired since the 2009 amendment. A Small Source Exemption that is in place for air emissions would also need to be replaced with an air permit because of the increased surface disturbance. A GWDP through DWQ may also be required prior to resuming dewatering operations at the Energy Queen Property.

Existing mining operations at the Pandora, Beaver, La Sal and Snowball Properties are fully permitted with the State of Utah, the BLM, and the USFS. In order to allow expansion of the existing mines, Energy Fuels has obtained regulatory approvals for expansion of the Pandora, Beaver, and La Sal operations through UDOGM, BLM, and USFS. In late 2014, an EA, draft Decision Notice and FONSI were issued for public comment. In March 2015, in response to an objection filed by an environmental interest group, USFS ruled that additional analysis was required before a modified Plan of Operations and EA could be approved for the proposed expansion. An expanded EA was finalized by the USFS and BLM in September 2017. On February 23, 2018, BLM and USFS issued the EA, Decision Record (BLM)/Decision Notice (USFS), and FONSI approving the expansion, conditional upon the Company incorporating certain specific requirements into the Plan of Operations amendment and having the required reclamation bond in place. On September 26, 2018, USFS approved the Plan of Operations amendment and surety bond. In November 2020, the Large Mine NOI permit expansion was approved through UDOGM. All other regulatory approvals needed for project expansion, including an air emissions permit, are in place.

The Colorado Plateau covers nearly 130,000 square miles in the Four Corners regions. The La Sal Project lies in the Canyon Lands Section in the east-central part of the Plateau in Utah. The La Sal Mountains Intrusion is located to the north and east of the La Sal Project and the peaks are visible from most of the La Sal Project.

The La Sal deposits are classified as sandstone hosted uranium-vanadium deposits. Sandstone-type uranium deposits typically occur in fine to coarse grained sediments deposited in a continental fluvial environment. The La Sal Trend uranium-vanadium deposits are a similar type to those elsewhere in the Uravan Mineral Belt. The Uravan Mineral Belt was defined by Fisher and Hilpert (1952) as a curved, elongated area in southwestern Colorado where the uranium-vanadium deposits in the Salt Wash Member of the Morrison Formation generally have closer spacing, larger size, and higher grade than those in adjacent areas and the region as a whole. The location and shape of mineralized deposits are largely controlled by the permeability of the host sandstone. Most mineralization is in trends where Top Rim sandstones are thick, usually 40 feet or greater.

The La Sal Trend is a large channel of Top Rim sandstone that trends due east, possibly as a major trunk channel to tributaries that fanned-out to the east to make a portion of the Uravan Mineral Belt. The Energy Queen deposit appears to be at the location of the junction of a tributary channel that joins the main channel from the southwest. The uranium may be derived from a weathered rock containing anomalously high concentrations of uranium, leached from the sandstone itself or an adjacent stratigraphic unit. It is then transported in oxygenated groundwater until it is precipitated from solution under reducing conditions at an oxidation-reduction interface. The reducing conditions may be caused by such reducing agents in the sandstone as carbonaceous material, sulfides, hydrocarbons, hydrogen sulfide, or brines.

The primary assay data used to calculate the Mineral Resource estimate for the Project is natural gamma radiometric log data. Core was collected by Union Carbide to determine vanadium assays and core was collected by the Company in 2019 to verify vanadium assays and to verify natural gamma grades, where core data was available it was used in place of natural gamma data. Calibration for natural gamma completed by the Company was done at the DOE test pits in Casper, WY. No calibration records are available from Atlas or Union Carbide, but it is assumed that they followed standard operating procedures for calibrating their natural gamma equipment.

Core analysis from Union Carbide was completed at their own laboratories. Core analysis by the Company was done at the White Mesa Mill in Blanding, Utah. The Company submitted uranium standards and blanks to the mill as part of a standard QA/QC procedure.

Utilizing only natural gamma logs as assay data could lead to an over or under estimation of Mineral Resources due to disequilibrium. Positive disequilibrium occurs when the uranium present has not had enough time to decay and produce daughter isotopes, which are what are actually measured during a natural gamma assay. Under positive disequilibrium a natural gamma assay would indicate lower amounts of uranium than what is present. Negative disequilibrium occurs when uranium has had enough time to decay to produce the daughter radioisotopes but was remobilized and removed from the deposit. This would lead to measuring more uranium than is present. The Project is part of a larger mining district with no history of disequilibrium issues. The disequilibrium factor applied to the Project Mineral Resource is 1.0.

Mineral Resources Estimates

Uranium block grade estimations for the La Sal Project were based on radiometric drillhole logs on the five principal mineralized domains (La Sal West, Energy Queen, Redd Block, Beaver/La Sal, and Pandora). Mineral Resources were estimated using Vulcan software using inverse distance squared methods. Vanadium grades were calculated based on the uranium grades utilizing a regression analysis. A power relationship was observed between the uranium grade (% U 3 O 8) and the vanadium to uranium ratio (V 2 O 5:U 3 O 8). The relationship is given by the equation below:

y = 2.4805 x-0.382

Where y is the V 2 O 5:U 3 O 8 ratio and x is the uranium grade (%U 3 O 8). The vanadium grade (%V 2 O 5) for La Sal can then be calculated by the equation:

%V 2 O 5 =V 2 O 5: U 3 O 8

%U 3 O 8

Additional details regarding the estimation technique can be found in Section 14.0 Mineral Resource Estimate in the La Sal Technical Report Summary.

The table below sets out the Mineral Resources estimates for the La Sal Project as of December 31, 2024. These estimates are derived from the La Sal Technical Report Summary, which estimated the Mineral Resources as of December 31, 2021. Daniel Kapostasy, the Company’s non-independent Qualified Person, reviewed and confirmed that the Mineral Resources estimates set forth in the La Sal Technical Report Summary remained accurate as of December 31, 2024.

La Sal Mineral Resources – In Situ Uranium and Vanadium, December 31, 2023(1)(2)(3)(4)(5)

ClassificationZoneCut-Off GradeTonsGradePoundsMetallurgical RecoveryGradePoundsMetallurgical Recovery
(%U3O8) · (000s) · (% eU3O8) · (000s eU3O8) · (U3O8) · (% V2O5) · (000s V2O5) · (V2O5)
La Sal Inferred ResourcesEnergy Queen0.171470.2574996%1.073,12975%
Redd Block0.173360.291,91896%1.147,67975%
Beaver/La Sal0.171180.2355296%1.012,38875%
Pandora0.172220.241,06196%1.024,55175%
Total Inferred Resources0.178230.264,28196%1.0817,74675%

Notes:

(1) SEC S-K definitions were followed for all Mineral Resource categories. These definitions are also consistent with CIM (2014) definitions in NI 43-101.

(2) Mineral Resources are estimated at a cut-off grade of 0.17% U 3 O 8.

(3) The cut-off grade is calculated using a metal price of $65/lb U 3 O 8. The long-term uranium price is based on supply and demand projections for the period 2021-2035.

(5) Mineral Resources are based on a tonnage factory of 14.5 ft 3/ton (Bulk density 0.0690 ton/ft 3 or 2.21 t/m 3).

(6) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

(8) Mineral Resources are 100% attributable to EFR.

La Sal Mineral Resources – In Situ Uranium and Vanadium, December 31, 2024(1)(2)(3)(4)(5)

ClassificationZoneCut-Off GradeTonsGradePoundsMetallurgical RecoveryGradePoundsMetallurgical Recovery
(%U3O8) · (000s) · (% eU3O8) · (000s eU3O8) · (U3O8) · (% V2O5) · (000s V2O5) · (V2O5)
La Sal Inferred ResourcesEnergy Queen0.171470.2574996%1.073,12975%
Redd Block0.173360.291,91896%1.147,67975%
Beaver/La Sal0.171090.2451596%1.012,18675%
Pandora0.172130.2498296%1.024,11075%
Total Inferred Resources0.177930.264,28196%1.0817,10375%

Notes:

(1) All notes from the La Sal Mineral Resources - In Situ Uranium and Vanadium, December 31, 2023, apply to this table.

(2) As of the date of this filing, the tons of mineralized material is sitting in stockpiles at the White Mesa Mill, La Sal Mine, Beaver Mine, Pandora Mine or has been processed at the White Mesa Mill. The uranium grade of produced tons of mineralized material is from gamma probing, which is considered standard practice in the industry and is reconciled when it is processed at the mill. The vanadium grade has not been assayed as of the date of this filing and is assumed to be the average grade of the deposit or 1.08% V 2 O 5.

(3) The 29,777 tons of uranium/vanadium ore mined represent 3.6% of the Total Inferred tons reported December 31, 2023.

(4) The 116,038 lbs of U 3 O 8 mined represent 2.7% of the contained Total Inferred U 3 O 8 lbs reported December 31, 2023.

(5) The 643,180 lbs of V 2 O 5 mined represent 3.6% of the contained Total Inferred V 2 O 5 lbs reported December 31, 2023.

(6) There are no other changes to the Uranium or Vanadium Mineral Resources between those reported December 31, 2023 and December 31, 2024 than those reported due to depletion of the Mineral Resource from mining operations.

Permanent structures existing at the Energy Queen Property include the head frame and a metal building containing an office, shop, showers, warehouse, and the hoist. The compressor is located in a separate building. One cased vertical ventilation hole was established into the underground working level. A small water treatment building and settling ponds are located on the San Juan County land in Section 5. In the past, water was treated with barium chloride to remove radium.

The Beaver and La Sal Properties are accessed through the La Sal decline with rubber-tired equipment. The principal shop, offices, and warehouse facilities used by all properties in the district are housed at the surface facilities of the La Sal decline. There are large fenced-in yards, as well as buildings for equipment and supply storage. It is used as a central receiving site for bulk and large orders, which are then distributed to the other Energy Fuels’ properties in the district and other parts of the region. The shop areas include facilities specific to electrical equipment, drills, mobile diesel equipment, and welding. Engineering, geology, safety, environmental, and supervisory and clerk offices are also located near the La Sal decline, in addition to staff and underground crew’s dry rooms. Ample stockpile space is available for easy truck load-out for transporting mineralized material to the White Mesa Mill. Electrical lines and substations exist and are adequately sized for any future extraction potential of the Mineral Resources. The Beaver and La Sal Properties are dry, so no water treatment facilities are needed.

The surface infrastructure at the Beaver shaft location consists of the hoist house, hoist, and head frame. The shaft is 690 feet deep to the underground haulage level and 750 feet in total depth. There are three loading pockets, two of 70-ton capacity and one of 90-ton capacity. This arrangement allows for separation of mineralized material and waste. The skips dump into a surface bin from which the mineralized material is trucked a short distance to a stockpile and subsequently loaded into highway trucks for haulage to the White Mesa Mill. The shaft conveyance system is certified for man trips, although the routine access for personnel is through the La Sal decline. Another building houses the compressors, which supply compressed air for the underground workings in the Beaver Project. Power lines and substations are in place. The Beaver Property is dry underground; therefore, no water treatment facilities exist.

Access into the Pandora Property is through a decline with rubber-tired equipment. Surface facilities here are less than at the other projects. They consist of a small office and shop buildings. A third building is used for storage of materials and equipment. Power lines exist to the property with enough capacity for the required load of potential future mining activities. The Pandora Property is dry underground. Mineralized material is mined from the La Sal Complex by miners using jacklegs and mining in a random room and pillar method. Mineralized material is identified by the miners due to its gamma signature. It is then drilled and blasted and moved to the surface using 7-10 ton trucks. The mineralized material is stockpiled on the surface at the mines and hauled to the Company’s White Mesa Mill in Blanding, UT for processing. The La Sal Complex untilizes infrastructure of various ages installed over the last 40 years. A new mine office was installed in 2023. Equipment including trucks, LHD muckers and jacklegs are replaced on an as needed basis.

Reclamation work on the Snowball development rock area was completed in 2021.

The Company acquired the Energy Queen Property in December 2006. The remainder of the La Sal Project was acquired by the Company in June 2012, through the acquisition of the Denison US Mining Division. As of December 31, 2024, the total net book value attributable to the La Sal Project and its associated equipment on the financial statements of the Company was $4.6 million.

In Q4, 2023, the Company restarted mining at the La Sal Complex. The La Sal Decline/Beaver Shaft mines were operated by Energy Fuels employees and the Pandora mine was operated by a contractor to the Company. The three mines together produced 29,777 tons of mineralized material in 2024. In addition to mining, additional rehabilitation work was undertaken where required. This included reopening of two existing vent holes, drilling of three new vent holes on existing permitted vent pads, expansion of the Pandora development rock area (60% complete in 2024, to be completed in 2025) and rehabilitation of underground works where required.

The Company plans to continue mining at the La Sal Decline/Beaver Shaft and Pandora mines. The Company has taken over mining at the Pandora mine from the mining contractor who operated at the Pandora mine in 2023 and 2024. In addition to mining, the Company plans to drill three additional vent holes to open up more areas of the La Sal Complex to mining and finish expansion of the Pandora development rock area.